ENG2020-0371 ROW PERMITOF WAY MINOR PERMIT
PERMIT NUMBER
City of Edmonds
AveRIGHT
980ENG2020-0371
www.cityofedmonds.gov
Description: Replace Existing Driveway ISSUED: 09/27/2021
Address: 7820 193RD PL SW EDMONDS WA 98026-6236
EXPIRES: 03/26/2022
rmit Type: RIGHTOF WAY MINOR Permit Subtype: RESIDENTIAL Parcel Number: 00512400001100
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT HENRY BYAM 7820 193RD PL SW, EDMONDS WA 98026 (206)650-3303
CONTRACTOR MANNY'S SERVICES 6304 51ST PL NE, MARYSVILLE WA 98270 (360)403-5045
OWNER VANVOLKENBURG KATHLEEN M 7820 193RD PL SW, EDMONDS WA 98026
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $40.00
ENGINEERING INSPECTION FEE
$110.00 $110.00
RIGHT OF WAY MINOR PERMIT FEE
$110.00 $110.00
•
REQUIREMENT TYPE
NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
:1•i ]1
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
09/27/2021
DATE
Printed: Monday, September 27, 2021 12:22:20 PM 1 of 2
OF WAY MINOR PERMIT
PERMIT NUMBER
City of Edmonds
AveRIGHT
980ENG2020-0371
www.cityofedmonds.gov•
CONDITIONS
CONDITION TYPE
NOTES
Contractor/Owner shall be responsible for repair/replacement of all damage to utilities and/or
DAMAGE TO FRONTAGE
frontage improvements in city right of way per city standards that is caused by or occurs during the
IMPROVEMENTS
permitted project.
ESC REQUIRED
Maintain erosion & sediment control per city standards.
UNDERGROUND UTILITY
Call for locates of underground utilities prior to any excavation.
LOCATES
INSPECTIONS
INSPECTION TYPE
DATE RESULT NOTES
COMPLETE
X-2 ENGINEERING FINAL"
E-7 DWY APPROACH
A-1 ENGINEERING PRECON
9/27/2021 JAPPROVED 71
12:00:00 AM
Printed: Monday, September 27, 2021 12:22:20 PM 2 of 2
Of ED&JO
01
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
"A'C. 1891) Requirements outlined in Right-of-Wgy permit Handout E6S.
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General Info
Project Name /
Site Address or if no site aAdress use Property Address at NW corner of project area:
Associated Permits: BLD PLN ENG
Owner and Entity
Name of Company
Holding• ••
Franchise Ordinance No:
Point of Contact
Title , ul�Pi
Address
Vq5-21, La
City EdA
State
Zip
Phone
Email
Q P
t �J - - - J
Contractor and AuthorizedAgent • •
Name of Company Sa ,
• r
• • • ! • •
Primary Name
Agent Name p
r
Title
Title r
Mobile
AddressA) P
Email
City
Sta e Vr
u
Zip 2
�
Secondary Name
Phone n� f�
Title
Email
Mobile
City of Edmonds Business License No:
Email
State License No: 10 A- g ,
Contractor verifies it is currently bonded
Contractor ve_rifie§ it currently has general liability insurance
NOTE: ECDC 18.6o.o2o requires that the Application be signed by a licensed anti b6n_de_de6ntractor unless otherwise approved by the city
engineer.
Type of Development — Check ALL that apply
❑ Multifamily residential ❑ Commercial ❑ City project
Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page i of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
RIGHT-OF-WAY
CLOSURE
AREA.
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
Alley 72 hours +
LF
x
LF
SF
Parking 72 hours +
LF
x
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
•- of
1. The work in the right of way is on or for the following type of facilities:
❑ telecom nications ❑ cable ❑ power o gas
❑ water o sewer ❑ storm
Details of Wor1c to be Completed
1. Does the utility own ave existing overhead infrastructure in the area of work?
Yes
No
2.
Will any equipment be added underground or above ground (e.. pedestals, vaults etc.)?
If yes, describe:
3.
Does the proposed work conne a lot or commercial development with utilities that serve more
than one lot or commercial devel ment?
4.
Does the work involve rebuilding or locating an existing aboveground utility system which
connects a lot or commercial develo nt to an existing underground common utility system?
5.
Does the work involve proposed addition to an aboveground utility stem? If es:
Are the additions for the purpose of servin ew commercial development?
Are the additions for the purpose of serving a le-familyresidential subdivision?
6. Does your project involve rebuilding or replacing utili uipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i. the actual area in which the
Droiect is proposed:
6a. Does your project involve wires/cables/lines? If yes:
1 How manv are existing? --r How many are to be adde ?
City of Edmonds ROW construction permit Application --Page 2 of 3 \`updated 3/25/2021
6b. Does your project involve poles? If yes:
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additionalpoles to be laced?
How many? What is the height of the additionalpoles?
6c. Are any poles to be modified/rebuilt/replaced? If yes:
How many? What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
APPLICANT PRINTED NAME:
APPLICANT TITLE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
9/14/21, 2:15 PM
image0000014pg
https://mai1.google.com/mail/u/O/#all?projector=1 1!1
m
a
0
0
0
0
0
0
rn
m