Loading...
ENG2021-0407 SEWER PERMITSEWER PERMIT PERMITNUMBER, City of Edmonds -0407 www.cityofedmonds.gov Description: X SPOT REPAIR ON PRIVATE PROPERTY ISSUED: 10/18/2021 Address: 518 MAIN ST EDMONDS WA 98020-3148 EXPIRES: 01/16/2022 Permit Type: SEWER Permit Subtype: PARTIAL LINE Parcel Number: 00434212000600 REPLACEMENT CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT ARS RESCUE ROOTER 175 ROY ROAD, PACIFIC WA 98047 (253)872-6944 OWNER MCDEVITT INVESTMENTS LLC 330 DAYTON ST #2, EDMONDS WA 98020 FEE INFORMATION -Am- DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 SIDE SEWER PERMIT - PARTIAL REPLACEMENT $110.00 $110.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. ED BY THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW DATE Printed: Monday, October 18, 2021 2:03:41 PM 1 of 2 SEWER PERMIT PERMIT NUMBER City of Edmonds www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSP PRIOR TO BACKFILL Call for all required inspections. All work shall be inspected prior to backfill. PLEASE REFER TO STANDARD DETAILS SS-200, SS-201 AND, SS-202. STANDARD DETAILS CAN BE FOUND ON THE CITY OF EDMONDS WEBSITE. SDR35 WITH GASKETED FITTINGS IS REQUIRED FOR ALL SEWER REPAIRS. FOR ANY REPAIRS WHERE THERE IS MORE THAN ONE STICK OF PIPE, A PRESSURE SEWER REQUIREMENTS TEST IS REQUIRED. WHERE LINING OR PIPE BURSTING WATER AND TV TEST IS REQUIRED. IF THE 4-6 TRANSITION IS ENCOUNTERED, A 6" CLEANOUT IS REQUIRED AT THE PROPERTY LINE. THE 6" CLEANOUT SHALL HAVE A 12" CAST IRON LAMPHOLE COVER WITH 1/2 HEX BOLTS, GRIPPER TWIST PLUG, AND A 24" CONCRETE COLLAR. AN AS BUILT IS REQUIRED PRIOR TO FINAL OF THE PERMIT. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONSM INSPECTION TYPE DATE RESULT COMPLETE E-2 SIDE SEWER X-2 ENGINEERING FINAL" Printed: Monday, October 18, 2021 2:03:41 PM 2 of 2 SIDE SEWER PERMIT APPLICATION CONTRACTOR INFORMATION: Company Name: Af4 r'Ca cy-, f-bm r, Site Contact: 0(�, P11-6i11A Company Address: ''jSP Y-04 City: C l G Zip: Of q)oy-I State License #� Expiration Date: t I i 120ZZ PROPERTY INFORMATION: Address: 5 1(6 �AAl h Phone #: 0-3 ") cb—j'Z_ (09 w Email #: %ekzAgC a4J Cop, City Business License Owner's Name: Phone #: C H-z 22 3.3 ❑ FULL LINE REPLACEMENT [ d SPOT REPAIR ❑ PIPE BURST ❑ RELINE (PERMALINE ONLY) DESCRIPTION OF PROPOSED WORK (Be Specific): � I w � / � � � V �! • �1 i/i G ,r_ ISSUANCE OF THIS PERMIT DOES NOT CONSTITUTE PERMISSION TO WORK ON ANY PROPERTY OTHER THAN THAT OWNED BY THE SUBJECT PROPERTY OWNER. CERTIFICATIONS NECESSARY FOR INSTALLATION METHODS ARE THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING SAID WORK. I REPRESENT AND WARRANT TO THE CITY OF EDMONDS, IF REPAIR OF EXISTING SEWER EXTENDS TO AN ADJACENT PROPERTY, I HAVE OWNERS EXPRESS PERMISSION TO PERFORM WORK ON THAT ADJACENT PROPERTY. SIGNATURE _ DATE l D Lb Z( Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE