Building Permit 2020'SIDENTIAL
BLDG Permit
PERMIT NUM
of Edmonds
EdmondsCity
•:i
1 1 1
-.
•.
Type: RESIDENTIAL BLDG
Owner/ Business: NICKOLAS ROBERTSON
Status: ISSUED
Subtype: ALTERATION OR REMODEL
Parcel No: 00639700001300 Site Address: 880 SOMERSET LN EDMONDS,WA 98020-2647
Applied: 5/24/2020
Subdivision: 005325, 006397
Lot: 0
Issued: 7/22/2020
Fire Sprinklers: Lot
Area: 12,197
Zoning: RS-12
Final:
Valuation: $230,000.00 Occupancy Type:
Construction
Type:
Expiration Date: 7/22/2021
Code Edition: 0 No. Stories: 0
# of Dwelling
Units: 0
Issued by: NED
Scope of Work: MCGAUGH- INT HOME REMODEL
WA State Contractor L & I #: CARLICH981RL
City of Edmonds Business License #: 6024S4996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
NICKOLAS ROBERTSON
6227 5TH AVE NW, SEATTLE WA
(917)714-5968
NICK@STUDIOPIANONOBILE.COM
98107
CONTACT
PIANO NOBILE
6227 5TH AVE
NW, SEATTLE WA
(917)714-5968
nick@studiopianonobile.com
98107
Po Box 31128, Seattle WA 98103
CONTRACTOR
CARLISLE CLASSIC HOMES LLC
(206)795-9253
RCARLISLE@CARLISLE.US
DAVID AND FRANCIS
880 SOMERSET LN, EDMONDS
OWNER
MCGAUGH
WA 98020
• ' I •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
7/22/20
R6566
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
7/22/20
R6566
PERMITS
AIR CONITIONING SYSTEM OR HEAT
001.000.322.10.000.00
$50.00
$50.00
7/22/20
R6566
PUMP - 1.75 BTU OR LESS
AIR HANDLERS - 10,000 CFM OR
001.000.322.10.000.00
$30.00
$30.00
7/22/20
R6566
LESS
APPLIANCE VENTS
001.000.322.10.000.00
$45.00
$45.00
7/22/20
R6566
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
7/22/20
R6566
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$390.00
$390.00
7/22/20
R6566
TRAP
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$105.00
$105.00
7/22/20
R6566
FURNACE OR FIREPLACE
001.000.322.10.000.00
$90.00
$90.00
7/22/20
R6566
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
$55.00
$55.00
7/22/20
R6566
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$1,880.00
$1,880.00
7/22/20
R6566
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$1,598.00
$1,598.00
5/29/20
R5540
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
7/22/20
R6566
WATER HEATER - TANKLESS
001.000.322.10.000.00
$15.00
$15.00
7/22/20
R6566
Printed: Wednesday, July 22, 2020 10:23:19 PM 1 of 3
MIDENTIAL BLDG PermitCity
• • • • PERMITNUM
1215th Ave N, Edmonds •:i 1 1 1
www.edmondswa.gov •
TOTALS; $4,404.50 $4,404.50
0Tk NI •
CONDITION TYPE
STATUS
NOTES
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
ALL BUILDING PERMITS
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays,
excluding Sundays and Federal Holidays. At all other times the noise originating from
construction sites/activities must comply with the noise limits of Chapter 5.30, unless a
variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a
project or final occupancy approval must be granted by the Building Official prior to use
or occupancy of the building or structure. Check the job card for all required City
inspections including final project approval and final occupancy inspections.
CARBON MONOXIDE SYSTEMS
FOR
INFORMATION
FOR
Provide combustion air per IFGC Chapter 3 for commercial and multifamily residential
COMBUSTION AIR
INFORMATION
installations, and IRC chapter 24 for one and two family dwellings.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
HOSE BIBBS
FOR
Hose Bibbs are required to have a permanently affixed anti -siphon device installed.
NFORMATION
LOT LINES STAKED
FOR
Lot line stakes must be in place at the time of foundation setback inspection.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
FOR
the datum point and the point of average grade. Call for inspections to verify. These items
MAXIMUM HEIGHT
INFORMATION
must be consistent with the approved plan. If the proposed height of a building is within
12 inches of the maximum height permitted for the zone an elevation survey is required.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
Printed: Wednesday, July 22, 2020 10:23:19 PM 2 of 3
'IDENTIAL BLDG PermitCity
PERMITNUM
• • • •
. •:i 1 1 1
-. •. •
FOR
Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water
PRV REQUIRED
INFORMATION
shutoff.
City approved plastic piping may be used in water service piping provided that where
FOR
metal water service piping is used for electrical grounding purposes, replacement piping
WATER SERVICE PIPING
INFORMATION
shall be of like materials (UPC 604.8) a state electrical permit and inspection is required if
electrical grounding is altered or removed.
Installer shall provide the manufacturer installation, operating instructions, and a whole
FOR
WHOLE HOUSE FAN
house ventilation system operation description. A label shall be affixed to the whole
INFORMATION
house timer control that reads "Whole house ventilation, see operating instructions".
COMPLETED
SEQID INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-1 SETBACKS
B-2 FOOTINGS
B-3 EXT WALL SHEATHING
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-3 PLUMB GROUND WK
B-3 PLUMB ROUGH IN
B-3 ROOF SHEATHING
B-3 WATER SERVICE LINE
B-4 FIRESTOPPING
B-4 FRAMING
B-4 HEIGHT VERIFICATION
B-4 INTERIOR SHEAR
B-4 SHOWER PAN
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
Printed: Wednesday, July 22, 2020 10:23:19 PM 3 of 3