Loading...
Building Permit 2020'S IDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 98020 1 1 • wwm www.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: MARK SMITH Status: ISSUED Subtype: ALTERATION OR REMODEL Parcel No: 00512700001200 Site Address: 7726 202ND PL SW EDMONDS,WA 98026-6845 Applied: 12/17/2020 Subdivision: 004077, 005127 Lot: 0 Issued: 1/27/2021 Fire Sprinklers: Lot Area: 7,440 Zoning: RS-8 Final: Valuation: $420,739.00 Occupancy Type: R3 Construction Type: VB Expiration Date: 1/27/2022 Code Edition: 2015 No. Stories: 2 # of Dwelling Units: 1 Issued by: WAC Scope of Work: COMPLETE REMODEL AND NEW ROOF, PLMB & MECH INCL WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT MARK SMITH 7726 202ND PL SW, EDMONDS (253)778-3679 MARKCSMITH45@GMAIL.COM WA 98026 CONTACT NA 7726 202ND PL SW, EDMONDS (253)778-3679 markcsmith45@gmail.com WA 98026 CONTRACTOR OWNER OWNER MARK C SMITH 7726 202ND PL SW, EDMONDS (253)778-3679 WA 98026-6845 INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 1/26/21 R10001 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 1/26/21 R10001 PERMITS AIR CONITIONING SYSTEM OR HEAT 001.000.322.10.000.00 $50.00 $50.00 1/26/21 R10001 PUMP - 1.75 BTU OR LESS APPLIANCE VENTS 001.000.322.10.000.00 $30.00 $30.00 1/26/21 R10001 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 1/26/21 R10001 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $150.00 $150.00 1/26/21 R10001 TRAP EACH VENT OR EXHAUST NOT CONNECTED TO A HEATING OR AC 001.000.322.10.000.00 $60.00 $60.00 1/26/21 R10001 SYTEM FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $15.00 $15.00 1/26/21 R10001 FURNACE OR FIREPLACE 001.000.322.10.000.00 $60.00 $60.00 1/26/21 R10001 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 1/26/21 R10001 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $1,712.00 $1,712.00 1/26/21 R10001 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 1/26/21 R10001 WATER HEATER - INCLUDING 001.000.322.10.000.00 $15.00 $15.00 1/26/21 R10001 EXPANSION TANK Printed: Wednesday, January 27, 2021 8:53:44 AM 1 of 3 MIDENTIAL BLDG PermitCity • • • • PERMITNUM 9:0i 1 1 • www.edmondswa.gov • TOTALS: $2,268.50 $2,268.50 • • CONDITION TYPE STATUS NOTES 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. FOR Provide combustion air per IFGC Chapter 3 for commercial and multifamily residential COMBUSTION AIR INFORMATION installations, and IRC chapter 24 for one and two family dwellings. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION GAS PIPE TEST O Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted ORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. HOSE BIBBS FOR Hose Bibbs are required to have a permanently affixed anti -siphon device installed. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. OTHER CONDITION FOR MANUAL ENTRY NFORMATION Printed: Wednesday, January 27, 2021 8:53:44 AM 2 of 3 'IDENTIAL BLDG Permit PERMIT NUM City of Edmonds -13915 -. •. • IF STRUCTURE IS DEMOLISHED TO A LEVEL THAT MEETS OR EXCEEDS 75% OF THE REPLACEMENT COST OF THE STRUCTURE THEN STRUCTURE MUST BE RECONSTRUCTED IN FOR OTHER CONDITION FULL CONFORMANCE WITH THE PROVISIONS OF THE EDMONDS COMMUNITY INFORMATION DEVELOPMENT CODE WHICH WOULD INCLUDE FULL SETBACK COMPLIANCE FOR THE WESTERN FACADE OF 7.5 FEET New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street FOR POST ADDRESS or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 4 inches high with a half inch min stroke width on a contrasting background. FOR Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it WATER SERVICE SHUTOFF INFORMATION enters the building. Installer shall provide the manufacturer installation, operating instructions, and a whole FOR WHOLE HOUSE FAN house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". L INSPECTIONS - Schedule Online at: https://Inspection.MvBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-2 DEMO AMT VERIFICATION B-2 ROOF TEAR OFF B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 TESC AND MOBILIZE E-9 COMPOST AMEND X-2 ENGINEERING FINAL Printed: Wednesday, January 27, 2021 8:53:44 AM 3 of 3