Loading...
190133 FR 01 21-0204Architectural Field Report # 1 Site Visit Dates: 1-11-21, 1-13-21, 1-19-21, and 1-26-21 Report By: Nate Sobotta Project: Sunrise at Edmonds Condominiums Attachment(s): Structural Letter from DEI A. GENERAL NOTES & CONDITIONS: 1. General: a. Site Visit(s): This Field Report documents Nate's site visits on 1-11-21, 1-13-21, 1-19-21, and 1-26-21 to review construction progress. The weather was rainy on 1-11-21, sunny on 1-13- 21 and 1-19-21, and overcast on 1-26-21. b. Follow -Up Communication: Follow-up conversations and emails between Marcus, Shane, Tina, Max, Kyle, and myself may also be included in this field report for the purpose of documentation. c. RFIs and ASIs: Refer to RFI and ASI responses for additional direction regarding specific items. d. Note: Direction provided in this Field Report with associated costs must be approved by the Construction Manager prior to execution. 2. Construction Status: On 1-11-21, RCI began demolition at existing unit decks beginning with Building 1, Unit 1. On 1-13-21 and 1-19-21, demolition continued at existing unit deck locations. On 1-26-21, deck framing was exposed at all fourteen (14) unit decks for review by DEI. Demolition was ongoing on 1-26-21. Refer to Photos 1 and 2. B. DISCUSSIONS: 1. Emergency Shoring Discussion (1-13-21 and 1-19-21): On 1-12-21, Shane informed the Project Team regarding existing framing damage discovered between garage #2 and #3. Refer to Photo 3. a. 1-13-21: On 1-13-21, Robb met the Project Team on site to discuss emergency shoring at the damaged party wall. On site, Robb provided a detail sketch of the emergency shoring for RCI. Via email on 1-13-21, Robb formally issued a Letter regarding his observations at the damaged framing with attached emergency shoring details. Refer to Item C, 1 for additional information regarding Robb's analysis and temporary emergency shoring requirements at the damaged framing location. b. 1-19-21: Onsite, I observed emergency shoring installations between garage #2 and #3 and garage #9 and #10. Refer to Photo 4 and S. The emergency shoring between garage #9 and #10 was missing the mid -post installation per direction provided by DEI. On 1-27-21, Shane and Marcus informed me that the mid -post support has been installed at the emergency shoring location between garage #9 and #10. 710 2nd Avenue Suite 400, Seattle WA 98104 amentogroup.com 206.682.9722 AMENTOGROUP 2. Existing Rim Joists at Unit Decks (1-11-21 and 1-26-21): Existing Rim Joists at Leading Edge: On 1-11-21, 1 reviewed existing conditions of rim joists at leading edge locations. Onsite, I documented one (1) existing rim joist at all unit deck locations. Refer to Photo 6. Per original drawings, AG assumed two rim joists existed and replacement of the exterior rim joist was required. Via a teleconference with Lindsey on 1- 27-21, she confirmed blocking installations required by DEI were sized to accommodate one (1) rim joist at leading edge locations. No structural detail changes are required. b. Existing Rim Joists at Return Edge: On 1-26-21, 1 documented all existing conditions of rim joists at return edge locations. Onsite, Marcus and I discussed the need for access into select units and garages to repair the existing rim joists at return edge locations. Via email on 1-27-21, RCI confirmed the affected units and garages known to date to properly repair damaged rim joists at return edges. Marcus also noted the existing garage doors at garage #3 and #9 will need to be fully removed and reinstalled to accommodate the work. In addition, interior gypsum wallboard at select unit and garage locations is required to be removed and replaced to accommodate framing repairs. RCI will install new interior gypsum wallboard and paint corner to corner to match the existing color, texture, and sheen following necessary framing repairs. 3. Framing Damage at Roof to Wall Interface at Units #14 and #15 (1-26-21): Onsite, I observed insulation and framing damage at the roof to wall interface at Units #14 and #15. Refer to Photo 7. Existing step flashing or diverter flashing did not occur at this location, which is likely allowing water intrusion behind the existing vinyl siding. In addition, the existing downspout is installed tight to the building wall and should be relocated away to mitigate the risk of water and debris getting trapped. Exact downspout relocation will be coordinated between AG and RCI onsite and documented accordingly. AG will provide a detail forthcoming to provide flashing installations at the roof to wall interface. a. Existing Window Adjacent to Sliding Glass Door: To accommodate the necessary repairs at the roof to wall interface at Units #14 and #15, the existing window adjacent to the Unit #14 sliding glass door will need to be removed and reinstalled. Refer to Photo 8 for existing window location. 4. Framing and Sheathing Damage at Existing Storage Closets (1-26-21): On 1-26-21, 1 observed existing WRB and exterior sheathing removed at the exterior side of all storage closet locations by RCI. Refer to Photo 9. RCI informed me that during removal of existing vinyl siding at all storage closet locations as part of the BSOW, damage was discovered at existing sheathing & framing. Refer to Photo 10. Existing WRB and exterior sheathing was scheduled to remain installed at storage room closets as part of the BSOW. The removal of existing WRB and sheathing is justified by damage observed at the existing framing. However, RCI shall inform AG of additional demolition required outside the BSOW moving forward. RCI will repair or replace damaged framing at storage closet locations per DEI's Site Visit Report forthcoming. Existing sheathing will be replaced where damage occurs and at locations needed to accommodate the necessary framing repairs directed by DEI. 190133 FR 01 21-0204 Page 2 710 2nd Avenue Suite 400, Seattle, VVA 98104 arre r..".group.com 206.682.9722 AMENTOGROUP 5. Framing Damage Above Existing Garage Doors (1-26-21): On 1-26-21, 1 observed existing vinyl siding scheduled to remain installed was removed above garage doors #3, #8, #9, and #19. Refer to Photo 11. During demolition of existing soffit panels, framing damage was discovered above select garage door locations. The removal of existing vinyl siding, insulation, cedar siding, WRB, and exterior sheathing was justified by the damage observed at the existing framing. However, RCI shall inform AG of additional demolition required outside the BSOW moving forward. RCI will repair damaged framing at garage locations per DEI's Site Visit Report forthcoming. RCI will dispose of existing cedar siding and Green Guard insulation at garage framing repair locations. RCI will install plywood furring strips without bug screens, as needed to accommodate the resultant gap in the wall assembly prior to reinstalling existing vinyl siding. 6. Existing Gutter and Downspout at Unit #13 (1-26-21): Onsite, Marcus and I discussed the existing downspout and gutter at Unit #13. Refer to Photo 12. The existing gutter and downspout were previously installed by the unit owner and therefore is scheduled for removal and disposal per Addendum #1. 7. Additional Vinyl Siding Replacement (1-26-21): On 1-26-21, 1 documented damaged vinyl siding at Unit #10, which is likely the result of excess heat. Refer to Photo 13. Vinyl siding replacement at this location is not scheduled in the BSOW. Excess existing vinyl siding removed during demolition at the framed guardrail walls can be used to replace the damaged siding at this location pending BOD approval. 8. Deck Sheathing Installations (1-27-21): Via a teleconference on 1-27-21, 1 discussed the new deck sheathing installations with Lindsey as part of the BSOW. AG assumed new plywood sheathing installations at all decks did not have to be continuous and could have a splice between two (2) units in the same plane. Lindsey confirmed that deck sheathing installations are not required to be continuous between two (2) unit decks. C. FOLLOW UP & MISCELLANEOUS: 1. Structural Letter from DEI: Attached is Robb's Structural Letter from his site visit on 1-13-21 to review existing damaged framing. Direction was provided by Robb via email on 1-13-21 regarding the temporary emergency shoring required between garage #2 and #3 and garage #8 and #9. Formally attached in Field Report #1 is Robb's Structural Letter for reference. 190133 FR 01 21-0204 Photo 1 Demolition by RCI ongoing at existing unit decks on 1-11-21, 1-13-21, and 1-19-21. Page 3 710 2nd Avenue Suite 400, Seattle, WA98104 amentogroup.com 206.682.9722 AMENTOGROUP 190133 FR 01 21-0204 Photo 2 Demolition by RCI to expose existing deck framing for review by DEI complete on 1-26- 21. Photo 3 Significant framing damage observed by RCI between garage #2 and #3 on 1-12-21. Photo 4 Emergency shoring observed installed between garage #2 and #3 on 1-19-21. Page 4 710 2nd Avenue Suite 400, Seattle, WA98104 amentogroup.com 206.682.9722 AMENTOGROUP 190133 FR 01 21-0204 Photo 5 Emergency shoring observed installed between garage #9 and #10 on 1-19-21. Mid - post support is missing per details provided by DEL On 1-27-21, RCI communicated that the mid -post support was installed. Photo 6 One (1) existing rim joist observed at unit deck locations on 1-11-21. Existing rim joists at leading edge locations are scheduled for replacement as part of the BSOW. Photo 7 Insulation and framing damage at the roof to wall interface at Units #14 and #15 observed on 1-26-21. Page 5 710 2nd Avenue Suite 400, Seattle, WA98104 amentogroup.com 206.682.9722 AMENTOGROUP IM e = • d i �-mow �` 190133 FR 01 21-0204 Photo 8 Existing window adjacent to Unit #14 sliding glass door requires removal and reinstallation to accommodate the necessary repairs at the existing roof to wall interface. Photo 9 Existing WRB and exterior sheathing observed removed at the exterior side of all storage closet locations by RCI on 1-26-21. Photo 10 Existing framing and sheathing observed damaged at storage closet locations on 1-26- 21. Page 6 710 2nd Avenue Suite 400, Seattle, WA98104 amentogroup.com 206.682.9722 AMENTOGROUP 190133 FR 01 21-0204 Photo 11 Existing vinyl siding removed by RCI above garage door #8 and #9. Existing vinyl siding was scheduled to remain installed as part of the BSOW. Existing framing damage was discovered by RCI during demolition above select garage door locations. Photo 12 Existing gutter and downspout at Unit #13 scheduled for removal and disposal per Addendum #1. Photo 13 Existing vinyl siding at Unit #10 observed damaged on 1-26-21. Damage is likely a result of excess heat from a grill. Page 7 710 2nd Avenue Suite 400, Seattle, WA 98104 A M E N T O G R O U P amentogroup.com 206.682.9722 REFERENCES: AG is Amento Group, Inc.; Tina is Tina Ray of AG; Max is Maxwell Maloney of AG; Nate is Nate Sobotta of AG; Kyle is Kyle Smith of AG; RCI is Ruff Construction, Inc.; Marcus is Marcus Parks of RCI; Shane is Shane Azbill of RCI; DEI is Dibble Engineers, Inc.; Robb is Robb Dibble of DEI; Melissa is Melisa White of DEI; Lindsey is Lindsey Peterson of DEI. COPY TO: Tina Ray, Max Maloney, Nate Sobotta, Kyle Smith, Marcus Parks, Shane Azbill, and Nicole Lemons. 190133 FR 01 21-0204 Page 8 710 2nd Avenue Suite 400, Seattle, WA98104 amentogroup.com 206.682.9722 AMENTOGROUP �DEI DIBBLE ENGINEERS INC January 13, 2021 Sunrise at Edmonds HOA Care of: Amento Group- Attn: Tina Ray, Amento Group traVCj�amentogroup.com 720 Second Avenue, Suite 400 Seattle, WA 98104 Nicole Lemons, Emerald Management & Consulting Nicole.lemons(o.emeral-mc.com Re: Sunrise at Edmonds HOA - Emergency Shoring — Building Support Required. 8512 - 242.d St SW, Edmond, WA DEI #18-342 Dear Ms. Ray & Ms. Lemons: On January 13, 2021, a site review performed by Robb A, Dibble, PE to provide emergency shoring recommendations. These include fundamentally: Shoring across the front of the Slider (SGD) to extend out past the wall corner, with posts down. Intersecting shoring at the wall corner for stabilizing the wall corner. Post and beam shoring inside the garage and outside under the deck to allow the garage header replacement. See the attached sketches for use. At completion of the shoring, please document with photos and notify DEI for confirmation of stabilization. Onsite review may be required. At completion of the demolition to the damaged areas, notify DEI for follow up review and repair recommendations. Dibble Engineers appreciates your business. We invite you to please contact us with any questions or for clarifications to our work, and we will be happy to assist. Sincerely, DIBBLE ENGINEERS, INC. Robb A. Dibble, PE Principal robb(cDdibbleengineers.com CC: Milton Thompson, Building Inspector. milton.thompson(,@-edmondsWA.gov PROJECT NAME :5�� � S �DMC �� SHEET# 5'V D E I PROJECT# DATE DIBBLE ENGINEERS INC"�2- SUBJECT BY� A DjA �►O��tr �3L-P67 :5 40(Z-,/ �,) Z::rl /47— (5*'o'TA-(3 C-5 Fitt (L*7' A -A - e-.-oE PROJECT NAME �'� SHEET#DEI C' PROJECT # DATE DIBBLE ENGINEERS INC SUBJECT BY T-06A C-f� JrKJ�;-W �,x 5 ".51tips li a>-)( 51 f H A i '11\\ �U \ \v C f[ N Jf II E IC v✓ b I IJUL f i � jI I� C IiJ+ ' 9