Building Permit 2020•MMERCIAL BLDG Permit
PERMIT NU M
of Edmonds
EdmondsCity
98020 1 1 1 422
ww -. •. A
Owner/ Business: SUNRISE AT EDMONDS ASSOC C/O EMERALD
Type: COMMERCIAL BLDG Status: ISSUED
MNGMT
Subtype: COM ALTERATION OR REPAIR
Parcel No: 00812000000100 Site Address: 8512 242ND ST SW 1 EDMONDS,WA 98026-9048
Applied: 4/21/2020
Subdivision: 004633, 006781, 008120 Lot: 0
Issued: 10/15/2020
Fire Sprinklers: Lot Area: Zoning: CG
Final:
Valuation: $176,470.60 Occupancy Type: Construction Type: VB
Expiration Date: 10/15/2021
Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 0
Issued by: WAC
Scope of Work: BLD A -SUNRISE CONDOS -REPAIR ALL DECKS, RAILINGS AND SLIDERS
WA State Contractor L & I #: RUFFCM1016DK City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE EMAIL
APPLICANT
AMENTO GROUP-TINA RAY
710 2ND AVE SUITE 400,
(206)957-4716
TRAY@AMENTOGROUP.COM
SEATTLE WA 98104
CONTRACTOR
RUFF CONSTRUCTION INC.
16120 WOODINVILLE REDMOND
(425)487-0702
RD, WOODINVILLE WA 98072
SUNRISE AT EDMONDS
14900 INTERURBAN AVE S SUITE
OWNER
ASSOC C/O EMERALD
MNGMT
271, SEATTLE WA 98168
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
6/1/20
R5574
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
6/1/20
R5574
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$1,854.40
$1,854.40
6/1/20
R5574
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$1,576.24
$1,576.24
4/28/20
R4980
TOTALS: $3,495.64 $3,495.64
CONDITIONS
CONDITION TYPE STATUS NOTES
Printed: Thursday, October 15, 2020 9:21:12 AM 1 of 2
• '-rmit
PERMIT NUM
City of Edmonds
. ••� i66 1 1 1
WW.www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
Work approved under this permit may or may not qualify as an essential or allowed
activity per the Governors Stay Home, Stay Healthy Order. Refer to the Order and the
FOR
Citys website for up-to-date information related to development activities during COVID-
COVID-19 NOTICE
INFORMATION
19. Issuance of this permit does not certify that construction is allowed to immediately
occur, and inspections may or may not be granted accordingly. Construction activities and
all required inspections will resume when the Order has been lifted.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
7
COMPLETED
SEQID INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-3 EXT WALL SHEATHING
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
Printed: Thursday, October 15, 2020 9:21:12 AM 2 of 2