Loading...
APPROVED ENG PLN - BLD2020-0904+Site_Plan+10.15.2020_4.19.33_PMCLIMATIC & GEOGRAPHIC DESIGN CRITERIA (R3o1.2(I)) ROOF SNOW d OPOGRAPHIG SEISMIC f a FR05T LINE WINTER ICE BARRIER FLOOD R MEAN LOAD WIND SPEED EFFEGT5 DESIGN GAT, WEATHERING DEPTHb TERMITE DESIGN UNDERLAYMENT g HAZARD5 EAI FREZING ANNUAL TEMP REQUIRED INDEX TEMFJ :z pjjGJ NO DZ MODERATE IZ 51_IGHT TO zZ NO FIRM 170 91 MODERATE 2015 05E0 & IRC VENTILATION TAFLE 402.1.1 CLIMATE ZONE MARINE 4 (R-VALUE (a) OR U-FACTOR) FENESTRATION U-FACTOR (b) 0.3o SKYLIGHT (b) U-FACTOR o.r�o GLAZED FENE5TARTION 5HGG (b,e) N/A CEILING R-VALUE (k) 4� WOOD FRAME WALL (g,m,n) R-VALUE 21 Int. MA55 WALL R-VALUE (p 21/21 (h) FLOOR R-VALUE 3o (g) FELOW-GRADE (c,m) WALL R-VALUE 10/le/V Int, +TF 5LAI3 (d) R-VALUE & DEPTH 10, 2 ft, FOR 91: 1 f00t.=304.emm, el. = CONTINUOUS INSULATION, Int.= INTERMEDIATE I=RAMING (a) R-VALUE5 ARE MINIMUMS, U-FACTORS AND 5HGG ARE MAXIMUMS. WHEN INSULATION 15 INSTALLED IN A CAVITY WHICH 15 LE55 THAN THE LABEL OR DESIGN THIGKNE55 OF THE IN5ULATION, THE GOMPRE55ED R-VALUE OF THE IN5ULATION FROM APPENDIX A101.4 5HALL NOT BE LE55 THAN THE R-VALUE 5FEGIFIED (b) THE FENESTRATION U-FACTOR COLUMN EXCLUDES 51<YLIGHT5. THE 5HG0 COLUMN AFPLIE5 TO ALL GLAZED FENESTRATION. EXCEPTION: 5KYLIGHT5 MAY BE EXCLUDED FROM GLAZED FENESTRATION 5HGG REQUIREMENT5 IN CLIMATE ZONE5 I THROUGH 3 WHERE THE 5HGG FOR 5UGH 5KYLIGHT5 DOE5 NOT EXGEED 0. ,O W I0/16/21 MEANS R-Io CONTINUOUS INSULATION ON THE EXTERIOR OF THE WALL, OR R-10 ON THE CONTINUOUS INSULATION ON THE INTERIOR OF THE WALL, OR R-21 CAVITY INSULATION FLUS A THERMAL BREAK BETWEEN THE 5LA15 AND THE I3A5EMENT WALL AT THE INTERIOR OF THE BASEMENT WALL. I0/19/ZI+TB SHALL BE PERMITTED TO BE MET WITH R-I3 CAVITY INSULATION ON THE INTERIOR OF THE BA5EMENT WALL PLU5 R-5 GONTINUOUS IN5ULATION ON THE INTERIOR OR EXTERIOR OF THE WALL. TB MEAN5 THERMAL BREAK BETWEEN FLOOR SLAB AND 15A5EMENT WALL (d) R-10 CONTINUOUS INSULATION 15 REQUIRED UNDER HEATED SLAB ON GRADE FLOORS, SEE R402.Z.,9.1 (e) THERE ARE NO 5HGG REQUIREMENT5 IN THE MARINE ZONE (f) (g) (h) RESERVED 0) THE SECOND R-VALUE APPLIES WHEN MORE THAN HALF THE INSULATION 15 ON THE INTERIOR OF THE MA55 WALL. (I) RESERVED (k) FOR 51NGLE RAFTER OR JOIST VAULTED GEILING5, THE INSULATION MAY BE REDUCED TO R-3O (I) RESERVED w7INT. (INTERMEDIATE FRAMING) DENOTES 5TANDARD FRAMING I& IN0HE5 ON CENTER WITH HEADERS INSULATED WITH A MINIMUM OF R-10 INSULATION. CN) LOG AND 50LIP TIM1 ER WALLS WITH A MINIMUM AVERAGE THIGKNE55 OF 3.5 INGHE5 ARE EXEMPT FROM THI5 INSULATION REQUIREMENT TABLE R402.1.3 FOOTNOTE: (a) NONFENE5TRATION U-FACTORS 5HALL BE OBTAINED FROM MEA5UREMENT, CALCULATION OR AN APPROVED 5OURGE OR A5 SPECIFIED IN SECTION R40Z.1.3 GENERAL NOTES: SMOKE ALARMS (R314): THESE GENERAL NOTE5 ARE TO FE U5EP A5 A 51JPPLEMENT TO THE DRAWING5. ALL SMOKE ALARMS 5HALL FE L15TF-P IN ACCORDANCE WITH UL217 AND INSTALLEP IN ANY DISCREPANCIES FOUND AMONG THE DRAWING5, GENERAL NOTES AND SITE ACCORDANCE WITH THE PROVISIONS OF THIS CODE AND THE HOUSEHOLD FIRE WARNING CONDITION5 5HALL FE REPORTED TO THE ARCHITECT, WHO 5HALL CORRECT 5UGH EQUIPMENT PROVISIONS OF NFPA 72, SMOKE ALARMS SHALL FE IIOV INTERCONNECTED DISCREPANCY IN WRITING. ANY WORK DONE FY THE CONTRACTOR AFTER THE WITH FATTERY FACK-UP. P15COVERY OF A 1215GREPANCY 5HALL FE DONE AT THE CONTRACTORS OWN R15K. EXHAUST HOOD MAKEUP AIR (MI003.4): KITCHEN EXHAUST HOOP5 EXHAUSTING OVER ALL METHOD5 AND MATERIALS TO CONFORM TO THE 2010 INTERNATIONAL FUILDING 4000PM 5HALL FE EQUIPPED WITH MAKEUP AIR AT A RATE APPROXIMATELY EQUAL TO GORE, ZOIr'J INTERNATIONAL RE5IPENTIAL GORE AND ZOIr'J WA5HINGTON STATE ENERGY THE EXHAUST RATE. SUCH MAKE UP SYSTEMS SHALL FE EQUIPPED WITH A MEANS OF GORE A5 AMENDED AND ADOPTED FY APPLICAFLE JURI5DICTION. OL05URE AND 5HALL FE AUTOMATICALLY CONTROLLED TO START AND OPERATE SIMULTANEOUSLY WITH THE EXHAUST 5YSTEM. DESIGN CRITERIA (IRC 300: THE ENGINEERED LATERAL DESIGN FOR THE FUILDING IS IN ACCORDANCE WITH THE ZolO INTERNATIONAL FUILDING CODE AND 15 PROVIDED FY THE FIREFLOGKING: 5HALL FE PROVIDED TO OUT OFF ALL CONGEALED DRAFT OPENING5 AND TO ENGINEER OF RECORD, FORM AN EFFECTIVE FIRE FARRIER FETWEEN 5TORIE5 AND FETWEEN TOP STORY AND ROOF SPACE. INSTALL PER IRC 302.11 DESIGN LOAP5: ROOF: LL=20, PL=10, TL=40 WATER-RE515TANT GYPSUM FACKING FOARP (IRC 702.3.8): GYPSUM FOARP U5EP A5 A FLOOR: LL=40, DL=10, TL=CjO FACKER FOARD FOR CERAMIC TILE 5HALL CONFORM TO ASTM C0o69, 011791 OR 0127e, WATER-RE515TANT GYPSUM FOARD 5HALL NOT FE INSTALLED OVER A VAPOR RETARDER CONCRETE FOUNDATIONS: IN A 5HOWER OR TUF COMPARTMENT. GUT OR EXP05E12 EDGES, INCLUDING TH05E AT CONCRETE FOUNDATIONS SHALL FE DE5IGNED IN ACGORDANGE WITH IRC CHAPTER 4. WALL INTERSECTIONS, SHALL FE SEALED AS RECOMMENDED FY THE MANUFACTURER. MIN, CONCRETE COMPRESSIVE STRENGTH PSI (R4o4.1•3.3•I) FASTENERS IN PRESERVATIVE TREATED WOOD (R317.3.1): FASTENER5, INCLUDING NUTS MIN, YIELD STRENGTH OF 5TEEL REINFORCEMENT: (00,000 P51 (R404.1.3.3.7) AND WA5HER5, FOR PRESERVATIVE TREATED WOOD 5HALL FE HOT DIPPED ZING -COATED, CONCRETE MIXING & DELIVERY 5HALL COMPLY WITH A5TM C 94 OR A5TM G (o850 GALVANIZED 5TEEL, 5TAINLE55 5TEEL, 51LICON FRONZE OR COPPER. MIN, REINFORCEMENT COVER: IF GA5T AGAINST EARTH: 3` MIN COVER. IF CAST AGAINST REMOVAFLE FORMS: I-I/Z FOR NO, 0 15AR5 AND 5MALLER, 2 FOR NO, (o DRIP EDGE (IRC R900.2.8.0): A DRIP EDGE 5HALL FE PROVIDED AT EAVE5 AND GAFLE5 OF ASPHALT SHINGLE R001=5 AND 5HALL EXTEND .20 INGHE5 FELOW 5HEATHING AND 2° UP 15AR5 OR LARGER. (R403,1.3.0.3 & R404.1.3.3.7.4) ROOF DECK PORM5 5HALL FE MADE OF AN APPROVED MATERIAL AND 5HALL PROVIDE 51JFFICIENT ZOIS WA-5HINGTON STATE ENERGY GODS: STRENGTH TO CONTAIN CONCRETE DURING THE CONCRETE PLACEMENT OPERATION (IRC R404.1.3.3•(0) - ENERGY GREDIT5 (DEFITS) REGIUIRED: 5EE ATTACHED FORM5 AND FELOW: 31� 5F < I,ri00 5F = SMALL DWELLING UNIT = 1.0 GREDIT5 REQUIRED CONCRETE SHALL FE CON50LIPATEP FY SUITABLE MEANS DURING PLACEMENT AND 5HALL FE WORKED AROUND EMFEDPEP ITEMS AND REINFORCEMENT AND INTO CORNER OPTION #3d = 1.0 GREDIT5: HIGH EFFICIENCY HVAG EQUIPMENT: DUCTLESS PSLIT OF FORMS (IRC 404.1•3.3.0) 5Y5TEM HEAT PUMPS, ZONAL CONTROL (NEW ADDITION ONLY) VERTICAL AND HORIZONTAL WALL REINFORCEMENT 5HALL FE THE LONGE5T LENGTH5 1'* OPTION #GDo = I.Ci GREDIT5: EFFICIENT WATER HEATING - WATER HEATING 5Y5TEM TO PRACTICAL. WHERE 5PLICE5 ARE NEGE55ARY IN REINFORCEMENT, THE LENGTH FE GAS WITH MINIMUM EF OF 0.01. 5HALL FE IN ACCORDANCE WITH TAFLE R(91IR.4(1) AND FIGURE R(oll.0.4(I). THE MAXIMUM GAP FETWEEN NON -CONTACT PARALLEL 15AR5 AT A LAP 5PLIGE 5HALL NOT EXCEED -VENTILATING SYSTEM USED: INTERMITTENT WHOLE HOUSE USING EXHAUST FAN5 (IMG THE 5MALLER OF ONE -FIFTH THE REQUIRED LAP LENGTH AND (o INGHE5. 403•S•(9, CHAPTER 01-0Z WAG) FOR GRADE (00 5TEEL 04 FAR (TAFLE R(oll.0.4(I)): -WHOLE HOUSE FAN 5HALL OPERATE INTERMITTENTLY AND CONTINUOU5LY -LAP 5PLIGE LENGTH -TENSION = 30 INGHE5 -AUTOMATIC 24-HR CLOCK SET TO OPERATE FRAGTIONAL'ON' TIME IN 003•S•0.1 -TEN51ON DEVELOPMENT LENGTH FOR 5TRAIGHT FAR = 23 INGHE5 -OUTDOOR AIR WILL FE DRAWN FROM AIR INLETS INSTALLED IN WINDOWS (403.8•(o•I) -TEN51ON DEVELOPMENT LENGTH FOR 90-DEGREE AND 180-DEGREE WITH NOT LESS THAN Z.0 INGHE5 OF SIDE COVER PERPENDICULAR TO PLANE OF HOOK AND FRACTIONAL OPERATION TIME (f) OF 24 HR TIMER TO FE 5ET FY MECHANICAL ,90-DEGREE 5TANDARD HOOK5 WITH NOT LE55 THAN 2 INGHE5 OF COVER ON THE CONTRACTOR, 100 GFM FAN (11(o GFM oc ,20IN WC) WILL FE U5EP AND 5ET TO A 4-HOUR FAR EXTENSION FEYONP HOOK = of INGHE5 CYCLE. THE ON TIME MINUTES 15A5E12 ON TAFLE 403.S,1 AND A5HRAE (02.24.010: -TEN51ON DEVELOPMENT LENGTH FOR FAR WITH 90-DEGREE AND 00 DEGREE - 120 MINUTE5 PER 4-HR CYCLE IF RATE (00 (TAFLE f=.02 5TANDARD HOOK HAVING LE55 COVER THAN REQUIRED AFOVE = IZ INGHE5. - Irv& MINUTE5 PER 4-HR CYCLE IF RATE 70 (TAFLE f=.(o0 DAMPPROOFING (IRO R40(o): - 07 MINUTE5 PER 4-HR CYCLE IF RATE 90 (TAFLE M1007.3.3(I))� f=.7S FOUNDATION WALLS THAT RETAIN EARTH AND ENCLO5E INTERIOR 6PAGE5 AND FLOORS - Ve MINUTE5 PER 4-HR CYCLE IF RATE 100 (TAFLE MI0o7.3.3CI)); f=.oJl FELOW GRADE 5HALL FE PAMPPROOFED FROM THE TOP OF THE FOOTING TO THE FINI5HED GRADE, CONCRETE WALLS 5HALL FE PAMPPROOFED FY APPLYING ANY ONE OF THE PERMANENT CERTIFICATE 5HALL FE P05TED WITHIN 3 FEET OF THE ELECTRICAL PANEL MATERIALS LISTED IN R 40(0.1 & R40(o.Z OR ON THE PANEL ITSELF- THE CERTIFICATE 5HALL FE COMPLETED FY THE FUILDER OR REGISTERED DESIGN PROFE5510NAL AND L15T THE FOLLOWING: INSULATION R-VALUE5 INFILTRATION CONTROL (W5EG 4OZ): FOR ALL FUILDING FRAMING AND FOUNDATION/SLAF COMPONENTS, DUCT INSULATION I. EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, OPENINGS FETWEEN WALLS AND OUTSIDE CONDITIONED AREAS, GLAZING U VALUE5 AND/OR 5HGG VALUE5, TYPE AND FOUNDATIONS, FETWEEN WALLS AND ROOF AND FETWEEN WALL PANELS OPENINGS AT EFFICIENCY OF HEATING/COOLING 5Y5TEM AND HEATING EQUIPMENT, DUCT LEAKAGE PENETRATION OF UTILITY 5ERVICE5 THROUGH WALL5, FLOOR AND ROOF53ANP ALL OTHER RATES INCLUDING TEST CONDITION5 AND AIR LEAKAGE RE5ULT5 (W5EG 401.3)• OPENING IN THE FUILDING ENVELOPE 5HALL FE 5EALED, CAULKED AND GA5KETED OR WEATHER5TRIPPED TO LIMIT AIR LEAKAGE. OTHER EXTERIOR JOINTS AND 5EAM5 5HALL HIGH EFFICACY LUMINARIE5 (W5E0 404.1): 70% OF ALL LUMINARIE5 5HALL FE HIGH FE SIMILARLY TREATED, OR TAPED, OR COVERED WITH MOISTURE VAPOR PERMEAFLE EFFICACY. HOU5EWRAP Z. ALL EXTERIOR POOR5 OR DOOR5 5ERVING A5 ACCE55 TO AN ENCL05EP UNHEATED TESTING (W5E0 402.4.1.2): REQUIRED FOR ALL FUILDING5 AND 5HALL OCCUR ANYTIME AREA 5HALL FE WEATHER5TRIPPED TO LIMIT LEAKAGE AROUND THEIR PERIMETER WHEN AFTER ROUGH -IN AND AFTER INSTALLATION OF PENETRATION5 OF THE FUILDING IN A OL05EP 1`051TION ENVELOPE. ACGEPTAFLE AIR LEAKAGE TO FE 1_E55 THAN 0 AIR CHANGES PER HOUR 3• RECE55EP LIGHTING FIXTURE5 (402.4.4). WHEN INSTALLED IN THE FUILDING ENVELOPE WITH A FLOWER DOOR AT A PRESSURE OF 1 INCH W.G. COO PA50AL5) 5HALL FE: -TYPE IC RATED AND CERTIFIED UNDER A5TM E283 TO HAVE NO MORE THAN 2.0 GFM AIR 5EALING (W5EG 403.2.2): DUGT5 5HALL FE LEAK TESTED IN ACCORDANCE WITH W5U MOVEMENT R5-33 USING THE MAXIMUM DUCT LEAKAGE RATE5 51"EGIFIED. -THE LIGHTING FIXTURE 5HALL FE TESTED AT 7(o PA60AL5 OR IRi7 LF5/5F PRE55URE -POST CONSTRUCTION & ROUGH -IN: TOTAL LEAKAGE TO FE LE55 THAN OR EQUAL TO DIFFERENCE AND LA15ELEP SHOWING COMPLIANCE 401'M PER 100 5.F. OF CONDITIONED FLOOR AREA AT 0.1 INGHE5 W.G. FOR ENTIRE 5Y5TEM, -5HALL FE INSTALLED WITH A GASKET OR CAULK AT THE CEILING TO PREVENT AIR INCLUDING AIR HANDLER ENCLOSURE. ALL REGISTER 15OOT5 5HALL FE TAPED OR LEAKAGE OTHERWISE 5EALED DURING TEST, LEAKAGE TO OUTDOORS 5HALL FE LE55 THAN OR EQUAL TO 401'M PER 100 5QUARE FEET OF CONDITIONED FLOOR AREA VAPOR FARRIERS/GROUND COVERS: GLASS I (SHEET POLYETHYLENE, UNPERFORATED ALUMINUM FOIL) OR GLA55 II DUCT INSULATION le INSTALLATION (W5EG 403,11 & 403.23), DUGT5 5HALL FE INSULATED (KRAFT-PAGED FI15ERGLA55 FATT5) VAPOR RETARPER5 ARE REQUIRED ON THE INTERIOR TO A MINIMUM R-e, EXCEPT IF LOCATED COMPLETELY WITHIN THE FUILDING THERMAL SIDE OF FRAMED WALL5 (R702.2) ENVELOPE. FUILDING FRAMING CAVITIES SHALL NOT FE USED AS DUCTS OR PLENUMS. INSTALLATION OF DUGT5 5HALL NOT 12I5PLACE REQUIRED ENVELOPE INSULATION. GLA55 III VAPOR RETARDER (LATEX OR ENAMEL PAINT) PERMITTED AT VENTED CLADDING OVER WOOD STRUCTURAL PANELS, FIFERFOARD, OR GYPSUM, OR CONTINUOUS INSULATION WITH R-VALUE >= 2.0 OVER Zx4 WALL5 OR R-VALUE >=3.70 OVER Zx(o WALL5. (R702.7.1) VAPOR RETARDER UNDER SLAF (R00(o.2.3): (o MIL POLYETHYLENE OR APPROVED VAPOR RETARDER WITH JOINTS LAPPED NOT LE55 THAN (o" 5HALL FE PLACED FETWEEN THE CONCRETE FLOOR 5LA15 AND THE 15A5E COURSE OR THE PREPARED 5U15GRADE WHERE NO FA5E COURSE EXI5T5. EXCEPT AT GARAGES, UTILITY 15UILDING5 AND OTHER UNHEATED ACCESSORY 6TRUCTURE5. GROUND COVER (R40e.1): (o MIL FLACK POLYETHYLENE OR APPROVED EQUAL 5HALL FE LAID OVER THE GROUND WITHIN CRAWL 5PAGE5 AND SHALL FE OVERLAPPED 12° MINIMUM AT THE JOINTS AND 5HALL EXTEND TO THE FOUNDATION WALL APPROVED PLANS MUST BE ON JOB SITE ALL DISTURBED SOILS SHALL BE COMPOST AMENDED PER CITY OF EDMONDS STANDARD DETAIL SD-642 OR APPROVED EQUAL. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE EX. WATER METER 51TE PLAN THIS IS THE APPROVED SITE PLAN FOR ALL SITE WORK. ARCHITECTURE AND BUILDING APPROVALS ON PAGE 1 OF PLAN SET Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. SECTION OF EX. GURF REMOVED FOR EXISTING EXISTING DRIVEWAY GONG. GURF VE N SOX` ASPHALT EXPANSION �� REPLACED:]� \Op POINT, 9,9•50' EXISTING �� < LANDSCAPING --------------4 SILT- FENG�z •! ° ' EXISTING --M -- M-- M---M- - -M--- M---� !/ EXISTING ° FXISTINr> 1 . 1 RZI�(F-WA°,'•,� ° I P.Af�K1�4G, -3 C%/ FENCE 11AI GONG. WALK CARPORT ,° REMOVED• I o Q 27 5f: NEW REMOVED ,SF �, ���COING.ING o ENTRY ADDI EX. E E °. AflDIT10N. ° ° • '�. ,I DRIVEWAY AT EX. PORC' I GAS METERS �OaTPK1NT; 4'° I u p0 r ----- - I 1�� A I'-3 5/81I IDS EX. RETAINING z vI -- ---------- I - D 7 I '- // I �--yam �I_Aj_ r-, Z�l'� ° • X 7•0 I w I I I EX. - - I �\ I WALL -0 XISTING DECK EXOTING ZOI-0° - 0 l4 S %N S S> � o OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. SCOPE OF WORK: PROPERTY INFORMATION: LOT COVERAGE: CONSTRUCT 1,96 Sr MAIN PARCEL #: 00477300000300 FUILDING FOOTPRINT FLOOR ADDITION, 044 UPPER ADDRESS: (HOUSE & PORCH): FLOOR ADDITION, 044 5F r210 HOMELAND DR 100(0 5.P• ROOF TOP DECK AND 380 SF ZONING: R5-(o COVERAGE: GARAGE, LOT AREA: 0.17 ACRE (7,200 5F) 100(0/72o0= 21.(0% < 30% 5ETFACK5: STREET: 20' REAR: 10' 51DEYARD: 0' MAX. HT: 20' LOT COVERAGE: 35% IMPERVIOUS SURFACE COVERAGE: EXIST. TO REMAIN NEW REPLACED TOTAL HOUSE + O.H. 123(0 (000 183(0 DRIVE (- O.H.) 270 207 032 DECK 307 307 GONG, WALK 80 80 PAVERS 148 148 TOTAL 1(07e e70 207 ZSIo . I 0 O �v EXISTING I SHED REMOVED LLD "I l0'-0" ETA ACCESS 11.81 I EASEMENT o I --V(N - BLD2020-0904 HEIGHT CALCULATION: LEGAL DE50RIPTION: AVERAGE GRADE: I00,00' HOMELAND ADD REPLAT FLK 000 D-00 - MAX. HEIGHT ALLOWED: 120.00' LOT 3 5UFJ E5E PUP I HIGHEST POINT: 123.27' < 120.00' AVERAGE GRADE ELEVATIONS A 100.00 F 100.r2o G 100.r2o D 100.00 AVE. 100.00 Minimum of 5' separation _ between the two driveway and private access road required. Zone RS-6 Corner X Flag Setbacks: Required Actual Front _20'_ _20' Sides 5' 5', 13' Rear Other 25' 23.25' Height z o 0 01 LJ LJ D Li Z _ V) �Q L�JQ 0 0 A- 0) )) • a M m }e 0 N Co N L ` N aY� � a) o E U) LL U > O S 2 cm, 0 3 z� L .. ocV �N O Z O Q APPROVED BY PLANNING o - z .er < ENGINEERING DIVISION APPROVED AS NOTED Dz lu 10/28/2020 Oct 20 2020 ***Proposed new and replaced is under o <C N = Z O 2000sgft; therefore, no stormwater O Dz O management system required. If the < new and replaced is 2000sgft or greater, a stormwater management system is required per City standards. *** DC Z SCALE: I 10'-0° VIGINTIY MAP: `d ataLFtlrt+O�45 �P Ps ��' mma�N§mngsmn �6flr end Iran �„g ; ;^ � i Fdmonrhe F �11900fh �.-.�yf' - Edmonds ua,a moles, � Porl �f EdmOr°9 § g Htti que {.a 9�t Wex err Pius ,. r:-AthlettC Club Ed,,,,,d, Hu'borlmr __- �lmmrsosreHn�) e_� Edmond. Marsh Creek -- 9510 Homeland OrlM '°'_. w w{anns dmonds _ - _ hPark - lI ff Leash '-_ I AREA CALCULATION LEVEL/ROOM EX15T. NEW TOTAL MAIN FLOOR (S.F.) 19013 106 1170 UPPER FLOOR (S.F•) 0 044 e44 NEW TOTAL (5Q.FT•): 083 740 1723 GARAGE: 0 380 380 SHEET INDEX C COVER -GENERAL NOTES I I=OUNDATION PLAN Z MAIN I✓LOOR FRAMING 3 MAIN I=LOOR PLAN 4 UPPER FLOOR FRAMING 6 UPPER FLOOR PLAN (o ROOF FRAMING 7 ELEVATIONS 8 SECTIONS AN ARCHITECTURAL DETAILS 5- STRUCTURAL DETAILS I- W W _ U) 0. LLI O CU JOR # Zo-o43 DATE: 10-IG�-20 SHEET # ES B I 11I11?ICI-IT (cl 17 Aprw IT�(`Tc I I r Oct 15 2 0 CITY OF EDMO S DEVELOPMENT SE ICES DEPARTMEN