Loading...
APPROVED BLD-BLD2020-1395+Revised Cost Breakdown+3.24.2021_1.58.40_PM+2109753Permit # I Lt' ,20,20 - 139-6-- �pF FDATU �� , r C.,............................................ REVIEWED Address: 7726 202 PL SW BY Home Owner: MARK & Debbie SMITH CITY OF EDMONDS BUILDING DEPARTMENT Contractor: HOMEOWNER ............................................... 3/29/2021 This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost, the structure will be required to be rebuilt to the standards of new construction. Replacement cost of existing home $ 637,000 How was the value determined? 1821 SF X $350/SF Component Value of Existing Component Percentage removed Replacement cost of removed component Notes Foundation $76,440 0 so 12% of construction cost, includes excavationtbackfiil Floor Framing $38,220 20 $7,644 %ofconstruction cost Floor Insulation $6,370 100 $6,370 1% of construction cost Wall Framing S70,070 30 $21,021 1I%ofconstruction cost Wall Insulation $12,740 100 $12,740 %ofconstructioncost Siding $38,220 100 S38,220 % of construction cost Roof Framing $31,850 100 $31,850 5% of construction cost Attic Insulation $6,370 100 $6,370 1 % of construction cost Windows $25,480 100 $25,480 % of construction cost Doors $12,740 100 $12,740 % of constriction cost Plumbing $50,960 100 $50,960 8% of construction cost Electrical $50,960 100 S50,960 8% of construction cost HVAC $50,960 100 $50,960 8% of construction cost Drywall 25,480 100 $25,480 %ofconstruction cost Cabinets 31,850 100 $31,850 % of construction cost Painting, Flooring and Finishes $63,700 100 $63,700 10% of construction cost Deck Other $44,590 57 $25,490 % of construction cost, (roofing & other) Tota 1 $637,000 461,825 100% % of total removed 72.5% Percentage of Removed equals `Total Owner Mark Smith Contractor:: Column 4 divided by Full Replacement cost' equals 72.50 % l�