Loading...
Signed-Special Inspection Formof ED V SPECIAL INSPECTION AND TESTING AGREEMENT rp Permit #: BLD2021-0102 Project: AT&T Modification of rooftop cellular antennas Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for approval. The completed form must have signatures of acknowledgment by all parties. DUTIES AND RESPONSIBILITIES Special Inspection Firm and Special Inspectors: The Special Inspection firm of _Krazan & Associates Inc. will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): Reinforced Concrete _Bolting in Concrete _Prestressed Concrete _Shotcrete _Structural Masonry _Structural Steel/Welding _High Strength Bolting _Spray applied Fireproofing _Smoke Control Systems Lateral Wood _Structural Observation by design professional Grading/soils _Steel Floor and Roof Decks _X_Other_Epoxy Anchors in masonry All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. C:\Users\LCooke\AppData\Local\Microsoft\Windows\iNetCache\Content.Outlook\SFPZ4ZFF\BLD2021-0102_special inspection form_SN6 I _doc9/9/2021 Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner: Contractor: _Chris Stevens Arch./Eng: Special Insp. G. Lance Cooke Special Insp. Agency Signature Date Signature_ &Wi6 pfleven4 Date: _09/03/21_ Signature Signature G ;' W C;We Date: 2021.09.09 13:09:37-0719ate: ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION LOW Date: Date: C:\Users\LCooke\AppData\Local\Microsoft\Windows\rNetCache\Content.Outlook\SFPZ4ZFF\BLD2021-0102_Special inspection form_SN61. doc9/9/2021 Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Buildin:? Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner: Contractor: _Chris Stevens Arch./Eng: Special Insp._Jeff Mercer Special Insp. Agency: Signature Signature_ ?X qo 96emi Signature Date Date: 09/03/21_ Date: Signature Date: 9/3/2021 _Krazan and Associates, Inc. ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION Date: C:\Users\jeffm\AppData\Loca]\Microsoft\Windows\1NetCache\Content.Outlook\TZ9YW34H\BLD2021-0102_3pecial inspection form_SN6 Ldoc913/2021 Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS have read and agree to comply with the terms and conditions of this agreement. Owner: Lindell Graham, President, The Sundstone Condominiums Owners Association Signature _LLvudeLL r1rnhcivv. Contractor: _Chris Stevens_ Arch./Eng:_Mark W. Olson - Special Insp. Special Insp. Agency Signature_ V/vxm 0%Ceoel,14 Signature X444 T. Oeim S ignature ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION By: Do7wwmuLW. lei OAxzxL Date: 9/16/2021 Date 09/14/21 Date: _09/03/21_ Date: _09/14/21 Date: \\edmsvr-deptfs\ADDRESS_FILES\Numeric\9TH AVE N\1414\BLD2021-0102 CELLULAR\APPORVED BLD BLD2021-0102_Special inspection form_SN6 I _SIGNED Owner.doc9/16/2021