Loading...
APPROVED BLD BLD2021-1033+Mechanical_Plan+7.26.2021_10.27.39_AM+2320855ABBREVIATIONS GENERAL -LEGEND 0 DIAMETER RTU EQUIPMENT TAG TYPE ABV ABOVE 2 EQUIPMENT TAG NUMBER ACH AIR CHANGES PER HOUR AD ACCESS DOOR 1 DETAIL OR DIAGRAM NUMBER AFF ABOVE FINISHED FLOOR M2.1 SHEET NUMBER WHERE DETAIL SHOWN AFG AVERAGE FINISHED GRADE AFUE ANNUAL FUEL UTILIZATION EFFICIENCY 1 SECTION LETTER AHU AIR HANDLING UNIT M2.1 SHEET NUMBER WHERE SECTION SHOWN AHRI AIR CONDITIONING, HEATING REFRIGERATION INSTITUTE AP ACCESS PANEL REVISION CLOUD AND CHRONOLOGICAL NUMBER ARI AMERICAN REFRIGERATION INSTITUTE BHP BRAKE HORSEPOWER DETAIL REFERENCE OUTLINE BDD BACKDRAFT DAMPER BOD BOTTOM OF DUCT POINT OF CONNECTION TO EXISTING OR TO BF BELOW FLOOR OTHERS' WORK BOT BOTTOM BTU(H) BRITISH THERMAL UNIT (HOUR) O KEY NOTE CALLOUT CD CONDENSATE CFM CUBIC FEET PER MINUTE 1Q PHOTO ID CALLOUT CONN CONNECTION COP COEFFICIENT OF PERFORMANCE WORK TO BE REMOVED DB DRY BULB/DECIBELS BELS H VAC - L E G E N D DIBFF DIFFERENTIAL DN DOWN DR DRAIN �► AIR FLOW DIRECTION E EXISTING EA EACH OR EXHAUST AIR SUPPLY OR OSA DUCT SECTION UP, ROUND OR EAT ENTERING AIR TEMPERATURE RECTANGULAR EC ELECTRICAL CONTRACTOR EER ENERGY EFFICIENCY RATIO RETURN, RELIEF OR EXHAUST DUCT SECTION UP, EF EXHAUST FAN ROUND OR RECTANGULAR EFF EFFICIENCY EG ELEV EXHAUST GRILLE ELEVATION SUPPLY OR OSA DUCT SECTION DOWN, ROUND OR RECTANGULAR EQUIP EQUIPMENT ESP EXH EXTERNAL STATIC PRESSURE EXHAUST RETURN, RELIEF OR EXHAUST DUCT SECTION DOWN, ROUND OR RECTANGULAR EXIST EXISTING F FURNACE EXISTING DUCTWORK °F FAHRENHEIT FF FINISHED FLOOR SLSM SOUND LINED SHEET METAL FLA FULL LOAD AMPERAGE FPM FEET PER MINUTE FC FLEXIBLE EQUIPMENT CONNECTION FREQ FREQUENCY FT FOOT OR FEET SFD COMBINATION FIRE AND SMOKE DAMPER G NATURAL GAS HP HORSEPOWER OR HEAT PUMP FD FIRE DAMPER HR HOUR HSPF HEATING SEASONAL PERFORMANCE FACTOR SD SMOKE DAMPER HT HEIGHT HVAC HEATING, VENTILATING, AIR-CONDITIONING EVADE VOLUME DAMPER HZ HERTZ IBC INTERNATIONAL BUILDING CODE M MD MOTORIZED DAMPER ID INSIDE DIAMETER IEER INTEGRATED ENERGY EFFICIENCY RATIO IFC INTERNATIONAL FIRE CODE TURNING VANES IFGC INTERNATIONAL FUEL GAS CODE IMC INTERNATIONAL MECHANICAL CODE IN INCHES ROUND TO ROUND 45° FITTING IN WG INCHES WATER GAUGE KW KILOWATT LAT LEAVING AIR TEMPERATURE/LATITUDE SQUARE TO SQUARE 45° FITTING LBS POUNDS LIN FT LINEAR FOOT OR FEET LRA LOCKED ROTOR AMPS SQUARE TO ROUND 45° FITTING MAX MAXIMUM MBH 1,000 BTU PER HOUR MCA MINIMUM CURRENT AMPS VD 45° FITTING FOR DUCTWORK MFR MANUFACTURER MIN MINIMUM GAS PIPING MOCP MAX OVER CURRENT PROTECTION NEC NATIONAL ELECTRICAL CODE Oc CARBON MONOXIDE SENSOR NIC NOT IN CONTRACT NOM NOMINAL O COORDINATED POWER LOCATION OD OUTSIDE DIAMETER/DIMENSION OPTS OPTIONS Os REMOTE SENSOR OSA OUTSIDE AIR PH ELEC POWER PHASE (1 0 OR 30) O THERMOSTAT PN PROJECT NORTH (REFERENCE) POC POINT OF CONNECTION PRESS PRESSURE COMMISSIONING PSI POUNDS PER SQUARE INCH RA RETURN AIR OR RELIEF AIR MECHANICAL SYSTEMS RD ROOF DRAIN REF REFERENCE COPIES OF ALL APPLICABLE SERVICE AND EQUIPMENT DATA, AS WELL AS RPM REVOLUTIONS PER MINUTE PROJECT DOCUMENTATION THAT RELATES, SHALL BE PROVIDED TO THE RTU ROOFTOP UNIT OWNER AND MADE AVAILABLE TO THE AUTHORITY HAVING JURISDICTION (AH SA SUPPLY AIR WITHIN 90 DAYS OF PROJECT COMPLETION AND IN ACCORDANCE WITH 201 SEER SEASONAL ENERGY EFFICIENCY RATIO WSEC SECTION C408.1, INCLUDING: SF SUPPLY FAN OR SQUARE FOOT OR FEET SMACNA SHEET METAL NATIONAL ASSOCIATION 1. PRELIMINARY COMMISSIONING REPORT AND OTHER RELATED REPORTS T TON (1 TON = 12,000 BTUH) SUCH AS AIR BALANCING, START-UP AND/OR PRESSURE TESTING DATA TN TRUE NORTH (REFERENCE) T-STAT THERMOSTAT 2. RECORD DRAWINGS DEPICTING FINAL INSTALLATION CONFIGURATIONS OF TYP TYPICAL SYSTEMS AND EQUIPMENT. ULL ULTRA LOW LEAK DAMPER UNO UNLESS NOTED OTHERWISE 3. OPERATION AND MAINTENANCE EQUIPMENT MANUALS INCLUDING: UPC UNIFORM PLUMBING CODE MANUFACTURER'S INFORMATION WITH SPECIFIC MODEL NUMBERS AND W WATTS/WIDTH/WINDOW OPTIONS NOTED, CONTROLS DATA INCLUDING CALIBRATION AND SET WB WET BULB POINT INFORMATION, AND A SIMPLE NARRATIVE DESCRIPTION OF EACH WSEC WASHINGTON STATE ENERGY CODE SYSTEM. COPYRIGHT 2021 PINEHURST ENGINEERING, PLLC PROJECT DESCRIPTION THE PROJECT IS A LIKE -FOR -LIKE, ONE (1) SPLIT SYSTEM HEAT PUMP REPLACEMENT FOR A RESIDENTIAL SPACE, WITHIN A THREE-STORY ASSISTED LIVING BUILDING. THE BUILDING IS SITED WITHIN THE CITY OF EDMONDS (JURISDICTION), SNOHOMISH COUNTY, WASHINGTON. MECHANICAL PERMIT: UNDER APPLICATION RELATED ELECTRICAL PERMIT: UNDER SEPARATE PERMIT GENERAL NOTES 1. COORDINATE ALL NEW WORK WITH STRUCTURE AND OTHER TRADES. 2. FIELD VERIFY UNIT LOCATIONS, DROPS AND POSITIONS. 3. ALL LINE VOLTAGE WORK SHALL BE INSTALLED BY AN LICENSED COMMERCIAL ELECTRICIAN. 4. HVAC SYSTEMS HAVE BEEN DESIGNED PER THE REQUIREMENTS OF 2015 WSEC, IBC AND IMC. 5. ALL RIGGING AND LIFTING TO BE COORDINATED WITH THE BUILDING OWNERSHIP AND ANY OTHER CITY AND LOCAL JURISDICTIONS. APPLICABLE CODES 1. 2018 WASHINGTON STATE ENERGY CODE (WAC) CHAPTER 51-11) 2. 2018 INTERNATIONAL BUILDING CODE (WAC CHAPTER 51-50) 3. 2018 INTERNATIONAL MECHANICAL CODE (WAC CHAPTER 51-52) 4. 2018 INTERNATIONAL FUEL GAS CODE (WAC CHAPTER 51-52) 5. 2018 UNIFORM PLUMBING CODE (WAC CHAPTER 51-56) 6. NATIONAL ELECTRICAL CODE (NFPA 70 - WAC CHAPTER 296-46B) CODE COMPLIANCE NOTES 1. PROGRAMMABLE CONTROLS SHALL BE CAPABLE OF PROVIDING 5 DEGREE DEAD BAND AS REQUIRED BY 2018 WSEC SECTION C403.2.4.1.2. CONTROLS SHALL ALSO BE CAPABLE OF PROVIDING SEVEN DAY PROGRAMMABLE TEMPERATURE SETTINGS, AUTOMATIC SETBACK AND SHUTOFF AND OPTIMUM START AS REQUIRED BY 2018 WSEC SECTION C403.2.4.2 (OFF -HOUR CONTROLS). CONTROLS SHALL BE CONFIGURED TO PREVENT SIMULTANEOUS HEATING AND COOLING. 2. REPLACEMENT SPLIT SYSTEM HEAT PUMP IS OF THE SAME TYPE AND OUTPUT CAPACITY. 3. THIS PROJECT MEETS THE 2018 WSEC MINIMUM EFFICIENCY REQUIREMENTS FOR COOLING PROVIDED BY ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS PER TABLE C403.2.3(2)A WITH A SEER OF 14.0, WHICH MATCHES THE MINIMUM REQUIREMENT OF 11.0 SEER FOR EQUIPMENT SIZE CATEGORY <65 MBH (UNITARY AND APPLIED HEAT PUMPS, SPLIT SYSTEM). MECHANICAL SCOPE THE PROJECT IS FOR THE REPLACEMENT OF ONE (1) EXISTING SPLIT SYSTEM HEAT PUMP HVAC UNIT. THE EXISTING SYSTEM HAS REACHED THE END OF IT'S USEFUL LIFE. THE NEW SYSTEM IS THE SAME TYPE AND SAME NOMINAL OUTPUT CAPACITY: 1. DEMO THE (1) HP-1 EXISTING ROOFTOP HVAC UNIT & FAN COIL SERVING THE RESIDENTIAL SPACE. 2. THE REMOVAL AND DISPOSAL OF THE EXISTING UNITS FROM BUILDING SHALL BE IN A LAWFUL MANNER. RECLAIM EXISTING REFRIGERANT PER EPA STANDARDS; R-22 IS EXISTING REFRIGERANT PER EQUIPMENT NAME PLATE DATA. 3. PROVIDE AND INSTALL ONE (1) ROOFTOP HP UNIT & (1) FAN COIL IN PLACE OF THE EXISTING UNITS PER PLAN. NEW EQUIPMENT INCLUDES ELEC HEAT, ELECTRIC DX COOLING, & BASIC ELECTRO-MECHANICAL CONTROLS. 4. DISCONNECT AND RE -CONNECT REPLACEMENT HP & FCU TO EXISTING ELECTRICAL SERVICES. RE -USE EXISTING ELECTRICAL DISCONNECT WHERE PRACTICABLE. LINE VOLTAGE WORK SHALL BE BY LICENSED COMMERCIAL ELECTRICIAN (UNDER SEPARATE PERMIT). 5. REUSE EXISTING THERMOSTAT AND CONTROL WIRING. 6. EQUIPMENT AND SYSTEM START-UP, TEST AND BALANCE, PROGRAMMING AND OWNER TRAINING FOR NEW EQUIPMENT, 0&M MANUALS AND RECORD DRAWINGS. 7. THERE IS AN EXISTING ±48" HIGH PERIMETER PARAPET WALL SURROUNDING ALL OF THE MECHANICAL EQUIPMENT ON THE ROOF. NO SCREENING IS NECESSARY. ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE APPROVED PLANS MUST BE ON JOB SITE \/I r_I r\I IT T KA A P !nv nnnnl r AAAnC` nlnT Tn C'nAl r-N nnn IrnT I nnAT1nK1 -7Gn rnlAnnmC` IAIAV rnlAnnlnC' SITE MAP (BY GOOGLE MAPS, NOT TO SCALE) r I\UULU I LUU/'11 IUIV - l I) I\UUI I Ur UIVI 1 I U UL I\Lr LJ'1ULU BUILDING INFORMATION PROJECT ADDRESS: SUNRISE OF EDMONDS 750 EDMONDS WAY, EDMONDS, WA. 98020-5126 SITE CONTACT: RICHARD (425) 673-9700 PROPERTY OWNER: HCP SUN1 EDMONDS WA LLC., 2235 FARADAY AVE, SUITE #0, CARLSBAD, CA. 92009 TAX PARCEL NUMBER: 27032500306200 CONSTRUCTION TYPES: 11 - 1 HR FULLY SPRINKLERED :0IIT, /_1Lord 111194 to]9_111[1]10weffi111%1109]111lall 111111:0 ORIGINAL CONSTRUCT: 2004 TOTAL BUILDING AREA: 60,052 SF CLIMATE ZONE: 4C-SNOHOMISH THIS ASSISTED LIVING RESIDENTIAL PROPERTY HAS A SINGLE INSTUTUTIONAL RELATED OCCUPANCY AND BUILDING IDENTIFICATION ASSOCIATED WITH IT. ADDITIONAL PROPERTY AND BUILDING DATA CAN BE FOUND FROM THE CITY OF EDMONDS AND SNOHOMISH COUNTY ASSESSORS MAPS. DRAWING INDEX PAGE # SHEET # SHEET TITLE SCALE 1 MO.1 COVER SHEET, LEGEND AND NOTES N/A 2 MO.2 EQUIPMENT SCHEDULES N/A 3 MO.3 NEW EQUIPMENT DATA SHEETS N/A 4 MO.4 NEW EQUIPMENT DATA SHEETS N/A 5 M1.1 ROOF PLAN - MECHANICAL 1/8" = 1'-0" LEGAL DESCRIPTION SEC 25 TWP 27 RGE 03 TH PTN SW1/4 SE1 /4 SW1 /4 DAF: BEG SW COR SD SUBJH N01 *00 36E ALG W LN 60.6FT TH N60*11 41 E 358.30 FT TO SWLY MGN OF SR-104 (EDMONDS WAY) AS CONVD PER DEED REC AF2180193; THS39*05 51 E PLW & 40FT SWLY C/L SR-104 ALG SWLY MGN AS CONVD TO ST OF WA BY DEEDS REC AFN'S 2180193, 2181901 & 2185476 DIST OF 201.69FT TAP OPST HWY ENGR STA 97+85; TH S01 *05 34W ALG SD MGN DIST OF46.49FT TAP 30FT NWLY & OPST HES 0-70; TH N88*29 44W DIST OF 382.17FT TO POB; PER CITY OF EDM LL-2000-134 REC AFN200303175004 City Of Edmonds Building Department Work MECHANICAL Address 750 EDMONDS WAY Owner SUNRISE OF EDMONDS -------------- Approved Date: 08/06/2021 Building Official:- ErU- C44^l-' Permit Number; BLD2021-1033 APPROVED BY PLANNING i;z 60 Aug 06 2021 0 4' 8' 16' SCALE: 1/8" = 1'-0" CD w N O Q z o ��w �CO_°O �N az LU3: CVQ p W = L1J LL 3 elf 00 z m CV 0 ti p>0 00 O UU) Z EXPIRES: 1 0/25/22 2i 0 0 CO LJJ co J = CV � 05 0f U)o LL oN o2i LJJ z i U � J 0 0 U 0 RECEIVED Jul 26 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SHEET NO. M001 COVER SHEET LEGEND AND NOTES PROJECT NO. 020-033 7/26/21 HEA T P UMP S C HED UL E EQUIP NO. SERVICE CONNECTED INDOOR UNIT NOMINAL CAPACITY, TONS TOTAL COOLING CAPACITY, BTUH TOTAL HEATING CAPACITY, BTUH SEER ELECTRICAL DATA SOUND POWER, DBA WEIGHT, LBS BASIS OF DESIGN (1) (2) (3) (4) VOLTAGE MOCP HP-306 I UNIT 306 1 FCU-306 1 1.5 17,800 17,800 14 230V/1P 20 69 170 CARRIER 25HCE418AP03 (5) (1) ARI LISTED WITH STANDARD FEATURES, INSTALLATION ACCESSORIES AND COMPRESSOR SHORT CYCLING PROTECTION, FILTER DRIER, REFRIGERANT LINE FILTER, LIQUID SOLENOID VALVE AND SAFETY PRESSURE SWITCHES. INSTALL REFRIGERANT TUBING AND LENGTH IN STRICT ACCORDANCE WITH MANUFACTURERES RECCOMENDATIONS. (2) WITH FACTORY OPTION DISCONNECT. (3) PROVIDE ALL REQUIRED ACCESSORIES FOR LONG -LINE AND LOW -AMBIENT APPLICATIONS. (4) ROUTING OF REFRIGERANT LINES FROM INDOOR TO OUTDOOR UNITS NOT SHOWN ON PLANS. CONTRACTOR TO FIELD COORDINATE ROUTING. (5) UNIT IS LIKE FOR LIKE REPLACEMENT. FAN COIL UNIT SCHEDULE (1) EQUIP NO. SERVICE COIL CONFGURATION COOLING CAPACITY, TONS AUX ELEC HEAT KW (@a 230 V) ELECTRICAL DATA WEIGHT, LBS BASIS OF DESIGN AIRFLOW, CFM ESP, IN WC MOTOR HP VOLTAGE MOCP FCU-306 UNIT 306 VERTICAL 600 10.5 1113 1.5 5 208V/1P 160 172 CARRIER FB4CNP018L00 2 3 4 5 6 NOTES: (1) PROVIDE CONDENSATE DRAIN TO NEAREST APPROVED RECEPTOR. PROVIDE CONDENSATE PUMP IF REQUIRED. (2) UNIT IS LIKE FOR LIKE REPLACEMENT (3) ALL EQUIPMENT CONNECTIONS SHALL UTILIZE EXISTING DUCTWORK AND SHALL BE PER THE MANUFACTURERS INSTALLATION GUIDE AND APPLICABLE CODES AND INDUSTRY STANDARDS. (4) UNIT TO UTILIZE EXISTING WIRED T-STATAND EXISTING CONTROL WIRING. (5) ALL ELECTRICAL WORK SHALL BE DONE BYA LICENSED COMMERCIAL ELECTRICIAN, UNDER SEPARATE PERMIT. (6) BALANCE AIR FLOWS TO MATCH EXISTING CONDITIONS AT UNIT AIR DUCT FLOW RATES. GENERAL NOTES DRAWINGS FOR MECHANICAL WORK WITHIN THE EXISTING BUILDING SPACE AND ROOFTOP ARE DIAGRAMMATIC AND INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. THE ACCURACY AND COMPLETENESS OF THE DESIGN CONTENT REQUIRES FIELD VERIFICATION FOR ALL LOCATIONS AND DIMENSIONS PRIOR TO START OF MECHANICAL WORK, 2. MECHANICAL SCOPE OF WORK BOUNDED BY BUILDING EXTERIOR WALLS AND ROOF, UNLESS NOTED OTHERWISE. ALL WORK SHALL BE PARALLEL AND PERPENDICULAR TO BUILDING COLUMN LINES. 3. THE NEW ROOFTOP HP UNIT & FCU ARE REPLACING THE SAME TYPE AND CAPACITY HP & FCU IN THE SAME LOCATIONS, UTILIZING EXISTING POWER SUPPLY AND DUCTWORK. 0 4' 8' 16' SCALE: 1/8" = 1'-0" O U H u) LU m J = N � 0000 ZD O O Q LL Cn 2i =) O co U 7-- LL] Lil c/) c/) Z >_ LL] (n U_ � J O Q LL 75 O U i G �QN F WAC Mq� O _ S /yin. °6�30 00 0 )_6 20 EXPIRES: 10/25/22 0 RECEIVED Jul 26 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SHEET NO. MOm2 EQUIPMENT SCHEDULES PROJECT NO. 020-033 COPYRIGHT 2021 PINEHURST ENGINEERING, PLLC 7/26/21