BLD2021-0190
� ssfengineers.com
Memorandum
To: Karim Khoury Date:
Address: 1113 Juniper Beach Road From:
Camano Island, WA 98282
Project: 21302 93Id PI. W. Edmonds
12665-2021-01
Structural Recommendations
January 27, 2021 REVIEWED
BY
Ryan Anderson, PE, SE CITY OF EDMONDS
SSF Engineers completed on -site structural observation of the existing roof framing at 21302 93" PI W. in Edmonds,
Washington. We understand that several interior walls (indicated with dashed lines in the attached partial roof framing
plan) are proposed to be removed as part of the renovation. The existing roof framing consists primarily of
premanufactured roof trusses spanning east -to -west from exterior wall to exterior wall. Where the orientation of the
trusses changes to accommodate the skew in plan the roof is stick framed with rafters and ceiling joists. The rafters frame
into short spanning ridge beams that are supported by full span girder trusses as indicated on the plan. The ceiling joists
in this area appear to splice above the interior walls below.
In these locations, we recommend supporting the existing ceiling joists up to the existing rafter above with a 2x6 each
side of each splice location per SSK-2 (attached). Upon completion of the proposed ceiling joist reinforcing, the interior
walls below may be removed.
All existing framing shall be field verified by the contractor prior to demolition. The contractor shall notify the structural
engineer if existing conditions determined during work vary from the existing construction shown on the drawing.
Ryan Anderson, PE, SE
rnderson@ssfengineers.com
(E) PREMANUFACTURED ROOF
TRUSS @ 24"oc TYP UNO
EXISTING INTERIOR
WALLS TO BE REMOVED '
i
(E) RIDGE
(E) GIRDER TRU06 SS �i
G1RpER TRUSS
® � � ,I,,
PROVIDE 2x6 VERTICAL EA '
CEILING JOIST EA SIDE OF
EA SPLICE LOCATION TO
RAFTER ABOVE PER SSK-2
Partial Roof FraMng Ran
T s°=T -o°
'RUCTURAL
IGINEERING
2124 Third Avenue - Suite loo - Seattle, WA 98121
p:2o6.443.6212 ssfengineers.com
Project Title:
21302 93rd PI. W. Edmonds
Sheet Title:
Partial Roof Framing Plan
Date SSF project no.
01/27/21 12665-2021-01
Design
RJA
Drawn Sheet
RJA
SSK-1
LS7O RAFTI
RIDGE AT
SUPPORTIN
JOIST
(E) RAFTEF
(E) RIDGE
(E) CEILINV Qdi l l
SPLICING OVER (E)
INTERIOR WALL
'RUCTURAL
IGINEERING
(3) 0.22" 0 SDWS SCREW
VERTICAL 2x6 TO (E)
CEILING JOIST AND RAFTER.
PROVIDE SOLID BLOCKING
AS REQD FOR ALIGNMENT
AND PROVIDE SCREWS w/
FULL PENETRATION INTO
JOIST AND RAFTER
PROVIDE 2x6 VERTICAL
SUPPORT EA SIDE OF
CEILING JOIST SPLICE TO
RAFTER ABOVE.
W --INTERIOR WALL TO BE
REMOVED
Project Title: Date
21302 93rd PI. W. Edmonds 01/27/21
Sheet Title:
Ceiling Joist Reinforcing
Design
RJA
SSF project no.
12665-2021-01
Drawn Sheet
RJA
SSK-2