Building Permit (2)MISCELLANEOUS Permit
� J
City of Edmonds
www.edmondswa.gov
Type: MISCELLANEOUS Owner/ Business: DOINA COPACEANU Status: ISSUED
Subtype: PARKING LOT
Parcel No: 00434401600300 Site Address: 306 MAIN ST EDMONDS,WA 98020-3136
Applied: 4/7/2021
Subdivision: 004344 Lot: 0
Issued: 5/7/2021
Fire Sprinklers: Lot Area: Zoning:
Final:
Valuation: $7,700.00 Occupancy Type: Construction Type:
Expiration Date: 11/3/2021
Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0
Issued by: JOK
Scope of Work: DIAMOND PARKING- CONVERT EXISTING PARKING TO PAID PARKING
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME
ADDRESS I
PHONE
EMAIL
APPLICANT
DOINA COPACEANU
605 FIRST AVE 600, SEATTLE WA
(360)220-7966
DOINA.COPACEANU@DIAMONDPARK
98104
ING.COM
CONTACT
DIAMOND PARKING
605 FIRST AVE FIRST AVE,
(360)220-7966
doina.copaceanu@diamondparking.c
SERVICES LLC
SEATTLE WA 98104
om
CONTRACTOR
MR ENTERPRISES
11853 GLENDALE WAY S,
(206)588-3635
SEATAC WA 98168
OWNER
HUI MAIN STREET LLC
2100 22ND AVE S, SEATTLE WA
98144
DESCRIPTION
ACCOUNT
7001.000.321.99.100.00
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
$40.00
$40.00
4/12/21
R11608
PER PERMIT
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$290.80
$290.80
5/6/21
R12203
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$247.18
$247.18
4/12/21
R11608
TOTALS: $577.98 $577.98
17
CONDITION TYPE
STATUS
NOTES
Printed: Friday, May 07, 2021 2:59:15 PM 1 of 2
IMFe
PermitMISCELLANEOUS
City • Edmonds
121 5th
www.edmondswa.gov
Ave N, Edmonds WA 9802LO 131-1]12021-04�193
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
INSPECTIONS•• •nline at: https://Inspection.MyBuildingPermit.co
COMPLETED RESULT
SEQID
INSPECTION TYPE INSPECTOR
NOTES
DATE
F-0 FIRE LANE MARKING
X-3 BUILDING FINAL"
X-2 ENGINEERING FINAL
Printed: Friday, May 07, 2021 2:59:15 PM 2 of 2