Loading...
Fallon Walls 4Daily Field Report ce • , lWay Project No: 2021-177-1 17522CorporBothOellate Northeast ILW Bothell, Washington 98011 Report No: 4 RILEYGROUp 425.415.0551 RGI rep: Lizzie Wratten www.riley-group.com Date: Sept 9, 2021 Day Thursday Permit No: BLD2021-0886 Page No. 1 of 1 Project: Fallon Walls Subject: Wall Construction Location: 1116 Vista Place, Edmonds Contractor: FM Enterprise LLC Client Name: Eddie Fallon Superintendent Felix Mata 425-322-8250 & Address: 1116 Vista Place Visitors: Edmonds, Washington 98020 Weather: Sunny OBSERVATIONS RGI was onsite to observe the wall construction pr( Contractor has started placing the third layer of blc installed drainage behind the entire length of the v Perforated drain pipe has been surrounded by drai the depth of the first blocks, and surrounded all thi filter fabric. More rock is arriving on site to backfill wall to 1' below the top of the wall, contractor exp done backfilling by Monday. The last of the blocks are arriving on site later toda The cuts appear stable but raveling of the soils sho expected. Special care should be taken when settir the excavator is located on top of the cut. No tracking was observed and a silt fence is installed on the downslope portion of the project below the wall location. RGI Rep sign: Lik3ie1Wr tttevy Copies To: Reviewed by 1(K4VbrLa1WaU,e4- The Riley Group, Inc.