Fallon Walls 5Daily Field Report
• ,Corporate ce
Project No:
2021-177-1
17522 Bothell'Way Northeast
Bothell, Washington 98011
Report No:
S
RILEYGROUp 425.415.0551
RGI rep:
Lizzie Wratten
www.riley-group.com
Date:
Sept 10, 2021 Day Friday
Permit No: BLD2021-0886
Page No.
1 of 1
Project: Fallon Walls
Subject:
Wall Construction
Location: 1116 Vista Place, Edmonds
Contractor:
FM Enterprise LLC
Client Name: Eddie Fallon
Superintendent
Felix Mata 425-322-8250
& Address: 1116 Vista Place
Visitors:
Edmonds, Washington 98020
Weather:
Cloudy
OBSERVATIONS
RGI was onsite to observe the wall construction progress.
Contractor has finished placing the third layer of blocks. Perforated drain pipe has been surrounded by
drain rock to V below the top block, and surrounded with filter fabric along the entire length of the wall.
The front and back of the wall have been loosely backfilled with native materials. A jumping jack is on site
but nothing appears to have been compacted yet.
The cuts have mostly been backfilled and
are stable or sloped
No tracking was observed and a silt
fence is installed on the downslope
portion of the project below the wall
location.