Loading...
2021-10-27 Planning Board PacketPlanning Board Remote Zoom Meeting Agenda 121 5th Ave. N. Edmonds, WA 98020 www.edmondswa.gov Michelle Martin 425-771-0220 Wednesday, October 27, 2021 7:00 PM Virtual Online Meeting Remote Meeting Information Join Zoom Meeting: https://zoom.us/j/98720508263?pwd=VUhBNO9OaWQvSkhJNOtTb3NhQytBQT09 Meeting ID: 987 2050 8263. Passcode: 155135. Call into the meeting by dialing: 253-215-8782 Land Acknowledgement for Indigenous Peoples We acknowledge the original inhabitants of this place, the Sdohobsh (Snohomish) people and their successors the Tulalip Tribes, who since time immemorial have hunted, fished, gathered, and taken care of these lands. We respect their sovereignty, their right to self-determination, and we honor their sacred spiritual connection with the land and water. 1. Call to Order Attendee Name Present Absent Late Arrived 2. Approval of Minutes 3. Announcement of Agenda 4. Audience Comments 5. Administrative Reports 6. Public Hearings A. Generic Agenda Item (ID # 5884) Public Hearing on Proposed 2022-2027 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) Background/History This item was introduced to the Planning Board on October 13, 2021. The City's Capital Facilities Plan (CFP) Element is updated annually and identifies capital projects for at least the next six years, which support the City's Comprehensive Plan. CFP projects are capital Planning Board Page 1 Printed 1012612021 Remote Zoom Meeting Agenda October 27, 2021 improvement projects that expand existing facilities/infrastructure or provide new capital facilities in order to accommodate the City's projected population growth in accordance with the Growth Management Act. Thus, capital projects that preserve existing capital facilities are not CFP projects. These preservation projects are part of the six -year capital improvement program (CIP) along with capital facility plan projects that encompass the projected expenditure needs for all city capital related projects. Staff Recommendation Recommend approval to City Council. ATTACHMENTS: • Attachment 1 - Public Works & Utilities Proposed 2022-2027 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) (PDF) • Attachment 2 - Parks Proposed 2022-2027 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) (PDF) • Attachment 3 - Public Works & Utilities CFP-CIP Planning Board Presentation 10_27_21 (PDF) • Attachment 4 - Parks CFP-CIP Presentation (PDF) 7. Unfinished Business 8. New Business A. Generic Agenda Item (ID # 5889) Code Amendment to Update Residential Occupancy Standards Background/History The Washington State Legislature adopted Senate Bill (SB) 5235 during the 2021 legislative session to address "Housing Unit Inventory - Removing Limits." It was signed by the Governor in May 2021 and addresses local control over residential occupancy restrictions. Specifically, it limits a local government's ability to regulate the number of occupants living within a household (dwelling). The only exceptions are for occupancy limits assigned in the Building Code, group homes, and short-term rentals. The applicable portion of SB 5235 is provided as Attachment 1. Note: The majority of SB 5235 was vetoed by the Governor. To avoid confusion, the vetoed and non -applicable sections have not been included. Note: This initial discussion was moved from the October 13, 2021 agenda because of time constraints. Staff Recommendation None at this time. This is an introduction of the topic. ATTACHMENTS: • Attachment 1 - SB 5235 (Simplified) (PDF) • Res Occupancy Pres 10.27.21 (PDF) B. Generic Agenda Item (ID # 5892) Selection of Student Representative to the Planning Board Background/History N/A Planning Board Page 2 Printed 1012612021 Remote Zoom Meeting Agenda October 27, 2021 Staff Recommendation N/A ATTACHMENTS: • Lily Distelhorst-Student Rep Application (PDF) 9. Planning Board Extended Agenda A. Generic Agenda Item (ID # 5881) Extended Agenda 10/27 Background/History N/A Staff Recommendation Review of the Extended Agenda. ATTACHMENTS: • 10-27-2021 PB Extended Agenda (DOCX) 10. Planning Board Chair Comments 11. Planning Board Member Comments 12. Adjournment Planning Board Page 3 Printed 1012612021 6.A Planning Board Agenda Item Meeting Date: 10/27/2021 Public Hearing on Proposed 2022-2027 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) Staff Lead: Rob English, Angie Feser & Shannon Burley Department: Engineering Prepared By: Rob English Background/History This item was introduced to the Planning Board on October 13, 2021. The City's Capital Facilities Plan (CFP) Element is updated annually and identifies capital projects for at least the next six years, which support the City's Comprehensive Plan. CFP projects are capital improvement projects that expand existing facilities/infrastructure or provide new capital facilities in order to accommodate the City's projected population growth in accordance with the Growth Management Act. Thus, capital projects that preserve existing capital facilities are not CFP projects. These preservation projects are part of the six -year capital improvement program (CIP) along with capital facility plan projects that encompass the projected expenditure needs for all city capital related projects. Staff Recommendation Recommend approval to City Council. Narrative The 2022-2027 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) are being presented in a different format this year. In previous years, the CFP and CIP were separate documents and projects in the CIP were organized by the City's financial funds. This year, staff combined the CFP and CIP into one document with project lists that identify Capital Facility projects and project information sheets for all projects and programs. The Public Works and Utilities Department proposed 2022-2027 CFP/CIP is included as Attachment 1. The Parks, Recreation & Cultural Services Department proposed 2022-2027 CFP/CIP is included as Attachment 2. The October 27th presentations from Public Works & Utilities (Attachment 3) and the Parks, Recreation & Cultural Services Department (Attachment 4) are attached. Following the Planning Board's public hearing and recommendation, the City Council will also hold a public hearing prior to final approval. Attachments: Attachment 1 - Public Works & Utilities Proposed 2022-2027 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) Packet Pg. 4 6.A Attachment 2 - Parks Proposed 2022-2027 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) Attachment 3 - Public Works & Utilities CFP-CIP Planning Board Presentation 10_27_21 Attachment 4 - Parks CFP-CIP Presentation Packet Pg. 5 Packet Pg. 6 6.A.a Index TRANSPORTATION & UTILITY PROJECT MAP ..................................................... 2 FACILITIES & WWTP PROJECT MAP....................................................................... 3 TRANSPORTATION PROJECT LIST........................................................................4-6 TRANSPORTATION PROJECT SHEETS............................................................. ..7-64 WATER PROJECT LIST..........................................................................................65-66 WATER PROJECT SHEETS....................................................................................67-69 STORMWATER PROJECT LIST............................................................................70-71 STORMWATER PROJECT SHEETS......................................................................72-81 SEWER PROJECT LIST...........................................................................................82-83 SEWER PROJECT SHEETS.....................................................................................84-88 FACILITIES PROJECT LIST...................................................................................89-90 FACILITIES PROJECT SHEETS...........................................................................91-108 WASTEWATER TREATMENT PLANT PROJECT LIST.................................109-110 WASTEWATER TREATMENT PLANT PROJECT SHEETS...........................111-114 CIP-CFP COMPARISON(2021-2027).................................................................115-118 Packet Pg. 7 1 -11. 1 C" Public Works & Utilities Department TRANSPORTATION & PW D-04� UTILITY PROJECTS �� � WT-28 Projects o Sewer o Stormwater • Street/Intersection Project o Non -Motorized Transportation Project o Water Sewer Street/Intersection Project Non -Motorized Transportation Project PWT-05 PWT-17 • • PWT-24 • PWT-03 PWT-09 I PWT-12 F7= PWT-35 PWT-ZPWT-16 PWT-19 • PWT-11 PWT-1/ -13 IPWT-14 I WT-31 WT-50 PWS-11 P�Y.YII��f07 MMWr��<fflw PWT-10 * Site specific projects only. Citywide/annual citywide projects not shown. PWT-43 10 PWT OV BDD4 Public Works & Utilities Department FACILITIES & In ,�yo WWTP PROJECTS p�P 9Sovat3pragStfx � . PWF-01 �,ati M Q iQWF-07 ,. M ✓ �� p' �e// � �� Edmonds_St_ �a� Sjr P h`r I �'.4 r PWF-16 ■ '✓abjes� °` PWFj03` zr�j��1M� L;� • Mai tP.W,F.-09 > sell St PWF-10� L liiiFIon•• lo MAIN-ST _ 0 PW� a 05 , yDayton St N Dayton St • PWF-13 ¢� ��� a �� CO)f y:r Q O ` a) Maple St M Q O G Alder St NON� ���•r N� p �` Alder St a L Walnut St Walnut St his Ell , IIEW PWF-07 PWI PWF-04 PWF-09 • PWI PWF-03 PWF-10 00 PWF-13 P Projects ' � ��� o Facilities ► I o WWTP 1 I � �II ■I1LV� 1 04 I * Site specific projects only. Citywide/annual citywide projects not shown. �= Packet Pg. 9 6.A.a TRANSPORTATION FL_ U_ E to L O L CL Qi E i O L Q E Q m U 06 El U- U_ c R a N O R LL R .Q R U ti N O N N N O N d N O 0. O L a w O 'rr 06 fA Y L O :.i 3 d r a Packet Pg. 10 Transportation Projects 6.A.a # CFP PROJECT DP 2022 2023 2024 2025 2026 2027 TOTAL TOTAL TOTAL # (2022-2027) (2028-42) Project Cost Preservation / Maintenance Proiects PWT-01 lAnnual Street Preservation Program 76 $1,500,000 $1,500,000 $1,500,000 $1,386,000 $1,650,000 $1,650,000 $9,186,000 $0 $9,186,00C PWT-02 84th Ave. W Overlay from 220th St. SW to 212th St. SW 84 $5,780 $0 $0 $0 $0 $0 $5,780 $0 $5,78C PWT-03 76th Ave. W Overlay from 196th St. SW to Olympic View Dr. 78 $1,663,723 $0 $0 $0 $0 $0 $1,663,723 $0 $1,663,722 PWT-04 Main St. Overlay from 6th Ave. to 9th Ave. $0 $157,000 $780,000 $0 $0 $0 $937,000 $0 $937,00C PWT-05 Puget Dr. @ OVD Signal Upgrades $0 $0 $0 $80,000 $450,000 $0 $530,000 $0 $530,OOC PWT-06 Signal Upgrades - 100th Ave @ 238th St. SW $0 $0 $0 $150,0001 $700,000 $0 $850,000 $0 $850,OOC PWT-07 Main St. @ 3rd Signal Upgrades sol sol $0 $0 $100,0001 $350,0001 $450,000 $0 $450,OOC Safetv / Canacity Analvsis PWT-08 X 228th St. SW from Hwy 99 to 95th PI. W Corridor $0 $0 $0 $1,000,000 $1,700,000 $12,000,000 $14,700,000 $0 $14,700,OOC PWT-09 X Hwy 99 Revitalization & Gateway Project - Stage 2 80 $7,660,000 $0 $0 $0 $0 $0 $7,660,000 $0 $7,660,OOC PWT-10 X Hwy 99 Revitalization & Gateway Project - Stage 3 81 $640,000 $3,200,000 $1,930,000 $16,000,000 $10,752,000 $0 $32,522,000 $0 $32,522,OOC PWT-11 X Hwy 99 Revitalization & Gateway Project - Stage 4 82 $400,000 $2,000,000 $3,000,000 $3,167,000 $16,000,000 $16,434,000 $41,001,000 $0 $41,001,00C PWT-12 X Hwy 99 Revitalization & Gateway Project - Stage 5 $0 $0 $0 $0 $2,080,000 $4,964,000 $7,044,000 $37,971,000 $45,015,00( PWT-13 X Hwy 99 Revitalization & Gateway Project - Stage 6 $0 $0 $0 $0 $0 $0 $0 $20,217,000 $20,217,00C PWT-14 X Hwy 99 Revitalization & Gateway Project - Stage 7 $0 $0 $0 $0 $0 $0 $0 $38,142,000 $38,142,00C PWT-15 X Hwy 99 Revitalization & Gateway Project - Stage 8 $0 $0 $0 $0 $0 $0 $0 $35,242,000 $35,242,OOC PWT-16 X Hwy 99 Revitalization & Gateway Project - Stage 9 $0 $0 $0 $0 $0 $0 $0 $20,072,000 $20,072,00C PWT-17 X SR 524 196th St. SW / 88th Ave. W - Intersection Improvements $0 $0 $0 $238,000 $216,000 $720,000 $1,174,000 $0 $1,174,00C PWT-18 X Main St. @ 9th Ave. Intersection Improvements $0 $0 $0 $176,000 $1,000,000 $0 $1,176,000 $0 $1,176,OOC PWT-19 X 76th Ave. W @ 220th St. SW - Intersection Improvements 83 $276,902 $387,439 $725,000 $6,881,000 $0 $0 $8,270,341 $0 $8,270,341 PWT-20 SR-104 Adaptive System 86 $150,000 $260,000 $0 $1,955,000 $0 $0 $2,365,000 $0 $2,365,OOC PWT-21 X SR-104 tooth Ave W. Intersection & Access M mt m rovements $0 $0 $0 $160,000 $931,000 $0 $1,091,000 $0 $1,091,000 PWT-22 X SR-104 @ 95th PI. W Intersection Improvements $0 $0 $0 $80,000 $450,000 $0 $530,000 $0 $530,OOC PWT-23 X SR-104 @ 238th St. SW Intersection Improvements $0 $0 $0 $213,000 $1,219,000 $0 $1,432,000 $0 $1,432,OOC PWT-24 X Olympic View Dr. @ 76th Ave. W Intersection Improvements $0 $0 $0 $0 $0 $0 $0 $1,266,000 $1,266,OOC PWT-25 X 84th Ave. W (212th St. SW to 238th St. SW) $0 $0 $0 $0 $0 $0 $0 $16,622,000 $16,622,OOC PWT-26 X SR-104 @ 76th Ave. W Intersection Improvements $0 $0 $0 $481,000 $2,750,000 $0 $3,231,000 $0 $3,231,OOC PWT-27 X Olympic View Dr. @ 174th St. SW Intersection Improvements $0 $0 $0 $0 $0 $0 $0 $671,000 $671,OOC PWT-28 175th St Sope Repair $0 $1,000,000 $0 $0 $0 $0 $1,000,000 $0 $1,000,OOC PWT-57 2022 Guardrail Program 95 $20,180 $0 sol sol $0 $0 $20,180 $0 $20,18C PWT-58 2022 Traffic Signal Upgrades 88 $30,2801 $0 sol sol $0 $0 $30,280 $0 $30,28( Non -motorized transportation Proiects R; a LL V C to a to d O tL r G. C) ti N O N N N O N N to O rL O d to d r to Y O t� sZ PWT-29 X 232nd St. SW Walkway from 100th Ave. to SR-104 $0 $0 $0 $0 $206,000 $1,183,000 $1,389,000 $0 $1,389,00C d PWT-30 X 236th St. SW Walkway from Madrona Elementary to 97th Ave. W $0 $0 $0 $0 $227,000 $1,267,000 $1,494,000 $0 $1,494,OOC PWT-31 X 236th St. SW Walkway from Hwy. 99 to 76th Ave. W $0 $0 $0 $0 $0 $0 $0 $1,831,000 $1,831,00C PWT-32 X 84th Ave. W Walkway from 238th St. SW to 234th St. SW $0 $0 $0 $0 $150,000 $640,000 $790,000 $0 $790,OOC 4) PWT-33 X 80th Ave. W Walkwayfrom 212th St. SW to 206th St. SW $0 $0 $0 $209,000 $209,000 $2,476,000 $2,894,000 $0 $2,894,00C t PWT-34 X 80th Ave. W Walkway from 188th St. SW to Olympic View Dr. $0 $0 $0 $597,000 $2,339,000 $0 $2,936,0001 $0 $2,936,OOC v PWT-35 I X 1218th St. SW Walkway from 76th Ave. W to 84th Ave. W 1 $0 $0 $0 $0 $240,000 $1,350,000 $1,590,000 Sol $1,590,00C r PWT-36 X Walnut St. Walkway from 6th Ave. S to 7th Ave S $0 $0 $0 $265,000 $0 $0 $265,000 $0 $265,00C Q PWT-37 X 216th St. SW Walkway from Hwy. 99 to 72nd Ave W $0 $0 $0 $200,000 $0 $0 $200,000 $0 $200,00C PWT-38 Citywide Pedestrian Enhancements Project 85 $10,000 $0 $0 $0 $0 $0 $10,000 $0 $10,OOC O PWT-39 X Citywide Bicycle Improvements Project 79 $1,562,390 $0 $0 $0 $0 $0 $1,562,390 $0 $1,562,39C PWT-40 X Maplewood Dr. Walkway from Main St. to 200th St. SW $0 $0 $0 $201,000 $201,000 $2,300,000 $2,702,000 $0 $2,702,00C V O PWT-41 I X 195th PI. W Walkway from 224th St. SW to 220th St. SW $0 $0 $0 $120,000 $668,000 $0 $788,000 $0 $788,00C +�'+ PWT-42 X I Railroad St. Walkway from Dayton St. to Main St. / SR-104 $0 $0 $0 $170,000 $754,000 $0 $924,000 $0 $924,00( Q PWT-43 X SR-104 76th Ave. W Non -Motorized Trans Improvements $0 $0 $0 $0 $0 $0 $0 $1,294,000 $1,294,000 PWT-44 X Downtown Lighting Improvements $0 $0 $0 $300,0001 $1,200,000 $0 $1,500,000 PWT-45 X SR-104 Walkway: HAWK to Pine/Pine from SR-104 to 9th $0 $0 $0 $327,0001 $327,000 $2,636,000 $3,290,000 Packet Pg. 11 Transportation Projects 6.A.a # CFP PROJECT DP # 2022 2023 2024 2025 2026 2027 TOTAL (2022-2027) TOTAL (2028.42) TOTAL Project Cost PWT-46 X 191st St. SW Walkway from 80th Ave. W to 76th Ave. W $0 $0 $0 $0 $0 $0 $0 $678,000 $678,OOC PWT-47 X 104th Ave. W / Robinhood Lane Walkway from 238th St. SW to 106th $0 $0 $0 $0 $0 $0 $0 $1,060,000 $1,060,OOC PWT-48 X 80th Ave. W Walkway from 218th St. SW to 220th St. SW $0 $0 $0 $0 $0 $0 $0 $324,000 $324,OOC (LL PWT-49 X 84th Ave. W Walkway from 188th St. SW to 186th St. SW $0 $0 $0 $0 $0 $0 $0 $328,000 $328,OOC U PWT-50 X 238th St. SW Walkway from Hwy. 99 to 76th Ave. W $0 $0 $0 $0 $0 $0 $0 $1,285,000 $1,285,OOC C PWT-55 X Elm Way Walkway from 8th Ave. S to 9th Ave. S 93 $901,780 $0 $0 $0 $0 $0 $901,780 $0 $901,78C d PWT-56 X 2022 Pedestrian Safety Program 87 $20,185 $0 $0 $0 $0 $0 $20,185 $0 $20,18E ui aV Ferry Projects PWT-51 Fx IFerry Storage Improvements from Pine St. to Dayton St. $0 $0 $0 $357,000 $0 $0 $357,000 $0 $357,OOC .� R Traffic Calming LL PWT-52 ITraffic Calming Program 11 94 1 $33,1301 $18,0001 $18,0001 $18,0001 $18,0001 $18,00011 $123,130 $0 $123,13C .Q Traffic Planning Projects PWT-53 I Citywide ADA Transition Plan 1 $0 $100,000 $0 $01 $0 $0 $100,000 $0 $100,OOC PWT-54 I ITransportation Plan Update 77 1 $185,000 $0 $0 $0 $0 $0 $185,000 $0 $185,OOC C N Total Projects $15,059,350 $8,622,439 $7,953,000 $34,731,000 $46,537,000 $47,988,000 $160,890,789 $177,003,000 $337,893,7K N N e Funding Source 2022 2023 2024 2025 2026 2027 TOTAL (2022-2027) TOTAL (2028.42) TOTAL (2022-2027) Street Fund 112 - Gas Tax & Multi -modal revenue $185,000 $131,000 $156,000 $150,000 $150,000 $150,000 $922,000 $0 $922,000 REET Fund 125 $835,199 $0 $0 $0 $0 $0 $835,199 $0 $835,199 REET Fund 126 $1,382,400 $1,596,000 $1,518,000 $1,518,000 $1,518,000 $1,518,000 $9,050,400 $0 $9,050,40C Transportation Impact Fees $60,000 $75,609 $343,750 $145,000 $500,000 $0 $1,124,3591 $0 $1,124,35£ General Fund $500,000 $0 $0 $0 $0 $0 $500,000 $0 $500,OOC Stormwater Utility Fund 422 $371,272 $25,000 $5,000 $0 $0 $0 $401,272 $0 $401,272 Federal Grants $936,428 $1,811,830 $1,343,250 $0 $0 $0 $4,091,508 $0 $4,091,50E State Grants $8,700,000 $3,700,000 $2,607,000 $0 $0 $0 $15,007,000 $0 $15,007,OOC Other $2,073,211 $0 $0 $0 $0 $0 $2,073,211 $0 $2,073,211 Unsecured Funding $0 $1,268,000 $1,975,000 $32,918,000 $44,369,000 $46,320,000 $126,850,000 $177,003,0001 $303,853,OOC N to O M O L tL to d r 06 to Y L O Total Revenue $15,059,350 $8,622,439 $7,953,000 $34,731,000 $46,537,000 $47,988,000 $160,890,789 $177,003,000 $337,893,7K ,V B 3 d C N E t U R r Q C d t v to Q Packet Pg. 12 6 Project Description Annual pavement preservation program to maintain City streets. Project Benefit Maintains the City's pavement infrastructure and reduces the need for larger capital investment to rebuild City steets. Estimated Project Cost $1,500,000/ year Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $225,000 $150,000 $150,000 $150,000 $200,000 $200,000 $1,275,000 $1,350,000 $1,350,000 $1,236,000 $1,450,000 $1,450,000 $1,500,000 $1,500,000 $1,500,000 $1,386,000 $1,650,000 $1,650,000 $150,000 $150,000 $150,000 $500,000 $500,000 $1,500,000 $1,500,000 $1,236,000 $1,500,000 $1,500,000 $500,000 $1,500,000 $1,500,000 $1,500,000 $1,386,000 $1,650,000 $1,650,000 7 Packet Pg. 13 212TH ST SW r 2161n &L 514 < :.sly A 'T ' I i 220TH.ST Project Description Pavement overlay of 84th Ave. W from 220th St. SW to 212th St. SW, with curb ramps upgrades, RRFB's at the existing crosswalk in front of the Chase Lake Elementary School, and bike lane addition from 215th St. SW to 212th St. SW on both sides of the street. This project is funded through a secured Federal grant and local funds. The project will be completed in fall 2021 and the funding in 2022 is necessary to close-out the project and complete the grant documents. Project Benefit Improve pavement condition and active transportation safety along the corridor. Estimated Project Cost $1,130,000 Design Right of Way Construction $5,780 Expense Total $5,780 Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 $780 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants $5,000 State Grants Unsecured Funding Funding Source Total $5,780 Packet Pg. 14 Q;- w Qe6 Sk 5i4 155th S? SW '7 Q C •- a L %HhLh Se b1+r Q. W 1&11h PI 8W 7 �88TWST SW'' _ 1$d p1 X� Penny Lfi r 93 $ i89uk P7 Si �k1'F4+de S1 54h �- 191MI St SW ii_a T 192+kd Pl &W 5w Malt. wp' # 1920 PF M P3jr4 3iq* 1?JFd W • > 193r sW N #51 Nw S 4JI cm u t d _VNN= Project Description Pavement overlay of 76th Ave. W from 196th St. SW to Olympic View Dr. with pedestrian curb ramps upgrades, RRFB's at the proposed crosswalk at 75th PI. W, and possible addition of a bike lane for the northbound movement. This is a joint project funded by the Cities of Edmonds and Lynnwood, since the west half of the street is in the City of Edmonds and the east half is in the City of Lynnwood. Project Benefit Improve pavement condition, install new Rapid Rectangular Flashing Beacons (RRFB's) for pedestrian safety and upgrade pedestrian curb ramps to meet ADA standards. In addition to the existing southbound bike lane, the project may add a new northbound bike lane as outlined in the City's Transportation Comprehensive Plan. Estimated Project Cost 1,955,000 Design Right of Way Construction $1,663,723 Expense Total $1,663,723 Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 $274,195 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants $639,788 State Grants Other $749,740 Unsecured Funding Funding Source Total $1,663,723 Packet Pg. 15 G Edmonds Polito and Orvic Pinyfleid Municipal Court Veteran's. Z LL3 Playa y Bell sr r_i st .� { F_ IN A Sno•Isla Frances Artdvrron Par Par ,s ■ 0 Library Anderson enter 7 0 IL C@nter Field LU Uavton S . Christian,CrL � Science Church Project Description Pavement overlay along Main St. from 6th Ave. to 9th Ave. with pedestrian curb ramps upgrades and Rectangular Rapid Flashing Beacons (RRFB's) at the existing pedestrian crosswalk at 8th Ave. The project will be funded with a federal grant (funds available in 2023) and City funds for a local match. Project Benefit Improve pavement conditions on this segment of Main St., pedestrian safety with the addition of RRFB's, and pedestrian accessibility with the ADA curb ramp. Estimated Project Cost $937,000 Design $157,000 Right of Way Construction $780,000 Expense Total $157,000 $780,000 Street Fund 112 - Gas Tax & Multi -modal re $31,000 $156,000 REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants $126,000 $624,000 State Grants Unsecured Funding Funding Source Total $157,000 $780,000 Packet Pg. 16 10 a C• PU ET DR Project Descriptio The project consists of a complete signal rebuilt, with the removal of all vehicle head currently on spam wire and conversion to standard traffic signal poles with mast arms. Vehicle detention will also be upgraded as part of this project. Project Benefit his upgrade will provide safer roadway conditions since the vehicle heads aren't fixed while handing on those wires. The new vehicle detection will guarantee that all vehicles will be detected. Estimated Project Cost $530,000 Design $80,000 Right of Way Construction $450,000 Expense Total $80,000 $450,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $80,000 $450,000 Funding Source Total $80,000 $450,000 Packet Pg. 17 11 1' S Vr 2381h St SW Faith f� F Cornrnunity < Church Project Description Install new traffic signal and vehicle detection system. Project Benefit _V The existing traffic signal is near the end of its anticipated service life. Estimated Project Cost $850,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total 23sth Si $150,000 $700,000 $150,000 $700,000 $150,000 $700,000 $150,000 $700,000 ir 23 7th F' Packet Pg. 18 12 Orackom La nd i ng"t 5avth 0 -f it F dr Railroad `'Sf Si�CiC►t r �ti. � � ' w Edmonds Palici "t and Municipal At / ' Court li:ni Park co Aiv Uateran'! ' r '&V Edmonds Cenlignnial Plaa� 4k- City Hall Playa Oell S ` ■ Foiirit in MAIN ST � Project Description Install new traffic signal and vehicle detection system. Project Benefit 79 The existing traffic signal is near the end of its anticipated service life. Estimated Project Cost $450,000 Design $100,000 Right of Way Construction $350,000 Expense Total $100,000 $350,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $100,000 $350,000 Funding Source Total $100,000 $350,000 Packet Pg. 19 13 _ PERAN E L +'Ir t r IF"� Syr IF2�gyn' !g #' i- a w �'in 4 * ;motFs�Lr •". # * Yid . ` 1.10 w - t F Let- r�'t � y * J q y + t a 23� St SW 7bfiif-h `a SW # i r T ',LF r r i WM k *" ■' # € " L. r: � • ,, dart Lit {r.ti ��; ,. :c1.1 �� �rgig-*� •�mi•liWI a� ��..� #++ r *M-0 i tlx.* '* t t �k4lS�U1Mr q 1 R h. I. R ;4t+ a �■ + �"T t.SV} } • �i* ° rt: P #t t f: w�i—4fR1P;eRt y Q r*! i� . 234t1e ;St 4 .ram +1TLMY i' Project Description Widen 228th St. SW from Hwy. 99 to 95th PI. W to three lanes (with center two-way left turn lane), with curb and gutter, sidewalk, and bike lanes. Project Benefit This project would improve active transportation safety and traffic flows along this corridor. Community Transit will evaluate the possibility of creating a new east -west bus route along 228th St. SW, if this project moves forward (connecting Edmonds Transit Station to Mountlake Terrace Transit Station). Estimated Project Cost $14,700,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $1,000,000 $700,000 $1,000,000 $12,000,000 $1,000,000 $1,700,000 $12,000,000 $1,000,000 $1,700,000 $12,000,000 $1,000,000 $1,700,000 $12,000,000 14 Packet Pg. 20 6OWZ)0 f J rL 03 04 In 17j, 244TH ST S 232-THS1-,T*— - LU n W a > 3 Pik } ? Jto 4 0 W Ifs >236TH-ST SW 244TI J ET SLV Project Description Installation of raised landscaped median along Highway 99 corridor from 244th St. SW to 212th St. SW, addition of"Gateway" signage on both ends of the corridor, and a new pedestrian HAWK signal just north of 234th St. SW. The project is funded from state funds provided by the Connecting Washington Transportation program. Project Benefit The conversion of the center two-way left turn lane to a landscaped raised median will improve corridor safety along this Highway of Regional Significance (HRS), with an Average Daily Traffic (ADT) of — 35,000 vehicles per day. The new HAWK signal will provide a signalized pedestrian crossing between the existing traffic signals at 238th St and 228th St. Estimated Project Cost 9,033,000 Design Right of Way Construction $7,660,000 Expense Total $7,660,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants $7,660,000 Unsecured Funding Funding Source Total $7,660,000 A 15 Packet Pg. 21 244TH 0 SW bAsa ; 'E.j ! *:Ir_X_ z `_.. J' fe sw 24151 S= it �4K.E,BALL,INGER WAY tVAY� L,4�{E �k,�d1N0EF 1 I Project Description The Stage 3 Highway 99 project limits are from 244th St SW to 238th St. SW. The project will construct wider sidewalks with a planter strip, new street lighting, improved stormwater facilities, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments. The Design and right of way phases are funded through secured Connecting Washington funds. Project Benefit Improve aesthetics, safety, and user experience along this segment of the Hwy 99 corridor. Estimated Project Cost $32,522,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $640,000 $2,000,000 $712,000 $1,200,000 $1,218,000 $16,000,000 $10,752,000 $640,000 $3,200,000 $1,930,000 $16,000,000 $10,752,000 $640,000 $3,200,000 $1,875,000 $55,000 $16,000,000 $10,752,000 $640,000 $3,200,000 $1,930,000 $16,000,000 $10,752,000 16 Packet Pg. 22 .4 F i; T se w 222hd Si 5W a Jq ro togf isP, y r Project Description fit P1a sw int41 - ti t u,nc eu _w J ' U.JI— z 0 or To -=" The Stage 4 Highway 99 project limits are from 220th St SW to 224th St. SW. The project will construct wider sidewalks with a planter strip, new street lighting, improved stormwater facilities, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments. The intersection of Highway 99 and 220th St. will be widened to add capacity and improve the level of service. The Design and right of way phases are funded through secured Connecting Washington funds, a federal grant and local transportation impact fees. Project Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved Estimated Project Cost $41,001,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $400,000 $1,500,000 $1,500,000 $688,000 $500,000 $1,500,000 $2,479,000 $16,000,000 $16,434,000 $400,000 $2,000,000 $3,000,000 $3,167,000 $16,000,000 $16,434,000 $1,232,000 $348,000 $400,000 $500,000 $732,000 $268,000 $1,920,000 $400,000 $2,000,000 $3,000,000 $3,167,000 $16,000,000 $16,434,000 $3,167,000 $16,000,000 $16,434,000 Packet Pg. 23 17 Project Description Along Hwy 99 from 216th St SW to 212th St. SW, the project will include wider sidewalks with a planter strip, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Project Benefit Improve aesthetics, safety, and user experience. In addition, future economic development will be improved along the corridor. Estimated Project Cost $45,015,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $1,580,000 $2,013,000 $1,000,OC $500,000 $2,951,000 $1,000,OC $35,971,OC $2,080,000 $4,964,000 $37,971,00 $2,080,000 $4,964,000 $37,971,OC $2,080,000 $4,964,000 $37,971,00 is Packet Pg. 24 SPE tAN . _ t- 23MI, 51 SW � l�'im it $Vj :' M&I�nhD IJ+ Ar Wi At . # 23511i St~StiA' M '..ZTI•{ ST ';-a Project Description ti h LL LL 29Gtti st SW Cis y _ LW Along Hwy 99 from 238th St. SW to 234th St. SW, the project will include wider sidewalks with a planter strip, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Project Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Estimated Project Cost $20,217,000 Design $2,146,OC Right of Way $1,433,OC Construction $16,638,OC Expense Total $20,217,00 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $20,217,OC Funding Source Total $20,217,00 Packet Pg. 25 19 ESPERANCE 5-.A _ 1;�*iaf* 228 TH ST SW i 5 i ;sit IF .� Pon a iPh # 4 Ztn 51 9W r — 4 -� r M # A % J dP i l k . �JO it f, x i■ �,..,� Mor- ■rt '3nbn sr sw :�Tureiswt r-M�.h#. r �■� ��` F i l e i � �s 14.4 HrIfV to ����04rt 6+'; 7 * � � 'A * £� I aItY*�K L ! k isIPP ■ra1Aw�l■yM' 234ih h 8W — Project Description W"A 4 W < O � 4 Along Hwy 99 from 234th St. SW to 228th St. SW, the project will include wider sidewalks with a planter strip, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Project Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Estimated Project Cost $38,142,000 A Design $4,013,OC Right of Way $5,354,OC Construction $28,775,OC Expense Total $38,142,00 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $38,142,OC Funding Source Total $38,142,00 Packet Pg. 26 20 ilia 7. i � M} IL *� F. 1W 00 ■ a * 9 2751h as 5:W G' N* am Z a % 44 mmaat e_� 225ah Sw k 5 IN -L INN LU HIM A JP 7► sw.. 'k' n A k u� $ 228TH 5T SW Project Description L I [l NTLA E w w t" t 0 It i Jr i- 226TH SIN Along Hwy 99 from 228th St. SW to 224th St. SW, the project will include wider sidewalks with a planter strip, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Project Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Estimated Project Cost $35,242,000 Design $3,596,OC Right of Way $2,439,OC Construction $29,207,OC Expense Total $35,242,00 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $35,242,OC Funding Source Total $35,242,00 Packet Pg. 27 21 A Project Description Along Hwy 99 from 220th St. SW to 216th St. SW, the project will include wider sidewalks with a planter strip, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Project Benefit Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. Estimated Project Cost $20,072,000 Design $1,866,OC Right of Way $2,036,OC Construction $16,170,OC Expense Total $20,072,00 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $20,072,OC Funding Source Total $20,072,00 Packet Pg. 28 22 seventh Day d �i Adventist Church sa 1 6tn St SW 7 96TH ST SW PU D -Q Sub LLJ Station co N . Maplewood Hill Park oa Project Descriptio Install traffic signal at the intersection of 196th St. SW @ 88th Ave. W. The modeling in the 2009 Transportation Plan indicated that restricting northbound and southbound traffic to right -turn -only (prohibiting left -turn and through movements) would also address the deficiency identified at this location through 2025. This is same alternative as one concluded by consultant in 2007 study but not recommended by City Council. This could be implemented as an alternate solution, or as an interim solution until traffic signal warrants are met. The existing LOS is F (below City Standards: LOS D). This project was ranked #6 in the Roadway Project Priority in the 2015 Transportation Plan. Project Benefit Improve traffic flow characteristics and safety at the intersection. The improvement would modify LOS to A, but increase the delay along 196th St. SW. Estimated Project Cost $1,174, 000 Design $238,000 Right of Way $216,000 a Construction $720,000 Expense Total $238,000 $216,000 $720,000 y Street Fund 112 - Gas Tax & Multi -modal re t REET Fund 125 r REET Fund 126 r Q Transportation Impact Fees $80,000 = m General Fund E s Stormwater Utility Fund 422 Federal Grants Q State Grants Unsecured Funding $158,000 $216,000 $7 Packet Pg. 29 23 Funding Source Total $238,000 $216,000 $720,000 � GJ < CrL MAIN ST .4nd�rson U7 Center ti.l Field } Yost Park A Project Description Installation of a traffic signal or mini -roundabout. The project ranked #4 in the Roadway Project Priority of the 2015 Transportation Plan. Project Benefit The existing intersection is stop -controlled for all approaches and the projected intersection LOS in 2035 is LOS F (below the City's concurrency standards: LOS D). The installation of a traffic signal would improve the intersection delay to LOS B. Estimated Project Cost $1,176,000 Design $176,000 Right of Way Construction $1,000,000 Expense Total $176,000 $1,000,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees $500,000 General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $176,000 $500,000 Funding Source Total $176,000 $1,000,000 Packet Pg. 30 24 INCO 219th St S;W 0 ea Lo I STARBUCKS 21919 0TH ST SW h w IL r 7514 P IWO � 221st PI SW ESPEI?ATE LYNWOOD Project Description Reconfigure eastbound lanes to a left turn lane and through / right turn lane. Add eastbound and westbound dedicated left turn lanes with a protected -permitted phase. Provide right turn overlap for westbound movement during southbound left turn phase. (Additional improvements include wider sidewalk, bike lanes, and various utility improvements (invluding potential conversion overhead utility lines to underground). ROADWAY PROJECT PRIORITY #1 in 2015 Transportation Plan). Project Benefit Reduce the intersection delay and improve the LOS. The projected LOS in 2035 would be improved from LOS F to LOS D. Improve active transportation conditions for pedestrians and bicycle riders. Estimated Project Cost $8,270,341 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Water Utility Fund 421 Federal Grants State Grants Unsecured Funding Funding Source Total $276,902 $287,439 $50,000 $100,000 $675,000 $6,881,000 $276,902 $387,439 $725,000 $6,881,000 $60,000 $75,609 $343,750 $21,062 $25,000 $5,000 $15,840 $15,000 $5,000 $180,000 $271,830 $371,250 $6,881,000 $276,902 $387,439 $725,000 $6,881,000 Packet Pg. 31 25 AIYMr 147 '.' m4h' ga :l1bu,. ut A¢ss Dr Q* fi . - - 71 ►ram k �.' .• } _•',,arm„ •Jilihr l �7+1 vi L.I Project Description Installation of an Adaptive System along SR-104 from 236th St. SW to 226th St. SW (total of five traffic signals along this stretch / spaced — % mile from each other). No signal communication currently exists between any of the existing traffic signals. Project Benefit Improve traffic flows along this regional corridor with a current Average Daily Traffic (ADT) of — 25,000 vehicles per day. Estimated Project Cost $2,365,000 Design $150,000 $260,000 Right of Way Construction $1,955,000 Expense Total $150,000 $260,000 $1,955,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 $45,000 REET Fund 126 $78,000 $264,000 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants $105,000 $182,000 State Grants Unsecured Funding $1,691,000 Funding Source Total $150,000 $260,000 $1,955,000 Packet Pg. 32 26 QFC PCC NATURAL MARKET 0 76 gas WALGREEN'S PARIIINO BABE{ EDMO DS WAY eQ o Q Q 0 co *r w a Gy ev o BANK � a°� a°iw 4co M o, a�a � aak � � ry ew m IVAR' a4M G N BARTELL'S — Project Description Implement Westgate Circulation Access Plan, install mid -block pedestrian crossing along 100th Ave. W, improve safety to access the driveways within proximity to the intersection, and re -striping of 100th Ave. W with the potential addition of bike lanes. This project was identified in the SR-104 Completed Streets Corridor Analysis (completed in 2015). Project Benefit Improve access and safety at the intersection and improve active transportation safety. Estimated Project Cost $1,091,000 Design $160,000 Right of Way Construction $931,000 Expense Total $160,000 $931,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $160,000 $931,000 Funding Source Total $160,000 $931,000 Packet Pg. 33 27 2281h Sr SVV PVD Sub Station CL En 7L - dinn SL LN K'V � O+ _ 28 TH ST SWi Vh�estgate �Clia pgl Project Description Upgrade all ADA Curb Ramps; and add C-Curb for access management. This project was identified in the SR-104 Complete Streets Corridor Analysis (completed in 2015). Project Benefit Improve intersection safety for pedestrians and vehicles. Estimated Project Cost $530,000 Design $80,000 Right of Way Construction $450,000 Expense Total $80,000 $450,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $80,000 $450,000 Funding Source Total $80,000 $450,000 uw w Zz LU IL uU LA w Packet Pg. 34 28 38TH ST %: x ICarean Presbyter Church Project Description Install traffic signal. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). Project Benefit Improve vehicular and pedestrian safety. Estimated Projec ost $1,432,000 Design $213,000 Right of Way Construction $1,219,000 Expense Total $213,000 $1,219,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $213,000 $1,219,000 Funding Source Total $213,000 $1,219,000 Packet Pg. 35 29 Seaview Park '0st Office L� LU ia5lh PI SW > l� L Jr 7841h PI SW aw 01) OLYMP(c v,6VV OR Lynndals Park Ai Project Description Install traffic signal (the intersection currently stop controlled for all movements). (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #11). Project Benefit The improvement will reduce the intersection delay. The projected Level of Service is LOS F in 2035, which is below the City's concurrency standards (LOS D). The project will improve the Level of Service to LOS B. Estimated Project Cost $1,266,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REST Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $213,OC a $1,053,OC $1,266,00 $1,266,OC $1,266,00 i Packet Pg. 36 30 L c a saUJ > 'UpVOO� P 212 S�Ar a , i 220TFI ST SW-LU s 7 � _J CL L } C _ 9C r LU 4LU s 287}i T StiN WD 4 228TH :S t' u C 2367FI S7�r t s 0 t Project Descriptio Widen 84th Ave. W to (3) lanes with curb, gutter, bike lanes, and sidewalk on each side of the street. (part of this project was ranked #6 in the Long Walkway list of the 2015 Transportation Plan). Project Benefit Improve traffic flow, access and active transportation uses by installing a center two way left turn lane, sidewalks, bike lanes and street lighting. Estimated Project Cost $16,622,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $2,122,OC a $14,500,OC $16,622,00 $16,622,OC $16,622,00 i Packet Pg. 37 31 Seattle 243rit PI S Z Baptist �r !!-: � Church Lake °' aLLJ r' Ballinger EDMONDS WAY LASE BALLINGE R 4A A Project Description Add a second westbound left turn lane along SR-104. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). Project Benefit Improve access, safety and delay at the intersection. Estimated Project Cost $3,231,000 Design $481,000 Right of Way Construction $2,750,000 Expense Total $481,000 $2,750,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees $65,000 General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $416,000 $2,750,000 Funding Source Total $481,000 $2,750,000 Packet Pg. 38 32 /17 OkVDA LE B 17,W1 St S)~') 7 K rd St SW 173rd p1 SVV 1740 St SW 5t. Thomas Moore school Project Description Widen Olympic View Dr. to add a northbound left turn lane for 50' storage length. Shift the northbound lanes to the east to provide an acceleration lane for eastbound left turns. Install traffic signal to increase the LOS and reduce intersection delay. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #13) Project Benefit Improve intersection efficiency and safety of drivers accessing either street. Estimated Project Cost $671,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total A $109, OC $562,OC $671,00 $671,OC $671,00 33 Packet Pg. 39 Project Descriptio — a The project will stabilize the roadway subgrade and embankment and rebuild the damaged pavement on 175th St. SW. Project Benefit r Repair roadway and stabilize slope embankment. Estimated Project Cost $1,000,000 Design Right of Way Construction $1,000,000 Expense Total $1,000,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $1,000,000 Funding Source Total $1,000,000 Packet Pg. 40 34 SPERANCE tEti V IF �� 01 f :-, Project Description Install sidewalk along 232nd St. SW from 100th Ave. W to SR-104. This project ranked #3 in the Long Walkway List of 2015 Transportation Plan. Project Benefit This project would improve pedestrian safety. Estimated Project Cost $1,389,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $206,000 $1,183,000 $206,000 $1,183,000 $206,000 $1,183,000 $206,000 $1,183,000 35 Packet Pg. 41 F .._v--,F Flementary II'd F.T. Project Descriptio Install sidewalk with curb and gutter along 236nd St. SW from Madrona Elementary to 97th Ave. W. This project ranked #4 in Long Walkway list of the 2015 Transportation Plan. Project Benefit This project would improve pedestrian safety. Estimated Project Cost $1,494,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $227,000 $1,267,000 $227,000 $1,267,000 $227,000 $1,267,000 $227,000 $1,267,000 A 36 Packet Pg. 42 3, to < ,. L � > Z Project Description Install sidewalk along 236th St. SW from Hwy 99 to 76th Ave. W. This project ranked #10 in Long Walkway List of the 2015 Transportation Plan. Project Benefit This project would improve pedestrian safety. Estimated Project Cost $1, 831,000 Design $264,OC Right of Way Construction $1,567,OC Expense Total $1,831,00 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $1,831,OC Funding Source Total $1,831,00 Packet Pg. 43 37 16 0 w _ �+ �i#}bass *- ! ■ #� O �- t'LvhFC � E 13 A N 238 r1mn ESPERANCE w. am ilia Ni . ac A. 1 f EOMtiunl: AP HALI Chris# z; y�l 111 Ilfl4C■ _ . Lutheran ,,,,hrn = CMIST LUTHERA N a 3 S {'R1FCM Church QFTIFT -n ell I.II Perk and Ride a7G@1 Ch 23eo: �dF€wAY 0 7HZ. L FU NG � 2HO? M.M * a IM � .� 2Sd15 ¢ ,t AURORA MARKETPLACE T 1. U reWILY h4ni.n�i " - I SEQQL Project Description Install sidewalk along 84th Ave. W from 238th St .SW to 234th St. SW, with curb and gutter. This project ranked #5 in the Long Walkway List of the 2015 Transportation Plan. Project Benefit This project would improve pedestrian safety. Estimated Project Cost $790,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $150,000 $640,000 $150,000 $640,000 $150,000 $640,000 $150,000 $640,000 Packet Pg. 44 38 (YNNW0O [ EDMONDS Project Description Install sidewalk along 80th Ave. W from 206th St. SW to 212th St. SW with curb and gutter. This project ranked #1 in Long Walkway List of the 2015 Transportation Plan. Project Benefit The improvements will improve active transportation safety (including for school kids due to proximity of several schools). Estimated Project Cost $2,894,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $209,000 $209,000 $2,476,000 $209,000 $209,000 $2,476,000 $209,000 $209,000 $2,476,000 $209,000 $209,000 $2,476,000 39 Packet Pg. 45 It iL' C LYC � I '110 NIP Z. LYNNWOOD �Nt:. C 01n s}1 svr A s a Project Description Install sidewalk along 80th Ave. W from 188th St. SW to OVD. This project ranked #13 in Long Walkway List of the 2015 Transportation Plan. Project Benefit This project would improve pedestrian safety. Estimated Project Cost $2,936,000 Design $597,000 Right of Way Construction $2,339,000 Expense Total $597,000 $2,339,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $597,000 $2,339,000 Funding Source Total $597,000 $2,339,000 Packet Pg. 46 40 Chase Lake Elementary Chase Lake School } Edmonds Church of'Clod .' i 6tlt St 54V Edmonds Woodway High School wadisi C Edmond { LIJ : JI M4 4� X---� � No r a u N C s . a 0TH ST SW Project Description Install sidewalk along 218th St. SW from 76th Ave. W to 84th Ave. W with curb and gutter. This project ranked #2 in Long Walkway List of the 2015 Transportation Plan. Project Benefit The improvements will improve pedestrian safety. Estimated Project Cost $1,590,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $240,000 $1,350,000 $240,000 $1,350,000 $240,000 $1,350,000 $240,000 $1,350,000 Packet Pg. 47 41 BECK'S GPEGORY THE MAMNER t cn - LU COMMODORE tu dw lu - R M alp i Holly or U) _ ,_ L _ Cedar t Project Description Install sidewalk on the south side of Walnut St. from 6th Ave. S to 7th Ave. S. Project Benefit This project will improve pedestrian safety along this stretch. Estimated Project Cost $265,000 Design $40,000 Right of Way Construction $225,000 Expense Total $265,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $265,000 Funding Source Total $265,000 Packet Pg. 48 42 4NT N no z- � �T ' t rS I� Swedish F_dmil ndc 216?11 st SW EDMONDS MEDICAL pA1ILlOIV 1645 KRUGE:R CLINIC =N'S E F� MCDONALD'S VALUE Q VILLAGE Project Descriptio Install 150' sidewalk on north side of 216th St. SW from Hwy. 99 to 72nd Ave. W (completing a missing link on north side of 216th St. SW). This project ranked #3 in the Short Walkway List (from 2015 Transportation Plan). Project Benefit To provide a safe and desirable walking route. Estimated Project Cost $200,000 Design $20,000 Right of Way Construction $180,000 Expense Total $200,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $200,000 Funding Source Total $200,000 43 Packet Pg. 49 Project Description Complete pedestrian crossing enhancements with the installation of RRFB's at (7) intersections (Walnut St. @ 8th Ave. S, SR-524 @ Brookmere, 106th Ave. W @ 229th PI. SW, Main St. @ Olympic Ave., 76th Ave W @ 206th St. SW, Dayton @ 2nd Ave. S, and Dayton St. @ Private Drive ), a new traffic signal at SR-104 @ 232nd St. SW, and a HAWK signal at SR-524 @ 84th Ave. W. Design, right of way and construction phases are funded through a federal grant, TIB state grant and local funds. Project Benefit Improve pedestrian safety by increasing driver yielding compliance for pedestrians waiting to cross at a marked crosswalk and safer crossing along SR-104 and SR-524 with higher speeds and longer crossing distances through signal and HAWK signal. Estimated Project Cost $2,145,000 Design Right of Way Construction $10,000 Expense Total $10,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 $820 REET Fund 126 $2,230 Transportation Impact Fees General Fund Stormwater Utility Fund 422 $310 Federal Grants $6,640 Other Unsecured Funding Funding Source Total $10,000 Packet Pg. 50 Project Description Installation of bike lanes or sharrows along various street segments as identified on the Proposed Bike Facilities map of 2015 Transportation Plan. Bike lanes or sharrows will be added along 100th St. SW / 9th Ave. from 244th St. SW to Walnut St, Bowdoin Way from 9th Ave. to 84th Av., 228th St. SW from 80th Ave. to 78th Ave., and 80th Ave. from 228th St. SW to 220th St. SW. Project Benefit This project will create new bike connections to various destination points throughout the City (such as schools, parks, Downtown, Sound Transit Station...). Sound Transit awarded the grant to fund improvements that will provide more convenient access so that more people can use Sound Transit services. Estimated Project Cost 2,100,000 Design Right of Way Construction $1,562,390 Expense Total $1,562,390 Other $1,323,471 $0 $0 $0 $0 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 $238,919 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $1,562,390 $0 $0 $1 $0 45 $0 $ Packet Pg. 51 CASPIRs T Z w w LU M cr, 4 J MAIN ST Project Description Construct sidewalk on Maplewood Dr. from Main St. to 200th St. SW (— 2,700'). A sidewalk currently exists on 200th St. SW from Main St. to 76th Ave. W, adjacent to Maplewood Elementary School (rated #18 in the Long Walkway list of the 2015 Transportation Plan). Project Benefit Create pedestrian connection between Maplewood Elementary School on 200th St. SW and Main St., by encouraging kids to use non -motorized transportation to walk to / from school. Estimated Project Cost $2,702,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $201,000 $201,000 $2,300,000 $201,000 $201,000 $2,300,000 $201,000 $201,000 $2,300,000 $201,000 $201,000 $2,300,000 Packet Pg. 52 46 220TH ST SVJ ZZ a o f rrUJ r • 0. tA �s + t � y �, 22+■ Pe'. L 3r 1. ■+ -. _ gF 01 #� N' ■ Ln ■■ y H 4 ¢ k M Project Description Install sidewalk along 95th PI. W from 224th St. SW to 220th St. SW with curb and gutter. This project ranked #8 in the Long Walkway List of the 2015 Transportation Plan. Project Benefit This project would improve pedestrian safety. Estimated Project Cost Design $120,000 Right of Way Construction $668,000 Expense Total $120,000 $668,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $120,000 $668,000 Funding Source Total $120,000 $668,000 Packet Pg. 53 47 Puget Sound Fishing Pi@r Olympic Beach Park Restro D m Washington State Ferry T2rmT vial Bracketts Landing South •� 4 Railroad Station t• Post Office Mini Park V ►i z City of Edmonds Project Description Install new and wider sidewalk along Railroad Ave from Dayton St. to SR-104. Project Benefit Improve active transportation safety along Railroad Ave from Dayton St. to SR-104, key stretch since connects to various destination points (such as Waterfront Center, Port of Edmonds, Downtown Edmonds, WSDOT Ferry Terminal...). $924,000 Design $170,000 Right of Way Construction $754,000 Expense Total $170,000 $754,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $170,000 $754,000 Funding Source Total $170,000 $754,000 Packet Pg. 54 Seattle .. flap#ist Church W Lake Ballinger OAI b WA Y � FDMONDS WAIF LACE BALUNGER WAY A Project Descripti ila Extend bike lanes within proximity of the intersection in northbound and southbound directions. Install APS on all corners and new ADA curb ramps. Project Benefit Improve active transportation safety along this section of the Interurban Trail and across SR-104. Estimated Project Cost $1, 294,000 Design $238,OC Right of Way Construction $1,056,OC Expense Total $1,294,00 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $1,294,OC Funding Source Total $1,294,00 Packet Pg. 55 spV1�47_7_ - .,Z�r Project Description Installation of street lights along various streets within Downtown Edmonds. Project Benefit This project will add new street lighting in Downtown to improve pedestrian safety at night. Estimated Project Cost $1,500,000 Design $300,000 Right of Way Construction $1,200,000 Expense Total $300,000 $1,200,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $300,000 $1,200,000 Funding Source Total $300,000 $1,200,000 Packet Pg. 56 50 Edmonds Marsh � cra z 0 W w } .. CL 4F m Fe ❑WOn _.- _ F ?: LU V) .JJ Project Description Installation of sidewalk with ADA curb ramps along SR-104 from the HAWK signal to Pine St and along Pine St from SR-104 to 9th Ave S Project Benefit This project will improve pedestrian connectivity between the residential areas along 3rd Ave. S to Downtown Edmonds and City Park. Estimated Project Cost $3,290,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $327,000 $327,000 $2,636,000 $327,000 $327,000 $2,636,000 $327,000 $327,000 $2,636,000 $327,000 $327,000 $2,636,000 51 Packet Pg. 57 Sierra Park un m ❑o 0 O� u, Project DescriptiAom Install sidewalk along 191th St. SW from 80th Ave. W to 76th Ave., with curb and gutter. This project ranked #8 in Long Walkway List of the 2015 Transportation Plan. Project Benefit This project would improve pedestrian safety. Estimated Project Cost $678,000 Design $100,00 Right of Way Construction $578,00 Expense Total $678,00 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $678,OG Funding Source Total $678,00 Packet Pg. 58 52 4 LA i=::. n C LU 23Nh WI SW Edmonds Memorial Com etery Salem Edmonds Lutheran Helghts Church K-12 Scrilorlcr k: irii h � h E g C oo y* 36W . X — 4r. i�h Pr'Sv4 0 * i I '. FaFkb Community -rk... 1% Project Description Install sidewalk along 104th Ave. W from 238th ST. SW to 106th Ave. W, with curb and gutter. This project ranked #10 in the Long Walkway List of the 2015 Transportation Plan. Project Benefit This project would improve pedestrian safety. Estimated Project Cost $1,060,000 Design $160,00 Right of Way Construction $900,00 Expense Total $1,060,00 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 i Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $1,060,00 Funding Source Total $1,060,00 Packet Pg. 59 53 of 46, " rya � . w- 219trt St Sw . No 1 a - E r 0TH ST SW Edmonds Church of God Project Description Install sidewalk along 80th Ave. W from 218th ST. SW to 220th ST. SW, with curb and gutter. This project ranked #7 in the Short Walkway List of the 2015 Transportation Plan. Project Benefit This project would improve pedestrian safety. Estimated Project Cost $324,000 Design $59,OC Right of Way Construction $265,OC Expense Total $324,00 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 i Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $324,OC Funding Source Total $324,00 Packet Pg. 60 54 4Ln Seavi vw Elern@ntai I-B61h St SW r f 1871h St sw Op Project Description Install sidewalk along 84th Ave. W from 188th St. SW to 186th St. SW., with curb and gutter. This project ranked #5 in Short Walkway List of the 2015 Transportation Plan. Project Benefit This project would improve pedestrian safety. Estimated Project Cost $328,000 Design $50,OC Right of Way Construction $278,OC Expense Total $328,00 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 i Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $328,OC Funding Source Total $328,00 Packet Pg. 61 55 { < L OC L (Q 77 1-fir Q• 7 41 . L � . LLf Ar a o N CU CO 7401!h S[ SW Nlathay Ballinger Park r Project Description Install sidewalk along 236th St. SW from Hwy 99 to 76th Ave. W. This project ranked #10 in Long Walkway List of the 2015 Transportation Plan. Project Benefit This project would improve pedestrian safety. Estimated Project Cost $1,285,000 Design $187,OC Right of Way Construction $1,098,OC a Expense Total $1,285,00 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 s c Transportation Impact Fees General Fund i Stormwater Utility Fund 422 { Federal Grants s State Grants y e Unsecured Funding $1,285,OC Funding Source Total $1,285,00 I Packet Pg. 62 56 PugelSound Edmonds Marsh k b Qart pan 3 6ap,L C Ot vr� Y r,. MT ? a i G z S y s Project Description Modify existing lane channelization on SR104 to add vehicle storage for ferry users. Project Benefit Reduce conflicts between ferry storage and access to local driveways. Estimated Project Cost $357,000 Design Right of Way Construction $357,000 Expense Total $357,000 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $357,000 Funding Source Total $357,000 Packet Pg. 63 57 Project Description Install traffic calming devices (such as Radar Feedback signs, speed cushions, or other elements). Project Benefit Reduce vehicle speeds on City streets that qualify under the City's Traffic Calming Policy. Estimated Project Cost $33,130 for 2022 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $33,130 $18,000 $18,000 $18,000 $18,000 $18,000 $33,130 $18,000 $18,000 $18,000 $18,000 $18,000 $33,130 $18,000 $18,000 $18,000 $18,000 $18,000 $33,130 $18,000 $18,000 $18,000 $18,000 $18,000 Packet Pg. 64 Project Description The Plan identifies all existing ADA deficiencies within the City Right of Way (such as non -compliant ADA curb ramps, tripping hazards within sidewalk, non -compliant ADA driveways, and signalized intersection without Audible Pedestrian Signals (APS). Project Benefit Inventories and prioritizes ADA issues in the City right of way. Estimated Project Cost $100,000 Design $100,000 Right of Way Construction Expense Total $100,000 Street Fund 112 - Gas Tax & Multi -modal re $100,000 REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $100,000 Packet Pg. 65 59 Project Description Update the City's long range transportation plan. Project Benefit Estimated Project Cost $185,000 Design $185,000 Right of Way Construction Expense Total $185,000 Street Fund 112 - Gas Tax & Multi -modal re $185,000 REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $185,000 Packet Pg. 66 Ln Sea Vista p5. 7#h and w Elm Paris Q 2 DTI ST SW . o Project Description The walkway project is ranked #6 on the short walkway list from the 2015 Transportation Plan. The project will install approximately 700 feet of new sidewalk, six pedestrian curb ramps and modify the existing stormwater system on Elm Way between 8th Ave. S and 9th Ave. S. Project Benefit The project will improve pedestrian safety and provide a missing link of sidewalk on Elm Way between 8th Ave and 9th Ave. Estimated Project Cost Design Right of Way Construction $901,780 Expense Total $901,780 Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 $551,880 Transportation Impact Fees General Fund Stormwater Utility Fund 422 $349,900 Federal Grants State Grants Unsecured Funding Funding Source Total $901,780 A 61 Packet Pg. 67 Project Description Jw Addition of Rectangular Rapid Flashing Beacons (RRFB) and/or flashing LED lights around regulatory signs at selected locations throughout the City. Project Benefit Improve safety at pedestrian crossings. Estimated Project Cos $20,000/year Design Right of Way Construction $20,185 Expense Total $20,185 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 REET Fund 126 $20,185 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $20,185 62 Packet Pg. 68 Project Description J Install guardrails along selected stretches throughout the City with steep drop-off and other safety issues. Project Benefit Improve safety of City transportation system. Estimated Project Cost $20,000/year Design Right of Way Construction $20,180 Expense Total $20,180 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 $20,180 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $20,180 63 Packet Pg. 69 Project Description Upgrade traffic signal equipment at selected signalized intersections with new equipment within signal cabinet, new vehicular detection, new vehicle heads, and/or new pedestrian heads. Project Benefit Improve reliability of traffic signal operation. Estimated Project Cost $30,000/year Design Right of Way Construction $30,280 Expense Total $30,280 Street Fund 112 - Gas Tax & Multi -modal re REET Fund 125 $30,280 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $30,280 Packet Pg. 70 64 6.A.a WATER E: v E L O L a. r E i O L Q E 76 .Q R U a U- v c a N N LL .Q U ti N O N N N O N N N O 0. O L a N N N Y L O c.i a. r a Packet Pg. 71 65 6.A.a Water Proiects # CFP PROJECT OP # 2022 2023 2024 2025 2026 2027 TOTAL (2022-2027) TOTAL (2028-42) TOTAL Project Cost PWW-01 Phase 12 Annual Replacement Program 2022 50 $2,159,412 $0 $0 $0 $0 $0 $2,159,412 $2,159,412 PWW-02 Phase 13 Annual Replacement Program 2023 46 $486,661 $3,389,788 $0 $0 $0 $0 $3,876,449 $3,876,449 PWW-03 Phase 14 Annual Replacement Program 2024 $0 $506,128 $3,525,379 $0 $0 $0 $4,031,507 $4,031,507 PWW-04 I I Phase 15 Annual Replacement Program 2025 $0 $0 $526,373 $3,666,379 $0 $0 $4,192,7521 $4,192,752 PWW-05 Phase 16 Annual Replacement Program 2026 $0 $0 $0 $547,428 $3,813,034 $0 $4,360,462 $4,360,462 PWW-06 Phase 17 Annual Replacement Program 2027 $0 $0 $0 $0 $569,325 $3,965,555 $4,534,880 $4,534,880 PWW-07 Phase 18 Annual Replacement Program 2028 $0 $0 $0 $0 $0 $592,098 $592,098 $592,098 PWW-08 2022 Waterline Overlays 49 $175,000 $0 $0 $0 $0 $0 $175,000 $175,000 PWW-09 Yost & Seaview Reservoir Assessment 47 $505,000 $0 $0 $0 $0 $0 $505,000 $505,000 Total Projects $3,326,073 $3,895,916 $4,051,752 $4,213,807 $4,382,359 $4,557,653 $24,427,560 $0 $24,427,560 Funding Source 2022 2023 2024 2025 2026 Y027 TOTAL TOTAL TOTAL (2022-2027) (2028-42) Water Fund - 421 $3,326,073 $3,895,916 $4,051,752 $4,213,807 $4,382,359 $4,557,653 $24,427,560 $24,427,560 Total Revenue $3,326,073 $3,895,916 $4,051,752 $4,213,807 $4,382,359 $4,557,653 $24,427,560 $0 $24,427,560 Packet Pg. 72 66 1 Project Description Per the approved 2017 Water Comprehensive Plan, the projects will replace/maintain pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase flow or pressure, or more prone to breakage due to its material properties. Project Benefit Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of breakages and leakage, improve fire flows, and decrease overall day to day maintenance costs. Estimated Project Cost $2.9 to $4.5 million/year Design $486,661 $506,128 $526,373 $547,428 $569,325 $592,098 Right of Way Construction $2,159,412 $3,389,788 $3,525,379 $3,666,379 $3,813,034 $3,965,555 Expense Total $2,646,073 $3,895,916 $4,051,752 $4,213,807 $4,382,359 $4,557,653 Water Fund 421 $2,646,073 $3,895,916 $4,051,752 $4,213,807 $4,382,359 $4,557,653 Funding Source Total $2,646,073 $3,895,916 $4,051,752 $4,213,807 $4,382,359 $4,557,653 Packet Pg. 73 67 Project Description Road pavement overlays to cover areas of roadways that were excavated and patched in previous years as part of the Waterline Replacement Projects. Project Benefit Improve overall pavement condition in locations that were excavated and patched due to Waterline Replacement Projects. Estimated Project Cost $175,000 Design $30,000 Right of Way Construction $145,000 Expense Total $175,000 Water Fund 421 $175,000 Funding Source Total $175,000 Packet Pg. 74 185th P[ SW a J:r; S 18151h PI SW Ravi@W Water TAnk A LIa' k OW Project Description Per the approved 2017 Water Comprehensive Plan, the project will replace/maintain pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase flow or pressure, or more prone to breakage due to its material properties. This work is being done to provide an in detail evaluation of the condition of our two underground potable water storage reservoirs. Findings will be used to determine costs and next steps for any future needed maintenance or repairs. Project Benefit Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of breakages and leakage, improve fire flows, and decrease overall day to day maintenance costs. Estimated Project Cost TBD Design Right of Way Construction $505,000 Expense Total $505,000 Water Fund 421 $505,000 Funding Source Total $505,000 LLJ I- 00 A Packet Pg. 75 6.A.a STORMWATER FL_ U_ E to L O L CL Qi E i O L Q E Q m U 06 El U- U_ c R a N O R LL R .Q R U ti N O N N N O N d N O 0. O L a w O 'rr 06 fA Y L O :.i 3 d r a Packet Pg. 76 70 6.A.a Stormwater Projects # CFP PROJECT DP 2022 2023 2024 2025 2026 Y027 TOTAL TOTAL TOTAL # (2022-2027) (2028-42) Project Cos Edmonds Marsh Estuary Restoration Related Projects PWD-01 X lEdmo.ds Marsh Water Quality Improvements 55 1 $190,000 $1,230,840 $0 $0 $0 $0 $1,420,840 $0 $1,420,8, PWD-02 X I Edmonds Marsh/Willow Creek Daylighting - Design & Construction 1$0 $600,0001 $600,0001 $8,000,0001 $8,000,0001 $0 $17,200,00011 $0 $17,200,0( Perrinville Creek Basin Projects PWD-03 Perrinville Creek Flow Management Projects 60 $121,542 $100,000 $100,000 $100,000 $100,000 $100,000 $621,542 $0 $621,5, PWD-04 X Lower Perrinville Creek Restoration (Phase 1) 53 $550,000 $150,000 $2,800,000 $0 $0 $0 $3,500,000 $0 $3,500,0( PWD-05 X Seaview Park Infiltration Facility Phase 2 59 $555,000 $0 $0 $0 $0 $0 $555,000 $0 $555,0( Storm Drainage Improvement Projects PWD-06 Lake Ballinger Regional Facility Design Phase 54 $300,000 $250,000 $0 $0 $0 $0 $550,000 $0 $550,0( PWD-07 X Ballinger Regional Facility Construction Phase $0 $0 $6,000,000 $0 $0 $0 $6,000,000 $0 $6,000,0( PWD-08 Green Street & Rain Gardens 61 $400,000 $600,000 $0 $0 $0 $0 $1,000,000 $0 $1,000,0( Annually Funded Proiects PWD-09 12022 SD Overlays 57 $60,000 $0 $0 $0 $0 $0 $60,000 $0 $60,0( PWD-10 Phase 3 Annual Storm Replacement Project (2022) 58 $1,450,000 $0 $0 $0 $0 $0 $1,450,000 $0 $1,450,0( PWD-11 Phase 4 Annual Storm Replacement Project (2023) 52 $312,000 $1,622,400 $0 $0 $0 $0 $1,934,400 $0 $1,934,4( PWD-12 Phase 5 Annual Storm Replacement Project (2024) $0 $324,480 $1,687,296 $0 $0 $0 $2,011,776 $0 $2,011,7, PWD-13 Phase 6 Annual Storm Replacement Project (2025) $0 $0 $337,460 $1,754,786 $0 $0 $2,092,246 $0 $2,092,2, PWD-14 Phase 7 Annual Storm Replacement Project (2026) $0 $0 $0 $350,9581 $1,824,977 $0 $2,175,935 $0 $2,175,9, PWD-15 Phase 8 Annual Storm Replacement Project (2027) $0 $0 $0 $0 $364,996 $1,897,976 $2,262,972 $0 $2,262,9 PWD-16 Phase 9 Annual Storm Replacement Project (2028) $0 $0 $0 $0 $0 $379,596 $379,596 $0 $379,55 Compliance Related Projects p—w—p--i —7F I Storm and Surface Water Comprehensive Plan 11 56 1 $300,000 $0 $0 $0 $0 $0 $300,000 $0 $300,0( Total Projects $4,238,542 $4,877,720 $11,524,756 $10,205,744 $10,289,973 $2,377,572 $43,514,307 $0 $43,514,3L Funding Source 2022 2023 2024 2025 2026 2027 TOTAL (2022-2027) TOTAL (2028-42) TOTAL Stormwater Utility Fund 422 $ 2,457,292 $ 2,363,880 $ 3,774,756 $ 4,205,744 $ 4,289,973 $ 2,377,572 $ 19,469,217 $ $ 19,469,21 Federal Grants $ - $ - $ - $ - $ - $ $ - $ $ State Grants $ 671,250 $ 723,840 $ - $ - $ - $ $ 1,395,090 $ $ 1,395,09 Unsecured Grants $ 1,110,000 $ 1,790,000 $ 7,750,000 $ 6,000,000 $ 6,000,000 $ $ 22,650,000 $ $ 22,650,00 Total Revenue $ $ $ $ $ $ $ $ $ $ 4,238,542 1 $ 4,877,720 1 $ 11,524,756 1 $ 10,205,744 1 $ 10,289,973 1 $ 2,377,572 $ 43,514,307 $ $ 43,514,30 7t� d LL U_ c IL N d LL r Q to U ti N O N N N O N O O M O a` u) d r r 06 N Y O U 7 IL Packet Pg. 77 71 Edmonds Marsh RJniup Qf, O Edmonds Mar3h Project Descriptio Feasibility documents for the Willow Creek Daylighting project identified some areas of concern for water quality of stormwater entering the Marsh. Additionally, new research has identified a chemical in tire production causing pre -spawn mortality in salmon, further cementing the linkage between vehicle traffic and poor water quality for fish habitat. By improving the water quality inputs of stormwater, the future marsh can provide better habitat for the return of salmon to the marsh. This project was previously included in the 2021 budget as only a "Phase 1" project specific to the west side of SR-104. However, with additional funding identified, staff propose to expand this effort to provide water quality mitigation for all discharges directly into the marsh form SR-104 and Harbor Square. Project Benefit Improve water quality of stormwater discharging into the Edmonds Marsh from the west portions of SR-104 located near the marsh. The improvements will provide better habitat for the return of salmon to the marsh. Estimated Project Cost $1,500,000 Design $190,000 $10,000 Right of Way Construction $1,220,840 Expense Total $190,000 $1,230,840 Stormwater Utility Fund 422 $104,500 Federal Grants State Grants $30,000 $536,340 Unsecured Grants $160,000 $590,000 Funding Source Total $190,000 $1,230,840 Packet Pg. 78 72 %VI I; -.I L.L. I;, ofAI I •I II--:. I . Project Description 1iaish as it cximud in I D 41 L;lximed pLoj2acmkepr The project will daylight Willow Creek and help begin restoration of historic conditions in the Marsh. The project has three sub -components including (1) daylighting Willow Creek through the existing Unocal property, (2) daylighting of the Willow Creek through Marina Beach Park (top of bank to top of bank), and (3) excavation/reestablishment of tidal channels within the existing Marsh. The project includes significant re - vegetation and mitigation within the Marsh to improve habitat conditions. The current cost estimate for the project includes all flood walls and berms associated with daylighting the creek but does not include Marina Beach park improvements beyond the top of bank. The project is a component of the PROS plan (comprehensive plan) for open space, habitat and fulfills goals #1, #3 and #4. Total project cost is estimated around $17.2 million and future funding sources are yet to be identified; however, grant funding of roughly 75% of the project cost is tentatively planned. Project Benefit The daylighting of Willow Creek and subsequent redevelopment of Marina Beach park (not included) will help reverse the negative impacts to Willow Creek and Edmonds Marsh that occurred when Willow Creek was piped in the early 1960s. This project will provide habitat for salmonids, including juvenile Chinook. The project will also help reduce the flooding problem at the intersection of SR-104 and Dayton Street. This project is a priority in the Edmonds PROS plan. Estimated Project Cost $17, 200, 000 Design Right of Way Construction Expense Total Stormwater Utility Fund 422 Federal Grants Unsecured Grants $600,000 $600,000 $8,000,000 $8,000,000 $600,000 $600,000 $8,000,000 $8,000,000 $150,000 $150,000 $2,000,000 $2,000,000 $450,000 $450,000 $6,000,000 $6,000,000 $600,000 $600,000 $8,000,000 $8,000,000 Packet Pg. 79 73 Funding Source Total Project Descriptio Reducing scouring flows in order to reduce sediments load in Perrinville Creek was identified in a previous basin report completed in 2015 as a critical element of restoring this creek which has been significantly impacted by urban development. The projects funded by this program are incremental steps toward recovering this stream run as adequate fish habitat. These effort have become even more critical given recent challenges around the Perrinville Creek outfall area. This program is a fund for implementing projects within the Perrinville Creek basin to reduce scour flows in the creek. It allows staff flexibility to respond to ad -hoc opportunities such as rain garden cluster projects, or ensure matching funds are available for chasing grant applications for flow reductions projects. Project Benefit The project will reduce peak flows in Perrinville creek, improve fish passage and decrease creek bed scour during peak flow events. Estimated Project Cost $100,000/year Design $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 Right of Way Construction $111,542 $90,000 $90,000 $90,000 $90,000 $90,000 Expense Total $121,542 $100,000 $100,000 $100,000 $100,000 $100,000 Stormwater Utility Fund 422 $121,542 $100,000 $100,000 $100,000 $100,000 $100,000 Federal Grants State Grants Unsecured Grants Funding Source Total $121,542 $100,000 $100,000 $100,000 $100,000 $100,000 Packet Pg. 80 74 Project Description The City has struggled to manage the undersized outfall system at Perrinville Creek; the current combination of creek alignment, sedimentation, and undersized culverts creates several issues which make the creek unsustainable as a natural system. The concern must be addressed from the bottom of the creek up in order to sequence the relief of the numerous concerns correctly. A future phase would replace the culvert under Talbot Road as well. The improvements are needed to relieve current flooding, ease City maintenance needs, and provide better and more sustainable fish habitat. This project will build on any interim improvements which staff are able to complete in 2021. The project would include a new culvert under BNSF right-of-way which is fully compliant with current flood management and fish passage regulations. The project will include many stakeholders and likely include a minimum 2-year design and development phase before being ready for construction. Project Benefit The project will reduce City maintenance needs in the future and improve fish passage. Estimated Project Cost $5,500,000 Design Right of Way Construction Expense Total Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Grants Funding Source Total $550,000 $100,000 $50,000 $2,800,000 $550,000 $150,000 $2,800,000 $550,000 $150,000 $2,800,000 $550,000 $150,000 $2,800,000 75 Packet Pg. 81 Post EL Office S&a- -),v Park cn 7851h 81 SVv r 3: JO lu Ik I R6th S1 5W ir Ti cc V- 0 Project Descriptio 20 Reducing scouring flows in order to reduce sediments load in Perrinville Creek was identified in a previous basin report completed in 2015 as a critical element of restoring this creek which has been significantly impacted by urban development. The project is an incremental step toward recovering this stream run as an adequate fish habitat. The grant for this project has already been secured. This project proposes construction of an infiltration system in Seaview Park, almost identical to the successful Phase 1 project which was completed in 2019, in order to infiltrate more runoff in the Perrinville Creek basin. Project Benefit Decrease peak storm flows in the Perrinville Creek basin to help normalize flows within Perrinville Creek and decrease potential of scour within the Creek. Estimated Project Cost $742,000 Design $60,000 Right of Way Construction $495,000 Expense Total $555,000 Stormwater Utility Fund 422 $138,750 Federal Grants State Grants $416,250 Unsecured Grants Funding Source Total $555,000 76 Packet Pg. 82 Mathay Ballinger Park W 240Ih PI SW 241st ST FVV a L f� - 242 nd $I S Project Descriptiois Lake Ballinger suffers from urban flooding & seasonal algae blooms along with other water quality impairments. The Highway 99 corridor is an area of high development, including a future City project which will require stormwater mitigation. By creating a regional facility, the City can improve the stormwater mitigation achieved by development, addressed stormwater mitigation needs for the future Highway project, and treat runoff from one of the City bigger pollution generating areas. The City can drastically improve Lake Ballinger water quality. The project proposes to implement water quality and flow control improvements at City -owned Mathay-Ballinger Park as green stormwater infrastructure (GSI) which would significantly benefit the Lake ecology and habitat conditions and enhance a valued neighborhood, but underutilized, park. This phase is limited to design and production of plans and specifications; construction phase will be tracked as separate project (to ease and simplify grant management/reporting). Project Benefit The project proposes to implement water quality and flow control improvements at City -owned Mathay-Ballinger Park as green stormwater infrastructure (GSI) which would significantly benefit the Lake ecology and habitat conditions and enhance a valued neighborhood, but underutilized, park. Estimated Project Cost $550,000 Design $300,000 $250,000 Right of Way Construction Expense Total $300,000 $250,000 Stormwater Utility Fund 422 $75,000 $62,500 Federal Grants State Grants $225,000 $187,500 Unsecured Grants Funding Source Total $300,000 $250,000 Packet Pg. 83 77 Mathay Ballinger Park Ld nil yy }y.., [y` 240th Pa ','- - f 1b C Y l'- EL 242n 1 -n sv i Project Description Lake Ballinger suffers from urban flooding & seasonal algae blooms along with other water quality impairments. The Highway 99 corridor is an area of high development, including a future City project which will require stormwater mitigation. By creating a regional facility, the City can improve the stormwater mitigation achieved by development, addressed stormwater mitigation needs for the future Highway project, and treat runoff from one of the City bigger pollution generating areas. The City can drastically improve Lake Ballinger water quality. This phase is limited to the construction phase and will be tracked as separate project (to ease and simplify grant management/reporting) Project Benefit The project proposes to implement water quality and flow control improvements at City -owned Mathay-Ballinger Park as green stormwater infrastructure (GSI) which would significantly benefit the Lake ecology and habitat conditions and enhance a valued neighborhood, but underutilized, park. Estimated Project Cost $6,000,000 Design Right of Way Construction $6,000,000 Expense Total $6,000,000 Stormwater Utility Fund 422 $1,500,000 Federal Grants State Grants Unsecured Grants $4,500,000 Funding Source Total $6,000,000 Packet Pg. 84 Project Descriptio City forays into green stormwater infrastructure elements have been limited, but with good success. Continuing to implement such projects will allow us to proactively make improvements to the conditions of the City drainage system and will help reduce flooding. This project proposes to implement green stormwater elements, such as rain garden and bioretention, throughout the City. Staff will leverage opportunities with other projects, communication with property owners, and historical knowledge/experience to identify and selected locations where green infrastructure can be implemented with relative ease or efficiency. Staff proposes to implement this effort as a series of small work projects over the next several years. Project Benefit Improvements to the City drainage systems using raingardens and green infrastructure resulting in reduced flooding and a reduction to peak stormwater flows. Estimated Project Cost $1,000,000 Design $75,000 $100,000 Right of Way Construction $325,000 $500,000 Expense Total $400,000 $600,000 Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Grants $400,000 $600,000 Funding Source Total $400,000 $600,000 Packet Pg. 85 79 Project Description Road pavement overlays to cover areas of roadways that were excavated and patched in previous years as part of the Annual Storm Maintenance Projects. Project Benefit Improve overall pavement condition in locations that were excavated and patched due to the Annual Storm Replacement Projects. Estimated Project Cost $60,000 Design $9,000 Right of Way Construction $51,000 Expense Total $60,000 Stormwater Utility Fund 422 $60,000 Federal Grants State Grants Unsecured Grants Funding Source Total $60,000 Packet Pg. 86 Project Description Annual storm drain replacement/maintenance projects. Projects propose to replace or rehab storm drain infrastructure in several locations throughout the City. Locations of work identified by City crews and staff via first had knowledge or video inspection results. Much of Edmonds stormwater infrastructure is past its lifespan and requires routine replacement or repair in order to preserve the function of the storm drain system. Failure to conduct annual maintenance projects will increase chances of a storm drain system failure. Project Benefit Improve system reliability and capacity, decrease breakages, and decrease overall day to day maintenance costs Estimated Project Cost $1.8 to $2.3 million/year Design $312,000 $324,480 $337,460 $350,958 $364,996 $379,596 Right of Way Construction $1,450,000 $1,622,400 $1,687,296 $1,754,786 $1,824,977 $1,897,976 Expense Total $1,762,000 $1,946,880 $2,024,756 $2,105,744 $2,189,973 $2,277,572 Stormwater Utility Fund 422 $1,762,000 $1,946,880 $2,024,756 $2,105,744 $2,189,973 $2,277,572 Funding Source Total $1,762,000 $1,946,880 $2,024,756 $2,105,744 $2,189,973 $2,277,572 Packet Pg. 87 6.A.a Sewer Proiects # CFP PROJECT DP # 2022 2023 2024 2025 2026 2027 TOTAL (2022-2027) TOTAL (2028-42) TOTAL Project Cost PWS-01 Phase 9 Annual Sewer Repl/Rehab/Improvements, (2022) 65 $1,606,550 $0 $0 $0 $0 $0 $1,606,550 $1,606,550 PWS-02 Phase 10 Annual Sewer Repl/Rehab/Improvements (2023) 62 $336,074 $1,889,212 $0 $0 $0 $0 $2,225,286 $2,225,286 PWS-03 Phase 11 Annual Sewer Repl/Rehab/Improvements (2024) $0 $349,517 $1,964,780 $0 $0 $0 $2,314,297 $2,314,297 PWS-04 Phase 12 Annual Sewer Repl/Rehab/Improvements (2025) $0 $0 $363,498 $2,043,372 $0 $0 $2,406,8701 $2,406,870 PWS-05 Phase 13 Annual Sewer Repl/Rehab/Improvements (2026) $0 $0 $0 $378,038 $2,125,107 $0 $2,503,145 $2,503,145 PWS-06 Phase 14 Annual Sewer Repl/Rehab/Improvements (2027) $0 $0 $0 $0 $393,160 $2,210,111 $2,603,271 $2,603,271 PWS-07 Phase 15 Annual Sewer Repl/Rehab/Improvements (2028) $0 $0 $0 $0 $0 $408,886 $408,886 $408,886 PWS-08 1 12021 SS Overlays 64 $60,000 $0 $0 $0 $0 $0 $60,000 $60,000 PWS-09 I I Citywide CIPP Sewer Rehabilitation Phase 4 63 $482,258 $0 $0 $0 $0 $0 $482,258 $482,258 PWS-10 I IAnnual Citywide CIPP Sewer Rehabilitation $0 $501,549 $521,6111 $542,475 $564,174 $586,741 $2,716,550 $2,716,550 PWS-11 1 1 Lake Ballinger Sewer $0 $1,000,0001 $5,000,000 $0 $0 $0 $6,000,000 $6,000,000 Total Projects $2,484,882 $3,740,278 $7,849,889 $2,963,885 $3,082,441 $3,205,738 $23,327,113 $0 $23,327,113 Funding Source 2022 2023 2024 2025 2026 2027 TOTAL TOTAL TOTAL (2022-2027) (2028-42) Sewer Fund -423 $2,484,882 $3,740,278 $7,849,889 $2,963,885 $3,082,441 $3,205,738 $23,327,113 $23,327,113 Total Revenue $2,484,882 $3,740,278 $7,849,889 $2,963,885 $3,082,441 $3,205,738 $23,327,113 $0 $23,327,113 Packet Pg. 89 83 Project Description Per the approved 2013 Sewer Comprehensive Plan, the projects will replace pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase capacity, or more prone to breakage due to its material properties. Project Benefit Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs. Estimated Project Cost $2.0 to $2.6 million/year Design $336,074 $349,517 $363,498 $378,038 $393,160 $408,886 Right of Way Construction $1,606,550 $1,889,212 $1,964,780 $2,043,372 $2,125,107 $2,210,111 Expense Total $1,942,624 $2,238,729 $2,328,278 $2,421,410 $2,518,267 $2,618,997 Water Fund 423 $1,942,624 $2,238,729 $2,328,278 $2,421,410 $2,518,267 $2,618,997 Funding Source Total $1,942,624 $2,238,729 $2,328,278 $2,421,410 $2,518,267 $2,618,997 Packet Pg. 90 Project Description Road pavement overlays to cover areas of roadways that were excavated and patched in previous years as part of the Sanitary Sewer Replacement Projects. Project Benefit Improve overall pavement condition in locations that were excavated and patched due to Sanitary Sewer Replacement Projects. Estimated Project Cost $60,000 Design $12,000 Right of Way Construction $48,000 Expense Total $60,000 Water Fund 423 $60,000 Funding Source Total $60,000 Packet Pg. 91 Project Description Per the approved 2013 Sewer Comprehensive plan and current video inspections of sewer mains, the project will line existing sewer mains that are subject root intrusion, infiltration and inflow, and damage that can be repaired by this trenchless method. Project Benefit Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs. Estimated Project Cost $482,258 Design $72,338 Right of Way Construction $409,920 Expense Total $482,258 Water Fund 423 $482,258 Funding Source Total $482,258 Packet Pg. 92 Project Description Per the approved 2013 Sewer Comprehensive plan and current video inspections of sewer mains, the project will line existing sewer mains that are subject root intrusion, infiltration and inflow, and damage that can be repaired by this trenchless method. Project Benefit Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs. Estimated Project Cost $500,000 to $590,000/year Design $75,232 $78,241 $81,371 $84,626 $88,011 Right of Way Construction $426,317 $443,370 $461,104 $479,548 $498,730 Expense Total $501,549 $521,611 $542,475 $564,174 $586,741 Water Fund 423 $501,549 $521,611 $542,475 $564,174 $586,741 Funding Source Total $501,549 $521,611 $542,475 $564,174 $586,741 Packet Pg. 93 ESPERANCE �],p 4 SyF'�llf SiV _ : dztlM' . 0 � Q Al �'c cn Lu .. 2 L J 4 235TH PL SW =�2 -TH SW }ST F 238TH ST SW I t Lake a Ball�fige� � OS 4YAy LAICF BALUNGER WAY" -.:�2A4-.TH;STr,$yy� y Project Description Per the approved 2013 Sewer Comprehensive plan and current video inspections of sewer mains, the sewer pipe along Lake Ballinger will require additional flow capacity in the near future. These improvements are needed to account for population growth, reduce Infiltration and Inflow from the pipe and improve maintenance and emergency access for this major trunk system. ProjevB Improve system reliability and capacity, decrease infiltration and inflow, and decrease overall day to day maintenance costs. Improved access will help ease maintenance and access for emergencies, which will further decease any chance of potential sewer spills into Lake Ballinger. Estimated Project Cost $6,000,000 Design Right of Way Construction Expense Total Water Fund 423 Funding Source Total $1,000,000 $5,000,000 $1,000,000 $5,000,000 $1,000,000 $5,000,000 $1,000,000 $5,000,000 Packet Pg. 94 FACILITIES WA - Packet Pg. 95 m 6.A.a Facilities Proiects # CFP PROJECT OP # 2022 2023 2024 2025 2026 2027 TOTAL (2022-2027) TOTAL (2028-42) TOTAL Project Cost PWF-01 Boys and Girls Club $36,151 $38,034 $27,733 $37,453 $32,077 $15,101 $186,549 $0 $186,549 PWF-02 Cemetery Building $455 $1,954 $2,094 $8,414 $3,377 $818 $17,112 $0 $17,112 PWF-03 City Hall $171,463 $279,064 $323,246 $150,000 $70,949 $108,628 $1,103,350 $0 $1,103,350 PWF-04 I I Fishing Pier 1 $10,320 $9,991 $2,971 $2,9181 $5,628 $1,043 $32,870 $0 $32,870 PWF-05 I Frances Anderson Center $143,925 $130,593 $298,378 $98,892 $20,934 $113,029 $805,751 $0 $805,751 PWF-06 IFS 16 $24,970 $47,689 $1,591 $69,388 $30,107 $31,631 $205,377 $0 $205,377 PWF-07 I FS 17 $39,935 $81,545 $225,547 $144,830 $27,575 $122,245 $641,678 $0 $641,678 PWF-08 I FS 20 $16,960 $20,000 $16,274 $94,248 $69,782 $23,765 $241,029 $0 $241,029 PWF-09 IHistoric Log Cabin $7,903 $80,000 $888 $546 $1,361 $6,469 $97,167 $0 $97,167 PWF-10 I Historical Museum $12,121 $13,0891 $15,000 $10,000 $4,6211 $10,199 $65,029 $0 $65,029 PWF-11 Library $45,000 $105,1751 $150,902 $53,325 $45,038 $35,000 $434,441 $0 $434,441 PWF-12 Meadowdale Club House $26,083 $13,426 $6,365 $7,985 $4,446 $1,159 $59,464 $0 $59,464 PWF-13 Old Public Works $55,635 $107,743 $24,308 $25,000 $25,000 $24,519 $262,205 $0 $262,205 PWF-14 Parks Maint. Building $130,631 $15,789 $40,320 $9,349 $5,177 $69,228 $270,495 $0 $270,495 PWF-15 Public Safety $340,180 $50,967 $445,276 $55,169 $151,481 $515,071 $1,558,144 $0 $1,558,144 PWF-16 Public Works O&M $80,000 $126,570 $218,643 $80,315 $79,348 $43,821 $628,697 $0 $628,697 PWF-17 WadeJames Theater $21,697 $18,600 $99,077 $43,880 $115,734 $21,872 $320,860 $0 $320,860 PWF-18 Yost Pool House $25,0001 $65,5701 $26,128 $8,409 $19,127 $30,389 $174,623 $0 $174,623 Total Projects $1,188,429 $1,205,800 $1,924,741 $900,120 $711,762 $1,173,988 $7,104,840 $0 $7,104,840 Funding Source 2022 2023 2024 2025 2026 2027 TOTAL (2022-2027) TOTAL (2028-42) TOTAL Fund 001 (Repair & Maint, Prof Services) $388,076 $111,454 $126,656 $117,964 $106,361 $122,520 $973,031 $0 $973,031 Fund 016 (2021 Facilities Bond) $800,353 $1,094,345 $1,798,085 $48,325 $0 $0 $3,741,108 $0 $3,741,108 Fund 016 (non -bond proceeds) $0 $0 $0 $30,453 $0 $0 $30,453 $0 $30,453 Unsecured Funding $0 $0 $0 $703,3791 $605,401 $1,051,4671 $2,360,2471 $0 $2,360,247 Total Revenue $1,188,429 $1,205,799 $1,924,741 $900,121 $711,762 $1,173,987 $7,104,839 $0 $7,104,839 LI Packet Pg. 96 Project Description This building built in 1900 was the original field house for Edmonds High School. The property located at Civic Field and is not part of the large Civic Field Park restoration project. The building is solely operated by the Snohomish County Boys and Girls Club in partnership with the City's Parks and Recreation department. The building has significant need for major renovations if it is expected to be in operation for another 10 years. Renovation and deferred maintenance may eclipse the building value in its current location. Projects: Exterior plumbing access, Window replacement, Roof replacement, Siding replacement, ADA Access, Plumbing replacement, Front entry door replacement, Fire Alarm System new installation, Fire Sprinkler updates, Baseboard heating replacement Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $186,549 Construction\Professional Services $36,151 $38,034 $27,733 $37,453 $32,077 $15,101 Expense Total $36,151 $38,034 $27,733 $37,453 $32,077 $15,101 Fund 001 (Repair & Maint, Prof Services) $6,000 $6,000 $7,000 $7,000 $7,000 $7,000 Fund 016 (2021 Facilities Bond) $30,151 $32,034 $20,733 Fund 016 (non -bond proceeds) $30,453 Unsecured Funding $25,077 $8,101 Funding Source Total $36,151 $38,034 $27,733 $37,453 $32,077 $15,101 Packet Pg. 97 91 Project Descriptio M This small structure houses the Edmonds Cemetery funerary services and the cemetery Sextant office. The building is in relatively good condition and has little deferred maintenance backlog. Minor security and communications updates will be needed as technology dictates. Projects: Minor repair and maintenance Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost Construction\Professional Services Expense Total Fund 001 (Repair & Maint, Prof Services) Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $455 $1,954 $2,094 $8,414 $3,377 $818 $455 $1,954 $2,094 $8,414 $3,377 $818 $455 $1,954 $2,094 $2,000 $2,000 $818 $6,414 $1,377 $455 $1,954 $2,094 $8,414 $3,377 $818 92 Packet Pg. 98 lla Project Description City Hall was built in 1979 and was operated as a private business office center until the City purchased and renovated the building in the 1990s. The City has operated Edmonds City Hall from this location since the renovations were completed. The building is in near original condition and is in need of substantial repair and maintenance. Projects: Solar utilization and cool roof engineering scope, HVAC upgrades and equipment replacements, Electrical Service replacement, Plumbing and drain pipe replacement, Restroom remodels w/gender neutral consideration, Center Stairway Code updates and replacement, Lobby remodel, Main Entry Awning re -glazing, Interior Painting, ADA accessibility improvements, Whole building generator installation Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $1,103,350 Construction\Professional Services Expense Total Fund 001 (Repair & Maint, Prof Services) Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $171,463 $279,064 $323,246 $171,463 $279,064 $323,246 $15,000 $15,000 $18,000 $156,463 $264,064 $305,246 $171,463 $279,064 $323,246 $150,000 $70,949 $108,628 $150,000 $70,949 $108,628 $18,000 $20,000 $20,000 $132,000 $50,949 $88,628 $150,000 $70,949 $108,628 93 Packet Pg. 99 O Project Description The Pier was recently renovated and is generally in good condition. The Beach Ranger Office is a 1200 square foot office and restroom facility located near the east end of the pier. There are season programs and visitor support functions that operate out of this facility. Projects:, Electrical panel and pier electrical feed replacement, Minor repairs and maintenance Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $32,870 Construction\Professional Services $10,320 $9,991 $2,971 $2,918 $5,628 $1,043 Expense Total $10,320 $9,991 $2,971 $2,918 $5,628 $1,043 Fund 001 (Repair & Maint, Prof Services) $5,000 $5,000 $2,971 $2,918 $2,500 $1,043 Fund 016 (2021 Facilities Bond) $5,320 $4,991 Fund 016 (non -bond proceeds) Unsecured Funding $3,128 Funding Source Total $10,320 $9,991 $2,971 $2,918 $5,628 $1,043 Packet Pg. 100 Project Description The Frances Anderson Center is housed in the 1928 Edmonds elementary school building. This building serves as the Parks, Recreation, Cultural and Human Services offices and is on the City's Historic Register. The Building is nearly 55,000 square feet and is home to several permanent tenants including, Main Street Kids daycare, Edmonds Montessori, Sno-King Youth Organization and the Olympic Ballet practice space and offices. The building serves as the City's main recreation center offering arts, athletic and cultural programing year round. Due to the age and high usage of the building there are many building systems that are in need of replacement or restoration. Projects: Replacement of Heating Boilers with Electric alternatives that will add ventilation, cooling and heating, Replacement of all exterior doors (24 ea), New, ADA accessible door closures, New Windows (historically appropriate), Interior painting Classrooms , Plumbing drainage collector, Gym Floor, Drinking fountains ADA compliant, Restroom remodels (w/ gender neutral consideration), Replacement of all plumbing fixtures, Replacement of several common area and classroom flooring, Addition of building security card readers , Building HVAC controls to maximize efficiency, Fire Alarm replacement, Fire Sprinkler replacement, Elevator refresh and code updates Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $805,751 Construction\Professional Services $143,925 $130,593 $298,378 Expense Total $143,925 $130,593 $298,378 Fund 001 (Repair & Maint, Prof Services) $20,000 $20,000 $25,000 $98,892 $20,934 $113,029 $98,892 $20,934 $113,029 $25,000 $15,000 $30,000 Fund 016 (2021 Facilities Bond) $123,925 $110,593 $273,378 95 Packet Pg. 101 Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total Project Description 6.A.a $73,892 $5,934 $83,029 $143,925 $130,593 $298,378 $98,892 $20,934 $113,029 This facility is operated by South Snohomish County Fire and Rescue and was built in 2003 and has a building area of 10,700 square feet. The building is in fair condition and will require some infrastructure updates or replacements to remain operationally ready for the needs of the City. Projects: Roll -up bay door replacements, HVAC unit replacements, Gutter and drainage repair or replacements, Building Controls updates , Interior painting and flooring Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $205,377 Construction\Professional Services $24,970 $47,689 $1,591 $69,388 $30,107 $31,631 Expense Total $24,970 $47,689 $1,591 $69,388 $30,107 $31,631 Fund 001 (Repair & Maint, Prof Services) $5,000 $5,000 $1,591 $8,000 $8,000 $8,000 Fund 016 (2021 Facilities Bond) $19,970 $42,689 Fund 016 (non -bond proceeds) Unsecured Funding $61,388 $22,107 $23,631 Funding Source Total $24,970 $47,689 $1,591 $69,388 $30,107 $31,631 Packet Pg. 102 Project Description This building is operated by South Snohomish County Fire and Rescue, was built in 1999 and has a building area of 9,800 square feet. This building has had some updates but will need some infrastructure upgrades to remain operationally ready. Projects: Bay Door replacements, Drainage updates, Electrical infrastructure updates, HVAC Chiller plant replacement, Interior Painting and flooring Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost Construction\Professional Services Expense Total Fund 001 (Repair & Maint, Prof Services) Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $39,935 $81,545 $225,547 $144,830 $39,935 $81,545 $225,547 $144,830 $5,000 $5,000 $8,000 $8,000 $34,935 $76,545 $217,547 $136,830 $39,935 $81,545 $225,547 $144,830 $27,575 $122,245 $27,575 $122,245 $5,000 $5,000 $22,575 $117,245 $27,575 $122,245 97 Packet Pg. 103 Project Description This building is the eldest of the City's three fire stations and is operated by South County Fire and Rescue. This station serves Esperance and supports the other two fire stations in Edmonds. The building is 6400 square feet and was built in 1990. The building has had significant updates to the exterior envelope and is in need of interior and HVAC system updates. Projects: New engine bay doors, Fire alarm system replacement, New property perimeter fencing, Storm water drainage system, Interior painting and flooring Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $241,029 Construction\Professional Services Expense Total Fund 001 (Repair & Maint, Prof Services) Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $16,960 $20,000 $16,274 $16,960 $20,000 $16,274 $3,500 $3,500 $3,500 $13,460 $16,500 $12,774 $16,960 $20,000 $16,274 $94,248 $69,782 $23,765 $94,248 $69,782 $23,765 $5,000 $5,000 $5,000 $89,248 $64,782 $18,765 $94,248 $69,782 $23,765 Packet Pg. 104 Project Description This Historic log cabin is home to the Edmonds Chamber of Commerce visitor center, the structure was a purpose built cabin from the turn of the century. The structure is professionally maintained on a three year cycle by a log cabin specialist and requires only minor maintenance and upkeep annually. Projects: Front entry steps and railing, New thick cut shat roof Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $97,167 Construction\Professional Services $7,903 $80,000 $888 $546 $1,361 $6,469 Expense Total $7,903 $80,000 $888 $546 $1,361 $6,469 Fund 001 (Repair & Maint, Prof Services) $4,000 $1,000 $500 $546 $1,361 $500 Fund 016 (2021 Facilities Bond) $3,903 $79,000 $388 Fund 016 (non -bond proceeds) Unsecured Funding $5,969 Funding Source Total $7,903 $80,000 $888 $546 $1,361 $6,469 Packet Pg. 105 • 00 Project Description The 110 year old original Carnegie Library building is home to the Edmonds Museum. The building is on the State of Washington Historic registry and has been well maintained over the last several years. Buildings of this age require specialized maintenance and coordination with the state historic architect to maintain the historic status. Structural stabilization and weatherproofing are the most significant priorities to maintain this facility. Projects: Minor structural reinforcement , Entry facade masonry repair, Lower entry restoration, Heating boiler replacement Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $65,029 Construction\Professional Services Expense Total Fund 001 (Repair & Maint, Prof Services) Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $12,121 $13,089 $15,000 $10,000 $4,621 $10,199 $12,121 $13,089 $15,000 $10,000 $4,621 $10,199 $12,121 $2,500 $2,500 $2,500 $2,000 $2,500 $10,589 $12,500 $7,500 $2,621 $7,699 $12,121 $13,089 $15,000 $10,000 $4,621 $10,199 100 Packet Pg. 106 Project Description The Edmonds Library is operated by the Sno-Isle Library system with exception of the Second floor Plaza room rental space. The library is a 19,000 square foot building built in 1982. The building hosts special event rentals and daily Library programming and community services. This is one of the City's most heavily used buildings by the public and has significant deferred maintenance needs, including the building fagade and plaza deck waterproofing. Projects: Window replacement, ADA access device upgrades or replacement, Gender inclusive public restroom creation, Plaza room restroom/changing facilities, Plaza room A/V installation, Building masonry restoration or building cladding, Exterior stairway restoration, HVAC ventilation fan replacement, Building breezeway remodel, Building flooring replacement, Garage level drainage and stucco repairs, Exterior planter box replacement and waterproofing, Staff restroom remodel Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $399,441 Construction\Professional Services $45,000 $105,175 $150,902 $53,325 $45,038 $35,000 Expense Total $45,000 $105,175 $150,902 $53,325 $45,038 $35,000 E Fund 001 (Repair & Maint, Prof Services) $5,000 $5,000 $7,500 $5,000 $5,000 $5,000 Fund 016 (2021 Facilities Bond) $40,000 $100,175 $143,402 $48,325 Fund 016 (non -bond proceeds) Q Unsecured Funding $40,038 $30,000 Funding Source Total $45,000 $105,175 $150,902 $53,325 $45,038 $ Packet Pg. 107 101 Project Description This 4000 square foot facility was built in 1965 as a community theater facility and later was transformed into the Meadowdale community club house. The building is currently owned and maintained by the City of Edmonds and houses the City operated Meadowdale pre-school and the 1500 square foot Meadowdale club house rental facility. This facility while dated has been well maintained and only requires minor maintenance and repairs. Projects: Minor maintenance and repairs, Furnace replacement, Increased mechanical ventilation Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost Construction\Professional Services $26,083 $13,426 $6,365 $7,985 $4,446 $1,159 Expense Total $26,083 $13,426 $6,365 $7,985 $4,446 $1,159 Fund 001 (Repair & Maint, Prof Services) $5,000 $3,500 $3,500 $3,500 $2,500 $1,159 Fund 016 (2021 Facilities Bond) $21,083 $9,926 $2,865 Fund 016 (non -bond proceeds) Unsecured Funding $4,485 $1,946 Funding Source Total $26,083 $13,426 $6,365 $7,985 $4,446 $1,159 Packet Pg. 108 102 7 Project Description This facility was built in 1965 to house the City's Public Works Department, the building was converted in 1995 to tenant space and City storage, as well as Edmonds Police large evidence storage. This is a vital piece of property adjacent to the Waste Water Treatment Plant, and could be converted for utility use if regulatory requirements dictate. Building is primarily used as storage and will need some updates to maintain current operational readiness. Projects: HVAC updates, Role -up door replacement, Parking lot resurfacing Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $262,205 Construction\Professional Services Expense Total Fund 001 (Repair & Maint, Prof Services) Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $55,635 $107,743 $24,308 $55,635 $107,743 $24,308 $2,500 $5,000 $2,000 $53,135 $102,743 $22,308 $55,635 $107,743 $24,308 $25,000 $25,000 $24,519 $25,000 $25,000 $24,519 $2,000 $2,000 $2,000 $23,000 $23,000 $22,519 $25,000 $25,000 $24,519 103 Packet Pg. 109 Project Description This facility was built in 1967 by Ed Huntley who at the time was the City Facilities supervisor. The 4800 square foot facility now houses all City Facility Operations staff(11) and all of Park and Rec Parks Maintenance Staff(12+ seasonal help) This Facility is home to the City Carpentry Shop, Key Shop, City Flower program, Parks engine repair shop and Parks and Facilities maintenance supply storage as well as Parks and Facilities Manager offices. This Facility is near end of life and is undersized to support the departmental staffing that are assigned to this facility. Projects: Maintenance and Repair to maintain operational capacity Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $270,495 Construction\Professional Services $130,631 $15,789 $40,320 $9,349 $5,177 $69,228 Expense Total $130,631 $15,789 $40,320 $9,349 $5,177 $69,228 Fund 001 (Repair & Maint, Prof Services) $5,000 $2,500 $5,000 $1,500 $1,500 $5,000 Fund 016 (2021 Facilities Bond) $125,631 $13,289 $35,320 Fund 016 (non -bond proceeds) Unsecured Funding $7,849 $3,677 $64,228 Funding Source Total $130,631 $15,789 $40,320 $9,349 $5,177 $69,228 Packet Pg. 110 104 owl Project Description The Public Safety building houses Edmonds Police Department, Edmonds Municipal Court and the City Council Chambers. The building was built in 1999 encompassing 30,000 square feet of office, court and municipal government uses. The building houses one of the City emergency operations centers, large police training, simulator facilities and evidence processing and storage. The building has had minimal system updates over it's life and has a significant amount of deferred maintenance and should be retrofitted with new fire sprinklers. Projects: Boiler replacement, Air Handler and Outdoor ventilation unit replacements, Chiller plant replacement study/scope, Auxiliary heating coil replacement, New solar plant installation, Parking lot reconfiguration to meet current usage, Fire Sprinkler Installation, Interior hallway renovation and painting, Sleeping room remodel and gender specific/neutral accommodations, Gender inclusive public restrooms, Operable windows is specific locations, Roof replacement, Courts flat roof, Sally Port garage/processing remodel Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $1, 558,144 Construction\Professional Services Expense Total Fund 001 (Repair & Maint, Prof Services) Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding $340,180 $50,967 $445,276 $340,180 $50,967 $445,276 $285,000 $15,000 $20,000 $55,180 $35,967 $425,276 $55,169 $151,481 $515,071 $55,169 $151,481 $515,071 $15,000 $15,000 $20,000 $40,169 $136,481 $495,071 $55,169 $151,481 $5 Packet Pg. 111 Funding Source Total $340,180 $50,967 $445,276 105 Project Description This building built in 1995 houses four Public Works divisions and the auxiliary City Emergency Operations Center This building is 28,000 square feed and is capable of operations 24/7 during weather emergencies and natural disasters. The building has significant deferred maintenance needs and infrastructure updates. Projects: Vehicle yard leveling, HVAC unit replacements, Ventilation fan replacements, Fire Alarm system replacement, Lobby remodel, Restroom remodel with gender inclusivity considerations, Electric Vehicle Charging and maintenance infrastructure, Emergency Communications updates, Wireless network expansion, Interior hallway flooring, Utility Bay HVAC replacement, Water main replacement (building connection), Window replacement Offices and Conference rooms, Achieve storage room remodel Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $628,697 Construction\Professional Services Expense Total Fund 001 (Repair & Maint, Prof Services) Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $80,000 $126,570 $218,643 $80,315 $79,348 $43,821 $80,000 $126,570 $218,643 $80,315 $79,348 $43,821 $5,000 $8,500 $10,000 $5,000 $5,000 $5,000 $75,000 $118,070 $208,643 $75,315 $74,348 $38,821 $80,000 $126,570 $218,643 $80,315 $79,348 $43,821 106 Packet Pg. 112 Project Descriptio This community theater was built by the Driftwood Players theater group in 1967 and was deeded to City ownership at a later date. The facility is 6,300 quare feet in size and houses the Driftwood Players theatrical performances and City meetings. The City's maintenance responsibilities are limited to large infrastructure, parking lot, roofing and grounds. Projects: Parking lot repair and recoating, Gutter/down spout replacement, Minor repair and maintenance Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $320,86u Construction\Professional Services Expense Total Fund 001 (Repair & Maint, Prof Services) Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $21,697 $18,600 $99,077 $21,697 $18,600 $99,077 $2,000 $2,000 $5,000 $19,697 $16,600 $94,077 $21,697 $18,600 $99,077 $43,880 $115,734 $21,872 $43,880 $115,734 $21,872 $5,000 $5,000 $2,000 $38,880 $110,734 $19,872 $43,880 $115,734 $21,872 107 Packet Pg. 113 Project Description This recreational facility houses the City's aquatic programing and some Parks and Recreation programs. Built in 1971 the pool house historically was only operated seasonally. The tenant run aquatic programing is currently expanding to year round lap and team aquatic activities and will continue to support summer open swim programing. The facility requires minimal maintenance to remain operational and is subject to tenant lease terms of use. Projects: Security updates, Roof replacement, Gutter replacement, Plumbing fixture updates, Operational repair and maintenance Project Benefit Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. Estimated Project Cost $174, 623 Construction\Professional Services Expense Total Fund 001 (Repair & Maint, Prof Services) Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $25,000 $65,570 $26,128 $25,000 $65,570 $26,128 $2,500 $5,000 $2,500 $22,500 $60,570 $23,628 $25,000 $65,570 $26,128 $8,409 $19,127 $30,389 $8,409 $19,127 $30,389 $2,000 $2,500 $2,500 $6,409 $16,627 $27,889 $8,409 $19,127 $30,389 Packet Pg. 114 WASTEWATER TREATMENT PLANT 416 109 Packet Pg. 115 6.A.a WWTP Proiects # CFP PROJECT DP # 2022 2023 2024 2025 2026 2027 TOTAL (2022-2027) TOTAL (2028-42) TOTAL Project Cost PWP-01 WWTP Annual Capital Replacement In-house Projects $0 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000 $14,000,000 $19,000,000 PWP-02 Carbon Recovery Project 67 $1,162,671 $0 $0 $0 $0 $0 $1,162,671 $0 $1,162,671 PWP-03 City Park Odor Scrubber 68 $297,121 $0 $0 $0 $0 $0 $297,121 $0 $297,121 PWP-04 I I Nutrient Removal Project 1 $0 $1,000,0001 $5,000,000 $0 $0 $0 $6,000,000 $0 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Projects $1,459,792 $2,000,000 $6,000,000 $1,000,000 $1,000,000 $1,000,000 $12,459,792 $14,000,000 $26,459,792 Funding Source 2022 2023 2024 2025 2026 2047 TOTAL (2022-2027) TOTAL (2028-42) TOTAL Edmonds (Sewer Fund 423) (50.79%) $741,428 $1,015,800 $3,047,400 $507,900 $507,900 $507,900 $6,328,328 $7,110,600 $13,438,928 Mountlake Terrace (23.17%) $338,234 $463,400 $1,390,200 $231,700 $231,700 $231,700 $2,886,934 $3,243,800 $6.130,734 Olympic View Water Sewer District (16.55%) $241,596 $331,000 $993,000 $165,500 $165,500 $165,500 $2,062,096 $2,317,000 $4,379,096 Ronald Sewer District (9.49%) $138,5341 $189,8001 $569,4001 $94,9001 $94,9001 $94,9001 $1,182,4341 $1,328,6001 $2,511,034 Total Revenue $1,459,792 $2,000,000 $6,000,000 $1,000,000 $1,000,000 $1,000,000 $12,459,792 $14,000,000 $26,459,792 Packet Pg. 116 110 Project Description This ongoing project is to ensure that critical infrastructure is maintained and replaced as needed. Project expenditures may include, but are not limited to, variable frequency drives, pumps, motors, gear boxes, conveyors or any WWTP equipment that needs replacement versus repair. Project Benefit This project ensure that the critical infrastructure is maintained and equipment is replaced in order to reduce risk to the City. Estimated Project Cost $19,000,000 Design $200,000 $200,000 $200,000 $200,000 $200,000 $2,800,OC Right of Way Construction $800,000 $800,000 $800,000 $800,000 $800,000 $11,200,OC Expense Total $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $14,000,00 Sewer Fund 423 $507,900 $507,900 $507,900 $507,900 $507,900 $7,110,6C Mountlake Terrace $231,700 $231,700 $231,700 $231,700 $231,700 $3,243,8C Olympic View Water Sewer District $165,500 $165,500 $165,500 $165,500 $165,500 $2,317,OC Ronald Sewer District $94,900 $94,900 $94,900 $94,900 $94,900 $1,328,6C Funding Source Total $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $14,000,00 Packet Pg. 117 111 High Efficiency Blowers Project saves: $33,9091yr, and 345 tons CO2, equivalent to: 36.6 home's energy I 799 barrels of use For one year oil com med Dewaterin Project saves: $133,211iyr. and 537 tons C 0 r, equivalent to: 56.7 riome s e, ergy 1.243 barrels oFoil u�afor one year I c,pn3mmd Aeration & Blowers Projects ayes, $3d,00yr. and 294 tons M, equivalent to: 87.3 home's energy 611 barrels of use for oneyear I ail cDn5umed Project Description The Carbon Recovery Project replaces the aging Sanitary Sewage Sludge Incinerator with the Ecoremedy Gasification Process. The multi -year project which was approved by City Council on July 7, 2020 is being delivered through the State of Washington Energy Savings Performance Contracting program. Project Benefit Project benefits include a more sustainable approach to treating and disposing of biosolids by creating a marketable biochar. The project will reduce overall energy requirements while producing a PFAS free (or greatly reduced) end product. The project also includes a more robust odor scrubber and screenings management enhancements which are designed to reduce operation and maintenance cost for our ratepayers while improving odor in our surrounding community. The Carbon Recovery Project is the final project that was envisioned within the Pathway to Sustainability Estimated Project Cost $26,121,039 Design Right of Way Construction $1,162,671 Expense Total $1,162,671 Sewer Fund 423 $590,521 Mountlake Terrace $269,391 Olympic View Water Sewer District $192,422 Ronald Sewer District $110,337 Funding Source Total $1,162,671 112 Packet Pg. 118 a f� Project Description I 1 This project will remove and treat the hydrogen sulfide gas that is being released into the atmosphere from a City owned sewer mainline and private roof vents in the area of Pine St and 2nd/3rd Ave S. The gas has a rotten egg smell which results in numerous complaints from residents in the area. An activated carbon odor scrubber was identified as the most efficient and effective method of capturing and destroying the nuisance odor. Project Benefit This project would formally address the ongoing problem and reduce odors in the area for residents and park patrons. Estimated Project Cost $297,121 Design Right of Way Construction $297,121 Expense Total $297,121 Sewer Fund 423 $150,908 Mountlake Terrace $68,843 Olympic View Water Sewer District $49,174 Ronald Sewer District $28,197 Funding Source Total $297,122 113 Packet Pg. 119 Project Description The State of Washington Department of Ecology will soon issue the General Permit for Nutrient Reduction. This General Permit will be issued to all WWTP's who discharge into the Puget Sound and currently caps the WWTP nutrient load. With the anticipation of the General Permit, the City has participated in a full scale pilot program that began in August 2020. The pilot program has shown promise to meet the requirements of the General Permit. This project is a place holder to fully develop a design and ultimately determine the cost of construction and ongoing O&M expenses. Project Benefit This project will ensure a reduction in nutrients discharged by the WWTP into the Puget Sound while increasing settleability and reducing effluent solids. Completion of the project will allow the City to meet the requirements within the General Permit, accompanying NPDES Permit and to increase flows in order to maximum the rated capacity of the WWTP. Estimated Project Cost $6,000,000 Design $1,000,000 Right of Way Construction $5,000,000 Expense Total $1,000,000 $5,000,000 Sewer Fund 423 $507,900 $2,539,500 Mountlake Terrace $231,700 $1,158,500 Olympic View Water Sewer District $165,500 $827,500 Ronald Sewer District $94,900 $474,500 Funding Source Total $1,000,000 $5,000,000 Packet Pg. 120 114 6.A.a CIP- CFP COMPARISON (2021-2022) Packet Pg. 121 115 UP / CIP COMPARISON (2021 TO 2022) 6.A.a ADDED PROJECTS Type PROJECT NAME CFP DESCRIPTION Transp Hwy 99 Revitalization and Gateway - Stage 2 X Hwy 99 Revitalization & Gateway project divided in different Stages Transp Hwy 99 Revitalization and Gateway - Stage 3 X Hwy 99 Revitalization & Gateway project divided in different Stages Transp Hwy 99 Revitalization and Gateway - Stage 4 X Hwy 99 Revitalization & Gateway project divided in different Stages Transp Hwy 99 Revitalization and Gateway -Stage 5 X Hwy 99 Revitalization & Gateway project divided in different Stages Transp Hwy 99 Revitalization and Gateway - Stage 6 X Hwy 99 Revitalization & Gateway project divided in different Stages Transp Hwy 99 Revitalization and Gateway - Stage 7 X Hwy 99 Revitalization & Gateway project divided in different Stages Transp Hwy 99 Revitalization and Gateway - Stage 8 X Hwy 99 Revitalization & Gateway project divided in different Stages Transp Hwy 99 Revitalization and Gateway - Stage 9 X Hwy 99 Revitalization & Gateway project divided in different Stages Parks ADA Playground Upgrade Program Annual Program to upgrade / replace plagrounds Parks Yost Pool Repair Replacement of failing plaster at the pool Water Phase 18 Annual Replacement Program (2028) Estimated future costs for waterline replacements. Water Yost & Seaview Reservoir Assessment Reservoir assessment to determine upgrade needs and preliminary design Water 2022 Waterline Overlays Estimated future costs for road repairs due to waterline replacements. Storm Phase 9 Annual Storm Replacement Project (2028) Estimated future costs for storm pipe replacements. Storm Lower Perrinville Creek Restoration Phase 1 Estimated future costs for 1st phase of Creek Restoration Storm 2022 SD Overlays Estimated future costs for road repairs due to storm replacements Storm Green Street & Rain Gardens Estimated future costs for Citywide green infrastructure projects Sewer Phase 15 Sewer Replacement/Rehab/Improvements (2028) Estimated future costs for sewer line replacements/rehab/impr. Sewer 2022 SS Overlays Estimated future costs for road repairs due to sewer line replacements. Sewer Citywide CIPP Sewer Rehab Phase 4 jEstimated future costs for sewer project. T, d u_ U_ c IC d N d r v M u_ .Q co U N O N N N O N N O O_ O L d N d r 06 Y L O 3-1 a+ Q Page 1 of 3 Packet Pg. 122 116 6.A.a UP / CIP COMPARISON (2021 TO 2022) REMOVED PROJECTS Type PROJECT NAME UP DESCRIPTION Transp Hwy 99 @ 220th St. SW Intersection Improvements X Removed / Included in Hwy 99 Revitalization & Gateway project - Stage 4 Transp Hwy 99 @ 216th St. SW Intersection Improvements X Removed/ included in Hwy 99 Revitalization & Gateway project - Stage 9 Transp Hwy 99 @ 212th St. SW Intersection Improvements X Removed / included in Hwy 99 Revitalization & Gateway project - Stage 5 Transp Hwy 99 Pedestrian Improvements (SR-104 Off -Ramps) X Removed / included in Hwy 99 Revitalization & Gateway project Stage 2 & 3 Transp Hwy 99 @ 234th St. SW Traffic Signal X lRemoved Transp Sunset Ave. Sidewalk X Removed Transp Walnut St. Walkway from 3rd Ave. S to 4th Ave. S X Completed Transp Dayton St. Walkway from 7th Ave.S to 8th Ave. S X Completed Parks Greenhouse Replacement 2021 Project Water 2021 Waterline Overlays Completed Water Dayton 3rd to 9th Completed Water 5 Corners Reservoir RecoatinR Completed Water Phase 11 Annual Replacement Program (2021) Completed Storm Dayton 3rd to 9th Completed Storm Dayton St and Hwy 104 Drainage Improvements -Dayton Pump Station Completed Storm 2021 SD Overlays Completed Storm Phase 1 Annual Storm Replacement Project (2020) Completed Sewer Citywide CIPP Sewer Rehab Phase 2 Completed Sewer Phase 7 SS Replacement Project (2020) Completed Sewer Phase 8 SS Replacement Project (2021) Completed Sewer Dayton 3rd to 9th Completed Sewer 2021 SS Overlays Completed Sewer LS#1 Metering and Flow Study Completed �, d LL U_ c IC d N d r v M LL .Q co U N 0 N N N O N O N O O_ 0 d N d r 06 Y L O v d a+ Q Page 2 of 3 Packet Pg. 123 117 6.A.a UP / CIP COMPARISON (2021 TO 2022) CHANGED PROJECTS Type PROJECT NAME CFP CHANGE Transp SR-104 Adaptive System X Moved up from 2023 to 2022 Transp 175th Slope Repair Moved from Fund 126 to Fund 112 Transp Elm Way Walkway from 8th Ave.S to 9th Ave. S X Construction funding added in 2022 Parks 4th Avenue Cultural Corridor Postponed until 2025 Parks Waterfront Walkway Completion Moved to fund 125 Parks Civic Park X Utilizing $2M from REET and not General Fund Parks Citywide Park Improvements / Capital Replacement Program Increase in funding 2023-2027 �, d LL U_ c IC d N d r v M LL .Q co U N O N N N O N O N O O_ O L N d r 06 N Y L O V a+ Q Page 3 of 3 Packet Pg. 124 118 EDMONDSPARKS, RECREATION & CULTURAL SERVICES 2022-2027 PROPOSED CAPITAL FACILITIES PLAN & CAPITAL IMPROVEMENT PROGRAM 6.A.b EDMONDSPARKS, RECREATION & CULTURAL SERVICES October 13, 2021 Members of the City Council, Staff and Citizens of Edmonds, It is an honor to present the 6-year Parks Capital Improvement Program (CIP). The CIP serves as a long- range planning guide identifying parks capital projects and related funding sources, both secured and unsecured. The CIP is updated each year and presented in conjunction with the budget. Capital Improvement projects that are also included in the Capital Facilities Plan (CFP) which are identified in the following document. In 2022 the Parks, Recreation and Cultural Services Department will focus on the completion of the largest ever City of Edmonds Parks Capital project, the redevelopment of the 8-acre Civic Center Playfields. There are significant resources of staff time and funding invested in this project which began construction in August 2021 and is schedule to be complete Winter 2022. In addition to Civic Center the department will continue to focus on deferred maintenance of existing parks and recreation facilities, playground renovations and upgrades and required maintenance at Yost Pool. The updated Parks, Recreation and Open Space Plan (PROS) will be completed in early 2022. This document, based largely on citizens priorities will guide future CIP plans. At this time, near future projects include the re -development of Marina Beach Park ($1M in grant funding secured), and annually funds are being set aside and accumulating for potential parkland and open space acquisition should the right opportunity become available. The department is focused on providing an equitable distribution of access to park and recreational facilities throughout the entire City. Your Parks, Recreation and Cultural Services Department is proud to have served the citizens throughout the COVID-19 pandemic, working to ensure residents and visitors had safe and enjoyable places to recreate. With unprecedented usage of the city's parks system our priorities shifted to enhanced litter, garbage and restroom sanitization however we are looking forward to returning to our list of deferred maintenance and keeping the Edmonds Parks safe and enjoyable for all. Sincerely, ,Ril� Angie Feser Edmonds Parks, Recreation & Cultural Services Director 425-771-0256 Angie.Feser@EdmondsWA.gov Edmonds Parks, Recreation & Cultural Services • 600 Main Street, Edmonds, WA 98020 Page 1 Packet Pg. 126 6.A.b 2022 - 2027 SIX -YEAR PARKS CAPITAL IMPROVEMENT PROGRAM CFP # PROJECT 2022 2023 2024 2025 2026 2027 6-Year Toll PARKS CIP/CFP PROJECTS Civic Center Playfield Redevelopment of 8-acre park consistent with Master Plan adopted in 2017; X PRK 1 add restrooms, walking track, landscaping, inclusive playground, improve $ 9,755,742 $ $ $ $ $ $ 9,755,7 field and lighting, skate park, petanque grove, tennis and multi sports courts. Marina Beach Park Improvements Redevelop the park consistent with the Master Plan adopted in 2015; X PRK 2 Parking lot reconfiguration, overlooks, lawn areas, permanent restrooms, $ $ $ 1,750,000 $ 1,500,000 $ 2,750,000 $ $ 6,000,0 upgrade play area, improve ADA Accessibility, add bridges over new alignment of Willow Creek. 4th Avenue Cultural Corridor Prioritized in the 2014 Community Cultural Plan and State certified Creative PRK 3 District. Improvements encourage pedestrian traffic and provide visual $ $ $ $ 1,000,000 $ 1,000,000 $ 6,000,000 $ 8,000,0 connection between ECA and downtown contributing to economic vitality. Playground Upgrade Program Annual upgrades of playground equipment and fall surfacing to provide PRK 4 additional inclusive playgrounds/facilities providing access for children of all $ 175,000 $ 175,000 $ 175,000 $ 175,000 $ 175,000 $ 175,000 $ 1,050,0 ages and abilities. Yost Pool Repair Regular maintenance to re -plaster the pool to replace and repair failing PRK 5 plaster. Pool will be forced to close without repair. $ 175,000 $ $ - $ - $ $ $ 175,0 Waterfront Walkway Completion Connecting the waterfront walkway from Brackett's Landing North to Marina PRK 6 Beach Park by adding missing section in front of the Ebb Tide Condominiums, $ $ $ 500,000 $ 750,000 $ $ $ 1,250,0 to provide ADA improvements. Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) X PRK 7 Restoration of the Marsh to reconnect the Puget Sound within the Edmonds $ $ $ $ $ $ $ Marsh and two fresh water creeks to provide fresh water / salt water estuary and natural tidal exchange. Packet Pg. 127 Page 2 6.A.b 2022 - 2027 SIX -YEAR PARKS CAPITAL IMPROVEMENT PROGRAM CFP # PROJECT 2022 2023 2024 2025 2026 2027 6-YearToi Community Park & Athletic Complex - Phase II X PRK 8 In cooperation with the Edmonds School District, complete a community park $ $ $ $ $ $ $ and athletic complex at Former Woodway High School to include lighting and Parks & Facilities Maintenance and Operations Building X PRK 9 Replace and/or renovate deteriorating building in City Park. Project in $ $ $ $ $ $ $ conceptual phase. (A) SUBTOTAL PARKS CIP/CFP PROJECTS $ 10,107,764 $ 177,023 $ 2,427,024 $ 3,427,025 $ 3,927,026 $ 6,177,027 1 $ 26,230,7. PARKS CIP PROGRAMS Citywide Park Improvements / Capital Replacement Program PRK A This ongoing program allocates funds for the regular maintenance, repair and $ 155,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 2,405,0 replacement of parks amenities, structures and equipment. Beautification Program This ongoing program allocates funds to support beautification. Specifically PRK B flower plantings, irrigation and mulch in areas such as corner parks, landscape $ 21,000 $ 21,000 $ 21,000 $ 21,000 $ 21,000 $ 21,000 $ 126,0 Park and Open Space Acquisition Program PRK C To acquire land for future parks and open spaces as opportunities become $ 1,099,000 $ 399,000 $ 399,000 $ 399,000 $ 399,000 $ 399,000 $ 3,094,0 available. Debt Service and Interfund Transfers PRK D Debt service on Civic Park $1.6M bond (2021) and Interfund transfers to $ 193,832 $ 123,000 $ 148,000 $ 173,000 $ 198,000 $ 198,000 $ 1,033,8 Engineering for Capital Project Support. (B) SUBTOTAL - PARKS CIP PROGRAMS $ 1,468,832 $ 993,000 $ 1,018,000 $ 1,043,000 $ 1,068,000 $ 1,068,000 $ 6,658,8 c a� E aD O L Q E M CL R U 06 El u_ V C O a N a) r U M u_ ca U ti N 0 N N N O N N O O_ O L a N L Id d N C a) (C) TOTAL PARKS CIP/CFP EXPENDITURES (A+B) $ 11,576,596 $ 1,170,023 $ 3,445,024 $ 4,470,025 $ 4,995,026 $ 7,245,027 $ 32,889,5 E R a E r r a Packet Pg. 128 Page 3 6.A.b 2022 - 2027 SIX -YEAR PARKS CAPITAL IMPROVEMENT PROGRAM PARKS CIP REVENUE 2022 2023 2024 2025 2026 2027 6-Year Tot Real Estate Excise Tax (REET) I - Fund 126 $ 900,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,900,0 Real Estate Excise Tax (REET) 11 - Fund 125 $ 3,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 11,000,0 Park Impact Fee's - Fund 332-100 $ 874,575 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 3,124,5 Tree Fund 143 - Land Acquisition $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 1,194,0 Operating Contribution - General Fund $ - $ $ $ - $ - $ $ Investment Interest (3%) $ 78,110 $ 39,793 $ 50,797 $ 31,381 $ 25,632 $ (539) $ 225,1 Donations $ 142,000 $ $ $ - $ - $ $ 142,0 Bond Proceeds $ - $ $ $ - $ $ $ Secured Grants $ 2,728,000 $ $ $ 1,000,000 $ - $ $ 3,728,0 Unsecured Grants $ - $ $ $ 1,000,000 $ 1,600,000 $ 6,000,000 $ 8,600,0 (D) TOTAL PARKS CIP REVENUE $ 8,421,685 $ 2,388,793 $ 2,399,797 $ 4,380,381 $ 3,974,632 $ 8,348,461 1 $ 29,913,7. Parks Fund 6-Year Overview 2022 2023 2024 2025 2026 2027 (E) Beginning Fund Balance (332 + 332-100) $ 4,554,645 $ 1,399,734 $ 2,618,504 $ 1,573,276 $ 1,483,632 $ 463,238 (D) Revenue $ 8,421,685 $ 2,388,793 $ 2,399,797 $ 4,380,381 $ 3,974,632 $ 8,348,461 (C) Expenditures $ 11,576,596 $ 1,170,023 $ 3,445,024 $ 4,470,025 $ 4,995,026 $ 7,245,027 (G) Ending Fund Balance (E+D-C) $ 1,399,734 $ 2,618,504 $ 1,573,276 $ 1,483,632 $ 463,238 $ 1,566,672 c E d O L CL E R R U 06 a u_ V c O a N d r U O u_ .Q U r• N O N N N O N d N O O_ O L a N Y L a N C d E L U R r+ a E U f4 Q Page 4 Packet Pg. 129 of Epp Parks, Recreation, and Cultural Services PARKS PROJECTS ,-- - - a� 2 F a Projects 1�■� a o Parks �� v E 0 E IL Ga U `�RK,03�PRK-01 �= w p PRK,====_ PRK-05 -O�� .� PRK-02 NE � . U CL PRKzl9 _ N �111111 �'�Cl�III 04 N r 0 CL U) N N E ■ ■�-irA 1 JIMI * Site specific projects only. Citywide/annual citywide projects not shown. Packet Pg. 130 Page 5 6.A.b Parks, Recreation & Cultural Services PRK 1: Civic Center Playfield f, 310 61h Ave. N — Downtown Edmonds Project Summary: An 8-acre downtown park development supported by $3.47M in grant funding, $5.3M in bonds, $1.3M in Park Impact Fees and $3.4M in Real Estate Excise Tax. This signature project broke ground in August 2021 and is slated for completion Winter 2022. Project Justification: This is a multi -year design, fund development and construction project that is a very high priority in the 2016 PROS plan. The Master Plan process was robust with extensive community input. Construction began August 9, 2021 and is underway and 2022 funding necessary to complete the project. Estimated Construction Cost: $13,758,000 2022 2023 0- Planning & Design Construction $9,755,742 $9,755,742 Total Expenses $9,755,742 $9,755,742 Real Estate Excise Tax II - Fund 125 $2,898,672 $2,898,672 Park Impact Fees - Fund 332-100 $1,352,620 $1,352,620 Bond Proceeds $1,634,450 $1,634,450 Federal Grant (LWCF) $500,000 $500,000 RCO State Grants $850,000 $850,000 Snohomish County Grants $450,000 $450,000 Verdant Grant $170,000 $170,000 Hazel Miller Foundation Grant $1,500,000 $1,500,000 State Appropriation / DOC Grant $258,000 $258,000 Park Donations $142,000 $142,000 Total Revenue Unsecured Funding $9,755,742 $0 $9,755,742 $0 Project Accounting #C536 & C551 a O a Page 6 Packet Pg. 131 6.A.b Parks, Recreation & Cultural Services PRK 2: Marina Beach Park Improvements 470 Admiral Way, South of the Port of Edmonds Project Summary: Park renovation to better serve the community as it accommodates the new alignment of Willow Creek. The project will include parking lot reconfiguration, overlooks, lawn areas, potential concession areas, permanent restrooms, upgraded play area, upgraded benches, picnic tables and BBQ's, improved ADA accessibility, a loop trail system including two pedestrian bridges connecting the park across Willow Creek, personal watercraft staging and launching area, bicycle racks, fencing, retaining the existing beach/ driftwood area and off leash dog area and environmental education opportunities. The Marina Beach Master Plan includes daylighting Willow Creek which requires removal of a 1,600' pipe that was placed in the early 1960's and is the only exchange between the Puget Sound and the freshwater Edmonds Marsh Estuary. $1,000,000 in RCO grants were awarded for this project in 2021. Project Justification: Marina Beach Park is a highly used regional park. Through the City of Edmonds Comprehensive Plan, Strategic Action Plan and the 2016 Parks, Recreation, and Open Space (PROS) Plan the community identified the need to restore the adjacent Edmonds Marsh, and re-established for salmon habitat. Improvements are intended to retain this site as an asset to the regional waterfront park system. This project is intended to address sea level rise and will promote recreational tourism at both Marina Beach and the Marsh for all generations to enjoy, learn about, and utilize as a wildlife sanctuary in an urban environment. Estimated Cost: $6,000,000 Planning & Design 2022 2023 2024 2025 $600,000 2026 $600,000 Construction $1,150,000 $1,500,000 $2,750,000 $5,400,000 Total Expenses $1,750,000 $1,500,000 $2,750,000 $6,000,000 Real Estate Excise Tax II - Fund 125 $750,000 $1,000,000 $1,750,000 Fund 332 Balance + Park Impact Fees $1,000,000 $500,000 $1,150,000 $2,650,000 Secured Grants $1,000,000 $1,000,000 Total Revenue Unsecured Funding $1,750,000 $1,500,000 $2,150,000 $5,400,000 $600,000 $600,000 Project Accounting # C550 a O a Page 7 Packet Pg. 132 6.A.b Parks, Recreation & Cultural Services PRK 3: 4th Avenue Cultural Corridor 41h Avenue from Main St. to the Edmonds Center for the Arts, Downtown Project Summary: Final design of 4th Avenue Cultural Corridor to include site design and construction documents for a safe, pedestrian friendly, and art enhanced corridor in the public right of way which provides a strong visual connection along 4th Avenue N between Main Street and Edmonds Center for the Arts. Interim work on this project since the concept was developed includes a 2015 temporary light artwork "Luminous Forest", as well as preliminary design development through 2020-21. Funding for this project has not been secured at this time. Project Justification: The corridor improvements in the public right of way will encourage pedestrian traffic and provide a strong visual connection between the ECA and downtown retail. Improvements will enhance connectivity as an attractive walking corridor and contribute to the economic vitality in downtown. The project has been supported by the community in the 2014 Community Cultural Plan and in the goals and priorities for the State certified Creative District. Estimated Cost: $8,000,000 Planning & Design 2022 2023 2024 2025 $800,000 $800,000 Construction $200,000 $1,000,000 $6,000,000 $7,200,000 Total Expenses $1,000,000 $1,000,000 $6,000,000 $8,000,000 Real Estate Excise Tax II - Fund 125 Park Impact Fees - Fund 332-100 Operating contribution — general fund Secured Grants Total Revenue Unsecured Funding $0 $1,000,000 1 $0 $1,000,000 1 $0 $6,000,000 1 $0 $8,000,000 Project Accounting #C538 Page 8 Packet Pg. 133 6.A.b Parks, Recreation & Cultural Services PRK 4: Playground Upgrade Program Project Summary: City of Edmonds owns, operates and maintains 15 playgrounds and only two of them are considered fully inclusive and accessible (Seaview and Civic Parks). One of the Parks, Recreation and Cultural Services Department initiatives is to continually update playgrounds which range in installation dates from 1985 - 2019. As part of these scheduled updates the department will work to enhance playgrounds to be inclusive versus merely meeting ADA standards. In many cases this includes enhanced play surfacing and play equipment that provide for children of all abilities. The playground improvement prioritization is slated to be established at the conclusion and adoption of the 2022 PROS plan to determine an implementation strategy. Project Justification: Playground upgrades are a necessary part of maintaining a safe play environment. With playgrounds that are 35+ years old many will be scheduled for upgrades. Further, it is the goal of the City to ensure that those upgrades include considerations for children of all physical and mental abilities and that these play amenities are designed to be a welcoming and healthy experience for all. Estimated Cost: $175,000 per year / $1,050,000 (6-year total) 2022 2023 2024 2025 2026 2027 Planning & Design Construction $175,000 $175,000 $175,000 $175,000 $175,000 $175,000 $1,050,000 Total Expenses $175,000 $175,000 $175,000 $175,000 $175,000 $175,000 $1,050,000 Real Estate Excise Tax II - Fund 125 $175,000 $175,000 $175,000 $175,000 $175,000 $175,000 $1,050,000 Fund 332 Balance + Park Impact Fees Secured Grants Total Revenue Unsecured Funding $175,000 $175,000 $0 $175,000 $175,000 $175,000 $175,000 $1,050,000 $0 - 0 a Page 9 Packet Pg. 134 6.A.b Parks, Recreation & Cultural Services PRK 5: Yost Pool Repair 96th Ave W & Bowdoin Way, Yost Park Project Summary: Yost Pool was built nearly 50 years ago and continues to provide recreational opportunities for many residents. In addition to teaching our youth water safety, the pool serves as an opportunity for community members of all ages to lead healthy and active lifestyles. At this time, the pool needs a significant capital repair as the plaster lining the inside of the pool is continuing to deteriorate, falling off the walls and detaching from the bottom of the pool. The pool was re -plastered in 2001, 2011 and it is past due to re -plaster it again. Project Justification: Typically, the plaster on the pool bubbles when it reaches its end of life, eventually breaking open creating sharp edges which present a danger to the pool users and leads to future damage to existing plaster. If the plaster repair is not completed, the pool will not be operational at a point in the near future. Estimated Cost: $175,000 Planning & Design i Construction $175,000 $175,000 Total Expenses $175,000 $175,000 Real Estate Excise Tax II - Fund 125 $175,000 $175,000 Fund 332 Balance + Park Impact Fee's Secured Grants Total Revenue $175,000 Unsecured Funding $0 L $175,000 i r- 0 a Page 10 Packet Pg. 135 6.A.b Parks, Recreation & Cultural Services PRK 6: Waterfront Walkway Completion — Ebb Tide Section Beachfront in front of Ebb Tide Condominiums (200 Beach Place) Project Summary: This would connect the waterfront walkway from Brackett's Landing North to Marina Beach Park ensuring all individuals, including those with mobility challenges and those pushing strollers can safely enjoy the waterfront. The final missing piece would be constructed in front of the Ebb Tide condominiums in the easement owned by the City of Edmonds. The easement and walkway design are currently under legal review. Project Justification: To provide public access along the waterfront for all individuals. Completion of the walkway would meet ADA requirements and would support efforts to keep dogs off of the beaches. A top priority in the 2016 PROS plan is to open up beachfront access. Estimated Cost: $1,250,000 i Planning & Design $125,000 1 $125,000 Construction $375,000 1 $750,000 $1,125,000 Total Expenses $500,000 $750,000 $1,125,000 Real Estate Excise Tax II - Fund 125 $500,000 $750,000 $1,125,000 Park Impact Fee's - Fund 332-100 Operating contribution — general fund Secured Grants Total Revenue Unsecured Funding $500,000 so $750,000 $0 $1,125,000 $0 - 0 IL Page 11 Packet Pg. 136 6.A.b Parks, Recreation & Cultural Services PRK 7: Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) Edmonds Marsh - City of Edmonds Marsh and property owned by Unocal (Chevron Services Co.) Project Summary: Reconnect the Puget Sound with the Edmonds Marsh restoring the natural tidal exchange. This project will impact the existing Marina Beach Park and its proposed renovation including daylighting of Willow Creek within the park. That project is identified and detailed a separate capital improvement project (PRK 2). Project Justification: This project will fulfill the 2016 PROS plan goals and support Governor's Inslee's capital budget for salmon recovery, culvert removal, water quality and water supply projects to expand and improve salmon habitat. The marsh estuary restoration project will allow for and provide a natural tidal exchange, allow Chinook salmon to again migrate into Willow Creek, support migratory birds and waterfowl, provide a natural redistribution of saltwater -freshwater flora and fauna and address sea level rise impacts. In addition, it will promote recreational tourism at both Marina Beach and the Marsh for all generations to enjoy, learn about, and utilize as a wildlife sanctuary in an urban environment. The project has a stormwater component which will require removal of tidal gates and a 1,600 pipe that was placed in the early 1960's as a connection between the Puget Sound and the Edmonds Marsh. Estimated Cost: TBD Page 12 Packet Pg. 137 6.A.b Land Acquisition Planning & Design Construction Total Expenses Real Estate Excise Tax II - Fund 125 Real Estate Excise Tax I — Fund 126 Fund 332 Balance + Park Impact Fee's Bond Proceeds Secured Grants Tree Fund 143 — Land Acquisition Park Donations Operating Contribution — General Fund Stormwater — Fund 422 Total Revenue Unsecured Funding Project Accounting #M070 Page 13 Packet Pg. 138 6.A.b Parks, Recreation & Cultural Services PRK 8: Community Park & Athletic Complex Phase II (CFP Only) 23200 100`h Ave. W — Former Woodway High School Project Summary: Two projects - Phase I lighting, Phase II renovation of existing underdeveloped athletic field Project Justification: By adding lighting to the newly renovated Phase I year-round field, usage of the multi -use facility would significantly increase. Phase II would renovate a currently poorly maintained and underutilized large athletic field to provide community significantly more multi -sport use of an existing facility. This Athletic Complex serves a densely populated area of more than 150,000 residents within 5-mile radius. Future maintenance costs offset by user fees. Phase I was completed in 2015 for $4.2M, Phase II estimated at $6-8M. Estimated Cost: $6-8M 2022 2023 2024 2025 2026 2027 Total TotalConstruction ------- Real Estate Excise Tax 11 - '125Bond ------- Proceeds Total Unsecured Funding ------- $6-8 M Page 14 Packet Pg. 139 6.A.b Parks, Recreation & Cultural Services PRK 9: Parks & Facilities Maintenance Building (CFP Only) 600 3rd Avenue South — City Park Project Summary: The 40+ year old maintenance building in City Park is reaching the end of its useful life and needs major renovation or replacement and is currently too small to accommodate staff and needed work areas. Project Justification: Parks and Facilities Divisions have long outgrown this existing facility and need additional work areas and fixed equipment in order to more efficiently maintain City parks and Capital facilities. Estimated Cost: $3 — 4M Planning & Design Construction Total Expenses Real Estate Excise Tax II - Fund 125 Park Impact Fees— Fund 332-100 Bond Proceeds Operating Contribution — General Fund Park Donations Total Revenue Unsecured Funding - 0 a Page 15 Packet Pg. 140 6.A.b Parks, Recreation & Cultural Services PRK A: Citywide Park Improvements / Capital Replacement Program Project Summary: The City of Edmonds owns, operates, and maintains 47 parks and open spaces consisting of more than 230 acres and including a mile of Puget Sound beach and shoreline. Funding allocation for major maintenance, replacements and small capital projects for the city-wide parks and recreation amenities including paved and soft -surface trails, bridges, playgrounds, sports courts, athletic fields, skate park, Yost pool, restrooms, pavilion, picnic shelters, fishing pier, lawn areas, parking lots, fencing, lighting, flower poles, monument and interpretative signage and related infrastructure. Project Justification: Insufficiently maintained parks and related assets lead to higher deferred maintenance costs, increased city liability and decreased level of service and community satisfaction. The 2016 PROS Plan Goal #7 is to provide a high quality and efficient level of maintenance for all parks and related public assets in Edmonds. Estimated Cost: $2,405,000 (6-year total) Repair & Maintenance $105,000 $400,000 $400,000 $400,000 i $400,000 $400,000 $2,105,000 Professional Services $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $300,000 Total Expenses $155,000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,405,000 Real Estate Excise Tax II - Fund 125 $155000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,405,000 Total Revenue Unsecured Funding $155,000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,405,000 $0 Page 16 Packet Pg. 141 6.A.b Parks, Recreation & Cultural Services PRK B: Beautification Program Project Summary: Beautification to include flower plantings, irrigation and mulch in multiple areas throughout town for example: outdoor plazas, corner parks, the library, Frances Anderson Center, streetscapes, gateways and hanging flower baskets. Project Justification: Improve beautification and provide comprehensive adopted plan for beautification and trees. This program is highly supported by volunteers in the community. Baskets and corner parks are sponsored resulting in about $19,000 of contributions a year in additional funding. Estimated Cost: $21,000 per year / $126,000 (6-year total) a 0 a Page 17 Packet Pg. 142 6.A.b Parks, Recreation & Cultural Services PRK C: Park and Open Space Acquisition Program Project Summary: Acquisition of land when feasible that will benefit citizens and support the priorities identified in the PROS plan. $700,000 is currently reserved for park land and open space acquisition. These funds were accumulated in 2019, 2020 and 2021. There is no request to purchase a specific property at this time. Project Justification: There are large areas of Edmonds where the Parks, open space and recreation facilities level of service is below adopted standards; particularly on the Hwy 99 corridor. This is a priority in the PROS plan. Estimated Cost: TBD, funds accumulated in preparation for land acquisition opportunities total $3,094,000 over 6 years. Land — Park Facilities Total Expenses Real Estate Excise Tax I - Fund 126 $900,000 $200,000 $200,000 $200,000 $200,000 $200,000 $1,900,000 Tree Fund 143 - land acquisition $199,000 $199,000 $199,000 $199,000 $199,000 $199,000 $1,194,000 Total Revenue $1,099,000 $399,000 1 $399,000 1 $399,000 1 $399,000 1 $399,000) 1 Unsecured Funding � I $3,094,000 - 0 a Page 18 Packet Pg. 143 6.A.b CIP/CFP COMPARISON 2021-2022 Fund Project Name CFP Description New Projects Added 125 Playground Upgrade Program Annual upgrades of playground equipment and fall surfacing to provide additional inclusive playgrounds / facilities providing access for children of all ages and abilities. 125 Yost Pool Repair Regular Maintenance to re -plaster the pool to replace and repair the failing plaster. Pool will be forced to close without repair. Projects Removed 125 Greenhouse Replacement 2021 Project Projects Changed 125 4th Avenue Cultural Corridor Postponed until 2025 125 Waterfront Walkway Completion Moved to fund 125 125 Civic Center Playfield X Utilizing $2M from REET and not the General Fund 125 Citywide Park Improvements / Capital Replacement Program Increase in funding 2023-2027 Page 19 Packet Pg. 144 Capital Facilities Plan (CFP) & Capital Improvement Plan (CIP) Planning Board — October 27, 2021 Packet Pg. 145 6.A.c CFP & CIP Format Changes Combined CFP & CIP Document Packet Pg. 146 6.A.c Public Works & Utilities —Transportation 2022 Preservation Projects • 2022 Pavement Preservation Program ($1.5M) • 6 Lane Miles • 10 New ADA Ramps • 76t" Ave Overlay ($1.6M) • 196t" St to Olympic View Dr • City of Lynnwood • 2.8 Lane Miles (1.4 in Edmonds) • 15 New ADA Ramps (10 in Edmonds) • 84t" Ave Overlay Project Close-out ($5k) Packet Pg. 147 6.A.c Public Works & Utilities —Transportation 2022 Safety &Capacity Projects • Hwy 99 Revitalization/Gateway ($7.6M) • Hwy 99 244t"St-238t"St Stage 3($640K) • Hwy 99 224thSt-220thSt Stage 4($400K) • 76th Ave/220th St Intersection ($276K) • SR-104 Adaptive System ($150K) • Guardrail Improvements ($20K) • Traffic Signal Upgrades ($30K) T N ti I N 0 I T Packet Pg. 148 6.A.c H Public Works & Utilities —Transportation o 2022 Active Transportation Projects & Planning • Citywide Bicycle Improvements($1.5M) • Elm Way Walkway($901K) • Transportation Plan Update($185K) • Traffic Calming Program($33K) • Pedestrian Safety Program ($20K) • Citywide Pedestrian Improvement($10K) Packet Pg. 149 6.A.c Public Works & Utilities — Utilities 2022 Water Utility • 2022 Replacement Program($2.1M) • 2023 Replacement Program($486K) • Yost & Seaview Reservoir Assessment($505K) • Waterline Overlays($175K) Packet Pg. 150 6.A.c Public Works & Utilities — Utilities 2022 Stormwater Utility • 2022 Replacement Program($1.45M) • 2023 Replacement Program($312K) • Edmonds Marsh Water Quality Impr ($190K) • Perrinville Creek Basin Projects • Perrinville Creek Flow Mgmt ($121K) • Lower Perrinville Creek Restoration($550K) • Seaview Park Infiltration Ph 2 ($555K) • Lake Ballinger Regional Facility($300K) • Green Street &Rain Gardens($400K) • Stormwater Overlays($60K) • Storm &Surface Water Comp Plan($300K) N ti N O 0 CU 0 m CU a U aL LL U N 06 0 �r Packet Pg. 151 6.A.c Public Works & Utilities — Utilities 2022 Sewer Utility f ra • 2022 Replacement Program($1.6M) tiA • 2023 Replacement Program($336K) -' • Cured in -place pipe rehabilitation ($482K) • Sewerline Overlays($60K) 2022 WWTP • Carbon Recovery Project ($1.16M) • Capital Replacement Projects ($1M) • City Park Odor Scrubber ($297K) a t sj y .,. z d N ti I N 0 I I ka Packet Pg. 152 6.A.c Public Works & Utilities — Utilities 2022 Sewer Utility f ra • 2022 Replacement Program($1.6M) tiA • 2023 Replacement Program($336K) -' • Cured in -place pipe rehabilitation ($482K) • Sewerline Overlays($60K) 2022 WWTP • Carbon Recovery Project ($1.16M) • City Park Odor Scrubber ($297K) a t sj y .,. z d Packet Pg. 153 6.A.c Public Works & Utilities — Facilities • Boys &Girls Club • Cemetery Building • Historic Museum • Library • City Hall • Meadowdale Club House • Fishing Pier • Old Public Works • Frances Anderson Center • Parks Maintenance Bldg • Fire Station 16 • Fire Station 17 • Fire Station 20 • Historic Log Cabin • Public Safety • Public Works O&M • Wade James Theater • Yost Pool House N ti N O �1 m �IL - - U � d L cn z 0a L O M Packet Pg. 154 6.A.c Questions N ti I N 0 I c 0 c (1) m L IL L cu M0 W IL IL U d LL U W w 06 N Y L 0 :.i IL M 2 C d E r a Packet Pg. 155 6.A.c End N ti I N 0 I c 0 M c (1) m L IL L cu M0 W IL IL U d LL U W w 06 N Y L 0 :.i IL M 2 C d il Packet Pg. 156 6.A.d Parks 2022-2027 CIP / UP a_ U Complete 2022 Parks, Recreation & Open Space (PROS) Plan Update Complete Civic Park Redevelopment Deferred Maintenance/Capital QQplacement Program -epare for Future Large Projects Land Acquisition Marsh Restoration Marina Beach Park PROS Plan Priorities Packet Pg. 157 6.A.d a_ U a V 2022-2027 Parks CIP/CFP Framework CS! Parks, Recreation & Cultural Services Planning Timeline 2021 1st QTR 2nd QTR Parks Capital Projects/Contracted Work JAN FEB I MAR APR MAYJ JUN Civic Park Complex cc Yost Park - Civic Water Mitigation (2022) Waterfront Redevelopment X Fishing Pier Repair X Olympic Beach Pathway Olympic Beach Parking Lot Gateway Sign Installation Haines Wharf Slide Repairs New Property Clean-up/Securing Greenhouse Replacement Cemetery Columbarium Veteran's Kiosk Removal Brackett's North Restroom Refurb Park Maintenance/Major Maintenance Yost Park Bridges Repair Waterfront Redevelopment Signage X Museum Art Panel Installation X Hiring Staff (8) X Brackett's Landing North - Anchor Removal X City Park Pedestrian Safety Project Veteran's Plaza Sculpture Yost Pool Startup/Maintenance X Spray Pad Startup/Maintenance Portico Panel Installation X Brackett's North Entrance Gate Refurb Flower Basket / Corner Park Planting Veterans Plaza Flag Pole Sleeve Install Flower Pole Order / Replace (5) Library Bookdrop Removal Dayton Street Project Landscaping Holiday Light Installation 2016 Parks, Recreation & Open Space Plan (PROS) Goals Q • Collaborative efforts to meet recreation and cultural needs ° • Interconnected park system that includes cultural identity and natural environm • Preserve and expand shoreline a� • Natural resource land for habitat conservation, recreation & environmental edul L Dn • Promote a healthy, active and engaged community through recreation • Provide an engaged and vibrant community through arts and cultural opportune U • High quality maintenance of parks and related amenities a 2022 Parks, Recreation & Open Space Plan (PROS) o • Adoption February 2022 • Recommended CIP/CFP s_ • City Comp Plan — reference a • U Parks Project List a • Deferred maintenance • Small capital projects t4 a • Nearly 30 projects d ot= F D _ M��° Grant Funding eligibility Q al Packet Fg. 158 6.A.d 2022-2027 Parks CIP/CFP Project Distribution I I PRK-03 PRK-01 ® PRK-06 PRK-05 PRK-07 • PRK-02 • ® PRK-09 • N PRK-08 • a_ U a- LL U N O N N N O N O N O O_ O L a c O c �L m 2 v O a OF EDA, U�4 � 0.0 �4c. 189� Packet Pg. 159 6.A.d Parks 2021-2027 CIP - New Format 2022 - 2027 SIX -YEAR PARKS CAPITAL IMPROVEMENT PROGRAM CIP # PROJECT a +.' a IL r` N O N N N O N Project -based versus Fund-ba 0 2022 2023 1 2024 1 2025 1 2026 1 2027 1 6-Year Total a 9 CIP/CFP Proj1ects Civic Center Playfield X PRK 1 Redevelopment of 8-acre park consistent with Master Plan adopted in 2017; add restrooms, walking track, landscaping, inclusive playground, improve $ 9,755,742 - $ - $ - $ - $ - $ 9,7SS,742 field and lighting, skate park, petanque grove, tennisand multi sportscourts. 0 C 4 CIP Programs anna eac arImprovements V Redevelop the park consistent with the Master Plan adopted in 2015; X PRK 2 Parking lot reconfiguration, overlooks, lawn areas, permanent restrooms, $ - - $ 1,750,000 $ 1,500,000 $ 2,750,000 $ - $ 6,000,000 3 upgrade playarea, improve ADA Accessibility, add bridges over new 2022 Projects =Decision Pack a es alignment of Willow Creek 4th Avenue Cultural Corridor Prioritized in the 2014 Community Cultural Plan and State certified Creative PRK 3 District. Improvements encourage pedestrian traffic and provide visual $ - - $ - $ 1,000,000 $ 1,000,000 $ 6,000,000 $ 8,000,000 connection between ECA and downtown contributing to economic vitality. Playground Upgrade Program Annual upgrades of playground equipment and fall surfacingto provide PRK 4 additional inclusive playgrounds/facilities providing accessfor children of all $ 175,000 175,000 $ 175,000 $ 175,000 $ 175,000 $ 175,000 $ 1,050,000 ages and abilities. Yost Pool Repair Regular maintenance to re -plaster the pool to replace and repair failing PRK 5 plaster. Pool will be forced to close without repair. $ 175,000 - $ - $ - $ - $ - $ 175,000 Waterfront Walkway Completion Connecting the waterfront walkway from Brackett's Landing North to Marina PRK 6 Beach Park by adding missing section in front of the Ebb Tide Condominiums, $ - - $ 500,000 $ 750,000 $ - $ - $ 1,250,000 to provide ADA improvements. Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) X PRK 7 Restoration of the Marsh to reconnect the Puget Sound within the Edmonds $ $ $ $ $ $ Marsh and two fresh water creeks to provide fresh water / salt water estuary and natural tidal exchange. of Eb-4 Nd cP Inc. 189� Packet Pg. 160 6.A.d Parks 2021-2027 CIP - New Format 2022 -2027 SIX -YEAR PARKS CAPITAL IMPROVEMENT PROGRAM CFP # PROJECT 2022 2023 2024 202S 2026 2027 6-Year Total Community Park & Athletic Complex -Phase II X PRK 8 In cooperation with the Edmonds School District, complete a community park $ - $ - $ - $ - $ - $ - $ - and athletic complex at Former Woodway High School to include lighting and construction of two additional fields. Parks & Facilities Maintenance and Operations Building X PRK 9 Replace and/or renovate deteriorating building in City Park. Project in $ _ $ _ $ _ $ _ $ _ $ _ $ _ conceptual phase. (A) SUBTOTAL PARKS CIP/CFP PROJECTS $ 10,107,764 $ 177,023 $ 2,427,024 $ 3,427,025 $ 3,927,026 $ 6,177,027 $ 26,230,742 PARKS CIP PROGRAMS Citywide Park Improvements / Capital Replacement Program PRKA This ongoing program allocates funds for the regular maintenance, repair and $ 155,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 2,405,000 replacement of parks amenities, structures and equipment. Beautification Program This ongoing program allocates funds to support beautification. Specifically PRK B flower plantings, irrigation and mulch in areas such as corner parks, landscape $ 21,000 $ 21,000 $ 21,000 $ 21,000 $ 21,000 $ 21,000 $ 126,000 beds, streetscapes and gateways as well as flower baskets. Park and Open Space Acquisition Program PRK C To acquire land for future parks and open spaces as opportunities become $ 1,099,000 $ 399,000 $ 399,000 $ 399,000 $ 399,000 $ 399,000 $ 3,094,000 available. Debt Service and Interfund Transfers PRK D Debt service on Civic Park $1.61M bond (2021) and Interfund transfersto $ 193,832 $ 123,000 $ 148,000 $ 173,000 $ 198,000 $ 198,000 $ 1,033,832 Engineering for Capital Project Support. (B)SUBTOTAL- PARKS CIP PROGRAMS $ 1,468,832 $ 993,000 1 $ 1,018,000 1 $ 1,043,0001 $ 1,069,000 1 $ 1,069,000 1 $ 6,658,832 (C)TOTAL PARKS CIP/CFP EXPENDITURES(A+B) $ 11,576,596 $ 1,170,023 1 $ 3,445,024 1 $ 4,470,025 1 $ 4,995,026 1 $ 7,245,027 $ 32,889,574 4 CIP Programs Packet Pg. 161 6.A.d Parks 2021-2027 CIP - New Format 2022 - 2027 SIX -YEAR PARKS CAPITAL IMPROVEMENT PROGRAM PARKS CIP REVENUE 2022 2023 2024 202S 2026 2027 6-Year Total Real Estate Excise Tax (REET) I - Fund 126 $ 900,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,900,000 Real Estate Excise Tax (REET) II - Fund 125 $ 3,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 11,000,000 Park Impact Fees -Fund 332-100 $ 874,575 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 3,124,575 Tree Fund 143-Land Acquisition $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 1,194,000 Operating Contribution - GeneralFund $ - $ - $ - $ - $ - $ - $ - Investment Interest (3%) $ 78,110 $ 39,793 $ 50,797 $ 31,381 $ 25,632 $ (539) $ 225,173 Donations $ 142,000 $ - $ - $ - $ - $ - 1 $ 142,000 Bond Proceeds $ - $ $ $ - $ - $ $ - Secured Grants $ 2,728,000 $ - $ - $ 1,000,000 $ - $ - $ 3,728,000 Unsecured Grants $ - $ - $ - $ 1,000,000 $ 1,600,000 $ 6,000,000 $ 8,600,000 (D) TOTAL PARKS CIP REVENUE $ 8,421,68S $ 2,388,793 $ 2,399,797 $ 4,390,381 $ 3,974,632 $ 8,348,461 $ 29,913,748 i6-Year Overview 2022 1 2023 1 2024 1 2025 1 2026 1 2027 1 6-Year Total Beginning Fund Balance (Accts 332 + 332-100) $ 4,554,645 $ 1,399,734 $ 2,618,504 $ 1,573,276 $ 1,483,632 $ 463,238 $ 12,093,029 Revenue $ 8,421,685 $ 2,388,793 $ 2,399,797 $ 4,380,381 $ 3,974,632 $ 8,348,461 $ 29,913,748 Expenditures $ 11,576,596 $ 1,170,023 $ 3,445,024 $ 4,470,025 $ 4,995,026 $ 7,245,027 $ 32,901,721 (37%i (29%) a_ U Packet Pg. 162 6.A.d PRK 1: Civic Center Playfield i Planning & Design Construction $9,755,742 Total Expenses $9,755,742 Real Estate Excise Tax II - Fund 125 $2,898,672 Park Impact Fee's - Fund 332-100 $1,352,620 Bond Proceeds $1,634,450 Federal Grant (LWCF) $500,000 RCO State Grants $850,000 Snohomish County Grants $450,000 Verdant Grant $170,000 Hazel Miller Foundation Grant $1,500,000 State Appropriation / DOC Grant $258,000 Park Donations $142,000 p Eb Total Revenue Unsecured Funding $9,755,742 $0 Packet Pg. 163 6.A.d PRK 2: Marina Beach Park Improvements Planning & Design 2022 20231 $600,000 125 2026 2027 Construction $1,150,000 $1,500,000 $2,750,000 Total Expenses $1,750,000 $1,500,000 $2,750,000 Real Estate Excise Tax II - Fund 125 $750,000 $1,000,000 Fund 332 Balance + Park Impact Fees $1,000,000 $500,000 $1,150,000 Secured Grants $1,000,000 Total Revenue Unsecured Funding $1,750,000 $1,500,000 $2,150,000 11 111 o, a Total 6-year Cost Estimate: $61VII • Renovation to better serve community • ADA Improvements • Daylighting Willow Creek Packet Pg. 164 6.A.d PRK 3: 41hAvenue Cultural Corridor Planning & Design ,, 2025 $800,000 2026 2027 Construction $200,000 $1,000,000 $6,000,01 Total Expenses $1,000,000 $1,000,000 $6,000,01 Real Estate Excise Tax II - Fund 125 Park Impact Fees - Fund 332-100 Operating contribution — general fund Secured Grants Total Revenue Unsecured Funding $0 $1,000,000 $0 $1,000,000 $6,000,0� • Total 6-year Cost Estimate: $8M • Priority in State -Certified Creative District • Priority in 2014 Community Cultural Plan • No funding source currently identified Packet Pg. 165 6.A.d PRK 4: Playground Upgrade Program is ' P The Sierra Park Playground 5 —12 year olds a Planning & Design Construction $175,000 $175,000 $175,000 $175,000 $175,000 $175,00( Total Expenses $175,000 $175,000 $175,000 $175,000 $175,000 $175,00( Real Estate Excise Tax II - Fund 125 $175,000 $175,000 $175,000 $175,000 $175,000 $175,00( Fund 332 Balance + Park Impact Fees Secured Grants Total Revenue Unsecured Funding $175,000 $0 $175,000 $175,000 $175,000 $175,000 $175,00( • Total 6-year Cost Estimate: $1,050,000 • Upgrade playgrounds to be inclusive • Goal is one per year • Some playgrounds 35+ years old OF Epp A. v Packet Pg. 166 6.A.d PRK 5: Yost Pool Repair Planning & Design ,. 2025 2026 2027 Construction $175,000 Total Expenses $175,000 Real Estate Excise Tax II - Fund 125 $175,000 Fund 332 Balance + Park Impact Fee's Secured Grants Total Revenue Unsecured Funding $175,000 $0 • Re -plaster Yost Pool • Routine Maintenance/10 years • Necessary to continue operating the pool Packet Pg. 167 6.A.d PRK 6: Waterfront Walkway Completion - Ebb Tide -oe ' 4 J . Ma�SFi a_ U a ILL 0 N N N Sectioi,, N O Q O L a c O Planning & Design $125,000 Construction $375,000 $750,000 Total Expenses $500,000 $750,000 Real Estate Excise Tax II - Fund 125 $500,000 $750,000 Park Impact Fee's - Fund 332-100 Operating contribution —general fund Secured Grants Total Revenue Unsecured Funding $500,000 $0 $750,000 i • Total 6-year Cost Estimate: $1,250,000 • Improve safety mobility challenges or strollers • Shoreline Permit approved • Easement currently under legal review Packet Pg. 168 6.A.d a PRK 7: Edmonds Marsh Estuary Restoration Land Acquisition Planning & Design Construction Total Expenses Real Estate Excise Tax II - Fund 125 Real Estate Excise Tax I — Fund 126 Fund 332 Balance + Park Impact Fees Bond Proceeds Secured Grants Tree Fund 143 — Land Acquisition Park Donations Operating Contribution — General Fund Stormwater— Fund 422 Total Revenue Unsecured Funding �q c. 1890 Packet Pg. 169 6.A.d PRK 8: Community Park & Ath Phase 1 Phase 2 •I i a_ U a ILL N O N N N letic Complex Ph 2 (CFP Only, N O M O L a c O Construction Total Expenses Real Estate Excise Tax II - Fund 125 Park Impact Fee's — Fund 332-100 Bond Proceeds Total Revenue Unsecured Funding $6-8 a U a • Former Woodway High School site 1 • In partnership with the Edmond School District Y • Phase I — lighting to significantly expand usage a • Phase 2 - on hold Cat FD1y E u rl�p V Q r al Packet Fg. 170 6.A.d PRK 9: Parks & Facilities Maintenance Building (CFP Only) Planning & Design Construction Total Expenses Real Estate Excise Tax II - Fund 125 Park Impact Fee's— Fund 332-100 Bond Proceeds Operating Contribution —General Fund Park Donations Total Revenue Unsecured Funding • Current building 40+ years old • Long-term planning purposes only, must secure funding qk) Packet Pg. 171 6.A.d PRK A: Citywide Park Improvements/Capital Replacement Progra • Total 6-year Cost Estimate: $2,405,000 • Significant maintenance backlog throughout park system • Prioritization driven by community input through PROS plan and safety F 0 r Packet Pg. 172 6.A.d PRK B: Beautification Program ^�. VA • Total 6-year Cost Estimate: $126,000 • Flower plantings, irrigation and mulch • Outdoor plazas, corner parks, streetscapes, gateways, flower baskets, etc • $19,000 per year in sponsorship revenue a_ U IL LL , r- N OU N N N O N O N O M O L. a c O c �L d ci a Packet Pg. 173 6.A.d PRK C: Park and Open Space Acquisition Program • Total 6-year Cost Estimate: TBD based on opportunities that arise • Property supports PROS Plans priorities • $3,094,000 accumulated by 2027 ($700,000 from prior years) Packet Pg. 174 8.A Planning Board Agenda Item Meeting Date: 10/27/2021 Code Amendment to Update Residential Occupancy Standards Staff Lead: Eric Engmann Department: Planning Division Prepared By: Eric Engmann Background/History The Washington State Legislature adopted Senate Bill (SB) 5235 during the 2021 legislative session to address "Housing Unit Inventory - Removing Limits." It was signed by the Governor in May 2021 and addresses local control over residential occupancy restrictions. Specifically, it limits a local government's ability to regulate the number of occupants living within a household (dwelling). The only exceptions are for occupancy limits assigned in the Building Code, group homes, and short-term rentals. The applicable portion of SB 5235 is provided as Attachment 1. Note: The majority of SB 5235 was vetoed by the Governor. To avoid confusion, the vetoed and non -applicable sections have not been included. Note: This initial discussion was moved from the October 13, 2021 agenda because of time constraints. Staff Recommendation None at this time. This is an introduction of the topic. Narrative This introduction discussion will cover: - The specifics of the SB 5235 that apply, - The City's code sections that need amending, and - Possible actions to comply with the legislation. This is an introductory meeting to understand the changes made by the State Legislature in SB 5235. This legislation removes the City's ability to set limits on the number of people living in a household, outside of Building Code requirements, group living, and short-term rentals. The Edmonds Community Development Code (ECDC) contains several references to occupancy limits in the definitions section of the code. The definition for Families (ECDC 21.30.10) and the Criteria for Attached Accessory Dwelling Units (ECDC 20.21.030) both currently contain limits on the number of unrelated persons that can live in a dwelling unit. Packet Pg. 175 8.A The purpose of this code amendment will be to remove these specific occupancy limits and replace them with other criteria and standards to address how a household operates. This will ensure that the intent of single-family dwelling units and single-family zoning remains intact. The initial idea is to replace the occupancy limitations with other criteria. In reviewing options and discussing scenarios, the primary concern would be ensuring how the dwelling unit and the operations function. There will be opportunity to discuss the impacts and possible scenarios of the proposed changes at this meeting. The specific draft code language will be presented at a future Planning Board meeting. The presentation for the meeting is provided as Attachment 2. Action Needed None at this time. This action is a Type V legislative permit where the Planning Board will review the proposed code language (when presented) and make a recommendation to City Council. Attachments: Attachment 1 - SB 5235 (Simplified) Res Occupancy Pres 10.27.21 Packet Pg. 176 8.A.a CERTIFICATION OF ENROLLMENT ENGROSSED SUBSTITUTE SENATE BILL 5235 Chapter 306, Laws of 2021 (partial veto) 67th Legislature 2021 Regular Session HOUSING UNIT INVENTORY —REMOVING LIMITS EFFECTIVE DATE: July 25, 2021 Passed by the Senate April 14, 2021 Yeas 30 Nays 18 DENNY HECK President of the Senate Passed by the House April 7, 2021 Yeas 57 Nays 40 LAURIE JINKINS Speaker of the House of Representatives Approved May 13, 2021 11:53 AM with the exception of sections 1, 3, and 4, which are vetoed. JAY INSLEE Governor of the State of Washington CERTIFICATE I, Brad Hendrickson, Secretary of the Senate of the State of Washington, do hereby certify that the attached is ENGROSSED SUBSTITUTE SENATE BILL 5235 as passed by the Senate and the House of Representatives on the dates hereon set forth. BRAD HENDRICKSON Secretary FILED May 13, 2021 Secretary of State State of Washington E Cn LO M N LO m Cn c d E t Q c m E t .r Q Packet Pg. 177 8.A.a ENGROSSED SUBSTITUTE SENATE BILL 5235 AS AMENDED BY THE HOUSE Passed Legislature - 2021 Regular Session State of Washington 67th Legislature 2021 Regular Session By Senate Housing & Local Government (originally sponsored by Senators Liias, Das, Nguyen, Nobles, Saldana, and Wilson, C.) READ FIRST TIME 02/05/21. 1 AN ACT Relating to increasing housing unit inventory by removing E 2 arbitrary limits on housing options; amending RCW 36.70A.696, 3 36.70A.697, and 36.70A.698; adding a new section to chapter 35.21 a 4 RCW; adding a new section to chapter 35A.21 RCW; adding a new section as o 5 to chapter 36.01 RCW; and creating a new section. as w 6 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON: Q- E Cn U) 7 *NEW SECTION. Sec. 1. The legislature finds that local zoning N W) 8 laws can contribute to limiting the housing available for CO w 9 Washingtonians. The legislature finds that reducing these barriers 10 can increase affordable hog options. The legislature finds that a 11 accessory dwelling units can %oneway to add affordable long-term z 12 housing and to provide a needed � rease in housing density. However, r a 13 the legislature finds that resea from several cities shows that 14 when accessory dwelling units are bt and offered for short-term t 15 rental for tourists and business vis" rs, they may not improve 16 housing affordability. Therefore, it is t -ntent of the legislature a 17 to encourage reducing barriers to accessory 2l%elling units when local 18 governments have programs to incentivize or assure that they will be 19 utilized for long-term housing. The legislature finds that owner 20 occupancy requirements may provide an appropriate means for local 21 governments to ensure community impacts of accessory dwelling unit.- P. 1 E S S packet Pg. 178 1 applicable health and safety provisions as established by applicable 2 building code or city ordinance, a city or town may not regulate or 3 limit the number of unrelated persons that may occupy a household or 4 dwelling unit. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 NEW SECTION._ Sec. 6. A new section is added to chapter 35A.21 RCW to read as follows: Except for occupant limits on group living arrangements regulated under state law or on short-term rentals as defined in RCW 64.37.010 and any lawful limits on occupant load per square foot or generally applicable health and safety provisions as established by applicable building code or city ordinance, a code city may not regulate or limit the number of unrelated persons that may occupy a household or dwelling unit. NEW SECTION. Sec. 7. A new section is added to chapter 36.01 `i RCW to read as follows:,<V- 0 0 Except for occupant limits on group living arrangements c regulated under state law o n short-term rentals as defined in RCW 64.37.010 and any lawful limi't�gn occupant load per square foot or a m generally applicable health and Q�ety provisions as established by o U applicable building code or coup ordinance, a county may not regulate or limit the number of Ctnrelated persons that may occupy a household or dwelling unit. Q- E W Passed by the Senate April 14, 2021. Passed by the House April 7, 2021. cq Approved by the Governor May 13, 2021, with the exception of m certain items that were vetoed. Cn Filed in Office of Secretary of State May 13, 2021. c Note: Governor's explanation of partial veto is as follows: E z "I am returning herewith, without my approval as to Sections 1, 3, and 4, Engrossed Substitute Senate Bill No. 5235 entitled: a "AN ACT Relating to increasing housing unit inventory by removing arbitrary limits on housing options." Section 3 allows cities to delay local implementation of statewide requirements around siting of accessory dwelling units until two a years after their next required comprehensive plan update. Accessory dwelling units play an important role in creating additional housing options in urban areas and the state is currently facing a housing crisis. Section 4 limits the ability for local governments to require owner occupancy on lots containing an accessory dwelling unit, but it also creates numerous exceptions to that limitation which are problematic. I am concerned that the language may allow a local government to p. 6 E S S Packet Pg. 179 prevent the siting and development of accessory dwelling units in perpetuity with very little justification. Section 1 establishes the intent of the bill. Due to the vetoes of Sections 3 and 4, the original statement of intent no longer fully applies to this bill. For these reasons I have vetoed Sections 1, 3, and 4 of Engrossed Substitute Senate Bill No. 5235. With the exception of Sections 1, 3, and 4, Engrossed Substitute Senate Bill No. 5235 is approved." --- END --- m E Cn LO M N LO CO Cn C N E t t) r r Q C E t C� r+ Q P. 7 E S S Packet Pg. 180 8.A.b Q Packet Pg. 181 8.A.b IC TON IGHT'S TOPICS 00 w E 1) SENATE BILL 5235: WHAT IT DOES, WHAT IT MEANS a T" N 2) NON -COMPLIANT CITY CODE SECTIONS N 0 L 3)POTEN TIAL SO LUTIO N S 0 D.27.2021 r all Packet Pg. 182 8.A.b RESIDENTIAL OCCUPANCY LIMITS W hat does it do? • Limits the number of unrelated people living in dwellings • Began near turn of the 20t" century, to limit overcrowding in housing • Used to differentiate separate housing uses: ,9nje-Family, Multi -Family, Group Living Why is this an Issue? • Doesn't always recognize the components of a family • Doesn't accommodate 2V century living arrangements • Plenty of case la/v against residential occupancy limits in zoning codes L R N c,> cu Q ci 0 0 w E a 0 U W ME a Packet Pg. 183 8.A.b 2021 State Legislation Addressed: Removing Limits in Housing Unit Inventory Prohibits local governments from limiting the number of unrelated persons occupying a home Exceptions for short-term rentals, Building Code occupancy loads, some group homes Also addressed owner requirements for Accessory Dwelling Units (Governor Veto) Packet Pg. 184 8.A.b Recognizes that there are many versions of a fami ly Not all people who act as a family are related Cities can't use the number of unrelated people in a house to determine what constitutes a family Cities often use this method to identify other residential type uses within households 10.27.2021 Packet Pg. 185 8.A.b CONFLICTING EDMONDS SECTIONS Definition of Family - ECDC 21.30.010 Section A Family means individuals consisting of two or more persons related by genetics, adoption, or marriage, or a group of five or fewer persons who are not related by genetics, adoption, or marriage and none of whom are wards of the court unless such wards are related by genetics, adoption, or marriage to all of the members of such group living in a dwelling unit Section D. Calculations in Single -Family Zones N 1. No more than five unrelated people N 0 2. Contains special considerations for two renters or exchange students a Many Other Sections Rely on this Definition of a Family (Single -Family) o 10.27.2021 ME Q Packet Pg. 186 8.A.b What We Will Do Remove the Occupancy References, per State LaA/ Review Other Sections for Compliance Establish or Strengthen Definitions to Maintain Single -Family Uses& Zones What We Will Not Do Will Not Remove SIngle-Family Zoning Categories or Uses Packet Pg. 187 8.A.b L R Two Approaches to Ensuring Single -Family Zoning/Usage U C fC 3 Structure - Strengthen Definition for Single Family Dwelling Unit. Limited to one: • Mailbox • Water Meter 0 w • Gas Meter E • Garbage Collection Area a 0 - Create definition to discuss how the single-family N use operates N 0 • Common access to living, sleeping, cooking, eating area: L • Shared household expenses (primarily) • One lease (if rented) 0 W E U r a Packet Pg. 188 8.A.b NEXT STEPS 1)CONTINUE WORKING ON DRAFT AMENDMENT 2) PRESEN T D RAFT REC O M M EN D AT I O N S TO PLAN N I N G BOARD 10.27.2021 L R N c,> 0 L 0 d E E a 0 U w N0 ME a� E r a Packet Pg. 189 8.A.b Visit the Edmonds Code Update webpage for more information or to sign up for notifications. Residential Occupancy Limit (Update) specific page coming soon! 0� 0 www.edmondswa.gov/codeupdates Webpage Q R Code r A FOR QUESTIONS, CONTACT ERIC EN GMAN N , AICP SENIOR PLANNER I CITY OF ED M O N D S ERIC.ENGMANNBEDMONDSWA.GOV ( 4 2 5 ) 9 9 7 - 9 5 4 1 10.27.2021 0 c a� E E a N Packet Pg. 190 8.6 Planning Board Agenda Item Meeting Date: 10/27/2021 Selection of Student Representative to the Planning Board Staff Lead: Rob Chave Department: Planning Division Prepared By: Eric Engmann Background/History N/A Staff Recommendation N/A Narrative The Planning Board can select a student representative to join the Board as a non -voting member. Lily Distelhorst applied because of her interest in majoring in urban planning in college. She's been interviewed by the Chair and Vice Chair, who now want to discuss having her serve as the student rep with the rest of the Board. Her application is included (Attachment 1). Attachments: Lily Distelhorst-Student Rep Application Packet Pg. 191 I 8.B.a I ity of Edmonds Citizen Board and Commission Application (PLEASE PRINT OR TYPE) NOTE: This form is a public record and may be subject to disclosure upon request Planning Board (Board or Commission) Name: Amarlin Lily Distelhorst Address: Redacted Date- 10/11 /21 Day Phone: n/a Evening Phone: n/a roi,. REDACTED E-mail. REDACTED Occupational status and background: Student, 10th grade at Edmonds Woodway High School Organizational affiliations: n/a Why are you seeking this appointment? I am seeking this appointment because I want to major in Urban Planning in College and I am interested in learning more about planning, land -use, and transportation. What skills and knowledge do you have to meet the selection criteria?_I am passionate for issues related to livable and equitable cities. Please list any other Board, Commission, Committee, or official positions you currently hold with the City of Edmonds: None. Additional comments: I am very passionate about affordable housing and transit and how it affects youth in Edmonds. Please return this completed form to: Edmonds City Hall 121 5th Avenue North Edmonds, WA 98020 carolyn.lafave@edmondswa.gov Phone:425.771.0247 1 Fax:425.771.0252 Amarlin Lily Distelhorst Signature Revised 4130114 Packet Pg. 192 9.A Planning Board Agenda Item Meeting Date: 10/27/2021 Extended Agenda 10/27 Staff Lead: Eric Engmann Department: Planning Division Prepared By: Eric Engmann Background/History N/A Staff Recommendation Review of the Extended Agenda. Narrative The Extended Agenda is attached for Board discussion. Attachments: 10-27-2021 PB Extended Agenda Packet Pg. 193 ,5= F1)M items and Dates are subject to change J 1PLAKHNR BOARD Extended Agenda October 27, 2021 Meeting Item November 2021 November 10 1. Parks, Recreation and Open Space Plan (PROS Plan): Recap of Public Input, Goals/Objectives, and Recommendations 2. Parks, Recreation & Cultural Services Department Report November 24 Day Before Thanksgiving- Cancelled December 2021 December 8 1. Code Amendment addressing Residential Occupancy Standards and Definitions: Draft Code Recommendations 2. Code Amendments addressing Multifamily Design Standards: Overview and Public Outreach Effort Discussion 3. Election of Officers December 22 Day Before Winter Holidays/Christmas- Cancelled January 2022 January 12 1. Parks, Recreation and Open Space Plan (PROS Plan): Draft Document Review and Feedback 2. (Tentative) Public Hearing - Code Amendment addressing Residential Occupancy Standards and Definitions 3. Code Amendments addressing Multifamily Design Standards: Discussion January 26 1. Public Hearing - Parks, Recreation and Open Space Plan (PROS Plan): Recommendation to Council 2. (Tentative) Tree programs and regulations: Overview and Public Outreach Effort Discussion Packet Pg. 194 9.A.a Items and Dates are subject to change Pending 1. Implementation / code updates concerning trees and the UFMP For Future 2. Climate Action Plan update and public outreach Consideration 2021-2022 3. Housing policies and implementation (incl Multifamily Design) 4. Parks, Recreation & Open Space (PROS) Plan 5. Comprehensive Plan update preparation and gap analysis 6. Subdivision code updates 7. Community Development Code Amendments / Re -Organization 8. Neighborhood Center Plans & implementation (esp. 5 Corners) 9. Low impact / stormwater code review and updates 10. Sustainable development code(s) review and updates 11. Further Highway 99 Implementation, including: ✓ Potential for "urban center" or transit -oriented design/development strategies ✓ Parking standards Recurring 1. Election of Officers (15Y meeting in December) Topics 2 Parks, Recreation & Cultural Services Department Reports & Updates 3. Joint meeting with City Council —April or as needed 4. Development Activity Report Packet Pg. 195