Change Order #001
9/2/21
Ethan Home Repair & Remodeling, LLC
313 Heather Rd,
Everett, WA 98203
Lic#ETHANHR934PB
425-293-7913
Client: Hampton Place HOA c% Kathy Kerwat
Address: 20632 76's Ave W. Edmonds, WA 98026
Date of Existing Agreement: 7/13/21
SUBJECT TO FIELD
INSPECTION. DOES NOT
INCLUDE ANY
STRUCTURAL WORK
You are hereby authorized to perform the following specifically described additional work:
Unit 2 Entry Stair System and Garage Wall
1. Deconstruct and remove existing stairs and railing, taking extra care not to compromise
waterproof deck landing membrane if possible. In the event this area is deemed to require
compromising in order to executepennitted repairs, additional charges will apply.
2. Reframe storage area wall beneath landing to better support paneling and to prevent further/future
degradation.
3. Remove and replace grooved T-1 I I style 5/8" exterior wall sheathing on garage and storage area
East facing walls, including necessary metal flashings and sealants to protect against future
degradation_
4. Remove and replace compromised sheetrock on interior of East garage wall where visible
discoloration is present, fire tape seams as required.
5. Inspect East wall framing when exposed, recommend additional rot repairs if required. If none
required, cavity will be treated with antimicrobial and spray sealed to protect against future
microbial growth.
6. Remove and replace non -compliant wall mounted hand rail along stairs with new compliant
material (2x6 pre -milled cedar "keyhole" style wood) on new guard rail instead of garage wall to
match Unit 2 directly across.
7. Delete existing surface mounted electrical conduit and exterior electrical receptacle, junction into
covered box inside garage.
8. Remove compromised gypsum wall board from beneath stair landing.
9. Layout, construct, and install new code compliant stair system to replace existing, using code
compliant material, hardware, and dimensions, in similar style as existing for visual continuity
between units. Includes pressure treated structural members, 3x 12 floating stair treads, enclosed
risers, secured with approved galvanized hardware and fasteners as required. Treads, risers, and
framing to be separated from garage wall to allow drain plane for water runoff.
10. Layout, construct, and install new code compliant guard rail on new stairs to replace existing,
using code compliant material, hardware, and dimensions in similar style as existing for visual
continuity between units. Includes pressure treated posts, cedar infill and cap material, secured
with approved galvanized hardware and fasteners as required_
11. Prepare, prime, and paint all new materials to match existing_
General Notes
1 _ Haul away and disposal of additional debris is included.
2. Additional materials, labor, and equipment is included.
3. Change Order Fee: Waived
4. This project will require a building permit in this jurisdiction. Permits and related fees are not
included in this Change Order due to extremely variable jurisdictional requirements which cannot
be fully know until actual time of submittal. if this work is desired or requested, it will be invoiced
additionally based on Time and Materials rates shown on page 1 of the Original Agreement
Additional charge for above described additional work is: $17,182.41 plus 10.4% sales tax =
S18,%9.38
Payment will be made as follows: $9,484.69 due upon acceptance, balance due within 5 days of
invoicing.
Above additional work is to be performed under the same conditions as specified in Original Agreement
unless otherwise stipulated above.
Date G 7 10 2 1 Authorizing SignatureFir1
Date 9/2/21 Contractor Representative