Building Permit 2021Type: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED
Parcel No: 00784600000200 Site Address: 20632 76TH AVE W 2 EDMONDS,WA 98026-6812
Subdivision: 007846, 006143, 005958, 006718, 008256 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $17,200.00 Occupancy Type: Construction Type: VB
Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: HAMPTON PLACE- REPAIR/REBUILD STAIRS & GARAGE WALL TO UNIT 2
Applied: 10/27/2021
Issued:10/28/2021
Final:
Expiration Date: 10/23/2022
Issued by: NED
I WA State Contractor L & I #: ETHANHR934PB I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
MILT RYE
1202 300TH ST. NE, STANWOOD
(425)293-7913
MILT@ETHANHOMEREPAIR.COM
WA 98292-7203
ETHAN HOME REPAIR &
1202 300TH ST. NE, STANWOOD
CONTACT
(425)293-7913
milt@ethanhomerepair.com
REMODELING
WA 98292-7203
ETHAN HOME RPR &
313 Heather Rd, Everett WA
CONTRACTOR
(425)293-7913
RMLDNG LLC
98203
PO BOX 3384, LYNNWOOD WA
OWNER
MARK E ZIELKE
98046-3384
•' •
DESCRIPTION
7PER
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
10/28/21
R15594
PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
10/28/21
R15594
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$458.80
$458.80
10/28/21
R15594
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$389.98
$389.98
10/28/21
R15594
TOTALS: $913.78
$913.78
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, October 28, 2021 10:01:52 AM 1 of 2
•M MERCIAL BLDG Permit
of Edmonds PERMIT NUM
IF
EdmondsCity
121 5th Ave N, 98020 1 4�9
www.edmondswa.gov-
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Structural repair is not included in the scope for this permit. If it is found that structural
STRUCTURAL REPAIR NOT
FOR
repairs are needed a separate permit must be submitted to the city for approval, and
INCLUDED
INFORMATION
plans must be stamped and signed by the engineer of record.
COMPLETED RESULT
SEQID
INSPECTION TYPE INSPECTOR
NOTES
DATE
B-4 FRAMING
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL**
Printed: Thursday, October 28, 2021 10:01:52 AM 2 of 2