ENG2021-0406 ROW PERMITOF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
EdmondsRIGHT
A•:0i 1 141.
www.cityofedmonds.gov
Description: ZIPLY-CHECK CONDUIT AND IF DAMAGED, BORE & PLACE NEW CONDUIT
ISSUED: 11/01/2021
Address: 130 W DAYTON ST EDMONDS WA 98020-4130
EXPIRES: 05/01/2022
Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 27032300409600
Isle]'
NAME TYPE NAME ADDRESS PHONE
APPLICANT ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230
CONTRACTOR PACIFIC CABLE CONSTRUCTION, INC. , EVERETT WA 98201-1255 (425)348-7735
OWNER EDMONDS PORT OF 156 W DAYTON ST, EDMONDS WA 98020
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00
RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
11 /01 /2021
RELEASED BY
DATE
Printed: Monday, November 01, 2021 8:13:18 AM 1 of 2
-KRWOF WAY EUC PERMIT
PERMIT NUMBER
City of • • •
AveA•:•• 1 141.
www.cityofedmonds. ov/425.771.0220
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND OR NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROL
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
RESULT
INSPECTION MEN
A-1 JOB START
X-2 ENGINEERING FINAL"
Printed: Monday, November 01, 2021 8:13:18 AM 2 of 2
ENG2021-0406
of E°M°tio� RECEIVED
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION OCT 15 2021
Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS
/Ivc. i aa° Requirements outlined in Right -of -Way permit Handout E6�. DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name 5504204-519
Site Address or if no site address use Property Address at NW corner of project area: 130 W Dayton Street, Edmonds, WA
Associated Permits: BLD PLN ENG
Owner and Entity Holding Franchise (if applicable)
Name of Company Ziply Fiber Franchise Ordinance No: WN U-17
Point of Contact Mike HaKahan
Title Engineer
Address 1800 41 St St, Ste N 100
city Everett
State WA
Zip 98203
Phone 425-949-0230
Email mike.hakahan@ziply.com
Contractor and Authorized Agent of Owner (see note below)
Name of company Pacific Cable Construction
Contractor Contacts
Primary Name
During Construction
Danielle Harrera
Agent Name Danielle Herrera
Title
Permit Manager
Title Permit Manager
Mobile
425-348-7735
Address PO BOX 573
Email
danielle@paccab.com
City Woodinville
State WA
Zip 98072
Secondary Name
Phone 425-348-7735
Title
Email danielle@paccab.com
Mobile
City of Edmonds Business License No: PACI FCC954PJ
Email
State License No: 3636CON 1096
Of
Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
Ix Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Telecommunications and broadband arovider Zialy Fiber to:
Locate HH3 in parking lot near rear entrance of 110 W Dayton ST and check conduit from HH3 to HH4 for access
to pull new 12-port tail through. If conduit is damaged or not available. D-Bore SE from HH3 to HH4 (19oFT) and
place new 4" conduit in new path.
Locate MH6 at iio W Dayton ST and pull a 12-port fiber tail in existing/new conduit from the customer MPOE to HH4, to
HH3, to HHl, and then to MH6.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
I x
LF
SF
Alley 72 hours +
LF
Ix
I LF
SF
Parking 72 hours +
LF
Ix
I LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
VZtelecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
X
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
X
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
X
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
X
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
X
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? 1 5 1 How many are to be added? i
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: 4—a a)a&- DATE: 10/15/2021
APPLICANT PRINTED NAME: TRACI WEST
APPLICANT TITLE: OSP ENGINEER AND PERMIT COORDINATOR
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
PLANNING NOTES:
The Planning solution for this order from planner Ed Meneses is:
Existing Copper Term: C9EDM A900
Count: C9EDM DFV,801-825
FDT: New 12-port term
Fiber Count: 5XD+FC1031,78+6XD
CO CLLI CODE 1: HLLKWAXX
CUST CLLI CODE 2:
Facilities note: Reserve HLLKWAXX H5032,145.
GIS note: Reserve HLLKWAXX FC1031,78.
OSP Estimate: N/A
OSP Blanket: 5504204-519
Solution: HLLKWAXX - 130 W DAYTON ST, EDMONDS, WA
Locate HH3 in parking lot near rear entrance of 110 W Dayton ST and check conduit from HH3 to HH4 for access to pull new 12-port tail through. If conduit is damaged or not available, D-Bore SE
from HH3 to HH4 (190FT) and place new 4" conduit in new path.
NOTE: FROGS records show existing conduit from HH3 to HH4. Fielder site walk has determined D-Bore is required from HH3 to HH4.
Locate MH6 at 110 W Dayton ST and pull a 12-port fiber tail in existing/new conduit from the customer MPOE to HH4, to HH3, to HH1, and then to MH6.
In MH6, splice H5032,145 from the RBN-96 cable to XD,6 on the 12-port tail (5XD+FC1031,78+6XD).
Locate FDH H5032 at 201 2ND Ave S and place a red jumper from FC1031,78 port 6 (in Hub) and H5032,145 port 145.
Test Fiber FC1031,78 from MPOE back to HALLS LAKE CO BAY: 011, MS: 03, Connector: 06.
Feeder Fiber: FC1031,78 from MPOE back to HALLS LAKE CO on 2100/BAY: 011, MS: 03, Connector: 06.
Distribution Fiber: H5032,145 port 145 red jumper to FC1031,78, port 6.
Fiber Trunk Schematic: HLLK FTTCS FTTP.DWG, Sheet 17
APP Date: 09/20/21
Order: PSR 3396649
Customer Desired Due Date: 10/29/21
Carrier: N/A
Customer End User: BEST WESTERN PLUS EDMONDS HARBOR INN
Address: 130 W DAYTON, EDMONDS, WA 98020
Service: 500M
Circuit ID: 86/L1XN/722664//NWFC/
Exchange: HLLK/51419
OA/CO: 032/962
Copper Terminal: C9EDM A900
Fiber Terminal: None
LCON:
SITE LCON: Mark Raden
RECEIVED
SITE TEL NO: (206) 300-5265
SITE EMAIL: mlraden@yahoo.com
OCT 15 2021
ALCON:
ALCON: None Provided
ALCON TEL NO: None Provided
ALCON EMAIL: None Provided
CITY OF EDMONDS
DEVELOPMENT
Project Manager: Bryan Graham
SERVICES DEPARTMENT
DSAT#: 2191829
SF#/PON: SF00006896UNIN
I CERTIFY THAT THE WORK I COMPLETD ON THIS WORK ORDER
AND AS -BUILT IS IN COMPLIANCE WITH FRONTIER QUALITY
STANDARDS AS IDENTIFIED ON THE IPQIP CHECKLIST.
(SIGNATURE AND DATE)
TOTAL ALLOTTED HOURS
CONTACT SUPERVISOR IF ADDITIONAL
HOURS ARE REQUIRED TO COMPLETE PROJECT
CAP. X-TIME MAINT
CREW 0 0 0
SPLICING 0 0 0
W.O. DRIVER CONSTRUCTION START
I@ ETHERNET 10/11/21
❑ CIAC IN SERVICE DATE
❑ DAMAGE 12/03/21
❑ OTHER
CONSTRUCTION
❑ FLAGGING ❑ BRUSHING ❑ CONTRACTOR
PERMITS
MUNICIPALITY: CITY OF EDMONDS
❑ BLANKET
® TCP/TRAFFIC
® DETAILED (NOT BLANKET)
❑ NO PERMIT REQUIRED
JOINT POLE
JFN/NJUNS#
® NO JPN REQUIRED
POLE JPN
JPN
OWNER TO
FROM
❑ ❑
❑ POWER
❑ ❑
❑ CATV
❑ ❑
❑ FRONTIER
ACCOUNT CODES
❑ 2411.001 POLES
❑ 2422.201 UG FIBER
❑ 2421.101 OH COPPER
❑ 2441.001 CONDUIT
❑ 2421.201 OH FIBER
❑ 34XX.XXX REMOVAL
❑ 2422.101 UG COPPER
❑ 64XX.XXX MAINT.
SITE CONTACT: MARK RADEN 206-300-5265
SCHEDULING:
PHONE:
ENGINEER:
PHONE:
FACILITIES:
PHONE:
FIELDED BY:
JOHN WOOD
425-261-1412
MIKE HAKAHAN
425-949-0230
ELAINE GRACE
425-263-4001
SHANE NEWTON
� ziplyfiber
HLLK - 500M - ASR# 3396649 - BEST WESTERN
130 W DAYTON, EDMONDS, WA
PROJECT 5504204-519 C.O. AREA: 962
NUMBER: EXCH. CODE: 51419
DRAWN DATE: ENGR: M. HAKAHAN NTY: SNOHOMISF
10/11/21 PHONE:425-949-0230 FILE:
SCALE: 1:100 TAX DISTRICT: DWG 1 OF 4
TWNSHP: 27N RING: 3E SEC: 23D
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
0 05.2010
RBN 96 �.
OPT / HLLKWAXX H5032,97-110+
XD,111-120+
HLLKWAXX H5032,121-131+
HLLKWAXX FC1031,101+
HLLKWAXX H5032,133-168+
XD,73-96
I � �
W DAYTON ST (W DAYTON S
I
434 09.
20 RBHL XX H5032,145
296'
AE 100 24
. C9EDM DFV,801-900
FTTP PIGTAIL 1000FT 12
XD,1-5+
HLLKWAXX H5032,145+
XD,7-12
'
Utility patches shall be combined and full width or half
width overlay will be required depending on the extent
of disturbance. Where utility patches fall entirely within
one travel lane, the overlay shall extend to the
centerline of roadway. Where utility patches extend into
both travel lanes then a full width overlay is required.
Z 09.200�
�-
�RBN 96I
ILH52
782 09.2009
I HL,97-111+
RBN 96
I C1031,81+
XD,97-144+
i HILL113-131+
HLLKWAXX H5032,145-168+
I 1031,101+XD,73-96
PLACE FIBER TAIL HLL133-168+ROM
MH6 TO MPOE.xD,73-96
SEE MH DETAIL WP4.J
HH14F7
VC 60'
4
i
168 --- HH1
C9EOM
110 /
LLK
IN: HL
OUT:
BORE 190' 1-4-
,FROM HH3 TO HH4
SEE NOTES RIGHT
MPO
INe XD,1-5+
H5032,145+
XD,7-12
OUT:
RECEIVED
OCT 15 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
130
BEST WESTERN PLUS
EDMONDS HARBOR INN
130 W DAYTON
200 2ND AVE S
AKF 100 26 1 RED JUMPER
C9EDM DFV,8Q1-900 FC1031,78
0 09.2009 1 TO H5032,145
FDT MDU 12P IOFT 12
HLLKWAXX H5 32,157-168 HLLKWAXX 115037
1 FDH 48/288
0 IN: HLLKWAXX FC1031,73-78+
e8p� I XD,79-82+
XD,101+
HLLKWAXX FC1031,102-104+
< 101886 XDJ 05-108+
4XX H5032,1,57-168 XDJ9-24
OUT: HLLKWAXX H5032,1-432
5022
FIT7
302 09.2009
RBN 288
I
HLLKWAXX
H5032,1-2+
HLLKWAXX
FC1031,79+
HLLKWAXX
I
H5032,4-46+
XD,47-48+
HLLKWAXX
H5032,49-57+
HLLKWAXX
I
FC1031,82+
HLLKWAXX
H5032,59-64+
HLLKWAXX
FC1031,105-108+
HLLKWAXX
I
H5032,69-111+
HLLKWAXX
FC1031,81+
LLKWAXX
HLLKWAXX
H5032,113-131+
FC1031,101+
HLLKWAXX
II I
H5032,133-288
1AYTMLS_T_ QaAyTQ.N_
Cs ®s
I
102 09.2009
RBN 56
HLLKWAXX FC1031,73-82+
J HLLKWAXX FC1031,101-10F
r XD,11-48
I
194'
AE 100 24
C9EDM DFV,801-840+
XD,41-100
Locate HH3 in parking lot near rear entrance of 110 W Dayton ST and
1
check conduit from HH3 to HH4 for access to pull new 12-port tail
through. If conduit is damaged or not available, D-Bore SE from HH3
1
to HH4 (190FT) and place new 4" conduit in new path.
244' I
NOTE: FROGS records show existing conduit from HH3 to HH4.
AE 25 24
C9EDM DFV,801-825
Fielder site walk has determined D-Bore is required from HH3 to HH4.
>
Locate MH6 at 110 W Dayton ST and pull a 12-port fiber tail in
Q
existing/new conduit from the customer MPOE to HH4, to HH3, to
w
HH1, and then to MH6.
I �
z
can
In MH6, splice H5032,145 from the RBN-96 cable to XD,6 on the
415' 1 12-port tail (5XD+FC1031,78+6XD).
AE 50 24
C9EDM DFV,801-804+
XD,805+ OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
C9EDM DFV,806-813+ ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
XD,814-815+
C9EDM DFV,816-840+ UTILITIES MAY REQUIRE A SEPERATE PERMIT.
I CERTIFY THAT THE WORK I COMPLETD ON THIS WORK ORDER
AND AS -BUILT IS IN COMPLIANCE WITH FRONTIER QUALITY
STANDARDS AS IDENTIFIED ON THE IPQIP CHECKLIST.
(SIGNATURE AND DATE)
TOTAL ALLOTTED HOURS
CONTACT SUPERVISOR IF ADDITIONAL
HOURS ARE REQUIRED TO COMPLETE PROJECT
CAP. X-TIME MAINT
CREW 0 0 0
SPLICING 0 0 0
W.O. DRIVER CONSTRUCTION START
® ETHERNET 10/11/21
❑ CIAC IN SERVICE DATE
❑ DAMAGE 12/03/21
❑ OTHER
CONSTRtY=Nt - -
❑ FLAGGING ❑ BRUSHING ❑ CONTRACTOR
PERMITS
MUNICIPALITY: CITY OF EDMONDS
❑ BLANKET
® TCP/TRAFFIC
® DETAILED (NOT BLANKET)
❑ NO PERMIT REQUIRED
JOINT POLE
JFN/NJUNS#
® NO JPN REQUIRED
POLE JPN
JPN
OWNER TO
FROM
❑ ❑
❑ POWER
❑ ❑
❑ CATV
❑ ❑
❑ FRONTIER
ACCOUNT CODES
❑ 2411.001 POLES
❑ 2422.201 UG FIBER
❑ 2421.101 OH COPPER
❑ 2441.001 CONDUIT
❑ 2421.201 OH FIBER
❑ 34XX.XXX REMOVAL
❑ 2422.101 UG COPPER
❑ 64XX.XXX MAINT.
SITE CONTACT: MARK RADEN 206-300-5265
SCHEDULING:
JOHN WOOD
PHONE:
425-261-1412
ENGINEER:
MIKE HAKAHAN
PHONE:
425-949-0230
FACILITIES:
ELAINE GRACE
PHONE:
425-263-4001
FIELDED BY:
SHANE NEWTON
� ziplYfiber
XD,41-50 I� HLLK - 500M - ASR# 3396649 - BEST WESTERN
/ 130 W DAYTON, EDMONDS, WA
1 Applicant shall repair/replace all ENGINEERING DIVISION PROJECT C.O. AREA:962 damage to utilities or frontage APPROVED AS NOTED NUMBER: 5504204-519 EXCH. CODE: 51419
OWNER/CONTRACTOR IS RESPONSIBLE FOR improvements in City right-of-way DRAWN DATE: ENGR: M. HAKAHAN NTY: SNOHOMIS
EROSION CONTROL AND DRAINAGE per city standards that is caused or 10/28/2021 10/11/21 PHONE: 425-949-0230 FILE:
occurs during the permitted project. SCALE: 1:100 TAX DISTRICT: DWG 3 OF 4
TWNSHP: 27N RNG: 3E SEC: 23D
wei2121a
O
SIGNALIZED INTERSECTION
O
CONE (CANDLESTICK)
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
EMEP
WARNING SIGN
WHERE REQUIRED)
I)IRE(NOTCPAAVVEMMEENTT MARKINGS)
(AS NEEDED)
a
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
SIGN LEGEND:
� w1-640 0
LW20-1 \W9-3R \Wl-4L
X X X—
ROAD RIGHT LANE
WORK CLOSED
AHEAD AHEAD
W20-1 W9-3R
CLOSURE
O
Wl-4L
CENTER LANE
CLOSED
AHEAD
W9-3C
WI-6R
SUNSET AVE
(25 MPH)
I
W DAYTON STREET � I v 11*1 4
L
(25 MPH) "" ! "
W1-6R -�
o...
DRIVEWAY TO
PARKING LOT (I
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30
35
40
45
50
55
60
64
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
FFER SPACE (B
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
ENGINEERING DIVISION
APPROVED AS NOTED
lQa i,W41,,,,44? 10/28/2021
VV
CHANNELIZATION DEVICE
SPACING (feet)
MPH
F TAPER
TANGENT
50/70
40
80
25/30
20
40
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
10
105
150
205
270
450
500
550
-
-
-
11
115
165
225
295
495
550
605
660
12
125
180
245
320
540
600
660
720
780
840
EDMONDS WAY
(25 MPH)
NORTH
RECEIVED
OCT 15 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
O
ATCO COMMUNICATIONS SE"ICES, LLC
WWW.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
WSTCT# 012569
zilyfiber
p
Everett, WA 98206
I vi
04 0
0 :2
Ill
Lw
F_
w
w
F-
z
0
Q
0
0
W
z
U
j
O
w
a
Q
0
z
0
Ld
Q
w
z
D
U)
0
z
Q
w
w
z
0
i
Q
0
0
Q
O
J
w
U
N
Q
ry
Ld
Z
U
Ld
z
J
0
3
v
3r
0
0
a
0
I
rn
I
0
(V
0
In
Q
z
n
w
DATE:
10/15/2021
DESIGNED BY:
ATCO TELECOM
ATCO CONTACT:
360.562.9021
SCALE:
� OT TO
SCAT F
SHEET:
O
NO: 1 OF "