Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
100 2ND AVE S_Redacted
111111111111 4825 100 2ND AVE S 0 ADDRESS: / �(J AL �- TAX ACCOUNT/PARCEL NUMBER: vl (0 " (20 2 �� q - i) Z� �` BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS: qq,gg DETERMINATION: ❑ Conditional Waiver ❑ Study Required Aw aiver DISCRETIONARY PERMIT #' S: k& - / / / / DRAINAGE PLAN DATED: _ j PARKING AGREEMENTS DATED: EAS E ENT(S) RECORDED FOR:_ PERMITS (OTHER): I "f 11 "1 " V /� ��✓W �'y�' u'ii� 1- C� l (J l ' D��� I I / l �WLOI.�-� I _�' I�" PLANNING DATA CHECKLIS' SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: �� d SIDE SEWER AS BUILT DATED: SIDE SEWER PERMITS) #: SOILS REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: WATER METER �TAP CARD DATED: q7-1�336mndj vrn -hs) /7,v - 73 A7 L:\TEMP\DST's\Forms\Street File Checklist.doc • • PLANNING DATA New Commercial / Multi -Family Projects Ado Admik STREE L 11 Name: T• MWOOC, /ItCtvloor i5uild nG, Date: 1� 2� 1200� --'•�• Site Address: 100 � d A-Vt, GjpVA'Vl File Number: OWit r_� Add 2 otw pa rie( a ✓Ife 1n a � e4X• It Project Description: ro of-+v t rc P f 4 c e 4 Use(s) Proposed: W G f= Allowed Use: (YES / NO) Ma(1VT CUP File Number: To Allow What Uses: Legal Nonconforming Land Use Determination Issued: (YES I NO) �— Reduced Site Plan Provided: (YES / NO) Zoning: Map Page: Comp Plan Designation: Corner Lot: ( )NO) tin d 8/ M dV�► Flag Lot: (YES / 10 ADB File Number: Lot Area: Plans Match ADB Approved: (YES / NO) Shoreline Required: (YES / O) Critical Areas Determination #: ❑ Study Required ❑ Waiver SEPA Determination: ❑ Exempt ❑ Needed Requires: 1 Fee, 2 Environmental Checklist, and 3 APO List with notarized form Re wired Setbacks Street: i� e: � Side: � ��'hr'Ce 44 Actual Setbacks Street: Side: Side: -Rem Lot Coverage Required: Lot Coverage Provided: Lot Coverage Calculations: ' Building Hei ht , Datum Point: Datum Elevation: Maximum Height: ZCj * 151 awvC. Actual Height: Subdivision: r0 Of — Lot Aggregation Required: PLANNING CONDITION: . Antennas and related components shall be painted Landscaping Matches ADB Approved: the same color as the existing building, pole, or support structure (ECDC 20.50.030). Landscaping Bid Provided: (YES / NO) Plan Review By: ge;w f�,�,ctca YW ovi PLANNING DATA New Commercial / Multi -Family Projects STREET FILE Commercial Parkin Analysis Business Name Type/UseQ Parking Ratio Tenant' Area Required Parkin k. Total Parking Required. - Total Parking Provided. Multi -Family Parking Anal is # Bedrooms per Dwelling Unit Parking Ratio # Units Required Parkin Studio 1.2/13. U. 1 Bedroom 1.5/D.U. 2 Bedrooms 1.8/D.U. 3 + Bedrooms 2.0/D.U. Total Parking Required. - Total Parking Pro vided.• Plan Review By: gura (. a" Chapter 21.60 Page 1 of 1 2,1,.60.002 Macro facility. Macro facility is an attached wireless communication facility which consists of ;antennas. equal to or less than 15 feet in height or a parabolic antenna up to one meter (39.37 inches) in diameter and with an area not more than 100 square feet in the aggregate as viewed from any one point. [Ord. 3099 § 9, 1996]. Chapter 20.50 ' a Page 1 of 1 20.60.030 Development standards for macro facilities. A. Macro facilities are permitted in all zones except single-family residential (IRS) zones. B. Macro facilities may be located on buildings and structures; provided, that the immediate interior wall or ceiling adjacent to the facility is not a designated residential space. C. The macro facility shall be exempt from review by the architectural design board if the antenna and related components are the same color as the existing building, pole or support structure on which it is proposed to be located. D. The shelter or cabinet used to house radio electronic equipment shall be contained wholly within a building or structure, or otherwise appropriately concealed, camouflaged or located underground. E. Macro facilities shall comply with the height limitation specified for all zones, except as follows: Omni -directional antennas may exceed the height limitation by 15 feet, or, in the case of nonconforming structures, the antennas may extend 15 feet above the existing structure. Panel antennas may exceed the height limitation if affixed to the side of an existing building and architecturally blends in with the building. Placement of an antenna on a nonconforming structure shall not be considered to be an expansion of the nonconforming structure. [Ord. 3099 § 1, 1996]. http://www.mrsc.org/mc/edmonds/edmonds2I /edmonds2160.html 10/24/2007 * PLANNING DATA New Commercial / Multi -Family Projects 11 STREET FILE Name: Date: Cj 2q b Site Address: ��-hd Am S '� Plan Check #: BLD Project Description: Use(s) Proposed: C X� �G PJ Allowed Use: YES NO) CUP File Number: To Allow What Uses: Legal Nonconforming Land Use Determination Issued: (YES / O Reduced Site Plan Provided: (YES NO) Zoning: fbQ- Z Map Page: WIz Comp Plan Designation: Corner Lot: QES TO) Flag Lot: (YES NO) ADB.File Number (date waived): Lot Area: Plans Match ADB Approved: (YES / NO) Shoreline Required: (YES NO) Critical Areas Determination #: CKA.I(�j(A ( �Y qg ❑ Study Required y_Y_IVCJ"�O Waiver SEPA Determination: Exempt ❑ Needed (for sites with 500 cubic yards of grading or within 200 feet of Puget Sound or Lake Ballinger. Requires: 1 Fee, 2 Environmental Checklist, and 3 APO List with notarized form). Required Setbacks Street: Side: Side: Rear: Actua tbacks Street: Side: Side: \ -T Rear: Lot Coverage/FAR Required: LAot Coverage/FAR Provided: p I I Lot Coverage/FAR Calculations: ` w l.l'V -- .W v 0 �C�r Building Hei ht Datum Point: Datum Elevation: Maximum Height: Actual Height: Subdivision: Lot Aggregation Required: Landscaping Landscaping Matches ADB Approved: --TLandscaping Bid Provided: (YES / NO) Bond Amount (100% Bid): PA Plan Review By: PLANNING DATA STREET FILE New Commercial / Multi -Family Projects Commercial Parking Analysis Business Name Type/Use Parking Tenant Required Ratio Area Parkin Total Parking Required. - Total Parking Provided MtiJti=Fami/ Parkin Ana/ sis # Bedrooms per Dwelling Unit Parking Ratio # Units Required Parkin Studio 1.2/D. U. 1 Bedroom 1.5/D.U. 2 Bedrooms 1.8/D.U. 3 + Bedrooms 2.0/D.U. Total Parking Required. - Total Parking Pro vided.• Plan'Review By: O;W 6&0, ra PLANNING DATA New Commercial / Mulffamily Proiects SITE ADDRESS: I od - ? f" A e S.. 3Ga ZONING: 66 USE(S) PROPOSED: ALLOWED?:r LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED (Y/N) CUP File: To Allow What Uses?: — ADB FILE #: Nq PARKING: IIAI( ey'r U„A Pw"J t& aK car o�u� F � w+'n, 't" P."j Use: Ky� K^�+ - E.�Ac J�• 5�.0,0. c. a No. Spaces Required: X (floor area, # employees, etc.) _ t- Use: No. Spaces Required: X (floor area, # employees, etc.) _ Use: No. Spaces Required: X (floor area, # employees, etc.) _ i Use: No. Spaces Required: X (floor area, # employees, etc.) _ Total Required: Actual Provided: Q3 f SETBACKS: Pja c4-,z�t Required Setbacks: Front: Left Side: Right Side: Rear: Actual Setbacks: Front: Left Side: Right Side: Rear: Street map checked for additional setback required? (Yes/No) MAXIMUM FLOOR AREA: Maximum Allowed: Actual: F BUILDING HEIGHT: M, oc • o`: Maximum Allowed: Actual Height: a` Modulation Allowed?: Modulation Height: w„ Datum Point: Datum Elevation: Elevator Penthouse > 3 feet over height limit? If so,VAR# z c , LANDSCAPING: "rZ z.: a Matches ADB approved: o Bid Provided? Bond Amount (100% bid): W. O.� z F CRITICAL AREAS #: F' w. a SEPA DETERMINATION: x � z c SHORELINE REQUIRED?: No Continued ... I:\I ibrary\^P IandatNewComm.doc 0 F z 0 U 0 a. z a w a V z c 5 m DATE: PLAN CHK#: Z z, 6 i- 3, NAME OF BUILDING PERMIT APPLICANT: Da., s, Au 6-- PROJECT DESCRIPTION: +en ADB FILE #: OR DATE WAIVED: PLANS MATCH APPROVED PLAN: SUBDIVISION: LOT AGGREGATION REQUIRED?: iyo REDUCED SITE PLAN (8.5X11) PROVIDED FOR STREET FILE? M OTHER: Plan Review By: 1Alibrary\^PlandatNcwComm.doc PLANNING DATA Ne-w NAME5 1AD /Y1%(', AO SITE ADDRESSM ofd ko- . S 43©DATE: 1(21-1�Zq-q T ZONING: 7Rb PLAN CHK#: ' T`: PROJECT DESCRIPTION: USE(S) PROPOSED: N&P. j� 15WAW4' JJex "IN. LLOWElfi?: LEGAL NONC NFORMING LAND USE DETERMINATION ISSUED AW (Y/N) CUP File: lyp ADB FILE #: OR DATE WAIVED: PLANS MATCHPPROVED PLAN: �' ���n ��y, ���_,��1-� � PARKING: ULU" Use: �o. Spaces Required: (floor area, # employees, etc.) = Use: No. Spaces Required: X (floor area, # employees, etc.) = Total Required: Actual Provided: SETBACKS: Required Setbacks: mj Front: Left SideRight Side: Rear: Actual Setbacks: Front: Left Side: Right Side: Rear: Street map checked for additional setback required? (Yes/No) MAXIMUM FLOOR AREA: pj Maximum Allowed: ►V Actual: BUILDING HEIGHT: Maximum Allowed: �`-t`— Actual Height: Modulation Allowed?: Modulation Height: Datum Point: Datum Elevation: LANDSCAPING: �I Matches ADB approved:—T Bond: SUBDIVISION: CRITICAL AREAS #: V A' V11- �� c:Vga\permAt^PLANDAc.DDC , r O • SEPA DETERMINATION: SHORELINE REQUIRED?: 9 LOT AGGREGATION REQUIRED?: 6� Plan Review By: w\Clakpe=WPLANDAC.DDC PLANNING DATA NAME: 7Md SITE ADDRESS: 1 alp DATE: U ZONING: 'RO. - PLAN CHK#: �2-I ECT DESCRI USE(S) PROPOSED: - _ ALLOWED?: LEGAL NONCONFORMIf LX USE IbETERMINATION ISSUED (Y/N) CUP File: Af •ram ADB FILE #: ��,- qR� OR DATE WAIVED: � PLANS MATCH APPROVED PLAN: PARKING: Use Use: WA No. Spaces Required: X (floor area, # employees, etc.) _ No. Spaces Required: (floor area, # employees, etc.) _ Total Required: Actual Provided: SETBACKS: X Required S tba Front:_NJA Left Side: Right Side: Rear: Actual Setbac : Front: Left Side: Right Side: Rear: Street map checked for additional setback required? (Yes/No) MAXIMUM FLOOR AREA: �(I Maximum Allowed: Uv Actual: BUILDING HEIGHT: nn II Maximum Allowed: IU Actual Height: Modulation Allowed?: Modulation Height: Datum Point: Datum Elevation: LANDSCAPING: Matches ADB approved: Bond: SUBDIVISION: CRITICAL AREAS aktitnlpennWPLANDAc.DOC SEPA DETERMINATION: SHORELINE REQUIRED?: LOT AGGREGATION REQUIRED?: aAma\Pam,nt^PLANDAa,noc ;A 0 0 APR-0`7-1999 09:51 CITY OF EDMOHDS 4257710221 P. 0-3- 03 '_,T-______Critical Areas Checklist _ �A �449 -`� 6 Site Information (soils/topography/hydrology/vegetation) 1, Sity Address/Location' _�Q_� �..Np!•- J 2. Property THY Account Number. �C)2 3. Approximate Site Size (acres or square feet): 14,,,0 4. Is this site currently developed? yes; no. / If yes; how is site developed?�/>^ M� �L Q��j1dfs/kl� J 5. Describe the general site topography Check all that apply. ` Flat: less than 5-feet elevation change over entire site. �Rolling: slopes on site generally less than 151/6 (a vertical rise of I0-fret over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30°'0 (a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 301/6 prescnt on site (a vertical rise or 10-feet over a horizontal distance of less than 33-fee:). Other (please describe): - 6. Site contains areas of year-round standing water: n O ; Approx. Depth: ?, Site contains areas of seasonal standing water: 0 ; Approx. Depth:�--- `that season(s) of the 'year? 8. Site is in the floodway _vi 0 floodplam _ of a water coUrs6, 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round? n D Flows are seasonal? ✓t 0. (What time of year? a ;meadow N ;shrubs ✓t mixed _ 10. Site is primar:.yi: forested urban landscaped (lewn,shrubs etc) 11. Obvious wetland is present on site: ,�10 - 1, Site is.Zonad� �---�— 2, . S m"App.cd ioiT.type(y:)1 A_ 2-� r 3, Wetland inventq y, .. A -Map indicates wetland presen* oil, ae? uidioates CritcaTArea on ste7.. "• :4� : Crit,ca Areas �vrntory br C•A mgl : $itr \Yitbin desigIIatea earthsubsidence ln-1d9l�de hazar� real - 6.. -, 5;ite dQs�nated oga7�. F.t+virarir�arit�l);y :Sertsit:vs; . , eas, r�t�.p. , DZT RE1<1<II*tA?IO<\ �q.c hk.ax; Re- �a�o)rro7 v TOTAL P.©3 • APR-07-1999 09:51 r_ITY OF EDMOMbS City of Edmonds -NIW CRITICAL AREAS CHECKZIST The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available from obscrvations of the site or data available at City )`Tall (Critical Areas inventories, maps, or soil surveys). r An applicant, or his/her representar:ve, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a detc=laadon of the subsequent steps necessar) to complete a development permit application. Please submit a vicinity map along with the signed copy of this form to assist City staff in finding and locating Lhe specific piece of property described on this form. In addition, the applioant shall includc other pertinent information (e.e , site plan, topography map, etc.) or studies in conjunction -Mth this Checklist to assist staff in completing their preliminary assessment of the site I have completed the attached Critical Areas Checklist and attest that the answers provided are fac:ual, to the best of my knowledge (fill out the appropriate column below). Owner/Applicant: kJN I tJ6 6i9WT1DPY), tNC. Name 2 2 Ci Az21r,3 6-2 (\J Street Address 4,J ,e . C T1�4--OVA WA, �Bqol City State Zip Telephone Signature aAI-q,:::3 Applicant Representative: Name Street Address City State Telephone Signature Zip Datc Date :To cop lian\j1neloGot. doc (over) In S90 April 12, 1999 BARBAA FAHEY CITY OF EDMONDS MAYOR 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 • FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building • Engineering Awning Solutions, Inc. 5212. So. Washington Street Tacoma, WA 98409 Subject: Determination regarding Critical Areas Checklist # 99-98 Dear Applicant: Enclosed please find a copy of the Critical Areas Checklist you submitted. The "DETERMINATION" reached by the City is located on the reverse side of the form (bottom of page). It is very important for you to retain a copy of this Critical Areas Checklist "DETERMINATION" for your records. ... .......... _ ..... ......... ... IMPORTANT INFORMATION TO BE NOTED: PLEASE EXAMINE THIS" DETERMINATION" FOR ADDITIONAL REQUIREMENTS.. YOU MAY NEED TO SUBMIT ADDITIONAL INFORMATION SUCH AS AN ENVIRONMENTAL CHECKLIST OR CRITICAL AREAS STUDY. The 'DETERMINATION' for the Critical Areas Checklist you submitted is a site -specific determination not a project -specific determination. You must submit a cony of the CRITICAL AREAS CHECKLIST and DETERMINATION WITH ALL 40 PERMIT APPLICATIONS or YOUR APPLICATION WILL NOT BE PROCESSED. Permit applications include the following: Building Permits Conditional Use Permits Subdivisions Variances Applications to the ADB* Land Use Applications Any other development permit applications. Enc: Critical Areas Determination *Architectural Design Board Thank you. Sharla Graham Planning Secretary C: R eceptionU ana\C R LT R.doc • Incorporated August 11, 1890 • Sister City - Hekinan, Japan r ' APPLICATION for The City of Edmonds SIDE SEWER PERMIT EASEMENT No . .......................................... NEW CONSTRUCTION REPAIRS ❑ Cj OWNER wUC ...... H %....F''----------------------------------- CONTRACTOR INC. PERMIT No CG ADDRESS _I� — 2 ~� � �`v.� "-- TVA LEGAL DESCRIPTION: LOT3No. - �-I a I I--�2...--.. BLocK No. - 00 20 . ------------------------ ----.......--..-........-.. NAME OF ADDITION - u--..� ....... ..ST..-....^�-'. ,TIOIV. 0 ' Z � Q J '% �3 1 L,:q/o To s u mv=b-cam t4ulw GP S'1 pE, 15�Pc'Q I,-1T0 EX{ST • tE.-rue 7 N Approved: DATE -. . . . •--•...... "' ;'j'�`.�`,�``.•'�`. �CIT�Yi` :c0'F''E'D�Mf 'N1DlS' �SII,►'�E �S'EaWER` r'PER�MIT` i ,}✓`.�"'� � � WATER-SEWERI.,DEPARTMENT i ,�-f S. A H ' r , ns �. f�Call 1}6�}f941)fort side •sewer inspectio( BEFORE'!coveringr. any }portion oP thez wnatructlon t11 tInapection` will be tprovided°lwlthlnd24'ihoura after request NO) Sat plSun or (holiday inspections /1 . ' , r- •' _; j f i •" r.t. ,' r ` ,t s' _�?t 7 r ` ; n ; t ' t l . t J , ADDItESSI LUCATION OF CONSTRUCTION` : a 1 Q � Ci �°tV�`Y11d1?. �C,Uti. .. .:' • . 'PROPERTY LEGAirJDEitIPTiON l ots �, �Qf, 11, 1� R1�aE. L D,t�har�'s' • r`s Arldtf n' - SC}o 1 ,t . c... 1 r t t. ...........................................r -� .. r - -' t �..,o,WNER��AND%OO R-BUILDER ......... F(ACEfi r.: i r (CU. ANCTUR'.S`N°AME ADDRESS ¢iAR...EOP. CQiSTRUCTI7�3Pr` CO , IEVC ,�ti t`e 73GC�12QQ l 12tft?;t .......... ,r r Q�li 98 9 " ., "; 'Perfnission¢is.igranted; � t7��....)C!�...... , '19.;73 , for, repair and%or connection, of':a side sewer> foi the»c tQy sanitary se�werr` s' m�;in,accordariceleVith'Citytof' Edmondsf ordinances r 1 r z 1 A� TION IS"'CA'LLED TO,'TiIE'FOLLOWING _ { o1V' 'Io.r3'-Thefowneis„of ,the^properfy;;may-robtain',a;ipermit tofconstrudO,seweroInalde;property;Iine �AA1'cbnsed•�$lde Sewer:fContractor. must :•beaemployedl°toNconstruct" ^� .`side<-sewer<Imstreet;+area-.•Dornottcover.•ianyport ion.of''sewerabetore-It''.'haepbeen,lnspecfed'•. •!' •;.'.�'•; .�`S ,' NOTE •N( 2-A111 workdperPormed':1n+clty,fright of=way:Yequlres .an�Invasion of'; Right=of-W,ay PermICV obtalnalile trom'the City :Engineer s• offIce WOTD VN ., 3—Obtain' fulll'informatlont regarding,.Ordinance�-11.10'030 and' Regulations' ;governing$eldei.aewerarwhen. you, get,permit k'.+N.OTErNo :4'=Top oP-aide^sewer--must;>haveat-lea.af':30r1nahestJcoverageat'•:properfy�line�andt•12'�inches9inalde",proper[y,'line;, minlmumtjgrade,+ob'•2-%; �Nbtlbendspdnrtgrade� - - .;anarPer!than" �,fa•4williboipermitted. -'•'' a . `r •• ;•': ;- +"-.. NOT-EpNox*5—Trenchest.irrvsireet-,muat'ibeywater se tie' a d!taurface of;!street restored'to.orlglnalticondition'}+Gontrectors aNaID„beE(responslble Ffor.lfailure due ttoglmproper'; t _.work.,whichsmay. developi-Nithin' one•yeaeof'comPletion„ 1 '•N.OTEI•No:''&--It,is?iunlawfult•to,alter;+or•�do'•�any;�other;work•�thanTlsproylded„forWin�ahe�permlt, or�%to do a.nykwork�om:the.,,mairysewer',or-dts-.appurtenancesi=exE t-,torlin- r'! :aert 1he',pipe,into :,the wye: ro DIS'ATPROV'ED2 1 )1: Date ...:.. B tDate Date By APPROVED+ ,.'Data y ! /��� •.. Reiiuirks itJ IA � I t� C) t'I HT f .- A`q PFi�i ; fEifs.< s.,•t t 3('rGs t tz, -A J. -� *a 7 r. ti i t , �j ft i y 1 i1 :r • ,°.>{ ....:.i,� c,,r�vi�.wc <` ,1 4..c1tn� :of f)C�Eii��Ili'( tn. ci�#'t.rm� p,,..}. ,�•,t1 L BOTH'` erniit C0 f si UST"Se 'Signed ;By' Ownei °tofrFirm Performmgt Construction PRIORr Tol Request For Inspection .... ,} hereby,, certifyitha6j ner'side sewer lnstallation�colistructed,under,tthis,permit s,:; • d •;(Owner of •-Cone ac g i frm `-Per ormin i onstructlon)i s r s- a, �v` Stalledbinnaccordanc with alll,governing rdinances of the -City .of,�Edmonds. .��, -• `;, Datedt this ................day oflt 19° : Check BEFORE you' dig for `Water ;p;� t Gas'j0; Telephone, + ,1 Power 1Sewer tEls' i APPLICATION AL for The City of Edmonds SIDE SEWER PERMIT EASEMENT No . ........................................... NEW CONSTRUCTION REPAIRS ............................................... - ----- CONTRACTOR ..... OWNER PERMIT No . ..... #9� ... .. .... ADDRESS ........ j0.0 fzu . .................... LEGAJ, DESCRIPTION: LOT No. BLOCK No. ................... .......... . ........... . ........ AME OF ADDITION i ...... !-Zr�p .. ell�ae-........16....e-mi ...................................... .. 0 0 Is' Z-e�s 1411g,q Approved: AO 5 e, 6, 4 d eel r,' F Mop> DATE................................................ By ........................................................... APPLICATION for ` The City of Edmonds SIDE SEWER PERMIT NEW CONSTRUCTION REPAIRS ❑ EASEMENT No ........................................... ❑ OWNER-------------------------------------------------------------------------------------------------------------- CONTRACTOR..-----------------.............-----------.....-------------------------------------------------- PERMIT NO....!��� q..-. ADDRESS---------------------------------------------------------------------------------------------------------- LEGAL DESCRIPTION: LO No. .............................................. BLOCK No............................................. NAMEOF ADDITION ....................................... t............................................................................................. 4 Approved: DATE................................................ By ................................ v� Zlhe .Harbor Rmildimfir /L 100 - 2nd AVENUE EDMONDS, WASHINGTON, 98020 Phone: 776-3000 ' -z" a� L r Socr -711 o '19 " lvif s7 G `l .W CITY OF E D M O N D S GARY HAAKENSON MAYOR 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • 425-771-0220 • FAX 425-771-0221 Website: www.d.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division St LE.,M. August 24, 2010 Jay Struthers TTDUAL7140,GMAIL.COM SUBJECT: Right -Of -Way Construction Permit Application ENG20100257 Dear Mr. Struthers: A Right -Of -Way application was submitted to the City on June 22, 2010, requesting approval to install a private electrical line in a conduit within the alley adjacent to 100 2nd Ave S. In review of the subject application, city staff has had communications with Snohomish County PUD regarding their process fof locating electrical facilities and it does not involve locating privately owned electrical facilities. In addition, the public utility locate One Call Center does not locate or provide notification to property owners to locate privately owned electrical facilities. For these reasons, the City is denying your Right -Of -Way permit application. A refund of $260.00 will be processed. We are refunding the full amount due to the misunderstanding that the electrical lines will be privately owned, rather than owned and maintained by PUD. Please note, the City is not denying your request to install a light pole on the subject property. You may pursue other options to provide power to the subject property (i.e. having PUD provide power to the subject property, an agreement between private properties where the electrical lines will not cross the City Right -Of -Way, etc) and submit to the city for review and approval. If you have any additional questions please contact Jennifer Lambert at iennifer.lambert@ci.edmonds.wa.us 425-771-0220 ext 1321. Thank you, JR'). ROBERT S. ENGLISH, P.E. City Engineer C:eng20100257 Street File — 100 2" d Ave S Incorporated August 11, 1890 Sister City - Hekinan, Japan of EVA,lo r,vc. 1 s90 PROJECT NAME: ROW PERMIT NO.: ENG 2.7 ISSUE DATE: RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION CONTRACTOR: Mailing Address: L S -�7�. w State License #: y 41A y�L�9L /City Business License CONTACT: J4,i Sfm7 Phone #: q1 S -23 S_ S30 Fax #: S Z 3 ji Email #: -71 LI MCI, . 6r41 Liability Insurance W Bonded ADDRESS OR INTERSECTION OF CONSTRUCTION: a( d. L` 6C IDO '�'" Hv,- 5. ]ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF _PROJECT: Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only) ❑ Multi -Family ❑ Single Family ❑ EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit? ❑ Other ❑ Yes ❑ No ANY ASSOCIATED PERMITS? 1 # ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : l� ►��- by 401/JZ L4LrJ&!f' 64' 4Ot / L /iG, �l� �!/ &,Jrs: JAOwQe-hl 5 WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO Year: PAVEMENT CUT: Yes ❑ No CONCRETE CUT: ❑ Yes ❑ No If yes, indicate size of cut: i If yes, indicate size of cut: x RIGHT-OF-WAY AREA CLOSURE TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF LF SF Alley 72 Hrs + LF X LF SF Parking 72 Hrs + LF X L SF APPLICANT TO READ AND SIGN *Traffic control' and public safety shall be in accordance with City regulations as required by the City . Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. SIGNATURE DATE Contracto or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 4 s� L g- S YCO 9emo L U"s Ib I Nv 1u lakl- a je 1`6 L] 0 5OrO) OII Ciui si.5�'d. '-1 V r-C 0-0I U I VI OF EDM ° CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 Tuesday, June 22,2010 Your Application has been accepted by the City of Edmonds and we will start the review process with the information you provided. More information and changes may be required during this process. Application Number: ENG20100257 Project Address: 100 2ND AVE S, EDMONDS Intersection: Permit Type: Right Of Way APPLICANT O. BUSINESS JAY STRUTHERS EDGE ELECTRIC 4112 157TH ST NW - STANWOOD, WA 98292- (425) 335-5390 Ext. (360) 652-3785 E)d. Work Description: LINE BORE I" PIPE UNDERALLEY(WEST AND SOUTH OF 100-2ND AVE SOUTH) IN ORDERTO INSTALL ELECTRIC LIGHT POLE IN EXTERIOR PARKING LOT FOR SECURITY. PARKING LOT LOCATED AT 91 SUNSET AVE AND IS OWNED BY 100-2ND AVE S. Outstanding Item at Time of Submittal: -CITY BUSINESS LICENSE TO BE OBTAINED PRIOR TO ISSUANCE OF RIGHT-OF-WAY PERMIT. -TRAFFIC CONTROL PLAN TO BE SUBMITTED BY CONTRACTOR To view up to date information about your permit please visit the City of Edmonds Development Services website at hitp://www.ci.ednwnds.wa.us. 'a'Y'�' i"�; w"�i'y7 '+'-'4C:"T'n�.'�-�R�•$'�°^'tk'�"+�f�'kq,v���•�,!zY!'�p.�ry�,', �. ^.^c sue... ,. -•r �.=' '`°-c•".aF': .-�" "�s__•.'i"�.. . " - City of Edmonds RIGHT-OF-WAY CONSTRUCTION ^� PERMIT Permit Number- 3 3 °'•#'`'��,tP-'`° Lssue Dates-e-131 A. Address or Vicinity of Construction: 100 ZN°�,��r{ j� C. 1$ o p B. Type of Worrk (be specific): gem u,/E Q iF 0 64,rQ5 D/1.4-1,i S 2� �142 D / CS�' %iCnNiAAGI. (!1f r7nSE�o //fl�N/T!S]TfR01 ?RFi� OP6VIalcS. C. Contractor: *4M r^ iS.r � �/�rf„�. 15��2 �// T „✓c Contact: UM ill y Mailing Address: IS,(, l a._,rHa) /. t3omp,/0t gysio Phone: (42,5) ?'71- 3�La State License #: Liability Insurance: % Bond: $�I 60-o D. Building Permit # (if applicable):'' q"% 19 3-78 Side Sewer Permit #,(if applicable): .>, F ❑ Commercial ❑ Subdivision ❑ MuliiVamily ❑ Singlet Family INSPECTOR: F. Pavement or Concrete Cut N11500 a"61VIC City Project ❑ Utility (PUD, GTE, WNG, CABLE, WATER) Othar INSPECTOR: Yes []No G. Size of Cut: 3 / z ' 3 / H. Charge $ APPLICANT TO READ AND SIGN INDEMNITY: Applicant,understands and by his signature to this application to hold the City of Edmonds harmless from injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may' be made :against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. r THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD.OF ONE YEAR FOLLOWING THE FINAL INSPEC -„ TION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT. Two sets of construction drawings of proposed work required with permit application. A 24 hour notice is required for inspection. Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and -Public Safety shall be in accordance with City regulations as required by the City Engineer. . All street cut trench work shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. � � 4 I have read the above statements and understand the permit requirements and the pink c py of the permit will be available on si!at all times for inspection purposes. Signature: Date: // X (Contractor 0r Agent) - - CALL DIAL -A -DIG PRIOR TO BEGINNING WORK , R FOR CITY USE ONLY APPROVED BY: RIGHT OF WAY FEE:_ TIME AUTHORIZED: VOID AFTER St DAYS DISRUPTION FEEIFUND I 1 I: a ivv expo e d CO M 11'e. f-o SPECIAL CONDITIONS: RESTORATION FEE: r m if A A,4,b TOTAL FEE: r Y ; i ne RECEIPT NO.: Ir • �SSU . Qar K� NO WORK SHALL RIOR TO PERMIT ISSUANCE Eng. Div 1997 7 .k CITY OF .EDMONDS I p�V 2 ' �9� Permit No. COMMUNITY SERVICES DEPARTMENT RIGHT-OF-WAY CONSTRUCTION PERMIT EN('.7f Issue Date A. • Owner: ® ._. B. • Contractor: A , "4 N me � lJ N-ktRe ail* City State Zip ty State -t2 �\ State License Number Telephone Number C. • Address or Vicinity of Construction Type of Work to be Done: D. • Work in Connection With: ❑ Sub or Plat ❑ Single Family ❑ City Projects 1 ❑ Commercial �5_M ultifamily ❑ Utility E. • Pavement,Cut: ❑ Y ,® N . F. • Size of Cut:— X APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whgLaciever, forseen or unforseen, that may be made against the City of�EdTonds, or any of its departments or employeesd'tLding or not limited to the defense of any legal proceedings includtng_�irfense costs, court costs, and attorney fees by reas`o�i�f granting this permit. THE CONTRACTOR IS RESPONSIBLE_,FOR."WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND,ACCEPTANCE OF TH&WORK. Estimated restoration fees will be held until thee f�treet'patch is completed by City forces, at which time a debit or credit , i11 be processed for issuance to the applicant. T • A 24 hour notice is required for inspection; Please call Engineering: 771-3202 • Work is to be inspected during progress and at completion. • Restoration to be in accordance with City Code. • Street to be kept clean at all times. • Traffic Control to be in accordance with City regulations. • All street -cut ditches must be patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. i f I understand the above and that this permit must be available at the job site for inspection purposes at all times. Signature: Date: r Owner or Contractor This Permit Must be Posted at the Job Site For Inspection Purposes Call DIAL -A -DIG Prior to Beginning Work APPROVED BY: At PERMIT FEE a U OTime Authorized: Void after days. Restoration Fee: ril Special Conditions: Receipt No.:_ j ''r7 y'rt. C&)q � i � Fund Ill Fee:_ 0 INV I 6 0,5:0kyw Street Cut Dimensions _ x _ $ U RELEASED BY: DateBl,—r(lq t INSPECTED BY. �/ `G Date O w NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div. March 1989 Eng. Div. July 1985 BUILD DIVISION-TELEPHONEVI.VT-SISECORD DATE I\ - 6 - TIME PERSON CALLED }-ta CI-PaDYL BLDG m ANIV-, Q�OMPANY TELEPHONE # PROJECT RE: h T(2,b Mj► ,E To 114,ThLt, A CoNForLM 1 wG G KIT Voo0-- oN Tf+E 47Tv O AWT VvirrF1 N 3o 'DAA GjCoiT . IZoBEYL-TSoN -7 "71 1 755 . FILE COMMENTS: STREET FILE CALL TAKEN B Y : 1L ************************************************************************** VISIT DATE_ PROJECT SUBJECT ILE COMMENTS: CITY REPRESENTATIVE: TIME LOCATION WHOM/COMPANY MEMO TO: FROM: PROJECT: ADDRESS: PERMIT: m 70 0 PLANNING/BUILDING FINAL APPROVAL FORM BUILDING DIVISION, JEANNINE L. GRAF PLANNING DIVISION, BRUCE FINKE /oy zed �S g �SD.3 ADB# PERMIT APPROVED FOR FINAL PERMIT NOT APPROVED FOR FINAL REQUIREMENTS: 1. 2. 3. 4. 5. BRUCE FINKE DA NOV 1419a6 1 0 . COMMUNITY SERVICES DEPARTMENT CITY OF EDMONDS BUILDING DIVISION RECEIVED NOV 7 1986 DATE: �� I%��6 EQIVIDND M- /{� / S FIRE DE TO: FIRE DEPARTMENT "'C���ei� /' k(aWL5 ENGINEERING DIVISION PLANNING DIVISION SUBJECT: 7&kf5 j?tV,'4G[rll^l- ADDRESS lov Zyo lIW,9^ PERMIT: 6100 774 ADB# Please review and advise any outstanding requirements on the above permit, in order that they may be given final approval and a Certificate of Occupancy issued., and all applicable performance bonds may be released. cy V, S Hal Reeves Building Official BUILDING N O V 10 1986 Nit: j la 'low: • i CITY OF E®MONDS 250 5th AVE. N. • EDMONDS, WASHINGTON 98020 • (206) 771-3202 COMMUNITY SERVICES Fire Chief Equipment Company 13300 SE 30th Bellevue, Washington ATTN: Bill October 22nd, 1986 RE: Tasters Restaurant 100 2nd Avenue South Fire Protection System Permit LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR The City of Edmonds is holding afire protection permit for the Tasters Restaurant in Edmonds. The owner has informed the Building Division that you will pay for this permit, the fee.is $18.00, due immediately. Please send a.check attention to the Building Division within the next 5 working days. Your prompt attention to this matter is appreciated. We will return your copy of the permit by.mail. Please call me if you have any questions. Thank you, Jeannine L. Graf Permit Coordinator cc: Tasters Restaurant JLG : amm. PUBLIC WORKS PLANNING PARKS AND RECREATION ENGINEERING CITY OF E®MONOS 250 5th AVE. N. • EDMONDS, WASHINGTON 98020 • (206) 771-3202 COMMUNITY SERVICES September 26th, 1986 Dong Quao Fang Tasters Restaurant 6707 196th Street Southwest Lynnwood, Washington 98036 RE: Tasters Restaurant 100 Second Avenue South Edmonds, Washington LARRY S. NAUGHTEN MAYOR A recent site inspection revealed that your restaurant remodel is in compliance with City codes with the exception of the steel bar and padlock installation on the outside of the main entrance door to the restaurant. PETER E. HAHN DIRECTOR The louvered doors and the lock bar were installed without City approval and are in violation of UBC Section 3304 and Section 3305. The doors are required to be 20 minute rated smoke and draft control assemblies and may not have locks installed, but may have panic hardware installed for security purposes. Please contact the Building Division within 5 days receipt of this letter regarding your schedule to replace the doors and hardware. �QAo0- P-%Ag-,- Harold Reeves Building Official HR: j lg cc: Harbor Building Manager Celfy '066ki9s 3.2,- S7 S TE IVA5� , pmoYL Ass ok Pe- PUBLIC WORKS PLANNING PARKS AND RECREATION ENGINEERING CITY OF E D ® ® N ® S \ ' LARRY S. NAUGHTEN MAYOR 250 51h AVE. N. • EDMONDS, WASHINGTON 98020 • (206) 771'-3202 BUILDING DIVISION August 8th, 1986 Owner Tasters Restaurant 100 Second Avenue South Edmonds, Washington 98020 RE: Signage A field inspection on August 8th, revealed that a Street Use Permit is required for the overhanging sign,at 100 Second Avenue South. Attached is a permit application that must be completed and returned with your certificate of insurance. If you have any questions please call me at 771-3202. The cost of the permit is $25.00 and must be yearly renewed. Please respond within 10 days date of this letter. " eannine L. Graf Permit Coordinator �f8 6-/y JLG:pm CITY OF EDMONDS ,'�q -.,.Z �06)#OMMUNITY SERVICES DEPARTMENT .250 5th Ave N 771-3202 APPLICATION FOR STREET USE PERMIT Name of Applicant: �O Q& 01 A0 TA JG— �l iAST R.S G0I06sc Z�—S iAORA4 Mailing Address: rnn 7-J a,/= C ;-I��,�� Tel ephone Number: 775 72 ?t&AS& cod rAc i Description of Public Place or Portion may be attached) Ai R -S?Aj is Agd✓G C Q- r. A LK Type of Use desired to be made of Public Place: Date: desired to be used: (exhibit FIAIJ61N64 S-T8.6 i srfilO AEd✓c s►KWALK. If applicable, attach plans and specifications for any utility or structure to be erected and/or maintained on the Public Place: ?A111 i HC s(c 1J -�30k TEMPORARY PERMIT: Unless otherwise designated herein, by applicant to be wholly of a temporary nature, that whatsoever. If the permitted use becomes dangerous or become insecure or unsafe or shall not be constructed, accordance with the. provisions of this title, the same structure and obstructions ordered removed by order of application is for a specified period -of time, the ter INDEMNITY: Applicant understands and by to hold the City of Edmonds harmless fro kind or description whatsoever, foreseen the applicant or the City of Edmonds, or including but not limited to the defense costs, court costs, and attorney fees by addition, applicant understands that the insurance to indemnify and hold the City and/or property damage, naming the City this permit is understood it vests no permanent right such structure shall maintained or used in may be revoked and the the City Engineer. If this ms of said application is: his signature to this application, agrees m any injuries, damages or claims of any or unforeseen, that may be made against any of its department or employees, or any legal proceedings including.defence reason of qrantinq this permit. In City shall be provided a certificate of of Edmonds harmless from all claims of Edmonds as an also insured. APPLICATION OF CHAPTER 18.7.0 OF THE COMMUNITY DEVELOPMENT CODE: Applicant warrants that he has read, or had the opportunity to read, Chapter 18.70 of the Community Development Code, attached herewith, and understands that all terms of that Ordinance are incorporated herein as if set forth in full and this application and permit therefore are subject to the terms of that'Chapter of the Edmonds City Code. App icant s Si, ature Date City of Edmonds, Community Services Department APPLICATION FOR STREET USE PERMIT - - Page 2 Approval (and Agreement, if applicable) of Abutting Property Owners,: SIGNATURE PRINTED NAME ADDRESS DATE DO NOT WRITE BELOW THIS LINE (To be completed by Issuing Agency) City Council Approval (if appl.kable)(Attach Minute Entry): ADB Approval (if applicable)(Attach Minute Entry): Building Official Approval (if applicable): Signature Date Provision for Indemnity: Certificate of .insurance has been posted with the City. • Terms and Provision of Performance Bond, if.applicable: NOT APPLICABLE PERMIT AUTHORIZATION BY: Si gnat)pe Date PERMIT NO. Date Issued: 9 Permit Fee: Remarks/Comments: This permit is to be renewed on a yearly basis at the fee of $10. A current certificate of insurance must always be Posted with the City. PUBLIC WORKS DIRECTOR APPROVAL DATE FIRE DEPARTMENT.APPROVAL POLICE DEPARTMENT APPROVAL 0 DATE . DATE PLptj • Mrs Di64, SKI 1- r :. So , PLA-5774- r �. Nu` 5/GN � r tb tRiSE Q CITY OF EDMONOB r� 250 51h AVE. N. EDMONDS, WASHINGTON 98020 (206) 771.3202 COMMUNITY SERVICES November 13, 1987 Tasters Restaurant 100 2nd Ave. S. Edmonds, WA 98020 RE: Street Use Permit 86-14 Yearly Renewal Fee LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR According to building division records, yearly street use permit fees are again due. For your information, attached is Section 18.70 of the Edmonds Community Development Code on street use permits. This payment is for 1987, the renewal fee is $10.00, please make your check payable to the City of Edmonds, Building Division, 250 5th Avenue North, Edmonds, Washington, 98020. Please enclose a current certificate of insurance with your payment. If you have any questions please feel free to call me at 771-3202. Thank you, Jeannine L. Graf Permit Coordinator STREET/TXTJLG52 PUBLIC WORKS 0 PLANNING PARKS AND RECREATION 0 ENGINEERING �4 CITY OF EDMONDS LARRY S. NAUGHTEN MAYOR 250 - 5th AVE N. • EDMONDS. WA 98020 • (206) 771-3202 COMMUNITY SERVICES: PETER E. HAHN I g9 C� Public Works • Planning • Parks and Recreation • Engineering . DIRECTOR 80-1 November 15, 1988 Tasters Restaurant 100 2nd Ave. S. Edmonds, WA 98020 RE: Street Use Permit #86-14 Yearly Renewal Fee • According to building division records, yearly street use permit fees are again due. This payment is for 1988, the renewal fee is $10.00, please make your check payable to the City of Edmonds, Building Division, 250 Fifth Avenue North, Edmonds, Washington, 98020. Please enclose a current certificate of insurance with your payment. If you have any questions please feel free to call me at 771-3202. Thank you, Jeannine L. Gra Permit Coordinator -51541'z4Vce— Ut STREEUSE/TXTDMC24 • Incorporated August 11, 1890 • Sister Cities International — Hekinan, Japan CITY OF EDMONDS 250 - 5th AVE N. • EDMONDS. WA 98020 • (206) 771-3202 COMMUNITY SERVICES: 1 C � Public Works • Planning • Parks and Recreation • Engineering 890-19 March 22, 1989 Tasters Restaurant Dong Quao Fang 100 2nd Avenue South Edmonds, Washington 98020 RE: Street Use Permit #86-14 LARRY S. NAUGHTEN MAYOR PETER E. HAHN OIRECTOR The City of Edmonds has received notification from your insurance agent that your current certificate of insurance for the overhanging sign will expire 5/31/89. • Prior to the expiration date you must provide the City with a new certificate of insurance. Failure to provide adequate insurance is grounds for termination of the street use approval and the City will be forced to proceed with action to remove the sign. • If you have any questions call me at 771-3202. Thank you, Jeannine L. Graf Permit Coordinator • Incorporated August 11, 1890 • Sister Cities International — Hekinan, Japan • • .7 CITY OF EDMONDS 250 - 5TH AVE. N. • EDMONDS, WA 98020 • (206) 771-3202 COMMUNITY SERVICES: Public Works • Planning • Parks and Recreation • Engineering 89p-199 November 15, 1989 Tasters Restaurant 100 2nd Ave. S. Edmonds, WA 98020 RE: Street Use Permit #86-14 Yearly Renewal Fee LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR According to building division records, yearly street use permit fees are again due. This payment is for 1989, the renewal fee is $10.00, please make your check payable to the City of Edmonds, Building Division, 250 Fifth Avenue North, Edmonds, Washington, 98020. Please enclose a current certificate of insurance with your payment. If you have any questions please feel free to call me at 771-3202. Thank you, Jeannine L. Graf Permit Coordinator STREEUSE/TXTDMC24 • Incorporated August 11, 1890 • Sister Cities International — Hekinan, Japan • CITY OF EDMONDS 250 - 5TH AVE. N. • EDMONDS, WA 98020 • (206) 771-3202 COMMUNITY SERVICES: Public Works • Planning • Parks and Recreation • Engineering January 18, 1991 Tasters Restaurant 100 2nd Ave. S. Edmonds, WA 98020 RE: Street Use Permit 86-14 LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR According to Building Division records, Street Use Permit renewal fees are due. As you were notified on the November 1989 billing, street use renewal fees are now collected in January for the current year. No fee was collected for 1990, therefore, total fees now due are $20.00 - $10 for 1990 and $10 for 1991. Please remit fees within 15 days date of this letter. If you no longer utilize the portion of City right-of-way under the subject permit, please contact the City at your earliest convenience. Also note, a current certificate of insurance is required to be on file with the City at all times, you may want to check expiration dates with your insurance carrier. If there are any questions contact the building division at 771-3202. Thank you, �Awxz--:�75 Jeannine L. Graf -- Permit Coordinator • Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan -sue' :6 • I «9111110— O 89'0 19C, CITY OF EDMONDS 250 - 5TH AVE. N. • EDMONDS, WA 98020 • (206) 771-3202 COMMUNITY SERVICES: Public Works • Planning • Parks and Recreation • Engineering January 15, 1992 Tasters Restaurant 100 2nd Ave. S. Edmonds, WA 98020 RE: Street Use Permit 86-14 LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR According to Building Division records, Street Use Permit renewal fees are due. Street use renewal fees are collected in January for the current year and are currently set at $10. Please remit fees within 15 days date of this letter. • If you no longer utilize the portion of City right-of-way under the subject permit, please contact the City at your earliest convenience. Also note, a current certificate of insurance is required to be on file with the City at all times. Please check expiration dates with your insurance carrier and include a current copy of your Certificate of Insurance with your payment. The City Council will be reviewing Building Department fee increases during the next few months and it is possible that Street Use fees, both original and renewal fees, will be increased for next year and reflected in the billings for 1993. .7 If there are any questions contact the building division at 771-3202. Thank you, �D' ce-V-0-11 Sharon F. Nolan Permit Coordinator STREETLT/TXTDOS62 • Incorporated August 11, 1890 • Sister Cities International — Hekinan, Japan • • 890 _,19C� CITY OF EDMONDS 250 - 5TH AVE. N. • EOMONDS, WA 98020 • (206) 771-0220 • FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works • Planning . Parks and Recreation . Engineering December 28, 1992 Tasters Restaurant 100 2nd Ave. S. Edmonds, WA 98020 RE: Street Use Permit 86-14 LAURA M. HALL MAYOR According to Building Division records, Street Use Permit renewal fees :-are due. Street use renewal fees are collected in January .for .the current year and are currently set at $10. Please remit fees within 15 days of the date of this letter. If you no longer utilize the portion of City right-of-way under the subject permit, please contact the City at your earliest convenience. Also note, a current certificate of insurance is required to be on file with the City at all times. Please check expiration dates with your insurance carrier and include a current copy of your Certificate of Insurance with your payment. The City Council will be reviewing Building Department fee increases during the next.few months and it is possible that Street Use fees, both original and renewal fees, will be increased for next year and reflected in the billings for 1994. If there are any questions contact the building division at 771-0202. Thank you, Sharon F. Nolan Permit Coordinator p �y3 d STREETLT/TXTDOS62 • Incorporated August 11, 1890 • Sister Cities International — Hekinan, Japan i Mw - A64010.10® CERTIFICATE OF INSURANCE ISSUE DATE (MM/DD/YY) 01-12-93 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE . DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE Dickison Insurance Agency POLICIES BELOW. P.O. Box 160 COMPANIES AFFORDING COVERAGE Edmonds, WA 98020 COMPANY A LETTER --- _ --Olio Casualty ----�--- - _J - - - - -- -- --- - - --- . - - -- --- COMPANY {{�� LETTER B BUILDIn INSURED Tasters Restaurant LETTER COMPANY C i J ;� 100 - 2ND AVE S COMPANY D Edmonds WA 98020 LETTER COMPANY E LETTER COVERAGES THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO TYPE OF INSURANCE POLICY NUMBER LTR POLICY EFFECTIVE; POLICY EXPIRATION LIMITS DATE (MM/DD/YY) DATE (MM/DD/YY) GENERAL LIABILITY ii GEN ERAL AGGREGATE $ 1-, OOO, OQQ,_ A X COMMERCIAL GENERAL LIABILITY ; _ _ 1 ' PRODUCTS-COMP/OP AGG. $ rj(7O-, nOO_-- CLAIMS MADE; -X:OCCUR.' BZO (93) 50559786 -, 05-31-92 05-31-93 iPERSONALBADV.INJURY $ S0O.,.00.O_-- OWNER'S &CONTRACTOR'S PROT. I EACH OCCURRENCE : $ 500., OOQ,_-- FIRE DAMAGE (Any one fire) :$ - 50, OOQ AUTOMOBILE LIABILITY f MED. EXPENSE (Any one person) $ 5 QQ O > - COMBINED SINGLE ` $ ANY AUTO ' LIMIT - - - ---- -- - - --- -- - - ALL OWNED AUTOS ' i i- BODILY INJURY $ SCHEDULED AUTOS (Per person) HIRED AUTOS BODILY INJURY $ NON -OWNED AUTOS (Per accident) ' GARAGE LIABILITY i PROPERTY DAMAGE $ EXCESS LIABILITY EACH OCCURRENCE $ UMBRELLA FORM AGGREGATE $ OTHER THAN UMBRELLA FORM ! STATUTORY LIMITS WORKER'S COMPENSATION EACH ACCIDENT $ ' AND DISEASE -POLICY LIMIT $ EMPLOYERS' LIABILITY - DISEASE -EACH EMPLOYEE $ OTHER ? f DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/SPECIAL ITEMS Restaurant operations CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE y City of Edmonds EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO 250 - 5TH AVE N MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE Edmonds, WA 98020 LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED R PRESE TIVE ^i ACORD 25-S (7/90) `/ ©ACORD CORPORATION 1990 CITY OF EDMONDS PUBLIC WORKS DEPARTMENT RIGHT - OF - WAY CONSTRUCTION PERMIT P it No."�� Issue Date 7 13 / 1 STREP, U RLIP A. *Address /for vici i�yCons ruction C/ • Owner:e�3�� 7iO4,le 7, O Name Mailing Address City, State, Zip Code • Contractor: , &71 t� • Permit Issued To: ( /-. M • �« • Type of Work to be Done: • Work in Connection With: ❑ Sub or Plat ❑ Single Family ❑ Comml. / Ind. ❑ Apt. Condo. • Pavement Cut: '❑ Yes No Mailing Address State License Number Z City, State, Zip Code Telephone Number NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE B. APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. Upon issuance of this permit, the contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the restoration by the Engineering Division. Funds held from the Security Deposit (estimated restoration fee) will be held until the final street patch is completed, at which time a debit or credit will be processed for issuance to the applicant. Work is to be inspected. Restoration to be in accordance with City Code. Traffic Control to be in accordance with Traffic Section of City Code. Street to be kept clean at all times. A 24 - hour notice is required for inspection by Engineering. Call 775-2525, extension 220. I understand that this permit must be available at the job site for inspection purposes at all times. r Signature: �' % y2 ��G Date Owner or Agent �t THIS PERMIT MUST BE POSTED AT THE JOB SITE FOR INSPECTION- PURPOSES CALL DIAL - DIG PRIOR TO BEGINNING WORK C. Issued By: -A " Time Authorized: Void after %5days Special Conditions: Ammendments: Permit Fee: Security Deposit: Receipt No.: Fund 111 Fee: Street Cut Dimensions X_ * NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div. December 1978 FIELD INSPECTION'NOTES (Fund. 111 -.'oute conv to Street Dent. rnmmean+. a Diagram: Contractor called for Nork Disapproved By: Work Approved By: Inspector: inspection Yes No Date: Bv: Date: Date: Ena. Div. December 1978 ..,rap ..... �.�___.�.� __.._.__. .. ._. _. .>._._... :..�_ � ,...•'...�:IIw.�J:„:Z loSi.a:1.J.:.w.. uJL4:i..u"., I11.t1,G::.Y+. 1pil y CITY OF EDM NDS 200 DAYTON ST. • EDMONDS, WASHINGTON 98020 • (206) 771.3202 DEPARTMENT OF PUBLIC WORKS CERTIFIED MAIL June 15, I982 The Harbor Group 1215-4th Ave., Suite 2226 Seattle, WA 98161' HARVE H. HARRISON MAYOR 4 PROPERTY DESCRIPTION: Lots 9, 10,-11, & 12 „ Blk. #2 'Gepharts First Addition (4548) Re: 100_-2nd Ave. So." (south side, Harbor Bldg., 100 Blk,.,,, Edmonds, WA 98020 Dear Resident: ;I 1 At On February 17, 1981, the Edmonds City Council. passed Resolution 488 for construction, reconstruction,,and repair of deteriorated sidewalks. A leter dated March 16,,1981 was sent to residents that were required to repair the sidewalk.abu.tting.their! property. The improvement of sid-ewalks in need of repair at .the expense of the abutting property owner is provided by Ci",ty.1 Ordinance, Chapter 7.20 and Revised,Code of Washington,,thapter 35.68. The .areas needing repair have been marked in paint .on the sidewalk adjoining your property. Reconstruction permits must be obtained, from the Building Department -at 501 Bell Street! •with-i,n,.3,0 , 1 days upon receipt of this certified letter. The fee for.,�the sidewalk repair has been waived by the City of'Edmondq. In,,the' , event these improvements are not completed within ninety (�90)'',days-, upon receipt of this certified'letter, the City will employ a, private contractor to perform the designated repairs and the Cityll will bill the abutting property owner. This action is in response to many citizen requests and pedestrian falling accidents which have been increasing in recent years as a result of sidewalk deterioration and increased pedestrian traffic. If 'you have any questions, please call Bobby Mills at 77f3202', ext. 289.. Sincerely, JOHN,-B.• MITCHELL ! '. Superintendent of Public�:Works I ii BM/ml, j i RECEIPT FOR CERTIFIED MAIL SENT TO The Harbor Group STREET A M5-4th Ave., SuiteZ220' --P.O STATE AND ZIP CODE Seattle, WA 98161 —FEES --- --- ADDITIONAL —OPTIONAL SERVICES FOR ARI?�I_ —1Shows to whom and date — RETURN . a — deliverydelivered With restricted delivery HE E'J�T � 2Shows to whom, date and where delivered X =ka SERVICES With restricted delivery G — —p D--F--R .. RESTRICTED FL VEI y extra fee required) PS Form NO INSURANCE COVERAGE PROVIDED — Jan. 19763800 NOT FOR INTERNATIONAL MAIL Woe :4 a. ILJINAsLIE'To',DFLIVER .0 1 ECAUSBt'.--' - ITIA 4 POSTMARK OR DATE (See other side) GPO: 1975-0-591-452 Cliff OF EDMONDS 200 DAYTON ST. • EDMONDS, WASHINGTON 98020 • (206) 771.3202 DEPARTMENT OF PUBLIC WORKS CERTIFIED MAIL June" 15, 1.982 Resident 100-2nd Ave. So. Edmonds, WA 98020. HARVE H. HARRISON MAYOR PROPERTY DESCRIPTION: Lots 9, 103-.11, & 12 „ Blk. #2 Gepharts First Addition,(4548) Re :. 100 n2 d-Ave_._ S:o . ( south side., Harbor Bldg., 100 B.lk.,. Edmonds; WA. 98020 Dear Resident: On February 179 1981, the Edmonds City Council passed Resolution 488 for construction) reconstruction, and repair of deteriorated sidewalks.' A leter dated March 16,,1981 was sent to residents that were required to repair the sidewalk abutting their property. The improvement of sidewalks -In need of.repair at.the experi.se of the abutting property owner is provided by City" DOrdinance, Chapter 7.20 and Revised Code of Washington, Chapter 35.68. The areas needing repair have been marked in.paint on the sidewalk adjoining your property. Reconstruction permits must be obtained from the Building Department -at 501 Bell Street within 30 days upon receipt of this certified letter. The fee for the sidewalk repair has been waived by: the City of Edmonds. 'In .the•• event these improvements are not completed within ninety (90)da'ys upon receipt of this certified letter, the City will e4pl:9y a; private contractor to perform the designated repairs and the Cityl, 'will bill the abutting property owner. This action. is in response to many citizen requests and pedestrian falling accidents which have been increasing in recent years as a result of sidewalk deterioration and increased pedestrian traffic. ; If,you have any,.questions, please call Bobby Mills at 771'=3202, ext. 289. Sincerely, I' JOHN .B. • MITCHELL Superintendent of,Public Works BM/ ml � j RECEIPT FOR CERTIFIED MAIL SENT TO Resident POSTMARK OR DATE --STREET AND NO. 100"2nd Ave. So. P.O., STATE AND ZIP CODE 77, MCI Edmonds WA 98020 OTjoN�;LS61Mi; FOR ADDITIONAL FEES RETURN � 1. Shows to j�—toffi and late delivered R CIPT With restricted delivery EC shows to whoin, date and where 2. SERVICES With restricted delivery RESTRICTED DELIVERY- _.With. I DELIVERY (extra fee required).... ........... PS Form NO INSURANCE COVERAGE PHUV1ULU— (bee other side) 3800 Jan. 1976 NOT FOR INTERNATIONAL MAIL GPO: 1975-0-591-452 k IT'o , CITY of EDMONDS BUSI.'�SS LICENSE APPLICATION DA0 Civic Center • Edmonds, Washington 9 Ciry Clerk Phone 775-2525 v TYPE OF BUSINESS CLASS YEAR LIC. EFFEC. DATE IREASG. LIC, N0. SPEC. ❑ (A) HOME OCCUPATION LIC ENSE SE N0. , ANNUAL FEE AFTER FEB. 15 $15.00 $ 22.50 NSTRUCTIONS: -1 B BUSINESS WITH ( ) $20.00 $ 30.00 All items must be completed RECEIPT NO. DATE PAID 1 TO 3 EMPLOYEES or application Will not be aC PRINT'X' IN SPEC. BOX ❑ (C) BUSINESS WITH $22.00 $ 33.00 cepied. FOR ISSUE OF 4TO9EMPLOYEES FEE PAID PENALTY PAID CORRECTED ❑ (�) BUSINESS WITH 10 $75.00 $112.50 Sign and return application i LICENSE WITH OR MORE EMPLOYEES with fee. Renewals received 'LC' ACTION. ❑ after February 15 must pay NEW APPLICATION (LA) penalty in addition to fee. ❑ RENEWAL (LB) NEW BUSINESSES AFTER ❑ CHANGE (LC) JULY 31, 1/2 FEE. (PLEASE MAKE ANY NECESSARY CHANGES) ❑ DELETE (LD) NAME OF FIRM BUSINESS PHONE NO. OF EMPLOYEES Gulf Properties, Inc. 774-6889 1 MAILING ADDRESS NATURE OF BUSINESS 300-Harbor-But 1-di ng-- .---��--' ,,yK0 a-7 100 Second Avenue South '� ,/ Real Estate.Brok-erag-e Edmonds, WA 98020 BUST ESA AgD,RES .I 3 (� INDIVIDUAL PARTNERSHIP CORPORATION 34-G4a•r=bo,r •61=d Edmonds, WA 98020 QUINIERS NAME C �� H 0 M ADDRESS 77, HOME PHONE DA E OF BIRTH PIA E OF BIRTH SO IAL SECURITY NUMBER �— � 2 d o EMERGENCY NOTIFICATION (1) NAME & TELEPHONE John D . Cadi gan 778-9262 (PLEASE LIST TWO) (2) NAME & TELEPHONE Anita Slaven 367-4491 WASHINGTON }TACT TAX NO. C 600 243 9122 0 APPLICANT'S SIGNATURE/ DO NOT WRITE BELOW THIS LINE STAFF REVIEW: FILL IN LAND USE CODE, UFIR NUMBERS, ZONING, ETC. CHECK APPROVAL OR DISAPPROVAL, DATE, AND SIGN. IF DISAPPROVAL, PLEASE COMPLETE "COMMENT" SECTION. ROU E TO NEXT DEPARTMENT ON LIST. PLANNING DEPARTMENT DATE t LAN USE CODE ZONING CODE 11?,APPROVE ❑ DISAPPROVE SIGNATURE CONDITIONAL USE PERMIT COMMENTS L—L-t- I L� BUILDING DEPARTMENT DATE 12-1;%�''I APPROVE ❑ DISAPPROVE �— SIGNATURE F: -`- COMMENTS: Q� CAPACITY: (NO. UNITS, APTS. OFFICES, SEATS, BEDS, STUDENTS) FIRE DEPARTMENT DATE ��, -91 -`' APPROVE ❑ DISAPPROVE SIGNATURE _��✓� COMMENTS: Building ❑ Hotel/Motel (L) Permit ❑ ❑ Apt. Bldg. Office Bldg. (A) (0) Occupancy ❑ Restaurant (R) Group ❑ Hosp/Nurs Home (H) ❑ School (S) U.F.I.R. 1= EbFc_)To_1 12 11 10 J POPE DEPARTMENT DATE l4 0 � SIGNATURE APPROVE ❑ DISAPPROVE COMMENTS: PUBLIC WORKS DEPARTMENT ❑ APPROVE ❑ DISAPPROVE DATE SIGNATURE 2ZG ti1_111c_) COMMENTS: PLEASE RETURN TO CITY CLERK CITY of EDMONDS BUSS LICENSE APPLICATION DAd6 LICENSE NO. Civic Center • Edmonds, Washington 9 City Clerk Phone 775.2525 =u - TYPE OF BUSINESS ANNUAL FEE CLASS ❑ (A) HOME OCCUPATION :VSTRUCTIONS: All items must be completed or application will not be ac- cepted. Sign and return application with fee. Renewals received after February 15 must pay penalty in addition to fee. NEW BUSINESSES AFTER JULY 31, 1/2 FEE. YEAR LIC. EFFEC. DATE REASG. LIC. N0. SPEC. RECEIPT NO. DATE PAID PRINT 'X' IN SPEC. BOX FOR ISSUE OF CORRECTED FEE PAID PENALTY PAID ' ' 1 1 — LICENSE WITH 'LC' ACTION. (B) BUSINESS WITH 1 TO 3 EMPLOYEES ❑ (C) BUSINESS WITH 4 TO 9 EMPLOYEES ❑ (D) BUSINESS WITH 10 OR MORE EMPLOYEES $ 20.00 $ 22.00 $ 75.00 ❑ NEW APPLICATION ❑ RENEWAL ❑ CHANGE (PLEASE MAKE ANY NECESSARY CHANGES) ❑ DELETE AFTER FEB. 15 $ 30.00 $ 33.00 $112.50 (LA) (LB) (LC) (LD) NAME OF FIRM BUSINESS PHONE NO. OF EMPLOYEES Compushare Company 776-4881 MAILING ADDRESS NATURE OF BUSINESS 39(�-Na rbor-Bu i 1-d i rrg' 100 Second Avenue South 75T Edmonds, WA 98020 _;�,13- oa 9i a Compttter--S2rv-i�s BUS NS,SJADDES,S/� j �j ( INDIVIDUAL PARTNERSHIP CORPORATION ``350-Ha-r��bo��r-Bldg., Edmonds, WA 98020 (S) S( (P) (C) OWNERS NAME HO ADDRESS HOME PHON TAT - OF BIRTH PL JC E OF BIRTH SO IAL SECURITY NUMBER 61 EMERGENCY NOTIFICATION John D. Cadigan 778-9262 (1) NAME &TELEPHONE (PLEASE LIST TWO) (2) NAME & TELEPHONE Anita S1 aven 367-4491 WASHINGTON STATE TAX NO APPLICANT'S SIGNATUR DO NOT WRITE BELOW THIS LINE STAFF REVIEW: FILL IN LAND USE CODE, UFIR NUMBERS, ZONING, ETC. CHEC APPROVA OR DISAPPROVAL, DATE, AND SIGN. IF DISAPPROVAL, PLEASE COMPLETE "COMMENT" SEC ON. ROUTE TO NEXT DEPARTMENT ON LIST. PLANNING DEPARTMENT [GZAPPROVE ❑ DISAPPROVE DATE 'S� LAND SE CODE ZONING CODE SIGNATURE c_ CONDITIONAL USE PERMIT COMMENTS BU ING DEPARTMENT DATE 1 C' i (=PROVE ❑ DISAPPROVE — �,'..I SIGNATURE 1-( i c.� �� COMMENTS: CAPACITY: (NO. UNITS, APTS. OFFICES, SEATS, BEDS, STUDENTS) FIRE DEPARTMENT DATE �;w __j' APPROVE ❑ DISAPPROVE SIGNATURE COMMENTS: Building Permit ❑ Hotel/Motel (L) Q� ❑ ❑ Apt. Bldg. Office Bldg. (A) (0) Occupancy ❑ Restaurant (R) Group ElElHosp/Nurs Home (H) ro ❑ School (S) 4 INIMINERRE N ru-NIN POLI E DEPARTMENT APPROVE El DISAPPROVE DATE=�� SIGNATURE COMMENTS: PUBLIC WORKS DEPARTMENT l ❑ APPROVE ❑ DISAPPROVE DATE SIGNATURE COMMENTS: PLEASE RETURN TO CITY C II._E::RK ITY 0 CITY of EDMONDS BUSW LICENSE APPLICATION J Civic Center • Edmonds, Washington 980 City Clerk Phone 775-2525 INSTRUCTIONS: • All items must be completed or application will not be ac- cepted. e Sign and return application with fee. Renewals received after February 15 must pay penalty in addition to fee. NEW BUSINESSES AFTER JULY 31, 1/2 FEE. CLASS YEAR LIC. EFFEC. DATE LIC. N0. SPEC. L JREASG. RECEIPT NO. DATE PAID PRINT 'X' IN SPEC. BOX FOR ISSUE OF CORRECTED FEE PAID PENALTY PAID I LICENSE WITH 'LC' ACTION. DAT LICENSE NO. TYPE OF BUSINESS ANNUAL FEE AFTER FEB. 1E LI (A) HOME OCCUPATION $ 15.00 $ 22.50 ❑ (B) BUSINESS WITH $20.00 S 30.00 1 TO 3 EMPLOYEES (C) BUSINESS WITH $22.00 S 33.00 4 TO 9 EMPLOYEES ❑ (D) BUSINESS WITH10 $75.00 $112.50 OR MORE EMPLOYEES ,25 NEW APPLICATION (LA) ❑ RENEWAL (LB) ❑ CHANGE (LC) (PLEASE MAKE ANY NECESSARY CHANGES) ❑ DELETE (LD) NAME OF FIRM BUSINESS PHONE NO, OF EMPLOYEES Campbell Investment Company 771-1755 MAILING ADDRESS NATURE OF SINESS -300-Harbor--Bui 1 ding i,✓,e,/��� (lempra 100 Second Avenue South ``Pr-i-v.ate_I-nw-es-tmen-t-ny Edmonds, WA 98020 BUSINESS ADDRESS INDIVIDUAL PARTNERSHIP CORPORATION same as above 13- 0=?/ a _111""'ERS NAME HOME ADDRESS HOME PHONE TDATE OF BIRTH PLACE OF BIRTH SO'CIIAL SECURITY NUMBER EMERGENCY NOTIFICATION (1) NAME&TELEPHONE John D. Cadigan 778-9262/'� (PLEASE LIST TWO) (2) NAME 8 TELEPHONE Anita S1 aven 367-4 9 WAr �m I GT cSyb�r�T T dE �i�ia5788p4 211 7 APPLICANT'S SIGNAT , \ x-� DO NOT WRITE BELOW THIS LINE STAFF REVIEW: FILL IN LAND USE CODE, UFIR NUMBERS, ZONING, ETC. CHEC APPRO AL OR DISAPPROVAL, DATE, AND SIGN. IF DISAPPROVAL, PLEASE COMPLETE "COMMENT" SECT N. ROU E TO NEXT DEPARTMENT ON LIST. PLANNING DEPARTMENT It q) -APPROVE ❑ DISAPPROVE DATE _ S/ SIGNATURE LAN USE CODE ZONING CODE [, CONDITIONAL USE PERMIT COMMENTS W B�UI�DING DEPARTMENT I f ; DATE 2 �f ! r Building fFe'APPROVE ❑ DISAPPROVE , SIGNATURE i— ��' e`er ' ElHotel/Motel Permit ❑ Apt. Bldg. (L) (A) D Office Bldg. (0) COMMENTS: Occupancy ❑ Restaurant (R) Group ❑ Hosp/Nurs Home (H) 17 CAPACITY: (NO. UNITS, APTS. OFFICES, SEATS, BEDS, STUDENTS) ❑ School (S) FIRE DEPARTMENT DATE / '4'-�� U.F.I.R. APPROVE ❑ DISAPPROVESIGNATURE .. S�_ %, 7, U COMMENTS: POE DEPARTMENT (�, APPROVE D DISAPPROVE DATE l�' SIGNATURE COMMENTS- LIC WORKS DEPARTMENT ❑ APPROVE ❑ DISAPPROVE DATE /�• %fi/ SIGNATURE r• _trio MENTS: r11 r w 200 DAYTON ST. • EDMONDS. WASHINGTON 98020 • (206) 'r75 2'. DEPARTMENT OF PUBLIC WORKS March .16, 1981 Dear Resident: HARVE H. HARRISON MAYOR On February 17, 1981, the Edmonds City Council passed Resolution 488 for construction, reconstruction and repair of deteriorated sidewalks. A public hearing will be held in the Council Chambers at the Civic Center. on April 21,1981 at 7:30 P.M., You are invited to ataend3 this hearin fo.r -- g discussing repair of portions of_'rdeteriotated sid'ewalk:. abutting your ro ert T do "" _�_."s--I p p y� _:� he"'imprwement ofsid�ewalks in need of repair at the expense of the abutting property owner is provided by City Ordinance, Chapter 7.20 and Revised Code of Washington, Chapter 35.68. The areas needing repair have been marked in paint on the sidewalk adjoining your property. Reconstruction and repair of these sidewalks must be completed on or before September 1, 1981. In the event improvements are not completed within the above specified time, the City will perform and complete the improvements at: the expense of the abutting property owner. This action is in response to many citizen requests and pedestrian falling accidents which have been increasing in recent years as a result of sidewalk deterioration and increased pedestrian traffic. Sincerely, I FRED F. HERZBERG Di.rec:tor. of Public Works G rT OA -.-� �•�- CITY of EDMONDS 4%ui BUST LICENSE APPLICATION Dqr[ LICENSE NO. e4f,'�'°� - --- civic Center • Edicts Washington sego) City Cram Phone 775.2525 ANNUAL FEES PENALTY AFTER FEB. 1; 4„J ❑ HOME OCCUPATION INSTRUCTIONS: CLASSYEAa UC EFFEL. GATE REA%. LIL. NO. SPEC. $1 D.OD (A) ADDITIONAL$5.00 C � IJ�SMALL BUSINESS • All items must be completed or application will not be ac. Al NO, DATE PAID PRINT %. $15.00 (B) ADDITIONAL $7.50 C cepted. FOR SPECISS.E SOX O Business with 10 or •Sign and return application FEE PAID ENALTY PAID CORRECTED more employees ADDITIONAL$25.00 C with tee. Renewals received I I I I I uCENSE WITH LC ACTION. (C $50.00 ) after February 15 must pay EW APPLICATION (LA) penalty in addition to fee. ❑ RENEWAL (LB) NEW BUSINESSES AFTER ^9Pn lr� W�P+ III r� D CHANGE (LC) JULY 31, 12 Ftt. (PLI MAKE qff j ,(jl ❑ DELETE (LD) NAME OF FIRM _ BUSINESS PHONE '77 NO. OF EMPLOYEES yb4y.�.,.V/ - . 7 .J .S MAILING ADDRESS /06 c,c d'.(CL L< ji; Y�370 NATURE] F BUSINESS / ✓� ( Div<�>s� F� dt<7� Ee1*?e11016@ 970,0o BUSINESS ADDRE S / ea �Ciu� .-)# 370 INDIVIDUAL s) PARTNERSHIP CORPORATION o (P) o (C) OWN EVj NAME t` a �'�i ✓i..fcw HOME ADDRESS �1 T ;:./ lcam- �� J 7 U eL,CM-�✓�/. HOME PHONE_ SO'h EMERGENCY NOTIFICATION: (1) NAME & TELEPHONE '< (PLEASE LIST TWO) (2) NAME & TELEPHONE C.u-t A:, le L CLLl-� bo S v; it WASHINGTON STATE TAX NO. APPLICANT'S SIGNATURE DO NOT WRITE BELOW THIS LINE STAFF REVIEW: FILL IN LAND USE CODE, UFIR NUMBERS, ZONING, ETC. CHECK APPROVAL OR DISAPPROVAL, DATE, AND SIGN. IF DISAPPROVAL, PLEASE COMPLETE "COMMENT" SECTION. ROUTE TO NEXT DEPARTMENT ON LIST. PLANNING DEPARTMENT DATE LAND APPROVE ❑ DISAPPROVE USE CODE ZONING CODE SIGNATURE CONDITIONAL USE PERMIT COMMENTS O m BUILDING DEPARTMENT DATE - -8o Builtling ❑ ❑ APPROVE ❑ DISAPPROVE SIGNATURE HotellMotel Permit ❑ Apt. Bldg. - L (A) .® D Office Bldg. (0) COMMENTS: Occupancy D Restaurant Group ❑ Hosp/Nurs Home (R) (H) ® CAPACITY: (NO. UNITS, APTS.. OFFICES, SEATS, BEDS, STUDENTS) ® ❑ School (S) FIRE DEPARTMENT //- BO DATE U.F.LR. 1( APPROVE El DISAPPROVE SIGNATURE - --- COMMENTS: PO E DEPARTMENT AOg7E SIGNATURE APPROVE ❑ DISAPPROVE COMMENTS: PUBLIC WORKS DEPARTMENT 3 ❑ APPROVE ❑ DISAPPROVE DATE SIGNATURE PLEASE RETURN TO CITY CLERK CITY of EDMONDS BISS LICENSE APPLICATION D LICE o. Civic Csnlar • EDmonds. Washington ` r ai crmx AN L FEES pgy7�� p r Phone 7752525 ❑ HOME OCCUPATION P A 19SAEA�R PjEB.�l5:. CLAW YEAR LIC EFFEC. DATE MEAEG. LIC. NO. SPED 1STPUCTIONS: $10.00 (A) ADDITIONAL $5.00 ❑ All items must be completed Q RSMA*k,9V.SINESS or application will not 6e so- RECEIPT NO. DATE PAID mlNr.x. .00 (B) ADDITIONAL $L50 ❑ cepted. FORS ssuE soF ❑ usiness with 10 or Sign and return application FEE PENAL in CDR RECTED more employees ADDITIONAL$25.00 ❑ with fee. Renewals received PAID i LiCeACTI WITH Le ACTION. $50.00 (C) after February 15 must pay ❑ NEW APPLICATION (LA) penalty in addition to fee. ❑ RENEWAL (LB) NEW BUSINESSES AFTER ❑ CHANGE LC) JULy 31, 712 FEE. (PLEASE MAKE ANY NECESSARY CHANGES) ❑DELETE fLDI NAME OF FIRM BUSINESS PHONE NO. OF EMPLOYEES .✓. uJ.0 p a -L3 MAILING ADDRESS NATURE OF BUST ESS BUSINESS ADDRESS oe ag Q D Q 0 C INDIVIDUAL PARTNERSHIP - CORPORATION ' N © (S) o (P) o (C) OWNERS NAME HOME ADDRESS ids A) /J Ff o 4 fi'T so/ /a OOA . /U - At�7 bti o.Jq 1 HOME PHONE v EMERGENCY NOTIF (PLEASE LIST TWO) (2) NAME & TELEPHONE N ).moo Y G\tA,oN- o.AL3, WASHINGTON STATE TAX NO.C'r40!) nra/ 9e5r APPLICANT'S SIGNATURE DO NOT WRITE BELOW THIS LINE STAFF REVIEW: FILL IN LAND USE CODE, UFIR NUMBERS, ZONING, ETC. CHECK APPROVAL OR DISAPPROVAL, DATE, AND SIGN, IF DISAPPROVAL, PLEASE COMPLETE "COMMENT,. SECTION. ROUTE TO NEXT ON LIST. gDEPARTMENT PLANNING DEPARTMENT DATE /� LAND USE CODE ZONING CODE r APPROVE ❑ DISAPPROVE SIGNATURE CONDITIONAL USE PERMIT COMMENTS O O m BUILDING DEPARTMENT DATE A - IS -80 F�APPROVE El DISAPPROVE Building ❑ Hotel/Motel ' (L) SIGNATURE ULr- Permit ❑ Apt. Bldg. ® ❑ (A) Office Bldg. (0) COMMENTS: Occupancy ❑ Restaurant (R) Group ❑ Hosp/Nurs Home ® CAPACITY: (NO. UNITS, APTS., OFFICES, SEATS, BEDS, STUDENTS) m ❑ School (H) IS) FIRE DEPARTMENT DATE - U.F.I.R. ❑ APPROVE ❑ DISAPPROVE SIGNATURE fjpr AZ ry i'e N. ❑ DISAPPROVE DATE •r--/io- OV SIGNATURE PUBLIC WORKS DEPARTMENT ❑ APPROVE ❑ DISAPPROVE DATE SIGNATURE PLEASE RETURN TO CITY CLERK _.41r� n+. CITY of EDMONDS Bl� LICENSE APPLICATION D,�g LICENSE NO. CIYb center Edmonds, Washington 9802D ANNUAL FEES ary Crerx phone 7752525 } PENALTY AFTER FEB. 15 e ,i�' f9 HOME OCCUPATION INSTRUCTIONS: • All '.Items must be completed or application will not be ac- cepted. • Sign and return application with fee. Renewals received $10.00 (A) ADDITIONAL $5.00 ❑ SMALL BUSINESS $15.00 (B) ADDITIONAL $7.50 ❑ ❑ Business with 10 or more employees ADDITIONAL $25.00 ❑ $50.00' (C) after February 15 must pay - NEW APPLICATION (LA) penalty In addition to fee. - ❑ RENEWAL (LB) NEW BUSINESSES AFTER ❑ CHANGE iLcl cuss TEAR Uc: EFFEC. DATE a. I7EE RECE DATE PAID PRINT IN S C^ FOR EE PAID PENALTY PAIDCOR LICENLO'A JULY 31, 112 FEE. (PLEASE MAKE ANY NECESSARY CHANGES) ❑ DELETE (LD) .,NAME OF FIRM arcIIMV .c. S�OC10.�4 BUSINESS PHONE NO. OF EMPLOYEES r)l4A MAILING ADDRESS ir IlID-0 aIA'A f4v-q� # 3Lo g8Da0' NATURE OF BUSINESS BUSINES w a o0. E e1e 3f INDIVIDUAL - PARTNERSHIP CORPORATION �iSl (P) lC) HOME ADDRESS n ,M \ fX iCF .t�tye k LM .O O� -- H M.g ZHON (PLEASE LIST TWO) (2) NAME $ TELEPHONE U WASHINGTON STATE TAX NO. > APPLICANT'S SIGNATURE - �� DO NOT WRITE BELOW THIS LINE STAFF REVIEW: FILL IN LAND USE CODE, UFIR NUMBERS, ZONING, ETC, CHECK APPROVAL OR DI5APPROVAL,-DATE, AND SIGN. IF DISAPPROVAL, PLEASE COMPLETE "COMMENT" SECTION. ROUTE TO NEXT DEPARTMENT ON LIST. IE PLANNING DEPARTMENT DATE 3 -''20�Ly- i dyyLAND USE CODE ZONING CODE . 18-APPROVE ❑DISAPPROVE SIGNATURE�YI.C�.d4wA A9N ,.. „•f CONDITIONAL USE PERMIT - ILDING DEPARTMENT DATE �' 2 APPROVE ❑ DISAPPROVE SIGNATURE CAPACITY: (NO. UNITS, APTS.,-OFFICES, SEATS, BEDS, IE DEPARTMENT DATE APPROVE ❑ DISAPPROVE SIGNATURE ❑ DISAPPROVE �PUBLIC WORKS DEPARTMENT DATE-`] ) Z PROVE' O DISAPPROVE SIGNATURE Building ❑-. Hotel/Motel (A) Permit ❑ Apt, Bldg. �4-Ofrce Bldg. (0) Occupancy ❑ Restaurant (R) Group ❑ HoSP/Nurs Home (H) l� ❑ School (S) �n �o0 0s291 PI FARE RFTI IRN1 TrT r'ITY r,l FMW ' BUSINLICENSE AF'i'LICATION HEYERBE JgpPL. N0' r . _ Y OF EDMONDS 0 - smE I DATE �d//;,] J STH AVENUE NORTH 13' EDMONDS, WAS 120 APPLICATION FOR: - - TELEPHONE (20 '] 5m� xUON s Va VEAR �T F BUS ❑ RENEW 'YEAR /9lQI e �� LICExSE NUM9ER gCIION LA . OEW BUS. INSTRUCTIONS ANNUAL FEES �. { OC CHAERGE 1. PRINT APPLICABLE LICENSE CLASS, FEE AND PCNAIIY PAID TYPE BUS. CLASS FEE PENALTY LD DELETE IN ANNUAL FEE BOX AT RIGHT. PENAl1Y D'Jt ON HtNLWA'S HOME' A 410.00 $ 5,00 CLASS YEAR L1C, EFFEC DATE RFASO LIC N0. ANN RECEIVED By CITY CLERK AFTER FEBRUAFY I]. SMALL B -15.00 250 }' 13 / B. NEW BUSINESS: COMPLETE ALL LICENCE APP.ICAIION BG%ES. 'GENERAL C 50.00 2500 6! LIC. RENEWAL: REVIEW uCLNSF iNFORMAFIO� BLLUWN PRINT RECEIPT NO, DATE PAID d CORRECTIONS AND ADDITIONS AT RIGHT_ 'OVER.0 EOP_OYE-V OR EMPL WORK /} PRINT'% OVER VC WN4CNTHS PER YEAR. Y ' / l ) /' IN SPEC BUY 3. SIGN AND RETURN APPLICATION WITH FEE (AND PENALTY). - FDR ISSUE OE 4. LICENSE WILL BE MAILED TO YOU UNLESSYOUARE NOTIFIED cLn55 FEf .I eJ PENALTY PAm FEE PAID PENALTY PAID COR.RE CTEO !Q/ LICENSE . WITI- TO APPEAR FOR APPLICATION REVIEW. / S I LC ACTION. 3. BUSINESS IDENTIFICATION BUSINESS NAME NATURE OF BUSINESS BUSINESS PHONE WASH. STATE iA% NP. EMPLOYEES I ORGAN. OCCUPANCY TYPE ORGANIZATION IF BUSINESS IS: TYPE CAPACITY C HOTEL MOTEL L NO OF RJOMS/UNITS O C � CORPORATION APT BLDG. A NR OR ARTS D L LTD. PART OFFICE BLDG. 0 NR OF OFFICES E P PARTNERSHIP RESTAURANT R NR OF SEATS S S SOLE OWNER HOSP./NURS. HOME H NR OF BEDS SCHOOL S NR OF STUDENTS O. BUSINESS ADDRESSES BUSINESS ADDRESS LICENSE MAILINGADDRESS 5. EMERGENCY NOTIFICATION NAME AREA TELEPHONE lU I G1 D.FII.R. CODE BLDG. PERMIT OCCUP C.U. PERMIT LAND USE ZONING Lr. I LICENSE'. APPLICATION AND CHANGES. PLEASE PRINT CLEARLY 3. BUSINESS IDENTIFICATION ENTER APPLICABLE TYPES AND CAPACITY B. EMERGENCY NOTIFICATION TIN EVENT, OF FIRE. BURGLARY. ETC) Ul LA I' NAME, FIRST INITIAL a on�Q T' AREA WOEETELE.-MORNE:7 ',9,al� LAS NAME, FIRST INITIAL AREA OJDETE LEP�HON�E�{��� L11LLJ 55 OFFICIAL USE ONLY Uf IR. PRIM.' UNITS 'BUS.' BLDG. PERMIT OCCUP.GRP:. `-' CODE �. ON O. USE PE IRMIT LAND USE ZONING rye. �1 1 CITY CLERKS APPLICANT'S ASIGNATURE SIGNATURE Q APPROVED DISAPPROVED DAi BUS TITLE -0NM cal (10n6) .. - -N RETURN TO CITY CLEF BUSI�"LICENSE APPLICATION W7TY OF EDMOND,) ��� 250 5TH AVENUE NORTHr ll EDMONDS, WASH. 98020 TELEPHONE (206) 775-2525 FI INSTRUCTIONS 1. PRINT APPLICABLE LICENSE CLASS, FEE AND PENALTY PAID IN ANNUAL FEE BOX AT RIGHT. PENALTY DUE ON RENEWALS RECEIVED BY CITY CLERK AFTER FEBRUARY 15. 2. NEW BUSINESS: COMPLETE ALL LICENSE APPLICATION BOXES. LIC, RENEWAL: REVIEW LICENSE INFORMATION BELOW. PRINT CORRECTIONS AND ADDITIONS AT RIGHT. 3. SIGN AND RETURN APPLICATION WITH FEE (AND. PENALTY). 4. LICENSE WILL BE MAILED TO YOU UNLESS YOU ARE NOTIFIED TO APPEAR FOR APPLICATION REVIEW. LICENSE RENEWAL REVIEW BELOW INFORMATION, PRINT CHANGES AT RIGHT. ANNUAL FEES TYPE BUS. CLASS FEE PENALTY HOME A $16.00 S 5.00 SMALL B 15.00 7.50 'GENERAL C 50,00 25.00 2. APPLICANT NAME SOCIAL SECURITY NO. DATE OF BIRTH 7.PLACEF BIRTH HOME ADDRESS 3. BUSINESS IDENTIFICATION BUSINESS NAME NATURE OF BUSINESS BUSINESS PHONE WASH. STATE TAX NR. EMPLOYEES ORGAN. OCCUPANCY 'OVER 10 EMPLOYEES. OR EMPL WORK' OVER 120 MAN MONTHS PER YEAR CLASS I FEE PAID PENALTY PAID TYPE ORGANIZATION IF BUSINESS IS: TYPE CAPACITY C HOTEL/MOTEL L NR OF ROOMS/UNITS 0 C CORPORATION ' APT. BLDG. A NR OR APTS D L - LTD. PART OFFICE BLDG. 0 NR OF OFFICES E P - PARTNERSHIP RESTAURANT R NR OF SEATS S S SOLE OWNER HOSP./NURS. HOME H NR OF BEDS SCHOOL S NR OF STUDENTS 4. BUSINESS ADD BUSINESS ADORES`. 5. EMERGENCY NOTIFICATION NAME AREA TELEPHONE (1) (2) I OFFICIAL USE ONLY U.F.LR. CODE BLDG. PERMIT OCCUP. r C.U. PERMIT .LAND USE ZONING r i --VSIAFF ACTION Q l Ct REVERSE APPL. NO.: SIDE r DATE: � FOR: C�!CATION .Y LIC. LICENSE S RENEW YEAR OFFICIAL UE N LICENSE NUMBER ACTION ( LA NEW BU" Jll LB - RENEWAL LC AN - CHGE LD - DELETE 1 CLASS YEAR LIC. EFFEC. DATE I REASG. LIC. NO I SF" RECEIPT NO. DATE PAID AIN C /� PRINT 'X' IN SPEC. BOX FOR ISSUE OF FEE PAID PENALTY PAID C O R R E C T E I, I A-- -)! LICENSE Wll I 'LC' ACTION. LICENSE APPLICATION AND CHANGES ;..:,:-•;:.:. ' . PLEASE PRINT CLEARLY SOCIAL SECURITY NUMBER ` T" C• DATE OF BIRTH PLACE OF BIRTH [MOD:AYMYEAR CITY �" STA'TI: PIPIIII��EILF} I I I I I I I I I I AQW ADDRESS STDG NUMBER STREET APT�NO.I STATE I I ZIP CODE 3. BUSINESS IDENTIFICATION BUSINESS NAME TT�i (FULLY) WEAN 111 RE?i]•Ty rl t+'1C I I I I I I I I I 11 NATURE OF BUSINESS (DRUG STORE, CPA. ETC) BUSINESS PHONE Real estate sales 78 3�- 1117 WASH. STATE TAX NR. ANTICIPATED TYPE OF OCCUPANCY (REGISTRATION) NR.EMPLOYEES ORGAN. TYPE CAPACII C _. a-- ENTER APPLICABLE TYPES AND CAPACITY 4. BUSINESS ADDRESS DG. APT. N0. 0 d v i S BLDG,. NUMBER [STRETAPT. NO. 0 d -v 1 �'' CITY STATE ZIP CODE A 8 7: 5. EMERGENCY NOTIFICATION (IN EVENT OF FIRE. BURGLARY, ETC.) LAST NAME. FIRST INITIAL AREA CODE TELEPHONE (1> i• 1 2 7 1 7; LAST NAME. FIRST INITIAL AREA CODE TELEPHONE (2) i 1 F. . 2 7 rJILT 5S OFFICIAL USE ONLY U.F.I.R. PRIM. UNITS BUS. BLDG. PERMIT OCCUP. GRP. CODE COND. USE PERMIT LAND USE ZONING CITY CLERK'S APPLICANT'S ✓ v;.� SIGNATURE SIGNATURE ❑ APPROVED ❑DISAPPROVED DATE BUS. TITLE President DATE 23 �� FORM CC.t 110.71:1 ._I ..... _ LTY�oA BUSINGOICENSE APPLICATION _ 'CITY OF EDMONDS r l 250 5jH E NORTH EDMO'N,QQ �R1�1980� - TELEPR,Q,N MMS FILE PENALTY PAID ON RENEWALS NEW BUSINESS: COMPLETE ALL LICENSE APPLICATION BOXES. LIC. RENEWAL: REVIEW LICENSE INFORMATION BELOW. PRINT CORRECTIONS AND ADDITIONS AT RIGHT. SIGN AND RETURN APPLICATION WITH FEE (AND PENALTY). LICENSE WILL BE MAILED TO YOU UNLESS YOU ARE' NOTIFIED' STAFF ACTION REVERSE APPI. NO. e,)/ RC! SIDE DATE APPLICATION - NEw BOS. FOR: ❑ LIC. LICENSE RENEW YEAR TYPE SUS. CLASS FEE PENALTY HOME A $10.00 E S00 SMALL B' 15.00 7.50 'GENERAL C 50.00 25.00 3. BUSINESS IDENTIFICATION BUSINESS NAME NATURE OF BUSINESS- BUSINESS PHONE WASH. STATE TAX NR. EMPLOYEES ORGAN. OCCUPANCY TYPE ORGANIZATION IF BUSINESS IS: TYPE CAPACITY C HOTEL/MOTEL L NR OF RoowsNNRs p .LCORPORATION ART BLDG. A NR OR ARTS D L - LTD' PART OFFICE BLDG. O NR OF OFFICES E P- PARTNERSHIP RESTAURANT R NR OF SEATS S S - SOLE OWNER HOSP./NURS. HOME H NR OF BEDS SCHOOL S W OF STUDENT$ 4. BUSINESS ADDRESSES - ' BUSINESS ADDRESS 1'. LICENSE MAILING ADDRESS 5. EMERGENCY NOTIFICATION OFFICIAL USE ONLY AREA TELEPHONE O.F:LR:,000E ` BLDG. PERMIT. OCCUP C.II �PERMH LAND USE ZONING (1) (2) 11 PRINT'M' 'LICENSE APPLICATIGN AND .CHANGES':'".':.'--:.".;(F:.-. ' PLEASE PRINT CLEARLY - - NOTIFICATION (IN EVENT OF FIRE, BURGLARY. ETC) LAST NA E, FI T INIA AREA CODE 0�L qE USTM��ET )1 1 d, NwL K�sc. AREA wP ���� TLEPHO7E LLFIR. PRIM. 'UNITS' BUS. BLDG. PERMIT OCCUP. GNP. 'g�}'' CODE' S / 0 1 S COND. USE PERMIT LAND USE ZONI CITY CLERK'S Z APPLICANT'S SIGNATURE SIGNATURE - APPROVED 0 DISAPPROVED DATE BUS. TITLE M Name of Applicant: Mailing Address: CITY OF EDMONDS ENGINEERING DEPARTMENT 505 BELL STREET EDMONDS, WASHINGTON 98020 APPLICATION FOR STREET USE PERMIT SNOHOMISH COUNTY PUBLIC TRANSPORTATION BENEFIT AREA CORPORATION 3719 - 196th St. S.W., Lynnwood, WA 98036 Telephone Number: 778-2185 Date: Description of Public Place or Portion thereof desired to be used: (exhibit may be attached) Planting strip and sidewalk on north side of'Harbor Building Type of Use desired to be made of Public Place: Construction of a passenger shelter in conjunction with established bus stop If applicable, attach plans and specifications for any utility or structure to be erected and/or maintained on the Public Place: See attached picture and site plan •TEMPORARY PERMIT: Unless otherwise designated herein, this permit is understood by applicant to be wholly of a temporary nature, that it vests no permanent right whatsoever. If the permitted use becomes dangerous or such structure shall become insecure or unsafe, or shall not be constructed, maintained or used in accordance with the provisions of this title, the same may be revoked and the structure and obstructions ordered removed by order of the City Engineer. If this application is for a specified period of time, the terms of said application is: • INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages or claims of any kind or descrip- tion whatsoever, foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. In addition, applicant understands that the City shall be provided - a certificate of insurance to indemnify and hold the City of Edmonds harmless from all claims 'and/or property damage, naming the City of Edmonds as an also insured. APPLICATION OF CHAPTER 6.40 OF THE EDMONDS CITY CODE: Applicant warrants that he has read, or had the opportunity to read, Chapter 6.40 of the Edmonds City Code, attached herewith, and understands that all terms of that Ordinance are incorporated herein as if set forth in full and this application and permit therefore are subject to the terms of that Chapter of the Edmonds City Code. Applicant s Signature /- 7X Date 11/7/74 rev. o RECEIVED Ci tf f Ldmonds :,..-,i neeri rir rtment FEB 22 ]a $ APi,LIUTiON FOF, S_i—P-T USAF ^ i1T -- �'a 2' Public works Uep:. •` :___ Approval (and Agreen.ent, if applicable) of Abutting Property O;;ners: Signature Printed ^ arle AddrF.ss Date loll DO NOT VIRITE BELO.,,' THIS LINE (To be completed by Issuing Agency) City Council Approval (Attach 111,i nute Entry) : - Permit Fee: Annual Fee: due January 1, 19 111menities Design, Board Approval (if applicable) Attach Minute Entry: Building Official Approval (if applicable): Signature Date Provision for Indemnity: Terms and Provision of Perforr;ance Bond, if applicable: (Reference 6.40.050 of applicable Ordinance) PER.iII' AUTHORIZATION BY CITY ENGINEER: i g n a t u r e Date PERMIT NO. ..� i��� . DATE—zi, Remarks:. •, 11/7/74 rev. f1` F !h � � 1-'-1+ ! i!•- ;v>,' i � � t. � �..'•"�"' 1 '. �Flt�,`'jifr.�.'4Ti.2 �. 4 ( r4 / Nil ±R.tJ oSn Tgp 1 ('. �.t J +4- •' t j �r t. )).� t i ��+ 1�;- x y!`„�,�u-� ��ti��� � 3. tY�,/t 4 t•�'� -�v{j �:,.1-:S x^ `dEN40 TO: FROM: SUBJECT: ATE: M Div Building Division Community Development Department Engineering Division Public Works Department SI CW PWM IT AMJ C&Mt\J 1 00 -2 D IFS After review of the subject building permit application, we have the following comments: (1) Coordination of the location of any structure with respect to utilities, streets, property lines and driveway grades isle responsibility of the contractor. (2) The contractor is required to keep the abutting streets clean- ed of dirt and debris caused by the construction. (3) A "Right -of -Way Construction Permit" is required, from the Engineering Division of Public Works, for any work within the Public Right -of -Way or public easement. (4) Driveway slope not to exceed 14%. PW S/77 DATE: 0 M,D-10 TO: Harry Yhi tcutt E,uildinq Official FRO,': Richard H. Allen Assistant City Engineer SUBJECT: 2 k)r3 A'V F. After revi&,i of the subject building permit application, we have the following ccf,:,;ents Cl) Coordination of tlie.. f nny structure with respect to utili i s + streets, property lines and driveway grades is the responsibility of the contractor. required to keeD the abutting streets cleaned of dirt and debris caused by the construction. (31 A "Might-of-Wav Construction" permit is required, from the Engineering Div. of Public Worl;s, for any work within the Public riglit-of-way or public easement "- (4) Driveway slope not to exceed 140 I PPOV L fngM 11ta C.�Tr Co CJ L., R"IF oVJli - I S1" r Me P • ff f w I r' WITI, LIST —l'iPILDING, PER' UT PJ V T Strcet Rip' CY) 0 ,ht-oE-1-,'aN ExistinF Rj T) 11) Access Easements Existing R17N) Utility Fascinont Existina Lot Pcr Suidiv.4sjon Plat Assessor 1*ji) Sitc Plan (1cc1od for Accuracy Existing 1""Iter I -an t ],C(%u Fir:' F- Dc,-tector c- "C'ptic Tan�: t j. c t c-: , I i. I SA`,-Vl' 5A','1CCtiC),'1 F- '00161-CO R-11 Nucl) culk-ort. 1'equired 0 CItc,) ;oil Condit.101" Revi en" Fi i Si ze INIto 11 Poo 1,J Jjicl;clt:c oil "ii:c P],m oil 'I"Cl. Field (1cc,'-,c(1 Street P th in,; I:ccllli i•C(l _ --�--_ Girl) vul (";Ittcr RC0.11.i.rccl _ i • Sidcl:ctll. 'Coll.i.rcc! Curb Out for Privc ,,a, I P�� Construction Pclr -T (I)C)Ilcl J?cmd rc(l for Pti1)1' 1.,I)rovcrler.t5 'I i I S t-rcct Na-10 Sic, ;Cquircd -__- I' Othcr sip?1t111, I�cquircc!---_----`___-- �I II . i I i c I ci,,:i -- li �I Strcct_-__--_ c_ I I:ilf�].IICCl'].Il;� ! Sj ccir ? 1?cr,tl.irc":cnts 1istcd in 1.cr:10 to Il-prtmient D-I to rJ.l)CCI 1I1 Oil ],t1I1.d111�, I'C11'll.t ��J1i111.Caj.011 i I 1 r I :,j;j)1cvc(l 1))• PI.ld.ic l:orJ:: 1,c�11Irtrlcllt 11� i'o»vL R/VV 1 Olt" t SUITE 230 HARBOR BUILDING 100 SECOND AVENUE SOUTH EDMONDS, WASHINGTON 98020 0 it RICHARD COLE ATTORNEY AT LAW January 17, 1977 City of Edmonds. Engineering Department Edmonds Civic Center 250 Fifth North Edmonds, WA 98020 ( 206 ) 775-4488 Fi... ni o n t DILL, VANCOCCzMas ATTENTION: Leif Larsen., City Engineer Re: Harbor Building Passenger Zone Dear Leif: I wanted to write and thank you for the prompt and efficient action you took to establish a passenger loading.zone in front of the Harbor Building. Those who will benefit the most from it may not realize how cooperative and helpful you were in completing this task, but those of us who requested it are very appreciative. Thank you again. RC/cag cc: Douglas W. Hager V4tlyours, ell N1—.t-OFFICE COMMUWfC,__,fI _jS t. TO HARBOR BUILDING FILE & SECOND AVE. STREET FILE `DATE-_1/Q/76 _19 FROM Bill Nims g °SUBJECT: HARBOR.'BUILDING LOADING ZONE -= SECOND'AVENIlE; SOUTH OR 'MAIN STREET s On this date, the City Engineer set the policy for..*thet establishment of Loading Zone for the Harbor Building. } A Loading Zone .will. be established. on. -the'west t curb: of `.Second Avenue South of Main' in front of the Harbor Building `for 'the safety, and .:convenience -of Ahe ' tenants' because the Harbor' Building has: already provided'" more' than the required "off=street" parking spaces as required-in.the'City Code.. MEMO TO: tIARLO FOSTER POLICE CHIEF FROM: LEIF.R: LARSnN CITY ENGIP SOJECT.: 1 Second Avenue South Harbor Building The attached.re.quest for a 'passenger "Loading Zone°has been received at this office for the subject .location. Please provide us'with any comments you might have with regard to en- forcement if a "Loading Zond'is allowed. RI A: mj Atta"chments • 0• it I I0>I76 eirr OF SwkUsV!S T+1 FC-. .oW (03 SIGN FcaUDArD INS, ZCNaS u / Zl �je CCOLD ALCE0 PrCIO "EJUWT Sot4f.Y% / KWDA-YS P11 • 60 • •• SUITE 230 HARBOR BUILDING 100 SECOND AVENUE SOUTH EDMONDS. WASHINGTON 98020 City of Edmonds Edmonds Civic Center- 250 Fifth North Edmonds, WA 98020 RICHARD COLE ATTORNEY AT LAW November 12, 1976 ATTENTION: Leif Larsen, City Engineer Dear Leif: R E C E 1,V E® (206) 775-4488 Nm 1-I 197� umands [Bit-De�t� Re: Passenger Loading Zone at Harbor Building Doug Hage.r,who is the owner of the Harbor Building at 100 Second Avenue South, has authorized me to write to the City requesting that a passenger loading zone be designated in front of the building on Second Avenue to permit loading and unloading of passengers from automobiles at the curb. I feel this is an important change because it will permit elderly people or people in wheelchairs to disembark from the automobiles at the curb line.. Paul Lund, M.D.,who is a tenant of the building,has elderly patients and injured patients who cannot get into the building without assistance of a wheelchair. I believe it would also aid the patrons of the Harbor House Restaurant and perhaps other tenants in the building who are visited by individuals with physical problems. We realize that there is door level access on the west side but I do not believe that is adequate. Elderly people find it sometimes difficult to turn around in that parking lot, and to:have to drive -Into it, let the passengers out, then turn around and go to another area for parking.seems to be an inconvenience that is unnecessary. If Mr. Hager or I can supply you with additional information, please feel free to contact either of us. If it is necessary City of Edmonds November 12, 1976 Page 2 for this matter to be brought before the City Council, let . me know and I will be glad to appear on behalf of the proposal. Thank you for considering this. Very trul yours, r J` r Richard Cole RC/cag cc: Douglas W. Hager August 2, 1976 Mr. Charles Korten Harbor House Restaurant 100 - 2d Avenue South Edmonds, Washington 98020 Re: Street Use Permit`Application for Sign to Overhang Main Street Street RJW from Restaurant Dear Mr. Korten: The Edmonds City Council approved the application for a street use permit to install an overhanging sign over the Main Street right-of-way from the Harbor House Restaurant,subject to approval of the plans and issuance of a building permit by the Building Official. The Street Use Permit will be issued upon receipt of the certificate of insurance of indemnity. It is suggested that the insurance for this permit and the insurance for Permit No. 14-76 be combined. Please be sure to have the insurance company be specific in naming the items to be covered. Yours very truly, CITY OF EDMONDS LEIF R. LARSON, P.E. City Engineer LRL : rf cc: Building Dept. _ )[ _ ) ^ COUNCIL 1,11HUTES July 1O, I_,6 ..8- and he said the police operate on a priority basis and really don't have the dine to chr.ck I.axis. [le aid he just didn't have ennngh people to do this type of functiotr. He said I;here would he times when here might be t:he possibility.of doing this, but it was a very low priority item. Mr. Hawkins said Chief Foster did not appear to be with him, although he has saved.the Police Depar-4,cnt a lot. of manhours by responding to calls. 11-;yor Harrison said he was inclined to sympathize and recommendQd that, the Council amend the ordinace to give soma protection to the Plaza Cab Company and if the ordinance is changed Lhe City can send a letter to the Seattle cab companies. He fel t if .Lhe Edmonds police saw what appeared to Le an obviotis pick-up they should du a spot-check. Councilman Herb was opposed to any controls of this kind. He said if it is done for, this company it should be done for others. Councilman Gould felt actions should be those that support. private enterprise and he Felt the Seattle ordinance is wrong. . Councilman Gellert agreed that th- re should he less regulation; however, he felt it: was important MOTION: that there be a viable taxicab operation in this area. iIIEREFORE, A MOTION WAS MADE 13Y COUNCILMAN C1FI_LLRT, SFCOi;DCt) BY COUNCILi1AN CARNS, THAT TI1F CITY ATTORiII�Y BE [[ISFRUCTED TO AMEtID THE TAXICAB ORDTHiVICF b11F11 THE FJORDS THAT NO TAXI COMp;r,NY OmE.R THAN THOSE LICENSED IN THE CITY OF ED[101IDS DILL BE ALLOI,iED TO P[CK UP IN ED1iONDS, REGARDI.FSS OF THE: NAFURE OF THE BUSINESS, IIIE ROUTE TRAVELED OR ME DESTINATION. A ROLL CALL VOiF WAS TAKLII, WITH COUNCILIIELI GELI_LF;T, NORDQUIST, ANDERSON ARID CARNS VOTING YES, ARID COUNCILMEN GOULD, Cl_EMI-INT A,,D HERB VOTING NO. MOTION CARRIED. STREET USE PERMIT APPLICATION FOR S[GN TO OVERHANG MAIN STREET R/W FROM 1IORTH WALL. OF HARBOR HOUSE RESTAURANT The Harbor Ilou�;e Restaurant had requested permission to install asign to project over, tine sidertalk 5' on [lain Street. The Amenities Design Board approved the ap;alir_ation, -object to.appr•oval of the Building Official. City Engineer Leif Larson recommended by uu,mo that the permit be approved subject to providing t:he City with a certificate of insurance to ind;�nrnify and hold the City harmless from all claims and/or property damage, n:uaing MOT1014: the City of F(Imonds as onalso insured. A MOTION WAS HAOE BY COUNCIL.[?A[d ANDERSON, SEGOM)FI) BY COUNC[LiiAN CARNS, THAT THE COUNCIL APPROVE THC APPI_ICA- AION AS RECOfilir:NDED BY TIIE CITY ENGINEER. MOTION CARRIFD, WITH COUNCILMAN lOWOQUIST VOTING NO. SECOND REPORT ON JUNIOR HIGH SCHOOL Par,l< Director Rod Garretson revie1.gd the report prepared by the Finance Director. The net loss for the last quarter had been $1,5111 and at the end of the second quarter it totaled ?12,078', so the loss for, each quarter was about tlr^ same. Ile said in order For thr� building to be -self-supporting they needed more revenue and he had prepared a memo listing some possible ideas for increased revenue. Councilman Carns said he rccalled Mr. Garretson's expecting the building would be self-supporting, and that it obviously was not. He wondered i;Ity these ideas w(,re not evolved some time a(lo. Mr. Garretson said they had the problem of relocating and Lhat he had only one staff person for recreation. When asked why the Junior Iligh School was needed, he said it is the only aucli torium in Soul.h County and it has tr,A) gymnasiums. lle also noted that t;he Council had made the decision to move the classes from the elementary school to the junior high. He said there are times when the building is full of people. There follo,�ied a lengthy discussion regarding whether the escape clause of the lease should he exercised. There is until November 30 to exercise it to terminate Lhe lease at the end of the year. It was agreed that the athletic field should be kept if possible, even if the building were not. It tvas suggested that this be explored at the August 19 dinner meeting with the School Botird and [.hat a letter be sent to them to let them know that the Council would like to discuss Lhis. The various cost items were discussed at length. Councilman Clemens: said he felt: the facility is an asset to Edmonds and he would hate to see it torn down or, become a housing development, but he felt the costs are beyond what the City can subsidize. Ile asked what it would take to get the people of the EI)iiOilOS CITY COUNCIL MINUTES July 20, 1976 ME and he said ':i- police operate on a priori ty.basis and really don't have the time to check taxis. He said he ,just didn't have enough people to do this type of functian. lie said there t;(ruld be times when there might be the possibility of doing this, but it VMS a very 10�1 priority item. Flr. Havikins said Chief Faster did not appear to be with him, all:hough he has saved the Police Depa.rtc;�nt a lot. of manhours by responding to calls. Mayor Harrison said he was ir,,:H.ned to sympathize and recommended that the Council amend the ordinace to give soine protection to the Plaza Cab Cow,inany and if the or`dinanc_e is c,anged the City can send a letter to the Spattle cab companies. He felt if the Edmonds police saw what appeared to be an obvious !rick -up they should do a spat-clv�ck. Councilman Herb rigs opposed to any controls of this kind. He said if it is done for, this company it should he done for others. Counciinian Goi_rld felt actions should he those that support private enterprise and he felt the Seattle ordinance is wrong. Councilman Gel Ie.rt agreed that; tl ire should be less r^qulation; however, he i'el t it r,ras irnpor'tant MOTION: that there be i viriblc taxicab opr-rati.on in this area. iIIEREFOPE, A 1I01-ION WAS*MADE BY CO'IIPICiLP•IAl1 GEI_I_ERT, SECONDED BY COUNCILPlAII CAMIS, THAi TH-E CI1Y ATTORNEY GE It13TR!1CTED iO AtIEND THE 1AXICAB ORDINANCE 'JITH THE I.JORDS THAT NO TAXI CW-IlXd( O1FILR THAN THOSE I_ICFNSFD IN 1HE CITY OF EDHONDS WILL BE 00 ALLOW[D 'i0 PiC,', I,)P'IN E1;;IONDS, RE(;!\RDI.FSS OF Till: HAMPE OF ME BUSINESS, THE ROUTE 1RAV11FI) OR THE DESiINATION. A ROLL CALL. ',,OFF UAS TAKLN, WITH COUNCIL_1.11-N GEI_t.I:R'T, NORDQUIST, ANOLRS011 ACID CAMIS VOTING YES, AND COUNCILMLN GOULD, CI_Ei•1EIVT AND HERB VOTING NO., MOTION CARRIED. STREET USF PEi;'lIT APPLICATION FOR SIGN TO OVERHANG MAIN STREET R/W FROM NOR FIi WALL OF :IARGOR HOUSE RESTAURAN F The Harbor Hou-se Restaurant had requested permission to install asign to project over tie sidelaalk 5' on Plain Street. The Aur.mities Design Board approved th^ a;,plication, subject to approval of the l=>uiIdiny Official. City Engineer '.eif Larson recommended by memo fiat the permit be approved subject to providing 0y, City with a certificate of insurance to indemnify ,in(] hold the City harinlcss from all claims and/or property damage.., na;ning HOFION: the City of Ec`�;onds as an also insured. A MOTION 11AS MADE GY-COUiJCH.P1AN ANDERSON, SI:C(1'IDED BY COUNCILMAN CAMIS, THAT THE COUP!CR_ APPROVE: THE APPLICA- UTION AS RFC0N;i _:P!l) D BY THE CITY ENGINIA-R. NOTION CARRIED, WITH COUNCILMAN Hri(RDQUISt VOTI'IG NO. . SECOND REPORT =)N JUNIOR HIGH SCHOOL Park Director Pod.GarreV.son reviewd the report prepared by the Finance Director. The net loss for the last quarter had been $7,541 and al: the end of the sec:rnd quarter, it totaled $12,078, so the loss for, each quarter was about the >airre. He said in order for the building to be self--slrpporting they needed mo-o revenuo and he had prepared a memo listing sorre Possible ideas for incr:ised revenue. Councilmmii Carns said 'he recalled Mr. Garretson's expecting the i,a i ldi ng would he self-supporting, anti that it obviously was 'not. lie v,,onderrd these id•c.rs were not evolvrd some time, ago. Mr. G,rr retson said they h,id the-problr�m of relocating and that he hne had only otiiaff person for recreation. 'lien asked r:hy the Junior high Schuol %ms, needed, ire said it is the orrl",, auditorium in South Cor.nrty and it has two gymna,;iu,ns. Ile also noted that the Council h•ad made the decision to move Lhr, glasses From 'the elementary school to the junior high. He said i:h re are times ~given the building is full of people. There followed a lengthy discussion regarding whether the escape clause of the lease should be exercised. There is until November 30 to exercise it to terminate the lease at the end of the year. It was agreed that the athletic field should be kept if possible, even if the building viere not. It was suggested that this be exirlorcd at the August 19 dinner meeting with Lhe School Board and that a letter be sent to them to let them know that the Council would like to discuss this. The various cost items were diSCUSSe(I at length. Councilman Clement said he felt the facility is an asset to Edmonds and he would hate to see 'it torn down or become a housing development, but lip Felt the costs are beyond 101,rt the City can subsidize. Ile asked what it would take to get the people of the MEMO TO: Mayor H.N. Harrison & City Council FROM: Leif R. Larson City Engineer SUBJECT: Street Use Permit Application for Sign to Overhang Main Street right-of-way from North Wall of Harbor House Restaurant -- &ge da Forwarded herewith is a request for installation of a sign.for the Harbor House Restaurant to project over the sidewalk 5' on Main Street. The Amenities Design Board has reviewed and approved the application for the sign permit, subject to approval of the.Bui'lding. Official. It is recommended that the permit be approved subject to providing the City of Edmonds with a certificate of insurance to indemnify and hold the city harmless from all claims and/or property damage, naming the City of Edmonds as analso insured. Respectfully, LRL:rf Attachments �Pl��enl� JULRECEIVED 1 1976 CITY OF EDMONDS ENGINEERING DEPARTMENT 505 BELL STREET Edmunds Eogr. Dept. EDMONDS, WASHINGTON 98020 APPLICATION FOR STREET USE PERMIT Name of Applicant:l�, MailingAddress: /Oo — � ✓e : 4� � .� Q if o ,c..9 Telephone Number: / �.�' �� L Date: 2 -?4/1 Description of Public Place or Portion thereof desired to be used: (exhibit may be attached) VIC Type of Use desired to be made of Public Place: - If applicable, attach plans and specifications for any utility or structure to be erected and/or maintained on the Public Place: TEMPORARY PERMIT: Unless otherwise designated herein, this permit is understood by applicant to be wholly of a temporary nature, that it vests no permanent right whatsoever. If the permitted use becomes dangerous or such structure shall become insecure or unsafe, or shall not be constructed, maintained or used in accordance with the provisions of this title, the same may be revoked and the structure and obstructions ordered removed by order of the City Engineer. If this application is for a specified period of time, the terms of said application is: INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages or claims of any kind or descrip- tion whatsoever, foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of -its departments or employees, including but not limited to -the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. In addition, applicant understands that-the.City shall be provided... a certificate of insurance to indemnify and hold the City of Edmonds harmless from all. claims and/or property damage, naming the City of Edmonds as an also insured. APPLICATION OF CHAPTER 6..40 OF THE EDMONDS.CITY CODE: Applicant warrants that he has read, er Tiad tthe opportunity to read, Chapter 6.40 of tFe Edmonds City Code, attached herewith, and understands that all terms of that Ordinance are incorporated herein as if set forth. ;, in full and this application and permit therefore are subject to the terms of that Chapter. of the Edmonds City.Code. licant'-s Signature: ate 11/7/74 rev. L City of Edmonds Engineering Department APPLICATION FOR STREET USE PERMIT -- PaQe 2 Approval (and Agreement, if applicable) of Abutting Property Owners: Signature Printed Name Address Date DO NOT.WRITE BELOW THIS LINE (To be completed by Issuing Agency) City Council Approval (Attach Minute Entry): Permit Fee: Annual Fee: due January 1, 19 Amenities Design Board Approval (if applicable) Attach Minute Entry: Building Official Approval (if applicable): Signature Date Provision for Indemnity: Terms and Provision of Performance Bond,.if applicable: Ordinance) PERMIT AUTHORIZATION BY CITY ENGINEER gnature (Reference 6.40.050 of applicable PERMIT, NO. /3 • 7 -0 ' DATE / �.Z/70 .. �A28olZ �}a�sE R�ST�aUPANT' - 8ovBLE PAC-G-o 31- 4" x s'-00 �-vIGN IS 4F 2X2K�4 ANGLE IRort GONST. BOLTED TO 'STEP-L- STRUC'rL?F2R�- MEMO�t2 OF UL-VG CORNE2 W k-r H y2" MOLTS 10�-0" ASaJE 61zoc1No WE r= a N INTJ7=-tZNP•L-Lq W T• S16N HA'S OFAQu.E BAG1� G 20 V N l� — .--S;b--.,� COP�I •'� NAtZea+2 MciuSE �1 Tr-kAAa�czA,v r' pUAA T'C��M ONLN 1LLVMtNprTES }i l Ab13-Gq--74 Mf1lN ST p��Iti VIEW I /V • f �UL 1 1976 CITY OF EDMONDS ENGINEERING DEPARTMENT • 505 BELL STREET WWIds Ertgr. Dept. EDMONDS, WASHINGTON 98020 STREW APPLICATION FOR STREET USE PERMIT Name of Applicant: Mailip Address /yv — ,2 "' ✓�_ di"�o ���Lo 9 � � .r Telephone Number: -72.r_3z,'6y Date: -7 �/�--2 - -- Description of Public Place or Portion thereof desired to be used: (exhibit may be aY 1 ��t- a / �,ched // Type of Use de-i red to be made of Public Place: sz If applicable, attach plans and specifications for any utility or structure -to be erected J/or maintained on the Public Place: TEil?ORARY PE^_11IT: Unless otherwise designated herein, this permit is understood by applicar.c to be wholly of a temporary nature, that it vests no permanent right whatsoever. If the perfitted use becomes dangerous or such structure shall become insecure or unsafe, or shall not, be constructed; maintained or used in accordance with the provisions of this title, the same may be revoked and the structure and obstructions ordered removed by order of the City Engineer. If this application is for a specified period of time, the terms Of said application is: INDEMNITY: Apnlicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages or claims of any kind or descrip- tion whatsoever, foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of its departments or employees, including but not limited to the defers of any legal proceedings including defense costs, court costs, and attorney fees by reason o-i -ranting this permit. In addition, applicant understands that the City shall be provide a certificate= of insurance to indemnify and hold the City of Edmonds harmless from all claims and/or property damage, naming the City of Edmonds as an also insured. APPLICATION OF CHAPTER 6.40 OF THE EDMONDS CITY CODE: Applicant warrants that he has read, or ►.ad th(-� opi ortunity to read, Chap er 6.40 of the Edmonds City Code, attached herewith, and understands that all terms of that Ordinance. are incorporated herein as if set forth in full anj this application and permit therefore are subject to the terms of that Chapter of the Edri, n.►_ City Code. � 0 )licant's Signature Uat Edmonds Eng i n eri ng Department TION' FOR: STP.EET USE PER.! -'IT --- Page 2 proval (and Agreement, if applicable) of Abutting Property Owners: Sic,nature � Printed Name_ Address � Date DO NOT WRITE BELOW THIS LINE (To be completed by Issuing Agency) City Council Approval (Attach Minute Entry): Permit Fee: Annual Fee: due January 1, 19 4menities Design Board Approval (if applicable) Attach Minute Entry:_ Building Official Approval (if applicable): �jate Signature Provision for Indemnity: Terms and Provision of Performance Bond, if applicable: (Reference 6.40.050 of applicable Ordinance) . PERMIT AUTHORIZATION BY CITY ENGINEER: gnature PERMIT NO. / S • Z n Remarks: 11/7/74 rev. at DATE C. I ' Q Cr6t,ti� �' GC d • 6 ti • := oyCC/ni C. RARE a X 1 x Al 1-;',4 4 SY sC S/6 `v Coe. ?"iF-D j-o STE�G n r ' � X/57F1n/G 3t-DG. 0 ff'. /Y6 U 5 { r /'A L. ;tV.,H Al ! t C,`/U. '- +4-YA//M A S. Al- 'IWONC ST � , '• ��Ct , •I /w-.�� C: rCc' ✓t � i.-�rrA f9 3'-.Es ;��,.,;°.,�: ''q«. � •1 . SUM' l:•- .•=i'+�', ? .tom".i�n�..l q.t1 Plt�•� L { •Si i� e5laR t�'t41 • U±i' i 1 i,. i i SlJr, A 1 i q) f n U 1 -you 5Lf�- FACE o I �viGN 15 .OF /4 ANC -LE LROt4 CON5T. gOt-TE—P TO STEEL • STRJCTc.RRt.. MEM©L:2 OF UL-vG CORtaE2 Lu t-r H VZ" 13OLTS 10`-O" AgOJE 62oc1NA WE v E > - AbI3- oq S1�7N VAAs OFAQuE — 5.0-e{ COf-,( •NAQ6c2 14605E, . �� ..2Es-rp,utZtln,r' p�tJo' TT-IM OKLq %LLVMIAJATE5 4i l T ah •' )iiD.`> f CUIJNCiI. L•IllIl1TES ��� lu ly 70, 1976 J I •,_. and he s%ri(l;!:i.t police n1)r.rate oila prior, iLy.hasis and 1-c,i1ly don't have the - 1:111e to check taxis. Ile said - he ,j[IS L didn't ha•:e t:nuu()h j;col)le to (to this type of. functKim. lie said there tmuld he times ,rhrcl I:her•e might he the possibilil,,',of doin(j''this, but it was a very lu.i priori!,y ilcln. ilr. 11a4)kins said Chief .l-o-,ter slid nut a1l rear Io ho 1')i UI 1111!1, al l.huugir he has 'saved the ' Horace Depa.i t,i:nt a tut. of ntanhonrs by re,;!;nndinq 1,1) calls: Llayrir Harrison sa i d he .vets i re: l i.ned to sylilpa thi ze and r icon wt,-•nded Lha 1, the Coun, i l aulend the ordirlace !, r)[v� s1;mo In�tet-Lion !o the ('lr,.,r i'ah f,ren)ny .;n:l if the or`dinalic:e is c;ianrt,d the City can send ,i II'I-ter 1'o ti11! til,11.1.1e c;tb companies. lie fell: if Ulc- Fdnrmlds pl.lic:t, sac; ollat anpearod I:o 1'o an nbvion; pick-up they Should,do a spot-clr�c:ic. Cortnc.i lmoll Herb vI.Is Opposed to any controls of this kind. 1!e Said if it is doile fur• I,his co;c,rl,mv if, ehnnld he (11 JIW for others. Councilmah Go-Ilrl felt actions shn;lld I l;hn e i,hilt LII)p0rt private. enterprise, and he felt (1w SeaLLlr, ordinance is tvrow,1. .CotIIICi1II1iIlt (;elle.rt 1. agreed I;hat!t!>re should be less reclulat.ion; I)rnv^;t:•1, hl: ;`tilt it 1-;as important. MOTION: that there he: 1 viiihl^ taxicab operalion in II -hi,; area. THEREFORE, A 1'10T[011 WAS'IIADE B,( Clt')idC(I_t1;1P1 GEI-LERT, SF_COHDI::D RY CO11i1C11_(1,A! CARi1s, THAF Ti1E CITY ' ATTORNEY CI: Itri-TRUCH TO AMEND THE iUICAB ORDi;It"1UF I.11Ill 711E k;ORUS 1IIAT I. bk•1-'�'j� i40 I/'„x( CO11'Afri ( mclI '111:1i! THi)SI:.I.lcl--,i':I) itI 1111: CEIY OF i'mol!US 1•I[I_I. GE U ALLOWED TO P[r:.'; UP'll•1 Ul':; OHDS, RE(-ARD!.FSS Oi TM: HAJURE 01: I•!:IE BUSiNESS, THE ROUTE TRAVi:L.I•:1) OR Hil: OLSTIiIAi JON. A lti)I_L CAI.1. VO71: WAS TAKIJI, I.1(TII COU(lCll_fP it GI:I_'-[ RT, ilUl'U(�ULS'i, AidUE1'.`;ON AND CAI ' VOI-ING YES, AiID' COU;ICILMU-1 GOULD, CI-Ei•IEi'IT AND HERB V0f1['l PIO.. NOTION (:ARRIi:D. + STREET USE. PE,"NUF APPLICATIOiI FOR SIGN TO OVERHANG i•lAii1 SFRE(.:T R/11 FROM NORT11 WALL OF �IARGOR HOUSI: RLSTAURM-11- The Harbor Hou;e Restaurant had redue,l;ed.pe-mission to install asign to project over the siilcl.valk �i' on train S1:ree1:. The Allif" Jes Design Board - • ! approved the m,,,plication, suhject to ;Ipproval of, lAw Bui tdiml Official. City Ell!Iirleer '..coif Larson re(:unra011dol by Illunlo I•!1a1, Lhe permiL bc" i:ppruved subject to providing I:l)(1 City With a Ci`l1,ificaLe of insurance to indemnify and hold the City harmlc;s from all claims.and/or properly dilmage, naming i;0TION: the .City of Ec-';:ro?IdS-as an also iIIscired. A 1.10T(ON 11AS iiADE BY.COUTALHA.N AlDEI;SOt1, Sl:C�''lllFp RY CtlUi!CIIiIAt! CAI'f15, LIIAi 111L f:OU:f:tl. Ai'PI:OV1: 'Ill[- AI'PLICA- TION AS REC,ti!`i'-rdUf:D BY THE CITY ENG111H.R. i10'10IN f•ARIM.0, WITH f,OUiICILh1AiN N0RDQLI [ S r VOT I'6 .P10. SECOiID REPORT 1)rI JUNIOR HIGH SCHOOL Park Director .o-cl.Garr•ellson r•evietvd.the report prc-porod by t:he Finance Director. The net loss for the last: glrar•ter had -been '7,541 and al: the end of the- sec:)nd quarter it totaled 12,9 8, so the loss for c;ich quarter etas about the wire. Ile said in order for the building t:o be stilt-sllpporl:ing U:ey needed IU);c.' reV011111? 011d lltr hild piwj)di'etl a 111;,1110 l IStlllg solile pnSsible Ideas for- inr_r-::isnd rovowie. CouncilmanCarlls Sa';d he rocalled ilr•. CarretSOn'S expecting t:hc i;ailding multi he St.]f-Suppovl irig, alld I'il,lf, it obviously vms 'not. lie :•:ondered :;!•,i these id.^:l, lvt_r•c not, ovolved ,m;ie Lhw: ago. 1`1r. GaI,—I L, 11 said they •h;id '_hip: prublr:m of relocal:ing. and I:hat he h,ld only olie sf.aff person for rerreal.icnr: I!hen asked t-:hy the Junior Hiclh SriNol r:r, needed, he said it is the on1/ auditorium in South Couply and iI: his I,:o gynuu+Siu;!rs. Ile- also noted that the Council h.id made the decision to move the classes f`runl the elcillentary school •to tile •jullior high. He said i.h:>r`e times v.,ilcn the building is ;full of people. 1-here foll�):)r(I a Ie_nc11-11ly discussinn.rc:;ardirig whether tho.'escape clause of the lease should be exercised. There is until Noverlber' 30 to exercise it L.o ternririaLe the lease ill: the end of the year. I t:'as agreed that the athletic- field should be ko;)L if possible,• even if the building .i6ro tint. It rrati sliggeslad Lhlt, fhiS 1w vxplr,l•cd 1il. Lhe.August 19 dinner IllooLincl with -lie School Board and t.haC a leL!_c:r he sent Lo them • to let them kliow,that t.ht: Council would like, to diScrl;s I;his. The various cost: itches WO)-0. diSCussed at lOngth. COI111Cill1li111 CkrwenL said he felt the i fac-iIJ ty -is iail asset to Fklwonds and he would hate I:o see 'it torn down or heronle a •htuisinq developli;r,nl:, but he felt I:he Cots art: beyond Ivitat the. City can silbsiclize. Ile risked what it'truuId Lake Lu gol, the: people of the !y j / f a , • t d r •7 ;� r i h4 . .. AP '� h d�•� 7•�t n � a August 2, .1976 , -; .Harbor House.,Restaurant 2dAve"nue -South. '4J + Edmonds; Wa`shi ngton s 98020 . rd P' 4 Re.t Street Use`Permi't`App1ication for -Sign to Overhang ti Main,"Street.Street: R/W from Restaurant De_K. Korten• "� n The:Edmvnds City.Council ,approyed thetrappl�icat.ion -'for a street' °x permit ,to :instal,l.:an. overhanging _sign.,rveri.the Bain Street right-of=way from ,the:'Harbor'. Noose, Restaurant, subject to :approval. of. -the: plans. and issuance+Qf a bui..lding permby the Building Official. :i. .' a <The., Street Use ,Perms t••:wi 11 be' issued I upon r•ecei pt of the=`certificate of ip'surance :?of .a ndemni ty. I t ''i s suggested that the insurance for this perms t k and the. insurarice';:fior Permit'No;.14-76,:be�combined., Please'be sure' to ---.have , ttie insurance company ,be specific ih,.naming the items to be covered. .: • r t . �i Y 4 iPi a ? tf, � r J Yours very "truly, j r CITY OF EDMONDS. t ' LEIF R. LARSON,, P F 4 F City Engineer• `Busldirig,,Oe`Pt: . ,; MEMO TO; Mayor.'H.H. Harrison & City Council FROM: Leif R . Larson City Engineer ,SUBJECT: Str'eet,Use Permit Application for Sign to Overhang Main Street right-of-way from North Wall of Harbor House Restaurant Agenda Item..# 1.1— —7/.2 0/,X6—. Forwarded herewith is a request for installation of a sign for the :li*Harbor'House Restaurant to project over the sidewalk 5' on Main Street. :;The Amenities' Design Board has reviewed and approved' the application .:for the sign permit, subject to approval of'the Building Official. ,It is recommended that the permit be approved subject to providing the City of Edmonds.with a certificate of insurance to indemnify and.hold :the city harmless from'all:claims and/or property damage, naming.the City of Edmonds as an also insured. Respectfully, LRL: rf Attachments, 0 DATE: July 14, 1976 MEMO. TO: Ronald L. Whaley Mayor's Administrative Assistant FROM: Leif R. Larson City Engineer SUBJECT: City Council Extended. Agenda It is requested that the following be added to the extended agenda-. Suggested Agenda Date: July 206 1976 Item; Street Use Permit Application,for Sign.to overhang Main Street R/W from north -wall of Harbor house Restaurant. ,• S T R E E T U S E P E R M I T I N S P E C T I O N L 0 G DATE REPORT #oure lest S5&• I /W,A)r llowe Wo /,-✓ AuSoletes1- ploysh// /� e!?1UA1vi6e It June 11, 1976 Mr. C. Korten Harbor House Restaurant 100 - 2d Avenue South Edmonds, Washinnton 98020 Dear Mr. Korten: The Edmonds City Council on June 8, 1976, approved the Street Use Permit for the sign and landscaping between the Harbor Building and the sidewalk at the intersection of 2d Avenue and Main Street. The Street Use Permit will be issued upon receipt of a certificate of insurance to indemnify and hold the City of Edmonds harmless from all claims and/or property damage, naming the City of Edmonds as an also insured. A copy of Ordinance No. 1416, which regulates the Street Use Permit, is enclosed for your information. Also enclosed is a copy of the City Council minutes reflecting the approval.and conditions by which the permit is granted. Yours very truly, CITY OF EDMONDS LEIF R. LARSON, P.E. City Engineer rf Enclosures cc: Building Dept. �' • �DMONDS CITY COUNCIL MINUTES ° June 8, 1976 -3= p Jack Weinz will be at the meeting and will bring back a report. There followed some discussion regarding the possibility of an area -wide inter -local agreement MOTION: that aid cars handle this service. A.MOTION WAS MADE BY COUNCILMAN GELLERT, SECONDED BY COUNCILMAN GOULD, THAT.'AN AGENDA ITEM BE ,SET FOR JUNE 22 TO DISCUSS THE POSSIBLE REVENUES AND COSTS INVOLVED IN AID CARS PROVIDING AMBULANCE SERVICE, AND THAT FIRE CHIEF COOPER BE ASKED TO PROVIDE ESTIMATES. MOTION'CARRIED. Mayor Harrison introduced Dave Larson, Chairman of .the Downtown Parking.Com- mittee, who commented on the informal meeting the evening before which was set upto get input from the property owners downtown. He said another meeting was set for June 15 and he thought it appropriate to get some comments from the City Council prior to that meeting.. He also pointed out newspaper articles regarding the Parking Committee have been very inaccurate insofar as statistics are con- cerned.. Addressing the press, he asked for the opportunity to review their articles for accuracy of statistics before publication. He said they are still in the formative stage and as yet have presented no actual plan to the Council, that the property owners will have a right to protest it out and, negative report- ing could impair the efforts of the Parking Committee. He also said there will be Parking Committee meetings every Monday at 2:30 p.m. in the. Mayor's office until the problem is resolved. Discussion followed and it was the general con sensus of the Council that they could not offer comments at this point, that they would want input from the people they represent before offering comments. Councilman Anderson said.he did have an interim opinion which he would submit in memo form, and Councilman Carns indicated if the Committee could present a plan that the property owners would approve, since the property owners would be paying for it the Council would undoubtedly be receptive to the plan. The question of funding a parking plan was discussed,and the problem of a formula by which the entire business area could make a contribution appeared difficult to MOTION: reach. A MOTION WAS MADE BY COUNCILMAN NORDQUIST, SECONDED BY COUNCILMAN HERB, THAT A HEARING DATE BE SET FOR JULY. 6 TO DISCUSS THE PARKING COMMITTEE'S LATEST PROPOSAL. MOTION CARRIED. STREET USE PERMIT APPLICATION FOR HARBOR HOUSE RESTAURANT City Engineer Leif Larson .stated the Harbor House Restaurant owner had presumed, on the basis of approval by the Amenities Design Board, that he had authority to complete the installation of the signs and landscaping applied for, and therefore had. completed the installation, although the permit had not be issued. MOTION: Mr. Larson did.recommend approval. A MOTION WAS MADE BY COUNCILMAN CARNS, . SECONDED BY COUNCILMAN CLEMENT, THAT THE PERMIT BE APPROVED, SUBJECT TO PROVIDING THE CITY OF ED14ONDS WITH A CERTIFICATE OF INSURANCE TO. INDEMNIFY AND HOLD THE CITY HARMLESS FROM ALL CLAIMS AND/OR PROPERTY DAMAGE, NAMING THE CITY OF EDMONDS AS AN ALSO INSURED. MOTION CARRIED. REPORT FROM M.A.A. ON STATUS OF EDMONDS' DISABILITY PAYMENTS M.A.A. Whaley presented a report on LEOFF members presently on disability , retirement; together with a letter from the State of Washington LEOFF System which indicated tile monthly retirement allowance presently being received by those on disability retirement. These two items were discussed at length. The question arose as to whether the City could make a policy not to hire people who have.gone on disability. City Attorney Wallace advised that would not be discrimination in non -civil service jobs, but on civil service jobs you must take people off an eligibility list and could not make such a policy. It was also pointed out that such a policy could shortchange the City insofar•as ability and experience are concerned. Further, that the entry requirements are much more strict now which will preclude occurrence of some of these situations in the future. M.A.A. Whaley added a point not previously mentioned, that the LEOFF Act specifically allows any covered member, if he is injured while on duty, to receive all the allowed benefits and then to sue the City for negligence DATF: June 10,'1976 MEMO TO: Ilarry I phi tcutt Buildinn Official FROM: Ri chard I.. Al l en t Assistant City Fnnineer SUBJECT: Building Perm itprication for harbor T'Touse Restaurant - 100 2d Aven S. ---- After review, of the suh,jeC hI dipi permit anplication, �!e have the fol- lowing comments: --- 1. Permit not to he released until all requirements of Street'. Use Permit have been met. (check wMionda'on status later). TdiA:mjr off June 3, 1976. IIEP10 TO: Mayor Harrison and: City Councilmemhers FROM: Leif-R. Larson City Engineer SUBJECT: Adenda Item No. 4 - Street Use Permit for Harbor House Restaurant Forwarded herewith is a Street Use Permit reque.st.from the Harbor House Restaurant for the. installation of two 3-foot by 4-foot signs and land- scaping between the Harbor Building and the sidewalk at the intersection of 2d Avenue and Plain Street. The plan has been reviewed and approved by, the Amenities Design Poard. The Restaurant owner, on the basis of the approval of the ADR,.presumed he had authority to complete the installation and, therefore, the signs and landscaping have already been installed. The permit has not been . issued; however, it is recommended that the permit be approved subject to providing the City of Edmonds with a certificate of insurance to indemnify and hold the City harmless from all claims and/or property damage, naming the City of Edmonds as an also insured. Respectfully, LRL:mjr Attachments 'DATE: May 27, 1976 MEMO T0: Ronald L. W.haley Mayor's Administrative Assistant FROM: Leif R. Larson City Engineer SUBJECT: City Council Extended.Agenda It is requested that,the following be added to_the extended agenda. Suggested Agenda -Date: June 8, 1976 Item: Street Use Permit Application for Harbor House. Restaurant (landscaping and sign in r/w) 9 W /3 7e CIV' OF EDMONDS ENGINEEhING DEPARTMENT TELL STREE 50E= T EDMONDS, 14ASHINGTON 98020 FILE APPLICATIGN FOR STREET USE PERMIT RECEIVED MAY 1 iyr6 ? v Edtoods Engf. B4 Name of Appl icant: C , �lo e-Tc ,c) 6 wal' ., //�s<_ 4d O, Mailing Address: % O o - 2- Telephone Number: 771-- ` Date: Description of Public Place or Portion thereof desired to be used: (exhibit [nay be attached) ^Q .O ../l C' a.G�.d R!�'44 �•ih NYG d' 4ze 4 Q d '0. CP.J 7 �O �di4J✓ /✓/� - Type of Use desired to be made of Public Place:c� s If applicable, attach plans and specifications for any utility or structure to be. erected and/or maintained on the Public Place: TEMPORARY PERMIT: Unless otherwise designated herein, this permit is understood by applicant to -Fe —wholly of a temporary nature, that it vests no permanent right whatsoever. If the permitted use becomes. dangerous or such structure shall become insecure or unsafe, or shall not be constructed, maintained or used in accordance with the provisions of this title, the same may be revoked and the structure and obstructions ordered removed by order of the City Engineer.- If this application is. for a specified period of time, the terms of said application is: INDEMNITY: Applicant. understands' and by his signature to this application, agrees to *hold the City of Edmonds harmless from any injuries, da[nages or claims of any kind or descrip- tion whatsoever, foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of 1 is departments or employees, including but not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. In addition, applicant understands. that the -City shall be. provided. a certificate of insurance to.indemnify and hold the City of Edmonds harmless from all claims and/or property damage, naming the City of Edmonds as an also insured. APPLICATION OF CHAPTER 6.40 OF THE EDMONDS CITY CODE: Applicant warrants` that he has read, or had the opportunity to read, Chapter 6.40 of the Edmonds City Code, attached herewith, and understands that all terms of that Ordinance are incorporated hereinias if set forth in full and this application, and permit therefore are subject to the terms of that Chapter of the Edmonds City.Code. pplica. t s Signature at e ---_ .11/7/74 rev. 5 City of Edmonds Engineering Department AP.PL.ICATION FOR STREET USE PERMIT -- Paces 2 Approval (and Agreement, if applicable) of Abutting Property Owners: Si nature Printed Name Address Date a DOUGLAS W. HAGER 100 - 2nd. Ave. 5/10/76 DO NOT WRITE BELOW THIS LINE (To be completed by Issuing Agency) City Council Approval (Attach.Minute Entry.): AP17 e Permit Fee: Annual Fee:' due January 1, 19 Amenities Design Board Approval (if applicable) Attach Minute Entry: Building Official Approval (if applicable): Signature Date Provision for Indemnity:_1a Terms and Provision of Performance Bond, if applicable: (Reference 6.40.050 of applicable Ordinance). PERMIT AUTHORIZATION BY CITY ENGINEER: nature Remarks: ; Da te PERMIT NO. 1,3 7,1 DATE /7 7 C 11/7/74 rev. CERTIFICATE OF INSURANCE 0 ft DESCRIPTIVE SCHEDULI• Name of Insured HARBOR HOUSE RESTAURANT Address of Insured 100 - 2nd Avenue South, Edmonds, Washington 98020 Location Covered same R Operations Covered All Operations 97� THIS IS TO CERTIFY TO CERTIFICATE HOLDER: . ,-Mailing Address (Street And Number, City, State, Zip Code). CITY OF EDMONDS WASHINGTON Edmonds Engr. Dept. COVERAGE is provided in Company initialed below: QX A=AETNA INSURANCE COMPANY Q U=AETNA FIRE UNDERWRITERS INSURANCE CO. Q C=CENTURY INDEMNITY COMPANY Effective 6/25/76 that on the above date the following described insurance policies, issued by this Company, are in full force and effect, subject to all the terms, conditions, limitations and exclusions, thereof. Co Name of Coverage Policy Effective Expiration Lim?ts of Number Date Date Liability Workmen's Compensation Statutory *Public Liability —Bodily Injury (Not Auto) CpP 386982 4/15/76 4/15/79 $ 500 ,110 each occurrence *Public liability —Property Damage (Not Auto) tt tt it $ 500 ,000 each occurrence $ 500 000 aggregate (Explosion, Collapse, Underground Hazards $ ,000 each occurrence Not Covered Unless Otherwise Stated Herein) $ ,000 aggregate Products —Completed Operations- $ ,000 each occurrence Bodily Injury $ ,000 aggregate Products —Completed Operations- $ ,000 each occurrence Property Damage $ ,000 aggregate Specific Contractual —Bodily Injury $ ,000 each occurrence (Other Than Incidental Contracts As Defined In The Policy) Specific Contractual —Property Damage $ ,000 each occurrence (Other Than Incidental Contracts As Defined In The Policy) $ ,000 aggregate THE CITY OF EDMONDS IS NAMED AS ADDITIONAL INSURED AS RESPECTS Automobile —Bodily Injury ,000 each person 000 each occurrence Automobile —Property Damage - $ 000 each occurrence Burglary Plate Gloss ''Includes coverage for the following incidental written agreements: (I) lease of premises, (2) easement agreement, except in connection with construction or demolition operations on or adjacent to a railroad, (3) undertaking to indemnify a municipality required by municipal ordinance, except in connection with work for the municipality, (4) sidetrack agree- ment, or (5) elevator maintenance agreement. Should any of the above described policies be cancelled before the normal expiration date thereof, the Company will mail ... day's prior written notice of such cancellation to the above named Certificate -holder. The mailing of notice shall be sufficient proof of notice. THIS CERTIFICATE OF INSURANCE NEITHER AFFIRMATIVELY NOR NEGATIVELY AMENDS, EXTENDS ALTERS THE COVERAGE AFFORD BY THE POLICIES INDICATED ON THIS CERTIFICATE UNDER POLICY NUMBER. Iff ✓I C i 11 Inst ai ce Agency By Authorized Agent (Agent or Branch Office to send Head Office One Duplicate Copy for each Policy listed hereon) FORM 600-83 ED. FEB. '73 "+s "'YTS• �, #i t'•Y • ff •��r-•"" "•"e.. • 4. + r;+.' sA r rf ._,�p. .e.. w A u�' :�r'�r,"'` •v�, � VV f • �'. a�; �Y 1, 1,T, + •. r: %% 9 • +'�,., '' •}2 ♦., � `' .r � _'±, {Y. •l' 'y I. �,� If ;� i N� + %Y dr � ` • �� �`` � � .rl��6wr �f.. s i^.�� j %� yL.r"p�'4 ,.� # /'.•' \ 1 f � !g^ter t Y �.�'... � . ,. �' t 'T' fit >i�r• t i.. e�Nte.�:wMi y.+��1 �'. ',•� I"jdE. ��'�•'rY^.•.v «Mny✓MMhi•+•*:.rsn4bryM' Y.It.ni•i•H6. ehni`:..'xY,.Ye.7.fivS.�.... 'IErin,q� • .` ' 'iF'•,{1 .Z�,• ` +, Q �i, M by AS IG IS �1� (ift 1�VJtf,,:{ �d '• '. 1 �,i .t S 2�., r I '•row!oa,a'!:y.1,'-u":,ei4ws ` cat, tiL y`!Es •< n F (1■p e+n`�� F. {r ,#. �: ttt1��,. Ty+. IFh J ��t;� ,'. •, . ��� !• +� r 4 t ! J r. Eys`, {l,�Z•r �r�ir} a 1 , !" � t .y °w f - t Y xyi 1i L•' t t. ><; "i-t '' � _ .`• r° %?� - .t �� . , y A i �f .f • tr , � n . ( ! y+ri � �� . t �,��?,.+y „ * ,.•o...,.•...�,w r • t o t r � r ti,,�'r !ezf 4 �- L �Y �� r,. �,� Jam` •�ty,.� � � _ � rr. +er � 9 ���` � 1 ^ p +•,, Y y E �, ly ` ' s�Y �yt ,ty� tr { i i' d�t!•�•1 �♦ �t•;�¢c"�,�� l!�• s .^' 1!T �, ai r?� -( r : r 7 y • 7 `,a .iy !i •• { 4 � 4•ty v���}} i!f �f5J7'1��cte. -fy, i � 5 r Q4s. a.r. "+"V d i.' "' ,J+, 't t i c ! �' f k ti� e h S• t •SIN•. j`'1 rT!• tir ''f !� V� 4 1yjJr 3{ !%k r � -3,E: .,�. a - f-l. -it f• _t .,r {_ '-� ",�,nia+y Z. 'T �t '};� ��y� • � ♦ T M � ! >r t 2} ip 1 l � - J.)' M1 i11 P'� �n itip�►� r.9 !f. ,rS ,4 rtr-- .: {j -t.41 it i -.•.n. -.r .+{.it �' � �`i h ti.'-v' 'j�•i *_ �: h!`'rpl^ �,lRl -`;t !'!- ff 2 f f L 1.•' Y i.• fi •�. � ��f �,, i JA � j . '� y P» •< :{; 1 l.i { •� N�, -x � 4S , ,��k }t`+' 4 L.•A pf ,, J a .-0� i f 5 1 �fd- �tld�cf^T�� J�+ 'Y.' l.-1 'C11 b 1. 1 y •1 �- .f� l �t.i { .�y �b � �r �y 5ii. r+s t4 3 a' - s (. - 2 ..p r{y. 114tS+•.9. �n ����3! y} :. i.: 9 # y; t I 1 r _t1 .� t"4 - J ?• �' �; b i d � T ♦ a ^ E/ "i a f�j�"x° V„' rat k. 2d�,+a•1 ��, (�}•'!' � � � i y, �,:. � riV7l 7:i. `" Zr. F, rl.< < v _rfd_.� '+t��� ffP M-�?�• i �.�.,. 'ty'*ti' y� 8 t' 7•. .�.- .�' t :t. r •. ! 1'n' '<� 3--, .�,"-a. y, �i}��r t dc.,'' �Ay t �f. ��y.p�-:..T�v f+�+r _ �•i '"t i. t '" L -�� v' °��tj-��.i:ai ���.,+;s4. '• r 'y}'}F��'LL `J`^' y �• t 1 f. ti j 1. jii•. <t ;p�•�..�fJ��}'r�'^;U ``y" �• + t .5. y' '' t I f • t y t .oil P.., ♦ h '� , �; . . r rs.. • . � I. _ � }, a. �i p };'��upl,r}'E n r i � . ~~i,� 0. N Oft d `r WAS H I N GTO N' NATURAL GAS 815 Alercer Street (P.O. Box 1869) Seattle, Washington 98111 0 s MR. LEIF LARSON CITY ENGINEER 505 BELL STREET EDMONDS, WASH. 93020 U COMPANY RECEIVED Telephone (206) 622.6767 MAR 10 1976 Gentlemen Washington Natural Gas Company hereby applies for permission' to: Edmonds Engi. u,lt Contract I. R. R/W Appl. Date March 9_ 1976 Appr. Date Install 2" PE IP Main in Main St. from 21' west of the centerline of 2 Av. N., extending westerly for approximately 95'. Per Attached Drawing: 76CO38 Also Install New Service at the following: 100 2 Av. S. 3/4" ST 163.65 ,002 k Work is scheduled to start approximately Atgxch 1976 Construction to require 9p_ days in this area. If this work meets with your approval, please sign and return the original of this form. 1 . u : w�C1rl. WASHINGTON NATURAL GAS COMPANY F 1f. 1 v, "t M. C. McCallum Distribution Engineer EDMONDS PERMIT WASHINGTON NATURAL GAS COMPANY is hereby authorized to perform the work listed above in accordance with their franchise and subject to all applicable state, county, and/or municipal ordinances and specifications. Subject to inspection & restoration. All work to be i c ordance with Qrd. No. 1394-A. A 24-hour notice is required for inspe i For inspection, call 715-2525, ext Date 3/11/76 252 76-37 WNG 688.1 ( 9/72 ) CTTY OF P.D:!ONDS Insp Date. By .................... Tnsp Duic ............ ..... T-.v ................ ... :. inspDate ................ ................. . ....... .......... ........................ Insp Da'e ...... .......... b.) ...... .. ... ..... Fina ...... .... .......... ..A.................. ......... 74B Y... r� 0 -01 �7 PAST SERVICE PRC)P 2'` PE /P MPaIN Lv C 4, s ✓ ti 22'w / S V I )1101 Q' • � J"08 SITE IVC 21' w t 16's 4 1 1 EX?-" S rw /P MAIN h ,v o i BF ST 4/70 ST DAMES ST s17',E Loc-,gTION Iqo 5 c.s9 L E NOTES Ju i f,a`77S _zSZS EXT Zoo POWEFr . 774-Z11I-._...��._.__,._.- S _». - ill - 8- PZ: D.RE- T bURIAL P"P'- NOT�� 4 SAW-c. u T Z' STRIP IN SIDEWALK 8 LAN KET /R No G043 - 3 8 1 2- " PE C-,qP 52ro50 7 95' 2" SOR-9.33 PE PIPE 7o2ro5 6 .95' NO /4 I>IF2ECT BURIAL WIRE e594o 5 1 2 " TR,gnls FITT/n/G -78801 4. 1 Z " SE'/R V / cE TEE H 17Soo '787 / 3. 4" PROTECTOWRAP 66940 2. 6" PROTECTOWRAP 66950 I. PRIMER 70 B 66620 ITEM QUANT. _ 0 E S C R I T 1 0 N I STOCK ITEM BILL OF MATERIAL E R M I T S ` E/�MOIvDs lOGl4- 3�Z5/7G T.=iX Go/DE WASHINGTON NATURAL GAS COMPANY (5E/4 z3 -27-3) AREA EDMO N DS MAP NO 3 6 S „ SDR- 9.33 PE 1 P MAIN EXTEN S IO/V / 00 Z"' AvE S DWN. R LCIAON 3/a /�6 I.R. 6043-3I R. R. JOB 7r. c 038 NO. DESCRIPTION GATE SY APP'0. CHK'D . ,< r DRAWING I REVISIONS SCALE A" :a u, %moo C 038 } is FEND MAIN 3 NOTES • 22'W ¢ /6's • I PA57- SERVICE PROP 2" PE /P Mfa/N /G's 4 w 8� •\ CLs 01 w 2 V I.v 16'S E'X Z" 5-rw /P MAIN A) zr w ? ti oP r 6� ST DAMES 5T i SITE Lac:.gTloN No 5 -,I L E i TOB SITE NO. j DESCRIPTION I DATE I BY I APP'D. REVISIONS i _^ATE As..� � II {L.► { ;:, "ALL t} «77.5- 2525- EXT 26 w P0'0 E R- 7 74 ], LAY our-'Ic-ir ALL PE BURIAL ?'Ipr'.. 4 SAS/-G o T 2" STRIP IN SIDEWALK I I I B LAN KET /R No G043 - 3 I I 9 8 1 2. " PE GAP _ S Z G 50 7 95' 2" 50FZ-9-33 PE" PIPE 7o2G5 G 35' h/O /4 olczECT BURIAL W/RE 85940 51 1 .2- TR,4NS-ITTl"<s 76&01 4 F Z " SE/R V / CE TEE H 175oo 787 / 3. 4" PROTECTOWRAP 669 2. 6" PROTECTOWRAP 66950 1. PRIMER 70 B 66620 ITEM I QUANT. D E S C R I T I O N' I STOCK ITEM BILL OF MATERIAL RECEIVED E R M I T S E� O N1 0 /V 1 6 Edfilords Engr. Dept. L7GR- 3�Z5/7G TAX GO/OE NO. 80 WASHINGTON NATURAL GAS COMPANY (S,E/4 23 -27-3) AREA ED/N1 o NOS MAP NO / '-' 3 .6 S r? I, SDP,— 9-33 PE ) P MAIN ExTEN S 10N /QO ?-" AVE S OWN. R L.€MON 3/a /76 I.R. G043-3I R.R. JOB 710 c 03G CNK'D DRAWING i / SCALE API. , f *0 • • ENGINEERING REQUIREMENTS FOR COMMERCIAL AND APARTME14T BUILDING PROJECTS Name Service Building - 127-Second Avenue S. Date November 25, 1974 STREETS AND ACCESS 1. Right -of -Way Requirements: 2d Avenue 60' existing i Alley 16' existing 2. Road Bed Width: 2d Avenue 40'existing 3. Turn Around: None 4. Sidewalks: Required per City Code 5. Parking Strip: None 6. Access Easements: None a UTILITIES 1. Water Mains: 81' C.I. existing 2. Fire Hydrants: Existing 3. Sewers or Septic Tanks: 4. Drainage: Install all necessary storm sewers and drainage facilities per drainage plan and City Standards. Where drainage is across adjacent private property, all parties having any ownership interest in the lands being developed shall provide, as a restriction on the title running with the land, that the City of Edmonds shall be held harmless from any and all claims for damages which may be occasioned to adjacent land by reason of the construction and operation of the drainage system, unless, releases of damages and/or drainage easements are obtained from the other property owners affected by said drainage. Any drainage problems created by change of contour during development must be corrected.. prior to occupancy permits or release of performance bond. Final approval (or release of bond) will be withheld until actual drainage as installed has been inspected by the City Engineer. .✓ Engineering RequAftmi., for Comm'1 & Apartment Building Pcts - Page 2 ReBuilding - 127.2d Ave. S. m er 25, 1974 5. Utility Easements: 6. Underground Utilities: To be provided in accordance with Ordinance No. 1387. saW—street--li-gt. s.tandardS and undprarnt,nrl *�a TOPOGRAPHY 1. Excavation and Grading: Excavation and grading shall conform to the requirements outlined in Chapter 70 of the Uniform Building Code, latest adopted edition, Vol. 1. Where extensive grading and fill are involved in the development, a grading plan and specifications shall be prepared. QUOTATION FROM THE CITY CODE REGARDING IMPROVEMENTS 11.02.025(f) Utilities and Street Improvements. No building permit shall be issued for the construction of any building or structure of any kind or description unless the plans and specifications include the construction for chrbs, gutters, sidewalks, paved streets, necessary water lines, sewer lines, and storm drainage necessitated by the new construction or improvement, to be built to applicable City standards, provided, however, if found by the City Engineer to be impractical to construct at the time of application for said building permit, construction may be waived by the City Engineer and in lieu thereof a performance bond filed with said engineer to cover the estimated cost of construction to City standards for said improvements, provided further, in areas zoned single family residential at the time of said application for building permit in which the applicant has received final approval for a plat or sub -division and has compiled with requirements therein compliance with this subsection shall be deemed by compliance with the sub -division or plat requirements. COMMENTS Rev. April 2, 1971 Form 5 J 77 'Engineer INTE.-.OFFICE COIOAM.U�,.CATKJS 4 Y To Harry Whitcutt - Building official FORM Al - LITTLE'6 DATE May 20, FROM Bill N{iR3f� `r ,jamIL I:nginaeri.n 9 SUBJECT: Harbor Building - Site Improvement Inspection Per the attached inspection report, all site improvements arc acceptable to this departmenttiexcept one --drainage: Surface water flows to the City Mini Park from the paved parking area. Suggest a meeting on the site with the developer to work out a solution. i c3 74 FORM 41 - LITTLE'B -: INT0 OF ICE :CO MU. ICATIONS DATE May'. 16 1974 J PLANNING DEPT. FROM RECE10 ENGINEERING DEPT. �" BUILDING DEPT. M AY ' 1 G 1974. .. itl R J.tn2r.UCU6- - SUBJECT: Bond for. Site Improvement - Harbor Bldg. 100-2nd Ave. S. Please indicate your approval or corrections requirements on above subject project i.e. drainage, paving, landscaping, etc. In order that we may return their bond. Har ee F I 0 TO Harry Whitcutt Building Official FORM 41 - LITTLE'S 1I�Tk-./_O'FF1'CE CONAMU'NICA I'�NS DATE August 20., 19 74 SUBJECT: Harbor Building Drainage FROM BillNims. Engineering Dept: Per your request;: an on site inspection was conducted on.8/19j74 of:the underground storm system and its abi1 ity to handle surface run -off -from the the Harbor Building property and adjoining alleys. The system meets with approval. ,of th'i s. Department although i t _ s;lioul d `be noted -that downspouts pour roof water -,on the asphalt paving from the. building -directly west of the sub ject`:p'roperty. You might ask the park°department for.�any comments with regards to -water flowing on to the Mini Park from the Harbor Building. WJN:mjr P&jj_u� cc.Af" kwa ry Wou COM COTS WISM CBS s w ft-t.Ms C V (Z,>o S NOTE—, Wmw2 Pvc w I tyG Q� f 5LD& BY WEV s 'fit K6 60TO CATTY PA) Wl (5 0 66MY ^vU*OT 6WM ;. c rrY . ~��{��' I�../ram 1 � �! �� '+"� 1 �.✓��"�'�� �'/ "�Sy�'����� Mj to N• Ca'M6uflagela ndscaping eyed for Harbor Building Ways to `camouflage' the mechanical equipment on top of the Harbor Building, along with a landscaping plan for the overall site, were suggested by the City of Edmonds Amenities Design Board last week. Detailed plans for the work are due to be presented to the design board in a special meeting it called for tonight (Wednesday) at 7:30 p.m. in the Civic Center annex building. The design board was asked to give an informal review to the Harbor Building, but is not dealing with the question of whether the building exceeds the 35-foot height limit. The mechanical equipment City Planner Joe Wallis told the board to look at the building as it is and recommend treatments which could make it acceptable in the community'. He said this meant primarily the mechanical equipment on top of the roof. Wallis referred to a letter to,the city attorney from Harbor representatives which said the review should be concerned with the equip- ment and possible screening, the parking lot off Main St. and the landscaping. He said Harbor had agreed to do landscaping and there would be bonding to insure that this was completed. The board approved a motion by Don Westlin to have Harbor come back with specific details regarding landscaping and a method of painting or camouflaging the mechanics on the roof. A complete color scheme is to be submitted. Bruce Beard, president of Harbor Con- struction Co., and Richard Kelleher, attorney and Harbor vice president, appeared before the board. Beard said they wanted to propose screening of the metal duct work on top of the � building to obscure it from view. He said they had in mind a slated steel screen three feet-' nine inches tall. However, several board members felt this type of screening would not do the job. Some felt it would have the effect of `adding still another floor' to the building. Planner Wallis asked if all the equipment could be put on the third floor. Board chair- man Margaret Bernhoft also told Harbor that `it would be to your benefit' if that could be done. Beard said, however, that `it wouldn't work'. He said there would be horrendous problems in trying to put the equipment inside the building. Sound control would be a problem and there would be problems `duct - wise and electrically' trying to relocate the equipment now, Beard said. He reitereated that they were interested in screening. Board member Keith Goldsmith said it would be better to paint the equipment. "If it was screened it would look like a square box," he said. Goldsmith also urged landscape treatment of the parking lot to screen it from view on Main Street. He asked for a detailed plan with plants named specifically. Mike Rizzuto, another board member, said, when the discussion turned to the height of the building, the board's concern was with screening and landscaping, not the legal question on height. Speaking from the audience were Dr. Jim Mueller and J. Ward Phillips, citizens who were among those first raising questions about- the Harbor Building. Dr. Mueller said their research concerned whether city codes were being enforced and the Harbor Building was one of several cases brought up. He urged the board to suggest amenities which might modify the building. Phillips commented that there were many things which Harbor could do with land- scaping along the sidewalks and in the parking lot to soften the impact of the building. He felt painting the roof equipment rather than adding a screen around it would be best. Another project The design board also reviewed another project to be built by Harbor Construction Co., the Alaska Publishing addition on 2nd Ave. S. Harbor presented revised plans which they said would be compatible with the other building. The board approved the new plans and board member Mike Rizzuto, in making the motion, commented, "You have gotten away from the metal warehouse looking building." Detailed landscaping plans are to be submitted later. • Amenities Design Board - April 3, 1974 - Page 2 ADB-26-74 ADBADB_ Robert Holt (continued) Mr. Rizzuto stated that he felt the project would be an asset to the City of Edmonds, however it was the responsibility of the Board to look at the overall picture.of the product, inclyding the landscaping and screening of the parking area. MOTION MADY BY "R. RIZZUTO AND SECONDED.BY MR. GOLDS"ITH, THAT APPROVAL OF REMODELING OF THE BUILDING BE -GAMED -SUBJECT JO P4R. HOLT BRINGING INA LANDSCAPE PLAN SNOWING'HOW ADEQUATE SCREENING, IS PROPOSED WITH LANDSCAPING OR ANY OTHER METHOD FOR THE.PARKING ELEMENT, AND REVIEW OF THE PROPSED SIGN', EMOTION CARRIED. Lai Awl Harbor Construction. Review of Hagar.:Bui lading ,at 2nd and Main. Review propose screening of,mechanical equipment on roof and landscaping. / Mr. Wallis -,stated that ADB-19-74%wa's:on ,the agenda as a result V of a motion at the March 27, 1974 meeting that Amore detailed plan for screening and landscaping.be, presented. Mr. Wallis showed; slides of the building And.the mechanical equipment on the top, stating that M1r. Beard had delivered landscape plans and a color collage to the,Planning Department on 4-1-74. Mr. 'Wallis reviewed the minutes of the .March 27th meeting pointing out that there was some question whether'the..proposed screen Would be adequate since it is 3'9" and the equipm6h t is s„me 5 ft. high. Mr. Beard .referred to the color coll age and 'Stated ;that all the equipment on the roof would be';painted..the dark anodiied color. Mr. Beard further stated that he had -:quest. ironed the architect. about the proposed. 3'9" screen.'and .found:that:. the screen was to cover just the duct. work which is aoprozimately.3 ft. high. '1r. goldsmith stated he :did not feel. that the screen W6UId be, the ansWer as. it only adds. to, what is already there. Mr. Rizzuto .stated that he did not necessarily object to the screen :but. did iike the proposed plan that. all the equiprrieht, be painted. There was, .'general discussion regarding the mushroom ducts and the problems that may be encountered when painting. h1OTI,0N .MADE BY ►1R. GOLDSMITH TO ACCEPT THE PROPOSAL FROM A DESIGN STANDPOINT ONLY, TO PAINT ALL EQUIPMENT AND DUCTS ON THE TOP OF THE BUILDING THE DARK ANODIZED COLOR. SECONDED BY MR. RIZZUTO. MOTION CARRIED. Amenities Design Board - April 3, 1974 - Page 3 . ADB 19-74 Harbor Construction (continued) /Item 2 to be discussed was the landscape plan for'the Hagar Building. Mr. Beard stated -that -they purposely did.not-size the, plants and felt that the Board, would .like to. go over the plan. Mr. Beard presented his recommendation with reference to the size of plants and shrubs to be used. He stated thWthe flowering or color plants would be changed with the season. Mr. Goldsmith stated_ they must. size the plants before the plan could be approved. His recommendations were as follows: - Italian.•Cypress'7-8 ft.; Rosebud Azaleas 18-24 inches; Vine Maples.12-20-feet in clumps; Flowering Cherry 1h to 1-3A calibre; Pines .3-4feet Heather, gallon size. MOTION MADE:. BY MR. GOLOSMITH, SECONDED BY MR. - RIZZUTO,. THAT THE LANDSCAPE.PLANS BE APPROVED AS MODIFIED. MOTION CARRIED. Amenities Design Board- March 27, 1974 - Page 2 � ;ram b. 6-74 J. Ward PAilltos. Fifth and Day' ton. Signs for Old Mill Town. Mr -.Wallis presented slides of the proposed sign locations stating the area is zoned BC. Circulation.acoess is on 5th Avenue, a caamunity arterial: Statement of design intent is identification and character signing for complex of retailing establishments in Old Mill.Town: Analysis was done and signing does fall within the code. Mr. J. Ward Phillips presented drawings and graphic designs of the .proposed signs and their locations. All signs would be of wood•or on the buildingg Mr. Phillips 'pointed out that all proposed signing was within the code requirements.: ,He also stated that the signs -had been designed.to keep with the theme of the Old Nil I, Town. ; A, NOTION WAS MADE•BY:MR. WESTLIN, SECONDED'BY MR..RIZZUTO, THAT ADB-16-74.BE APPROVED AS. PROPOSED.- NATION CARRIEO.UNANINOUSLY. C. ADB-17-74 Rich O'Brien. Sign for Harbor Building, 100 2nd Ave. Mr. Wallis shbtied:slides of the Harbor Building at Main:,and 2nd. pointing out location of proposed project for sign to identify i buildingSign would be located near main entry.dcor. Mr. Wallis also ponted out the brick:paving that had been done at -the recommendation, of the plan the staff submitted -and agreed•io by Harbor Construction.. Documents from Mr:' O'brien indicate type of sign to be used. Mr. O'Brien had pictures of his work and pointed out to the Board the type of sign to be•used would be wood, 4 ft. across, stained in transparent blue with rustborder and lettering. 'This sign design,is low key which is appropriate for. downtown Edmonds. MOTION MADE BY MR. WESTLIN, SECONDED BY MR. RIZZUTO, THAT ADB-17-74 BE APPROVED AS PROPOSED. MOTION CARRIED UNANIMOUSLY_ d. ADB-21-74 Dean Echelbarger, Sign for Plat of Somerset. Bao - 9th 'Ave. North. Mr. Wallis presented slides of the area pointing out that.Somer§et is a subdivision approved by the .City of Edmonds some time back. The proposed project is -an identification sign for, the project.' J Zone is RS-12 and circulation access.is on 9th Avenue:N., a (� community arterial. The design intent is identification of a subdivision on a cul-de-sac street. Jir..Wallis also noted that layout of the subdivision indicates a good deal of.sens.itivity has been paid to the subdivision and the sign would probably be an asset. Mr. Wallis also stated that in this particular case:we are in a somewhat vulnerable position because neighborhood signs or identification signs are *hot specifically regulated by the City of Edmonds. He felt particular attention should be given to the matter so that the applicant knows exactly where he stands. �► Amenities Design Board - March 27 1974 - Page 6 j • AM-19- ��d a Harbor Construction. iew of.Hager Building at 100 2nd �venue out and Main) � `�. / ►ir. Wallis showed slides of the Hager Building at 2nd and Hain asking the board to take the building as it currently exists and make recommendations for treatment to the building to make it acceptable to the community. He showed slides of the equipment on the top of'the building pointing out a 5 foot pole placed against the equipment to show height.. Applicant has agreed to landscape plan and would become part of the project. Mr. Goldsmith asked Mr. Wallis to clarify the position of the Board. fir. Wallis stated that at the time this plan came before -the City and the Council therewas some,question as to whether it Was. in. compliance with the height regulations and there was some question whether Alaska Publishing met the use regulation. There was an agreement on the part of the applicant at that time that the. Hager Building.would be submitted for informal review And -the Alaska Publishing would be submitted for formal review, and thereisanother building that has'noi been submitted to the City for application for building permit or review by this Board. Mr: Wallis restated,that the Board is being.asked to take the building as it exists on site at present time:and recommend Any treatment that applicant install that would make the.building acceptable with primary regard to the mechanical equipment on the roof.. Bruce Beard representing Harbor.Construction, presented plans for a proposed screen to cover the mechanical.equipment. 'The equipment consists of three mechanical. units and the. proposed screen would be some 3 feet high placed at a slanted angle and would enclose the middle.mechanical unit. Mr.. Westlin pointed out that the two units to the north and south would still be visible. There'was general discussion regarding the practicality of screening ,just the middle unit and whether a foot screen Would be adequate. Mr. Wallis asked.about the implications involved in placing the entire mechanical unit on the third floor. Mr. Beard responded ;that it would not be feasible at this stage a'nd would be costly. The question of whether or not the building conformed to code regulating height was raised. Mr. beard statedthat the plans had been reviewed by the Building Department.and Planning Department as they progressed through stages of development. '1r. Wallis stated that drAwings submitted to the .City.for height review did not include the mechanical equipment at ,the time they were reviewed. Also, elevations that we're rev"ievied for height did not include mechanical equipment, and mechanical equipment had not been discussed in relation to height regulations. Amenities Design Board - March 27, 1974 - Page 7 J. ADS-19-74 Harbor Construction (Continued) iir. Beard responded that mechanical eQuipment did appear in drawings presented to the Building Department. / 4r. Mueller, a member of the audience and spokesman for a v community group, stated that research had.been done of several buildings.in Edmonds to determine whether or not they were in compliance with City Building Code requirements. He stated that he felt the Amenities Design Board should not be involved with the legal aspects.of the Hager S uilding but it was his understanding that the Council referred this matter back to the Board for the.amenities'design as'it exists. and as it might be Modified to meet the. amenities design in -Edmonds. Chairman.Bernhoft asked if there.were any councilmen in the audience.to respond. Mr: Kenneth Welling from the Council,, was yn the audience and stated that.he could not give a statement on the action or recommendation of the. Council.with.regard to the Harbor. Building as he did not have.the minutes of that meeting'writh hi m. fir. Kel.lerher, Attorney and Vice President of Harbor Construction, stated that he felt the Board should address itself fo the landscaping, the screen and recommendations .to the building as it exists no -a. Mr..j: Ward Phillips stated that it was also his understanding that'the•Board should only be concerned with.the.buiIding as it exists and whether or,not there are recommendations for treatment to make it more acceptable. 4r. Phillips also stated that he felt the screening on top of the building.should be at least 5 feet high and screening should cover entire roof area. He felt landscaping and the. parking lot 'should be, of prime .concern and that Harbor Construction should come back with answers to questions that have been raised and present alternative plans for screening and landscaping. Mr. Wallis read from a portion of a letter from Chet Bennett, who represents Harbor Construction, addressed to John Wallace, City Attorney, which stated that on an informal basis the Harbor Construction Company would meet with the principals involved in the Amenities Design Board for informal review of the ,problems.raised concerning the,various questions of the Hager Building. Mr. .WaIIis suggested that the .Board consider.ask Iing Harbor Construction to come back with recommendations or proposals on the three major questions raised;._(1) equipment. on top of the building; (2) roof screening, and (3) treatment of the parking lot as it approaches Hain Street and landscape plans. There was general discussion regarding the landscape 'proposed with reference to the 8%.requirement for parking area landscaping. 110TION MADE BY MR. WESTLIN THAT ADB-19-74 BE TABLED UNTIL APPIL 3, 1974, AT WHICH TIME f40RE SPECIFIC DETAILS JF SCREENING,LANDSCAPING COULD BE PRESENTED. !NITION SE011DED AND CARRIED. fir. Wallis suggested that if there were any paint or color schemes involved for the roof area that complete color samples also be presented. !1r. Beard stated he would have the material available for reviw by 4-1-74. r s ign rd - March 27, 1974 - Pac* • kc ADB-20-74 Harbor Cone-truction. Alaska'Publishing. Review of -printing, bindin a— ndstorage building at 2nd and Dayton Mr. Wallis presented slides of the existing building and proposed site for,addition. Zone is BC. Mr. Wallis stated that at the last meeting there was a request that a more specific proposal be made with sortie changes .in the treatment of the building to make it more compatible with the adjacent building and that more specific landscaping material be indicated in a plan. Mr '.:Beard presented drawings indicating the proposed building would be attached to the existing building utilizing the wall of the existing building - There was. general discussion regarding the treatment of the face of the building, parking,ond landscaping. Mr. Goldsmith raised the question of whether this type of business was permitted. Mr. Wallis stated that it is a permitted use. 140TION MADE BY ►iR. RIZZUT% SECONDED BYMR. WESTLIN', THAT ADB-20-.74 BE ACCEPTED WITH THE STIPULATION THAT ADDITIONAL LANDSCAPING INFORMATION.BE PROVIDED. MOTION CARRIED. I. ADB-23-74 Don Finnigan. 10 unit condominium'at 523 tiaple St. Final Review. Mr. Wallis._presented slides of the 'proposed construction site for..a resiAential condominium structure. Zone is RMH. Was approved on a preliminary basis at last meeting and•this is i final review: Landscape plans and final plans are available v for review. There was general discussion with.Hr. Finnigan regarding landscape design and lighting. There.was also considerable discussion regarding the alley and proposed driveway. Hr..Phillips stated he was concerned with the proposed drive and the fact that there were no barriers to protect the wall along the drive. After considerable discussion,Mr..Leif Larson,. City Engineer, stated he felt the matter of the drive should be studied by the Engineering Department with regard to safety aspects. Pir..Phillips requested that the Board request that the Engineering Department review the alley access and the safety hazards that might be involved. P10TION MADE BY MR. RIZZUTO, SECONDED BY MR. WESTO N, THAT ADB-23-74 BE APPROVED WITH RECOT4ENDATION TO THE ENG,INEERING., DEPARTMENT THAT. THE ALLEY ACCESS BE CLOSED AND THAT LANDSCAPINr, DESIGNS BE RESUBMITTED. MOTION CARRIED. �H 19, 11974 MEETING MINUTES Councilman Welling stated that he would not vote on this matter because of a possible conflict of interest. The motion was then voted upon and carried. Councilwoman Shippen noted that when the new domed stadium is finished, the King Street Station will still be there, along with the railroad tracks leading to Edmonds, Mukilteo, Everett, etc. She wondered if anyone had considered the possibility of a recreation train to transport people to the stadium. Mayor Harrison said that he would not encourage this as he would not like to see Edmonds become a large parking lot for this purpose. This.was discussed briefly. Councilman Welling reminded council that on January 15th he had made a motion that the City commence an injunction action against the owners of the Harbor Building to enjoin them from finishing and occupying that building. He reviewed events that have taken place since that time. He thought now was the time to decide if we are to carry out our previous resolution oramend it. He therefore, MOTION: MADE A.MOTION THAT THE CITY REAFFIRM ITS POSITION TAKEN AT THE JANUARY 15th, 1974 COUNCIL MEETING TO THE EXTENT THAT AN INJUNCTION ACTION COMMENCE AGAINST THE .HARBOR BUILDING AND THE OWNERS THEREOF AGAINST THEIR OCCUPYING THE BUILDING, AND REQUIRING THAT THEY RDOVE ANY STRUCTURES THAT MAY EXIST IN VIOLATION OF THE HEIGHT LIMITATIONS AS CONTAINED IN THE CITY ORDINANCE. THE MOTION DIED FOR LACK OF A SECGND: Capt.Shields commented that he thought it would be ridiculous to stop work on a building when it is this far along. Mayor Harrison'read a letter that he had received from the Ward Phillips Co. Mr. Phillips requested permission 'to have five railway luggage carts to be placed on various street corners downtown. They would be selling arts and crafts, coffee and.cold drinks; flowers, etc. Mr. Phillips had suggested that DECA classes from the five local high schools each be assigned a cart to operate as a business project. Mayor Harrison thought that this would be a council matter,. and thought perhaps it.would be advisable to circulate a petition among the downtown businessmen to see what they think of the .idea. Wand Phillips, who was in the, audience., agreed that this was a good,suggestion. In reply to questions from council, Mr. -Ph that•the carts would be on the.sidewalk MOTION• and would be' taken in each night 'and stored•at Milltown. A MOTION WAS MADE BY �D J&.QQUNCILMAN NORDQUIST AND SECONDED BY COUNCILMAN ANDERSON Ta EL4GE THIS MATTER LAP ON THE AGENDA FUR DISCUSSION AND ACTION ON APRIL 2ND. City Clerk; Irene Varney ran, stated that this would be handled as a concession fora given time at g period of given locations. Councilman Gellert asked that the.City.Attorney check franchise. chise. MOTION WAS THEN AUDIENCE PARTICIPATION Jim Mueller expressed concern over the motion made by Councilman Gellert earlier which restricts audience participation during the council work sessions. He thought that if there is a situation occurring in the City of sufficient magnitude, it should be possible for the citizenry to bring it to the council at any time. ,Councilman Gellert pointed out that the citizens have the oppor- tunity to bring matters to council attention three weeks out of the month, whereas in the past only two council meetings were held each month.. He thought that it was very important for the council to have the one week,per month set aside so that they can discuss lengthy issues among themselves. Mr. Gellert also pointed out that these meetings are held in a large area where as many people as possible can attend to hear them deliberate. Capt. Shields asked who had issued the stop work order on the Harbor Building. Building Official, Harry. Whitcutt, answered that it was issued by .the Building L/. Department and that it was not council action. Mr. Whitautt said the stop work order was issued because of a violation of the occupancy provisions. EDMONDS OOUNCIL MELTING MINUTE.", MARCH 19, 1974 -3- Chet Bennett, who said he was speaking on behalf of Richard Kelleher and Harbor Construction Company, asked that the council authorize the building inspector to issue a Temporary Occupancy Permit for the Harbor Buildingi, Mr. Bennett described the events leading to a stop work order being issued by the Building Department. The tenants did vacate the premises. Subsequently, the structure was inspected by the Building and fire Departments and the State Electrical Inspector and.found to be in satisfactory compliance with the life safety provisions of the City Codes. A letter from the Fire Department and a memo from the Building Department stating these facts were read by Mr. Bennett. .Councilwoman Shippen asked when this matter was scheduled to come.before the Amenities Design Board. Mr. Kelleher stated that they are on the agenda for the next meeting. Following some further discussion, a. MOTION: MOTION WAS MAIZE BY COUNCILMAN NELSON AND SECONDED BY COUNCILMAN WINTERS THAT A',TEMFORARY.000UPANCY PERMIT BE GRANTED FOR THE HARBOR BUILDING. COUNCILMAN WITH BUILDING CODES AS OF NOW". THIS WAS SECONDED BY COUNCILMAN WELLING. During discussion that followed, Councilman: Gellert 'asked the City Attorney if the 'issuance of the Occupancy Permit could prejudice the City's case if this matter should go to court. Deputy City Attorney, John Wallace referred to a letter which had been delivered this date from Mr. Kelleher's office.wherein they "ct.ipulate. that .they will not assert any defense arising out of receiving the.permission for temporary occupancy. Mr. Wallace read ihe.letter from Mr. Kelleher into the record. Councilwoman Shippen.asked Mr. Bennett if tie will have comments to offer when .the Uniform Building'Code.comes`up for revisions. ale replied that he will. be glad to help. The amendment was voted upon and carried and the motion as amended also carried. Dave Larson inquired about.the landscaping for the Harbor Building. City Planner, Joe Wallis, stated that Harbor Construction has agreed to comply. with a landscaping.scheme suggested by the City.. Mr.•Whitcu.tt said that Ordinance #1610 requires that a bond be posted prior to issuance or a permit to insure that the- landscaping :is provided. He said we do hold that bond from Harbor. CORRESPONDENCE Deputy City Clerk, Eleanor Quealey, read a letter from Peter'D. Fay, �41 Paradise Iane, wherein he requested that the City permit ;iim to.rign a 180 �day promissory note for the $550.00 sewer connection' fee to connnct him to . the City system. Attorney. Wallace stated that..it .is prohibited to lend the Cityis credit. I'oll.owing further comments by the.attorney, Mayor Harrison stated that he will. look into the matter personally. HEARING: ON PASSAG[i; OF S!lBbIVISJON ORDINANCE City Pl.am;u.r, Joe Wallis, reported that tits Subdivision Ordinance liar; been rent down to ttii� Ut't'icc, o.t' Community Development at the State l(.?vrl for review, but nothing hair been Beard from them. lie said there Tian, t,e,crn come le�;isl.ation passed Since tl;c ordinance was drafted and there .will. bo :in Milo . rug process going on- I'olaovii.ng :;ome discussion, 'tire Mayor declared t!.(, hearing open. No-: MUTTON: one wished to speak, so the hearing was closed: A t•10T.1Uf1 WAS WE by C0;iNC1IMAN NEI:SON AND SECONDE) Bi' COIJIJCILMAN NORDQJIST TO PAS:; URll.i,lANCE ?','l jUj�. ADOPTING RI;GUIJI'.I':IUIJS 1tF;1 A'Pl.lA) 'i0 PLATTING AND SUBDIVISION OI!' 1AND. '1' JiOL.LOWING A BR1EF DISCIC;S1.011, E 1�10`fl.0t+ WAS VCyrED UPON AND CARRIED. 19714 :p;DNONIDG, ANJ' J-E;'.l':f.VAL - PRESENTATION BY W. (' SEia.,Fk0' P'RESIDFNT Mr. Walter O'clAor:;:Stated that the Board of Directors of the Edmonds Art Festival liar; sul;i�euted tl,at they .investigate the ponsibil.i:ty of nloving the ('sell via. i'r ors tl;-� C i v i r, Center to a site euc6r1lpa:3G-i irg the. Mac301i:i a Temple and Old IN i 11 tow". Ile ;;a i.d they have !lad electrical problems;; r;torr3ge and space proldom.,i, and tills is the reason they are proposing thit; move. Mr. Sellers vaid that it' thoy do make t!Lis move, i.t will he rrect-osary to cl.oac Dayton 000 MOTION: n Q lib -4- EDMONDS COUNCIL MEETING MINUTES 14ARCH 12, 1974 suggested that council approach the PUD for changing the formula A, MOTION WAS MADE BY COUNCILMAN ANDERSON. SECONDED.BY COUNCILWOMAN SHIPPEN TO REDEFINE THE UNDERGROUNDING POLICY. ON AN ARTERIAL BASIS, INCLUDING MAIN FROM THIRD TO SIXTH, BASED ON NEGOTIATION FOR A 50-50 FORMULA, AND PRIORITIES TO BE ESTABLISHED FOR ARTERIALS AT THE MARCH 26 MEETING. MOTION CARRIED. The LID and other procedures were then discussed. At this point, Councilman Nordquist stated that the hour was late; that there were several items on the agenda; and that the presentation on agenda item `,,p N8 would take some time. He therefore suggested,postponing this report on the ;f°' d water system for two weeks, since Mr. Kennedy would be in New York next week. w� ! Councilman Gellert said he was concerned with the time factor on this item; that it was in regard to a formula for bonding, and A time lapse might jeopar- MOTION: }° dize the entire project. He .therefore MOVED, SECONDED BY COUNCILMAN ANDERSON fi THAT AGENDA ITEM N8 BE TAKEN UP NEXT, 4Jim Mueller, in the audience, asked about the rumor that -the Harbor Building was occupied, and asked if.an occupancy permit had been issued. He wanted to know the status of this. Harry. Whitcutt explained occupancy permits, and 1 stated that they were included in the Building Code. It had been reported that IV / someone was occupying the building now: and doing. this without the 'permit having v/ been issued. He had indicated this to the builders, and then had advised the City Attorney. Council discussed this problem, and stated opposition to any form of temporary occupancy permits. There was discussion on this violation ' by thellarbor Building owners, and council advised that the Building Dept. enforce the city ordinances: Councilman Gellert stated that there was a motion on the floor,.and it was out of order to discuss other subjects until vote was taken on the motion. "Upon call for the question, the motion carried: REPORT�ON�WATER SYSTEM City Engineer Leif. Larson reported on the. water system plan, bond issue and /water rate study., Copies of the comprehensive water system "plan, 1973 were distributed to,council. .Engineer•L"arson stated that the plan ;has been.re= viewed by the Dept. of Social and :Health Services, and the estimated cost of the improvements as indicated on the plan during a four-year period is.in the amount of.$3,100,000. He was submitting this preliminary water system plan for,council review and approval. He noted that applications for grants under Referendum 27 had been made, and the pre-application,notices have been cleared by.the various reviewing authorities and they indicated that the city is. eligible for submitting projects under Referendum 27,"and these should be submitted by April 1, 1574. Engineer Larson went'on to.say that the Engineer- ing Dept. is in the process of completing and submitting the applications for state assistance based on the.water plan for storage facilities at Five Corners and Seaview areas and water transmission mains. He stated that a water rate study will be formalized and submitted to the council with recom- mendations, including a proposed water rate ordinance by the work meeting of April 9 . Dick Kennedy, Seattle Northwest Securities, made a preliminary report on the bond issue. lie noted that he. had helped with the study to assign various rate increases in regard to'the benefits derived,.and that these documents will be.furnished on April 9 with the rate structure. Mr., Kennedy advised council that the municipal bond index seemed to indicate interest rates trending upward, and timing was. important to -'go to market with the bonds as soon as possible. He explained that the amount of the new'debt would be greater than the old debts; that all the old debts are first lien bonds; and that he would suggest the new bonds be sold on a second lien basis. There 1.r -',`7 ' ONDS COl) � MEETING MiNUTES ,RUARY 12, -2- t AerIY V" There followed discussion on structure and building materials. Councilman h'elline said he was concerned with an emergency situation here, and wnether it was. ne merely a frustration to Mr. Roy, Paul Roy admitted that it was more: frustrating than financial to him personally, but that 'it. was a financial concern to the owner of Anchor Boats, who was in the audience and who assured council that' he was IQsin(I approximately $14,000 i.e'r.oronth because of financing of the proposed building and? because.of not: enough ,covered area under which to repair boat, in winter weather'. Following some further discussion, a motion was made by Councilman Anderson, seconded by Councilman Winters that an exception be granted to Paul Roy from the. building moratorium for the building at Anchor Boats, and he be allowed to apply ? for a building permit with plans as presented. Motion carried. 1974 EQUIPMENT RENTAL RATES Director of M. A 0, Ptibl'i.c Works, Herb Gilbo presented the 1974 equipment rental. rates for acceptance by council. He advised that this is a rcn,tine matter, re- qu i rod by urd i nanr_e. copies or the rate:, had been d i s tr i bu tc:d to council ,•, and . �. Director GiIbo explained these rate: for clar•ificaLion of council members and answered questions pertaining to overages and/or deficiencies, and hoer this was arrived at and handled. : A motion was made by Councilman Gellert, seconded by Councilman Andenon UK the 1974 equipment rental rates be accepted and approved. I= am carrieiY SE1 DATE FOR HEARING ON SUBDIVISION OROINANCE As nuygeq,ted, it. was moved by Councilman Gal IorL, noconded by CnunCilnun Andrlr-mn that March 19 he net a5 the Jate for.heori iq on 1,assaqLi of rru cised Sub-. divi-.ion Ordinance, arise urotion carried. . C APPLiCAlION 10 STA71- I1TIUTKS & •iRANWO.0ATION COMMIS;10h1 FOR RVOuCTION OF IJ IRAIN 1.0.1J) IMI`f M.._ _.._.. .. y,`, ! •�"• Council had pre.vlously some months ago moved to set a train `.speed limit of 25 miles per hour within the city limits of Edmonds. Authorization. was now being asked to apply to the Uti lities A Transportation ComOsdon, and fmotion way therefore made by Councilman Gellert, seconded by Councilman Winters that the . ,1v Mayor be authorized to -apply to the State Utilities A Transpnrtation ingp scion N for a reduction of the train speed limit to 21 miles per hour as stated in.a prior ordinance. Motion carried. 1P,P 1 1 ,. WRIiTEN PROPOSAL FROM HARBOR CONSTRUCTION COMPANY City Attorney John Wallace explained to council ihat prirsuant to his request at Lhe couric l mectiuy last Tuesday, the p.ri,pi.,;al of llarl,or Ctnrst.ruction f.,f,mpany . �� ri:'I;trding submitting of proposed con;t•r'untiop projoc", as well W rui infernal' ;utmi;:ion of the qui!sLion; of i:he building at Second and Main, to the Amenities; Design Board for review, had been reduced to writing. The proposal in the letter listed three points: (I) that Harbor Construction and its client, Laebugten Wharf, will submit its proposed construction to the ' jurisdiction of the Amenities Design Board for, us consideration, but not to preclude the normal appeal from that Board to the council, as set forth in the ordinance; (2) Harbor Co. would meet' with all principals involved in an Am informal review of the problems ririsr>d concer'niny the various questions or thr Harbor Building at Second and Main; and (3) As orally outlined at the (Wevious council meeting, it was indicated that the propnsed.Alaska Northwest building would be submitted to the ADB, but Mr. Bob Henning, the uwner of Alaski Pub- lishing, is on a trip and cannot be contacted in regard to this. The letter stated that they could informally reviei; this with the-ADB, and come Lip with some proposals that they Peel will he aclr•eeable to him on his return, but Mr. r OF# OtMOiVD`i COUNCIL MEETINk MINUTES E RUARY 12, 1974 -3 Krl'l01rfr� ttor neyamfor ►lafr6or 4'rrnstrtit i.lun, whO irrit, in k.Ire riurllrrnrt�, ,I.�tr;CJ t,irr+t rr cuuld not, hind tYiedi to this. Ili, (lid reel Mot there w�rs, no rr�sorr to doubt that Mr. Henning would agree, but he nevertheless did not have authority to put this in writing to commit Mr. Henning. Discussion followed, arrd the.City Planner remarked. that he had indicated to the owner that this building is classified as a warehouse, With no windows, no floor, and too facilities. There was a great deal of discussion, and Attorney Wallace advised that it was his recommendation that the city proceed on the basis that both buildings (warehouse and wharf) be required to be sut,witted to the Amenities Design Board, and the building at Second and Main also be reviewed by the Board. 'Following Attorney Wallace's statement regarding the wharf building, Attorney Kelleher agreed that it was mandatory that Laebugten Wharf go through the process of the Amenities Design Board. There was discussion of the withdrawing of the company from .representingg the client in regard to the matter involving Mr. Henning. Attorney Wallace, speaking about the Harbors Building's review by th(! ADB, stated that while the review of this would not be binding, the city would nol. pre- Judice its rights regarding the problem, and the proposed, recommendation would not Jeopardize the city's position in the matter. Councilman;Welling said he felt the harbor Building deserved full determination of whether or not it complies, without any use of the warehouse building with which to bargain: He also mentioned that the city should make some record of not being interested in; any withdrawing of any' of'the principals. After some further discussion,.a motion was made by Councilman Anderson,. seconded by, Councilman Welling that through ourattorney, we communicate to Harbor Construction our acceptance of Points 2 and 3 in their proposal, contingent upon written concurrence by Mr. Henning on his return, that it be a mandatory re- ferral to the ADB as to his building; and further contingent upon the understanding that the decision of the. Amenities Design Board on Point 2 binds neither, party; and further contingent that this is unrelated to any proposal that Harhrir, would r,akc° in relation to withdrawing fro«n representing Mr. Henning's interest. Motion carried. f1ISt:USSI ONOF PROPOSED.�PARKS p COMPREHENSIVE PLAN Uirector Rod Garretson explained that the proposed parks comprehensive plan must be, approved by the council before it can be sent to the IAC:. fie asked that council take the copies distributed tonight and give him'any input during the week so he can then include`thesr suggestions and a final drraft be made for their approvei at next week's council meeting. He stated that the It1C.must have this plan before taking steps for Seaview and Sierra parks funding`_ Following discussion on the widsom of asking IAC for, an extension, it was decided to place discussion of the parks comprehensive plan first on the February 19 agenda. REPORT ON APPRAISALOF BROOK) CRFS AND DISCUSSION 011CITY INTERLST IN ACQUISITION DirectorRod Garretson reported that .council �had viewed this property. He stated that the original estimate of $360.000 was the indication froth the property:cw.ner as her selling price for city acquisition. The property had now been appraised, and further. discussion was to be held for executive session following,this meeting. DATE SET FOR OPENING BIDS ON OFFICE FURNITURE Mayor Pro tem Juhn NOhiquiit advised that a'tthe-,lsitt mecting,�CoUn4i"I had nrrr mover#' to a;ithr,rrize opening (fate for bids on the office furniture � A memo with date,, had been furnished by fire Chitf Cooper, as Purchasing 'Agent., Covncilr;ian Anderson made the motion, seconded by Cotjnc'ilMan Winter! that March 12 be set as the date for opening of bids for the office furniture, and the motion carried. COUNCIL PARTICIi7ATION Councilman Gellert brought up the matter of-Stw+eet Use {aeriirits_ coming before council, y' rQ and felt that now with the Amenities Design Board, he would propose eliminating the AM' 01 • • MINUTES OF EDMONDS CITY COUNCIL MEETING FEBRUARY 5, 1974 ROLL -CALL (P The regular meeting of the Edmonds City Council was called to order by Mayor Harve Harrison with all council members present except Nelson, who arrived 6 at 7:50 PM. APPROVAL OF MINUTES Minutes of the council work meeting of January 29 had been posted, mailed and distributed, and with no omissions nor corrections, they were approved as written. APPOINTMENT TO BOARD OF APPEALS - INTERVIEW OF EARL MORRIS Earl Morris, architect, was interviewed by members of the council. .Following this, a motion.was made by Councilman Nordquist and seconded by Councilman Winters to confirm the appointment of Earl Morris to the.Board of Appeals. Carried. COUNCIL PARTICIPATION Councilman Nordquist asked that the CDC Minutes indicate who was present at the. meeting. Councilman Nordquist asked the Fire Chief if anything has been done with regard to the accident claim for the aid car. Chief Cooper answered that the file has been turned.over to the City Attorney. .Mr..Wallace said that he has just reviewed the file and he briefly explained what has taken place to date.. Councilman Welling inquired about minutes of the Board of Appeals Meetings. Building Official Whitcutt,stated.that the_ Building Department secretary takes these minutes. A motion was made by Councilman Welling and seconded by Council- woman Shippen that council request Building De artment to furnish the council 1 members with,copies of the minutes from the ar of Appeals Meetings. arried. Mayor Harrison announced that the Capital Improvements Committee Meeting which Co>ncilman Gellert stated. that he was absent from`the last meeting of the h Classification Review Committee, and that he would like to have minutes of that meeting. M.A.A. Whaley said that he would Provide these. T,v W Mayor Harrison said that the members of'the Blue. Ribbon Committee were anxious to get started and he asked that Councilman Nordquist set a date for the first meeting of that committee. AUDIENCE PARTICIPATION Jim Mueller asked if there would be a report on the Harbor Building.. Attorney Wallace.stated that at .the last council meeting Chet Bennett had made.a proposal on behalf of Harbor Construction Company, and that the council had indicated that' they would like to consider that proposal. This proposal was an agreement to submit all three of the proposed buildings to be constructed by Harbor. Construction to the Amenities Design Board for review. This was with the stipulation that the two new buildings,.Laebugten Wharf and the Alaska Publishing Warehouse, would be subject to the new regulations that are proposed for the Amenities Design Board. Neither party would be bound by the, Design Board's' review as to the 'existing IIIarbor Building and either party would be free to pursue whatever course of action after that review by t'a Design Board as 'to the Harbor Building that they felt they should take.. Following further discussion on this, a motion was made by Councilman Gellert and seconded by • 0 Councilman Anderson to r the Hager Building to re ,ti �.r�• the city accepting the o writing by the next coun EDMONDS COUNCIL MEETING MINUTES FEBRUARY 5, 1974 A,.,,pAf +he representatives of Harbor Construction and on HEARING: PLANNING COMMISSION RESOLUTION #425 er Hearing was opened on Planning Commission Resolution #435, recommending amending Sec. 12.13.050 of the City Code by adding a new subsection restricting the allowance of. projections in side yard setback areas in RS-6 and RS-8 zones. Planner Wallis 'reported, stating that the request for this change had come from the, Building Department. Harry Whitcutt stated that the intent of the proposed ordinance is:to more closely control,permitted projections. Mr. Paul Roy remarked that he'thought this.woul ' d restrict the use of many 60, lots. Ward Phillips asked the Building Official for further clarification of this amendment, and Mr. Whitcutt complied with his request. No one else wished'to speak on this matter, and the hearing was declared closed. A motion was then made by Councilman Nelson and seconded by Councilwoman Shippen to pass Ordinance #1693. Carried. HEARING: PLANNING COMMISSION RESOLUTION #426. Hearing was opened on Planning Commission Resolution #426 which recommends amending the Official. Street Map by.revising a portion of the alignment of a projected right-of-way and by proposing a public right-of-way approximately 60, in width to extend 86th Place West across Main Street to connect with the existing proposed right-of-way in Shell Valley. Planner Wallis reported on this matter, which has a rather lengthy history. Jim Mueller asked to see the area on a map. Dave Larson said that he lives in this area and he does not like to have this area developed, but that it is better that it be planned. There were no further comments, and the hearing was closed. A motion.was made by Councilman Gellert and seconded by Councilwoman Shippen that Planning Commission Resolution #426 be denied. Councilman Gellert stated; in support of his motion, that he feels this is alawkward access and will cause nothing but traffic problems. Following some discussion, the motion was voted.upon. A roll call vote resulted in Nelson, Nordquist, Anderson,.Welling and Winters voting :'no", and Gellert and Shippen-voting "yes". The motion, therefore, failed., A motion was then made by Councilman Nordquist and seconded by Councilman Nelson to pass Ordinance #1694, upholding Planning Commission Res. #426. This motion carried, with Gellert and Shippen voting against. AUDIENCE PARTICIPATION p� Lester Scott stated that he is in the bait business. .He requested permission 17to probe, electrically for worms in the parks. He said that he would do this ,p at a time when it would not interfere with the public or with our maintenance DoVpeople. Following some discussion, a motion was made by Councilman Gellert and sebonded`by Councilman Nordquist.to refer this matter to the Park Board, Park Director and Police Department for recommendations and action. Motion carried. City Planner; Joe Wallis, showed slides and photographs of the proposed zoning for the Everett Trust &Savings and VicinityAn tion. Mr. Wallis displayed . the Zoning Map, Uoulfty ZjORTTT —1 ane omprehensive an. He indicated that there is very little difference between our zoning and the county. The resolutions referred to above are recommendations to change the zoning in that area to comply with City of Edmonds Zoning. Hearing was then opened. Ward Phillips asked if the changes in zoning fell oh a property line; and Mr. Wallis assured him that this had been carefully looked into. No one else wished to speak, so the hearing was declared closed. Councilman Nelson moved, seconded by Councilman Winters to pass Ordinance ##1695,'ameriding the Official Zoning.Map; by adopting the zoning classification for certain property newly annexed, to be zoned Neighborhood Business (BN). Motion carried. VESANCIL MEFTING.MIryUTLS JANUARY 29, 1974 REPORT ON EXTENDED BIDS FOR OrfiCE_F_lIQIURE Mayor Harrison advised that no new office furniture bids have been received, rart�<s specs would be ready next .•reel: when council will he asked for authorization to call for bids. DISCUS510N (1N HAGE:R BUILUi(JG - SE_COND ANO MAIN The Mayor explained that a letter From the attorney for Harhor Construction had requested that their problem be heard before council tonight. Attorney Chester Bennett, in the audience, introduced Richard Kelleher, attorney for. Harbor Construe- - tion Company, who had asked Attorney Bennett to help look into this matter of height of the building and help present their case before council. He then introduced Doug Hager, owner of the Ha ger Building at Second and Main, and Bruce Beard, the �pres,ident of Harbor Construction Company, Attorney Bennett gave a short sunmtary.of the history of the building on Second and Main, as well as mentioning the three other, . buildings being planned for construction by the Harbor Company in the city. These buildings are the proposed Alaska Building, the building at Laebugten Wharf, and the . planned warehouse on Fifth South. Mr. Bennett stated that hetad permission from the people involved to suggest to council that the Alaska Building project andjthe one for Laebugten Wharf be formally submitted on February 4 to the Amenities Design Board for review on ideas on how to create a situation compatible with the environ- mental needs of the city: He also recommended that the Hager Huilding matter be infnrnmlly submitted to the Board to see what might be done to lessen We problem raised by some people- in the community. > Ctginc:ilurrn Nelsirri ciur!ytionrd the iirawinr): nibntitted by rho rrchitecC, ,end Mr, Iseard explained that the Walton & Porneruy drawing; were the, original;.. Huwevr!r, Lhrcro were subsequent mechanical drawings submitted to the city departments. City Planner Joe Wallis stated that the plans for this building seen by the Planning Dept. at no time showed the mechanical equipment on the roof. it; was poinl:ed out that the „ mechanical equipment had been started without a permit, but they received one when they were notified of this. Attorney Bennett said he was not suggesting lifting of the moratorium, just bring these before the Amenities Design Board. Councilwoman Shippen raised the question of how many of these buildings in fact had permits and would be required to go before this Bcard. Mayor Harrison said he felt this was a fine proposal to submit three plans to the Amenities Board, and was confident that . ' a :,olution would come out of this. Councilman Nelson sugge;Led some sort of shield for the, mechi:riical equipment on the (lager Building roof, and Bruce Beard advised that he had Lhought of a louvemd screening. Councilman Nordquist stated that the.City had tried to maintain an "old" type atmosphere, and what made Mr. Beard put this type of building here? Me: Beard said his discussions with people and the attitude here made him Net that.foot traffic was the thing most needed, so the best type of building Would be an office building to create this, and clean, crisp, straight lines would be best. Ward, Phillips said that the people were concerned with the changing image of thi> town, and the Hager Building created a controversial issue in the city.. From,citizen in- put., he found no interest in nu-Lal warehouses such as the one: yoiny up next. to Crow, Hardware, and what attitude would the Harbor Construction take on this. Mr. Beard answered that both owners of these metal buildings have the need ,of space .tr, fill, and he was confident that the tastes of Lhe_city coulf be fulfilled; that this wa, not: a serious, problem; and that: the Design Board suggestioris would be taken into consideration. Mayor Harrison suggested a metal building could to s,ofte"ed with overhang and with addition of windows and doers. Paul Roy stsrted Chat beauty waa in the eyes of the b(;holder, and some ioeuhle 110 metal buildings,. These buildings as mentioned will be reviewed by the Amenities Design Board ors pro.- ' posed, and council took the matter under advisement. Ed Robinson Lhanked the ciurnoil for the position taken and stated that in the long run whatever i:; decided would III'! hn•.I too, rvc)"Yenr ,nnr,;r•nVd. ay T. icy r i� i i '` r� r • r d: y F t a i Yk 1 y r a y( j 4 PL»•s >G '��� ade N, January 24, 1974 MEMO TO: Ronald L. Whaley dy Mayor's -Administrative ,Assistant 1% FROM: Leif R. Larson City Engineer SUBJECT: Harbor Building = 2d &Main St. .� The following chronological list of events and actions taken by the Engineering Department is furnished pursuant to your request: 4/11/73 II met with Mr. Robinson and architect in connection with a request to allow footings to encroach into city right-of-way. It was indic4ted that a Street Use Permit would be required, however, that I would.recommend disapproval as I felt that the footings could be designed to be placed within property lines. No further action resulted. -4/26/73 Off -site storm sewer plans reviewed and approved by Assistant City Engineer. 4/26/73 Invasion of Right -of -Way Permit No. 73-62 issued to excavate for and install approximately 325 feet of 8" and 12", and 50 feet of 6" concrete pipe together with four catch basins for storm sewer system from Harbor property to catch basin on State property at James Street. Installation to`be in accordance with engineering standards for construction within city right-of-way. 5/2/73 Inspection by Engineering Dept. of section of storm sewer from State Highway catch basin to CB #1. "Work accepted except for finishing inside catch basin. 5/3/73 Inspection of pipe between EB #1 and #2; approved for backfill. 5/7/73 Inspection of pipe and catch basins and approved; restoration not completed. 5/22/73 Invasion of Right -of -Way Permit No. 73-77 issued for footings and foundation work for construction purposes only. Footings placed within property lines. 6/19/73 Footings approved. 7/20/73 Doug Hager, owner, made application for Street Use Permit for marquee to extend 3 1/2 feet over sidewalk. - continued - A � s .li2_—t y �4�y+ �n "Tj3�.�t '` 24s.�:�� _.;A.-'A,:F`. A s;� °a.3. ry Ronald L. Whaley, MAA - 2 - January 24, 1974 Re: Harbor Building 7/24/73 Engineering Dept. submitted engineering requirements for site plan. 8/1/73 Memo to Building Dept. reminding of certain engineering requirements (pave alley on west and south of property, and all storm drainage to be contained on the property and connected to storm sewer system). 8/7/73 Invasion of Right -of -Way Permit No. 73-108 issued to Snohomish County PUD to install primary and secondary electrical and telephone cable underground and also two underground vaults in alley west of 2d Avenue and Main Street. 8/7/73 City Council approved Street Use Permit application. 8/9/73 City Engineer's office issued Street Use Permit No. 73-7 for marquee. 8/15/73 Inspection of PUD work; work completed per code. 9/18/73 Per Building official, advised that Harbor will pave alley on Wednesday, 9/19/73. 9/26/73 Invasion of Right -of -Way Permit No. 73-134 issued to Harbor Construction to install side sewer to manhole in alley. 10/2/73 Base approved for placing of asphalt. 10/5/73 Asphalt paving approved. 10/5/73 All work per City Code except the alley paving at Main Street sidewalk. 10/10/73 Ailey paving completed. 10/10/73 All work complete per City Code; approved for release and/or bond for paving and sidewalk work. 10/19/73 Final inspection of storm sewer work under Permit No. 73-62 approved. 10/25/73 Released restoration bond of $1500 re R/W Invasion Permit No. 73-771 11/2/73 Memo to Building Official to hold site improvement bond until written release and final approval is given by Engineering on latest sidewalk and curb plans. 11/5/73 Invasion of Right -of -Way Permit No. 73-159B issued for cutting curb, placing of new curb, sidewalk and adjusting manhole. 11/8/73 Curb forms approved. - continued - -• - 0 9 0 Ronald L. Whaley, MAA _ 3 Re: Harbor Building 1119/73 Adjusting of manhole approved. 11/13/73 Concrete curb approved. 11/15/73 Concrete sidewalk approved. January 24, 1974 11/16/73 Final inspection and approval of R/W Invasion Permit No. 73-159B. LRL:rf ;N_ 0 • 40• MEMO TO: Ronald L. Whaley Mayor's Administrative Assistant FROM: Leif R. Larson City Engineer SUBJECT: Harbor Building - 2d & Main St. January 24, 1974 The following chronological list of events and actions taken by the Engineering Department is furnished pursuant to your request: 4/11/13 I met with Mr. Robinson and architect in 'connection with a request to allow footings to encroach into city right-of-way.. it was indicated that a Street Use Permit would be required, however' that I would recommend disapproval as I felt that the footings could be designed to be placed within property lines. No further action resulted. 4/26/73 Off -site storm sewer plans reviewed and approved by Assistant City Engineer. 4/26/73 Invasion of Right -of -Way Permit No. 73-62,issued to excavate for anc' install approximately 325 feet of 8" and 12", and 50 feet of 6" concrete pipe together with four catch basins for storm sewer system from Harbor property to catch basin on State property at James Street. Installation to be in accordance with engineering standards for construction within city right-of-way. 5/2/73 Inspection by Engineering Dept: of section of storm sewer from State Highway.catch basin to CB #1. Work accepted except for finishing inside catch basin. 5/3/73 Inspection of pipe between CB #1 and #2; approved for backfill. 5/7/73 Inspection of pipe and catch basins and approved; restoration not completed. 5/22/73 Invasion of Right -of -Way Permit No. 73-77 issued for footings and foundation work for construction purposes only. Footings placed within property lines. 6/19/73 Footings approved. 7/20/73 Doug Hager, owner, made application for Street Use Permit for marquee to extend 3 1/2 feet over sidewalk. - continued - r, 0 • 00 Ronald L. Whaley, MAA - 2 - January 24, 1974 Re: Harbor Building 7/24/73 Engineering Dept. submitted engineering requirements for site plan. 8/1/73 Memo to Building Dept. reminding of certain engineering requirements (pave alley on west and south of property, and all storm drainage to be contained on the property and connected to storm sewer system). 8/7/73 Invasion of Right=of-Way.Permit No. 73-108 issued to Snohomish County. PUD to install primary and secondary electrical and telephone cable underground and also two underground.vaults in alley west of 2d Avenue and Main Street. 8/7/73 City Council approved Street Use Permit application. 8/9/73 City Engineer's office issued Street Use Permit,No. 73-7 for marquee. 8/15/73 Inspection.of PUD work; work completed per code. 9/18/73 Per Building Official, advised that Harbor will pave alley on Wednesday, 9/19/73. 9/26/73 Invasion of.Right-of-Way Permit No. 73-134 issued to Harbor Construction to install side sewer to manhole in alley. 10/2/73 Base approved for placing of asphalt. 10/5/73 Asphalt paving approved. 10/5/73 All work per City Code ekeept the alley paving at Main Street sidewalk. 10/10/73 Alley paving completed. 10110/73 All work tomplete 'per City Code; approved for release and/or.bond for paving and sidewalk work. 10./19/73 Final inspection of storm sewer work under Permit No. 73-62 approved. 10/25/73 Released restoration bond of $1500 re R/W 'Invasion Permit No. 73-77. 11/2/73 Memo to Building Official to hold site improvement bond until written release and final approval is given by Engineering on latest sidewalk and curb plans. 11/5/73 Invasion of Right -of -Way Permit No. 73-159B issued for cutting curb, placing of new curb; sidewalk and adjusting manhole. 11/8/73 Curb forms approved. - continued - 9 w", Ronald L. Whaley, MAA - 3 - Re: Harbor Building January 24,.1974 11/9/73. Adjusting of manhole approved. 11/13/73 Concrete curb approved. 11/15/73 Concrete sidewalk approved. 11/16/73 Final inspection and approval of R/W Invasion Permit No. 73-159B. LRL:rf /6 -v. T-i e.,- -TL v - r ' I y . I CONTROVERSIALBUILDINGof the The skloomsn OIL I (din i . Ii r10 feet aboveutheeroofl which Cityepla nertJoefWall s j which starkly new Edmonds H 9new against the Edmonds waterfront at Second and Main city cou reset zoningsthatis hnd the building ordinances �. 1 Streets is the subject of heated debate nMain Street and at Edmonds City Hall. A buildingpermit legal al because those ordinances excepted certain in - because from the maximum requirement. was issued by the city to Harbor Construction Com- height building, the structures (Staff photo by Cole Porter) pany for a 35 foot maximum i maximum allowable under the city's building code. to the city did not show the The drawings presented �.. EDMONDS COUNCIL MEETING MINUTES % JANUARY 15, 1974 nY ,' -3- 1 Richard Myhre, 18920 Soundvi,Place, told council that in the Edmonds City Code ew' s for off Xunder, 12.14.020, paragraph G, food and beverages, it states reghavemlOtoff street street parking places. ,He said that the Sail In Tavern should spaces for its requirements, and does not. He found no request for a variance and c+. no parking plan submitted and it appears the zoning code conditions were not met. Mr. Myhre said the loading zone area was being used for parking purposes. Building i; Official HarrWhitcutt answered that the plan for rebuilding of the tavern is on y file ''in his department and'contains the parking plan and when the permit was the parking requirements had been reviewed by the Planning Dept. Mr. Myhre granted, t, was invited to go to.the Building Department to view these plans. Mr. Jim Mueller asked if the Planning Department had the policy of making variances within the code. because there are only 7 parking stalls at the tavern where 10 are required accord- ing to code. Mr. Myhre advised council that if the building has insufficient /_'� aces according to code, and no variance, there is a problem. The Building Dept. ill furnish the plans for perusal. �'9� Mueller, 209 Casper, brought to council attention the Harbor Building at Second �ai4d Main.' He noted that the plans show a 35 ft. height with a flat roof, but the build' exceeds this hei ht and therefore does not conform to the City of Edmonds ' �.�� buy ding or finances. Mr. Mueller stated that he felt there should be a very A definite adherence to the Code required by the City, and that this was not being done. He noted the amount of time and money spent by citizens fighting problems pry which would not be necessary if the,Code was adhered to; that the laws of the city must be enforced without any deviations. City Planner Joe Wallis explained that '! proper•interpretat.ion is needed, especially when the sidewalk position is not specified in the Code for. measuring height. There was discussion on this, and Councilman Welling stated.that it was the purpose of the City to apply the Code and interpret to the minimum, not maximum., Mr. Ted Chittenden, 19222 Olympic View ` ;Drive,,spoke about the roof structures on this building at Second and Main. Ward Phillips spoke against mechanical equipment on a roof and how can .the City interpret a this as being allowable; that it was in direct violation of the ordinances of the �qh city. He felt the Code should eliminate the words of exceptions on buildings in i;u.R reya•rd'to height limitation, and he referred to the need for an Amenities`Design Y'' �'> Board to control the aesthetics of the City of Edmonds . Mr. -Mueller said 'i f •the Harbor Building is in violation of the City Code, steps should be taken to stop it + immediately. Capt. Shields brought to everyone's attention that there had been court rulings that elevator shafts and other roof appendages, for example, were incidental to the building. He was against spending taxpayer money to fight this problem in court, as most certainly would happen. William Gear, 633 Walnut, told council he felt if this building was in violation as to height, something should be done about it. Jim'Mueller added that if it is invalid, it should be stopped, } and`he would rather see a court lawsuit�fosuggested that perhaps ht than have the lthis nproblem ue. '.,• Margaret Bernhoft, 8219 Talbot Park Road, 99 should be turned over to a committee. for recommendation. It was brought out that a proposed,definition of the building height will be presented from the staff to -the Planning Commission tomorrow night, and from there it will go to council or action, Mr. Gear felt the city should not allow this building to continue if it is in .violation, since two weeks would make quite a difference,to the construction. I' Ed Robinson, 19815 88th Ave."W., made the request that council take positive actio tonight on the Harbor Building at Second and Main and also reconsider the manner in y .�. which the Amenities Design Board will be allowed tohhandleethese situations. phrase appropriate -to Councilwoman ShiPeen i'nquired if it wouldn't be pprp on Steeples', antennas, and incidentals from the Code in regard to height limitation +' Attorney.Wallace advised this would have to go before the Planning''Correnission for hearing first.. City Planner Wallis reminded council that this .will. go from staff to the Planning Commission tomorrow night for interpretation of mean ground level, ` and suggested that those people in the audience - who were interested might attend ith input. Councilman the Planning Commission meeting wWelling said he felt the Harbor Building was in violation and ouncil should apply for an injunction to place the burden on them to decide iihey are liable. Attorney Wallace agreed that �,. Councilman Welling therefore moved, seconded this was'.one method open to the city. / r 4. . EDMONDS COUNCIL MEETING MINUTES JANUARY 15, 1974 -4- by Councilman Nordquist that council authorize the City Attorney to commence an injunction action without the use of any stop work order or application for a emporar injunction, a ai the owners or constructors of the Harbor Building at Secondand main in order to try out and determine the issue of whether or not they are in vio ation of this type of restriction in zoning. There was no dis- cussion on the motion, and it carried. Councilman Nordquist said he hoped the council would meet with the Staff and make some recommendations and see what the administration would recommend. Councilman Nelson asked that all people who had spoken on this toni ht have their name and address given to the City Clerk so the, can be advised of any court procedure. CAt this point, Mayor Harrison declared a 5 minute recess at 10:10 P.M. i SALARY ORDINANCE 1974 M.A.A. Ron Whaley presented the proposed 1974 Salary Ordinance, explaining that there was a change in concept this year in that the ordinance listed the grades under both exempt and non-exempt, with the minimum, average, and maximum figures in the salary range within these grades. Councilman Nordquist moved, seconded by Councilman Nelson that proposed Ordinance #1690 be passed, setting the salaries for the City of Edmonds employees oar 9974. Notion carried. ANNEXATION ORDINANCE - EVERETT TRUST & SAVINGS & VICINITY The City Clerk had received notice from the Snohomish County Boundary Review Board waiving jurisdiction on the proposed annexation. It was moved by Councilman Nelson, seconded by Councilman Welling that proposed Ordinance #1691 be passed, annexing this area to the City of Edmonds, and the motion carried. Councilman Nordquist abstained from voting because of business dealings with Everett Trust & Savings Bank. PREPAYMENT ORDINANCE - LID 191 /'A ttorney Wallace presented the prepayment ordinance for LID 191, and it was moved by Councilman Nordquist, seconded by Councilman Nelson that proposed Ordinance #1692 be passed, stating the expiration of the prepayment period for L11T 191. Nion carried. ,y PROPOSED RESOLUTION FOR SECONDARY SEWAGE TREATMENT City Engineer Leif Larson presented to council a memo and attached proposed reso- ;/ lution to plan for the City of Edmonds' upgrading its sewage treatment facilities pursuant to the federal Water Pollution Control Act as amended under Public Law 92-500. Engineer Larson explained that this would be required by law on a schedule of not later than July 1977, and the resolution had been prepared to reflect a time schedule. Councilman Nordquist stated that he would vote against this until he sees the definition of "secondary treatment". Councilman Welling noted that he had read an article where Metro was planning to fight this need for secondary treatment of sewage being deposited into Puget Sound waters. He was concerned that if Edmonds commits itself and Metro finds a way out, would the resolution bind the city to secondary facilities or could Edmonds also be excused from the requirement. A motion was made by Councilman Nelson, seconded by Councilwoman Shippen to pass proposed Resolution #291 to plan for upgrading the sewage treatment facilities. The motion failed to carry with Nelson and Shippen voting in favor; Welling, Nordquist and Winters against. There followed discussion on costs to both Edmonds and Mountlake Terrace citizens; time element for submitting resolution; capital improvements; and funds available. Mayor Harrison told Engineer Larson that if a resolution were to be passed, he would like to make sure that an alternate plan was presented for relocation of the • • 1040AITY COUNCIL MINUTES via JANUARY 24, 1974 -4- — Deputy City Attorney, John Wallace, stated that if. the council should pass the moratorium, it is'necessary'that' they find that an emergency does sexist, and that the public;.*health and general,.welfare will be affected if such a moratorium is not declared. This would also include the loss of amenities that presently:exist and that'the town as a whole could suffer irreparable damage if such a moratorium were not declared. Jt is necessary, Mr. Wallace said, to make that type of a finding upon which to base a moratorium. Margaret Bernhoft also spoke on.this issue. Councilman Gellert then amended the motion to exclude from Councilman Well.ing's motion any interior remodeling } of a buildingwhich does no a lec ie ez error appearance o e building or the site. .Engineer larson said a e hopes this does not a7ect tne bulkhead at the Senior Center. He said we have taken bids on it. Dewey Leyda wondered if the work planned on his building would be delayed. Following - ,more discussion, the' amendment,.. which had been seconded by Councilwoman Shippen, was voted upon and.passed. The motion as amended also carried, with Councilman Winters voting no,'as he,ha.d made a motion,which died for lack of a second, wherein he asked'to. exclude permits for non-structural work. CORRESPONDENCE The Deputy City Clerk, Eleanor Quealey, read a letter which had been received IN .from Kelleher, Murphy & Nelson, attorneys, representing Harbor Construction Co. and Douglas Hager owners.of the building being constructed at 2nd and Main. The letter asked for permission to speak at the January 29th council meeting. SELECTION OF MAYOR PRO-TEM FOR 1974'''. 'Councilman.Nelson nominated Councilman Nordquist to act as Mayor Pro-tem for 1974. Councilwoman Shippen seconded the nomination. Councilman Gellert moved, d .seconded by Councilman Winters that nominations be closed, whichh.resulted in unanimous vote for Councilman Nord uist to be named Mayor Pro-tem for 1974. PRELIMINARY PLAT - BODINE ' S ADDITION - i 8 LOTS, 6`I'H AVE. S . & PARADISE LANE.) ;- City Planner;.E. Joseph Wallis,:reported on this matter. He projected slides n s and htos of the lat. Mr. Wallis recommended on the screen showing map p p approval with.Engineering and Fire Department requirements. Following discussion, a motion was made by Councilman Gellert that the proposed subdivision.be approved 'subject to engineering and planning restrictions. This was seconded by Councilman Nordqui.st, voted upon and carried. Councilman Gellert.then made'a motion seconded by Councilman Anderson that the RMfi area be submitted to the Planning Commission for review; and that the area north also be reviewed. /� The motion was voted upon and carried: Mr. Don Levine, who owns a portion �J of.land in this area in the RMfi zone expressed concern about the possible 11 re -zone of his This was discussed between council and staff at property." M Levine a apprised u be ha to keep r. ' hand Mr. Wallis said that he would p PP lent a PPY Y g of events as'they take place with regard to this property. AUTHORIZATION FOR SENIOR'CITIZENS, INC. TO CONSTRUCT FACILITIES . Harry Sherman, a.member of the Board of the Senior Citizens Center, presented plans for construction of some new facilities at the Center and asked for II1 authorization to do so. The plans were placed on the cork board and M.A.A. i, Ron Whaley explained what they intended to do: lie said the plans are paid fot, and have commitments for materials, labor, etc. to do the work. Councilman li+ Nelson moved,'seconded by Councilman Nordquist'to authorize construction of the i.' Senior Citizens Center facility contingent upon review of the Building Department'.. Motion carried. MUNICIPAL LEASE BETWEEN UNION OIL COMPANY ANIL CITY FOR TINION OIL BEACH ' ayor Harrison stated that this lease concerns a modification wherein the area leased'to the City will be reduced by six feet adjacent to the dock on the southerly side of the Union Oil property. A motion was made by Councilman • COS IIINCIL MEETING MINUTES JANUARY 22, 1974 -3- ail some change in that /4,1 "installation, Maybe some new equipment, perhaps removal of some of the sound.reducing devices that had previously been put , . on there,' etc. Ward Phillips thought a change in circumstances has taker. place and thought remedial.acti.on should be taken. Following more discussion, a motion was made by Councilman Nelson to instruct the Building Department to investigate the premises and determine if' there has been anychange to substantiate the readings yProf. ue er an r.ing : ose panic' u a i.nves- ' tiRations to the attention of -the City Attorney so that the council can make an adequate determination an a' is report should e ready by,next week. V Councilman Nordquist seconded.the motion. Jane Cunningham', who was in the'audierice, stated that she would ask that no one go on her property without permission from her or Mr. Cunningham and that the noise level readings be taken along the store property line. harry Whitcutt, Building Official; stated that this would pose a problem since the fence is not on the property line and the code says that you must take readings on the property line, and therefore they must be 'taken from the west side. Mr. Whitcutt asked Mrs. Cunningham if the City dial not have permission to go onto her property? She'replied that she was too angry right now and the answer is no; and that he will have to go on the store owner's property. Jim Mueller suggested that if further measurements are to be made, that they be made in other areas other than ground level at the property -line. There was further discussion, and during that time Mr. Cunningham said. that if_ Mr. Whitcutt and an expert in testing for noise po'llution'were to..come to his door and ask for permission to take readings + on his property he would grant,that permission. Counci woman Shippen then amended.the motion to authorize the Building ITspector to retain an acoustical .. engineer and that the report come from a qualified testing laboratory. Counci an Nordquist seconded the amendment, which was voted upon and carri.ed. The main motion as amended;also.carr.'ied.' -Mr. William Gear presented,the City Clerk with petitions signed by owners of property suffering from storm water problems in vicinity of Walnut', west of 7th ana'east-of 6th. The, City Engineer is to report on this matter on the 29th of 'January' • k Mr. Ed Robinson mentioned that at the last council meeting it was determined that the City Attorney was to file an injunction on the Harbor Building. and he asked if'he could have a report on the matter as of today. Attorney,Wallace stated °'w that he has requested that there be an executive session so that he may report the results of his researchand his analysis of the problems that arise under.: such a lawsuit to the, council. prior to instituting the action. There was a brief discussion on the measurements taken of the building height. Jim Mueller suggested a possible moratorium of 30 to 60 days for the acceptance of applications . -for building permits until'this matter is resolved. Attorney Wallace said. there is� precedent, for such 'action. Pat Crawford-1 15824 - 75.th Place West, said that Laebugten Wharf .is virtually. in' his front'yard and'that he is concerned with what will happen with regard to,this project and was pleased that the council is considering moving swiftly to•.establish the Amenities Design Board. criteria. He also favored a moratorium bu'1 in permits. There was -some discussion regarding Laebu ten of".building d � e :for issuance g p, g g g . P it but have not Wharf It was inted out that the have their Shorelines erm t a ar , y d moti seconded lied for their building permit. Councilman Welling made a on eta g , ' y applied g P by Councilwoman!Shippen that the City'of Edmonds adopt a resolution declaring a moratorium on accepting for'",filing any building permits in -the -City of Edmonds,, except' those applied for in.' single-family residential areas for a period starting instantly and terminating March.1,.1974, or upon the effective date of the..proposed -Amenities. Design Board Ordinance Amendment, whichever first'occurs. Harry Sherman asked if this meant remodeling also, and that he was concerned with the work ' being done at the Senior Center. Ward Phillips spoke in favor of.a'moratorium.'' Warren Murphy;' 22919 -, 100th West asked what happensto* the builder that has ' made application and is almost ready to proceed. Attorney Wallace said :that his rights relate back to the date,of appl:L.cation, and that the items of the codes i` of,Edmonds,that.must'be met' are fixed as of that date under,State Law. �. .. , jr.:. •fir, ;s•, t CITY of EbMONDS Civic Center • EdmonO,..,Washi.ngton 98020 Telephone (206) 775-2525 Office of City Punning December 4, 1973 b ruce Beard, President Harbor Construction Company, Inc. Commons Building Suite 186C 1200 112th N.E. Bellevue, Washington 98004 Mr. Beard: Approval of plans for the 2nd and Blain Building was most difficult due to the lengthy preliminary review of incomplete plans. After several. conversations and commitments by the Staff the job pro - ceded. Your representatives approached the City regarding an alternative landscape proposal for the parking. I proposed a landscape scheme and curb realignment that I considered to be in your interest and the City of Edmonds. Dougald Robinson indicated that you agreed to the plan immediately prior to your scheduled construction of the curb and sidewalk. The proposal was reviewed with the City Council for an indication of policy acceptance of the transfer of parking landscaping to alternate site installation. With this brief history, I believeyou can understand my surprise and dismay when the City received a bill from Harbor Construction for some $2000.. At no time during the review and proposals did the City of Edmonds agree to fund any portion of the proposed landscap- ing. There are no funds budgeted for this purpose, and the Council has not authorized this payment. Further, I will not recommend that the bill,as submitted,be paid. JC0 E. Joseph Walli City Planner EJW/peh IN CITY OF EDMONDS ENGINEERING DEPARTMENT 505 BELL STREET EDMONDS, WASHINGTON 98020 APPLICATION FOR INVASION OF RIGHT-OF-WAY (Submit In Duplicate) Permit to be issued to: HA R 9 0 Q C 0 "t-, S�1 , C 0 71jjc- . For work at: (address or vicinity) M o Q Q's. Type of work to be (Attach Drawing When ilea W D '01 City State Telephone Number i J� �'( ( � Contractor: j�" 'j, 0, t4 Name m' t Mailing Addrm city state T@ phone Number Signature: Owner or Agent i Dati Signedt DO NOT WRITE BELOW THIS LINE (To be completed by Issuing Agency) Permit Issued (date) Permit Number Remarks: 1ck rv'twired fr,1, r CITY OF EMTONDS 11 •1 AIiT:. Insp Date- - .... .D7/-.._k _..-------- , rl JQA I ... ......... C.K% .........---• - . b�L- _---.............. ---- m Insp Lea t. r .-13y � � r• Flnali'_..'.. '11J... By ....... �!V m4wom... ?IEQ 1L.1-OFFICE COMMUNI(�TI`.,NS DATE November 2, TO Harry Whi tcutt FROM Bill Nims Building Official Engineering 1� FCAM 41 - LITTLE'S SUBJECT: Harbor Construction's_suildinat 2d Ave. & Main Street % Harbor Construction is applying for a Right-of-way Invasion Permit to install a corner park with curbs and landscaping per the attached drawi ng. Please hold their site improvement bond in the amount of $?ODO until such time as irritten release and final approval is given by this Department. WJN:mjr Attachment 19 73 �►'�- �}.�°�,� +.�+f='.� j 2 VA E ON I��''GI��F..� y s�s'i Li � W ATM. U NO P':�j� v: � "' • : 1 , , ' � 1 fib;,-��., { �(•.� � ,. 4 3 'TIC IVY',— AL S ? DL'vvAL K d# C LQIR b► t .� t• S4.A, cM W �►1 1.441 ii S SIDEWALK AeMA QF IZ16HT OM T o CoWbT" CT CoameQ 'PAQK. TO % G 1 N THIS EXISTIN(4 Co. a HPLJ NE wl VALV65 UYD %olaY 2.Wn avf. Wp'jiC MEji'1LS lb AE A0.IUSIED MY CITY D1113W M NEW ,SlfXWAUL %Y DEYSOM }}ARP�O2 13LLILi) ING M4 f:0Q. I T VALvG TO gE ADJUSTen 6"f IIIL`iri �N i La Harbor construction Company, Inc. 1200 112th Avimus Not. Eallevus, Washington 98004 October 25, 1973 StWECTs Right_ofWay Invasion. Rims .t gay. 734-77 - rooting � Foundation Work at Second 8 Nab Gontlesen m The subject work was inspected on September 1!, 1979, and found satiefadtory to the City. The restorstion bond in the mount of $1 500 is released and enclosed horewith. Yours very thy. CITY OF Ei# NDS RICHAD H. ALLEN Assistant City Engineer *Jr Encl. CITY OF EDiMONDS ENGINEERING DEPARTMENT 505 BELL STREET EDMONDS, WASHINGTON 98020 APPLICATION. FOR INVASION OF RIGHT-OF-WAY (Submit In Duplicate) Permit to be issued to: a co w S —rl C0 For work at: (address or vicinity) loo z Type of work to be done: ! YVCu � (,.I S I V r6 se H i ry - IJ (Attach Drawing When Applicable) Owner: F Z- Name Mailing Address Contractor: SOIZ- Co Ar S _r. C Name i7_ao�-I�Z�j� Mailing Address WJJ, i �'0®4- City State r Signature: �'r IX "j", �t.,� Q-� -- Owner or Agent(j Telephone Number Telephone Number Date Signed DO NOT WRITE BELOW THIS LINE (To be completed by Issuing Agency) Permit Issued (date) Remarks• A16 0 Permit Number �-26-7 3 NGINEER'S APPROVAL DATE ALL w 60A ?0Z e%.-rY'e'.0 TD Vocwvss ?Wx(T' fruo . . lee. racw foe V I G S -W-0it�4C>, 12-V N CITY OF MIMNDS ENGINEERING DEPARTMENT Insp Daeio.- -Ay... A ... j .. . ... .... . Insp DatcOVIDy ........ 6-$ .......... ........ ....... .. ... ....... Ii,,,,p Da to .............. -.By� s .......... ................................................................... Insp Dra-lUe ...... .......... B-f p- ........................ Z in a anal_ ...... 15 ... D.I.Q. ...... . ... ... tx � rc a�5Eunw SNT:wvlucs lt� A -Tw: t �_4_1 4— -au _;Va. A M _7� 7 4 ,7 OF �ZDMON DS _ 7� ENG =ARn= - 7M - 505`BELL' STREET sk _,.EDMONDS 9'.,-WASHINGMN 98020J',_. EL. �:�.'-APPLICAT ION.' FUR STREET.. USE PERMIT (Submit in Triplicate Name of Applicant:, Doug Hager Description of Public Place or Portion Thereof Desired to be used: (Exhibit may be attached) Marcuee extending _3 1/2 feet -as per attached sketch Type of Use desired to be Made of Public Place: to be used as covered entry If Applicable, Attach Plans and Specifications For Any Utility or Structure to be Erected. and/or Main'tained on the Public Place: Exhibit or 'Drawing Nos; 'HC-8-73-100 Second Ave. Marque* Temporary Permit: Unless otherwise designated'herein, this permit is understood by applicant to be - wholly -of a temporary nature, that. it vests no pe'rmanent right whatsoever. If the permitted use becomes dangerous -or structure shall become insecure or unsafe, or shall not be constructed, maintained or used in accordance with the provisions =;J of this title, the same may be revoked and the structure and obstructions ordered., removed by order of the City Engineer. If this application is for a specific' period of time, the term of.said application is: Indemnity: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages or claims of any kind or des- cription whatsoever, foreseen or.unforeseen, that may be made against the applicamt- or the City' of Edmonds, or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees. Application of Chapter 6.40 of the Edmonds City Code: Applicant warrants that he has read, or had the opportunity, to read, Chapter 6.40 of the'Edmonds City Code, and understands that all terms of that Ordinance are-. - incorporated herein as is set forth,in full and this application and permit there- fore are subject to the terims, of that Chapter of the Edmonds City Code.,:, -(Signatur-0 of A pplicant) V, 7: 17� ,W. PV, City of,Edmonds ApplAion for Street Use Permit Name of Applicant: Doug Hager Street Address: 2d Avenue at Main Street City: Edmonds, WA 98020 Date: 7/20/73 Approval (and Agreement, if Applicable) of Abutting Property Owner(s): Signature(s) Address DO NOT WRITE BELOW THIS LINE (To be completed by Issuing Agency) Date of City Council Approval: August 7, 1973 Permit Fee: none Annual Fee due January 1,.19 Provision for Indemnity: Terms .and Provision .of Performance Bond If .A licable: Note: Reference 6.40.050 of the applicable Ordinance) Additional Conditions Imposed Upon and Agreed to by Applicant: Approved by:August 9, 1973 T S�City Engine Date Approved by:K1'- August 9, 1973 (If applicable) B ilding Official Date Permit Issued: 3/9/7a Permit Number: 73-7 Date Applicant has read the foregoing application.and conditions of approval of this permit, fully understands and agrees to all conditions of the foregoing applica- tion and permit approval, and by the execution.of his signature hereto agrees to the same: Date Applicant's Signature 9 prv�ly I I.j T6 Ild- C) 4t, IT , - " -, ;e, , ', 5, .. .� 1 11 . . — - & , tll—•j.- I 1.11 1.... .1-4- -* -r* 9 *1*0 blirf I e"o r i5,1(z va-f CITY OF EDMONDS ENGINEERING DEPARTME14T RE C E I V E D 505 BELL STREET _ EDMONDS, WASHINGTON 98020 JUL 20 'I$73 APPLICATION FOR STREET USE Pc:1:I;IIT Edrlands Efig�: D pt. (Submit in Triplicate) Name of Applicant: Doug Hager Description of Public Place or Portion Thereof Desired to be used: (Exhibit may be attached) Marauee extending 3 1/2 feet as per.attached sketch Type of Use desired to be Made of Public Place: to be used as covered entry . If Applicable, Attach Plans and Specifications For Any Utility or Structure to.be Erected and/or Maintained on the Public Place: Exhibit or Drawing Nos: HC-8-73=100 Second Ave.-Marque4 Temporary Permit: Unless otherwise designated herein, this permit is understood by applicant to be wholly of a temporary nature, that it vests no permanent right whatsoever. If the permitted use becomes dangerous or such structure shall.become insecure or unsafe, or shall not be constructed, maintained or used in accordance with the provision of this title, the same may be revoked and the structure and obstructions ordered removed by order of the City Engineer. If this application is for a specific period of time, the term of said application is: Indemnity: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages or claims of any kind or des- cription whatsoever, foreseen or.unforeseen, that may be made against the applicant or the City of Edmonds, or any.of its departments or employees, including but not limited to the defense of'any legal proceedings including defense costs, court costs, and attorney fees. ADDlication of Chapter 6.40 of the Edmonds Citv Code: Applicant warrants that he has read, or had the opportunity to read, Chapter 6.40 of the Edmonds City Code, and understands that all terms of that Ordinance are incorporated herein as is set forth in full and this application and permit there- fore are subject to the terms of that Chapter of the Edmonds City Code. Signat re of Applicant) City of Zilmorjds Applj&ion. for Street Use Permit Name of Applicant: Doug Hatzer Street Address: Pier. 89 City:' Seattle Date: July 20, 1973 Approval (and Agreement, if Applicable) of Abutting Property Owner(s): Signature s Address DO NOT WRITE:BELOW THIS LINE (To be completed by Issuing; Agency) Date.of City Council Approval: Permit Fee: Provision for Indemnity: Annual Fee 1 due January 1, 19 Terms :and Provision .of _Performance ,Bond If Applicable,: Note: Reference 6.40.050 of..the applicable Ordinance) Additional Conditions Imposed Upon and Agreed to by Applicant: Approved by: City Engineer. Date Approved by: (If applicable) Building Official Permit Issued: Date Date Permit Number: Applicant has read the foregoing application and conditions of approval of this permit, fully understands and agrees to all conditions of the foregoing applica- tion and permit approval, and by the execution of his signature hereto agrees to the same: Date App h nt's Signature t _ CITY OF ���OITD8 ENGINZQll"II'M DEPABTIMCNT InspDate ...... ....... By..................... .--.___--___-'-'-_-_----._-__-__~~~~ IoopDutw........... ..... By- ----------------- ................. Inop Date--- ...... By B`n�r�o -,_-.--'---__----.-_--_~-._--_ . ____ " It ;I,.,_ -OFFICE COMMI; ICS DATE Au gus t 1 19 23_ O Harry Whitcutt FROM Bill Nims Building Official Engineering �> ' 41 - IITTLE'S "'jUBJECT• Edmonds Office Building - Harbor Construction , ! The developer must complete_, as part of the engineering requirements, the following items for proper access. 1. Pave alley on west and south of property. 2. All storm drainage must be contained on the property and connected to the storm system existing. WJN:mjr .'I- 0FFI'CE COMA Nl(,- 11G-�S TO Harry Whitcutt Building Official FORM 41 - LITTLE'S DATE July 24, 1973 FROM Bill Nims Engineering lyv SUBJECT: Edmonds Office Buildings Attached herewith are the Engineering Requirements for Commercial Buildings for the subject site. Please transmit to the developer as soon as possible the attached list of site plan requirements. WJN:mjr Attachements +•' +r,. >. EIJC�INEERING 1'iLQUIREMENTS FOR COMMERCIAL AIJD' APARTMENT BUILDING PROJECT'S Na me Edmonds Office Building Date July 24, 1973 STREETS AND ACCESS 1.Right-of-Way Requirements: Existing 2. Road Bed Width: Existing' 3. Turn Around. N/A 4.' Sidewalks: Existing 5. Parkins; Strip:. Existing 6. Access Easements: N/A UTILITIES 1. Water Mains: 8-inch Existing .2. F.ire Hydrants: Existing z 3. Sewers or Septic ranks; Connect to sanitary sewers' 4. Drainage Install all necessary,storm sewers and drainage facilities per drainage plan and City Standards. Where drainage is,across adjacent private property, all parties having; any ownership interest in the lands being developed shall provide, as a restriction on the title running with the land, that the. City of Edmonds shall be held:harmless from.any and all claims for damages which may be occasioned to adjacent land.by reason of the construction and operation of the drainage system, unless, releases of damages and./or.dra.inage easements are obtained from the other property owners affected by ';,,[d dra,i,n,.igo.Any dr� hi;..ige prol-defto c;.roatrd by change o.f,' rontour ;cocacyUor. tvlc a5during deveio,megt rmist br,cr.>rrecl,:c).. prior tris Us - of performance bond. Final approval (or release of bond) will be withheld until actual drainage as installed has been inspected by -the City Engineer.. F Engineering Requirements for Comm'1 Apartment Building Projects.- Page 2 5. Utility Easements: None required for City utilities 6. Underground Utilities: To be provided in accordance with Ordinance No. 1387. Street lighting shall also be 'Provided with the necessary street light standards and underground wiring. TOPOGRAPHY 1. Excavation and Grading: Excavation and grading shall conform to the requirements outlined in Chapter 70 of the.Uniform Building Code, latest adopted edition, Vol. 1. Where extensive grading and .fill are involved in the development, a grading plan and specifications shall be prepared. QUOTATION FROM THE CITY CODE REGARDING.IMPROVEMENTS 11.02.025(f) Utilities and Street Im rovements. No building permit shall be issued for the construction of any building or structure of any kind or description unless the plans and specifications include the construction for curbs, gutters, sidewalks, paved streets, necessary water lines, sewer lines, and storm drainage necessitated by the new construction or improvement, to be built to applicable City standards, provided, however, if found by the City Engineer to be impractical to construct at the time of application for said building permit, construction may be waived by the City Engineer and in lieu thereof a performance bond filed with said engineer to cover the estimated cost of construction to City standards for said improvements, provided further, in areas zoned single family residential at the time of said application for building permit in which the applicant has received final approval for a plat or sub -division and has compiled with requirements therein compliance with this subsection shall be deemed by compliance with the sub -division or plat requirements. COMMENTS Right-of-way Invasion Permit required for any work in City right-of-way. Site plan to be prepared per attached list. Gas, Power and telephone plans should be coordinated'with those utility companies and shown on site plan. Rev. April 2, 1971 r C y Engineer To: Date From: " P �FORR COMMENTS ❑ FOR YOUR INFORMATION ❑ FOR YOUR APPROVAL ❑ NOTE & RETURN ❑ TAKE APPROPRIATE ACTION ❑ NOTE & FILE ❑ CALL ME ❑ FOR YOUR -SIGNATURE �Af-E�70 11 (Form oA-4) ' ©"Copyright 1969,/1n970 Lau�uffic�eAid/s/, I/3Y/`Bronxville, N DATE HOJ// frvl TO WHILE YOU WERE OU 1,2 OF PHONE •oe • CODE HONE NUMB .R TELEPHONED RETURNED CALL LEFT PACKAGE PLEASE CALL WAS .IN PLEASE SEE ME WILL CALL AGAIN WILL RETURN IMPORTANT MESSAGE yl �rtQ " o� — SIGNED LITTLE'S OFFICE SUPPLIES Phone 782. 105 ❑ FOR YOUR -COMMENTS ❑ FOR YOUR APPROVAL ❑ FOR YOUR INFORMATION ❑ NOTE & RETURN ❑ TAKE APPROPRIATE ACTION ❑ NOTE & FILE ❑ CALL ME ❑ FOR YOUR SIGNATURE ❑ SEE.ME ❑ T COMMENTS: 7 3 LF 004-2 (Form OA-4) © Cdpyr.ight7969, 1970,Laure1 Office Aids, Iric:, Bronxville: N.-Y. ' { - F From '�G �C'•)�'•� .G" ; . ❑: FORf YOUR COMMENTS &,FOR YOUR INFORMATIQN _ ❑;,FOR•YOUR APPROVAL, .0, NOTE& RETURN _ ❑ _TAKE APPROPRIATE,ACTION ❑';NOTE:&FILE ❑� CALL'.ME ❑ FOR YOUR SIGNATURE ❑ SEE ME ❑" P COMMENTS. n,e7 I - I :Fo"rm OA-4%�:.. er.t•ur.I�OHInAId.,"Inc �x(IIO; C.nl�<k'Sfdlon, ,Yonbn,�H,Y.'10710 E L A CITY OF EDMONDS ENGINEERING DEPARTMENT 505AELL STREET EDMONDS, WASHINGTON 98026 4L APPLICATION FOR INVASION OF RIGHT-OF-WAY (Submit In. Duplicate) Permit to be —issued to; —44F�Q:r Cons.truciion Co. , .Inc. For work at: (address or vicinity) ?nd E thain Edmonds Type of work to be done: Footing .and. 'Joundation work (Attach Drawing When Applicable) Owner: DougLA!? Hager Name .11--'cr 89 Mailing Address Seattle, Washington At4 2750 City State Telephone Number Contractor:Cons t: ruction Co. . Inc. Name 1200 --.12th Ave. N.F. Mailing Address 3el72vur- Wasb 1.wtop. 455-325 City State Telephone Number -2 -2 1,q -7-:�; Signature: V "I. A10 owner or Agenf Date Signed 11 1 DO NOT WRITE BELOW THIS LINE (To be completed by Issuing Agency) Permit Issued (date) 5/22/73 Permit Number 73-77 Remarks: Subject to inspection IS restoration. All work to be done in accordance CITY OF ED110TIDS EVIGINEERING DEPARTMENT Insp Dat(S—WOkY ..... 5A ------ Remarlzs��.A- 1* . ......... Insp Date----------- ..... By ............ -ar ............................. ............................ . ...... . ................... Insp Date ................. i3y ................... InspDate ................. By ........................ Final............. . ............ By ........................ Ter 0�¢.te.�'�?W.e " C) -19::?-#75 is Edmonds office building now under construction EDMONDS — Ground was broken this week for a $700,000 office building at Second Avenue and Main Street in down. town Edmonds. The three-story, steel and glass structure is expected to be completed in about six months, said engineer Doug Robin• son of Harbor Construction, Bellevue, prime contractors. Owner will be Douglas W. Hager, Seattle, vice president Of New England Fish Company. The building will be 120 by 100 feet, including a two-story parking area for some 50 cars. A restaurant is planned for the top floor, With general office space on the first two floors. Builder is Bruce Beard, and architects are Waldron and? Pomeroy, Seattle. i 40 CITY OF EDMONIDS ENGINEERING DEPARTMENT 505 BELL STREET EDMONDS, WASHINGTON 98020 APPLICATION FOR INVASION OF RIGHT-OF-WAY (Submit In Duplicate) Permit'to be issued to: Harbor Construction Co.. Inca 100 Second Ave property to CB an state property For work at: (address or vicinity) at Tames Street Type of work to be done: excavate for and install approximately __-22 265' of R", 601 of (Attach Drawing When Applicable) 12" and 50' of 6" concrete vine together with four catch basins at locations indicated on Harbor Construction working drawine which is attached. Owner: Douglas Haa_ er Name . Pier 89 Mailing Address 1~ } 546-1313 Ss�at�la � ` ieTaahinat�n City State Telephone Number Contractor: Nari,.,m conof•r'lt tlon Co , inc Name 1200 112th Ave. N.E. Mailing Address Bellevue, Washington 455-3325 City State Telephone Number Signature: /—)06U1� Owner or Agent ,Date Signed ) DO NOT WRITE BELOW THIS LINE (To be completed by Issuing Agency) Permit Issued (date) April 26, M3 Permit Number 73-62 Remarks: SubJect to i.nsppction A restoration. All work to be done in (accordance with Ord. 1394-A. A 24-hour notice is required for pspections. Call 775-2525, ext. 252. l�n 4�ZG ROVAL DATE 0 •� CITY OF M'10NDS EI'MINZE41"ING D2PARTMENT see -room i=F-om s-r. Pwy, 4,8. ro c.s. o, I Insp Date-S-...-?-j-3.By,.�6----- ...... .c-"E'f-r FOIL '=)k'LsN)Ne- Wsloa ..................................................................... PI PC o r-- s=-r W&:,gA/ z- 'B - ----- Insp Dal -------•- ---- T-, ....... T ......... ......................... PIPE Se C-, 0- I Insp Da ,ES- Z. -4E-7-aV B y. .......... InspDate ................. By .............. ......... R,)mar.;-s ............ ....... ........ . .......... . ............................... . ............ ......................................................... PLAT OF SURVEY FOR. '24-ONSTRUCTION CO. • Lots 9, 10, 11 and 12, Block 2; Gepha W s N F`st Addition to Edmonds, according to the plat thereof recorded in Volume 5 of Plats, on page 43, Records of Snohomish County, Washington. . J L Main Street 2% w I6' I 120.00' I I>. �� I ; A _N I - I O i O I Q O I N u I 120.00' Publ is Al ley I I C, O O O 30' I L_ N30' :3 ,c N Q N I — • = INSTALLED IRON. PIN ;o: = INSTALLED COPPER TACK REID, MIDDLETON & ASSOCIATES, INC. CONSULTING ENGINEERS & LAND SURVEYORS EDMONDS & EVERETT. WASHINGTON DESIGN DRAWN CHECKED DATE FIELD BOOK SCALE FILE No. 4409 G. W. L . 4 -20 -73 329, p•45 1 " = 40' SHEET ' 1 OF 1 CITY OF EDMONDS Office of the City Engineer April 26, 1972 Dear Resident: � w As you are aware, 100th Avenue West between 244th Street S.W. and Edmonds Way is to be improved by constructing a 44-foot roadway, curbs and gutters, aidawalks and storm sewers. This improvement is a joint venture between the City of Edmonds, Snohomish County and Urban Arterial Board of the State of Washington, of which the City has been designated'as the sponsoring agent respon- sible for the supervision of design and construction. The construction will be accomplished by Knowles Construction Company; work will co-+ence approximately May 1, 1972. Access to the abutting properties will ba maintained except there will be short periods of time that access will be cur tailed. The property.owner will be notified of such curtailment. Also,"road closures will occur due to deep excavation in the present roadway. In addition to roadway construction, water services to residences are to be relocated. It will be necessary to interrupt water service for a short time. Resident occupants Will be notified prior to the interruption. If you have any trees, shrubs, flowers, fences and/or other improvements within the street right -of. -way, you are advised to remove these i►mediately. If you have any storm drains emptying onto 100th Avenue W. you are requested to advise Reid, Middleton & Associates of their location as soon as possible. Also, you should nark any existing property corner stakes and pipes and notify Reids of their location. Sewer laterals will be installed to properties not now.connected.to the sanitary sewer. If the sewer lateral has not been installed to. the property line, please advise the project engineer (Forest Roff, 778-1171) in order that side saver locations'gan be determined and installed at this time. Construction of this nature can be extremely hazardous particularly to young curious children; it would be greatly appreciated if you would caution your children to stay clear of the construction work. We sincerely regret the inconvenience that such construction will impose upon the abutting property owners and residents. We solicit your cooperation and under- standing in hopes that this work may be satisfactorily completed within the 180- day construction period allvAed the contractor. In the event you have any questions or emergencies pertaining to this project, the attached list of names and telephone numbers are supplied for your convenience. Yours very truly, CITY OF DMONDS L r LARSON City Engineer RHA:mjf Attachment -7 7y 33�3 Conl TEA-�tio� City of Edmonds 40. vila %if,I Permit Application Form Form A Puvfff NOT- <� Site Address: Sno County Tax Account Parcel #: Lot # Business/Tenant Name (if applicable): E-Mail: APPLICANT/CONTACT:.. Arne a" Fill out the following informationA" ' Name & Mailing Address:IM City Rq0 2oa Phone: ( FAX: ( ) BEET FILE E-Mail:& Va 01 .CONTRA R: ❑Same as Property Owner Other (Name) ; K _61.tL,f� A(;l�?�i'h 5 Mailing Address: if e /!/L. o--� 42m City: l !lc CLI_1 tat. State: 60 c.-,- —Zip:, Phone: L.2g,0 5 }5-11 49 2 FAX: 54-5— &�Py E-Mail: al L sor) _ �C �a`�'Q.rh�. Ig _ Ir State License Number: Fp_b U Li4 12z t) S Exp: Dat ity Business License No: rkdoq519/2009 LATEMP\BUILDING\HANDOUTS REVISED IN 2009\2009 updated handouts\FORM 1 HEAT SOURCE (CHECK THE PRIMARY FUEL SOURCE FOR HEAT/HOT WATER) S HEAT ❑Natural Gas ❑ Propane ❑ Electric ❑ Oil ❑ Geothermal ❑ Other HOT WATER ❑' Natural Gas ❑ Propane ❑ Electric ❑ Oil ❑ Geothermal ❑ Other TYPE OF CONSTRUCTION: (i.e. VA, VB, III B, etc.) DETAILED SCOPE OF WORK Please provide a complete detailed written scope of work for the proposed project Additions (additional square footage): Specify room use, floor level and square footage and direction if applicable (i.e. 545 square foot master bedroom/bathroom addition on the second floor with 140 square foot deck and 245 square foot kitchen addition on the main floor at south side of house). Remodels (interior renovations): Sp�"�c 2 on the main floor to create new ma1 with new French doors, reconfigure kitchi in the living room). a ses and floor levels (i.e. combine bedrooms 1 and /bathroom; replace dining room sliding glass door NtsI"% prep counter and install new gas fireplace E3 PROPOSED NEW SQUARE FOOTAGE FOR THIS PROJECT: Basement: sq ft (Select Basement Type: ❑ Finished ❑ Unfinished First Floor: sq ft Garage: 2nd Floor: 3RD Floor: Contractor's Bid: sq ft Deck: sq ft Other: 0—y'?J le-- sq ft sq .ft sq ft LATEMMUILDINGUiANDOUTS REVISED IN 2009\2009 updated handouts\FORM A.doc 5/19/2009 2 ` OF ED-4 O CITY'OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 InC. 1 g90 BUILDING APPLICATION ACCEPTANCE Thursday, June 25, 2009 This Application has been accepted by the City of Edmonds for review. More information and changes may be required during this process. The review target date is: Tuesday, July 21, 2009 Your City Contact is: THERESA UMBAUGH Application Number: BLD20090397 Project Address: 100 2ND AVE S #200, EDMONDS PROPEW17YONVNER APPLICANT HARBOR BUILDING OF EDMONDS FROULA ALARM SYSTEMS 2829 RUCKER A VE STE 100 861 UNDUSTRY DR EVERE17, WA 98201- TUKWILA, WA 98188- ( ) - Fad. (206) 575-1962 End. Work Description: IRE A LA RM MODIFICA TION )utstanding Items at Time of Submittal: I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION THATTHEINFORMATION GIVEN IS CORRECT AND THAT I AM THE PRO PERTY OWNER, OR THE DULY AUTHORIZED AGENT OF THE PRO PERTY OWNER TO A SUBMITA BUILDING PERMIT APPLICATION TO THE CITY. $?CNA V A A%'rJ'qlJ rnuI l nAl.lc DATE SIGNED To view up to date information about your application please visit the City of Edmonds Development Services website at http.1Avww.ci.edmonds.wa.us. Message Page 1 of 2 Harrison, Marie From: Smith, Mike Sent: Thursday, December 31, 2009 2:48 PM To: Harrison, Marie Subject: RE: 100 2nd Ave S, Edmonds Checked and no Fire Alarm work was done. . -----Original Message ----- From: Harrison, Marie Sent: Tuesday, December 15, 2009 3:34 PM To: Smith, Mike Subject: FW: 100 2nd Ave S, Edmonds Mike: What did you decide on this one. Thanks awl -----Original Message ----- From: Harrison, Marie Sent: Friday, December 11, 2009 11:27 AM To: Smith, Mike Subject: FW: 100 2nd Ave S, Edmonds Mike: Please see below. Thanks )K A.rie -----Original Message ----- From: Alison Deibel[mailto:alison@froulaalarms.com] Sent: Friday, December 11, 2009 11:26 AM To: Harrison, Marie Subject: RE: 100 2nd Ave S, Edmonds Thanks Marie. We did not need that permit after all. Can you disregard it? Alison Deibel 206-575-1962 From: Harrison, Marie [mailto:Harrison@ci.edmonds.wa.us] Sent: Friday, December 11, 2009 9:07 AM To: alison@froulaalarms.com Subject: 100 2nd Ave S, Edmonds 1 /4/2010 Message Page 2 of 2 Hello Alison: Just a reminder that the fire alarm permit for the Harbor Building needs to be picked up. Please stop by our office between 8:00 a.m. and 3:30 p.m. to pick up your permit (bld20090397). Sincerely, E. Marie Harrison Senior Permit Coordinator harrison.@ci. edmonds. wa. us. A significant budget shortfall has been identified for 2009 for the City of Edmonds. City employees are taking non -paid furlough days during 2009•(one day each month) to preserve services and, reduce the need for reduction in force. The remaining furlough day is December 23, 2009. i7 ' g thi5 email n�i�{er the en��iror�rn:�rrt heron �r,ntir; 1/4/2010 � DEVELOPMENT SERVICES COMMERCIAL & MULTI -FAMILY BUILDING PERMIT APPLICATION Fsr I aqo 121 5 h Avenue N, Edmonds, WA 98020 City of Edmonds Phone 425.771.0220 Fax 425.771.0221 PLEASE REFER TO THE COMMERCIAL & MULTI -FAMILY BUILDING CHECKLIST FOR SUBMITTAL REQUIREMENTS PROJECT ADDRESS (Street, Suite #, City State, Zip): 100 2nd Avenue South Parcel #: 00454800-200901 Subdivision/Lot #: Project Valuation: $ 20,000.00 APPLICANT: T-Mobile (Agent - RealCom Associates - Sarah Telschow) Phone: (425) 274-4444 ext. 114 Fax: 1(425)274-4449 Address (Street, City, State, Zip): 14432 SE Eastgate Way, Suite 260 Bellevue, WA 98007 E-Mail Address: stelschow@realcomassoc.com PROPERTY OWNER: Hassbh LLC Phone: (206) 617-1692 Fax: Address (Street, City, State, Zip): 3727 S. 194th Street E-Mail Address: LENDING AGENCY: Not Applicable Phone: N/A Fax: N/A Address (Street, City, State, Zip): N/A E-Mail Address: N/A CONTRACTOR:* TBD Phone: Fax: Address (Street, City, State, Zip): E-Mail Address *Contractor must have a valid City of Edmonds business license prior to doing work in the City. Contact the City Clerk's Office at 425.775.2525 WA State License #/Exp. Date: City Business License #/Exp. Date: DETAIL SCOPE OF WORK: The applicant, T-Mobile, proposes to modify an existing rooftop telecommunication facility located at 100 2nd Avenue South (Parcel No. 00454800-200901) to provide expanded services. The proposed modification consists of the following: Upgrading/replacing four (4) existing antennas and add two (2) new antennas. PROPOSED NEW SQUARE FOOTAGE FOR THIS PROJECT: Basement: N/A S . ft. Garage: N/A S , ft, 1" Floor: N/A s . ft. Deck: N/A s . ft. 2 Id Floor: N/A s . ft. Other: s . ft. P Floor: N/A s . ft. Occupancy: N/A Occupancy Load: N/A Retaining Wall: ❑ Yes ❑ No Grading: N/A c ds. I Type of Construction: Telecom I declare under penalty of perjury laws that the information I have provided on this form/application is true, correct and complete, and that I am the property owner or duly authorized agent of the property owner to submit a permit application to the City of Edmonds. Print Name: sar Telschow ❑ Owner Dgent/Other (specify): Signature: Date:6 Ca — 18 —12— MA FORME L:\Building New Folder 2010\DONE & x-ferred to L-Building-New drive\Form E.doc Updated: 10/2010 DEVELOPMENT SERVICES COMMERCIAL & MULTI -FAMILY BUILDING CHECKLIST 121 5`h Avenue N, Edmonds, WA 98020 Phone 425.771.0220 Fax 425.771.0221 City of Edmonds PROJECT ADDRESS: PRE -APPLICATION MEETING? ❑YESOO If YES, Pre -application Number: Plans shall be of sufficient clarity to indicate the location, nature, and extent of the work proposed, and conform to the provisions of the adopted International Codes and City Ordinances. n� 5 & SUBMITTAL REQUIREMENTS The number indicates the number of copies for submittal(ifapplicable). Check marks indicate additional submittal requirement as applicable s z' 34, k n o. CA El A z : 3 �' F.3 0 0 0 r) o 4 ez y �� M ft M n Y 3.°', ft 0 x @ c �► y A Application Form E 1 1 1 1 1 1 Site Plan 3 3 3 3 3 3 Reduced Site Plan (I I X 14 or 8'/2 x 11) 1 1 1 1 1 1 Architectural Construction Drawings 3 3 3 3 3 3 Structural Drawing and Calculations 3 3 3 3 ✓ N/A WA State Energy Code NREC Calcs & Lighting ✓ ✓ ✓ ✓ Site Classification Worksheet 3 3 Site Development Plans 4 4 N/A Landscape Plan 3 3 N/A Right —of-Way Permit Application 1 1 1 L1/ Critical Areas Determination or Checklist 1 1 1 N/A Geotechnical Report 3 3 N/A Health District Approval Letter ✓ ✓ ✓ N/A Manufacturer's Specifications/Cut Sheets ✓ ✓ ✓ ✓ 3 Contractor's City of Edmonds Business License ✓ ✓ ✓ ✓ ✓ ✓ Washington State Contractors License ✓ ✓ ✓ ✓ ✓ ✓ Plan Check Fee (due upon submittal) ✓ ✓ ✓ ✓ ✓ ✓ N/A Traffic Impact Analysis 3 3 3 3 V/ Survey 3 3 Special Inspection and Testing Agreement ✓ ✓ ✓ ✓ Contractor's Acknowledgement Letter ✓ ✓ Envelope Plans and Documents 2 2 N/A Bonds 1 1 ✓ ✓ N/A Architectural Design Approval 1 1 ✓ ✓ N/A Peer Review Fees ✓ ✓ N/A Deferred Submittals ✓ ✓ N/A Shop Drawings ✓ ✓ Street Use ✓ • Handouts and Standard Details may be found on the City's website www.ci.edmonds.wa.us or can be obtained at City Hall during normal business hours. • Plans/calculation/reports prepared by state licensed architects or professional engineers must be stamped and signed by the design professional. FORME LABuilding New Folder 201000NE & x-ferred to L-Building-New driveTonn E.doc Updated: 10/2010 Equipment Type Appliance/Equipment Information (new and relocated) Total # Furnace # Gas # Elec # Other: BTUs: <100k >100k Location Air Handler/ACIVAV # Gas # Elec # Other: CFM: <100k >100k Location Boiler/Compressor/ Heat Pump/Roof Top Unit # HP: Gas # <3, Elec #_Other: 3-15, 15-30 BTUs: <100k, Location 100k-500k, 500k-1Mil Hydronic Heating #—Gas #_Elec —in-Floor, _Wall Radiant, Boiler BTUs: Location Exhaust Fans (single duct) Location: # Bath # Kitchen # Laundry # _Other: — Fireplace #_Gas #_Elec #_Other: Location Other Number of Outlets Fixture/Appliance Type AC Unit -------------- BTUs: Location: Furnace -------------- BTUs: Location: Water Heater ------- BTUs: Location: Boiler ----------------- BTUs: Location: Fireplace/Insert BTUs: Location: Stove/Range/Oven: Dryer Outdoor BBQ: Other: TOTAL OUTLETS PLUMBING FIXTURE COUNT Number Fixture Type Number Fixture Type Water Closet (Toilet) Refrigerator water supply (for water/ice dispenser) Sink (kitchen, laundry, lavatory, bar, eye wash, etc.) Water Service Line Tub/Shower Drinking Fountain Dishwasher Bidet/Urinal Hose Bib Pressure Reduction Valve/Pressure Regulator Water Heater Tankless? Yes No Backflow Prevention Device (e.g. RBPA, DCDA, AVB) Expansion Tank for Water Heater Hydronic Heat in: Floor Wall Floor Drain/Floor Sink Other: Clothes Washer Other: FORME L\Building New Folder 2010\130NE & x-ferred to L-Building-New drive\Form E.doc Updated: 10/2010 l - vomn . Thornquist, Linda-i�Ct�hfhQ,Y" 1Y1:'p"� " u r! From: Thornquist, Linda Sent: Friday, August 09, 2013 9:24 AM To: 'ALLISON.ZIKE@SMARTLINKLLC.COM' Subject: BLD2012-0773 / 100 2nd Ave S Allison, This email is in regards to an application that will expire on September 4th, 2013. There has been no response to comments on this.project. If application is not approved and issued by the September 4th date a new application and fees will be required in order to moveforward with the project. Do you know what is happening with this project? 1s it to be withdrawn? Comments from planning are attached. Thank you, Linda LJ Planning Comments.pdf Linda Thornquist Permit Specialist City of Edmonds 425-771-022o ext.1336 1 y �.a ,+ `r.� �.,,� .tia `, w.. ' .:.i. ..i ._ . •. - .. �. T.,..w � ice'.; -!1 CM OF EDMON DS c�r P jwvlf�.L.nL`Ri 505 BELL ST e.. i r EDMONDS$ WASHINGTON 98020 "U•APPLI ATIU� R STREET f USE PERMIT r .. (Submit'in Triplicate) ^ Name of .Applicant: Doug Hager , Description of Public Place `or Portion The Desired to be used: (Exhibit may h-e attached) Marauee extending 3 1/2 feet as per attached sketch Type 'of Use, desired. to be Made of:Public Place: to;� bet:'used as covered entry. If Applicable, Attach Plans, and. Specifications For Any'Utility or :Structure to be Lrected:and/or Nainlained on the Public Place: Exhibit`,or:'i:rawing Nos: HC-8-73-100 Second Ave.'Marque* 'Temporary Pera:t:. Unles3 otherwise,`, designated herein, -this permit is understood by applicant to be' ". wholly,of a temporary nature, that it vests:no permanent right whatsoever. If ''tree permitted;.`use�. becomes dangerous or., such structure shall become insecure ;,or unsafe, .+ orshail.not".'be'.constructed, maintained.or used in accordance with:the provisiou:; of this title, the same may be revoked and the structure and obstructions ordered removed by ;order: of the City Engineer. If this application is for a. specific': period of time,: the term of ,said application is: ,Indemnity• - .. r . Applicant understands''and by his signature to this 'application agrees to hold the Cit''of.Edmonds harmless from any injuries, damages or claims of any,kind'orAds � cription whatsoever, foreseen.or unforeseen, that may be made against,the applican-t", or' the City. of'. Edmonds, or any, . of its departments or employees, including; but not' ' Y a.limited to She';.defense of any -legal proceedingsincluding,.defense costs,,court. a costs' and attorney fees. , A P ication of p1Chapter 6.40 of the Edmonds'City.Code Applicant warrants that he has 'read, or had the'opportunity to read, Chapter 6.40 of theEdmonds City Code, and' understands that . all terms of that.. Ordinance :are':; .°. indorporated herein as is set forth in full and this application and permit there l fore. are subject to -the terms of.that Chapter of.the Edmonds City Code. FVZ Signatu of Applicant) {'}.tom►„ .a r ra' ..ti -! �' • - ' "� _ '�S1ir ya:. -y, t " . f ,; : y '`. ,'"` _ +'k +�.. T•�.t. ..p bt.°" a - w...►�F .{+>7h:..aep City of Edmonds A)oli.cation for Street. Use Permit Name of Apoant. Doug Hater Street Address: 2d Avenue,pt Main street r City: Edmonds, WA 98020 . Date: 7/20/73 Approval (and Agreement, if Applicable) of Abutting Property Owner(s): Signature s Address DO NOT WRITE BELOW THIS LI14E (To be completed by Issuing Agency) Date of City Council Approval: August 7, 1973 Permit Fee: none Annual Fee due January 1, 19 Provision for Indemnity: . Terms and Provision of Performance Bond, If Applicable: Note: Reference 6.40.060 of the applicable Ordinance) Additional Conditions Imposed Upon and Agreed to by Applicant: Approved by: G 2�J (- August 9, 1973 Asst City Engineff Date Approved by: August 9, 1973 (If applicable) B ilding Official Date Permit Issued: 8/9/7 Permit Number: 73-7 Date Applicant has read the foregoing application and conditions of approval of this permit, fully understands and agrees to all conditions of the foregoing applica- tion and permit approval, and by the execution of his signature hereto agrees to the same: Date Applicant's Signature -.w? l�n� lift• �r� �t. P. _ - ;s , i{ t yr 6 b Iq r.iC �- b� 5t5'_i,ai f i ' r}_ a, ', t , 'i: ` y ...• t . a . , ! ' , , :a to AOpo4't) VIV(n ,pis p, . • i i i. 1C ' I ' to . r � 1 ' r� �t�'.o t ♦•', � ' ' .`tic k t ; f # • ' ( .� ", � �'�" It 4 y�'f . � t-E4 / / . C eQk 1 4k y er �sa ka rf- �• k ,� c d v;• _"-r.�� � _. .�.y lz .14 � 1�ar t'. `, �,,'�, .. � \ t t ' � S I,ro � , ,,tom � � � '✓� . Ir (,7.�p� r ` { . Mv F77. al,f. Wk it OA �t �4 `• �i [I �' f �� a�'7 .,.a. '• ',1.• - � n ,' � 1�IS1 <� � t `B E a f Awr•.. t. rfs'c �- ,'r�lE � �Y � , .- i �4 : � - ,rl a k y '• ' I { ,x_n S � L s iii .5. •, P � .f Z ro i�t „r 5. � t, • �•, � CO � :',�. i I ; • .4 .. � � ,. � tt t �,` t a i T C-. CyC� i °- 4�'�4� t'k+ .'. iui , Y u •'r f � ! 4 .»._.._..-.--_-�.._._.—. _._ � I - � � q , y .. F I # } , J 1 r4Tta i Ik • // # f I• .1 t r ,. �' i 1 ' MY3 A •'i 1 r 6 � �•:a �i %. • .-�v z s Cam, �u�• Yy`t .r � � = t as i� - (. / , • • • • . ♦ • n Jo SALES PERSCN �4 • • • k i. ..-. �,a. t. .�.. A .'. -. ,, ��r. �> {. �µ�.- �t wiA .ir. •--y -�. 3q- . " rt4 - _. ... .� , -, , .. J _. t y' ... .. ,.:. ., a. .._ _' -,.. ,. :.F t r. _ �'f�`i^:•+1,.. ?'b_ �+ sic trr+ .+ w 'k:: _ «'._. . .. _ , -..",: _.,, ,.—., :., -,.� ,'• 's;s.f' t .S - ';.' ,`"�'i��-• 3.,'Y• ��• :!�,> ;fir`• L - .. �r_.,.. . .4 w;... .. - ., �.,. .• .t. _.. rr. n.:5 .-. .- ..:^, }'-4i ..< +ti�zir- .'{:�.. 2 itr 1{r�.t` s{.y��.v ,.A�' ... .. _._ - .. • � -. ..-- t"- '-,f.. ._ .,. ;j-:v.. r. -�bf -::f` '` �4� :�'.' �r7'•'t!' ...,C'�is' ! �'.!" -. _.'f('1 - ,�w �syf'�9' �, '��`u Y•. " t':`S,n* �s•. •t> j:..{. :4 '?' X^ .f-,GS -ram` r'v.{:C�'"� v,<�,-" '7 +i . ?.:s .L i�.�, �'..-'L4•')' .'tom_-' 'ac_ .:i, ,.e �e':4''-:; . ;';.: i. . e Ll , { g 1' i ,,_ ,: , J. ..' •.• .� .: r.. •'.. ,. •- .._ ,r S �+ % �- .Ca. 1 ..� 13F "'r / ,T �i.� .k ;1' i�'� i• • Lt.. :S ' ,,,,, P .t•.r; :tr , ,t •h; .. .,. . , _ .. - .. - -.... . , � • •.-. ;' - ¢ ... ,_'' 3P:. , � � �.-.'r k . k . .,S . r+,:�•M1'• ,t -ter. .. s• � . . _. .� . �,, . _ .. _ . x . _ � ?i - ,w*:�" ✓.< ;,<+ ,,.-t§�� ::_ �} `�.:"�ryd • M%��' .,i., ^r<,,. 1 i +>S�+•t-' , Vp•._"t• i'f. 'S+'�'„.�3.5 r�7 ..t qr,'. 1�.T , S^a`> V ,_. .. ..,. .,' x.,..., ., ... •. :_ .. a.� L, _ f _ •_d�+'w�«•' -.,a. �'.F�+- qh :,.-i.,;t ,r �^F_.- iw. 1:' .-i ... - ��... , � .. _ ,. � - , . ... - _ - . , r � :. •:..,._ -.-.. ,,. ,n 'ri;.s, c'« t":. -t � .i. l., ,��'3� J# ''.�gt� �, �--•. ..2�_. � ..-t-.•g3"c-:x � :Y 3" �.>:..t ;Sv.a.-.:`.�'_..,, t .''<`s1'�,. :$�e...,. =L-:� ��-?{`� .=4.. r'. -4"- •t't�L-#-.. -�.� -•- t - rz; y � � � r �' T " -� . �-• —� e.v.w ,.fir• ..;4`�_w:.•.q,. y*}�' � �_�, ..1 _ �, - - _'T' �. _sv. :t_. 4x• y3.. ,A- 4•?:�'., `"'�`,_ s�=,, •`j:,.ai �f Y 4 s�..` n: y�T,. r .. _ .,. 3, ,; ��.. ,, ,..'F -, _ ;` •!,.' .',� t,. t s ';»?.. 1.... "4:[3i+ "�.l�:.Za ,.y.�+,.. .t..,,; ... +'vS .a« r,p' , ,S . � ... -.. .. � r .. . r�4-, ry 3.,�.. ...1.� 11. t , -. D•.,� �':•c_ � _ � � �'� . .;4=- �'�.-f',•' - v i C _r....r,. :�'.� x _ ,,.• � .:._ .. �.•. s• - � ."". ,-. - _ ..sy !:. xf' d' ,, &,�._ .,.'h'< ,< ,�".r"L e';`•,> � .e^'r 'i��.;r-rr•,..ry .�,^` ? - - _ .... r L 'S4� .'4.,'" 3' . Jam"`^ti tk '-._ * y_J �. - •t - �y "' s , .., -s. - -- s .`., •..::. ., . • � _ t .z. .>; >tt; � , y y.'�. `�-:Jr? �4 ; ems,.:�t ... z .: .. ;..� _. .. i .. • � ..: ... ..- ., .. _. . . .. .. - _ sas,.. ,L_ . .''- . ':3`•r 'ti` s9-:. f.-.. :l---a Mi+--<:Q'-.-r "'=«3�o,.:J... r+- x.cY:•_t+, �µar rr3t ?'?i.. ._ .,..-,• _ •. .•.... .... r ..:•:.... ,-,.sx•'-, ..} . �.., ••'. i ,C : ,.-.. r . � . .,,, � �''-� — fir. ':'at .i-r. APPRO FI DEP 0 2107 /j a6 • � 4PPROVED By PLANNING Corner ' / Fla&_ Zone �gtl' ks Raw �red -- Front .�.--- Sl(le3 tot Rear Other b Hei ht r PLANNING CONDITION: Antennas and related components shall be painted the same color as the existing building, pole, or support structure (ECDC 20.50.030). (E) T-MOBILE EQUIPMENT ROOM _�- (P) (2) 1-518 COAX 8 (E) (4) 15(8-COAX IN (E) ROUTING FROM ANTENNAS TO EQUIPMENT ROOM :r / 65' (,)PARKING LOT (P) T-MOBILE ANTENNAS #ANDREW \ TMBX 651 SR2M (TYP OF 21 MOUNTED ON (P) NON -PENETRATING ROOF FRAME -� IE)ROOF PROPOSED SITE PLAN 22X34 SCALE: 1• = 18 N 11X17 SCALE = 1 20 s• 1. (E) T-MOBILE ANTENNAS REPLACED W/ TMBX-6516-R2M COAX CONDUIT ROUTING T-MOBILE ANTENNAS REPLACED W1 TMBX.651GR2M RECEVED OCT -0 9.2007 BUILDING DEPARTMENT GTY;OF EDMONDS FIL T - -Mobile- 19807 NORTHCREEK PKWY H BOTHELL, WA 98011 OFFICE (4251 398.76W DOWNTOWN EDMONDS/HARBOR BUILDING SE1682B 100 2ND AVE S EDMONDS, WA 98020 ISSUED FOR: CBUILDING PERMIT REVISION XISTORY: FNo. DATE: DESCRIP Q10/2/2007 MINOR RE Q5129/2007 ISSUEDF( Qj 01242007 ISSUED OI PLANS PREPARED By; B. J. THOMAS, P.E. 7607 BOTH AVE NE MARYSVILLE, WA 98270 206-851.1106 C DRAWN BY: CNK. BY: = APPV. BY: JL,AAL BJT AM LICENSURE: 37.o �I I EXPIRES 08/ 5/09 EQUIPMENT: REPLACING EXISTING ANTENNAS 8 ADDING A NEW ANTENNA SUPPORT STRUCTURE FOR THIRD SECTOR. DRAWING INFORMATION: DO NOT SCALE DRAWINGS. CONTRACTOR MUST VERIFY ALL DIMENSIONS AND ADVISE CONSULTANTS OF ANY ERRORS AND OMISSIONS. ALL PREVIOUS ISSUES OF THIS DRAWING ARE SUPERSEDED BY THE LATEST REVISION. THE INFORMATION CONTAINED IN THIS SET OF DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN WHICH IS RELATED TO NAMED CLIENT IS STRICTLY PROHIBITED. DRAWING TITLE: PROPOSED SITE PLAN DRAWING NUMBER: Aml A Si`f� PU�'✓1 RECEIVED OCT 0 9 2007 BUGTMDING PEPARTMgNT OF EDmONDS i LJL ujui ($: Yoi V G 1— �. m ' r F T i , [L! 4 1 A i\ i jV4 A (1V.: ST -EDMONDS OFF IC . LQiNCR PARKIN-GL • - BUttDItVG n .� �-T / , � ' ,-DLil:��� 100 a . i-,,a cz) ARCHITECTURAL T-1 TITLE SHEET, OVERALL SITE PLAN, GENERAL INFORMATION A-1 SITE PLAN, NOTES, LEGAL DESCRIPTION AND VICINITY MAP A-2 EXISTING AND PROPOSED PARKING PLANS A-3 DETAILS A-4 DETAILS ELECTRICAL: E-1 ONE -LINE DIAGRAM AND GROUNDING PLAN SHEET INDEX SITE NUMBER: POWER: SEA-EDMONDS N/A SITE ADDRESS: PHONE: 100 2ND AVENUE S. �: EDMONDS, WA 98020 N/A PHONE: HARBOR BUILDING OF EDMONDS TWO LLC CONTACT: DONNA SCHAEFER, COAST RE SERVICESJNC PHONE: 425-405-1890 ZONING; BD2 DOWN TOWN MIXED COMMERCIAL PARCEL NUMBER: 0045480021100 PROJECT DESCRIPTION: THIS PROPOSAL IS FOR THE MODIFICATION OF AN EXISTING VERIZON WIRELESS FACILITY, CONSISTING OF THE ADDITION OF A 60KW NATURAL GAS STAND-BY GENERATOR (OPERATES DURING POWER OUTAGES ONLY) MOUNTED ON AN EXISTING CONCRETE GARAGE PARKING FLOOR WITHIN PROPOSED 8'-9' X 15'-0" LEASE AREA AND EXHAUST VENT TO BE ROUTED UP NEXT TO BUILDING. PROJECT INFORMATION A/C MR CONDITIONING HARD'.D HARDW00D so. SQUARE ADJ. ADJUSTABLE HORIZ. HORIZONTAL SS STAINLESS STEEL AFF APPROX. ABOVE FINISH GRADE APPROXIMATELY HR HT. HOUR HEIGHT STL. STRUCT, STEEL STRUCTURAL ASTM AMERICAN SOCIETY FOR HVAC HEATING, VENTING AND SUSP. SUSPENDED AND TESTING AND MATERIALS AMERICAN WIRE GAUGE MR CONDITIONING S.V. SHEET VINYL I.O. INSIDE DIAMETER IN THROUGH BLDO. BLK. BUILDING BLOCK IN. INFO INCH INFORMATION TNND T.O.C. TINNED TOP OF CONCRETE BMR S/S BASE MOBILE RADIO BUILDING SrANDARD INSUL. TNT. INSULATION INTERIOR T.O.M. TYP. TOP OF MASONRY TYPICAL CLG. CEILING LB(S) POUNDS) UBC UNIFORM BUILDING CUR. CONC. CLEAR CONCRETE MAX MAXIMUM UNO CODE UNLESS NOTED CONST. CONSTRUCTION MECH MECHANICAL QTHERMSE CONT. CONTINUES MTL, MFR. METAL MANUFACTURER VERT. VERTICAL DBL. DOUBLE MCR MANAGER VIF VERIFY IN FIELD DIA. 0IAC. DIAMETER DIAGONAL MIN MISC. MINIMUM MISCELLANEOUS VT VINYL TILE DIM. ON DIMENSION DOWN N NORTH W W/ WEST WITH DET DETAIL NA NOT APPUCAPLE WIN WINDOW DWG DRAWING NIC NOT W CONTRACT W/o wITHOuT E EAST NTS NOT TO SCALE W.P. WATER PROOF EA. EACH O.C. ON CENTER ELEV. ELECT. ELEVATION ELECTRICAL 00 O.M. OUTSIDE DIAMETER OPPOSITE HAND ED. EQUIP. EQUAL EQUIPMENT OPG. OPP OPENING OPPOSITE E.W. (E) EACH WAY EXISTING PLYWD. PLYWOOD EXT EXTERIOR PR PAIR FIN. FINISH PROD PROP PROJECT PROPERTY FLUOR. FLR FLUORESCENT FLOOR PT PRESSURE TREATED FT. FOOT REO•D REQUIRED GA. GAUGE RM R.O. ROOM ROUGH OPENING GALV. GALVAMZED CC GRID GENERAL CONTRACTOR GROUND S SHT SOUTH SHEET GWB GYPSUM WALL BOARD GYP. BD.GYPSUM BOARD Sim. SPEC. SIMILAR SPECIFICATION ABBREVIATIONS NOTES: THIS IS NOT A SffE SURVEY: ALL PROPERTY BOUNDARIES, ORIENTATION OF TRUE / APN / NORTH AND STREET HALF -WIDTHS HAVE BEEN OBTAINED I \ W858900120100 //�• / FROM A TAX PARCEL MAP AND ARE APPROXIMATE. � \ !\ 006589001204DO 1 00858900120200 (EXISTING TYPICAL) 008589001100 TREE-: \ \ 008569001203000 N00 / /� MNS �OC�D�S TED i�Z /Q �O PROPOSED VERIZON WIRELESS 6OKW NATURAL GAS STAND—BY GENERATOR (OPERATES DURING POWER OUTAGES ONLY) MOUNTED AT EXISTING CONCRETE GARAGE PARKING FLOOR WITHIN PROPOSED 8'-9jk15'=Q LEASE AREA NEW NATURAL GAS METER — LOCATION (LOCAL UTILITIES TO INSTALL NEW GAS METER AND CORDINATE POINT OF GAS CONNECTION) GAS METER IS DEDICATED FOR STANDBY GENERATOR USE ONLY NOTE: CONTRACTOR TO COORDINATE W/ PSE FOR METER INSTALLATION REOUIREMENTS ALONG GARAGE WALL / APN 00863300020200 �- 00863300020300O ' 00863300020100 / 00863300020100 / O APN 00454BW201700 2 / Q � O / ti / 4% L Data: /�J e4�^• \C��Nf EXISTING UPPER LEVEL PARK114G ' / � =U '97,ot,Rry V T '1'F� s.'S* �:S o O A\ Cf h APN "Cl? 00767600020300 00787600010000 00787600020200 00787600020100 / "-EXISTING / BUILDING I / L ' U APN 004344007 C Q` / \ �EXISTINO� A \ ROOFTOP 'P" �,,,,,,�,A; APN , Zone 00454800101300 Corner Fla _ 00454800200901 / Setbacks Tteauired Actual I-,q<4 cL�_ o t Fy Front \ / I � Sides O EXISTIN13 GAS LOCATED INTTHELAL LE "APPRO D BY T-T,, ING Rear - � Other 2j OVERALL SITE PLAN I 2 4°' 24 Ci6 6GALE:, _2p-0 I „•><,T SCALE: ,• _ 40•-0' � APPLICANT: VERIZON WIRELESS 3350 161ST AVE S. BELLEVUE, WA 98008 APPLICANT AGENT: ODELIA PACIFIC CORP. 208 WESTLAKE AVENUE NORTH SEATTLE, WA 98109 CONTACT: RICK CARDOZA PHONE: (253) 218-9017 ARCHITECT/ELECTRICAL ENGINEER: KDC ARCHITECTS 4720 200TH STREET SW., SUITE 200 LYNNWOOD, WA 98036 CONTACT: ERIC CAMP PHONE: (425) 670-8651 FAX: (425) 712-0846 WASHINGTON STATE CODE COMPLIANCE: 2006 IBC, STANDARDS AND AMENDMENTS- WAC 51-50: 2006 IRC, STANDARDS AND AMENDMENTS- WAC 51-51; 2006 IMC, STANDARDS AND AMENDMENTS-WAC 51-52; 2006 IFC, STANDARDS AND AMENDMENTS-WAC 51-54; 2006 UPC, STANDARDS AND AMENDMENTS-WAC 51 -56. 51-57. (PROJECT DIRECTORY SITE ALPHA NO: I DATE ISSUED AS Prelimincr 1 Preliminor -Revised I Zoning -Special Use Permit A Wicotion Construction Permit Applicatiori Issued for Zoning Constructiori Issued for Construction 1 Issued Zonin "'Construction Permit As Built Record Set For Owner and Engineering Approval VERIZON WIRELESS i CELLULAR DESIGN ENGINEER APPROVAL PRINTED NAME SIGNATURE TITLE DATE -L II VERIZON WIRELESS PROPERTY OWNER APPROVAL 1 PRINTED NAME SIGNATURE TITLE 1 DATE APPROVALS/ISSUE DATES I GEPHARTS 1ST ADD TO EDMONDS BLK 002 D-00 LOT 11 h 12 SEP - 9 2008 DING DEPARTME14T TY OF EDMONDS LEGAL DESCRIPTION DEPART SEATTLE—TACOMA INTERNATIONAL AIRPORT DEPART SEATTLE—TACOMA INTERNATIONAL AIRPORT TAKE RAMP (LEFT) ONTO 1-5 11.0 MI 1-5 / SEATTLE TURN POTENTIALLY RESTRICTED- KEEP LEFT ONTO 1-5 EXPRESS EXPRESS LANES NORTHBOUND MERGE ONTO 1-5 4.8 MI AT EXIT 177, TURN RIGHT ONTO RAMP 0.2 MI WA-104 / EDMONDS / LAKE FOREST PARK KEEP LEFT TO STAY ON RAMP 0.3 MI WA-104 / EDMONDS KEEP RIGHT TO STAY ON RAMP 164 YDS WA-104 TAKE RAMP (RIGHT) ONTO SR-104 [NE 205TH ST] 4.8 MI WA-104 / 244TH ST SW WEST / EDMONDS / KINGSTON FERRY TURN RIGHT (EAST) ONTO SR-524 [MAIN ST] 109 YDS ARRIVE 100 2ND AVE S, EDMONDS, WA 98020 DRIVING DIRECTIONS CONFIDENTIAL AND PROPRIETARY Not for disclosure outside VERIZON WIRELESS without permission. IIIIIIIIJ. I— V- I I I R VICINITY MAI2...,, z. vw•IP P-m a r' PLANS PREPARED FOR: U " ' - 9 2008 G DEPIARIVIENT .� OF ED NDS rt ■ i PLANS PREPARED BY: ■s P m p— R F. o' ow OW OF III �I �l W Q all Q I I KDC ARCHITECTS.ENGINEERS, P.G 4720 200TH STREET SW SUITE 200 LYNNVMD, WA 98036 PHONE: 425.670.8651 X FA425.712.0646 LICENSURE: 773 REGI ERED ECT i E• KENNETH D. CAMP STATE OF WASHINGTON DATE: 08/11/2008 DRAWN BY: CRW CHECKED BY: EJC REVISIONS DATE DESCRIPTION BY 10/10 2007 ISSUED FOR REVISED CO REVIEW JMA 12/07 2007 ISSUED FOR CONSTRUCTION CRW 03/10 2008 ISSUED FOR REVISED CONSTRUCTION CRW 4/04 ISSUED PER BUILOIN SN 2008 DIVISION COMMENTS 08/11 2008 ISSUED FOR REVISEa CONSTRUCTION 9/3 2008 ISSUED FOR REVISED Z CONSTRUCTION J ARM PROJECT: SEA- EDMONDS 100 2ND AVENUE S. EDMONDS, WA 98020 r +1 V f' �j ��,> i ! t v . Et! �,. NC1 �.1 S �1 1 /NT�F r J. �i . _ ��. I' ._ � �� �i � �/� I I � ,� r i� ' � � j � _ t i J 1 k `j� � ! (_ 1; I i �� � - - T � - P � oo • NOTES: THIS IS NOT A SITE SURVEY: ALL PROPERTY BOUNDARIES, ORIENTATION OF TRUE NORTH AND STREET HALF —WIDTHS HAVE BEEN OBTAINED FROM A TAX PARCEL MAP AND ARE APPROXIMATE. SECTOR (1UANTITY TIP HEIGHT ANT, SIZE AZIMUTH MECH, DOWN TILT NUMBER OF COAX RUNS COAX SIZE COAX LENGTH 1 3 EXISTING 39'-6"± 4'-0" 0° 0 2 EXISTING 1-5/8" T.B.D. 1 1 EXISTING 39'-6"± 6'-0" 0° 0 2 EXISTING 1-5/8" T.B.D. 2 2 NEW 39'-6"± 4'-0" 90° 0 2 EXISTING 1-5/8" T.B.D. 2 2 NEW 39'-6"± 6'-0" 90° 0 2 EXISTING 1-5/8" T.B.D. 3 2 NEW 39'-6"± 4'-0" 180' 0 1 EXISTING 1-5/8" T.B.D. 3 2 NEW 39'-6"± 4'-0" 180° 0 1 1 EXISTING 1-5/8" T.B.D. SECTOR OUANTITY TIP HEIGHT ANT, SIZE AZIMUTH MECH. DOWN TILT NUMBER OF COAX RUNS COAX SIZE COAX LENGTH 1 2 NEW 39'-6"± 4'-0" 20' 0 2 EXISTING 1-5/8" T.B.D. 1 2 NEW 39'-6"± 4'-0" 20° 0 2 EXISTING 1-5/8" T.B.D. 2 2 NEW 39'-6"± 4'-0" 90° 0 2 NEW 1-5/8" T.B.D. 2 2 NEW 39'-6"± 4'-0" 90° 0 2 NEW 1-5/8" T.B.D. 3 2 NEW 39'-6"± 4'-0" 180° 0 2 EXISTING 1-5/8" T.B.D. 3 2 NEW 39'-6"± 4'-0" 180° 1 0 1 2 NEW 1-5/8" T.B.D. NOTES: THIS IS NOT A SITE SURVEY: ALL "PROPERTY BOUNDARIES, ORIENTATION OF TRUE NORTH AND STREET HALF —WIDTHS HAVE BEEN OBTAINED FROM A TAX PARCEL MAP AND ARE APPROXIMATE. /N m 'In o Io o ♦ vl'0 EXISTING VERIZON WIRELESS ANTENNAS TO BE REMOVED ♦ � / PROPOSED VERIZON 1 ♦ ♦ /.., WIRELESS ANTENNAS A-4 I / p I AND REPLACE (4 TOTAL) / / p �p�j�p (4 TOTAL) EXISTING VERIZON WIRELESS _ rJ/� XI EXISTING BOLLARDS ♦FRT EXISTING BOLLARDS ♦F,QT �� EXISTING VERIZON WIRELESS (TYPICAL) �' ROOFTOP ANTENNA ♦ Y !.4 ROOFTOP ANTENNA ♦ 41N MOUNTING SKID TO REMAIN (TYPICAL) MOUNTING SKID TO REMAIN 4S � 0 4S EXISTING TRANSFORMER Oo / / / y EXISTING ANTENNA BY EXISTING TRANSFORMER Oo / / / 3 EXISTING ANTENNA BY Oo / ♦ OTHER CARRIER (TYPICAL) / ♦ OTHER CARRIER (TYPICAL) EXISTING NO —PARKING EXISTING NO —PARKING EXISTING BUILDING ZONE UNITEXISTING MOUNTED TNG HVAC AT ROOFTOP ZONE ♦ UNIT MOUNTED AT ROOFTOP TOP ♦ 00 ®® ♦ oo ��a ♦ / 2 OHO EXISTING BUILDING EDGE / o/ / a��® EXISTING BUILDING EDGE Q IfO EXISTING UPPER LEVEL--/ Off` ®ae°a EXISTING UPPER LEVEL O�` a®gee PARKING GARAGE O ®e®� ` PARKING GARAGE ® ♦ EXISTING ♦ / / / EXISTING ROOFTOP �, / ROOFTOP EXISTING ANTENNAS AND / ANTENNA MOUNTING SKID TO REMAIN 0 / I / EXISTING CABLE TRAYS EXISTING CABLE TRAYS /00 (TYPICAL) /00 (TYPICAL) / EXISTING BUILDING / EXISTING BUILDING / EXISTING ROOFTOP PENTHOUSE / EXISTING ROOFTOP PENTHOUSE ROOFTOP v ROOFTOP PROPOSED LOCATION OF RELOCATED VERIZON WIRELESS �� SECTOR_ 2" > _ ANTENNA MOUNT SKID; ®® �� SECTOR_ 2 (90) - — / MOUNTED ON 4 X 8 X m0 — — — - — — 12'-O" SLEEPERS ®�(90 �o Sil PROPOSED VERIZON j a / EXISTING VERIZON WIRELESS WIRE ESS ANTENNAS EXISTING VERIZON WIRELESS EXISTING VERIZON WIRELESS / / A-4 ROOFTOP ANTENNA MOUNTING ANTENNAS TO BE REMOVED ANTENNAS TO BE REMOVED (4 T `TAL) SKID TO BE RELOCATED AND REPLACE (4 TOTAL) AND REPLACED (4 TOTAL) EXISTING VERIZON WIRELESS EXISTING VERIZON WIRELESS EXISTING VERIZON WIRELESS 1 2 = ROOFTOP ANTENNA MOULTING SKID TO REMAIN ANTENNAS TO BE REMOVED / ROOFTOP ANTENNA A-4 A 4 S 1 / MOUNTING SKID TO REMAIN EXISTNG ANTENNAS BY 33`AND REPLACED (4 TOTAL) °m. / / OTHER CARRIER (TYPICAL) APN EXISTING ANTENNAS BY APN 00454800200901 c I OTHER CARRIER (TYPICAL) ` 00454800200901I `32' f�I ♦ I �'63 ♦ I. R � o pRop O I co - / °p��T O I co / FRTY U I �' U I �. tiNF♦ ♦ �I 1 F 60� cn� � with o nclMOO 2 60 APPROVED BY PLANNING A-3 'Ta"TET FILE \ ♦ ♦ / Phn-,ing t'uttditiuns for N,IINI facilities (ECDC Z US0.020). RECEIVED (1 )'t he "nni inciiit\ m"c N: lo. awj oo ih, building if the itnmadnG: mt,dcr c•-Jhy ;ljjdicrl io the laa!sly i" "ot a dunanat•:d reside,a:al space. ♦ / \ ♦ / v •'-) i n: anlu,ua and r lat .d .,m!p,n:cnv- Awil be the ..'.one color as the AUG O. 6 2009 \ ♦ ♦ . 6Thk: hai!dim nu chiuh it li rQ collum h, he loc,4.d. D \ t'1 rho �h�•Il•_t �;, ,:.,r•rna �1,:a; h.: cnnta;nra „�tinnc ,•d,n,;n ., t�t,;lning BUILDING DEPAflTMENT \ or othen�is a:?Inopri:n#; ;an eakd, camoulla r0 t 10"aled uudergicund. CITY OF EDMONDS 2' 4' 8' 24"x36" SCALE: 1/8"=1'-0" 0 2' 4' #� 8' 24"x36" SCALE: 1/8"=1'-0" 1 EXISTING ANTENNA LAYOUT 11 "x17" SCALE: 1 /16"=1'-0" jv 2 PROPOSED ANTENNA LAYOUT ME 1 I 11 "x17" SCALE: 1 /16"=1'-0" N STREET FILE Rece AUG Q 6 2cog BUILDING "lAIlTMl CITY OFFJ)MOMVNT EXIST ING CB JAMPS ST 1L4-15'INVERT ?-cp I6-50' f TOP t IL4,59 INVERT . 12, . .. SCALE l"=40 I CONCRETE PIRE-(CP) SHALL BE ASSOCII-ATED '!SA.NO 4 GRNVEL. BELL. SPIGOT VNfTH.TYPE..*A"'.RUBIBER -SEA,L, CATCH BAZON3 (CB) SHALL BE FR AME 4 COVER BASIN 0L-YM,PtC F0UN10R.Y :4 5 A SS 0 C, 'S 4 G, 15 a. A SHORELINE BUfLDING SECONU NVE F-Z)MONf-)S \V\(Al �DOUG HAGER �OWNER .HARBOR CONIST CO.'JINC, C(?N'T?\ACro-R .OFF -SITE STORM SEWER CITY OF EDMONDS - ENGINEERING DEPT. Examined by. Dai; t e ;DRk\NN ARSC)� C0 NSr.. Co Remarks ������'��\��� I Al ARCHITECTURAL T-1 TITLE SHEET, OVERALL SITE PLAN, GENERAL INFORMATION A-1 SITE PLAN, NOTES, LEGAL DESCRIPTION AND VICINITY MAP A-2 EXISTING AND PROPOSED PARKING PLANS A-3 DETAILS A-4 DETAILS MECHANICAL - - - - - � ' "' v M-1 MECHANICAL PLANS AND DETAIL _ELECTRICAL E-1 ONE —LINE DIAGRAM AND GROUNDING PLAN SHEET INDEX IT a R• P R• SEA—EDMONDS N/A SITE ADDRESS: PHONE: 100 2ND AVENUE S. TELCO: EDMONDS, WA 98020 N/A PHONE: R- HARBOR BUILDING OF EDMONDS TWO LLC CONTACT: DONNA SCHAEFER, COAST RE SERVICES,INC PHONE: 425-405-1890 ZONINQ: BD2 DOWN TOWN MIXED COMMERCIAL PARCEL NUMBER:0045480021100 THIS PROPOSAL IS FOR THE MODIFICATION OF AN EXISTING VERIZON WIRELESS FACILITY, CONSISTING OF THE ADDITION OF A 3OKW NATURAL GAS STAND—BY GENERATOR (OPERATES DURING POWER OUTAGES ONLY) MOUNTED ON AN EXISTING CONCRETE GARAGE PARKING FLOOR WITHIN PROPOSED 8'-10' X 1 6'-4" LEASE AREA AND EXHAUST VENT TO BE ROUTED UP NEXT TO BUILDING. ALSO INCLUDED IN THIS PROJECT IS THE INSTALLATION OF A FIBER CABINET. PROJECT INFORMATION A/C ADJ. AIR CONDITIONING HARD'WD HARDWOOD SQ. SQUARE AFF ADJUSTABLE ABOVE FINISH GRADE HORIZ. HR HORIZONTAL SS STAINLESS STEEL APPROX. APPROXIMATELY HT. HOUR HEIGHT STL. STEEL ASTM AMERICAN SOCIETY FOR HVAC HEATING, VENTING AND STRUCT. SUSP. STRUCTURAL SUSPENDED AWG TESTING AND MATERIALS AMERICAN WIRE GAUGE AIR CONDITIONING S.V. SHEET VINYL BLDG. BUILDING I.D. IN. INSIDE DIAMETER INCH THRU THROUGH BLK, BMR BLOCK BASE MOBILE RADIO INFO INFORMATION TNND T.O.C. TINNED TOP OF CONCRETE B/S BUILDING STANDARD INSUL. INT. INSULATION INTERIOR T.O.M. TOP OF MASONRY TYP. TYPICAL CLG. CLR. CEILING CLEAR LB(S) POUND(S) UBC UNIFORM BUILDING CONC. CONST. CONCRETE CONSTRUCTION MAX MECH MAXIMUM UNO CODE UNLESS NOTED CONT. CONTINUES MTL. MECHANICAL METAL OTHERWISE DBL. DOUBLE MFR. MGR MANUFACTURER MANAGER VERT. VERTICAL DIA. DIAMETER MIN MINIMUM VIF VT VERIFY IN FIELD DIAL. DIAGONAL MISC. MISCELLANEOUS VINYL TILE DIM. DIMENSION DIN DET. DOWN DETAIL N NORTH W W/ WEST WITH DWG DRAWING NA NIC NOT APPLICAPLE NOT IN CONTRACT WIN W/O WINDOW WITHOUT E EAST NTS NOT TO SCALE W.P. WATER PROOF EA, ELEV. EACH ELEVATION O.C. OD ON CENTER ELECT. ELECTRICAL O.H. OUTSIDE DIAMETER OPPOSITE HAND EQ. EQUIP. EQUAL EQUIPMENT OPG. OPP OPENING OPPOSITE E.W. EACH WAY (E) EXISTING PLYWD, PLYWOOD EXT. EXTERIOR PR PAIR FIN. FINISH PROJ PROP PROJECT PROPERTY FLUOR. FLUORESCENT PT . PRESSURE TREATED FLR FLOOR FT. FOOT REQ'D REQUIRED GA. GAUGE RM R.O. ROOM ROUGH OPENING GALV. GALVANIZED GC GENERAL CONTRACTOR S SOUTH GRND GROUND SHT SHEET GWB GYPSUM WALL BOARD SIM, SIMILAR GYP. BD. GYPSUM BOARD SPEC. SPECIFICATION a x"arra 1`x41,v4 .1A.IV11;,,% 1�< ,>,�sy ,..+c z s� �nz a a a �cX3aroWa-^ ,xv ,r'awrsu•r�^a�,•*�.ww sx✓„ NOTES: THIS IS NOT A SITE SURVEY - ALL PROPERTY BOUNDARIES, ORIENTATION OF TRUE NORTH AND STREET HALF —WIDTHS HAVE BEEN OBTAINED FROM A TAX PARCEL MAP AND ARE APPROXIMATE. PROPOSED VERIZON WIRELESS--\ FIBER CABINET MOUNTED AT EXISTING CONCRETE GARAGE PARKING FLOOR WITHIN PROPOSED 8'-9" X 15'-0" LEASE AREA PROPOSED VERIZON WIRELESS ---- 60KW NATURAL GAS STAND-BY GENERATOR (OPERATES DURING POWER OUTAGES ONLY) MOUNTED AT EXISTING CONCRETE GARAGE PARKING FLOOR WITHIN PROPOSED 8'-9" X 15'-0" LEASE AREA NOTE: L CONTRACTOR TO COORDINATE W/ PSE FOR METER INSTALLATION REQUIREMENTS ALONG GARAGE WALL NEW NATURAL. GAS METER — LOCATION (LOCAL UTILITIES TO INSTALL NEW GAS METER AND CORDINATE POINT OF GAS CONNECTION) GAS METER IS DEDICATED FOR STANDBY GENERATOR USE ONLY OVERALL SITE PLAN L'. APN JV 00858900120100 / \ \ 00858900120400 00858900120200 / EXISTING TREE 00858900100100 L J `',` \ (TYPICAL) \ \ 00858900120300 /q.�F /C /4 s / ' V 60, / APN 00863300020200 ` \ / / 00863300020300 00863300020100 / c� e �A / 00863300020100 F \ / � �pq° , i/ �/ , `>> / APN Q °°° `Ro \ \ 00434400700800 \ / Nr v EXISTING UPPER F LEVEL PARKING �hoZS, )1 ` / `, `V A pprIOVED AS NOTED APPLICANT: VERIZON WIRELESS 3350 161 ST AVE S. AppR D PL NMI ICa BELLEVUE, WA 98008 io z6 0 APPLICANT AGENT: ODELIA PACIFIC CORP. 208 WESTLAKE AVENUE NORTH SEATTLE, WA 98109 CONTACT: RICK CARDOZA PHONE: (253) 218-9017 ARCHITECT/ELECTRICAL ENGINEER• KDC ARCHITECTS 4720 200TH STREET SW., SUITE 200 LYNNWOOD, WA 98036 CONTACT: ERIC CAMP PHONE: (425) 670-8651 FAX: (425) 712-0846 WAS HINGTON STATE _opE COMPLI ANC E• 2006 IBC, STANDARDS AND AMENDMENTS—WAC 51 —50; 2006 IRC, STANDARDS AND AMENDMENTS—WAC 51-51; 2006 IMC, STANDARDS AND AMENDMENTS—WAC 51 —52; 2006 IFC, STANDARDS AND AMENDMENTS—WAC 51-54; 2006 UPC, STANDARDS AND AMENDMENTS—WAC 51 —56, 51 —57. PROJECT DIRECTORY E GIN EXISTING E RING Q � / ♦ BUILDING lb 69/ V \ Ng � TO A EXISTING--� To A \ 'QOpO NF 60. f ROOFTOP 000\ Fo c S 1 ♦ / \APN O FieFR F�FR�TO z(`iO 00454 APN, / v 00454800101300 APN 80b200901. 00787600020300 T \ �Q O 00787600010000 IC </'LF' 6 ♦ ♦ / / 00787600020200 00787600020100 a00f _ a400 REVISED PLAN APPROVED VERIZON WIRELESS CELLULAR DESIGN ENGINEER APPRO�/AL PRINTED NAME SIGNATURE TITLE DAT VERIZON WIRELESS PROPERTY OWNER APPROVAL PRINTED NAME SIGNATURE TITLE DATE APPROVALS/ISSUE DATES EXISTING NATURAL GAS METER LOCATED IN THE ALLEY DEPART SEATTLE-TACOMA INTERNATIONAL AIRPORT DEPART SEATI LE-TACOMA INTERNATIONAL AIRPORT TAKE RAMP (LEFT) ONTO 1-5 11.0 MI 1-5 / SEATTLE TURN POTENTIALLY RESTRICTED* KEEP LEFT ONTO 1-5 EXPRESS EXPRESS LANES NORTHBOUND MERGE ONTO 1-5 4.8 MI AT EXIT 177, TURN RIGHT ONTO RAMP 0.2 MI WA-104 / EDMONDS / LAKE FOREST PARK KEEP LEFT TO STAY ON RAMP 0.3 MI WA-104 / EDMONDS KEEP RIGHT TO STAY ON RAMP 164 YDS WA-104 TAKE RAMP (RIGHT) ONTO SR-104 [NE 205TH ST] 4.8 MI WA-104 / 244TH ST SW FERRY WEST / EDMONDS / KINGSTON TURN RIGHT (EAST) ONTO SR-524 [MAIN ST] 109 YDS ARRIVE 100 2ND AVE S, EDMONDS, WA 98020 DRIVING DIRECTIONS CITY OF EDMONDS BUILDING DIVISION J PLANS EXAMINER DATE 20 40' 24" x36" SCALE: 1 " = 20'-0" 11"x17" SCALE: 1" = 40'-0" CONFIDENTIAL AND P''I'll'',�����������������������������������--I ----------- ROPRIETARY Not for disclosure outside VERIZON WIRELESS without permission. Gaspers St. P p g e t S o h n U �m m ,m ry` Sater Ln Vis alo Glen St "0 . `r Daley St b © 4 a �s ��'� r. �a� Sf � S f S r, IT Eqi� Civic Center. - - c Playfleld _ Bell, St O 4 Qom• C Edrnonds s jr�) b8ytpn St v ® r•, Dayton St d U) Maple St r+ Alder St a) Beck Ln EdmbnU[ r,lanng Ueach Fart walnut alnut St z Li Holly Dr15 3� Ce - �JYIOgp j1,r Howell Way v, .. Nomgland Dr Spr [dmonds 2 Underwater (0 Hemlock Way Her Park �ry Lau Pine St Pine St � Woodway W co 0) a) m Go m Makah Rd t VICINITY MAP rIM ,t �1.IfL01NC� 1)EPA 1,1TF-A IN', ART` I,.;r= r•".,F.r��,17jr; EXISTING VERIZON WIRELESS EQUIPMENT ROOM AT EXISTING PARKING GARAGE, CONTRACTOR TO REMOVE EXISTING MANUAL TRANSFER SWITCH AND INSTALL NEW ATS EXISTING VERIZON WIRELESS GEN. RECEPTACLE TO BE REMOVED , PROPOSED POWER CONDUIT FOR / FIBER CABINET AT EXISTING PARKING GARAGE CEILING (APPROX. 100' - 0") / PROPOSED VERIZON WIRELESS '41 GENERATOR CONDUIT AT � EXISTING PARKING GARAGE , CEILING (APPROX. 100'-0") 46 PROPOSED FIBER CONDUIT FOR / FIBER CABINET AT EXISTING b / PARKING GARAGE CEILING ?� /// (APPROX. 100'-0") ��, Q�Quo /A// ♦ 46 46 40 / b 4' / PROPUbEu / // 0 p 60 INS LONG SWEEPING ELBOWS TYP. 0 EXISTING LOWER LEVEL PARKING GARAGE 0 ; PROPOSED GAS VENT PIPE 12'-0" ABOVE UPPER ` TING PARKING LOT GRADE 0 SEE A-4 FOR DETAIL PROPOSED GAS VENT PIPE RISE 10'—O" A.F.R. r• Es i 41 // 46 AREA 4/ SEE 46 / 46 j PROPOSED GAS VENT / _ v+&14tf� 46 PIPE SLOPE 3" TO LOW �, 101 0 /' e , //�/ POINT AT ELBOW / U)'/4 A j / �v EXISTING LOWER LEVEL / �Uc ♦ b / PARKING GARAGE46 �' PROPOSED GAS; VENT PIPE � 46 / BELOW (APPROX. 134'-0"t) ' //� ROPOSED 8'-0" X 20'-0" % (gvL e' COMPACT PARKING SPACE / e PROPOSED VERIZON WIRELESS / e 8'-9" X 15'-0" LEASE AREA FOR A 60KW NATURAL GAS t STAND-BY GENERATOR e ; PROPOSED VERIZON WIRELESS EXISTING TREE (TYPICAL) 0 p 14 Z_ EXISTING VERIZON WIRELESS ANTENNA AND ANTENNA MOUNT (TYPICAL) o� �p / EXISTING , / ROOFTOP `• CONCRETE FILLED BOLLARD / (TYP. OF 5 AT 4'-0" O.C.) e ' (BOLLARDS LOCATED NEXT TO EQUIPMENT TO BE REMOVABLE NOTE: 4, FOR DOOR ACCESS) / CONTRACTOR TO a� � . � PROPOSED VERIZON WIRELESS 2" COORDINATE W/ GALV. STEEL NATURAL GAS PIPE PSE FOR METER ROUTE AT EXISTING PA G / e �' ° e� O � INSTALLATION GARAGE CONCRETE FLOOR e /ryp REQUIREMENTS 5 (APPROX. 10'-0") / ALONG GARAGE WALL � 6 REMOVED EXISTING CORRUGATE SHEET PANEL NEW 2'-6"x5'-6" METAL STUD WALL FRAMED AROUND NEW METER NEW NATURAL GAS METER LOCATION (LOCAL UTILITIES TO INSTALL NEW GAS METER AND CORDINATE POINT OF GAS CONNECTION) R ` EXISTING 60, �Sh ROOFTOP I APN / tiF 00454800200901 \s � , I EXISTING BUILDING i NOTES: THIS IS NOT A SITE SURVEY: ALL PROPERTY BOUNDARIES, ORIENTATION OF TRUE NORTH AND STREET HALF —WIDTHS HAVE BEEN OBTAINED FROM A TAX PARCEL MAP AND ARE APPROXIMATE. ZONING NOTES: 1. NO PARKING IS AFFECTED BY THIS INSTALLATION. 2. EROSION CONTROL TO BE MAINTAINED THROUGHOUT CONSTRUCTION PHASE. 3. EQUIPMENT CABINETS ARE LOCKED, SELF—CONTAINED AND ACCESSIBLE TO AUTHORIZED PERSONNEL ONLY. 4. TOPOGRAPHY SLOPE IS LESS THAN 1 %. UPPER LEVEL PARKING: EXISTING UPPER LEVEL PARKING NOT SHOWN IN PLAN VIEW FOR CLARITY PROPOSED NATURAL GAS: NATURAL GAS TO ORIGINATE FROM NEW GAS METER LOCATED ON THE BUILDING SIDE FACING MAIN STREET, THEN ROUTED WITHIN 2" GALV. STEEL NATURAL GAS PIPE AT EXISTING PARKING GARAGE EXTERIOR WALL (APPROX. 70'f), THEN TO PENETRATE THROUGH EXISTING BUILDING WALL TO EXISTING VERIZON WIRELESS EQUIPMENT ROOM, THEN ROUTED ALONG EXISTING PARKING GARAGE CEILING (APPROX. 100't), TO PROPOSED 60KW NATURAL GAS STAND—BY GENERATOR LOCATED WITHIN 8'-9" X 15'-0" LEASE AREA. (EXISTING VERIZON WIRELESS GEN. RECEPTACLE TO BE REMOVED) It ;rTY Or :-qAG DIVISION PLANS EXAMINE, R DATE 21NOTES GEPHARTS 1ST ADD TO EDMONDS BLK 002 D-00 LOT 11 & 12 3 LEGAL DESCRIPTION r) 1.'. i is l ii " 'x Dale} ..mot .. ........ ..: ,v- 4 T31'�14iCf2ki3 Skippers. ^11TE - Ch ounlQ1 H Uu; a park and r? Ridg.Etlmoq,f>° � Ferry Tarrnlnat !?64 Edmonds•k:ingstor� kindred C,rcle urr.trpr=drnr..nis f ry ° EdmondsG in St 51 Dalton St Q. Inn at Thild and L13'ptOR© r FfUBlnlCe� and Aar 41 VICINITY MAP 1 t.i�� a �• �? d�6�L13 THIS IS NOT A SITE SURVEY: ALL PROPERTY BOUNDARIES, ORIENTATION OF TRUE NORTH AND STREET HALF -WIDTHS HAVE BEEN OBTAINED FROM A TAX PARCEL MAP AND ARE APPROXIMATE. ALLEY w J J Q PROPOSED FIBER CABINET NOTE: CONTRACTOR TO COORDINATE W/ PSE FOR METER INSTALLATION REQUIREMENTS ALONG GARAGE WALL Lo W � PROPOSED FIBER LINE. G.C. TO COORDINATE WITH UTILITY COMPANY AND CONSTRUCTION MANAGER FOR FIBER DEMARC & ROUTING w N It m J I U N 0) Is CONTRACTOR TO INSTALL A —J 2A:10B:C RATED FIRE EXTINGUISHER WITHIN PROPOSED VERIZON WIRELESS LEASE AREA PROPOSED VERIZON WIRELESS 2" GALV. STEEL NATURAL GAS PIPE ROUTE AT EXISTING PARKING GARAGE CONCRETE FLOOR (APPROX. 10'-0") PROPOSED VERIZON WIRELESS GENERATOR CONDUITS (ROUTE AT EXISTING PARKING GARAGE CEILING APPROX. 100'-0" TO EXISTING VERIZON WIRELESS EQUIPMENT ROOM) SEE 1 /A-1 FOR CONTINUATION EXISTING PARKING SPACE EXISTING LOWER LEVEL TO REMAIN UNDISTURBED PARKING GARAGE EXISTING PARKING SPACE --/ TO REMAIN UNDISTURBED �wZl v I PROPOSED GAS VENT LINE BELOW (APPROX. 134'-0"f) w I - Z EXISTING PARKING SPACE �WI TO REMAIN UNDISTURBED I- w Z �I I I w I z W Iu 7' 2 w ICI " EXISTING 4" WIDE PAINTED EXISTING PARKING SPACE PARKING STRIPE (TYPICAL) TO REMAIN UNDISTURBED EXISTING 16" DIA. CONCRETE COLUMN SUPPORT (TYPICAL) U PROPOSED VERIZON WIRELESS STEEL CONCRETE FILLED PROPOSED 8'-0" X BOLLARDS (TYP. OF 5 AT 4'-0" 20'-0" COMPACT O.C.) BOLLARDS NEXT TO / PARKING SPACE EQUIIPMENT TO BE REMOVEABLE TO ALLOW FOR DOOR ACCESS 2,-3„ 2'_2" a O 7'-0" 8" 1 PROPOSED 4" PAINTED PARKING STRIPE (PAINT COLOR TO MATCH GENERATOR EXISTING PARKING STRIPES) ® — — PROPOSED VERIZON 00 WIRELESS 60 KW NATURAL GAS GENERATOR (OPERATES DURING POWER OUTAGES Z 0) ONLY) WITHIN PROPOSED Li 8'-9" X 15'-0" LEASE AREA Na NEW 2'-6"x5'-6" METAL STUD WALL FRAMED AROUND NEW METER I 0, N 6'-3" METER GA GAS GAS GAS-� - -' NEW NATURAL GAS METER 15'-0" LEASE AREA ALCOV 2 -3 -5 r,i z LOCATION (LOCAL UTILITIES C/) TO INSTALL NEW GAS METER c/) m 7 1 7'—B" AND CORDINATE POINT OF cn GAS CONNECTION) 20'-0" PARKING SPACE NOTES: PHIS IS NOT A SITE SURVEY: \LL PROPERTY BOUNDARIES, ORIENTATION OF TRUE 4ORTH AND STREET HALF -WIDTHS HAVE BEEN OBTAINED -ROM A TAX PARCEL MAP AND ARE APPROXIMATE. EDGE OF BUILDING EXISTING NATURAL GAS METER LOCATION — — — — ---- I i — — — — — — — — — — — - L — — — — — — — — — — —� REVISED PLANT APPROVED ALLEY CITY OF EuDMONDS uulLDING DIVISION PLANS )EXAIVflN IZ DAkE • • r7.0 � PROPOSED - •' • pw EXISTING PARKING PLAN PLANS PREPARED FOR: Q) e � PLANS PREPARED BY: ,� F77 F7 17 F 17 =1 17 F h u Dy. KIM ARCHITECTS.ENGINEERS, P.C. 4720 200TH STREET SW SUITE 200 LYNNWOOD, WA 98036 PHONE: 425.670.8651 FAX: 425.712.0846 LICENSURE: 5776WASHINGTO K STAT DATE: 09/14/2009 DRAWN BY: SSM CHECKED BY: EJC REVISIONS DATE DESCRIPTION BY 03/10 ISSUED FOR REVISED CRW 2008 CONSTRUCTION 04/04 ISSUED PER BUILDING SN 2008 DIVISION COMMENTS 1 08/11 ISSUED FOR REVISEZ2� AW 2008 CONSTRUCTION 9/3 ISSUED FOR REVISED ARM 2008 CONSTRUCTION 06/09 ISSUED FOR REVISED SSM 2009 CONSTRUCTION 4 09/14 ISSUED FOR REVISEDn5 JP 2009 CONSTRUCTION PROJECT: S EA- EDMONDS 100 2ND AVENUE S. r- r- A � n , rN e— % A I A Cl C7 !'l rl /1 I—IJIVILIIVV.J, YVr-\ JIJVLv AJIl.OING, OEPIU IMAM:Kri 2'-211 I V- 7'—O„ e �e FRONT VIEW EXISTING CONCRETE GARAGE FLOORING 011[ill1 1,1Z An NOTE: PROVIDE CADWELD CONNECTION FROM GROUND RING TO BOLLARDS EXISITNG CONCRETE GARAGE FLOORING ONCRETE CAP 10 SCHEDULE 40 gRBON STEEL PIPE LLED WITH CONCRETE R GROUT AND PAINTED =LLOW ROUT (IF =Q'D) (4) 3/4" 0 GALV RAMSET/REDHEAD TRUBOLT OR EQUIV WITH 3 1 /4" EMBEDMENT (BOLT HOLES = 1 " b) I 3/4"x 10"x 10" ENERATOF MOUNTING PLATFORM L/\IJIIIVV \�VIVVI\LIL GARAGE FLOORING SIDE VIEW ANCHOR NOTE: 1. (4)-1 /2"fib STAINLESS STEEL KWIK BOLT 3 EXP. ANCHORS W/ 3-1 /2" EMBED. EA. LONG SIDE OF GENERATOR, (10) TOTAL 2.CONTRACTOR TO VERIFY WITH GENERATOR MANUFACTURERS SPECS PRIOR TO ATTACHMENT NATURAL GAS GENERATOR REFER TO AN, NOTE (TYP) EXISTING CONCRETE GF FL❑❑RING 0 2'-2" TOP VIEW EXISTING STURUCTURE VERIFY LOCATION (2) 5/8" EXTERIOR PLl ATTACH TO THE EXISTIN STRUCTURE (METAL J01`, BOTTOM CORD) B.O. EXISTING CEILING BOTTOM CORD METAL JOIST 7'-3" A.F.F. 3 5/8" 16 GA. TOP RA NEW 3-5/8" 16 GA. METAL STL @ 16" O.C. W/ 5/8" TYF 'X' GYPSUM BOARD EACH SIE TAPE, TEXTURF ;AND PAII TO MATCH ADJk ` NT WAL' NOTE: CONTRACTOR TO COORDINATE W/ PSE FOR METER INSTALLATION REQUIREMENTS ALONG GARAGE WALL EXISTNG CONCRETE BASE WALL F.F. (GARAGE) elm 7'-0" 151 BOLLARD DETAIL H 6 CONNECTION DETAIL H 7 WALL SECTION @ NEW METER NOTE: PROVIDE CADWELD CONNECTION FROM GROUND RING TO BOLLARDS VERIFY CABINET DOOR SWING CLEARS BASE PRIOR TO INSTALLATION BOLLARD SLEEVE WELDED TO PLATE TO RECIEVE REMOVEABLE BOLLARD CONCRETE CAP 6" 4 SCHEDULE 40 CARBON STEEL PIPE FILLED WITH CONCRETE OR GROUT AND PAINTED YELLOW �I 1/4 EXISITNG CONCRETE z II I� GROUT (IF GARAGE FLOORING REQ D) e n o d a a A d a; a c . .a BOLLARD SLEEVE WELDED TO PLATE TO (4) 3/4"� GALV RECIEVE REMOVEABLE RAMSET/REDHEAD BOLLARD a TRUBOLT OR EQUIV WITH 3 1 /4" 00 0 EMBEDMENT (BOLT HOLES = 1 "o) R 3/4"x 10"x 10" NOTE: SURFACE MOUNTED NON —RATED FIRE EXTINGUISHER CABINET MUST PROVIDE: *ACRYLIC PLASTIC VIEWING PANEL *BREAKER BAR AND CHAIN *BREAK GLASS DECAL 9 REMOVEABLE BOLLARD DETAIL SCALE *NT. N.T.S. ��01 FIRE EXTINGUISHER CABINET DETAIL11 NOTUSED COVER PLATE LOCK NOTE: CONTRACTOR TO REMOVE EXISTING MANUAL TRANSFER SWITCH AND INSTALL NEW AUTOMATIC TRANSFER SWITCH (VERIFY LOCATION OF EXISTING MANUAL TRANSFER SWITCH ON —SITE) 11'-2" 3'—.3 16", 2'-6" 11'-2"I V-11" BATTERY RELTEC SYSTEM HVAC i� 2'=0" 3,-3" N F I N LUCENT LUCENT MODCELL MODCELL MODCELL 4.0 #1 #2 GROWTH 3'-0" 3'-0" Q N \ m I c� —0" 2'-4" 8" 2'_4" 1'-101. 3,_1" I I LUCENT LUCENT LUCENT AIF LAF RCF FORME i REVI, ED PLAN APPROVED CITY O � EDM61i' DS J €UILDING DIVISION PLANS E k lValiv DATE \1 EXISTING VERIZON WIRELESS TO REMOVE EXISTING MANUAL TRANSFER SWITCH AND INSTALL NEW ATS I-i121 EQUIPMENT ROOM PLAN SCALE N.T.S. SCALE N.T.S. PLANS PREPARED FOR: J (� 01 Q) PLANS PREPARED BY: a,. F, d, .E [77 F T I F F7 F7"! F I. .I I F7 0 1 w KDC ARCH ITEM. ENGINEERS, P.C. 4720 200TH STREET SW SUITE 200 LYNNWOOD, WA 98036 PHONE: 425.670.8651 FAX: 425.712.0846 LICENSURE: 5773 REGISTERED ARCHITEC E H DAMP STATE OF WASHINGTON DATE: 09/ 14/2009 DRAWN BY: SSM CHECKED BY: EJC REVISIONS DATE DESCRIPTION BY 03/10 ISSUED FOR REVISED CRW 2008 CONSTRUCTION 04/04 ISSUED PER BUILDING SN 2008 DIVISION COMMENTS 08/11 2008 ISSUED FOR REVISED CONSTRUCTION AW 9/3 2008 ISSUED FOR REVISED CONSTRUCTION ARM 06/09 2009 ISSUED FOR REVISED CONSTRUCTION 4 SSM 09/14 2009 ISSUED FOR REVISED CONSTRUCTION 5 JP PROJECT: SEA- EDMONDS 100 2ND AVENUE S. EDMONDS, WA 98020 A=3 iljiLi)MG JE:PAR_ i'A_-N'-, n7- Z5 5*s COLUMN F- PENETRATION BELOW I \ / / / / / / / / / EXISTING WALL @ COLUMN X A X tE \� - --_-_- - X ............... EXISTING CONCRETE DECK \X \Lf5\ x X \x x C-4L X . ..... ....... .......... 1 UNISTRUT WITH CONDUIT CLAMP 4' O.C. 4 HOME= .......... ROUTE AROUND f //1 EXISTING COAX 4" VENT PIPE WITH EXISTING XTRUCTURE 1/2" CONTINUOUS INSULATION 1 " X 1 ANGLE CONNECTION TO CONCRETE 2" 2" list 2" 2" SECTION DETAIL SCALE 2 SECTION DETAIL SCALE 3 PLAN VIEW SCALE4 ONDUIT @ C WALL DETAIL SCALE N.T.S. N.T.S. FN N.T.S. N.T.S. FYRE-SIL - MIN 1/2" THICKNESS OF SEALANT APPLIED WITHIN ANNULUS, FLUSH WITH TOP OF FLOOR SURFACE \X` ANCHOR 211 --4 EXISTING CONCRETE PARKING DECK ..................... ...................... 1 UNISTRUT ..... 77 XX VENT SCREEN ---Z I (3 SIDES) El / THREADED ROD ..... ...... ...... ...... . . . . . . . . \x ........ ... PIPE CLAMP ........ ....... 4 .4 ..... II II x� XX............. x...... ............ ..... ...... .... ..... .......... ............. ......... ......................... ............ I ......... ...... ............. ................. XX 4" VENT PIPE WITH 1/2- CONTINUOUS INSULATION ".4- INSULATED VENT PIPE METALLIC PIPE: STEEL PIPE - 4"' (OR SMALLER)SCH. 10 5 (OR HEAVIER) STEEL PIPE 5" MINERAL WOOL INSULATION PACKING MATERIAL UL # CAJ 1064 (4 HR. RATED) 6 VENT PIPE HANGER DETAIL SCALLE 7 4 HR RATED PETRATION DETAIL SCALE SCA N.T.s.E N. T. N I I NOTES: UNISTRUT MOUNT 1. SHROUD TO BE 18 GA. SHEET METAL 2. PAINT TO MATCH STORE FRONT SYSTEM (VERIFY FINAL COLOR WITH LANDLORDS REPRESENTATIVE) 3. ALL SHROUD CONNECTIONS ARE TO BE SEALED WITH EXTERIOR GRADE SILICONE OR EQUAL \X REVISED PLAN APPROVED CITY OF EDMONDS BUILDING DIVISION PARKING 1 ST FLOOR I I PLANS EXAMINER ONCRETE DECK • DATE o -30AV2 1 5 F RO N T SIDE ELEVATIONS SCALE 8 NOT USED SCALE 9 NOT USED SCALE N.T.S. N.T.S. N.T.S. PLANS PREPARED FOR: PLANS PREPARED BY: Pon= MET F F "N' F7 17 17 F F. F- KDC ARCHITECrS. ENGINEERS, P.C. 4720 200TH STREET SW SUITE 200 LYNNWOOD, WA 98036 PHONE: 425.670.8651 FAX: 425.712.0846 LICENSURE: 5773 REGISTERED AR,C�il T , V. KENNETH D. CAMP STATE OF WASHINGTON DATE: 09/14/2009 DRAWN BY: ssm CHECKED BY: EJC REVISIONS DATE DESCRIPTION BY 03/10 ISSUED FOR REVISED CRW 2008 CONSTRUCTION 04/04 ISSUED PER BUILDING SN 2008 DIVISION COMMENTS21 08/11 2008 ISSUED FOR REVISED 2 CONSTRUCTION AW 9/3 2008 ISSUED FOR REVISED 3 CONSTRUCTION ARM 06/09 2009 ISSUED FOR REVISE CONSTRUCTION � 4 Ssm 09/14 2009 ISSUED FOR REVISED CONSTRUCTION 5 jp PROJECT: SEA- EDMONDS 100 2ND AVENUE S. EDMONDS, WA 98020 22 wW '(' r,w= lil � In tL 0 Ill '00ri• U i� w�wZ `-i 1 THE 5UE3_GONTi�'AGTOR SHALL V151T THE JOB SITE AND BEGOM TOhILI �= FAMILIARIZED WITH ALL REQUIREMENTS OF THE CONTRACT PRIO I a N TO SUBMISSION OF BID. THE SUB-GONTRACTOR SHALL NOTIFY THE qo _ a ARGHITEGT/ENGINEER OF ANY CONFLICTS PRIOR TO BID ORSTART OF INSTALLPcTION. 'fir=1ZU THE SUS-GONT}ZAGTOR SHALL. ARRANB FOR ALL INSPECTIONS WHE THEY S BEGONE DUE, AND SHALL NOT COVER ANY WORK UNTIL W I^ r AppROVED BY THE INSPECTION AUTHORITY. 7 'L a u� o W ANY AND ALL TRUGTIA550ON AND INSPECTIONS SHALL BE PA DF OR " - LIN ORDER TO DELIVER A COMPLETE INCLUDING EONS AND ld,;l. F, 0 BY THE SUB-CONTRAGTOR 1,7 z FINISHED BUILDING, READY FOR OCCUPANCY AND 1005� USAGE. 6 i THE SUBMISSION OF A PROPOSAL WILL BE CONSTRUED A5 EVIDENG z << Li �} 1AT T} }E SI�13_CONTRACTOR HAS FAMILIARIZED HIMSELF/HERSELF ;, wBUILPINO SITE. CLAIM WITH THE PLANS AND FOR MATERIALS AND LABOR FBECAUSE OF LI TO THE P ` ° o DIFFICULTIES N FORESE I: HAD PROPER EXAMINATION BEEN MADE. ` o (' COULD HAVE LI (1 _ !, z I, � ANY G05T5 DUE TO THE LACK OF COOPERATION AMONG TRADES Q. I 1 l w � a SHALL BE BORNE BY THE SUB- GONTRAGTO . `)6)00 o I,I z ' THE INFORMATION PRESENTED ON THESE DRAWINGS IS DIP�GRAMMAT G , F w IN NATURE, IT DOES NOT NEC OMPLETE E55ARILY REPRE5ENT ALL FITTIN �I y5TEt-l- PROVIDE ALL ? a HANGERS, ETC. FOA�R FOR COMPLETELY 1F N1Ne 55HED AND OPERATIONAL o, vi MATERIALS AND L w SYSTEMS. LI .. IT 7 tL w ° u ALL EQUIPMENT SHALL BE NEW, SHALL COMPLY WITH APPLICABLE WN ORAV"05, AND (1Qd a z (� INDUSTRY 5TA �OLIANGE GERTIFIGA ION A50ADOPTED BY THE hl ENERGY CODE Now STATE, A5 WELL A5 LOCAL JURISDICTIONAL BUILDING DEPARTMENT. W w i n: ��UBMIT DATA FOR APPROVAL PRIOR TO ORDERING EQUIPMENT. SUBMITTAL SHALL INCLUDE ENERGY GODS COMPLIANCE CERTIFICATION. r,,rou 0 a 0 ftV�}ot. J J 61 �J L wo w�0 F>° f 1 ty Lin W } UF UZ WFJ I y �7 V)20 W�r. m�a z NW °- V) •, ..I Z FW2'0 -a uaa, zit=o w II F UOL o U w _ Z F= 0 ZFU w Z •c fl. a 0>WN 2 wwz m�z W wa zw w 1' 0 0 �cu U IA .i F a 1 ON° Z0.10 u 7 U'- wW=n WF w z?nW ZF� w/ la�.w N�za w�IWz 0. Z yW W mzo= FF° ou3z ) Q'}o mu U nl W7 IJ�n 40)-F nUno wdwZ i�ae r� a ,- W ,- n WLIZ 51IF4 UFwv, wI,id - }} J Ur I1 e Q T OmW r F F F I �N()0 Wa a rGwIL W L, <�rrz UOF � { ( 0 0]F} �Uwz< au pgwa arcw0 a lilW� ° �= w �0Izo U 1- Z a 0 o nw Z,tI r °QZm a F,2u 0�a 00 wI = UFNVI z ' VI 1' �0 OL W W 0� 0 - ° Q ; w n t zI- �l-N 0w �?o', FUEL GAS PI GI K UN NL AND 6 IN. DIRT I FC7. L CONNECT TO TANCES ALL OASL NESTPMENT SHALL WIT}k GA5 GO , BE SCHEDULE 40 GARB STEEL.. PIPE AND SUPPORTED AT 8 FT. O CENTER. MATERIALS FUEL GAS CODE. ALL COMPLY WITH LATEST EDITION INTERNATIONAL SUB -CONTRA CvAS 5ER 1IGE INSTALLATION TACT LOCAL UTILITY COMPANY TO STALLA ION COMPLIES W TH UTILITY VERIFY THAT GOMPANY REGiUIREMENT5. FIBER PIPING- _E E — ELEGTRIG GONPOT _-m, m+— GEI\IERATOi? PlPlldv _ w___. ma.-- GA5 LINE e POINT OF C,ONNEGTION -- NEVA TO EX15TINC- SCALE SCALE N.T.S. / / EXI5TIN6 VERIZON WIRELE55 -� ' EQUIPMENT ROOM AT EXISTING \.\ PARKIN6 6ARA&E, / CONTRACTOR TO REMOVE EXI5TIN6 MANUAL TRAN5PER / SNITCH AND INSTALL NEW AT � ELco � kl , �S• , LO \ POINT AT ELBON / \ \ ` ./ ' J ' RISE 1�-O / SEE ENLA / / \ / \ ♦� EXI5TIN6 LONER MEGHANIG��- ` PARKIN6 \ \, PLAN -\ / "� 6ARA&E NEK 2'-6"x5'-6M-ETA4 SJiJD WALL Fi,�AMEID, ,9 ROUND NEW METER floW NA•rUR,4L. & AS METER LdCATION (LOCAL UTILITII�S (SOOR401411:ZACTOR ATE POINT OF AS GONNAEGTIO 4). TO CObRD TE N/P5E' FOR METER INSTALLAj ON REGU'�MENTS- 6ILEGEND 1 I EXISTING KEYrFto PROP05i=D VERIZO IRE=s � CONCRETE FIJ..1-E17 \ ` \ y/ AT 4'-O" 0.0. 'R1�5 LOCATED \\ \ ; ' NEXT TO EGtUI T/TC1 SE REMOV \ / EXI5TIN6 BUILDI 6 \ FOR DOOR AGG 5)/// w NF65\�"� i-EXISTIN6J/ /Q2 ROOFTOP F\,APN Q h F 6\\ 00454800200901 ol PROPOSED UNISTRUT P1000T— LENGTH AS REQ'D PROPOSED UNISTRUT —� CONDUIT CLAMP (TYP.) PROPOSED CABLE CONDUIT OR 1 1 /2" CARBON STEEL PIPE SCHED 40 OR APPROVED EQUAL 4 GAS PIPE SUPPORT DETAIL. -11-1 GFH 6A5 INPUT, 1 1/2" 6A5 LINE & sHuT-OFF VALVE AND DIRT LEG I 7-7'% 7-7 77 %-T \ � Imo- L'• �1\-\ \ \ 4" NPT PIPE. PROYII��\� \ OR APPROVE�b\j%'UAL\\ \ \ I EXI5TIN6 PANELS TO BE REMOVED OAS METER ? to GFH 6A5 LOAD I�— ME , PRESS. P.G. TO VERIFY 1 METER REGiUIREMENTS WITH P5E. -- -- -- -- -- -- -- --- B.O. F-XISTIN6 BOTTOM GOR F.F. (6ARAI 3I 60 KW GENERATOR ELEVATION ANCHORAGE: AT CONCRETE USE 3/8" THREADED ROD W/HILTI HY-150 MIN. 1 3/4" EMBED (ICBO# 5193) AT WOOD USE 3/8 X3 LAG BOLTS AT METAL STUDS USE #12X3" SHEET METAL SCREWS (2 MIN. PER UNISTRUT) EXISTING GARAGE CONCRETE FLOOR 1 SCALE N_ LSCALE 1 /2"=V-0" �4\t N '')uo I-) �, rb � I �w� 0f- 00r` o 0 r7 L L x pW() 01° w �? 0 On co z .co Tm * OM q�� 3 0 paw Nr� o rnv rn W n SCALE 1/2"=1'-0" E USED T-PIAN ARPROVE CITY Oi+ El Si �;'UIIJUING DIVISION PLANS EXA1b;ilN" R DATE / sL)I1l 4)1{'.IC JLF APATNII-N': "1 �.� � _ ., "f i� � 77��y � il9il..t)li�tCA s?F,t�,!;;iTP;�,:��"'', FON" Mom ~fir, mEET FILE I I-i