Loading...
Building Permit 2020'SIDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 98020 BLD2020-05312 ww wwWA.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: LOUISE WRIGHT Status: ISSUED Subtype: ADDITION Parcel No: 00507200000300 Site Address: 422 OLYMPIC AVEEDMONDS,WA 98020-2956 Applied: 5/21/2020 Subdivision: 005072 Lot: 0 Issued: 7/16/2020 Fire Sprinklers: Lot Area: Zoning: RS-12 Final: Valuation: $240,000.00 Occupancy Type: Construction Type: Expiration Date: 7/16/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: VELJI- REMODEL AND ADDITION. P&M INCL WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT LOUISE WRIGHT 11706 8TH AVE NW, SEATTLE (206)512-7444 LOUISESWRIGHT@GMAIL.COM WA 98177 CONTACT LOUISE WRIGHT 11706 8TH AVE NW, SEATTLE (206)512-7444 louiseswright@gmail.com WA 98177 CONTRACTOR WEIGAND CONST SEATTLE 4226 1ST AVE NW, SEATTLE WA (206)334-4651 I N C 98107 422 OLYMPIC AVE, EDMONDS OWNER RAIESH AND ANNIKA VEUI WA 98020 • ' I • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 7/15/20 R6451 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 7/15/20 R6451 PERMITS APPLIANCE VENTS 001.000.322.10.000.00 $15.00 $15.00 7/15/20 R6451 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 7/15/20 R6451 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $120.00 $120.00 7/15/20 R6451 TRAP ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $220.00 $220.00 7/15/20 R6451 FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $30.00 $30.00 7/15/20 R6451 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 7/15/20 R6451 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $1,940.00 $1,940.00 7/15/20 R6451 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $1,649.00 $1,649.00 5/22/20 R5421 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 7/15/20 R6451 TOTALS: $4,150.50 $4,150.50 7 • • CONDITION TYPE STATUS NOTES Printed: Thursday, July 16, 2020 9:16:01 AM 1 of 3 MIDENTIAL BLDG PermitCity PERMITNUM • • • • 1215th Ave N, Edmonds WA98020 32 www.edmondswa.gov • 66 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests ALL BUILDING PERMITS FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. FOR CARBON MONOXIDE SYSTEMS INFORMATION Contractor/Owner shall be responsible for repair/replacement of all damage to utilities DAMAGE TO FRONTAGE FOR and/or frontage improvements in city right of way per city standards that is caused by or IMPROVEMENTS INFORMATION occurs during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION ESC REQUIRED FOR Maintain erosion & sediment control per city standards. NFORMATION Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. LOT LINES STAKED FOR Lot line stakes must be in place at the time of foundation setback inspection. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. UNDERGROUND UTILITY FOR Call for locates of underground utilities prior to any excavation. LOCATES INFORMATION INSPECTIONS. •https://Inspection.MyBuildingPermit.com COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE A-1 BUILDING PRECON B-1 SETBACKS B-2 FND DAMPPROOFING B-2 FOOTINGS B-2 FOUNDATION WALL Printed: Thursday, July 16, 2020 9:16:01 AM 2 of 3 City of • • • li7i'SIDENTIAL BLDG Permit •:i 1 1 1 - wwWA edmondswa.Soivr B-3 EXT WALL SHEATHING B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-4 SHOWER PAN B-3 GAS PIPING TEST A-1 TESC AND MOBILIZE X-2 ENGINEERING FINAL Printed: Thursday, July 16, 2020 9:16:01 AM 3 of 3