Building Permit 2021Type: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED
Parcel No: 01070900010600 Site Address: 505 5TH AVE S 106 EDMONDS,WA 98020-3459
Subdivision: 010709, 007945, 004342 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: PLUMBING -WATER HEATER -ELECTRIC
Applied: 11/2/2021
Issued:11/3/2021
Final:
Expiration Date: 5/2/2022
Issued by: NED
I WA State Contractor L & I #: MIKESPC99OKM I
so
CONTACTS
j
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
MIKE'S PLUMBING
PO BOX 1535, EDMONDS WA
(425)775-0201
ADMIN@MIKESPLUMBINGANDDRAIN
98020
COM
CONTACT
GLENNA WATSON
505 5TH AVE S 106, EDMONDS
(425)268-5524
glenna2007@gmail.com
WA 98020
PO BOX 1535, EDMONDS WA
OFFICE@MIKESPLUMBINGANDDRAIN.
CONTRACTOR
MIKES PLUMBING
(425)775-0201
980201535
COM
505 5TH AVE S 106, EDMONDS
OWNER
GLENNA WATSON
WA 98020
• ' 1 111111 •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
11/3/21
R15689
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
11/3/21
R15689
PER PERMIT
WATER HEATER - INCLUDING
001.000.322.10.000.00
$15.00
$15.00
11/3/21
R15689
EXPANSION TANK
TOTALS: $105.00
$105.00
!91W
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, November 03, 2021 9:30:08 AM 1 of 2
Permit
City of Edmonds PERMIT NUM
EdmondsPLUMBING
980i 1 IC
www.edmondswa.gov
•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
FOR
In addition to the required pressure relief valve an approved listed expansion tank shall
EXPANSION TANK
INFORMATION
be installed on all hot water tanks per UPC 608.
INSPECTIONS - Schedule Online
at: https://Inspection.MVBuildingPermit.com
COMPLETED RESULT
SEQID INSPECTION TYPE INSPECTOR
NOTES
DATE
B-3 PLUMB ROUGH IN
X-0 PLUMBING FINAL"
Printed: Wednesday, November 03, 2021 9:30:08 AM 2 of 2