APPROVED Traffic Impact Analysis Lot 1RECEIVED
BLD2020-1146
Oct 29 2C''^
CITY OF EDMOI
DEVELOPMENT SE
DEPARTMEN
-7c. t �W"
PERMITTING & DEVELOPMENT
ENGINEERING
DIVIS10N
121 5th Avenue N
P; 425.771.0220
wvvw.edrnondswa.gov
Name of Proposed Project:
APPENDIX A
Page 1 of 2
Transportation Impact Analysis
Worksheet
Owner/Applicant
Name
15Z-() _
Street/Mailing Address
� Qz�
City State Zip
Telephone: _ I
Applicant Contact Person:
#L-i
Name
Street(Mailing Address
City State Zip
Telephone:
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name Contact Name
Telephone:
1. PROJECT DESCRIPTION
E-mail:
a, Location -Street address: 16 �1j, :6t
(Attach a vicinity map and site plan.)
b. Specify existing land use: � t �AdliP— �.Yt
c. Specify proposed type and size of development:
0 of residential units and/or square footage of building)
d. Date construction will begin and be completed: Zeo.-,o�,r 7 n 7 n --4, n
e. Define proposed access locations:
£ Define proposed sight distance at si
APPENDIX A
Page 2 of 2
tt a
locations: _�1 CAW
r
I d I' A &, ,n: ,A N Ate, P A
2. IVIITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. 1f
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use X
Prior Use $ X
LN=Use Fee: $ - Prior Use Fee: $
NEW DEVELOPMENT
ITE Land Use Category
New Use
u OTHER
EE
Units in
Per Unit square feet,
Fee Rate # of dwelling,
vfv, etc.
__ $240.00 (+
TOTAL TRANSPORTATION IMPACT FEE Is 6,249.14
Edmonds, Engineering Division Approval
12/16/2020
Date
1 No impact fees will be due, nor will a credit be given, for an impact fee calcination resulting in a net negative.