Loading...
APPROVED Traffic Impact Analysis Lot 1RECEIVED BLD2020-1146 Oct 29 2C''^ CITY OF EDMOI DEVELOPMENT SE DEPARTMEN -7c. t �W" PERMITTING & DEVELOPMENT ENGINEERING DIVIS10N 121 5th Avenue N P; 425.771.0220 wvvw.edrnondswa.gov Name of Proposed Project: APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet Owner/Applicant Name 15Z-() _ Street/Mailing Address � Qz� City State Zip Telephone: _ I Applicant Contact Person: #L-i Name Street(Mailing Address City State Zip Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name Telephone: 1. PROJECT DESCRIPTION E-mail: a, Location -Street address: 16 �1j, :6t (Attach a vicinity map and site plan.) b. Specify existing land use: � t �AdliP— �.Yt c. Specify proposed type and size of development: 0 of residential units and/or square footage of building) d. Date construction will begin and be completed: Zeo.-,o�,r 7 n 7 n --4, n e. Define proposed access locations: £ Define proposed sight distance at si APPENDIX A Page 2 of 2 tt a locations: _�1 CAW r I d I' A &, ,n: ,A N Ate, P A 2. IVIITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. 1f the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use X Prior Use $ X LN=Use Fee: $ - Prior Use Fee: $ NEW DEVELOPMENT ITE Land Use Category New Use u OTHER EE Units in Per Unit square feet, Fee Rate # of dwelling, vfv, etc. __ $240.00 (+ TOTAL TRANSPORTATION IMPACT FEE Is 6,249.14 Edmonds, Engineering Division Approval 12/16/2020 Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calcination resulting in a net negative.