Loading...
APPROVED ENG PLN STM BLD2020-1129+Civil_Plan+10.27.2020_10.35.40_AMic, o „ L N co o �o I � 00 CN N 11, 0 NO Z NW 1/4, SEC 25, TWP 27N, RGE 3E, W.M. 7TH AVE S SHORT PLAT -LOT 2 CIVIL ENGINEERING PLANS F c7s-- LOT 4 g I I LOT 7 I + I I LEGAL DESCRIPTION I I I i I YOST'S FIRST ADDITION TO EDMONDS I I I I I I LOT 6, BLOCK 4, YOST'S FIRST ADDITION TO EDMONDS, ACCORDING BLOCK 4 I I I 30' VOL 8, PG 6 TO THE PLAT THEREOF RECORDED IN VOLUME 8 OF PLATS, PAGE 6, �0' RECORDS OF SNOHOMISH COUNTY, WASHINGTON. I II 1 Ii II I 00619400400402 nnF ' 9400400702 BASIS OF BEARINGS 4" PVC OOF �11 THE MONUMENTED CENTERLINE OF FIR STREET, I I I 3 DRAIN ®l.07' MIN 10' MIN LENGTH FOOTING I II AS THE BEARING OF N 895938" E. I I I oI ' DRAIN DRYWELL TRENCH(PER GEOTECH RECOMMENDATIONS) DRY UTILITIES I o I ' i o C)CN o I I o - - _ SDCO "� SDCO `-" % BENCH MARK I I I Z i I lE 194.5E N895934E_-42 9 lE 202.0E \1 -0-1I _ FOUND CASED CONC. MON. AT THE INTERSECTION OF FIR ST. & B AVE. S. SET CB ON 6" DIELEVATION : 220.25 STORM DRAIN STUB l 20' SBL INSTALLED AS PART I , ,�'r A I O 56 -4' PVC 013.39b% I �3.99 DATUM : NA VD Oft SHORT PLAT CONSTRUCTION I I 4" PVC/FOOTING I W 1 / I DRAIN ® 1. 09 MIN I I CONCRETE 1. I j Cg I GARAGE I DRI VEWA Y l o J I 4" PVC i 1 2 , FF 206.5 I 20' o Q �r+ TYPE 11-48" 1i, W/RE�TRICTOR I 35'-36" .50f' / SEWER N AC �O 7,495 SF TO 06L DRAIN I `O LV SOLIDI ROUND I I SERVICE ® I (DETENTI PIPE) / 194.0E 11 79 00619400400503 LOCKING 9 I 2.09 MlN/ .1 j I - MIII IIj N=5137.29 I I I 3 PROPOSED HOUSE ) I I E=5036.44 �- ' l I R/M 96.00 1 �� 1 o J LOWERFfLF 191 500�� ° i 1 ' o, r o I m YOST'S FIRST ADDITION 36" l 189.50 ON S) I 1 0 0 ,� .4' I W b - I I Z o 4" lE 191.67 (lN-) I I I oo �O j Q COVERED I i 5' 1 IhI1 N TO EDMONDS Q 6" IEI 189.50 (OU II-�W o i I / 2 o a PORCH % I i 20' BLOCK 4 (SEE DETAIL ON SHT a-01 I I/ i l i _ D I // _, I C VOL 8, PG 6 � - - - 191 J II N CB -- I / I �i �h `. .-� ---- �� Ili 0 \yI TYPE l ---_ -_�- SOLI LOCKING LID I I I N=5096.29 1 I I i i C NNECT TO EWER 71[/B - '- i lI i I I LOT 5 R/M 96.00 II 111 I i /E� 192.5E I i Ili 8" l 192.01 (O4T,-Nt1ijjjjj I 1" WATER SERVICE INSTAL ED AS PART OF SHORT PLAT.INSTALLED 1" WATER METER ANL�1-1/2" PE (160 PSI) ERVICE LINE I I I I SHORT PLAT IMPROVEMENTS SHORT PLAT IMPROVEMENTS i jFROM WATER METER T� HOUSECONSTRUCTED AS PART OF 1 I / DETAILS. (TRACER W/RE TO BE III I THE 7TH AVE S SHORT PLAT CONSTRUCTED AS PART OFi INSTALLED WITH WATER L/NE) I I (PLN20200019) THE 7TH AVE S SHORT PLAT I I III I 00619400400502 (PLN20200019)\ I t 10' PRIU TE -------------� i I III II \ I I I SEWER EASEMENT i ®�\ - - - - - - - - - - /,P, I o' SEE DETAIL ON / �1 -SD-� / - -/� i i SD-/�-�° SD-- -- �+ / -- SD- -// SD---f� / ni ( / �R-a i SD----f-SD-- SD� -SS- SSA-- SSA I-SSi--J. - �+d�S---SS----SS---SS- 75�4.90 SS -----SS--- _ 1 �+oq� _ N 895 '38" E(Rl)(C) 329.791(R1)(C) (BASIS OF I BEARM✓G) I rn CID C)N C4 N N N `� N \ I N --W W---W---W- - --W ---VN\ -- ��W---�W----rW---�W----W----N� --SD S== -- LSD- --\ SD-t--4- -SDI BUILDING HEIGHT CALCULATIONS (AOG) SPOT ELEVATIONS FOR HEIGHT CALCULATIONS.- ELEVA T/ON A: 196.70 ELEVA TION B. 205.24 ELEVA TION C. 204. 73 ELEVA TION D: 197.44 TOTAL: = 804.11 AVERAGE ORIGINAL GRADE (AOG) = 201.03 TOP OF GARAGE SLAB = 206.50 ROOF A T RIDGE = 225.50 ALLOWABLE BUILDING HEIGHT = 226.03 PER CITY OF EDMONDS (201.03 + 25 FT) LOT COVERAGE LOT AREA (NET): 7,495 SF ALLOWABLE COVERAGE (359) 2,623 SF HOUSE, COVERED DECK & GARAGE 2,620 SF PERCENT COVERAGE 34.969 IMPERVIOUS AREAS LOT 1 HOUSE+COVERED D/W, PA T10, PORCH, WALK 2, 970 SF (ROOF LINE) UNCOVERED PATIO AND WALK 360 SF UNCOVERED DRI VEWA Y 520 SF HALF OF ROW IMPROVEMENT AREA (1.000 SF) 500 SF LOT 1 TOTAL = 4,J50 SF GRADING QUANTITIES CU T.- f250 CU YDS FILL: f250 CU YDS 1) GRADING QUANTITIES INCLUDE ADDITIONAL CUT AND FILL QUANTITIES POTENTIALLY NEEDED FOR ORGANIC SOIL AMENDMENTS IN ACCORDANCE WITH BMP T5.13 POST CONSTRUCTION SOILS QUALITY AND DEPTH. STORMWATER CONTROL SUMMARY PROJECT St TE CA TEGORY.• CA TEGORY 2 DISCHARGE LOCATION: CI TY'S MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) TYPE OF AREA SQUARE FOOTAGE STORM WA TER FACILI TY LAWN AND LANDSCAPE 3,745 SF SOIL AMENDMENTS (BMP T5.13) ROOFS 2,970 SF PER LOT DETENTION PIPE (ECDC 1 & JO. 060. D. 5. d) HARD SURFACES LOT= ROW ALLEY= 880 SF PER LOT 500 SF DETENTION PIPE (ECDC 18.30.060.D.5.d) 500 SF ADDED TO LOT SYSTEM 259 RETROFIT 0 SF N.A. 20' UTILITY NOTES ALL NEW UTILITIES ARE REQUIRED TO BE INSTALLED UNDERGROUND. CONSTRUCTION NOTE APPLICANT SHALL REPAIR/REPLACE ALL DAMAGE TO UTILITIES OR FRONTAGE IMPROVEMENTS IN CITY RIGHT-OF-WAY PER CITY STANDARDS THAT IS CAUSED OR OCCURS DURING THE PERMITTED PROJECT. N T N y CEDAR T e PINE ST 2 � v N FIR ST 2 BELLA COOLA RD ST e 220 S SW to _ 2241 N S S PUGET SOUND 228 T S _ _ Q I S DEER D 2 N T SW WACHUSETT RD 34 ST SW VICINITY MAP NOT TO SCALE N SCALE. 1 " = 20' 0 10 20 40 RAMI ENGINEERING, INC. Civil Engineering / Land Planning 16531 13TH AVE W, SUITE A108 LYNNWOOD, WA 98037 PHONE: (425) 678-6960 WWW.RAMENGINEERINGINC.COM WIC .c PROJECT TEAM N OWNER /APPLICANT CIVIL ENGINEER T SELECT HOMES RAM ENGINEERING INC. O 16531 13TH AVENUE W. #A 107 16531 13TH AVE W, SUITE A 108 15 L YNNWOOD, WASHINGTON 98037 L YNNWOOD, WA 98037 (425) 742-6044 (425) 678-6960 EMAIL: KAYLA.CLARK@OUTLOOK.COM EMAIL: ROBL@RAMENGINEERINGINC.COM CONTACT- KAYLA CLARK NICHOLS CONTACT.- ROB L. LONG, PE 1 SURVEYOR J PACIFIC COAST SURVEYS, INC. PO BOX 1 MILL CREEK, WA 98082 (425) 512-7099 CONTACT.- DARREN J. RIDDLE 4 �N SITE DATA `\ 6 SITE ADDRESS: 1055 7TH A VENUE S C EDMONDS, WA 98020 O TAX PARCEL ID NUMBER: 00619400400600 O O O TOTAL SITE AREA: 7,495 SF Q EXISTING ZONING: RS-6 PROPOSED LAND USE: SINGLE FAMILY RESIDENT/AL 41 AGENCIES/UTILITIES O JURISDICTION CITY OF EDMONDS WATER DISTRICT CITY OF EDMONDS SEWER DISTRICT CITY OF EDMONDS Q SCHOOL DISTRICT EDMONDS SCHOOL DISTRICT NO. 15 FIRE DISTRICT SNOHOMISH COUNTY FIRE DISTRICT NO. 1 O TELEPHONE FRONTIER COMMUNICATIONS ELECTRICAL SNOHOMISH COUNTY PUD NO. 1 GAS PSE Q GARBAGE REPUBLIC SERVICE I� o V SHEET INDEX CITY OF EDMONDS �,�� L L O� w of wash �l%r 1 SP-01 SITE DEVELOPMENT PLAN 2 TP-01 GRADING & TESC PLAN - 3 GN-01 GENERAL NOTES & DETAILS ��� ��G STEg�� `IOnreT . Know what's bellow. Gall before you dig. BLD20201129 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: BY CITY ENGINEERING DIVISION /a/yo/zl-:2 ENGINEER. ROB L. LONG, PE DRA WN BY.• MIKE MORRIS ISSUE DATE.- SCALE.• 1016120 AS NOTED JOB NO. 19-037 SHEET.• SP-01 SHT / OF 3 I II IN 130, �I % I V) s TOP 196.0CS 7 i i I / 1 TOPj112.5.0 7 N I I IN TOE0 o I I I _ 59 z 1891 FG TOP 1 A ORANGE FILTER FABRIC FENCE LOT 7 YOST'S FIRST ADDITION TO EDMONDS BLOCK 4 VOL 8, PG 6 00619400400702 ORANGE PROTECTIVE BARRIER (TYP) TOE 19--.v SEE DETAIL ER-900 _ L J I I I \I W - - -J = - ---- -- 196-- ----7 / t-tNG7NG SHALL tit t'LAULO AROUND INFILTRATION TRENCHES AFTER INSTALLATION. FENCE TO BE REMOVED COMPLETION OF HOUSE 9, CONSTRUCTION. o N 1 i CHANNEL 'DRAIN' l TOP 206.1 GARAGE / PROPOSED HOUSE j FF 206.5 MAIN FF 207.00 I `\ LOWER FF 197.00 i 11 206.5 2 11 FG 7,495 SF r EXISTING GROUND NW 1/4, SEC 25, TWP 27N, RGE 3E, W.M. FG', 15' MIN WIDTH 20' MIN LENGTH LOT 4 00619400400402 00619400400503 YOST'S FIRST ADDITION TO EDMONDS BLOCK 4 VOL 8, PG 6 G 1 Lo I------ I 2 roPlss.o \ I------ --- - -----� ; I II LOTS III TOE 1 s4.0 \ I PROPOSED FINISHED I I I I I I I I I III j ? I I I I GRADE CONTOUR 1 (TYP) I I I I III I SHORT PLAT IMPROVEMENTS III I 1 II % J I \\ CONSTRUCTED AS PART OF I 1 ( Ili I THE 7TH AVE S SHORT PLAT r I i II I i 1 \ I 1 II i (PLN20200019) SHORT PLAT IMPROVEMENTS i CONSTRUCTED AS PART OF I IT THE 7TH AVE S SHORT PLAT I \ 00619400400502 (PLN20200019) o I II I t I I ------ \ --- -------------� I I I INSTALL CB PROTECTION I O ,I II SEE DETAIL ER-902 I I/ I \ ,1® \1 `\ �• 1 / � � �II� I I �-------------------- --� \ f~ , PI III I I SD- T -�-SDI--- � i ��..T � �� ST R�•i -L-L--LSD---� / SD-- / SD- �-SD-- � i SD--Z SS ---I- SSA-- I SS -r I -SSt--�- ---� 154 950 G+t T"SS-: -SS-T-- 1 7t00f -r---SS---' 75 _9_0 a I I I 1 N 893 38 E(R1)(C) 329.79'(Rl)(C) (i?AS/S OF BEARING) 1 I I \ car I cfl rn \ co N O V O 00 0 o N N N \ N --_ -_ W --W W- --W- --W-�- -W\W---�W----I-W---�W----W----W- -------------- -------------------- -------------------- 2" x 2" WOOD/STEEL FILTER FABRIC SECURED TO 2" x 2" 14 GA WIRE FABRIC EQUAL NATIVE BACKFILL MATERIAL - 8" FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH F-ABRIC TO WIRE 2" x 2" WOOD/STEEL POSTS -\ WIRE MESH FENCE TO SUPPORT FILTER FABRIC BURY BOTTOM OF FILTER MATERIAL 8" TO 12' 6' MAX NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. CITY INSPECTION REQUIRED ON 2. SILT FENCE TO BE PLACED DOWNSILOPE OF CONSTRUCTION ALL EROSION CONTROL METHODS ACTIVITY. BEFORE OTHER WORK CAN BEGIN REVISION DATE CITY OF EDMONDS FILTER FABRIC FENCE AUGUST 2017 FILTRATION SYSTEMS PUBLIC WORKS STANDARD DEPARTME1,1T DETAIL APPROVED B'(: R. ENGLISH ER-900 20' _LS A TH IN DE FULL WIDTH GRESS/EGRESS DETAIL NOTES: 0 THE MINIMUM LEI+JGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAI- IS NOT TRACKED OFF SITE AND/OR INTO THE PUBLIC RIGHT-OF-WAY. 0 ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH. NOTES: 1. SURFACE: WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 2. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 3. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING THE SITE. WHEN WASHING IS USED, IT SHALL BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4. INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. *PROVIDE ATB OR ASPHALT TRANSITION WHERE FRONTAGE ROAD IS AN ARTERIAL. LENGTH TO BE DETERMINED BY CITY INSPECTOR. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL. METHODS BEFOF2E OTHER WORK CAN BEGIN \ REVISION DATE -� CITY OF EDMONDS STABILIZED CONSTRUCTION AUGUST 2017 ENTRANCE PUBLIC WORKS STANDARD DEPARTMENT DETAIL. st 1g4f'� APPROV-D BY: R. ENGLISH ER-901 PROJECT SIZE: MIN LENGTH OF (FEET) QUARRY SPALLS* < 1/4 ACRE 30 < 1 ACRE 50 < 3 ACRE 100 > 3 ACRE 100 CATCH BASIN GRATE FILTER SOCK WITH OVER FLOW HOLES (n'P) CATCH BASIN NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2, ANY SEDIMENT IN CATCH BASIN INSERT SHALL. BE REMOVED WHEN INSERT IS ONE-THIRD FULL-. 3. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. REVISION DATE `CITY OF EDMONDS �, TEMPORAR'.Y AUGUST 2017 €` .SEDIMENT TIRAP PUBLIC WORKS FOR CATCH BASINS STANDARD DEPARTMENT DETAIL s y 18Qn APPROVED BY: R. ENGLISH E R - 9 02 SCALE. 1 " = 20' 0 10 20 40 11 TESC NOTE INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, EDMONDS STANDARD DETAILS, AND THE SWPPP. CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE AND ADJUSTMENTS TO TESC MEASURES AS NEEDED. SOILS NOTE ALL DISTURBED SOILS WILL BE COMPOST AMENDED PER BMP T.5.13. Option (Choose one) Turf (grass or lawn) Areas Planting Bed Areas 1 -Compost-Amend existing soils (See 1. Ensure that there is at least 6 inches (in) of existing soil in the 1. Ensure that there is at least 5 in of existing soil in the disturbed area Figure 1 for turf and disturbed area (if not add topsoil). (if not add topsoil). Figure 2 for planting 2. Place 1 /2 to 1 /4 in of compost on top of existing soil. Till or 2. Place 3 in of compost on top of existing soil. Till or otherwise mix beds) otherwise mix the compost into the top 6 inches of existing soil such the compost into the top 6 inches existing soil such that the depth that the depth right after mixing is about 9.5 in (mixing will entrain air right after mixing is about 9.5 in (mixing will entrain air into the into the mixture and make it fluffy). It may be necessary to loosen mixture make it fluffy). It may be necessary to loosen (scarify) (scarify) existing soil to facilitate this mixing. existing soil to facilitate this mixing. 3. Water or roll to s Qhtly compact to the 9.5 inch compost -amended 3. Water or roll to sUghtly compact to the 9.5 inch compost -amended soil layer to approximately 8 inches. soil layer to approximately 8 inches. 4. Rake to smooth and remove surface woody debris and rocks larger 4. Rake to smooth and remove surface rocks larger than 2 inch in than 1 inch in diameter (if any). diameter (if any) 5. Mulch planting beds with 2 to 4 inches of organic mulch (i.e... For 100 square feet of turf area: A 1 '/2 to 1 3/4 inch lift requires -14 cubic arborist wood chips, leaves, bark) - Recommended not required. feet or - V2 cubic yard of compost. For 100 square feet of planting bed area: A 3 inch lift requires 25 cubic feet or -1 cubic yard of compost. 2 _ Import 1. Place a 3 inch thick layer of a topsoiUcompost mixture that contains 1. Place a 3 inch thick layer of a topsoil/compost mixture that. contains Topsoil/Compost Mix 4% to 5% organic matter (typically 25-35% compost by volume - the approximately 10% organic matter (typically 40% compost by balance shall be sand and or sandy loam soil). volume) - the balance shall be sand and or sandy loam soil). 2. Till or otherwise mix into the top 2 inches of existing soil. It may be 2. Till or otherwise mix into the top 2 inches of existing soil. It may be necessary to loosen (scarify) existing soil to facilitate this mixing. necessary to loosen (scarify) existing soil to facilitate this mixing. 3. Place a second lift of 3 inches of the topsoil/compost mixture on the 3. Place a second lift of 3 inches of the topsoil/compost mixture on the surface. surface. 4. Water or roll to slightly compact. 4. Rake to smooth and remove surface rocks larger than 2 inch in 5. Rake to smooth and remove surface woody debris and rocks larger diameter (if any) than 1 inch in diameter (if any). 5. Mulch planting beds with 1 to 2 inches of organic mulch (i.e., leaves, bark) - Recommended not required. For 100 square feet of turf area: each 3 inch lift will require 25 cubic feet (-1 cubic yard) of the topsoil/compost mix. This mix will have For 100 square feet of planting bed area: the each 3 inch lift will require approximately 30% compost by volume (0.3 cubic yards, - 8.1 cubic feet) 25 cubic feet (-1 cubic yard) of the topsoil/compost mix. This mix will and 70 % topsoil by volume (0.7 cubic yards, -19 cubic feet). have approximately 40% compost by volume (0.4 cubic yards, -11 cubic feet) and 60 % topsoil by volume (0.6 cubic yards, -16 cubic feet). COMPOST AMENDED SOILS REQUIREMENT FOR TURF AND PLANTING BED AREAS CONSTRUCTION SEQUENCE 1. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES. 2. CALL FOR UTILITY LOCATES. J. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATION OUTSIDE THE CONSTRUCTION ZONE. 4. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING INSPECTOR. ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED. 5. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 6. CLEAR, GRUB & ROUGH GRADE SITE. REVEGETA TE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW) 7. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING HOUSE CONSTRUCTION. 8. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATION OF ENTIRE SITE. 9. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR. • 3 Know what's below. Cull before you dig. BLD20201129 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: BY CITY ENGINEERING DIVISION RAMI ENGINEERING, INC. Civil Engineering / Land Planning 16531 13TH AVE W, SUITE Al08 LYNNWOOD, WA 98037 PHONE: (425) 678-6960 WWW.RAMENGINEERINGINC.COM OF W AS�V, �O�l d �i O �, 36508 W \��-'GISTEg��� IO>\reT . ENGINEER. /%/26:2 ROB L. LONG, PE DRAWN BY. MIKE MORRIS ISSUE DATE.' SCALE: 1016120 AS NOTED JOB NO. -037 19 SHEET TP-01 SHT 2 OF 3 w z 71 RESIDENCE a CLEANOUT a WITH 45' BENCH AND 2' CAP CLEANOUT f (TYP) [MAX) II NOT TO EXCEED 100' BETWEEN CLEANOUTS CLEANOUT (WYE WITH CAP AND CLEANOUT COVER) AND CONCRETE LEVELING COLLAR 2"'t r FINISHED GRADE F �z w � w `i 0 � 12" LOCKING COVER SEE NOTE 3 w o END OF PIPER GRIPPER PLUG (CHER)E 27061 OR APPROVED EQUALd U t�WAU-R TIGHT CAPR LEVELING COLD#R45" SEE NOTE 4 ! 12" PVC SLEEVE Y 6" RISER 4" OR 6" SIDE SEWER- 6" WYE ANDTY STUB GENERAL CLEANtaUT DETAIL 45' BEND 4" OR 6" - 12" LOCKING COVER SIDE SEWER CLEANOUT DETAIL z SEE NOTE 3 AT PROPERTY LINE/Cl Y EASEMENT w � LEVELING COLLAR NOTES: j -0w SEE NOTE 4 < n� an ASPHALT SURFACE 1. SEWER PIPE SHALL BE SDR-35 AND JOINTS SHALL BE _ GASKETED. 112"t 2. PIPE SLOPE TO BE 2% MIN AND UP TO 50% MAX. 3. SEWER CLEANOUT COVER TO BE EAST JORDAN IRON WORKS 1 FOOT LONG 12' PVC PRODUCT #00366102 STAR PIPE COSP48L OR APPROVED SLEEVE EQUAL. 6" RISER \- END OF PIPE GRIPPER 4. LEVELING COLLAR SHALL BE CONSTRUCTED AS FOLLOWS: PLUG (CHERNE 270261 OR APPROVED EQUAL) IN ROADWAYS PER COE STD DWG GU-424 TYPICAL CLEANOUT IN SIDEWALK/LANDSCAPED AREAS, EITHER 24"x24"x6" UNDER ASPHALT OR CONCRETE DEEP CONCRETE COLLAR OR 24" DIAMETER x 6" DEEP CONCRETE COLLAR i' REVISION DATE DECEMBER :2017 CITY OF EDMOND' p - SEWER CLEANOLIT DETAILS ti PUBLIC WORKS STANDARD `.- DEPARTMENT DETAIL APPROVED BY: R. SS-200F RING AND COVER PER COE STD OTL GU--420 FOR CURB AND SPLASH LINE ONLY: FRAME AND GRATE PER COE STD DTL SD--320 SERIES 8" MIN- 18,� TOP SLAB _ 20"x24" OR • ° ' 24" DIA HANDHOLDS (2) SEE COE STD DTL GU-423 s" MAX _ 12" (TIP) 1 54", 6C", 72" OR 96" STEPS OR LADDER OE,IENT SO THAT THEY ARE NOT ABOVE PIPE r - SAND COLLAR OR p POLYPROPYLENE ^"� _-_- _rl KOR-N-SEAL AROUND � _ � _ SAFETY STEP C)NOTE ���JJJ11 PIPE z (SEE 6)) Q �,- - h41IJ 1"-4" PRECAST BASE AND MAX �'� INTEGRAL RISER. .NOTES: 1. CATCH BASINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH NSDOT STANDARD SPECIFICATION 9-05.50(3). 2. HANDHOLDS IN ADJUSTMENT SECTION( SHALL HAVE 3" MIN CLEARANCE. STEPS IN CATCH BASIN SHALL HAVE 6" MINI CLEARANCE. 3. APPLY NON -SHRINK GROUT TO INSDE AND OUTSIDE OF ALL JOINTS, RINGS, PICK HOLES. RISERS AND FRAMES. ALL PRECAST CONCRETE SHALL BE CLASS 4000. 4. KNOCKOUT OR CUTOUT HOLE SIZE `SHALL EQUAL PIPE OUTER DIAMETER PLUS CATCH BASIN WALL THICKNESS. MAX HOLE SIZE SHALL BE 36" FOR 48" CATCH BASIN, 42" FOR 54" CB, "" FOR 60" CB, 60" FOR 72" CB, 84" FOR 96" CB. MIN DISTANCE BETWEEN HOLES SHALL BE :9" FOR 48"', 54", AND 60" CB: 12" FOR 72" AND 96" CB. 5. CATCH BASIN FRAMES AND GRATES OR COVERS SHALL BE IN ACCORDANCE WITH SEC 7.05 OF THE WSDOT STANDARD SPECIFICATIONS. 6. STEP AND LADDER MAY 13E USED IN LIEU OF POLYPROPYLENE SAFETY STEPS. SEE COE STD DTL GU-423. / CATCH BASIN, TYPE II REVISIONDATE OCTTOBEROBER 2018CITY OF EDMONDS 48" 54", 60", ' PUBLIC WORKS 72", & 96"" STANDARD DEPARTMENT DETAIL APPP.UVED BY: R. ENGLISH SD-31D0 FLOW CONTROL 4.5 _ STRUCTURE r �j NON -SHRINK GROUT - PVC PIPE* 1'-0" MAX ° �- CONTROL DEVICE ASSEMBLY TO BE COUPLING - PVC PIPE REMOVABLE FROM (OPTIONAL) STUB* I INSIDE THE FCS I IF SET SCREW TO t PREVENT ROTATION J JL NVE:RT* - - C46KET (TYP)If \-Pb'C PIPE PVC ADAPTER* W/ CROSS* o DOUBLE GASKET I I AND ADHESIVE BONDED SAND (FINISH ON EXTERIOR. MIN 7" LONG DRILLED ORIFICE IN PVC INSIDE CAULK SPACE BETWEEN CAP PLUG PVC ADAPTER AND PIPE STUB CONNECTION & CONTROL DEVICE ORIFICE DIAMETER* LCONNECTION DETAIL A AND 0' LADDER OR HAND HOLDS - CONTROL DEVICE POLYPROPYLENE (SEE DETAIL A) j i' OUTLET PIPE / _ - CINCH ANCHOR - -'F - - ALLOWABLE OUTLET LOCATION P WIRE ROPE (180' to 315') FINISHED GRADE CLIP (SS) CAl'CH BASIN TYPE II DEFORMED V-NOTCH WEIR AS NEEDED*- PER COE STD DTL 3/8" STEEL J D-300 k.\ ROD (SS OR I4 ALUMINUM) ADDITIONAL. ORIFICE r': t \ + LENGTH TO FIT AS NEEDED* ` - l'-0" MIN " /'\\-P1(C PIPE & V-6" MAX CROSS FLOW CONTROL STRUCTURE DETENTION PIPE PIPE SUPPORT (LENGTH, DIAMETER, DETAIL B Y MATERIAL TYPE)* NW 1/4, SEC 25, TWP 27N, RGE 3E, W.M. TESC NOTES EL* - PVC PIPE* TEE* SPOOL* ELBOW* SUPPORT (2 REQ'D) CONTROL DEVICE SEE DETAIL A I iN DRILLED J ORIFICE DIA* PVC INSIDE CAP PLUG* FLOW CONTROL STRUCTURE SHOWN W/ TYPE 2 CATCH BASIN (DETAILS A & B SMALL APPLY TO ALL DESIGNS NOTES: WHERE A SHEAR GATE WOULD OTHERWISE APPLY) * SPECIFIC DESIGN INFORMATION AS INDICATED ON APPROVED CONSTRUCTION DRAWINGS, INVERT OF DETENTION PIPE IN STRUCTURE SHALL BE EQUAL 'TO OR HIGHER THAN THE INVERT OF THE OUTLET PIPE. PRIVATELY -OWNED CONTROL STRUCTURES SHALL NOT BE PLACED IN CITY RIGHT-OF-WAY. REVISION DATE FLOW CONTROL JANUARY 2018 'CITY OF EDMONDS --'-- STRUCTURE PUBLIC WORKS (FCS) STANDARD DEPARTMENT DETAIL � + 159 A,PPf20'VED BY: R. ENGLISH SD-301 SEE APPLICABLE STANDARD DETAILS FRAME AND GRATE PIPE ALLOWANCES PIPE MATERIAL MAXIMUM INSIDE DIAMETER REINFORCED OR 12" PLAIN CONCRETE ALL METAL PIPE 15" CPSSP* 12" (WSDOT STD SPEC 9-05.20) SOLID WALL PVC 15" (WSDOT STD SPEC 9-05.12.(1)) PROFILE WALL PVC 15" (WSDOT STD SPEC 9-05.12(2)) �1 CORRUGATED POLYETHYLENE STORM SEWER PIPE �2", 4 5", OR 12" NOTES: RISER SECTION 1. CATCH BASINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 9-05.50(3). 2. AS AN ACCEPTABLE ALTERNATIVE TO REBAR, WELDED WIRE �,• FABRIC HAVING A MIN. AREA OF 0.12 SQUARE INCHES PER FOOT MAY BE USED. WELDED WIRE FABRIC SHALL COMPLY TO ASTM A497 (AASHTO M 221). WIRE FABRIC SHALL NOT BE PLACED IN KNOCKOUTS. ��ta �. \\` r• �/� 3. APPLY NON -SHRINK GROUT TO INSIDE AND OUTSIDE OF \ /f ALL JOINTS, RINGS, RISERS AND FRAMES. ' 4. ROUND KNOCKOUTS MAY BE ON ALL 4 SIDES, WITH MAX :Y DIAMETER OF 20". KNOCKOUTS MAY BE EITHER ROUND OR s J- "D" SHAPE. 5. THE MAX DEPTH FROM THE FINISHED GRADE TO THE v PIPE INVERT IS 5'-0", 6. THE TAPER ON THE SIDES OF THE PRECAST BASE SECTION AND RISER SECTION SHALL NOT EXCEED 1/2"/FT. 7. CATCH BASIN FRAME AND GRATE SHALL BE IN ACCORDANCE ���� \: • WITH STANDARD SPECIFICATIONS. MATING SURFACES SHALL BE FINISHED TO ASSURE NON -ROCKING FIT WITH ANY COVER POSITION. (MEASUREMENT AT THE TOP OF THE BASE) 8.VERTICAL EDGE OF RISER SHALL NOT BE MORE THAN 2" PRECAST BASE SECTION FROM VERTICAL EDGE OF CATCH BASIN WALL, REVISION DATE JANUARY 2018 ;CITY OF EDMONDS CATCH BASIN TYPE 7. PUBLIC WORKS STANDARD DEPARTMENT DETA.I- APPROVED BY: R. ENGLISH SD-303 6" MIN DEPTH fitterfabric- SET DEPTH AS REQD FOR POSITIVE FLOW FROM WALL/HOUSE FOOTING DRAIN rn oopacted backfill 7�-- ~ �c::p:.: 4 rigid cr 6'flexible 4 p o9 c op a perforated PIPE 2d' o e 12' v o0 ape r 9 �� _^ washed rock a o�4Q�° QoA�O 1 1/2 -3/4" Qa G " 1 I r-- 24'�-1 SECTION A - NTS RETAINING WALL / FOOTING DRAIN DRYWELL TRENCH NOT TO SCALE 1. ESC MINIMUM REQUIREMENT -CONSTRUCTION ACCESS ROUT, CONSTRUCTION VEHICLE ACCESS SHALL BE, WHENEVER PRACTICAL, LIMITED TO ONE ROUTE. ACCESS POINTS SHALL BE STABILIZED WITH QUARRY SPALLS OR CRUSHED ROCK TO MINIMIZE THE TRACKING OF SEDIMENT ONTO PUBLIC ROADS. IF SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, THE ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA WITHIN 24 HOURS. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 2. ESC MINIMUM REQUIREMENT -STABILIZATION OF EXPOSED AREAS. ALL SOILS EXPOSED BY LAND DISTURBING ACTIVITIES SHALL BE STABILIZED BY SUITABLE APPLICATION OF BMPS, INCLUDING, BUT NOT LIMITED, SOD, HYDROSEEDING, OR OTHER VEGETATION, PLASTIC COVERING, OR MULCHING. ALL BMPS SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN ACCORDANCE WITH THE MANUAL. THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TWO DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND NO MORE THAN SEVEN DAYS FROM MAY 1 THROUGH SEPTEMBER 30). 3. ESC MINIMUM REQUIREMENT -PROTECTION OF ADJACENT PROPERTIES ADJACENT PROPERTIES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION BY APPROPRIATE USE OF VEGETATIVE BUFFER STRIPS, SEDIMENT BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY A COMBINATION OF THESE MEASURES AND OTHER APPROPRIATE BMPS 4. ESC MINIMUM REQUIREMENT- MAINTENANCE. ALL EROSION AND SEDIMENT CONTROL BMPS SHALL BE REGULARLY INSPECTED AND MAINTAINED BY THE OWNER TO ENSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE CONDUCTED /N ACCORDANCE WITH THE MANUAL. 5. ESC MINIMUM REQUIREMENT -OTHER BMPS. AS REQUIRED BY THE CITY, OTHER APPROPRIATE BMPS TO MITIGATE THE EFFECTS OF INCREASED RUNOFF SHALL BE APPLIED. 6. EROSION AND SEDIMENT CONTROL REQUIREMENT- UNDERGROUND UTILITY CONSTRUCTION. THE CONSTRUCTION OF UNDERGROUND UTILITY LINES SHALL SPECIFICALLY ADDRESS THE FOLLOWING: a. EROSION CONTROL FOR EXCAVATED AND STOCKPILED MATERIALS; b. THE PLACEMENT OF EXCAVATED MATERIAL WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES; C. TRENCH DEWATERING SYSTEMS (MUST DISCHARGE INTO SEDIMENT TRAPS, SEDIMENT PONDS, OR OTHER ACCEPTABLE MEANS); d. TRACKING AND SPILLING OF MATERIALS ON STREETS DUE TO HAULING; e. DAILY CLEANUP AND STREET MAINTENANCE. 7. ADDITIONAL ESC MINIMUM REQUIREMENTS FOR LARGER DEVELOPMENTS ALL NEW DEVELOPMENT AND REDEVELOPMENT THAT INCLUDED LAND DISTURBING ACTIVITIES OF GREATER THEN, OR EQUAL TO, ONE ACRE IN ADDITION TO MEETING THE MINIMUM REQUIREMENTS SET FORTH ABOVE SHALL COMPLY WITH ESC REQUIREMENTS LISTED BELOW. 8. ESC MINIMUM REQUIREMENT- DELINEATE CLEARING AND EASEMENT LIMITS. IN THE FIELD, MARK CLEARING LIMITS AND/OR ANY EASEMENTS, SETBACKS, SENSITIVE/CRITICAL AREAS AND THE BUFFERS, TREES AND DRAINAGE COURSES 9. ESC MINIMUM REQUIREMENT -SEDIMENT TRAPPING. PRIOR TO LEAVING THE SITE, STORM WATER RUNOFF SHALL PASS THROUGH A SEDIMENT POND OR SEDIMENT TRAP OR OTHER APPROPRIATE BMPS. SEDIMENT PONDS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER BMPS INTENDED TO TRAP SEDIMENT ON -SITE SHALL BE CONSTRUCTED AS A FIRST STEP /N GRADING. THESE BMPS SHALL BE FUNCTIONAL BEFORE LAND DISTURBING ACTIVITIES TAKE PLACE. EARTHEN STRUCTURES, SUCH AS DAMS, DIKES, AND DIVERSIONS SHALL BE SEEDED AND MULCHED ACCORDING TO AN APPROVED TIMETABLE. 10. ESC MINIMUM REQUIREMENT -CUT AND FILL SLOPES. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. IN ADDITION, SLOPES SHALL BE STABILIZED IN ACCORDANCE WITH ESC REQUIREMENT NO. 2QU. SEE ADDITIONAL GEOTECHNICAL RECOMMENDATIONS IN REPORT DA TED OCTOBER 23, 2015. 11. ESC MINIMUM REQUIREMENT -CONTROLLING OFF -SITE EROSION. PROPERTIES AND WATER WAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM EROSION DUE TO INCREASES IN THE VOLUME, VELOCITY, AND PEAK FLOW RATE OF STORM WATER RUNOFF FROM THE PROJECT SITE. 12. ESC MINIMUM REQUIREMENT -STABILIZATION OF TEMPORARY CONVEYANCE CHANNELS AND OUTLETS. ALL TEMPORARY ON -SITE CONVEYANCE CHANNELS SHALL BE DESIGNED, CONSTRUCTED AND STABILIZED TO PREVENT EROSION FROM THE EXPECTED VELOCITY OF FLOW FROM A TWO-YEAR, 24-HOUR FREQUENCY STORM FOR THE DEVELOPED CONDITION. STABILIZATION ADEQUATE TO PREVENT EROSION OF OUTLETS, ADJACENT STREAM BANKS, SLOPES AND DOWNSTREAM REACHES SHALL BE PROVIDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS. 13. ESC MINIMUM REQUIREMENT -STORM DRAIN INLET PROTECTION. ALL STORM DRAIN INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT STORM WATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 14. ESC MINIMUM REQUIREMENT -REMOVAL OF TEMPORARY BMPS. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABILIZED. 15. EROSION AND SEDIMENT CONTROL REQUIREMENT-DEWATERING CONSTRUCTION SITES. DEWATERING SYSTEMS SHALL DISCHARGE INTO A SEDIMENT TRAP OR SEDIMENT POND. 16. EROSION AND SEDIMENT CONTROL REQUIREMENT -CONTROL OF POLLUTANTS OTHER THAN SEDIMENT ON CONSTRUCTION SITES. ALL POLLUTANTS OTHER THAN SEDIMENT THAT OCCUR ON SITE DURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORM WATER. 17. EROSION AND SEDIMENT CONTROL REQUIREMENT -FINANCIAL LIABILITY. PERFORMANCE BONDING, OR OTHER APPROPRIATE FINANCIAL INSTRUMENTS, SHALL BE REQUIRED FOR ALL PROJECTS TO ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLAN. [ORD. 3013 1, 1995] CATCH BASIN TOP EL 196.Of SOLID LOCKING LID CATCH BASIN TOP EL 196.Of SOLID LOCKING LID TYPE 1 CATCH BASIN TO BE MANUFACTURED PER CITY OF 2 EDMONDS STD DETAIL SD-303 0. F. EL. 192.68 I Q EX6"DI SD STUB U(0 EL. 189.5 W Lu 1/2" DIA N ORIFICE 35' - 36 " CMP 0.509 MIN (DETENTION PIPE) EL. 189.50 EL. 189.68 CBI - TYPE 2 NO SCALE 2 =8" CMP 192.02 0.507. PIPE ZONE BEDDING CITY OF EDMONDS STANDARDPER PLAN GU-400 CB 2 - TYPE I FLOW CONTROL STRUCTURE SEE COE STD DETAIL SD-301 (54" DIA TYPE ll CATCH BASIN TO BE MANUFACTURED PER COE STD DETAIL S0-300) NO SCALE GENERAL NOTES 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS - CURRENT INTERNATIONAL BUILDING CODE (IBC) - CURRENT WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION 2012 WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWA TER MANAGEMENT MANUAL FOR WESTERN WASHINGTON (AS AMENDED IN DECEMBER 2014) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE J. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF 'AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL ASBUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES N 0 T SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAW/NGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UT/L/T/ES LOCATION SERVICE (1 - 800- 424- 5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNERS REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS PAVEMENT IS TO BE PLACED SHALL BE DELINEATED AND PROTECTED AT ALL TIMES FROM COMPACTIVE ACTIVITIES (I.E. HEAVY EQUIPMENT, STOCKPILING). 14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT. 15. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 16. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS 17. ALL REQUIRED STORMWA TER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 18. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 19. ALL FOOTING DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC. SHALL CONNECT TO THE DRAINAGE SYSTEM DOWNSTREAM OF THE SITE STORMWATER DETENTION SYSTEM. 20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 21. A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED FROM THE CITY PUBLIC WORKS DEPARTMENT. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, PROVIDE TO THE CITY WATER QUALITY TECHNICIAN, A COPY OF THE BACKFLOW TEST REPORT. TEST REPORTS CAN BE FAXED TO 425-744-6057 OR EMAILED TO JEFF.KOBYLK@EDMONDSWA.GOV. BACKFLOW TESTING SHALL BE COMPLETED BY THE OWNER ANNUALLY THEREAFTER. 22. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 23. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ONSITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS 24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 25. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 26. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 27. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 57' SLOPE FOR A MIN/MUM DISTANCE OF 10 FEET. 28. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 29. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 30. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILI TIES. 31. ALL UTILITIES SHALL BE PLACED UNDERGROUND. 32. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTORS EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNERS REPRESENTATIVE PRIOR TO BACKFILLING. 33. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 34. FIELD STAKE ALL UTILITY STUBS AT THE PROPERTY LINE. 35. TRENCH BACKFILL OF UTILITIES LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE COMPACTED TO 95% COMPACTION TEST REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO PAVING. 36. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES 37. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UT/LIT/ES WITHIN THE BUILDING. 38. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. 39. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM. 40. PIPE MATERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY ENGINEERING DIVISION FOR APPROVAL PRIOR TO INSTALLATION. If Know what's be[OW. Gall before you dig. BLD20201129 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: BY CITY ENGINEERING DIVISION RAMI ENGINEERING, INC. Civil Engineering / Land Planning 16531 13TH AVE W, SUITE Al08 LYNNWOOD, WA 98037 PHONE: (425) 678-6960 WWW.RAMENGINEERINGINC.COM Q) O O W U W LO cc O ENGINEER: F WASH d 36508 W ISTEg��� IOnreT . ROB L. LONG, PE y DRA WN BY. MIKE MORRIS ISSUE DATE.' SCALE.- 10/6/20 AS NOTED JOB NO. 19-037 SHEET GN-01 ° SHT 3 OF 3