REVIEWED BLD BLD2020-1129+Geotechnical_Report+10.21.2020_1.39.22_PMFebruary 24, 2020
ES-7076
Select Homes, Inc.
16531 — 131h Avenue West, A107
Lynnwood, Washington 98037
Attention: Ms. Kayla Nichols
Subject: Geotechnical Evaluation
Proposed Single -Family Residences
1 055 — 7th Avenue South
Edmonds, Washington
Earth
Solutions
N W «C
Earth Solutions NW LLC
Geotechnical Engineering, Construction
❑bservationjesting and Environmental Services
Reference: Department of Ecology
Stormwater Management Manual for Western Washington
Amended December 2014
James P. Minard
Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles
Washington, 1983
Edmonds City Code
Chapter 23.80 (Geologically Hazard Areas)
Dear Ms. Nichols:
As requested, Earth Solutions NW, LLC (ESNW) has prepared this geotechnical evaluation report
for the proposed single-family residences. As part of our scope of services, we completed a
subsurface exploration, in -situ infiltration evaluation, laboratory and engineering analyses, and
prepared this written report with our findings and recommendations for the proposed project.
Based on our evaluation, the proposed project is feasible from a geotechnical standpoint.
Protect Description
The subject site is located immediately northeast of the intersection between 7th Avenue South
and Fir Street in Edmonds, Washington. The subject site consists of one parcel (Snohomish
County parcel number 00619400400600) covering 0.34 acres. Based on our understanding of
the proposed redevelopment, the boundary lines will be adjusted to create two new parcels. The
property is currently developed with a single-family residence and associated improvements. Site
topography descends to the west with about 10 to 15 feet of total elevation change across the
property. The subject site is bordered to the north by a single-family residence, to the east by an
alley, to the south by Fir Street, and to the west by 7th Avenue South.
15365 N.E. 90th Street, Suite 100 • Redmond, WA 98052 0 (425) 449-4704 • FAX (425) 449-4711
Select Homes, Inc. ES-7076
February 24, 2020 Page 2
We understand the existing single-family residential structure, detached garage, and associated
improvements will be removed and two new single-family residential structures will be
constructed. We anticipate grading activities will include cuts and fills of up to about five feet to
establish the planned building alignments. However, grading plans were not available at the time
this report was prepared. We understand infiltration and low impact development methods are
being evaluated for stormwater management. Site improvements will also include underground
utility installations.
At the time this report was prepared, specific building load values were not available. However,
we anticipate the proposed residential structures will consist of relatively lightly loaded wood
framing supported on conventional foundations. Based on our experience with similar
developments, we estimate wall loads on the order of one to two kips per linear foot and slab -on -
grade loading of 150 pounds per square foot (psf).
If the above design assumptions are incorrect or change, ESNW should be contacted to review
the recommendations in this report. ESNW should review the final design to verify the
geotechnical recommendations provided in this report have been incorporated into the plans.
Subsurface Conditions
As part of this geotechnical evaluation, an ESNW representative observed, logged, and sampled
three test pits on December 16, 2019, excavated at accessible locations within the proposed
development area, using a mini-trackhoe and operator provided by the client. The approximate
locations of the test pits are depicted on the Test Pit Location Plan (Plate 2). Please refer to the
test pit logs provided as an attachment to this report for a more detailed description of subsurface
conditions. Representative soil samples collected at the test pit locations were analyzed in
general accordance with the Unified Soil Classification System (USCS) and United States
Department of Agriculture (USDA) methods and procedures.
Topsoil and Fill
Topsoil was observed extending to depths of approximately 4 to 12 inches below the existing
ground surface (bgs). The topsoil was characterized by dark brown color and fine organic
material. Fill was encountered at all of the test pit locations extending to depths of one and one-
half to two and one-half feet bgs. The fill was characterized as silty sand (USCS SM), consistent
with reworked native soil. A relic topsoil layer was encountered below the fill at TP-2 and TP-3.
Native Soil
Underlying the topsoil and fill, native soil conditions at the test pit locations were observed to
consist primarily of silty sand (USCS: SM). Silty gravel (USCS: GM) was observed near -surface
at TP-2 which transitioned to silty sand at depth. Overall soil relative density increased with
depth, extending to the maximum exploration depth of about eight feet bgs. The native soil was
generally observed in a weakly cemented condition at about four feet bgs at TP-1.
Earth Solutions NW. LLC
Select Homes, Inc.
February 24, 2020
Geologic Setting
ES-7076
Page 3
The referenced geologic map resource identifies Vashon advance outwash deposits (Qva)
across the site with Vashon till deposits (Qvt) mapped immediately south and east of the site.
Vashon advance outwash is typically a well -sorted sand and gravel deposit, which was formed
by streams issuing from the advancing ice sheet. The Vashon advance outwash commonly
grades upward into glacial till (mapped to the south and east). Vashon till typically consists of a
nonsorted mixture of clay, silt, sand, pebbles, cobbles, and boulders. The till was deposited
directly by ice advanced over previously deposited sediment and rocks. In addition, the Web Soil
Survey identifies Alderwood-Urban land complex (Map Unit Symbol: 6) as the primary soil unit
underlying the subject site. The Alderwood series was formed in glacial till plains. Based on our
field observations, native soils on the subject site are generally consistent with the glacial till.
Groundwater
During our subsurface exploration completed on December 16, 2019, groundwater was observed
at each of the test pit locations, at depths of four to seven and one-half feet bgs. Groundwater
seepage rates and elevations fluctuate depending on many factors, including precipitation
duration and intensity, the time of year, and soil conditions. In general, groundwater flow rates
are higher during the winter, spring, and early summer months.
Geologically Hazardous Areas Assessment
As part of this geotechnical evaluation, the referenced chapter of the Edmonds City Code was
reviewed. Based on our investigation and review, there are no geologically hazardous areas
present on or adjacent to the site.
Foundations
The proposed single-family structures can be supported on conventional spread and continuous
footings bearing on undisturbed, competent native soil, compacted native soil, or new structural
fill. Competent native soils, suitable for support of the foundation, should be encountered
beginning at depths of approximately two to three and one-half feet bgs. Where loose or
unsuitable soil conditions are encountered at foundation subgrade elevations during site
preparation activities, compaction of the soils to the specifications of structural fill, or
overexcavation and replacement with granular structural fill will be necessary. Structural fill
should consist of suitable granular soils compacted to 95 percent of Modified Proctor (ASTM
D1557). Compaction of the soil to the levels necessary for use as structural fill will be difficult
during wet weather conditions. Organic material exposed at foundation subgrade elevations
must be removed and grades restored with structural fill.
Earth Solutions NW. LLC
Select Homes, Inc. ES-7076
February 24, 2020 Page 4
Provided the structures will be supported as described above, the following parameters can be
used for design of the new foundations:
• Allowable soil bearing capacity 2,500 psf
• Passive earth pressure
• Coefficient of friction
300 pcf (equivalent fluid)
AM
The passive earth pressure and coefficient of friction values included a safety factor of 1.5. A
one-third increase in the allowable soil bearing capacity can be assumed for short-term wind and
seismic loading conditions.
With structural loading as expected, total settlement in the range of one inch is anticipated, with
differential settlement of about one-half inch. The majority of the settlements should occur during
construction, as dead loads are applied.
Seismic Considerations
The 2018 IBC recognizes ASCE for seismic site class definitions. In accordance with Table 20.3-
1 of ASCE, Minimum Design Loads for Buildings and Other Structures, Site Class D, should be
used for design.
In our opinion, the site susceptibility to liquefaction is low. The native soil composition and relative
density are the primary bases for this opinion.
Drainage
Temporary measures to control surface water runoff during construction would likely involve
passive elements such as interceptor trenches and sumps. ESNW should be consulted during
preliminary grading activities to evaluate seepage areas and provide recommendations to
reduce the potential for seepage -related instability.
Finish grades should be designed to direct surface water away from structures and slopes.
Grades adjacent to buildings should be sloped away at a gradient of either at least 2 percent for
a horizontal distance of up to 10 feet or the maximum allowed by adjacent structures. In our
opinion, foundation drains should be installed along building perimeter footings.
Infiltration Evaluation
As indicated in the Subsurface Conditions section, native soils encountered during our fieldwork
were characterized primarily as silty sand glacial till deposits. Based on the results of USDA
textural analyses, the native soils were classified primarily as sandy loam with fines contents of
about 30 to 38 percent.
Earth Solutions NW. LLC
Select Homes, Inc. ES-7076
February 24, 2020 Page 5
In -situ testing was attempted at TP-1 at a depth of about four feet bgs. However, given the
presence of groundwater seepage at a depth of about four feet bgs, the relatively high in -situ
fines content of the native soil, and underlying impermeable layers in a cemented condition,
infiltration was deemed infeasible. Based on the results of our testing, we do not recommend
utilizing infiltration systems for the proposed development.
On -site Stormwater Management
Pursuant to City of Edmonds stormwater management requirements, implementation of on -site
stormwater BMPs are required for proposed developments in accordance with specified
thresholds, standards, and lists. The intent of BMP implementation is to infiltrate, disperse, and
retain stormwater runoff on site to the extent feasible. The table below summarizes our
evaluation of low impact development methods, as outlined in the referenced stormwater manual,
from a geotechnical standpoint. It is instructed in the referenced stormwater manual that BMPs
are to be considered in the order listed (from top to bottom) for each surface type, and the first
BMP that is determined to be viable should be used. For completeness, however, we have
evaluated each listed BMP for the proposed surface types.
BMP
Viable?
Limitations or
Infeasibility Criteria
Lawns and Landscaped Areas
T5.13: Post -construction soil
quality and depth (Volume V,
Yes
None.
Chapter 5
Roofs
T5.30: Adequate vegetative flow paths will likely not be
T5.30: Full dispersion (Volume
Maybe*
available.
V, Chapter 5)
T5.10A: The unweathered glacial till soils observed at
T5.10A: Downspout full
relatively shallow depths and observed groundwater
infiltration systems (Volume III,
NO
conditions exhibit very poor soil infiltration
Chapter 3)
characteristics and should be considered impermeable
for design.
The unweathered glacial till soils observed at relatively
Bioretention (Volume V, Chapter
No
shallow depths and observed groundwater conditions
7)
exhibit very poor soil infiltration characteristics and
should be considered impermeable for design.
T5.10B: Downspout dispersion
systems (Volume III, Chapter 3)
Maybe*
Adequate vegetative flow paths are likely not available.
Earth Solutions NW. LLC
Select Homes, Inc.
February 24, 2020
ES-7076
Page 6
BMP
Viable?
Limitations or
Infeasibility Criteria
T5.10C: Perforated stub -out
Perforated stub -out should be placed within upper
connections (Volume III, Chapter
Yes
weathered soil.
3
Other Hard Surfaces
T5.30: Full dispersion (Volume
V, Chapter 5)
Maybe*
Adequate vegetative flow paths are likely not available.
The unweathered glacial till soils observed at relatively
T5.15: Permeable pavement
No
shallow depths and observed groundwater conditions
(Volume V, Chapter 5)
exhibit very poor soil infiltration characteristics and
should be considered impermeable for design.
The unweathered glacial till soils observed at relatively
Bioretention (Volume V, Chapter
No
shallow depths and observed groundwater conditions
7)
exhibit very poor soil infiltration characteristics and should
be considered impermeable for design.
T5.12: Sheet flow dispersion
T5.11: Concentrated flow
dispersion (Volume V, Chapter
Maybe*
Adequate vegetative flow paths are likely not available.
5)
* Viability to be determined by storm designer.
Limitations
The recommendations and conclusions provided in this geotechnical evaluation report are
professional opinions consistent with the level of care and skill that is typical of other members in
the profession currently practicing under similar conditions in this area. A warranty is not
expressed or implied. Variations in the soil and groundwater conditions observed at the test pit
locations may exist and may not become evident until construction. ESNW should reevaluate
the conclusions in this geotechnical evaluation report if variations are encountered.
Earth Solutions NW. LLC
Select Homes, Inc.
February 24, 2020
ES-7076
Page 7
Should you require additional information, or have questions, please call.
Sincerely,
EARTH SOLUTIONS NW, LLC
Adam Z. Shier, L.G.
Project Geologist
Attachments: Plate 1 — Vicinity Map
Plate 2 — Test Pit Location Plan
Test Pit Logs
Grain Size Distribution
'24/2020
Henry T. Wright, P.E.
Senior Project Manager
cc: RAM Engineering, Inc.
Attention: Mr. Rob Long, P.E. (Email only)
Earth Solutions NW. LLC
A
r - Wa lntt
St[ee[
-
walnut 5Lr"i.
S�
walnutStwt
ceaarst:eer.
_ r-
10
-znrure
sneer
`
spruce Srreer.
-
_
--_ = jam'•
17,
.' Ffrri�["i :!c
Hr•dr,,k%Nay
x'
�laurl151r
- r
es r
�__ r
f•rrr: f),�[}y
GC1 -.
215N S15e�saz[n
_ _- �7�-::....1•) �
f
.. _ .
... :. Pair i[�rvri Pi1P S-reel,
Pir:r?•i.x�
g inc 5weet
-
216rh sk 5authwp
_
ATE
217th SlreE[5Qu[hxes[
Forsyth Lane
-
_
Bella Cnnla Ruacf
-_
Earn Street
',�' ,
Urn
I
q
T�*
-
Woodway
;
Edmonds
'=
n n
WA 10441.
-2211h
Sireei-Southwest
- _
ri Pyaongwnq
ya
'. tSN'S?
eR. Sou[hwey[
to
':'YL
�•
=
o,� J� �o�noeer ome
:
c .$`rc•r':NOOd s \
L—
ds=��' �s6s%l
__
__/ec•d
FaeS!
—
Eden°n1:
-_-
V'.+UCC?�^ray
3
.,
WA104
232nd Srreet 5°.uthwes[ _.
—
3
__
S Ne:11rfS
N
7MIhscree[5[fuLhw-
_ -
a
r
r Nottingham
Roa6 0 KP1 i
I
7i
m.
Q
3
v m
2'S5[h Place Sou[nWeR
'
e36th Srreet Sc
Mudrv.mr
0: schvvl
238[h Street 5°u[hives� j
3]xh Ple a¢ 2
738th Stieel, so+nhW
Paramour�r r,
R
j.
Petrp7et m
s
zar[hsvRets-[hwest
Terminal
m
Ea91e lane '�.
,3�
'S
- —
�FP. is ..::1:•=
C
rvl
nGP 2
o'er.
eerYLane
n
Y
NORTH }
Reference: .
Snohomish County, Washington
OpenStreetMap.org Vicinity Map
1055 - 7th Avenue S.
Edmonds, Washington
NOTE: This plate may contain areas of color. ESNW cannot be
responsible for any subsequent misinterpretation of the information Drwn. CAM Date 12/30/2019 Proj. No. 7076
resulting from black & white reproductions of this plate.
Checked AZS Date Dec. 2019 Plate 1
I
I
I
I
I
I
I
I
I
I i
I �
195 200 205
�—TTP///1 � ----
/ I Gara0e I
I
� I I
� House i I �
' I TJP-3
I TP-2 I v
I a
\ I 205
195
200
LEGEND
FIR STREET
TP-1 Approximate Location of
— ■ — ESNW Test Pit, Proj. No.
ES-7076, Dec. 2019
Subject Site
Existing Building
NOTE: The graphics shown on this plate are not intended for design
purposes or precise scale measurements, but only to illustrate the
approximate test locations relative to the approximate locations of
existing and / or proposed site features. The information illustrated
is largely based on data provided by the client at the time of our
study. ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
I
I
I
i
I
I
i
I
II
C77
I
I
I
I
I
I
I
I
I
IL----------
NOT - TO - SCALE
Test Pit Location Plan
1055 - 7th Avenue S.
Edmonds, Washington
NOTE: This plate may contain areas of color. ESNW cannot be '
responsible for any subsequent misinterpretation of the information Drwn. CAM Date 12/30/2019 Proj. No. 7076
resulting from black & white reproductions of this plate.
Checked AZS Date Dec. 2019 Plate 2
Earth Solutions NWLLC
SOIL CLASSIFICATION CHART
MAJOR DIVISIONS
SYMBOLS
TYPICAL
DESCRIPTIONS
GRAPH
LETTER
GRAVEL
AND
CLEAN
GRAVELS
�' ��
• �••
46 •�
GW
WELL -GRADED GRAVELS, GRAVEL -
SAND MIXTURES, LITTLE OR NO
FINES
GRAVELLY
SOILS
(LITTLE OR NO FINES)
° (Y o B,
o DOo D
Q oQ Q
GP
POORLY -GRADED GRAVELS,
GRAVEL - SAND MIXTURES, LITTLE
OR NO FINES
COARSE
GRAINED
SOILS
MORE THAN 50%
OF COARSE
FRACTION
GRAVELS WITH
FINES
°
o
0
�0
o
D
GM
SILTY GRAVELS, GRAVEL - SAND -
SILT MIXTURES
RETAINED ON NO.
4 SIEVE
(APPRECIABLE
AMOUNT OF FINES)
GC
CLAYEY GRAVELS, GRAVEL - SAND -
CLAY MIXTURES
MORE THAN 50%
OF MATERIAL IS
SAND
AND
CLEAN SANDS
SW
WELL -GRADED SANDS, GRAVELLY
SANDS, LITTLE OR NO FINES
�.
:.
SP
POORLY -GRADED SANDS,
GRAVELLY SAND, LITTLE OR NO
FINES
LARGER THAN
NO. 200 SIEVE
SIZE
SANDY
SOILS
(LITTLE OR NO FINES)
SANDS WITH
FINES
SM
SILTY SANDS, SAND - SILT
MIXTURES
MORE THAN 50%
OF COARSE
FRACTION
PASSING ON NO.
4 SIEVE
(APPRECIABLE
AMOUNT OF FINES)
SC
CLAYEY SANDS, SAND - CLAY
MIXTURES
INORGANIC SILTS AND VERY FINE
ML
SANDS, ROCK FLOUR, SILTY OR
CLAYEY FINE SANDS OR CLAYEY
SILTS WITH SLIGHT PLASTICITY
FINE
GRAINED
SOILS
SILTS
LIQUID LIMIT
AND LESS THAN 50
CLAYS
CL
INORGANIC CLAYS OF LOW TO
MEDIUM PLASTICITY, GRAVELLY
CLAYS, SANDY CLAYS, SILTY CLAYS,
LEAN CLAYS
OL
ORGANIC SILTS AND ORGANIC
SILTY CLAYS OF LOW PLASTICITY
MORE THAN 50%
OF MATERIAL IS
SMALLER THAN
NO. 200 SIEVE
MH
INORGANIC SILTS, MICACEOUS OR
DIATOMACEOUS FINE SAND OR
SILTY SOILS
SIZE
SILTS
AND LIQUID LIMIT
CLAYS GREATER THAN 50
CH
INORGANIC CLAYS OF HIGH
PLASTICITY
OH
ORGANIC CLAYS OF MEDIUM TO
HIGH PLASTICITY, ORGANIC SILTS
HIGHLY ORGANIC SOILS
PT
PEAT, HUMUS, SWAMP SOILS WITH
HIGH ORGANIC CONTENTS
DUAL SYMBOLS are used to indicate borderline soil classifications.
The discussion in the text of this report is necessary for a proper understanding of the nature
of the material presented in the attached logs.
r Earth Solutions NW, LLC
15365 N.E. 90th Street, Suite 100
Redmond, Washington 98052
Telephone: 425-449-4704
Fax: 425-449-4711
TEST PIT NUMBER TP-1
PAGE 1 OF 1
PROJECT NUMBER ES-7076 PROJECT NAME 1055 - 7th Avenue S.
DATE STARTED 12/16/19 COMPLETED 12/16/19 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Client -Provided GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION --
LOGGED BY AZS CHECKED BY HTW AT END OF EXCAVATION --
NOTES Depth of Topsoil & Sod 12": grass AFTER EXCAVATION -
W
0-
W
TESTS
=
Q O
MATERIAL DESCRIPTION
p
2Z
�
Q
U
0
Dark brown TOPSOIL (Fill)
TPSL
_
1.0
Brownish red silty SAND, loose to medium dense, moist to wet (Fill)
12.5
SM
-brick
-
MC = 18.70%
Gray silty SAND with gravel, medium dense, moist
-
SM
3.5 -light groundwater seepage at 3.5', weakly cemented, iron oxide staining
Gray silty SAND, dense, moist
_
MC = 12.80%
Fines = 30.00%
[USDA Classification: slightly gravelly sandy LOAM]
5
SM
-weakly cemented
nnr. = 1 n Fn°i
7.5
Test pit terminated at 7.5 feet below existing grade. Groundwater seepage encountered at 3.5
feet during excavation. No caving observed.
r Earth Solutions NW, LLC
15365 N.E. 90th Street, Suite 100
Redmond, Washington 98052
Telephone: 425-449-4704
Fax: 425-449-4711
TEST PIT NUMBER TP-2
PAGE 1 OF 1
PROJECT NUMBER ES-7076 PROJECT NAME 1055 - 7th Avenue S.
DATE STARTED 12/16/19 COMPLETED 12/16/19 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Client -Provided GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION --
LOGGED BY AZS CHECKED BY HTW AT END OF EXCAVATION --
NOTES Depth of Topsoil & Sod 12": grass AFTER EXCAVATION -
W
W =
wTESTS Q O MATERIAL DESCRIPTION
QZ
U
1.0
SM
12.0
TPSL L' '-1'
3.5
MC = 6.10%
GM _
5 MC = 17.00% 5.0
SM
hm, = 11 Rno/ 7.5
Dark brown TOPSOIL (Fill)
Gray silty SAND, loose to medium dense, moist (Fill)
Dark brown TOPSOIL
Gray silty GRAVEL, dense, moist
Gray silty SAND, medium dense, moist to wet
-groundwater table
Test pit terminated at 7.5 feet below existing grade. Groundwater table encountered at 7.0 feet
during excavation. No caving observed.
r Earth Solutions NW, LLC
15365 N.E. 90th Street, Suite 100
Redmond, Washington 98052
Telephone: 425-449-4704
Fax: 425-449-4711
TEST PIT NUMBER TP-3
PAGE 1 OF 1
PROJECT NUMBER ES-7076 PROJECT NAME 1055 - 7th Avenue S.
DATE STARTED 12/16/19 COMPLETED 12/16/19 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Client -Provided GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION --
LOGGED BY AZS CHECKED BY HTW AT END OF EXCAVATION --
NOTES Depth of Topsoil & Sod 4": grass AFTER EXCAVATION -
W
W =
wTESTS Q O MATERIAL DESCRIPTION
QZ
U
TPSL
0.4 Dark brown TOPSOIL (Fill)
Gray silty SAND, medium dense, moist (Fill)
SM
1.5
TPSL
•' ':A2.0
Dark brown TOPSOIL
Gray silty SAND with gravel, medium dense to dense, moist
MC = 14.60%
Fines = 38.30%
-iron oxide staining
SM
[USDA Classification: gravelly fine sandy LOAM]
4.0
Gray silty SAND, medium dense, moist
MC = 16.10%
5
SM
-increased fines
MC = 13.70%
Fines = 33.90%
8.0 -groundwater table
[USDA Classification: slightly gravelly fine sandy LOAM]
Test pit terminated at 8.0 feet below existing grade. Groundwater table encountered at 7.5 feet
during excavation. No caving observed.
itMEN
MEN
I ME,
I
I'm, mmiiiiiilmmiuililmmiiililis
NINE
I uu 1 u 1 0.1 0.01 0.001
GRAIN SIZE IN MILLIMETERS
3
i
COBBLES
GRAVEL SAND SILT OR CLAY
coarse fine coarse I medium fine
Specimen Identification
Classification
Cc
Cu
•
1 TP-01
4.00ft.
USDA: Gray Slightly Gravelly Sandy Loam. USCS: SM.
m
TP-03
2.50ft.
USDA: Gray Gravelly Fine Sandy Loam. USCS: SM with Gravel.
♦
TP-03
8.00ft.
USDA: Gray Slightly Gravelly Fine Sandy Loam. USCS: SM.
Specimen Identification
D100
D60
D30
D10
ILL
PL
PI
%Silt
%Cray
•
TP-01
4.Oft.
9.5
0.237
0.075
30.0
m
TP-03
2.5ft.
37.5
0.275
38.3
♦
TP-03
8.Oft.
19
0.201
33.9