Loading...
Building Permit 2021_1Type: CELLULAR Subtype: MACRO CO -LOCATION I Status: ISSUED Parcel No: 00491100001702 Subdivision: 004911 Fire Sprinklers: Valuation: $25,000.00 Code Edition: 0 Site Address: 24329 HIGHWAY 99 EDMONDS,WA 98020 Lot: 0 Lot Area: Zoning: CG Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: VERIZON-CELLULAR UPGRADE - ELIGIBLE FACILITIES REQUEST Applied: 9/15/2021 Issued:11/9/2021 Final: Expiration Date: 11/9/2022 Issued by: WAC I WA State Contractor L & I #: MASTENS876KN I ad CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL 2918 CLAIRMONT AVENUE APPLICANT KATIE KYLE SOUTH, BIRMINGHAM AL 35205 (205)235-6784 KKYLE@CRAFTONGROUP.COM 2918 CLAIRMONT AVENUE CONTACT CRAFTON SOUTH, BIRMINGHAM AL 35205 (205)235-6784 kkyle@craftongroup.com COMMUNICATIONS MASTEC NETWORK 22253 68th Ave S, Kent WA CONTRACTOR (206)683-4992 JOY.DAVIS@MASTEC.COM SOLUTIONS INC 98032 24329 PACIFIC HWY 99, OWNER CAMNEL PROPERTIES LLC EDMONDS WA 98020 L FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 9/16/21 R14826 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 11/9/21 R15836 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $576.40 $576.40 11/9/21 R15836 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $489.94 $489.94 9/16/21 R14826 TOTALS: $1,131.34 $1,131.34 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Tuesday, November 09, 2021 9:48:07 AM 1 of 2 Permit City of Edmonds PERMIT NUM EdmondsCELLULAR 98020 1-1281 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. L INSPECTIONS - Schedule Online at: https://Inspection.MvBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-3 BUILDING FINAL" Printed: Tuesday, November 09, 2021 9:48:07 AM 2 of 2