SPECIAL INSPECTIONS COMBINED== & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION July 15, 2020 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda — Service Center 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2019-1212 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfu INC. Corbett W. Project M er/Lab Manager Pacific ❑ west Division C WMaki CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 - Service BRK.doc ON,KXaZ�l&Associates,Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 7/3/2020 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda Service Center LOCATION: 22214 Hwy 99, Edmonds, WA KA P.M.: JM CONCRETE REPORT NO.: n967R279CRn7n37n_ur. CONTRACTOR: Wilcox Const./ Le Nacional PERMIT #: BLD2019-1212 INSPECTOR: Niccolo Guiao JURISDICTION: City of Edmonds WEATHER: Cloudy with Showers TEMP: 50's Field Data Concrete: Normal Weight Other: -- Supplier: Cadman i Plant No. 34 _i Site Mix:�� Slump Mix Air Unit Time Truck* Ticket # % Air Inch _ Temp (F) Temp (F) Weight 8:45am 444 1053696 5.1 5.5 71 ° 50's -- Location: Placement Area 8-in Thick Loading Ramp Walls at grids E.5-H.4/1-2. Remarks: The concrete was placed using the concrete truck's chute and was mechanically consolidated. (8 cubic yards) Glenium was also added at the site. Please Refer To Field Repot Number: 18279DFRO70320-NG Laboratory Data Cyl. Test Field Code Date Cure 71054-1 7110/20 71054-2 7/31 /20 71054-3 7/31 /20 71054-4 7/31 /20 71054-5 Concrete Report Inspector: Niccolo Guiao Reported Batch DATA Cement Type Ill I Design Actual Mix No. 4C43464 Cem. Lbs. 515 516 F. Ash lbs. 85 88 C. Agg. Lbs 3/8:283 286 C. Agg. Lbs 3/4:1569 1563 C. Agg. Lbs Sand lbs 1212 1208 Water 260 243 Admixture Pozz:25.0 25.0 Admixture Admixture Air Ent. 3.0 3.1 (ozI cm.) Water Added On Job Site (Gals.) 12 Field Test ASTM Method C172 C143 C138 C1064 C231 C31 Other Design Strength: 4500 ,d. 28 days Date Specimens Rec'd: 7/6/2020 Wt. Max Comp. Set Tested Brk Test Method Dia. Area # Load Strength # By Typ ASTM C39 4.00 12.57 -- 61210 4870 1 CD 2 ASTM C109 1 ASTM C617 1 ASTM C1231 J 1 ASTM C1019 1 OTHER Remarks: Results Reviewed By: Date: Fj 7 Codes for Break Types: ( i C } rr71 13 1 2 3 4� 5 L 6 Offices Serving The Western United States Test Results Effective 0510812019 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 is Tacoma (253) 939-2500 The information provided on this reload is prepared for the exclusive use efthe client, and may at be mpmduaed in any format without the w ,n permission of the client and Knaan B Asscalates. This repot indicates our Inspector's observation and testing results based on site conditions and. nmetmactivities. Thisinfarmafionissubjecttoreviewpiortofmalmbmitbl. By signing this report, our WWtar does not accept responsibility for validity of results. The same information has been provided by others on sde. TheWt results apply only to the speeimc locations,and hems inspected or tested. IN GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION August 3, 2020 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda — Service Center 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2019-1212 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, AZAN & ASSOCIATES, INC. .orbe t W. Mercer Projec Manager/Lab Manager Pacific Northwest Division CWM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 - Service BRK.doc 1C=;M&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 7/3/2020 PROJECT* 09618279 PROJECT: Doug's Lynnwood Mazda Service Center LOCATION: 22214 Hwy 99, Edmonds, WA KA P.M.: JM CONCRETE REPORT NO.: naaiR97arRn7na,n-Nca CONTRACTOR: Wilcox Const./ Le Nacional PERMIT #: BLD2019-1212 INSPECTOR: Niccolo Guiao JURISDICTION: City of Edmonds WEATHER: Cloudy with Showers TEMP: Field Data Concrete: Normal Weight Other: -- Supplier: Cadman i Plant No. L 34 1 Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 18:45aml 444 1 1053696 1 5.1 1 5.5 71 ° 1 50's 11 -- Placement Area Location: 18-in Thick Loading Ramp Walls at grids E.5- Remarks: The concrete was placed using the concrete truck's chute and was mechanically consolidated. (8 cubic yards) Glenium was also added at the site. Please Refer To Field Repot Number: 18279DFRO70320-NG Inspector:1 Niccolo Guiao Laboratory Data Design Strength: 1 4500 C 28 days 50's Reported Batch DATA Cement Type Design Actual Mix No. 4C43464 Cam. Lbs. 515 516 F. Ash lbs. 85 88 C. Agg. Lbs 3/8:283 286 C. Agg. Lbs 3/4:1569 1563 C. Agg. Lbs Sand Ibs 1212 1208 Water 260 243 Admixture Pozz:25.0 25.0 Admixture Admixture Air Ent. 3.0 3.1 (oz/cwt.) Water Added On Job Site (Gals.) 1 12 Field Test ASTM Method C172 C143 C138 C1064 C231 C31 H Other Date Specimens Rec'd: 1 7/6/2020 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ 71054-1 7/10/20 7 4.00 12.57 -- 61210 4870 1 CD 2 71054-2 7/31120 28 4.00 12.57 -- 78120 6210 1 CD 1 71054-3 7/31/20 28 4.00 12.57 -- 73130 5820 1 CD 1 71054-4 7/31/20 28 4.00 12.57 -- 75890 6040 1 CD 2 71054-5 7/31/20 28 4.00 12.57 -- 76190 6060 1 CD 1 2 Remarks: I I Results Reviewed By: Date: Codes for Break Types: I 1 2 3 L 4-15 Offices Serving The Western United States Concrete Report ASTM C39 ASTM C109 ASTM C617 ASTM C1231 ASTM C1019 OTHER Test Results Conforming J..^.I . 6 Effective 0510812019 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The lnforrr¢tim pro0ded on this repod is prepared forth, eacluaw, use a the client. end may riot be reproduced in any format wigwN the written permission of the client and KraaanBAssociates. This ,pit indicates our inspector's obare-tim, and healing results based on sit—hoilions andcontnistoradNNes. This Information is subject b wim prior to final submittal. Byslgningthisreport,curinspedordoesndacceptresponsibilityrorveliddyofresubs. The same infamdlon has been pn Aded by others on site. The test results apply onNto the specific Iodations,and ;lams iri peded or leafed. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION July 8, 2020 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda — Service Center 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2019-1212 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. rbett . Mercer Project Manager/Lab Manager Pacific Northwest Division CWNUIkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 - Service DFR.doc —KraZa- &ASSOCIATES GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION FORENSIC INVESTIGATION Date: July 07, 2020 Project No.: 096-18279 Project: Doug's Lynnwood Mazda Service Center Project Location: 22214 Hwy 99, Edmonds, WA Krazan PM: JM FIELD REPORT Report No.: 09618279DFRO70720-NG Contractor: Wilcox Const. Permit No.: BLD2019-1212 Inspector: Niccolo Guiao Jurisdiction: City of Edmonds Weather: Cloudy with Temp: 50-60's F Showers A Krazan representative visited the project site today for an adhesive anchors inspection. Upon our arrival, the contractor had prepared base shear anchor bolt holes on the planned SW-1 thru 3 within grids E.54/1-5. The holes were 7/8-in diameter with a minimum embedment of 8-in thru the sill plate. The holes were also cleaned using compressed air and wire brush. Prior to the installation of epoxied anchor bolts, holes were verified for cleanliness and embedment. Today, we observed ninety (90) 3/-in diameter x 12-in long ATR (all threaded rod) into the existing thickened concrete slab. The anchor bolts were placed in a twisting motion fully encapsulating the anchor bolts with adhesive. Adhesive were seen extruding at the surface. The contractor used a Hilti Hit RE 500V3 as adhesive with expiration date of 02/2021 and lot no. of 115725 L5. In our opinion, the epoxied anchor bolts were placed in general accordance to the approved structural plans per general structural notes, framing plans and wood shear wall scheduled, and RFI#135. Site photos are attached for reference. To the best of my knowledge, the above WAS performed in general accordance to the approved plans and project specifications. Superintendent/Representative: Technician: Niccolo Guiao 4303 —1986 Street SW • Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States KRAZAN & ASSOCIATES, INC. Site Photos: 09618279DFRO70720-NG Doug's Lynnwood Mazda Service Center Page No. 2 To the best of my knowledge, the above WAS performed in general accordance to the approved plans and project specifications. Superintendent/Representative: Technician: Niccolo Guiao Krazan & Associates, Inc. Offices Serving The Western United States ASS OC'IA GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION July 14, 2020 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda — Service Center 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2019-1212 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. orbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19814 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 Willi Offices Serving the Western United States 09618279 - Service DFR.doc - aZan & Associates, Inc. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTION DATE: 1 % Tka 1 Z 0 PROJECT #: al 2 'h PROJT ��fl���S L..iiti1.,.J©®17 LOCATION: V%1 / ZDI KRAZAN PROJECT MANAGER: FIELD REPORT 3751 CONTRACTOR: J II. C Ceti JURISDICTION:C;-% ''`i PERMIT#: 1i.*M.-1PZQi9 - I�1Z INSPECTOR: [j , VA Q' L _ WEATHER: Iv_ �� 7 �' , TEMP} V .:�.. ►.l �� Cam% � `" � ►7�.r;Z ► �i--.i � ,Jc" S n �' s � v�►7g �1 Equipment/Asset Number(s): To the best of my knowledge, the abov WAS WAS T performed in accordance with the approved plans, specifications, and regulatory requirements. Superintendent/Repre tativ Tech*'a'This report indicates our inspector's observation and testing results based on th site condition and contractor's activitieation is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of the results. Some information on this report may have been provided by others on site. The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. e)ffir_Pc Rprvinn tha Wpctnrn i/nitPd Rtafpc Kraza n- &ASSOCIATES, INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION July 17, 2020 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda — Service Center 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2019-1212 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, 7 TtW. & ASSOCIATES, INC. Corb Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 - Service DFR.doc Page 1 of 1 4.-T=K ' &Associates, Inc. Field Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Report NO.: 09618279DFR7162020JLG DATE: 7/16/2020 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: PROJECT: Dou 's Mazda Service Center INSPECTOR: Jerry L. Gelder LOCATION: 22130 Hwy 99 Lynnwood JURISDICTION: City of Lynnwood KA P.M.: WEATHER: Mostly Cloudy TEMP: 75' F Arrived onsite per contractors request to observe the installation of %" all thread anchor bolts at various locations. The holes were drilled and cleaned out. The bolts were installed with minimum 8" embedment using Hilti RE500V3 epoxy. Also observed hold downs were installed for wall Line 5 Grid HA to J. Observed hold downs were installed and sheathing installed and nailed for shearwalls Line 1 to 5 Grid E.5 to F.5. The walls that had sheathing installed were south side of 2 sided shear and east side of 1 sided shear. The sheathing and hold downs were installed per plans and specs. This work was on the main floor. Per contractors request observed the installation and nailing of sheathing for diaphragm Level 2. The sheathing was installed and nailed per plans and specs. Reviewed By: ASTM Test #: Asset Number(s):T-- To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintenden�resentative: Technician: r Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associatm. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site The test results apply only to the specific locations, and items inspected or tested ALM- GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION August 5, 2020 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda — Service Center 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2019-1212 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Re INC. eg�r� W.rProjecb anagerPacificivision CWMllkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 - Service DFR.doc Page 1 of 1 : wCiLGL11&Associates,Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR83202ODK DATE: 8/3/2020 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: PROJECT: Mazda INSPECTOR: Don Keller LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P.M.: WEATHER: sunny TEMP: 70 Inspected nailing patterns for shear walls @ J&2-4.5 (2nd face), @ 5&H.4-1.9 (2nd face), @ F.5&2-4 (2" d face) and @ 2.5&E.5-F.5. SW 1, 2, & 3 walls with 15/32" plywood sheathing fastened to framing members with 1 Od nails as per schedule on S004, GSN, S102. 3/13/20. Reviewed By: I I ASTM Test #: I I Asset Number(s): To the best of my knowle e, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. -Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kramn & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION August 7, 2020 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda — Service Center 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2019-1212 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, 7 AN & ASSOCIATES, INC. Corbett . Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serping the Western United States 09618279 - Service DFR.doc Page 1 of 1 6t!Wl 3 &Associates,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR84202ODK DATE: 8/4/2020 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: PROJECT: Mazda INSPECTOR: Don Keller LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P.M.: WEATHER: sunny TEMP: 70 Inspected nailing patterns for shear walls @5&F-G (2nd face) and@1&E-F (2nd face). SW2 walls with 15/32" plywood sheathing fastened to framing members with 10d nails as per schedule on S004, GSN, S 102.3/13/20. Reviewed By: ASTM Test #: I I Asset Number(s): To the best of my lmowl ge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client This report may not be reproduced in any format without the written permission of the client and Kraran & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested K,ra ar1_ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION February 25, 2020 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda — Service Center 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2019-1212 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. A -- orbett . Mercer Project Manager/Lab Manager Pacific Northwest Division CWNVIki CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09619279 - Service DFR.doc Page 1 of 1 === KXaZan&ASSociates, Inc. Field Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Report NO.: 09618279DFR2212020JLG DATE: 2/21/2020 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2019-1212 PROJECT: Dou s Mazda Service Center INSPECTOR: Jerry L. Gelder LOCATION: 22214 SR 99 Edmonds JURISDICTION: City of Edmonds KA P.M.: WEATHER: Partly Cloudy TEMP: 50' F Arrived onsite per contractors request to observe the installation of structural reinforcing steel for Footings Line 5 Grid A to I, Grid A Line 1 to 5 and Line 1 Grid A to E. The structural reinforcing for the Footings and Piers were installed per plans and specs. Contractor spoke with Engineer of Record. See Below for verbal approval and clarification of wall dowels that were inspected this day. Contractor will supply Krazan with written approval at a later date. Also below are approval and requirements for remaining Wall Dowels. 1) Grid A Line 1 to 5 CW-1 wall contractor installed #5 vertical dowels at 12" o.c. center of wall ----approved. 2) Line 5 Grid A to J CW-1 wall contractor installed #5 vertical dowels at 12" o.c. center of wall ----approved. CW-2 wall contractor installed #5 vertical dowels at 12" o.c. each face --- -approved. 3) Line 1 Grid A to E CW-1 wall contractor has option to install #6 vertical dowels at 12" o.c. inside face. Or #5 vertical dowels at 6" o.c. vertical dowels inside face. Both options ok for full height of wall ---- in progress. These items have not been inspected and pertain to wall dowels only though footings at these locations also have not been inspected at this time. 4) Line 1 Grid E to G, Grid G Line 1 to 2, Line 2 Grid G to J CW-1 wall. Vertical wall dowels to be #6 at 12" o.c. inside face or #5 at 6" o.c. inside face. 5) Grid J Line 2 to 5 CW-3 wall dowels #4 at 12" o.c. inside face. Outside face contractor to use Retaining wall schedule on S006 and will depend on height of wall. Reviewed B ASTM Test #: Asset Number(s): _T To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Su erintendent/Re resentative: Technician: i Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krmn & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested. Page 1 of 1 - Klw"an &Associates,Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 2/24/2020 Field Report NO.: 09618279DFR2242020IV Set Count: CONTRACTOR: WILCOX PROJECT #: 09618279 PERMIT #: BLD2019-1212 PROJECT: Dougs Mazda Service Center INSPECTOR: Itiaj Vahora LOCATION: 22214 Hwy 99 JURISDICTION: City of Edmonds KA P.M.: JSM WEATHER: PCL TEMP: 400 F On site per request for structural steel reinforcement inspection. Verified reinforcement for size, grade, count, spacing and clearances per approved plan details and RFI#106. Locations- Wall dowels placement requested by Krazan report#09618279DFR2212020JLG. Gridline 1/ A-E at CW1 dowels —used #5 at 6" o.c. —Item#3 reinspection Gridlines 1 / E-G; G/ 1-2; 2/ G-J for C W 1 per item#4 reinspection AND Gridline J/ 2-3 CW3 per item#5 retaining wall schedule S006 OF -#6@8" ox for 15"wall, 9 ft length and #5@6" o.c. remaining north side for J/3-5 To the best of my knowl regulatory requirements. ASTM Test #: Asset Numbei l s; :s the above WAS performed in accordance with the approved plans, specifications and Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission ofthe client and Kraian & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. Page 1 of 1 aan&Associates,InC. Field Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Report NO.: 09618279DFR2242020JS DATE: 2/24/2020 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2019-1212 PROJECT: DT19s Mazda Service Center INSPECTOR: Jordan Seiler LOCATION: 22214 Highway 99, Edmonds JURISDICTION: City of Edmonds KA P.M.: Jeff Mercer WEATHER: Mostly Cloudy TEMP: 45' F A Krazan & Associates, Inc. representative visited the site today to inspect the placement of about 100 cubic yards of concrete for footings along gridlines 5/A-J, 1-5/A, A-G/l, 1-2/G, G-J/2, and 2-5/J. Mix number P4C43464 was verified from Cadman. The strength of concrete was called out as 4500 psi at 28 days. Temperature, slump, and air content test were performed. One set of five cylinders were cast. The concrete was placed from a boom pump truck and it was mechanically consolidated. Refer to concrete report number 09618279CR2242020JS for more details. Reviewed To the best of my know] regulatory requirements. ASTM Test #: I I Asset the above WAS performed in accordance with the approved plans, specifications and I Superintendent/Representative: I Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and K— & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site The test results apply only to the specific locations, and items inspected or tested K - a7al1 & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION • FORENSIC INVESTIGATION August 24, 2020 Mr. Marc Ikegami DOUG'S LYNNWOOD MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CESCL STORMWATER INSPECTION SERVICES FOR: Doug's Lynnwood Mazda Service Center 22130 Highway 99 Edmonds, WA Dear Mr. Ikegami; KA No. 094-20001 In accordance with your request and authorization, our firm performed stormwater quality monitoring for the above -referenced project. The inspection was performed on the date(s) indicated below. The following report is attached: 0 CESCL Field Report dated August 21, 2020 If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Jor?A-- anain Environmental Department Manager Lynnwood, WA JK/ep 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09420001 CESCL Cover Letter.doc Page 1 of 2 Kjgan&Associates, I nc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Field Report NO.: 09420001DFR8212020JK DATE: 8/21/2020 Set Count: CONTRACTOR: Wilcox PROJECT #: 09420001 PERMIT #: PROJECT: Mazda Service Center / Hyundai Sales INSPECTOR: Jordan Kain LOCATION: 22130 WA 99 JURISDICTION: Edmonds KA P.M.: Jordan Kain WEATHER: Rain TEMP: 60 Temporary Erosion and Sediment Control (TESQ Inspection Mazda Service Center: Krazan and Associates representative was on site for the once weekly CESCL inspection at the Mazda Service Center. Stormwater was running beneath elevated straw wattles in some locations along the eastern site perimeter. (See photo) Contractor was informed. Turbidity sample as taken on -tie resulting in 67 NTU. Sidewalks are present along the northern site perimeter which act as a conveyance channel and prevent stormwater from running onto/off the site. Rainwater running off -site appears sediment free. Straw wattles are present along the eastern site perimeter. No gaps are present between the site and eastern asphalt. Contractor needs to maintain sediment -free asphalt through periodic sweeping and general site tidiness. Erosion and sediment control techniques include crushed rock for truck tires, silt fences along the eastern, straw wattles, plastic covering soil piles, and storm drain inserts. Below is a visual representation of the site conditions at the time Hyundai Sales Building_ Krazan and Associates representative was on site for the once weekly CESCL inspection at the Hyundai Sales Building. Stormwater running off -site is mostly sediment free. Perimeter straw wattles are effectively collecting sediment prior to stormwater runoff. Soil piles have received full plastic covering (see photo) Perimeter sidewalks work is contained by curbing (see photo) The asphalt must remain sufficiently clean to prevent turbid stormwater from running into the storm system. Temporary erosion and sediment control techniques include tires, silt fences along the eastern, straw wattles, plastic covering soil piles, and storm drain inserts. Below is a visual representation of the site conditions at the time of inspection. Below is a visual representation of the site conditions at the time of inspection. Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kraaan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. a Page 2 of 2 Xff sp�:1lCrazan&Ass ociate s,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09420001DFR8212020JK Reviewed By: I I ASTM Test #: I I Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kraean & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prim to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. -�" aZan & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION CONSTRUCTION STORMWATER — SITE INSPECTION CHECKLIST Page I of 3 Project Name: Mazda Service Center / Hyundai Sales Project Address: 22130 Highway 99 Permit Number: Project Number:094-20001 Date: 8/21120 1 Time: 1:00 PM Inspector: Jordan Kain, CESCL Site BMPs Overatl Condhion Need Repair? Comments/Obser vations Clearing Limits • Buffer Zones around sensitive areas ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No NA • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Construction/Access Roads • Stabilized site entrance ❑ Good ❑Fair ❑ Poor ❑ Yes ❑No • Stabilized roads/ arkin areas ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Parking on west end of the site • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Control Flow Rates • Swale ❑Good ❑ Fair ❑ Poor ❑ Yes ❑ No • Dike ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • Sediment Pond ❑ Good ❑ Fair ❑ Poor ❑ Yes [:]No • Sediment Trap ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • El Good El Fair ❑Poor ❑—Ye s ❑ No Install Sediment Controls • Sediment Pond/Trap ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Silt fencing have Silt Fence El Good El El ❑ Yes ❑ No been properly installed. • Straw Bale Barriers ❑ Good ❑ Fair ❑ Poor ❑ Yes❑ No • Straw Wattles ❑ Good ® Fair ❑ Poor ❑=No ttles in PIsites • Sandbags ❑ Good ❑ Fair ❑ Poor ❑ Preserve Vegetation/Stabilize Soils • Netsand Blankets ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • Mulch ® Good ❑ Fair ❑ Poor ❑ Yes ® No • Seeding ® Good ❑ Fair ❑ Poor ❑ Yes ® No Plastic sheeting is present on the soil • Plastic Sheeting❑Fair ® Good ❑ Poor ® Yes ❑ No Piles. More sheeting may be necessary during construction rocesses 4303 198" Street SW • Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 1<1'aZa� & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION CONSTRUCTION STORMWATER — SITE INSPECTION CHECKLIST Protect S. • Terrace Pipe Slope Drains Protect Drain Inlets • Inserts Stabilize Channels and Outlets Channels • Control Pollutants • Chemical Storage • Concrete Handlin Control De -Water] • Baker Tank Good U Fair Lj Poor I ❑ Yes ❑ No ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No ❑ Good ® Fair ❑ Poor ® Yes ®No I Drain inserts are in place ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Area ® Good ❑ Fair ❑ Poor ❑ Good ❑ Fair ❑ Poor ❑ Good ❑ Fair ❑ Poor Project Name: Doug's 1 Project Address: 22130 ❑ Good ❑ Fair ❑ Poor ❑ Yes ® No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑No d Mazda Service Center Project Number:094-20001 + 99 Date: 8/21/20 Time: 1:00 PM Inspector: Jordan Kai-, CESCL Will existing BMPs need to be modified or removed, or other BMPs installed? No If YES, list the action items to be completed on the following table: Actions to be completed Date 1. 2. 3. 4. 5. 6. No chemicals Initials Weather conditions at the time of the inspections were rain and 60 degrees. Approximate amount of precipitation since last inspection: _ 0.19 inches and precipitation in the previous 24 hours*: _0.11 inches *based on an on -site rain gauge or local weather data. Describe discharging stormwater, if present. Note the presence of suspended sediment, "cloudiness", discoloration, or oil sheen. Was water quality sampling part of this inspection? No Krazan & Associates, Inc. With Offices Serving the Western United States =1<17aZa7_ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION CONSTRUCTION STORMWATER — SITE INSPECTION CHECKLIST If YES, record results below (attach a separate sheet, if necessarv): Parameter Mete (Select One) Result Units Turbidity ❑ Tube ® Meter ❑ Laboratory NTU (cm, if tube used) H ElPaper ❑ Kit ❑ Meter pH Standard Units Is the site in compliance with the SWPPP and the permit requirements? YES If no, indicate tasks necessary to bring site into compliance on the "Actions to be Completed" table above, and include dates each job WILL BE COMPLETED. If no, has the non-compliance been reported to the Dept. of Ecology? YES / NO If no, should the SWPPP be modified: YES / NO Sign the following certification: "I certify that this report is true, accurate, and complete, to the best of my knowledge and belief " Inspection report completed on: 8/21/20 By: si,rnature Title/Qualification of Inspector: CESCL Name: Jordan Kain(print name Krazan & Associates, Inc. With Offices Serving the Western United States =-=HaZan & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION . FORENSIC INVESTIGATION September 21, 2020 Mr. Marc Ikegami DOUG'S LYNNWOOD MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CESCL STORMWATER INSPECTION SERVICES FOR: Doug's Lynnwood Mazda Service Center 22130 Highway 99 Edmonds, WA Dear Mr. Ikegami; KA No. 094-20001 In accordance with your request and authorization, our firm performed stormwater quality monitoring for the above -referenced project. The inspection was performed on the date(s) indicated below. The following report is attached: • CESCL Field Report dated September 18, 2020 If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. dafrKain Environmental Department Manager Lynnwood, WA JK/ep 4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09420001 CESCL Cover Letter.doc Page 1 of 2 1<j:UZan&AssocIates, Inc. Geotechnical Engineering e Environmental Engineering Construction Testing and Inspection Field Report NO.: 0942000 1 DFR9182020JK DATE: 9/18/2020 Set Count: CONTRACTOR: Wilcox PROJECT #: 09420001 PERMIT #: PROJECT: Mazda Service Center / Hyundai Sales INSPECTOR: Jordan Kain LOCATION: 22130 WA 99 JURISDICTION: Edmonds KA P.M.: Jordan Kain WEATHER: Cloudy TEMP: 70 Temporary Erosion and Sediment Control (TESL] Insnection Mazda Service Center: Krazan and Associates representative was on site for the once weekly CESCL inspection at the Mazda Service Center. Periodic street sweeping is recommended to prevent sediment track -out due to truck traffic. (see photo) Site is prepped for pavement installation and partially exposed. Contracot informed Krazan that pavement will occur within 24 hours and the site will be cleaned up. If stormdrains are connected to the stormwater system sediment needs to be removed and drains need to remain protected. Sidewalks are present along the northern site perimeter which act as a conveyance channel and prevent stormwater from running onto/off the site. Straw wattles are present along the eastern site perimeter. Contractor needs to maintain sediment -free asphalt through periodic sweeping and general site tidiness. Erosion and sediment control techniques include crushed rock for truck tires, silt fences along the eastern, straw wattles, plastic covering soil piles, and storm drain inserts. Below is a visual representation of the site conditions at the time of inspection. 1 M1� Hyundai Sales Building: Krazan and Associates representative was on site for the once weekly CESCL inspection at the Hyundai Sales Building. New concrete placement has occurred throughout the site. Eco-Pan needs to remain covered or transported off -site prior to rainwater filling and spilling over. Periodic street sweeping is recommended to prevent sediment from running into storm drains. All soils piles need to remain covered when left unworked, especially when sitting atop asphalt. Site perimeter appears effective in preventing sediment from running off -site. Temporary erosion and sediment control techniques include tires, silt fences along the eastern, straw wattles, plastic covering soil piles, and storm drain inserts. Below is a visual representation of the site conditions at the time of inspection. Below is a visual representation of the site conditions at the time of inspection. Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kra & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. Page 2 of 2 QUZan&Associates,Inc. Geotechnical Engineering e Environmental Engineering Construction Testing and Inspection Field Report NO.: 09420001DFR9182020JK Reviewed B ASTM Test #: I I Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: +! C C-� Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The inlb—n ion provided on this report is prepared for the =lusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krezan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. .1<ra a11& ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION CONSTRUCTION STORMWATER — SITE INSPECTION CHECKLIST Pagel of 3 Project Name: Mazda Service Center / Hyundai Sales Project Address: 22130 Highway 99 Permit Number: Project Number:094-20001 Date: 9/18/20 1 Time: 1:00 PM Inspector: Jordan Kain, CESCL Site BMPs Overall Condition Need Repair? Comments/Obser vations Clearing Limits • Buffer Zones around sensitive areas ❑ Good ❑ Fair ❑ Poor [:]Yes ❑ No NA • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Construction/Access Roads • Stabilized site entrance ❑ Good ❑Fair ❑ Poor ❑ Yes ❑No • Stabilized roads/parking areas ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No ❑ Yes ❑ No Parking on west end of the site • ❑ Good ❑ Fair ❑ Poor Control Flow Rates • Swale [—]Good ❑ Fair ❑ Poor ❑ Yes ❑ No • Dike ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • Sediment Pond ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑No • Sediment Trap ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Install Sediment Controls • Sediment Pond/Trap ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • Silt fencing have Silt Fence ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No been properly installed. • Straw Bale Barriers ❑ Good ❑ Fair ❑ Poor ❑ Good ® Fair ❑ Poor ❑ Yes[—] No • ❑ Yes ❑ No New straw wattles in Straw Wattles place on both sites • Sandbags ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Preserve Vegetation/Stabilize Soils ❑ Yes ❑ No ❑ Yes ® No • Nets and Blankets ❑ Good ❑ Fair ❑ Poor • Mulch ® Good ❑ Fair ❑ Poor N Good ❑ Fair ❑ Poor • Seeding ❑ Yes ® No • Soils piles need to Plastic Sheeting ® Good ❑ Fair ❑ Poor ® Yes ❑ No be covered if left unworked. • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Protect Slopes 4303 1981 Street SW • Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States M ===�__ Krazan& ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION CONSTRUCTION STORMWATER — SITE INSPECTION CHECKLIST • Terrace ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No ❑ Yes ❑ No • Pipe Slope Drains ❑ Good ❑ Fair ❑ Poor • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Protect Drain Inlets • ❑ Good ® Fair ❑ Poor ® Yes ® No Drain inserts are in Inserts place Stabilize Channels and Outlets • Conveyance Channels ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • Energy Dissi ators ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • ❑ Good ❑ Fair ❑ Poor [:]Yes ❑ No Control Pollutants • Chemical Storage Area ® Good El Fair Fair ❑ P Yes No El® No chemicals present • Concrete Handling ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No ❑ Yes ❑ No Eco-Pan on -site • ❑ Good ❑ Fair ❑ Poor Control De-Waterin • Baker Tank ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • Project Name: Dou 's Lynnwood Mazda Service Center Project Number:094-20001 Project Address: 22130 Highway 99 Date: 9/18/20 1 Time: 1:00 PM Inspector: Jordan Kain, CESCL Permit Number: N/A Will existing BMPs need to be modified or removed, or other BMPs installed? Yes If YES, list the action items to be completed on the following table: Actions to be completed Date Completed Initials 1. Protect storm drains on Mazda site 2. Sweep asphalt in all locations 3. 4. 5. 6. Weather conditions at the time of the inspections were cloudy and 70 degrees. Approximate amount of precipitation since last inspection:—0.35_inches and precipitation in the previous 24 hours*: _0.29 inches *based on an on -site rain gauge or local weather data. Describe discharging stormwater, if present. Note the presence of suspended sediment, "cloudiness", discoloration, or oil sheen. Was water quality sampling part of this inspection? No If YES, record results below (attach a separate sheet, if necessary): Parameter I Method (Select One) f Result I Units Krazan & Associates, Inc. With Offices Serving the Western United States Krazati& ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION CONSTRUCTION STORMWATER — SITE INSPECTION CHECKLIST Turbidity ❑ Tube ® Meter ❑ Laboratory NTU cm, if tube used) H ®Paper LJ Kit LJ Meter pH Standard Units Is the site in compliance with the SWPPP and the permit requirements? YES If no, indicate tasks necessary to bring site into compliance on the "Actions to be Completed" table above, and include dates each job WILL BE COMPLETED. If no, has the non-compliance been reported to the Dept. of Ecology? YES / NO If no, should the SWPPP be modified: YES / NO Sign the following certification: "I certify that this report is true, accurate, and complete, to the best of my knowledge and belief. " Inspection report completed on: 9/18/20 By: L - si ature Title/Qualification of Inspector: CESCL Name: rrdan Kain [print name] Krazan & Associates, Inc. With Offices Serving the Western United States _ A<ra7an & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION • FORENSIC INVESTIGATION October 6, 2020 Mr. Marc Ikegami DOUG'S LYNNWOOD MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CESCL STORMWATER INSPECTION SERVICES FOR: Doug's Lynnwood Mazda Service Center 22130 Highway 99 Edmonds, WA Dear Mr. Ikegami; KA No. 094-20001 hi accordance with your request and authorization, our firm performed stormwater quality monitoring for the above -referenced project. The inspection was performed on the date(s) indicated below. The following report is attached: • CESCL Field Report dated October 2, 2020 If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES. INC. Adrdan Kain Environmental Department Manager Lynnwood, WA 1K/ep 4303198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 0942MI CESCL Cava LeOa.doc _ Page I of 2 Kmzm&Associates, Inc. Field Geotechnical Engineering • Environmental Engineering Report NO.: 0942000 1 DFR9252020JK Construction Testing and Inspection DATE: 10/2/2020 Set Count: CONTRACTOR: Wilcox PROJECT #: 09420001 PERMIT #: PROJECT: Mazda Service Center / Hyundai Sales INSPECTOR: Jordan Kain LOCATION: 22130 WA 99 JURISDICTION: Edmonds KA P.M.: Jordan Kain WEATHER: Cloudy TEMP: 70 Temporary Erosion and Sediment Control (TESC) Inspection Mazda Service Center: Krazan and Associates representative was on site for the once weekly CESCL inspection at the Mazda Service Center. Much of the site has received permanent sediment and erosion control. The western portion of the site is covered in gravel parking. New mulch has been added to the western perimeter. No exposed soils exist on site. Hyundai Sales Building: Krazan and Associates representative was on site for the once weekly CESCL inspection at the Hyundai Sales Building. Similar to the previous report, site requires sweeping and removal of roadway sediment (see photos). Exposed soils and lot traffic spread sediment throughout the drive area. It is necessary to remove sediment from the asphalt to prevent sediment from running into storm drains. All soils piles need to remain covered when left unworked. Site perimeter appears effective in preventing sediment from running off -site. Temporary erosion and sediment control techniques include, straw wattles, plastic covering soil piles, periodic sweeping, and storm drain inserts. Below is a visual representation of the site conditions at the time of inspection. Below is a visual representation of the site conditions at the time of inspection. Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Thelnf donpmvidcdonthureponupRarwfm Nemclusivemeof NeclimLTh6r MmaynmbcrWr ccdinanyf twhh itkuw pa simUthedientand Kr &Mws ta. Thute on indiemes on, inapMoa obsevation and teting results based oa site coMitions and conlnclor aeetiveim. This wfmmetion is subjat to r—im prior to final submittal. By signing tim romp, our inponor dom no aaxpl rmpombility for validity oftmulm. The same iN'mmatiun has been provided by others an site Page 2 of 2 ��Kruzan&Ass ociate s, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.:09420001DFR9252020JK Reviewed By: ASTM Test #: Asset Numbers : To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: alk t Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Thei tion Prov o onrtimmd=tigmdf Ne onsime aeorthecliem ac rrpmtmry. berepmduadinanywto Tvilbem tb wfiasamissiun ByMpinenfandrr .,Mpsainrm. There in6ata oa impatms observation and tmti�results based onsitewMiriomandemmacrovJ%. tl Thisin(mmtm ubmpmreview prim toff isubmitul. By signing Mis rcpm, our vapmmdom nm aaWi rmPomibiliN fm validiry otasalb. Tbc umciM tian haz ban providdby dhas an sire. --�'i\raZan& ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION CONSTRUCTION STORMWATER — SITE INSPECTION CHECKLIST Pagel of 3 Project Name: Mazda Service Center / Hyundai Sales Project Address: 22130 Highway 99 Permit Number: Project No ber:094-20001 Date: 10/2/20 1 Time: 1:00 PM Inspector: Jordan Kain, CESCL Site BMPs Overall Condition Need Repair? Comments/Obser vations Clearing Limits • Buffer Zones around sensitive areas ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No NA • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Construction/Access Roads • Stabilized site entrance ❑ Good ❑Fair ❑ Poor ❑ Yes [—]No • El Good ❑ Fair El Poor El Yes El No Parking on west end Stabilized roads/parking areas of the site • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Control Flow Rates • Swale ❑Good ❑ Fair ❑ Poor ❑ Yes ❑ No • Dike ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • Sediment Pond ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑No • Sediment Trap ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • El Good El Fair El Poor ❑ Yes ElNo Install Sediment Controls • Sediment Pontl/Trap ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • Silt fencing have Silt Fence ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No been properly installed. • Straw Bale Barriers ❑ Good ❑ Fair ❑ Poor ❑ Yes❑ No • El N Fair El Poor El Yes [I No New straw wattles in Straw Wattles lace on both sites • Sandbags ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Preserve Vegetation/Stabilize Soils • Nets and Blankets ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • Mulch N Good ❑ Fair ❑ Poor ❑ Yes N No • Seeding ® Good ❑ Fair ❑ Poor ❑ Yes ® No • Soils piles need to Plastic Sheeting ® Good ❑ Fair ❑ Poor N Yes ❑ No be covered if left unworked. • ❑ Good El Fair El Poor El Yes ElNo Protect Slopes 4303 198" Street SW • Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States � XaZal & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION CONSTRUCTION STORMWATER — SITE INSPECTION CHECKLIST • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Terrace • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Pipe Slope Drains • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Protect Drain Inlets • ❑ Good ® Fair ❑ Poor ® Yes ® No Drain inserts are in Inserts place Stabilize Channels and Outlets • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Conveyance Channels • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Energy Dissi ators • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Control Pollutants • ® Good ❑ Fair ❑ Poor El Yes ® No No chemicals Chemical Storage Area present * Concrete Handling ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Eco-Pan on -site • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Control De -Watering • ❑ Good ❑ Fair ❑ Poor ❑ Yes ❑ No Baker Tank Project Name: Dou 's Lynnwood Mazda Service Center I Project Number:094-20001 Project Address: 22130 Highway 99 Date: 10/2/20 1 Time: 1:00 PM Permit Number: N/A Inspector: Jordan Kain, CESCL Will existing BMPs need to be modified or removed, or other BMPs installed? Yes If YES, list the action items to be completed on the followine table: Actions to be completed Date Completed Initials 1. Sweep asphalt at the Hyundai site 2. 3. 4. 5. 6. Weather conditions at the time of the inspections were clear and 65 degrees. Approximate amount of precipitation since last inspection:—1.91_inches and precipitation in the previous 24 hours*: _0.75 inches *based on an on -site rain gauge or local weather data. Describe discharging stormwater, if present. Note the presence of suspended sediment, "cloudiness", discoloration, or oil sheen. Was water quality sampling part of this inspection? No If YES, record results below (attach a senarate sheet, if necessary): I Parameter I Method (Select One) I Result I Units Krazan & Associates, Inc. With Offices Serving the Western United States KraZa11 &ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION CONSTRUCTION STORMWATER — SITE INSPECTION CHECKLIST Turbidity ❑ Tube ® Meter ❑ Laboratory NTU cm, if tube used H ® Paper ❑ Kit ❑ Meter pH Standard Units Is the site in compliance with the SWPPP and the permit requirements? YES If no, indicate tasks necessary to bring site into compliance on the "Actions to be Completed" table above, and include dates each job WILL BE COMPLETED. If no, has the non-compliance been reported to the Dept. of Ecology? YES / NO If no, should the S WPPP be modified: YES / NO Sign the following certification: "I certify that this report is true, accurate, and complete, to the best of my knowledge and belief. " Inspection report completed on: 10/2/20 By: l�� (signature) Title/Qualification of Inspector: CESCL Name: Jordan Kain (print name) Krazan & Associates, Inc. With Offices Serving the Western United States