MAZDA SPECIAL INSPECTIONS -LFPage 1 of 1 � I(Iwan&Associates, I nc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR1 1 12018DK DATE: 11/1/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Doug's Lynnwood Mazda INSPECTOR: Don Keller LOCATION: 22214 HWY 99 JURISDICTION: Edmonds KA P.M.: WEATHER: TEMP: Inspected the placement of ASTM A615 GR60 reinforcing steel and embeds for c.i.p. walls prior to form closure @A- D&5-5.5 Lower Level. A/S3.1, A/S4.1, GSN, S1.1. 5/3/18. Note: Work in progress to place embed plates (2) #5 U bars, (2) #5 bent bars, and cmu wall dowels @ t.o.w Main Level elevation as per A/S4.1. Reinspection required prior to concrete placement. Reviewed By: ASTM Test #: Asset Numbers : To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and K—an & Associates. Tbis report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. =�KraZall & ASSOCIATES HC GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION January 7, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN &'ASSOCIATES, INC. U �d / Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK - Kr an&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 12/6/2018 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 22214 Hwy 99, Edmonds KA P.M.: Corbett Mercer CONCRETE REPORT NO.: noaitt97a1-_a19n9t4a-ve CONTRACTOR: Wilcox PERMIT* BLD2017 1119 INSPECTOR: Yosief Abraha JURISDICTION: Edmonds WEATHER: cloudy TEMP Field Data Concrete: x Other: E Supplier: MILES i Plant No.125 Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 2:00 1 C084 1 216116 1 6 J. 60 ° 1 38 ° Location: Placement Area Wall (main level @ grid 5/C-D) and Footing (main level at grid D/5.5- 6) Remarks: The contractor placed the concrete using a pump truck and mechanical vibrator was used for consolidation. Please Refer To Field Repot Number: 09618279DFR1262018YA Inspector: Yosief Abraha J 38 ° Reported Batch DATA Cement Type I -II Design Actual Mix No..18400F6 .184001`6 Cam. Lbs. 450 450 F. Ash lbs. 70 69 C. Agg. Lbs 7/8 1650 1644 C. Agg. Lbs 3/8 200 196 C. Agg. Lbs Sand Ibs 1490 1481 Water 31 gl 2991 Admixture MB POLY 31. 29oz Air Ent. ( Oz 1 cwt. Water Added On Job Site (Gals.) 10 Field Test ASTM Method C172 C143 C138 C1064 C231 C31 Other Laboratory Data Design Strength:1 3000psi @ 28 days Date Specimens Rec'd: 12/7/2018 Cyl. Code Test Date Field Cure Age Dia. Area wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 65201-1 12/13/18 7 4.00 12.57 -- 50540 4020 1 BAW 2 ASTM C109 65201-2 1/3/19 28 4.00 12.57 -- 71000 5650 1 BAW 1 ASTM C617 65201-3 1/3/19 28 4.00 12.57 -- 70010 5570 1 BAW 1 ASTM C1231 65201-4 1/3/19 28 4.00 12.57 -- 70640 5620 1 BAW 1 ASTM C1019 65201-5 1/3/19 28 4.00 12.57 -- 70520 5610 1 1 BAW 1 1 1 OTHER Concrete Report Test Results Remarks: Results Reviewed By: Date: --7--( Conforming F( Codes for Break Types: ` rk oJ•� JJ 1 2 3 4 5 6 Offices Serving The Western United States Effective 02122/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The Information provided on this report is prepared far the exduaim use of Me client, and may not be reproduced in any formatwithoutthe wriden permission of the client and Kwan&Associates . This report indicates eurinspector's observation and testing results based on site conditicos and contractor adivi5es. This information is subtect to revkw prior to Final submittal. By signing this report, our inspector does not accept responsibility for validity or results. The same Informaton has been prwidetl by others on site. lgt A KrazamAssociates, Inc Geotechnical Engineering re Environmental Engineering Construction Testing and Inspection DATE: 12/10/2018 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer Field Data Concrete: X Other: CONCRETE REPORT NO.: 09618279CR121018-SS -1 CONTRACTOR: Wilcox Construction PERMIT* BLD2017 1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds WEATHER: Partly Cloudy Supplier: MILES Plant No. I X Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 8:30 C 114 1 216179 1 4.8 6 53 ° 44 ° Location: Placement Area Concrete was poured on the footing of building. Grid 5 to G through 'B to A Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 8 yd3 was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFR12102018SS Inspector:1 Susheel Sharma TEMP: 44 ° Reported Batch DATA Cement Type Ill I Design Actual Mix No. 0255AC 0255AC Cem. Lbs. 517 515 F. Ash lbs. C. Agg. Lbs #57 1650 1657 C. Agg. Lbs #8 300 295 C. Agg. Lbs Sand Ibs 1340 1335 Water 267 237 Admixture 16 16 Admixture Admixture Air Ent. 1.8 1.75 (oz ! cwt. ) [ I Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 C138 C1064 C231 C31 Other Laboratory Data Design Strength: L 3000 ,,q_� 28 days Date Specimens Rec'd: 12/11/2018 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 V 65223-1 12/17/18 7 4.00 12.57 -- 54220 4310 1 BAW 1 ASTM C109 65223-2 1/7/19 28 4.00 12.57 -- 73810 5870 1 BAW 1 ASTM C617 65223-3 1/7/19 128 4.00 12.57 -- 74160 5900 1 BAW 1 ASTM C1231 yr 65223-4 1/7/19 28 4.00 12.57 -- 73530 5850 1 BAW 1 ASTM C1019 65223-5 1/7/19 28 4.00 12.57 -- 73030 5810 1 BAW 1 OTHER Test Results Remarks: Conforming Results Reviewed By: Date: Codes for Break Types: f 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Effective 0212212018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Theinfonnaden provided an this mood is prepared for the eslusive uas of the client.and may not be reproduced in any Vnat witheut the wdden permission a the oient and Kre &Associates. This report indicates our inspector'sal,sa-tion and testing resuts based on ste cundiliom and oontpactar activities. This information is subject to review prior to Mal submltal. By signing this report, our inspector does not accept responsibility far validity of rasafts. The same infanatlnn has been provided by ethers on sRe. W m v .. - 1 & ASSOCIATES, IN GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION January 10, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. R � j)L � Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 Willi Offices Serving the Western United States 09618279 BRK sm V%XaZan & A s s o c i a t e s, I nc. Geotechnical Engineering as Environmental Engineering Construction Testing and Inspection DATE: 12/12/2018 PROJECT #: 69618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer Field Data Concrete: X I Other: CONCRETE REPORT NO.: 09618279CR121218-SS -1 CONTRACTOR: Wilcox Construction PERMIT #: BLD2017 1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds WEATHER: Cloudy Supplier: MILES Plant No. I X Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 1:501 C183 1 216286 1 5.2 1 7 3/4 1 56 ° 1 46 ° Location: Placement Area Concrete was poured on wall of the building (1) Grid 5 to 7 through Grid 'B (2) Grid A to Grid C through Grid 7 (3) Grid 6 through Grid C to D (4) Grid D through Grid 5 to Grid 6 Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 15 yd' was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFR12122018SS Inspector : I Susheel Sharma TEMP: 46 ° Reported Batch DATA Cement Type I/II Design Actual Mix No. 0255AC 0255AC Cam. Lbs. 517 512 F. Ash lbs. C. Agg. Lbs #57 1650 1644 C. Agg. Lbs #8 300 296 C. Agg. Lbs Sand Ibs 1340 1333 Water 267 247 Admixture 16 16 Admixture Admixture Air Ent. 1.8 1.7 ( oz / cwt. ) Water Added On Job Site (Gals.) 10 Field Test ASTM Method C172 C143 I C138 C1064 C231 C31 Other Laboratory Data Design Strength: 3000 @ 28 days Date Specimens Rec'd: 12/1312018 Cyl. Code Test Date Field Cure Age Dia. Area wt. # Max Load Comp. Strength Set # Tested By Birk Typ Test Method ASTM C39 65255-1 12/19/18 7 1 4.00 12.57 -- 53240 4240 1 BAW 1 ASTM C109 ASTM C617 65255-2 1/9/19 28 4.00 12.57 -- 68920 5480 1 BAW 1 65255-3 1/9/19 28 4.00 12.57 -- 68340 5440 1 BAW 1 ASTM C1231 65255-4 1/9/19 j 28 4.00 12.57 -- 67770 5390 1 BAW 1 ASTM C1019 65255-5 1/9/19 28 4.00 12.57 -- 68860 5480 1 BAW 1 OTHER Test Results Remarks: Results Reviewed By: Date: � �Codes Conforming for Break Types:H3 1 tI�)1111 IT 1 P-11 2 3 D 4 n 1 5 D 6 Offices Serving The Western United States Concrete Report Effective 02/22/2018 Lynnwood (425) 485-5519 as Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for thee.clusim use of the client, and may not be reproduced In any format without the wrtlen permission of the client and Krexan B Associates. This report ihd,catas our inspeclor's obsenalion and testing resuhs teased on site conditions and contractor achcitles. This information is subject Ie review prior to i nal submittal. By signing this repod, our Inspector does not accept responsibility for talidily of results_ The same Information has been provided by others on site. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION January 14, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK Q- KMzMM &Associates, Inc. Geotechnical Engineering - Environmental Engineering Construction Testing and Inspection Date: 12/14/2018 Project #: 09618279 Project: Dou 's Lynnwood Mazda Location: 22214 Hwy 99 KA P.M.: Corbett Mercer MASONRY GROUT REPORT #: 09618279MGR121418-JT -1 Contractor: Wilcox Permit #: BLD2017-1119 Inspector: Joseph Taylor Jurisdiction: City of Lynnwood Weather: Cloudy Temp: 45 ° Field Data( GROUT ) Supplier lCadman Plant No. 33 Site Mi. Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # % Air (in.) (F) (F) (F) 7:36 440 584612 N/a 9.5 64 ° 45 ° Grout Box Used Number of units used to form specimens x Placement Area: Elev mech room 1-2/D-E Remarks: Pumped and vibrated Asset -Equipment Numbers: Inspector: Joseph Taylor Reviewed By Re orted Batch Data Mix No. 35MG708 Design Actual Weights Weights Cem.lbs. 658 659 F. Ash lbs. C. agg. lbs. 1 #8 821 821 C.agg.lbs. 2 C.agg.lbs. 3 Sand lbs. 1887 1884 Water lbs. 425 414 Air Ent. (oz) Other(oz) Other(oz) Other(oz) Other(oz) Water Added (gal.) Field Test Methods ASTM C143 ASTM C138 ASTM C1064 ASTM C173 vr ASTM C31 Other ASTM C231 Laboratory Data Design Strength: 2,000 @ 28 days Date Specimens Rec'd.: 12117/2018 Laboratory Mid Pt. Out of Section Maximum Comp. Test Methods Cyl. Test Width Height Plumb Area Load Strength Test Set Tested Break ASTM C39 Code Date Age (in) (in) (%) (sq. in) (Ibs) (psi) Time # By Type ASTM C109 65281-1 12/21/18 7 3.58/3.58 6.32 -- 12.82 24050 1880 -- 1 BAW 3 ASTM C617 65281-2 1/11/18 28 3.48/3.61 6.12 -- 12.56 37360 2970 -- 1 BAW 3 ASTM C1019 65281-3 1/11118 28 3.51/3.56 6.04 -- 12.50 37470 3000 -- 1 BAW 3 Other 65281-4 1 /11 /18 28 3.5713.58 6.07 -- 12.78 37180 2910 -- 1 BAW 3 F:A Test Results ----I Conforming Remarks Results Reviewed By Date Reviewed Codes for Break Types: �f� 1 2 3 4 5 6 Offices Serving The Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 Form 04103 Effective 10/3/2017 1 he h6oronib.o provided on dsis rcpon is prepared Iur the ccelusive use of the client. and may not he repood—d o, any Ibnnat s,ift.l the wriltes permission of the eli-I and K—o ai As —isles. This report indieates our inspector's nb—fion end testing results haled on site conditions and contractor activities. This inlbrmation is subjcot to rcricsv prior to final suhminal. Hy signing this report. our inspector does not accept resp—sibility fur validil, ol'resolls. I he some infannelioo has heen provided by others oo site. �M- GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION January 15, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK VT i_�rQ.zan&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 1 /9/2019 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: 09618279CR010919-SS -1 CONTRACTOR: Wilcox Construction PERMIT #: BLD2017-1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds WEATHER: Shower Field Data Concrete: X I Other: F Supplier: MILES Plant No. 1 X Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 6:20 C 115 1 216998 L5 1 /2 1 61 ° 43 ° Location Placement Area Concrete was poured on slab (main level) of the building. (1) Grid A to F3 through 1 to 7 Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 219 yd' was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFRO1092019SS Inspector : Susheel Sharma TEMP: 43 ° Reported Batch DATA Cement Type Ill I Design Actual Mix No. 026006C 026006C, Cem, Lbs. 564 564 F. Ash lbs. C. Agg. Lbs #571550 1536 C. Agg. Lbs #8 300 296 C. Agg. Lbs Sand Ibs 1490 1485 Water 250 239 Admixture34 34 Admixture Admixture Air Ent. (oz / cwt. ) Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 C138 C1064 C231 C31 Other Laboratory Data Design Strength: 1 4000 @ 28 days Date Specimens Rec'd: F 1 0/0/2019 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 65466-1 1/14/19 5 4.00 12.57 -- 56270 4480 1 1 BAW 1 ASTM C109 65466-2 1/16/19 7 ASTM C617 65466-3 2/6/19 28 ASTM C1231 65466-4 2/6/19 28 ASTM C1019 65466-5 2/6/191 28 OTHER Remarks: Results Reviewed By: Date: .. Codes for Break Types: 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Test Results Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared tar the emlusive use of the client, and may not be reproduced In any format vidhout the vmtien permission of the client and Krenn & Associates. This report Indlcates our inspector's observation and testing results based on ads conditions and wMreclor activities. This Information is subject to review prior to final submittal. By signing tl!b report, our Inspectm does not accept responsibility for validity of results. The same Informed- has been provided by ptiters on site. g ■ mzan&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 1 /9/2019 PROJECT #: 09618279 PROJECT: Dou 's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: 0961R279CR11111919-RC _9 CONTRACTOR: Wilcox Construction PERMIT #: BLD2017-1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds WEATHER: Shower Field Data Concrete: X Other: Supplier: MILES Plant No. X Site Mix: Slump Mix Air Unit Time Truck# Ticket# %Air Inch Tempfl Temp(F) Weight 8:45 j C186 1^ 217014 L 6 63 ° J 44 ° Location: Placement Area Concrete was poured on slab (main level) of the building. (1) Grid A to F3 through 1 to 7 Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 219 yd' was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFRO1092019SS inspector:] Susheel Sharma TEMP: 44 ° Reported Batch DATA Cement Type Ill I Design Actual Mix No. 026006C 026006C Cam. Lbs. 564 564 F. Ash lbs. C. Agg. Lbs #57 1550 1539 C. Agg. Lbs #8 300 297 C. Agg. Lbs Sand Ibs 1490 1481 Water 250 236 Admixture 34 34 Admixture Admixture Air Ent. (oz / cot. ) Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 7 C138 C1064 C231 c31 7 Other Laboratory Data Design Strength: 4000 _a 28 days Date Specimens Rec'd: 1/10/2019 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 65466-1 1/14/19 5 4.00 12.57 -- 51270 4080 2 BAW 1 ASTM C109 65466-2 1/16/19 7 ASTM C617 65466-3 2/6/19 1 28 ASTM C1231 65466-4L2/6/19d 28 ASTM C1019 65466-5 281 OTHER Remarks: Results Codes for Break Types: Concrete Report Date: 11. i r 1 1 2 I 3— 1 4 Offices Serving The Western United States 5 1 6 Test Results Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the chant, and may not he reproduced in any format without the written permission of the diem and Kwan a AsseclaRs. This report indcates our inspector's obsewfon and testing results based on site conditions and contractor activities. This Inf e n lion Is subject to review prior to final submittal, By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. Imam k��KlaZaLl- & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION January 22, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198t1i Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK %K aZan&Associates,Inc. Geotechnical Engineering is Environmental Engineering Construction Testing and Inspection DATE: 1 /9/2019 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 2214 Kvv 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: naa�a��ar_Rn�na�o cc CONTRACTOR: Wilcox Construction PERMIT #: BLD2017-1119 INSPECTOR: Susheel Sharma JURISDICTION: _City of Edmonds WEATHER: Shower Field Data Concrete: X Other: Supplier: MILES Plant No. X Site Mix: Slump Mix Air Unit Time Truck# Ticket# %Air Inch Temp(F) Temp(F) Weight 6 2020 C115 1 216998 1 5 1/2 1 61 ° 1 43 ° Placement Area Location: Concrete was poured on slab (main level) of the building. (1) Grid A to F3 through 1 to 7 Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 219 yd3 was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFRO1092019SS Inspector: I Susheel Sharma TEMP: 43 ° Reported Batch DATA Cement Type Ill I Design Actual Mix No. 026006C 026006C Cem. Lbs. 564 564 F. Ash lbs. C. Agg. Lbs #57 1550 1536 C. Agg. Lbs #8 300 296 C. Agg. Lbs Send Ibs 1490 1485 Water 250 239 Admixture 34 34 Air Ent. (Oz/cm. ) Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 7 C138 C1064 C231 C31 Other Laboratory Data Design Strength:[ 4000 @ 28 days I Date Specimens Rec'd: 1 1/10/2019 Cyl. Code I Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 ASTM C109 65466-1 1/14/19 5 4.00 12.57 -- 56270 4480 1 BAW 1 65466-2 1 /16/19 7 4.00 12.57 -- 65560 5220 1 BAW 1 ASTM C617 65466-3 2/6/19 28 ASTM C1231 65466-4 2/6/19 28 ASTM C1019 OTHER 65466-5 2/6/19 28 Remarks: Results Reviewed By: L Date: 1�2 I — t Codes for Break Types: 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Test Results Effective 0212212018 Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 The Information proMed on this report is prepared W the tusive use of the client, and may not be reproduced in any format without the mitten permission of the dent and <,n & Assoosed-, This report indicates our lnspsdor's observation and testing results based on site canddlons and wnlmatar actNBies. This information is sudjeot to review prior to final submlted By signing this report, our inspects: does not accept responsibility for validity of resift. The same infomratian has been provided byathers on atte. =— Krazan&Associates, Inc. Geotechnical Engineering a Environmental Engineering Construction Testing and Inspection DATE: 1 /9/2019 PROJECT M 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: 09618279CRO10919SS .2 CONTRACTOR: Wilcox Construction PERMIT #: BLD2017-1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds WEATHER: Shower Field Data Concrete: X Other: Supplier: L MILES Plant No. X Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 8:45 1 C186 1 217014 6 1 63 ° 44 ° Location: Placement Area Concrete was poured on slab (main level) of the building. (1) Grid A to F3 through 1 to 7 Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 219 yd3 was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFRO1092019SS Inspector : i Susheel Sharma TEMP: 44 ° Reported Batch DATA Cement Type Ill I Desi n Actual Mix No. 026006C 026006C Gem. Lbs. 564 564 F. Ash lbs. C. Agg. Lbs #57 1550 1539 C. Agg. Lbs #8 300 297 C. Agg. Lbs Sand Ibs 1490 1481 Water 250 236 Admixture 34 34 Air Ent. (oz/..) Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 H C138 C1064 C231 C31 Other Laboratory Data Design Strength: ) 4000 @ 28 days Date Specimens Rec'd: 1 1/10/2019 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 65466-1 1/14/19 5 4.00 12.57 -- 51270 4080 2 1 BAW 2 ASTM C109 65466-2 1/16/19 7 4.00 12.57 -- 59270 4720 2 BAW 2 ASTM C617 65466-3 2/6/19 28 ASTM C1231 65466-4 2/6/19 28 ASTM C1019 65466-5 2/6/19 28 OTHER Remarks: Results Reviewed By: Date: — Z — i `tt Codes for Break Types:Li ll ti LLL���JJJ 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Test Results Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information pmvlded en this raper! is prepared forlhe a Imive use of the client, and may not he reproduced in any formatwithoutlhewrdtan permisslon nfine d,rd and Kneen b Associates. This raped indicates our inspectoye obssnalbn andtaatNg results based on ale condaiens antl conbsctcr solMlies. This infomullcn is subject io review pear to fine: submittal. By signing MIs repot, cur inspector does not accept responsibility for v Ildisy of results. The same informatbn has been Pmded by others on eke. n GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION February 8, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. r 'ter Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK -I(r- QZan&Associates, Inc. Geotechnical Engineering - Environmental Engineering Construction Testing and Inspection DATE: 1 /9/2019 PROJECT* 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer Field Data Concrete: X Other: CONCRETE REPORT NO.: 09618279CRO10919-SS -1 CONTRACTOR: Wilcox Construction PERMIT #: BLD2017-1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds WEATHER: Shower Supplier: MILES Plant No. I X ISite Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 6:20 1 C 115 1 216998 1 5 1 /2 1 61 ° 1 43 ° Location: Placement Area Concrete was poured on slab (main level) of the building. (1) Grid A to F3 through 1 to 7 Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 219 yd' was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFRO1092019SS Inspector:1 Susheel Sharma TEMP: 43 ° Reported Batch DATA Cement Type Design Actual Mix No. 026006C 026006C Cam. Lbs. 564 564 F. Ash lbs. C. Agg. Lbs #57 1550 1536 C. Agg. Lbs #8 300 296 C. Agg. Lbs Sand Ibs 1490 1485 Water 250 239 Admixture 34 34 Admixture Admixture Air Ent. (OzI cm.) Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 C138 C1064 C231 C31 Other Laboratory Data Design Strength: 4000 @ 28 days Date Specimens Rec'd: 1 1/10/2019 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 ASTM C109 65466-1 1/14/19 5 4.00 12.57 -- 56270 4480 1 BAW 1 65466-2 1/16/19 7 4.00 12.57 -- 65560 5220 1 BAW 1 ASTM C617 65466-3 2/6/19 j 28 4.00 12.57 -- 74870 1 5960 1 1 BAW 1 ASTM C1231 ASTM C1019 65466-4 2/6/19 28 4.00 12.57 -- 77050 6130 1 BAW 1 65466-5 2/6/19 28 4.00 12.57 -- 76800 6110 1 BAW 1 OTHER Test Results Conforming Remarks: Results Reviewed By: Date: Z-$-< Codes for Break Types: 1 E 2 11 !, 3 }� 4 5 E 5 6 Offices Serving The Western United States Concrete Report Effective 0212212018 Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 The informationprovided°, this report is prepared for the exclusive use of me ciient, and may not be fepmdueed In any farm[ athout the wdthm permission of the client and Krazan B AmW.atm This report indicates our inspector's observation and testing—fts based on site conditions and contactor activities. This information Is -bleat h, reviaw prior to final sub,fti. By signing this report, our Inspector does not accept respomibility for validity of results. The same information has been provided by others on site. �Krazan&Ass ociate s, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 1 /9/2019 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: n991R97QrRn1n919.CC -9 CONTRACTOR: Wilcox Construction PERMIT #: BLD2017-1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds WEATHER: Shower Field Data Concrete: X Other: Supplier: MILES Plant No. X Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 8:45 C 186 217014 1 6 1 63 ° 1 44 ° Placement Area Location: Concrete was poured on slab (main level) of the building. (1) Grid A to F3 through 1 to 7 Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 219 yd3 was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFROl092019SS Inspector: I Susheel Sharma TEMP: 44 ° Reported Batch DATA Cement Type Design Actual Mix No. 026006C 026006C Cam. Lbs. 564 564 F. Ash lbs. C. Agg. Lbs #57 1550 1539 C. Agg. Lbs #8 300 297 C. Agg. Lbs Sand Ibs 1490 1481 Water 250 236 Admixture 34 34 Admixture Admixture Air Ent. (oz / cwt. ) Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 C1311 C1064 C231 C31 H Other Laboratory Data Design Strength: 1 4000 28 days J Date Specimens Rec'd: 1 1/10/2019 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Camp. Strength Set # Tested By Birk Typ Test Method ASTM C39 +� 65466-1 1/14/19 5 4.00 12.57 -- 51270 4080 2 BAW 2 ASTM C109 65466-2 1/16/19 7 4.00 12.57 -- 59270 4720 2 BAW 2 ASTM C617 ASTM C1231 •� 65466-3 2/6/19 28 4.00 12.57 -- 73190 5820 2 BAW 1 65466-4 2/6/19 28 4.00 12.57 -- 72150 1 5740 2 BAW 1 ASTM C1019 OTHER 65466-5 2/6/19 28 4.00 12.57 -- 73910 5880 2 BAW 1 Test Results Remarks: Results Reviewed By: Date: Conforming Codes for Break Types: r / ) 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information providedpn this repot is prepared for the saolusive use of the client, and may not be reproduced in any format wlthmd the wrMen pemlissior. of the client and Waoin B Associates. Th:s report Indicates our inspector's observation and testing results based on site cundalons and —tractor ecf"ne This information is subject to review prior to Final s,bmifel. By signing this report, our Inspector dose not accept responsibility far wliddy of results. The same Infomtetlon hMe Deco pmvlded by others on site. KlCLLJM &Associates, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Date: 1 /29/2019 Project M 09618279 Project: Doug's Lynnwood Mazda Location: 22214 Hwy 99 _ KA P.M.: Corbett Mercer MASONRY GROUT REPORT M 09618279MGRO12919-JD -1 Contractor: Wilcox / Fairweather Masonry Permit #: BLD2017-1119 Inspector: Jeff Dewey Jurisdiction: Citv of Edmonds Weather: Clear Field Data ( GROUT ) Supplier lCadman Plant No. 33 1SIte Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck:#7j Ticket # % Air (in.) (F) (F) (F) 9.22am 440 598534 N/A 10.75 60 ° 37 ° 40-120 Grout Box Usecil Number of units used to form specimens Yes 1 Placement Area: Elavation 04, A.0 from 1.0-5.0, 5.0 from 'B.0-A.8, 1.0 from A.0- D.0, 1.5 from D.0-D.3, D.3 from 1.0-1.5, 7.0 from 'A.0-C.0, C.0 from 6.0-7.0, and E.0 from 3.0-3.8 Remarks: Sample Location: A.0/5.0 Inspector: Jeff Reviewed By: Temp: 37 ° Reported Batch Data Mix No. 35MG708 Design Actual Weights Weights Cem.lbs. 5264 5240 F. Ash lbs. - - C. agg. lbs. 1 6824 6800 C.agg. lbs. 2 - - C. agg. lbs. 3 - - Sand lbs. 15398 15360 Water lbs. 2102 2075 Air Ent. (oz) - - Other (oz) - - Other (oz) - - Other (oz) - - Other (oz) I - - Water Added (gal.) 15 Field Test Methods ASTM C143 ASTM C138 ASTM C1064 ASTM C173 ASTM C31 Other ASTM C231 Design Strength: 2000 @ 28 days Date Specimens Rec'd.: 1/30/2019 Laboratory Data Laboratory Mid Pt. Out of Section Maximum Comp. Test Methods Cyl. Test Width Height Plumb Area Load Strength Test Set Tested Break ASTM C39 Code Date Age (in) (in) (%) (sq. in) (lbs) (psi) Time # By Type ASTM C109 65680-1 2/6/19 8 3.48/3,49 5.89 -- 12.15 25640 2110 -- 1 BAW 3 ASTM C617 65680-2 2/26/19 28 28 ASTM C1019 65680-3 2/26/19 28 1 28 Other 65680-4 2/26/19 28 28 Test Results Remarks Results Reviewed By Date Reviewed Z - fi 1 Cr Codes for Break Types: E N Ink 9 1 � n 0 ID 1 2 3 4 5 6 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Form 04103 Effective 10312017 The information provided on'his report is prepared f.,th.exclusive..orto, dicnt—dmsy not be mp,,d... d in eny:ormet without the written permission ofthe clienl andK—&Assodales. This report indicates our inspector's observation endtes'ing results rased on sire mnditionssnd contmIX.r ecliv:lies. This information is suM1jecl to review prior to final submittal. ey signing this report. our inspamr dots not accept responsibility for velid(ty of results. The sameinformation has been provided by others on sle. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION February 28, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK ---��'aZan &Associates, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Date: 1 /29/2019 Project #: 09618279 Project: Dou 's Lynnwood Mazda Location: 22214 Hwy 99 ` KA P.M.: Corbett Mercer MASONRY GROUT REPORT #: 09618279MGROl2919-JD -1 Contractor: Wilcox / Fairweather Masonry Permit #: BLD2017-1119 Inspector: Jeff Dewey Jurisdiction: Citv of Edmonds Weather: Clear Field Data( GROUT ) Supplier Cadman Plant No. 33 Site Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # %Air (in.) (F) (F) (F) 9.22am 440 598534 N/A 10.75 60 ° 37 ° 40-120 Grout Box Used Number of units used to form specimens Yes 1 Remarks: Area: Elavation 04', A.0 from 1.0-5.0, 5.0 from 'B.0-A.8, 1.0 from A.0- D.0, 1.5 from D.0-D.3, D.3 from 1.0-1.5, 7.0 from 'A.0-C.0, C.0 from 6.0-7.0, and E.0 from 3.0-3.8 Sample Location: A.0/5.0 Inspector: Jeff Dewey Reviewed By: Temp: 37 ° Reported Batch Data Mix No. 35MG708 Design Actual Weights Weights Cem.lbs. 5264 5240 F. Ash lbs. - - C. agg. lbs. 1 6824 6800 C. agg. lbs. 2 - - C. agg. lbs. 3 - - Sand lbs. 15398 15360 Water lbs. 2102 2075 Air Ent. (oz) - - Other(oz) - - Other (oz) - - Other (oz) - - Other (oz) - - Water Added (gal.) 115 Field Test Methods 117 ASTM C143 ASTM C138 ASTM C1064 ASTM C173 ASTM C31 Other ASTM C231 Laboratory Data Design Strength: 2000 @ 28 day s Date Specimens Rec'd.: 1/30/2019 Laboratory Mid Pt. Out of Section Maximuml Comp. Test Methods Cyl. Test Width Height Plumb Area Load Strength Test Set Tested Break ASTM C39 Code Date Age (in) (in) (%) (sq. in) (Ibs) (psi) Time # By Type ASTM C109 65680-1 2/6/19 8 3.48/3.49 5.89 -- 12.15 25640 2110 -- 1 BAW 3 ASTM C617 65680-2 2/26/19 28 3.46/3.48 6.58 -- 12.04 38040 3160 -- 1 BAW 3 ASTM C1019 65680-3 2/26/19 28 3.45/3.46 6.47 -- 11.94 38490 3220 -- 1 BAW 3 Other 65680-4 2/26/19 28 3.49/3.53 6.45 -- 12.32 38360 3110 -- 1 BAW 3 Test Results Conforming Remarks Results Reviewed By l Date Reviewed Codes for Break Types: 1 2 3 4 5 6 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Fomt 04103 Efkciive 10132017 The information pmvidod on this op- is prepared for the —[.A- use oftk client and may not be roprodoced in by fomsst with-[ th, wrilten permission of the client and Ko—o & A—ialcs. This ratan iodi,[,s our inspector's observation and testing —,11, based on sit, umditions and wntmclor activities. This information is s.N.t to review prior to final submittal. By signing this roport, -ur inspee!or does not accept responsihility f r vbadily of resells. 1he snmc informatinn has b— provided by-ib,, -sit,. Krazxi & A s s o c i a t e s, I n c. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Date: 211912019 Project #: 09618279 Project: Dou 's Lynnwood Mazda Location: 22214 Hwy 99 KA P.M.: Corbett Mercer MASONRY GROUT REPORT #: 09618279MGRO21919-DK Contractor; Wilcox / Fairweather Mason Permit #: BLD2017-1119 Inspector: Don Keller Jurisdiction: Edmonds Weather: Field Data( GROUT ) Supplier Icadman Plant No. 33 1 Site Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # %, Air (in.) (F) (F) (F) 8:15 368 602291 8 64 ° 40 ° Grout Box Used Number of units used to form specimens yes Placement Area: cmu walls @A&1 2nd lift (4'-8') Main Level Remarks: 2,000 psi required. 3,500 psi grout placed Asset -Equipment Numbers: Inspector: Don Keller Reviewed Bv: Temp: Reported Batch Data Mix No.1 35MG708 Design Actual Weights Weights Cem. lbs. 6560 F. Ash Ibs. C. agg. lbs. 1 8480 C.agg.lbs. 2 C.agg.lbs. 3 Sand lbs. 19480 Water lbs. 70% HOT 411.3 Air Ent. (oz) Other(oz) Other(oz) Other(oz) Other(oz) Water Added (gal.) 0.0 Field Test Methods ASTM C143 ASTM C138 ASTM C1064 ASTM C173 ASTM C31 Other j ASTM C231 Laboratory Data Design Strength: 2,000 28 days Date Specimens Redd.: 2/20/2019 Laboratory Mid Pt. Out of Section Maximum Comp. Test Methods Cyl. Test Width Height Plumb Area Load Strength Test Set Tested Break ASTM C39 Code Date Age (in) (in) (°/,) (sq. in) (lbs) (psi) Time # By Type ASTM C109 65796-1 2/26/19 7 3.38/3.43 6.55 -- 11.59 53410 4610 -- 1 BAW 3 ASTM C617 65796-2 3/19/19 28 ASTM C1019 65796-3 3/19/19 28 Other 65796-4 3/19/19 28 Test Results Remarks Results Reviewed By Date Reviewed 3-1 —( Codes for Break Types: N3�g, @ � nE 1 2 3 4 5 6 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Farm 04103 Effective 1002017 The infm•.atinn provided on Ihis mporl is pmpa-edfor theesclusiv use fthe clicnLand may not be mp,.duocd in any fomstwilhoul thewritten per issiun of the client snd K—n&Associates. This report indicnles ourwsrcelor's nbse Iinn end telling results hosed on sile candilions end con.me.orsclivities. This information is subjmtIn—i— prior. final submittal. By signing this repnrL our inspector does not sncepl msp-,ibibly for rslidin, ofresulls_ Ths same inl'ormstion has boon provided by other., on site. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION March 4, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. 't✓ C-- Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/Ikj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK Krazan and Associates, Inc. Grout Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Grout Code: 65841 Weather: Overcast Jurisdiction: City of Edmonds Project: Dou 's Lynnwood Mazda Location: 22130 Hwy 99 Client: Adzam Inc. dba Douu,'s Mazda Pour Date: 2/22/19 Report No: 12618 Permit No. BLD2017 1119 Engineer: B&T Engineering Architect: Ned Nelson Architect Contractor: Wilcox Construction Field Data % Air (ASTM C-231) N/A Temp. (ASTM C-1064) 67 Slump (ASTM C-143) 8" Sampling (ASTM C-172) N/A Making (ASTM C-31) X Unit Wt. (ASTM C-138) N/A Other Consolidation Method Inspector: G. Moe Mechanical: X Manual: Field Notes: Main Level CMU Walls Please refer to Field Report No. 1888 Laboratory Data ASTM C-617 ASTM C-1019 X Cyl. Code Test Date Age Side 1 65841-1 3/1/19 7 3.47 65841-2 3/22/19 28 65841-3 3/22119 28 65841-4 3/22/19 28 Reported Batch Data Batch Time: Sample Time: 8:15 AM Truck #: 366 Ticket #: 603841 Design Wts. Actual Wts. Mix No. 35MG708 Cem. (Ibs) 658 F. Ash (Ibs) Agg. 1 (Ibs) 830 Sand (Ibs) 1887 Water (Ibs) 425 Air Ent. (oz) Other (oz) Water Added on Job (gal) Supplier: Cadman Plant Number: Site Mix: Initial Curing Temps High -Low: Ambient Air Temperature: 40 Load Size: 10 yds Sample @ cy of cy Field Test Results Conforming X Non -Conforming Design Strength: 2,500 @ 28 days Date Specimens Rec'd: 2/25/19 Laboratory Test Methods ASTM C-780 ASTM C-39 ASTM C-109 Other Side 2 Area Height % Plumb Load (Ibs) Strength (PSI) Set # Break Tested By 3.48 12.08 6.11 0.0% 30,710 2,540 1 3 BAW P.M. Review: , c�,� Date Reviewed: , —J— 1-1 Lab Data Reviewed By: �Xv�/(ti� Date Reviewed: 3 -S— (q Lab Test Results Conforming _ Non -Conforming This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Grout Report Effective Dale: 4/08/2009 a & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION March 7, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK «aZM &Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Date: 2/26/2019 Project #: 09618279 Project: Dou 's L nnwood Mazda Location: 22214 HwV 99 KA P.M.: Corbett Mercer MASONRY GROUT REPORT #: 09618279MGRO22619-DB Contractor: Wilcox Permit #: BLD2017-1119 Inspector: Dave Bale Jurisdiction: Edmonds Weather: Sunny Temp: 42 ° Field Data( GROUT ) Supplier lCadman Plant No. ISite Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # %Air (in.) (F) (F) (F) 11:08 435 605074 Grout Box Used Number of units used to form specimens 7 65 ° x 42 ° Placement Area: 8" CMU walls on grids A - 1 to 5, 5 - A to B.5, 1 - A to C from 16' to20'andon grids 1 -DtoE&E- 1 to5from8'to 12' Remarks: Asset -Equipment Numbers: Inspector: Dave Bale Reviewed By: t Reported Batch Data Mix No. 34MG708 Design Actual Weights Weights Cem.lbs. 658 656 F. Ash lbs. C. agg. lbs. 1 8333 8320 C. agg. lbs. 2 C.agg. lbs. 3 Sand lbs. 1887 1980 Water lbs. 425 311 Air Ent. (oz) Other(oz) Other(oz) Other(oz) Other(oz) Water Added (gal.) 10 Field Test Methods ASTM C143 ASTM C138 ASTM C1064 ASTM C173 vr ASTM C31 Other ASTM C231 Laboratory Data Design Strength: 2000 art 28 day s Date Specimens Redd.: 2/27/2019 _ Laboratory Cyl. Code Test Date Age Mid Pt. Width (in) Height (in) Out of Plumb (%) Section Area (sq. in) Maximum Load (Ibs) Comp. Strength (psi) Test Time Set # Tested By Break Type Test Methods ASTM C39 ASTM C109 65872-1 3/5/19 7 3.40/3.44 6.06 -- 11.70 43060 3680 -- 1 BAW 3 ASTM C617 65872-2 3/26/19 28 ASTM C1019 65872-3 3/26/19 28 Other 65872-4 3/26/19 28 Test Results Remarks Results Reviewed By Date Reviewed 3 Codes for Break Types: 7� s { I �� t 1 2 3 4 5 6 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Form 04103 Effective 10f3/2017 Theinfomlatioupmvidedon lhisreport isprepardl for the eaclusiveuse of the client. and maynotbcruproducad in any format w41a,allhe written permission nfthc client and K—n&Associsles. This re purl indiwlas onr inapiatnr'.s observationa:rdh,1ing resullabasedon silecundiliensand contractor activities. 'Phis mCormelion is subject to review prior to final subminal. By signing this r.po, our inspeelar does not accept responsibility for validity of resells. 'fhu umc inlonnelial has been provided by ofers ov site. =P- . mm KraZall & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION March 15, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. �v\ Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK =M%rotz 1 &Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Date: 3/8/2019 Project M 09618279 Project: Dou 's Mazda of Lynnwood Location: 22130 Hwy 99 KA P.M.: Corbett Mercer MASONRY GROUT REPORT #: 09618279MGRO30819-DK Contractor: Wilcox/Fairweather Masonry Permit #: BLD2017-1119 Inspector: Don Keller Jurisdiction: Edmonds Weather: overcast Temp: 40 ° Field Data( GROUT ) Supplier Icadman I Plant No, 32 Isite Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # % Air (in.) (F) (F) (F) 11:00 435 608656 9 64° 40° Grout Box Used es Number of units used to form specimens Placement Area: cmu walls @1&E 3rd lift (8'-12') Main Level Remarks: ipment Numbers: Inspector: Don Keller Reviewed Bv: Reported Batch Data Mix Nod 35MG708 Design Actual Weights Weights Cem. lbs. 15260 F. Ash lbs. C. agg. lbs. 1 6640 C. agg. lbs. 2 C. agg. lbs. 3 Sand lbs. 15720 Water lbs. 100%hot 327.1 Air Ent. (oz) Other(oz) Other(oz) Other(oz) Other(oz) Water Added (gal.) 110.0 Field Test Methods ASTM C143 ASTM C138 ASTM C1064 ASTM C173 ASTM C31 Other ASTM C231 Design Strength: _ 2000 @ 28 days Date Specimens Rec'd.: 3/11/2019 Laboratory Data Laboratory Cyl. Code Test Date Age Mid Pt. Width (in) Height (in) Out of Plumb (%) Section Area (sq. in) Maximum Load (lbs) Comp. Strength (psi) Test Time Set # Tested By Break Type Test Methods ASTM C39 ASTM C109 ASTM C617 66006-1 3/15/19 7 3.54/3.59 6.38 -- 12.71 52710 4150 -- 1 BAW 3 66006-2 4/5/19 28 ASTM C1019 66006-3 4/5/19 28 Other 66006-4 4/5/19 28 Test Results Remarks Results Reviewed By Codes for Break Types: E Ell 1 2 3 Date Reviewed n 0 I- 4 5 6 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Farm 04103 Ellcelive 10/3/2017 The information pot idad on this report is prepared for the exclusive nse oClhe Aicnr, and may not be reproduced in ooy formal wilheul tht wrillcn permission of the client and Korean & Associales. This report indicates su inspeclu observation end testing results hssed en silt eendilions end contmtterattivities. This information is subject to review prior to final aubmitto. By signing this report. our inspeclordecs not seecpt responsibility for vatidily of results. The same inf°mrafion hes been provided by others on site. TE GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION March 20, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/Ikj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK KXazan&Associates, Inc Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Date: 2/19/2019 Project #: 09618279 Project: Dou 's Lynnwood Mazda Location: 22214 Hwy 99 _ KA P.M.: Corbett Mercer MASONRY GROUT REPORT #: 09618279MGRO21919-DK Contractor: Wilcox/ Fairweather Masonry Permit #: BLD2017-1119 Inspector: Don Keller Jurisdiction: Edmonds Weather: Field Data GROUT } Supplier lCadman Plant No. 33 ISite Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # % Air (in.) (F) (F) (F) 8:15 �_ 368 602291 8 64 ° 40 ° Grout Box Used Number of units used to form specimens yes Placement Area: cmu walls @A&1 2nd lift (4'-8') Main Level 2,000 psi required. 3,500 psi grout placed ipment Numbers: Inspector: Don Keller Reviewed By: Temp: Reported Batch Data Mix No. 35MG708 Design Actual Weights Weights Cem. lbs. 6560 F. Ash lbs. C. agg. Ibs.1 8480 C. agg. lbs. 2 C. agg. lbs. 3 Sand lbs. 19480 Water lbs. 70% HOT 411.3 Air Ent. (oz) Other(oz) Other (oz) Other (oz) Other (oz) Water Added (gal.) 0.0 Field Test Methods ASTM C143 ASTM C138 ASTM C1064 ASTM C173 ASTM C31 Other ASTM C231 Design Strength: 2,000 du 28 days Date Specimens Rec'd.: 2/20/2019 Laboratory Data Laboratory Cyl. Code Test Date Age Mid Pt. Width (in) Height (in) Out of Plumb (%) Section Area (sq. in) Maximum Load (lbs) Comp. Strength (psi) Test Time Set # Tested By Break Type Test Methods ASTM C39 ASTM C109 ASTM C617 ASTM C1019 Other 65796-1 2/26/19 7 3.38/3.43 6.55 -- 11.59 53410 4610 -- 1 BAW 3 65796-2 3/19/19 28 3.34/3.47 6.25 -- 11.76 72470 6160 -- 1 BAW 3 65796-3 3/19/19 28 3.42/3.44 6.13 -- 11.76 72210 6140 -- 1 BAW 3 65796-4 3/19119 28 3.36/3.42 6.19 -- 11.49 72180 6280 -- 1 BAW 3 Test Results Conforming Remarks Results Reviewed By Date Reviewed Codes for Break Types: 1 2 3 4 5 6 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 F.— 04103 Effective 10/3/2017 The infomratian provided on this report is preparedfor the exclusive use fthe client, and may nol be rep.duced in any f—M without the wrinen permission ofthe client and Kmran&AsseaNtes. This report indicates ourinspector's observation end testing results based on site conditions and conuadaractivities. Thismfrmation i4 suliJecl to msitw prior to final auhuillal. Bysisamgthis.pod,ourbrspeclordoesnotao=Ttreapnnsibrle'yforvalidityofn; h. The some mfnnAion has been povided byerhm an she. -K-t & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION March 27, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. 1121 r Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK Krazan and Associates, Inc. Grout Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Weather: Overcast Grout Code: 65841 Pour Date: Jurisdiction: Citv of Edmonds 2/22/19 Report No: 12618 Permit No. BLD2017 1119 Project: Doug's Lynnwood Mazda Engineer: B&T En ineerin Location: 22130 Hwy 99 Architect: Ned Nelson Architect Client: Adzam Inc. dba Dou 's Mazda Contractor: Wilcox Construction Field Data % Air (ASTM C-231) N/A Temp. (ASTM C-1064) 67 Slump (ASTM C-143) 8" Sampling (ASTM C-172) N/A Making (ASTM C-31) X Unit Wt. (ASTM C-138) N/A Other Consolidation Method Inspector: G. Moe Mechanical: X Manual: Field Notes: Main Level CMU Walls Please refer to Field Report No. 1888 Reported Batch Data Batch Time: Sample Time: 8:15 AM Truck #: 366 Ticket #: 603841 Design Wts. Mix No. 35MG708 Cem. (Ibs) 658 F. Ash (Ibs) Agg. 1 (Ibs) 830 Sand (Ibs) 1887 Water (Ibs) 425 Air Ent. (oz) Other (oz) Water Added on Job (gal) Supplier: Cadman Plant Number: Site Mix: Initial Curing Temps High -Low: Actual Wts. Ambient Air Temperature: 40 Load Size: 10 yds Sample @ cy of cy Field Test Results Conforming X Non -Conforming Laboratory Data Design Strength: 2,500 @ 28 days Date Specimens Rec'd: 2/25/19 Laboratory Test Methods ASTM C-617 ASTM C-780 ASTM C-39 ASTM C-1019 X ASTM C-109 Other Cyl. Code Test Date Age Side 1 Side 2 Area Height % Plumb Load (Ibs) Strength (PSI) Set # Break Tested By 65841-1 3/1/19 7 3.47 3.48 12.08 6.11 0.0% 30,710 2,540 1 3 BAW 65841-2 3/22/19 28 3.47 3.52 12.21 12.21 0.0% 71,020 5,810 1 3 BAW 65841-3 3/22/19 28 3.48 3.55 12.35 12.35 0.0% 70,950 5,740 1 3 BAW 65841-4 3/22/19 28 3.42 3.46 11.83 11.83 0.0% 70,940 5,990 1 3 BAW P.M. Review: wkjj�_ Date Reviewed: 3- Z"Z _ 6 Lab Data Reviewed By: ;Uku." Date Reviewed: 3 • Z? - 15 Lab Test Results Conforming X Non -Conforming This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Grout Report Effective Date; 4/08/2009 Krazan and Associates, Inc. Grout Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Grout Code: 66061 Pour Date: 3/15/19 Report No: 12631 Weather: Pt. Sunny Jurisdiction: City of Edmonds _ Permit No. BLD2017 1119 Project: Doug's Lynnwood Mazda Engineer: B&T Engineering Location: 22130 Hwy 99 Architect: Ned Nelson Architect Client: Adzam Inc. dba Dou 's Mazda Contractor: Alcox Construction Field Data % Air (ASTM C-231) N/A Temp. (ASTM C-1064) 71 Slump (ASTM C-143) Flow Sampling (ASTM C-172) N/A Making (ASTM C-31) X Unit Wt. (ASTM C-138) N/A Other Consolidation Method Inspector: T. Tran Mechanical: X Manual: Field Notes: 8" CMU from 16' to 20' @ 5/'B-A, A/1-5, 1/A-E, E/1-3.5 Placement by line pump. Please refer to Field Report No. 2024 Laboratory Data ASTM C-617 ASTM C-1019 X Cyl. Code Test Date Age Side 1 66061-1 3/22/19 7 3.43 66061-2 4/12/19 28 66061-3 4/12/19 28 66061-4 4/12/19 28 P.M. Review: Lab Data Reviewed By: �C.X Design Strength: 2,000 @ 28 days Laboratory Test Methods ASTM C-780 ASTM C-109 Side 2 Area Height % Plumb 3.48 11.94 5.85 0.0% Reported Batch Data Batch Time: 12:47 PM Sample Time: 2:00 PM Truck #: 269 Ticket #: 611198 Design Wts. Actual Wts. Mix No. 35MG708 Cem. (Ibs) 658 F. Ash (Ibs) Agg. 1 (Ibs) 830 Sand (Ibs) 1887 Water (Ibs) 425 Air Ent. (oz) Other (oz) Water Added on Job (gal) Supplier: Cadman Plant Number: 34 Site Mix: Initial Curing Temps High -Low: Ambient Air Temperature: 53 Load Size: 6 yds Sample @ cy of cy Field Test Results Conforming X Non -Conforming Date Specimens Rec'd: 3/18/19 ASTM C-39 Other Load (Ibs) Strength (PSI) 37,820 3,170 Set # Break Tested By 1 3 BAW Date Reviewed: 2 "' Lab Test Results Conforming Date Reviewed: • "l ' f�L Non -Conforming This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Grout Report Effective Date: 4/08/2009 GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION March 29, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK `�`�Krazm StAssociates,Inc. Geotechnical Engineering a Environmental Engineering Construction Testing and Inspection Date: 3/21 /2019 Project #: 09618279 Project: Dou 's Lynnwood Mazda Location: 22214 highway 99 KA P.M.: Corbett Mercer MASONRY GROUT REPORT M 18279MGRO32119-TR Contractor: Wilcox Permit #: BLD2017-1119 Inspector: Taylor Rooney Jurisdiction: City of Edmonds Weather: Sun Field Data( GROUT ) Sup lier Icadman Plant No. 34 ISite Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # % Air (in.) (F) (F) (F) 12:02 443 11676 10.0 58 ° 61 ° Grout Box Used Number of units used to form specimens 1 p7:� Placement Area: Top of wall lift E/1-4, 1/A-E, A/1-5, 5/B'-A Placed by line pump, mechanically consolidated Asset -Equipment Numbers: Inspector: Taylor Roonev Reviewed Bv: Temp: 65 ° Reported Batch Data Mix No. 35MG708 77 Design Weights Actual Weights Cem. Ibs. 6370 F. Ash lbs. C. agg. lbs.1 #8 pea 7400 C.agg.lbs. 2 C.agg.lbs. 3 Sand Ibs. 17720 Water lbs. 434 Air Ent. (oz) Other(oz) Other(oz) Other(oz) Other(oz) Water Added Field Test Methods ASTM C143 ASTM C138 ASTM C1064 ASTM C173 ASTM C31 Other ASTM C231 Laboratory Data Design Strength: 2000 ra, 28 days Date Specimens Rec'd.: 3/22/2019 Laboratory Cyl. Code Test Date Age Mid Pt. Width (in) Height (in) Out of Plumb (%) Section Area (sq. in) Maximum Load (Ibs) Comp. Strength (psi) Test Time Set # Tested By Break Type Test Methods ASTM C39 ASTM C109 66120-1 3/28/19 7 3.40/3.45I 5.85 -- 11.73 48710 4150 1 1 BAW 3 ASTM C617 66120-2 4/18/19 28 ASTM C1019 66120-3 4/18/19 28 Other 66120-4 4/18/19 28 [ Test Results Conforming Remarks Results Reviewed By Date Reviewed - 2 Cl — ( Codes for Break Types: I� nE 11 1 2 3 4 5 iii 66 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Font 04103 EtTective 9/26/2017 The inf elion provided on this re port is prepared for the exclusive use of the client. end may not be re produced innny formal without the wntten permission ofthc client end Kr &As ietea This mpon indicates our inspector's observation end testing results based on site conditions and contrsoterectiAlies. This information is subject to mview pnorlo tine submittal. 0ysigninethisreport,ourinspeetordoesnolecccptresponsibilityforvalidityofresulh. The same information has been provided by others on site. "aZ 1=4ffi 1<1 an_ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 3, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. C� 1F Sa AMercer Project Manager/Lab Manager Pacific Northwest Division CW1V1/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198th Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK.doc Krazan and Associates, Inc. Grout Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Weather: Overcast Report No: 12647 Jurisdiction: City of Edmonds Permit No. BLD2017 1119 Project: Doug's Lynnwood Mazda Engineer: B&T Engineering Location: 22130 Hwy 99 Architect: Ned Nelson Architect Client: Adzam Inc. dba Dou 's Mazda Contractor: Wilcox Construction Field Data % Air (ASTM C-231) N/A Slump (ASTM C-143) 8 Making (ASTM C-31) X Other Inspector: Gordon Moe Grout Code: 66164 Field Notes: 8" CMU walls. 2nd Lift Lines 5-6 at'B Grids A.5 -'B at 6 Line 4th Lift at 5 Line inclusive Please refer to Field Report No. 1952 Date 3/25/19 Temp. (ASTM C-1064) 67 Sampling (ASTM C-172) N/A Unit Wt. (ASTM C-138) N/A Consolidation Method Mechanical: Manual: Reported Batch Data Batch Time: Sample Time: 1:55 AM Truck #: 368 Ticket #: 614363 Design Wts. Actual Wts. Mix No. 35MG708 Cem. (Ibs) NA F. Ash (Ibs) Agg. 1 (Ibs) Sand (Ibs) Water (Ibs) Air Ent. (oz) Other (oz) Water Added on Job (gal) Supplier: Cadman Plant Number: 34 Site Mix: Initial Curing Temps High -Low: Ambient Air Temperature: 57 Load Size: 7.5 yds Sample @ cy of cy Field Test Results Conforming X Non -Conforming Laboratory Data Design Strength: 2,000 @ 28 days Date Specimens Rec'd: 3/26/19 Laboratory Test Methods ASTM C-617 ASTM C-780 ASTM C-39 ASTM C-1019 X ASTM C-109 Other Cyl. Code Test Date Age Side 1 Side 2 Area Height % Plumb Load (Ibs) Strength (PSI) Set # Break Tested By 66164-1 4/1/19 7 3.44 3.44 11.83 5.71 -- 38,710 3,270 1 3 BAW 66164-2 4/22/19 28 66164-3 4/22/19 28 66164-4 4/22/19 28 P.M. Review: L'� AA— Date Reviewed: N Lab Test Results f c Conforming Lab Data Reviewed By: R Date Reviewed: Non -Conforming This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Grout Report Effective Date: 4/0812009 ES GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 5, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C W M/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198' Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK �-�VazM &Associates, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Date: 3/28/2019 Project #: 09618279 Project: Doug's Lynnwood Mazda Location: 22130 Hwy 99 KA P.M.: Corbett Mercer MASONRY GROUT REPORT #: 09618279MGRO32819-DK Contractor: Wilcox/Fairweather Permit #: BLD2017-1119 Inspector: Don Keller Jurisdiction: Edmonds Weather: sunny Temp: 48 ° Field Data( GROUT ) Supplier Icadman Plant No. 34 1SIte Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # % Air (in.) (F) (F) (F) 10:20 269 615479 9 65 ° 48 ° Grout Box Used Number of units used to form specimens yes Placement Area: cmu walls @5&C 5th lift (16'-20') Main Level Remarks: pment Numbers: Inspector: Don Keller Reviewed By: ,' iio Reported Batch Data Mix No. 35MG708 Design Actual Weights Weights Cem. lbs. 15890 F. Ash lbs. C. agg. lbs.1 7380 C.agg.lbs. 2 C.agg.lbs. 3 Sand lbs. 17700 Water lbs. 435.1 Air Ent. (oz) Other(oz) Other(oz) Other(oz) Other(oz) Water Added (gal.) 123 Field Test Methods Vr ASTM C143 ASTM C138 ASTM C1064 ASTM C173 Ir ASTM C31 Other ASTM C231 Laboratory Data Cyl. Test Code Date Age Design Strength: Mid Pt.y Width Height (in) (in) 2000 @ 28 days Out of Section Maximum Comp. Plumb Area Load Strength (%) (sq. in) (Ibs) (psi) Date Specimens Redd.: Test Set Tested Break Time # By Type 3/29/2019 Laboratory Test Methods ASTM C39 ASTM C109 66191-1 4/4/19 7 3.46/3.47 5.69 -- 12.01 46260 3850 -- 1 BAW 3 ASTM C617 ASTM C1019 Other 66191-2 4/25/19 28 66191-3 4/25/19 28 66191-4 4/25/19 28 Test Results Remarks Results Reviewed By Date Reviewed Codes for Break Types: �" 9 1 2 3 4 5 6 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Form 04103 Effective 10/3/2017 The information provided on lhiampo—pmpared for lhee><clusive useoflhe climt, and may nol be rcpmd,wd in any formal without the written perm)noftheelmm and K—&Asansiales. Thismpart indicates ourinspector'cobwrvalionandteslingresullsbesed on site candi[ioesand —smactorectiviliea. This information is subject to review prior 0 final submittal. By signing this report. our inspmlor doesnot eccep: responsibility for validity of results. Theaemeinformationhasbeenpm idedbyothemonsite. ..+r 1�2Kr"M _ & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 9, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 221.30 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. li�iAA-e� C, Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK Krazan and Associates, Inc. Grout Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Grout Code: 66254 Date 411/19 Report No: 12605 Weather: Fair Jurisdiction: Cit of Edmonds Permit No. BLD2017 1119 Project: Dou 's Lynnwood Mazda Engineer: B&T Engineering Location: 22130 Hwy 99 Architect: Ned Nelson Architect Client: Adzam Inc. dba Dou 's Mazda Contractor: Wilcox Construction Field Data % Air (ASTM C-231) N/A Temp. (ASTM C-1064) 65 Slump (ASTM C-143) 8 Sampling (ASTM C-172) N/A Making (ASTM C-31) X Unit Wt. (ASTM C-138) N/A Other Consolidation Method Inspector: G. Moe Mechanical: Manual: Field Notes: 8" CMU walls - 4' lift to top of wall Grids 'A.- 'B at 6 Line, Grid B inclusive and at 5 line inclusive Please refer to Field Report No. 2161 Reported Batch Data Batch Time: Sample Time: 1:10 PM Truck #: 311 Ticket #: 616743 Design Wts. Actual Wts. Mix No. 35MG708 Cem. (Ibs) 658 F. Ash (Ibs) Agg. 3/8" (Ibs) 830 Sand (Ibs) 1887 Water (Ibs) 425 Air Ent. (oz) Other (oz) Water Added on Job (gal) Supplier: Cadman Plant Number: 32 Site Mix: Initial Curing Temps High -Low: Ambient Air Temperature: 53 Load Size: yds Sample @ cy of cy Field Test Results Conforming X Non -Conforming Laboratory Data Design Strength: 2,000 @ 28 days Date Specimens Rec'd: 4/3/19 Laboratory Test Methods ASTM C-617 ASTM C-780 ASTM C-39 ASTM C-1019 X ASTM C-109 Other Cyl. Code Test Date Age Side 1 Side 2 Area Height % Plumb Load (Ibs) Strength (PSI) Set # Break Tested By 66254-1 4/8/19 7 3.46 3.49 12.08 6.31 -- 53,830 4,460 1 3 BAW 66254-2 4/29/19 28 66254-3 4/29/19 28 66254-4 4/29/19 28 P.M. Review: R�4Date Reviewed: q — 10 - lQ Lab Test Results nQ � w Conforming Lab Data Reviewed By: 1Date Reviewed: �"(� �1 Non -Conforming This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Grout Report Effective Date: 4/08/2009 xazan&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Date: 3/8/2019 Project M 09618279 Project: Doug's Mazda of Lynnwood Location: 22130 Hwy 99 KA P.M.: Corbett Mercer MASONRY GROUT REPORT #: 09618279MGRO30819-DK Contractor: Wilcox/Fairweather Mason Permit #: BLD2017-1119 Inspector: Don Keller Jurisdiction: Edmonds Weather: overcast Field Data( GROUT ) Supplier ICadman Plant No. 32 ISite Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # % Air (in.) (F) (F) (F) 11:00 435 608656 9 64 ° 40 ° Grout Box Used Number of units used to form specimens yes Placement Area: cmu walls @1&E 3rd lift (8'-12') Main Level Remarks: Asset -Equipment Numbers: Inspector: Don Keller Reviewed Bv: Temp: 40 Re orted Batch Data Mix No. 35MG708 Design Actual Weights Weights Cem. lbs. 5260 F. Ash lbs. C. agg. lbs. 1 6640 C. agg. lbs. 2 C. agg. lbs. 3 Sand lbs. 15720 Water Ibs. 100%hot 327.1 Air Ent. (oz) Other(oz) Other(oz) Other(oz) Other(oz) Water Added (gal.) 10.0 Field Test Methods 17 ASTM C143 ASTM C138 17 ASTM C1064 ASTM C173 vr ASTM C31 Other ASTM C231 Laboratory Data Design Strength: 2000 @ 28 days Date Specimens Redd.: 3/11/2019 Laboratory Mid Pt. Out of Section Maximum Comp. Test Methods Cyl. Test Width Height Plumb Area Load Strength Test Set Tested Break ASTM C39 Code Date Age (in) (in) (%) (sq. in) (Ibs) (psi) Time # By Type ASTM C109 66006-1 3/15/19 7 3.54/3.59 6.38 -- 12.71 52710 4150 -- 1 BAW 3 ASTM C617 66006-2 4/5/19 28 3.45/3.56 6.05 -- 11.94 63850 5350 -- 1 BAW 3 ASTM C1019 66006-3 4/5/19 28 3.47/3.51 6.01 -- 12.18 63310 5200 -- 1 BAW 3 Other 66006-4 4/5/19 28 3.42/3.48 5.93 -- 11.90 63470 5330 -- 1 BAW 3 Test Results Conforming Remarks Results Reviewed By Date Reviewed Codes for Break Types: 0 9 3 q E E i I 1 2 5 6 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Form 04103 Effective 10/3J2017 The information provided on thisreport is prepsred for:hlmlusive use fthe client.and — not be reproduced in any f mtwilb-1 the wnaen penissionofthe clicnl and Kr—n&.Associates. This epnd indiesh,s ourinspecmr'sobservstion and testing results based on sire eonditiocsand eonhactor sc mlies. This informalion is s,bjml to revicsv prior to foal suhnittul. By signing this report. our inspector does not accept responsibility for validity of resnits. The same infomretion has been provided by others on site. M i of � �w Mir GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 10, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. � 4/L L- Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK 114(mzari&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 4/2/2019 PROJECT #: 09618279 PROJECT: Dou 's Lynnwood Mazda LOCATION: 22214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: 09618279CRO40219-IV CONTRACTOR: WILCOX PERMIT* BLD2017 1119 INSPECTOR: Itiaj Vahora JURISDICTION: City of Edmonds WEATHER: PCL Field Data Concrete: Other: W/ air Supplier: MILES S & G Plant No. 125 Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 0700 1 C114 219991 1 5.0 5 1 56 ° I 45 ° 1 Location: Placement Area Trash enclosure footing/slab on 10 cys placed Remarks: Concrete placed via chute, consolidated w/ vibrator and finished Please Refer To Field Repot Number: 09618279DFR4220191V Inspector :I ITIAJ VAHORA TEMP: 45 ° Reported Batch DATA Cement Type Ill I Design Actual Mix No. 0255AC Cem. Lbs. 515 F. Ash lbs. C. Agg. Lbs #57 1650 C. Agg. Lbs PEA 298 C. Agg. Lbs Sand Its 1333 Water 249 Admixture MB POLY997 15.6 oz Admixture Admixture Air Ent. 1.7 oz (oz / cwt. ) Water Added On Job Site (Gals.) 1 Field Test ASTM Method C172 C143 C138 C1064 C231 C31 H Other Laboratory Data Design Strength: 3000 a 28 days Date Specimens Rec'd: _ 4/3/2019 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk �Typ Test Method ASTM C39 66252-1 4/9/19 7 4.00 12.57 -- 54660 4350 1 BAW 2 ASTM C109 66252-2 4/30/19 1 28 1 ASTM C617 66252-3 4/30/19 28 1 ASTM C1231 66252-4 4/30/19 28 1 ASTM C1019 OTHER Test Results Remarks: Results Reviewed By:1 i tA J Date:L(—I(—Icl Codes for Break Types:. 1 2 t' 3 4 5 6 Offices Serving The Western United States Concrete Report Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provlded on this report is prepared forth. exclusive useat the Giant, and may not be reprod—d in any format wNhout the written permission fthe client and Krazam&Associates. This report indicates our Inspector's observation and testing results based an site candIIbns end oontraotor actiAlea. This Information is subject to review prior to final submittal ey signing this report, our inspector does not accept responslbllity for validity of results. The same information has been p-lded by others on site. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 11, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. tvr Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425)"485-6837 With Offices Serving the Western United States 09618279 BRK &Associates, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Date: 3/13/2019 Project #: 09618279 Project: Doug's Lynnwood Mazda Location: 22130 Hwy 99 KA P.M.: Corbett Mercer MASONRY GROUT REPORT M 18279MGRO31319-DB Contractor: Wilcox/Fairweather Masonry Permit #: BLD2017-1119 Inspector: Dave Bale Jurisdiction: Edmonds Weather: partly cloudy Temp: 47 ° Field Data GROUT ) Supplier Icadman Plant No. Site Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # % Air (in.) (F) (F) (F) Grout Box Used Number of units used to form specimens x Area: 5 -'B to A FOR 4th lift and C - 6 to T, 6 - C to B, 7 -'A toCfor 2nd lift. Remarks: Asset -Equipment Numbers: Reported Batch Data Mix No. 35MG708 Design Actual Weights Weights Cem.lbs. 658 658 F. Ash lbs. C. agg. lbs.1 847 860 C. agg. lbs. 2 C. agg. lbs. 3 Sand lbs. 1898 1945 Water lbs. 425 344 Air Ent. (oz) Other (oz) Other (oz) Other (oz) Other (oz) Water Added (gal.) 10 Field Test Methods ASTM C143 ASTM C138 ASTM C1064 ASTM C173 -17 ASTM C31 Other ASTM C231 Inspector: Dave Bale Reviewed By: Laboratory Data Design Strength: 2000 228 days Date Specimens Redd.: 3/14/2019 Laboratory Mid Pt. Out of Section Maximum Comp. Test Methods Cyl. Test Width Height Plumb Area Load Strength Test Set Tested Break ASTM C39 Code Date Age (in) (in) (%) (sq. in) (Ibs) (psi) Time # By Type ASTM C109 66032-1 3/20/19 7 3.45/3.48 6.34 -- 12.01 41960 7120 -- 1 BAW 3 ASTM C617 66032-2 4/10/19 28 3.40/3.46 6.12 -- 11.76 49320 4190 -- 1 BAW 3 ASTM C1019 66032-3 4/10/19 28 13.4313.45 5.93 -- 11.83 49010 4140 -- 1 BAW 3 Other 66032-4 4/10/19 28 3.4813.51 5.98 -- 12.21 49470 4050 -- 1 BAW 3 Test Results Conforming Remarks Results Reviewed By Date Reviewed y-1 Z- lIl Codes for Break Types: EEM9 Ell q 0 0 1 2 3 4 5 6 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Puyallup (253) 939-2500 Fm 04103 The information pmvidadon this repon is prepared for the exclusive uaeoftheoticnt,endmaynol be reproduced in any format without the dufan permission of the client and K— &Associates. Thia re port indiuelea our inspector's observation and testing maulta based oa siu, conditions and conlraclorecliviliea. Thia information is auM1ject to review prior to final subminal. Bysigning this report, our inspcolordoes noreccept responsibility for validiNof-ulls. Thesame informalion has been provided try others on site. -- A01>� 'abw 1s M GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 12, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. J,,A-� -tor Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK Krazan and Associates, Inc. Grout Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Grout Code: 66291 Weather: Sunny Jurisdiction: City of Edmonds Project: Doug's Lynnwood Mazda Location: 22130 Hwv 99 Client: Adzam Inc. dba Doug's Mazda Field Data % Air (ASTM C-231) N/A Slump (ASTM C-143) Flow Making (ASTM C-31) X Other Inspector: T. Tran Pour Date: 4/4/19 Report No: 12633 Permit No. BLD2017 1119 Engineer: B&T Enriineering Architect: Ned Nelson Architect Contractor: Wilcox Construction Temp. (ASTM C-1064) Sampling (ASTM C-172) Unit Wt. (ASTM C-138) Consolidation Method Mechanical: Manual: Field Notes: 8" CMU from 8' to 12' @ A76-7, 7/A'-C, C/6-7, 6/C-D, D/5-6 Placement by line pump. Please refer to Field Report No. 2072 Laboratory Data ASTM C-617 ASTM C-1019 X Cyl. Code Test Date Age Side 1 66291-1 4/11/19 7 3.40 66291-2 5/2/19 28 66291-3 5/2/19 28 66291-4 5/2/19 28 66 N/A N/A �i Design Strength: 2,000 @ 28 days Laboratory Test Methods ASTM C-780 ASTM C-109 Side 2 Area Height % Plumb 3.42 11.63 5.79 0.0% P.M. Review: Lab Data Reviewed By: - Date Reviewed: Date Reviewed: Reported Batch Data Batch Time: 10:57 AM Sample Time: 12:00 PM Truck #: 422 Ticket #: 618210 Design Wts Mix No. 35MG708 Cem. (Ibs) 658 F. Ash (Ibs) N/A Agg. 1 (Ibs) 830 Sand (Ibs) 1887 Water (Ibs) 425 Air Ent. (oz) N/A Other (oz) N/A Water Added on Job (gal) Supplier: Cadman Plant Number: 34 Site Mix: Initial Curing Temps High -Low: Actual Wts. 35MG708 657 N/A 816 1883 412 N/A N/A 10 Ambient Air Temperature: 56 Load Size: 7 yds Sample @ cy of cy Field Test Results Conforming X Non -Conforming Date Specimens Rec'd: 4/5/19 ASTM C-39 Other Load (Ibs) Strength (PSI) 36,830 3,170 Set # Break Tested By 1 3 BAW Lab Test Results Conforming _ Non -Conforming — This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Grout Report Effective Date: 4/08/2009 Krazan and Associates, Inc. Grout Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Grout Code: 66291 Weather: Sunnv Jurisdiction: City of Edmonds Project: Dou 's Lynnwood Mazda Location: 22130 Hwv 99 Client: Adzam Inc. dba Dou {'s Mazda Field Data % Air (ASTM C-231) N/A Slump (ASTM C-143) Flow Making (ASTM C-31) X Other Inspector: T. Tran Pour Date: 4/4/19 Report No: 12633 Permit No. BLD2017 1119 Engineer: B&T Engineering Architect: Ned Nelson Architect Contractor: Wilcox Construction Temp. (ASTM C-1064) Sampling (ASTM C-172) _ Unit Wt. (ASTM C-138) Consolidation Method Mechanical: Manual: Field Notes: 8" CM from 8' to 12' @ A76-7, 7/A'-C, C/6-7, 6/C-D, D/5-6 Placement by line pump. Please refer to Field Report No. 2072 66 N/A N/A M Reported Batch Data Batch Time: 10:57 AM Sample Time: 12:00 PM Truck #: 422 Ticket #: 618210 Design Wts Mix No. 35MG708 Cem. (Ibs) 658 F. Ash (Ibs) N/A Agg. 1 (Ibs) 830 Sand (Ibs) 1887 Water (Ibs) 425 Air Ent. (oz) N/A Other (oz) N/A Water Added on Job (gal) Supplier: Cadman Plant Number: 34 Site Mix: Initial Curing Temps High -Low: Actual Wts. 35MG708 657 N/A 816 1883 412 N/A N/A 10 Ambient Air Temperature: _ Load Size: 7 yds Sample @ cy of Field Test Results Conforming X Non -Conforming lfl cy Laboratory Data Design Strength: 2,000 @ 28 days Date Specimens Rec'd: 4/5/19 Laboratory Test Methods ASTM C-617 ASTM C-780 ASTM C-39 ASTM C-1019 X ASTM C-109 Other Cyl. Code Test Date Age Side 1 Side 2 Area Height % Plumb Load (Ibs) Strength (PSI) Set # Break Tested By 66291-1 4/11/19 7 3.40 3.42 11.63 5.79 0.0% 36,830 3,170 1 3 BAW 66291-2 5/2/19 28 3.42 3.54 12.11 5.73 0.0% 45,970 3,800 1 3 BAW 66291-3 5/2/19 28 3.45 3.48 12.01 5.75 0.0% 45,480 3,790 1 3 BAW 66291-4 5/2/19 28 3.47 3.51 12.18 5.83 0.0% 45,500 3,740 1 3 BAW P.M. Review: ' J V Lab Data Reviewed By: Date Reviewed: Date Reviewed: q'1z--1 Lab Test Results Conforming X Non -Conforming This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Grout Report Effective Date: 4/08/2009 NO GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 19, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. 114 -V� C-.-- Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWMAki CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK �Kraz Ill &Associate s,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Date: 3/21 /2019 Project #: 09618279 Project: Dou 's Lynnwood Mazda Location: 22214 highway 99 KA P.M.: Corbett Mercer MASONRY GROUT REPORT M 18279MGRO32119-TR Contractor: Wilcox Permit #: BLD2017-1119 Inspector: Taylor Rooney Jurisdiction: Citv of Edmonds Weather: Su Field Data( GROUT ) Supplier lCadman Plant No. 34 ISite Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # % Air (in.) (F) (F) (F) 12:02 F 443 11676 10.0 58 ° 61 ° Grout Box Used Number of units used to form specimens 1 Remarks: Area: Top of wall lift E/1-4, 1 /A-E, A/1-5, 5/B'-A Placed by line pump, mechanically consolidated pment Numbers: Inspector: Taylor Rooney Reviewed By: Temp: 65 ° Reported Batch Data Mix No. 35MG708 Design Actual Weights Weights Cem. lbs. 6370 F. Ash lbs. C. agg. Ibs.1 #8 pea 7400 C.agg.lbs. 2 C.agg.lbs. 3 Sand lbs. 17720 Water lbs. 434 Air Ent. (oz) Other(oz) Other(oz) Other(oz) Other(oz) Water Added (gal.) 115 Field Test Methods ASTM C143 ASTM C138 ASTM C1064 ASTM C173 ASTM C31 Other ASTM C231 Laboratory Data Design Strength: 2000 @ 28 days Date Specimens Redd.: 3/22/2019 Laboratory Cyl. Code Test Date Age Mid Pt. Width (in) Height (in) Out of Plumb (%) Section Area (sq. in) Maximum Load (Ibs) Comp. Strength (psi) Test Time Set # Tested By Break Type Test Methods ASTM C39 ASTM C109 66120-1 3/28/19 7 3.4013.45 5.85 -- 11.73 48710 4150 -- 1 BAW 3 ASTM C617 66120-2 4/18/19 28 3.40/3.46 5.99 -- 11.76 57640 4900 -- 1 BAW 3 ASTM C1019 66120-3 4/18/19 28 3.43/3.49 5.84 -- 11.97 58410 4880 -- 1 BAW 3 Other 66120-4 4/18/19 28 3.41/3.43 5.91 -- 11.70 57970 4950 -- 1 BAW 3 Test Results Conforming Remarks Results Reviewed By Codes for Break Types: Date Reviewed nn L.+�.1 2 3 4 5 6 - Z Z-15 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Form 04103 The information provided an this report is prepared for the exclusive use fthe client, and may not be reproduced in any formatwilhoutthe written permission of[he clientead K— &Assneietes. This report indicates our inspator's ahservatior end testing results based on site conditiens crntmctoractivities. Thisinformstn. issulyect to review prior to first submittal. By signing this re port, our inspectordoes not accept responsibility for validity orn,sults. The same information has been provided by others on site. KMzM & A s s o c i a t e s, I n c Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Date: 4/11 /2019 Project #: 09618279 Project: Dou 's Lynnwood Mazda Location: 22214 HWY 99, Edmonds, WA KA P.M.: Corbett Mercer MASONRY GROUT REPORT #: 09618279MGR041119-ZZ Contractor: WILCOX Permit M BLD2017-1119 Inspector: Zelalem Zerihun Jurisdiction: City of Edmonds Weather: Cloudy Temp: 50 ° Field Data GROUT Supplier CADMAN Plant No. 34 Isite Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # % Air (in.) (F) (F) (F) 11:30 444 620571 1 9 1 56° 50° Grout Box Used Number of units used to form specimens yes 4 Remarks: Area: CMU top lifts @ D/5 5.9, 5.9/C — D, 5.9 — 7/C, 7/A — C, A/6 — 7, elevator shaft top lift, and trash enclosure walls 6' high. * Batch weights are within tolerances. pment Numbers: Inspector: Zelalem Zerihun Reviewed By: Reported Batch Data Mix No. 35MG708 Design Actual Weights Weights Cem.lbs. 658 F. Ash Ibs. C. agg. lbs. 1 821 C.agg. lbs. 2 C. agg. lbs. 3 Sand lbs. 1887 Water lbs. 425 Air Ent. (oz) Other(oz) Other(oz) Other(oz) Other(oz) Water Added (gal.) 20 Field Test Methods ASTM C143 ASTM C138 Vr ASTM C1064 ASTM C173 Vr ASTM C31 Other ASTM C231 Laboratory Data Design Strength: 2000 @ 28 day s Date Specimens Redd.: 4/12/2019 Laboratory Cyl. Code Test Date Age Mid Pt. Width (in) Height (in) Out of Plumb (%) Section Area (sq. in) Maximum Load (Ibs) Comp. Strength (psi) Test Time Set # Tested By Break Type Test Methods ASTM C39 ASTM C109 66392-1 4/18/19 7 13.4513.54 6.06 -- 12.21 34430 2820 -- 1 BAW 3 ASTM C617 66392-2 5/9/19 28 7ASTM C1019 66392-3 5/9/19 28 Other 66392-4 5/9/19 28 Test Results Remarks Results Reviewed By Date Reviewed 1 Codes for Break Types: E NN-i Rzi, q n i 1 2 3 4 5 6 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Form 04103 Effective 10/3/2017 The inf.rmetior. provided on this report is prepared for the exclusive use fthe client_ end may not be reproduced in any formal without the written permission ofthe client end Kr &.Assoeiates. This report mdicetos our inspector's observation nod testing results based on site conditionsand onntrectarecfi hi- Thisid-no-tion is subjeel to review prior to final sub,itini. By signing this pan, ourmpoclor doesnot accept responsibility for validity of—u!.. The same information h. Sec. provided by others on site. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 24, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lki CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK Krazan and Associates, Inc. Grout Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Grout Code: 66164 Date 3/25/19 Report No: 12647 Weather: Overcast Jurisdiction: City of Edmonds Permit No. BLD2017 1119 Project: Dou 's Lynnwood Mazda Engineer: B&T Engineering Location: 22130 Hwy 99 Architect: Ned Nelson Architect Client: Adzam Inc. dba Douq's Mazda Contractor: Wilcox Construction Reported Batch Data Batch Time: Field Data % Air (ASTM C-231) N/A Temp. (ASTM C-1064) 67 Slump (ASTM C-143) 8 Sampling (ASTM C-172) N/A Sample Time: 1:55 AM Making (ASTM C-31) X Unit Wt. (ASTM C-138) N/A Truck #: 368 Other Consolidation Method Ticket #: 614363 Inspector: Gordon Moe Mechanical: Design Wts. Actual Wts. Manual: Mix No. 35MG708 Field Notes: Cem. (Ibs) NA 8" CMU walls. 2nd Lift Lines 5-6 at'B F. Ash (Ibs) Grids A.5 -'B at 6 Line Agg. 1 (Ibs) 4th Lift at 5 Line inclusive Sand (Ibs) Water (Ibs) Air Ent. (oz) Other (oz) Water Added on Job (gal) Supplier: Cadman Plant Number: 34 Site Mix: Initial Curing Temps High -Low: Ambient Air Temperature: 57 Load Size: 7.5 yds Please refer to Field Report No. 1952 p Sample @ cy of cy Field Test Results Conforming X Non -Conforming Laboratory Data Design Strength: 2,000 @ 28 days Date Specimens Redd: 3/26/19 Laboratory Test Methods ASTM C-617 ASTM C-780 ASTM C-39 ASTM C-1019 X ASTM C-109 Other Cyl. Code Test Date Age Side 1 Side 2 Area Height % Plumb Load (Ibs) Strength (PSI) Set # Break Tested By 66164-1 4/1/19 7 3.44 3.44 11.83 5.71 -- 38,710 3,270 1 3 BAW 66164-2 4/22/19 28 3.47 3.47 12.04 5.56 -- 64,830 5,380 1 3 BAW 66164-3 4/22/19 28 3.43 3.45 11.83 5.61 -- 64,000 5,410 1 3 BAW 66164-4 4/22/19 28 3.41 3.42 11.66 5.87 -- 62,960 5,400 1 3 BAW P.M. Review: Date Reviewed: —2 —I, Lab Test Results Conforming X Lab Data Reviewed By: Date Reviewed: - Z�� ilk Non -Conforming This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Grout Report I Effective Date: 4/08/2009 GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 29, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK UKX0/Jan &Associates, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Date: 3/28/2019 Project #: 09618279 Project: Doug's Lynnwood Mazda Location: 22130 Hwy 99 KA P.M.: Corbett Mercer MASONRY GROUT REPORT M 09618279MGRO32819-DK Contractor: Wilcox/Fairweather Masonry Permit#: BLD2017-1119 Inspector: Don Keller Jurisdiction: Edmonds Weather: Field Data GROUT Supplier Cadman 1PIantNo. 34 1SIte Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # % Air (in.) (F) (F) (F) 10:20 269 615479 9 65. 48 ° Grout Box Used Number of units used to form specimens es Placement Area: cmu walls @5&C 5th lift (16'-20') Main Level pment Numbers: Inspector: Don Keller Reviewed By: Temp: 48 ° Reported Batch Data Mix No. 35MG708 Design Actual Weights Weights Cem. lbs. 5890 F. Ash lbs. C. agg. Ibs.1 7380 C.agg.lbs. 2 C.agg.lbs. 3 Sand lbs. 17700 Water Ibs. 435.1 Air Ent. (oz) Other(oz) Other(oz) Other(oz) Other(oz) Water Added (gal.) 23 Field Test Methods ASTM C143 ASTM C138 ASTM C1064 ASTM C173 ASTM C31 Other ASTM C231 Laboratory Data Design Strength: 2000 @ 28 dams Date Specimens Redd.: 3/29/2019 Laboratory Cyl. Code Test Date Age Mid Pt. Width (in) Height (in) Out of Plumb (%) Section Area (sq. in) Maximum Load (lbs) Comp. Strength (psi) Test Time Set # Tested By Break Type Test Methods ASTM C39 ASTM C109 66191-1 4/4/19 7 3.46/3.47 5.69 -- 12.01 46260 3850 -- 1 BAW 3 ASTM C617 ASTM C1019 66191-2 4/25/19 28 3.38/3.48 6.10 -- 11.76 57140 1 4860 -- 1 BAW 1 3 66191-3 4/25/19 28 3.42/3.46 6.00 -- 11.83 56550 4780 -- 1 BAW 3 Other 66191-4 4/25/19 28 3.45/3.47 6.08 -- 11.97 56740 4740 -- 1 BAW 3 Test Results Conforming Remarks Results Reviewed By Date ReviE wed 4 - 3 U ^ l5 Codes for Break Types: E 1 2 3 4 5 6 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Form 04103 Elrtxtive 10/3l2017 The information provided on lhiareport is prepared farthe exclusive use oftha Giant, and may hint be re produced in any format without the written permission ofthe client and Kramn.& Aasociatea. This report indicates our impector'sabservation and tealing resulla based on aim conditionsand contractor aeliviliea. This information is aubjecl to review prior to final submittal. By signingthisrtpon, our inspector does not accept responsibility for validity of results. The same infomnatien has been providd by he. on site. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 1, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. orb ett W. Mercer� C� Project Manager/Lab Manager Pacific Northwest Division CWNVlkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198'h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK Krazan and Associates, Inc. Grout Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Grout Code Weather: Fair Jurisdiction Project: Dou 's Lynnwood Mazda Location: 22130 Hwy 99 Client: Adzam Inc. dba Douq's Mazda 66254 Date 411/19 of Edmonds Report No: 12605 Permit No. BLD2017 1119 Engineer: B&T Engineering Architect: Ned Nelson Architect Contractor: Wilcox Construction Field Data % Air (ASTM C-231) N/A Temp. (ASTM C-1064) 65 Slump (ASTM C-143) 8 Sampling (ASTM C-172) N/A Making (ASTM C-31) X Unit Wt. (ASTM C-138) N/A Other Consolidation Method Inspector: G. Moe Mechanical: Manual: Field Notes: 8" CMU walls - 4' lift to top of wall Grids'A.-'B at 6 Line, Grid B inclusive and at 5 line inclusive Please refer to Field Report No. 2161 Laboratory Data ASTM C-617 ASTM C-1019 X Cyl. Code Test Date Age Side 1 66254-1 4/8/19 7 3.46 66254-2 4/29/19 28 3.45 66254-3 4/29/19 28 3.48 66254-4 4/29/19 28 3.46 P.M. Review: h /` Lab Data Reviewed By: Design Strength: 2,000 @ 28 days Laboratory Test Methods ASTM C-780 ASTM C-109 Side 2 Area Height % Plumb Load (Ibs) 3.49 12.08 6.31 -- 53,830 3.47 11.97 6.51 -- 66,450 3.49 12.15 6.46 -- 69,010 3.52 12.18 6.37 -- 67,210 Date Reviewed: s —1 Date Reviewed:! _I_ 6 Reported Batch Data Batch Time: Sample Time: 1:10 PM Truck #: 311 Ticket #: 616743 Design Wts. Actual Wts. Mix No. 35MG708 Cem. (Ibs) 658 F. Ash (Ibs) Agg. 3/8" (Ibs) 830 Sand (Ibs) 1887 Water (Ibs) 425 Air Ent. (oz) Other (oz) Water Added on Job (gal) Supplier: Cadman Plant Number: 32 Site Mix: Initial Curing Temps High -Low: Ambient Air Temperature: 53 Load Size: yds Sample @ cy of cy Field Test Results Conforming X Non -Conforming Date Specimens Rec'd: 4/3/19 ASTM C-39 Other Strength (PSI) Set # Break Tested By 4,460 1 3 BAW 5,550 1 3 BAW 5,680 1 3 BAW 5,520 1 3 BAW Lab Test Results Conforming X Non -Conforming This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Grout Report Effective Date: 4/08/2009 Krazan&Associ ate s, Inc. Geotechnical Engineering as Environmental Engineering Construction Testing and Inspection DATE: 4/2/2019 PROJECT #: 09618279 PROJECT: Dou 's L nnwood Mazda LOCATION: 22214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: n999 R970r Rndn990-1\/ CONTRACTOR: WILCOX PERMIT* BLD2017 1119 INSPECTOR: Miaj Vahora JURISDICTION: City of Edmonds WEATHER: PCL Field Data Concrete: Other: W/ air Supplier: MILES S & G Plant No. 125 Site Mix:�� Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 0700 1 C114 219991 5.0 5 56 ° 45 ° Location: Placement Area Trash enclosure footing/slab on 10 cys placed Remarks: Concrete placed via chute, consolidated w/ vibrator and finished Please Refer To Field Repot Number: 09618279DFR4220191V Laboratory Data Cyl. Test Field Code Date Cure 66252-1 4/9/19 66252-2 4/30/19 66252-3 4/30/19 66252-4 4/30/19 Remarks: Inspector:Inspector:L ITIAJ VAHORA Design Strength: Dia. Area 3000 c^u 28 da s Wt. Max # Load Comp. Strengtl 4.00 12.57 -- 54660 4350 4.00 12.57 -- 64500 5130 4.00 12.57 -- 62620 4980 4.00 12.57 -- 62960 5010 TEMP: 45 ° Reported Batch DATA Cement Type Design Actual Mix No. 0255AC Cem. Lbs. 515 F. Ash lbs. C. Agg. Lbs #57 1650 C. Agg. Lbs PEA 298 C. Agg. Lbs Sand tbs 1333 Water 249 Admixture M8 POLY997 15.6 oz Air Ent. 1.7 oz (oz I cwt. ) Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 N C138 C1064 C231 C31 Other Date Specimens Rec'd: 1 4/3/2019 Set Tested Brk # By Tyr 1 BAW 2 1 BAW 1 1 BAW 1 1 BAW 1 Reviewed By:1 iZj�.�t �1 Date: K.- I - it Codes for Break Types: Concrete Report 1J— 2 I-3..... 4 5 Offices Serving The Western United States ASTM C39 ASTM C 109 ASTM C617 ASTM C1231 ASTM C1019 OTHER Test Results Conforming 6 Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 as Tacoma (253) 939-2500 The inrormation provided on this report is prepared for the emlosive use of the Glent, and may not[ be reproduced in any format tatthout the wditbn permission of the client and K—n B Associates. True report ladjoales our inspector's observation and tnting results based on site eonddlone and cadraetorectivltles. This lMomlationssubjeot to review prior to final submittal. By signing this report, our inspe Yor does not acept responalblity forvelldltyof results. The same infowedion has been provided byothersoo ate. -- s &ram ir= m GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 3, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. ti.. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK Krazan and Associates, Inc. Grout Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Grout Code: _ Weather: Pt. Sunny Jurisdiction: C Project: Dou 's Lynnwood Mazda Location: 22130 Hwy 99 _ Client: Adzam Inc. dba Doua's Mazda Field Data % Air (ASTM C-231) N/A Slump (ASTM C-143) Flow Making (ASTM C-31) X Other Inspector: T. Tran 66061 Pour Date: 3/15/19 of Edmonds Report No: 12631 Permit No. BLD2017 1119 Engineer: B&T Engineering Architect: Ned Nelson Architect Contractor: Wilcox Construction Temp. (ASTM C-1064) 71 Sampling (ASTM C-172) N/A Unit Wt. (ASTM C-138) N/A Consolidation Method Mechanical: X Manual: Field Notes: 8" CMU from 16' to 20' @ 5/'B-A, A/1-5, 1/A-E, E/1-3.5 Placement by line pump. Please refer to Field Report No. 2024 Laboratory Data Design Strength: 2,000 @ 28 days Laboratory Test Methods Reported Batch Data Batch Time: 12:47 PM Sample Time: 2:00 PM Truck #: 269 Ticket #: 611198 Design Wts. Actual Wts. Mix No. 35MG708 Cem. (Ibs) 658 F. Ash (Ibs) Agg. 1 (Ibs) 830 Sand (Ibs) 1887 Water (lbs) 425 Air Ent. (oz) Other (oz) Water Added on Job (gal) Supplier: Cadman Plant Number: 34 Site Mix: Initial Curing Temps High -Low: Ambient Air Temperature: 53 Load Size: 6 yds Sample @ cy of cy Field Test Results Conforming X Non -Conforming Date Specimens Rec'd: 3/18/19 ASTM C-617 ASTM C-780 ASTM C-39 ASTM C-1019 X ASTM C-109 Other Cyl. Code Test Date Age Side 1 Side 2 Area Height % Plumb Load (Ibs) Strength (PSI) Set # Break Tested By 66061-1 3/22/19 7 3.43 3.48 11.94 5.85 0.0% 37,820 3,170 1 3 BAW 66061-2 4112/19 28 3.42 3.54 12.11 5.73 0.0% 45,970 3,800 1 3 BAW 66061-3 4/12/19 28 3.45 3.48 12.01 5.75 0.0% 45,480 3,790 1 3 BAW 66061-4 4/12/19 28 3.47 3.51 12.18 5.83 0.0% 45,500 3,740 1 3 BAW `? P.M. Review: c�` Date Reviewed: j Lab Test Results Lab Data Reviewed A 1Z�c-- Conforming X By: Date Reviewed: -g- Non -Conforming This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any formal without the written permission of the client and Krazan & Assoc. Grout Report Effective Date: 410812009 W GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 10, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. akt,-". G.1 Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK MKiGIzaa &Associate s,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Date: 4/11 /2019 Project #: 09618279 Project: Dou 's Lynnwood Mazda Location: 22214 HWY 99, Edmonds, WA KA P.M.: Corbett Mercer MASONRY GROUT REPORT #: 09618279MGRO41119-ZZ Contractor: WILCOX Permit #: BLD2017-1119 Inspector: Zelalem Zerihun Jurisdiction: Citv of Edmonds Weather: Cloudy Temp: 50 ° Field Data( GROUT ) Supplier CADMAN Plant No. 34 Site Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # % Air (in.) (F) (F) (F) 11:30 444 620571 9 56 ° 50 ° Grout Box Used Number of units used to form specimens yes 4 Placement Area: CMU top lifts @ D/5 5.9, 5.9/C — D, 5.9 — 7/C, 7/A — C, A/6 — 7, elevator shaft top lift, and trash enclosure walls 6' high. Remarks: * Batch weights are within tolerances. pment Numbers: Inspector: Zelalem Zerihun Reviewed By Reported Batch Data Mix No. 35MG708 Design Actual Weights Weights Cem.lbs. 658 F. Ash lbs. C. agg. lbs. 1 821 C.agg. lbs. 2 C. agg. lbs. 3 Sand lbs. 1887 Water lbs. 425 Air Ent. (oz) Other(oz) Other(oz) Other(oz) Other(oz) Water Added (gal.) 20 Field Test Methods ASTM C143 ASTM C138 ASTM C1064 ASTM C173 ASTM C31 Other ASTM C231 Laboratory Data Design Strength: 2000 Cd,) 28 days Date Specimens Redd.: 4/12/2019 Laboratory Cyl. Code Test Date Age Mid Pt. Width (in) Height (in) Out of Plumb (%) Section Area (sq. in) Maximum Load (Ibs) Comp. Strength (psi) Test Time Set # Tested By Break Type Test Methods ASTM C39 ASTM C109 66392-1 4/18/19 7 3.45/3.54 6.06 -- 12.21 34430 2820 — 1 BAW 3 ASTM C617 ASTM C1019 Other 66392-2 5/9/19 28 3.52/3.59 6.24 -- 12.64 51110 4040 -- 1 BAW 3 66392-3 5/9119 28 3.48/3.51 6.27 -- 12.21 48610 3980 -- 1 BAW 3 66392-4 5/9/19 28 3.49/3.56 6.29 -- 12.42 49890 4020 -- 1 BAW 3 Test Results Conforming Remarks Results Reviewed By Codes for Break Types: E N M A I 1 2 3 Date Reviewed Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Form 04103 Mimi- 10/3/2017 The inforl-tian provided on this report is prepared for the excursive use of the client, end may not bs reproduced in a. y formal whh°w few-ritten pem -ion of the diem end K— & A.—ieles. This report indicates our inspecmr's ob—im end testing results based on site conditions end aomreetor activities This information is subject to review prior to first submittal. By signing this report, our inspector does rat eecepl responsibility for validity of results. The same information has been provided by others on site. JE.� ..�.. ■ m— - Y GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 31, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 2213 0 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. � /� .. CorbettQ W. Mercer C Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK Krazan and Associates, Inc. Cylinder Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Cylinder Code: 66854 Pour Date: 5/23119 Report No: 59237 Weather: Sunny _ Jurisdiction: City of Edmonds Permit No. BLD2017 1119 Project: Doug's Lynnwood Mazda Engineer: B&T Engineering Location: 22130 Hwy 99 Architect: Ned Nelson Architect Client: Adzam Inc. dba Dou 's Mazda Contractor: Wilcox Construction Field Data % Air (ASTM C-231) Slump (ASTM C-143) Making (ASTM C-31) Inspector: Robert Smith -- Temp. (ASTM C-1064) 5-1/2" Sampling (ASTM C-172) X Unit Wt. (ASTM C-138) Other Field Notes: Slab, 2nd floor SW side of site & stairs Placed by pump Please refer to Field Report No. 2340 Consolidation Method Mechanical: X Manual: Laboratory Data 72 X Field Test Results Conforming X Non -Conforming Design Strength: 4,000 @ 28 days Reported Batch Data Batch Time: 11:47 AM Sample Time: 12:30 PM Truck #: C 114 Ticket #: 223054 Design Wts. Actual Wts. Mix No. 026006C 026006C Cem. (Ibs) 564 560 F. Ash (Ibs) -- -- Agg. 7/8" (Ibs) 1550 1540 Agg. PEA (Ibs) 300 298 Agg. 3 (Ibs) -- -- Sand (Ibs) 1500 1500 Water (Ibs) 250 238 Air Ent. (oz) -- -- MB POLY 997 (oz) 34.0 34.0 Other (oz) -- -- Other (oz) -- -- Other (oz) -- -- Water Added on Job (gal) -- Supplier: Miles Sand & Gravel Plant Number: Site Mix: Initial Curing Temps High -Low: Ambient Air Temperature: 65 Load Size: 10 yds Sample @ cy of cy Date Specimens Redd: 5/24/19 Cyl. Test Field Max. Comp. Code Date Cure Age Dimension Area C.F. Load (Ibs) Str. (psi) Set# 66854-1 5/30/19 7 4x8 12.57 1.0 56,790 4,520 1 66854-2 6/20/19 28 4x8 66854-3 6/20/19 28 4x8 66854-4 6/20/19 28 4x8 66854-5 H 4x8 P.M. Review: U(JV4.11 Date Reviewed: fvL"^' Lab Data Reviewed By: Date Reviewed: Break Tested Laboratory Type By Test Methods BAW 1 ASTM C39 X ASTM C109 ASTM C617 ASTM C1231 X ASTM C780 Other Lab Test Results Conforming _ Non -Conforming This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Cylinder Report Effective Date: 4-08-2009 GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION June 12, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. 910 ; I Corbett W. ercer Project Manager/Lab Manager Pacific Northwest Division CWM/Ikj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK mr!!dK-azan&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 5/31 /2019 PROJECT #: 09618279 PROJECT: Douc;'s Lynnwood Mazda LOCATION: 22214 Hwv 99, Lynnwood, WA KA P.M.: Corbett Mercer CONCRETE REPORT NO.: n9618279cRn53119-77 CONTRACTOR: WILCOX PERMIT #: BLD2017-1119 INSPECTOR: Zelalem Zerihun JURISDICTION: City of Lynnwood WEATHER: P. Cloudy TEMP: 60's Field Data Concrete: Yes Other: Supplier: FMILES _� Plant No. Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 6:30 1 C 115 1 223496 1 5 1 70 ° 1 60 ° Location: Placement Area Retaining wall foundation at NE corner of the site <100' Remarks: Batch weights are within tolerances Please Refer To Field Repot Number: 9618279DFR5312019ZZ Inspector: I Z. Z. Reported Batch DATA Cement Type Ill I Design Actual Mix No. 0255AC Cam. Lbs. 517 F. Ash lbs. C. Agg. Lbs 1650 C. Agg. Lbs 300 C. Agg. Lbs Sand Is 1340 Water 267 Admixture 16oz Admixture Admixture Air Ent. 1.8oz ( oZ t avi > Water Added On Job Site (Gals.) 15 Field Test ASTM Method C143 C138 C1064 C173 C31 Other Laboratory Data Design Strength: E:� 4000 @ 28 days I Date Specimens Rec'd: 1 6/3/2019 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 66946-1 6/7/19 7 4.00 12.57 -- 42310 3370 1 BAW 2 ASTM C109 66946-2 6128/19 28 ASTM C617 66946-3 6128/19 28 ASTM C1231 66946-4 6/28/19 28 ASTM C1019 F] 66946-5 H OTHER Test Results Remarks: Results Reviewed By: Date: J ._. Codes for Break Types: E L 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Effective 10/3/2017 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The informatlon provided on We report is prepared fertheexalmWe use of the opera, and may not be reproduced Inaryformat wdheut the written perrlaslon oftheollem and x h&Associau:s. This report lndlcetesour lnspectersobceivaLion and testing hautts shed an si[econdltlons and oontrecterectivilies. This inlormaliar.ls eubJed b review prior m flnl submittal. By algning this report, our inspector tlose not accept responsiblllty for validtty of results, The same im mration has been provided ey othere en aft. tea. -,.rim s s ...•y GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION June 25, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. "R Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWNVlkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK Krazan and Associates, Inc. Cylinder Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Cylinder Code: 66854 Weather: Sunny Jurisdiction: City, of Edmonds Project: Doug's Lynnwood Mazda Location: 22130 Hwy 99 Client: Adzam Inc. dba Doug's Mazda Pour Date: 5/23/19 Report No: 59237 Permit No. BLD2017 1119 Engineer: B&T Engineering Architect: Ned Nelson Architect Contractor: Wilcox Construction Field Data Reported Batch Data % Air (ASTM C-231) -- Temp. (ASTM C-1064) 72 Batch Time: 11:47 AM Slump (ASTM C-143) 5-1/2" Sampling (ASTM C-172) X Sample Time: 12:30 PM Making (ASTM C-31) X Unit Wt. (ASTM C-138) -- Truck #: C114 Other -- Ticket #: 223054 Inspector: Robert Smith Design Wts. Actual Wts. Mix No. 026006C 026006C Field Notes: Cem. (Ibs) 564 560 Slab, 2nd floor SW side of site & stairs F. Ash (Ibs) -- -- Agg. 7/8" (Ibs) 1550 1540 Agg. PEA (Ibs) 300 298 Agg. 3 (Ibs) -- -- Sand (Ibs) 1500 1500 Placed by pump Water (Ibs) 250 238 Air Ent. (oz) -- -- MB POLY 997 (oz) 34.0 34.0 Other (oz) -- -- Other(oz) -- -- Other (oz) -- -- Water Added on Job (gal) -- Please refer to Field Report No. 2340 Supplier: Miles Sand & Gravel Plant Number: Site Mix: Initial Curing Temps High -Low: Consolidation Method Field Test Results Ambient Air Temperature: 65 Mechanical: X Conforming X Load Size: 10 yds Manual: Non -Conforming Sample @ cy of cy Laboratory Data Design Strength: 4,000 @ 28 days Date Specimens Rec'd: 5/24/19 Cyl. Test Field Max. Comp. Break Tested Laboratory Code Date Cure Age Dimension Area C.F. Load (Ibs) Str. (psi) Set# Type By Test Methods 66854-1 5/30/19 7 4x8 12.57 1.0 56,790 4,520 1 BAW 1 ASTM C39 X 66854-2 6/20/19 28 4x8 12.57 1.0 75,260 5,990 1 BAW 1 ASTM C109 66854-3 6/20/19 28 4x8 12.57 1.0 74,740 5,950 1 BAW 1 ASTM C617 66854-4 6/20/19 28 4x8 12.57 1.0 72,920 5,800 1 BAW 1 ASTM C1231 X 66854-5 6/20/19 28 4x8 12.57 1.0 73,320 5,830 1 BAW 1 ASTM C780 Other P.M. Review: ,/�/(/�.- Date Reviewed:& - Z S- -kcl Lab Test Results Lab Data 1 Conforming X �'2b Reviewed By: Date Reviewed: l Non -Conforming This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Cylinder Report Effective Date: 4-08-2009 MoroL 1<1QL;an&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 6/14/2019 PROJECT* 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 22214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: n41t1R979r Rnr1A19-WR CONTRACTOR: Wilcox PERMIT #: BLD 2017-1119 INSPECTOR: William Bui JURISDICTION: Lynnwood WEATHER: Cloudy TEMP: 67 ° Field Data Concrete: _ X Other: Supplier: Mlles Plant No. I Site Mix: Slump Mix Air Unit Time Truck # Ticket# %Air Inch Temp (F) Temp (F) Weight 1 3: 25 pm, C 182 1 224298 1 3.7 _ 4.8 1 73 ° 1 67 ° Location: stem walls Placement Area Remarks: Please Refer To Field Repot Number: 09618279DFR61419-WB Inspector: William Bui Reported Batch DATA Cement Type Design Actual Mix No. 0255ACI 0255AC Cam, Lbs. 517 520 F. Ash lbs. C. Agg. Lbs 1550 1541 C. Agg. Lbs 300 295 C. Agg. Lbs Sand Ibs 1340 1331 Water 315 gI 278 Admixture Admixture 16 Oz 16 Admixture Air Ent. 1.8 OZ 1.8 (oz/cm.) Water Added On Job Site (Gals.) 5 gl Field Test ASTM Method C172 C143 C138 C1064 C231 C31 H Other t Laboratory Data Design Strength: 4000 :w 28 days Date Specimens Rec'd: 6/17/2019 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. ITSetTested Strength By Brk Typ Test Method ASTM C39 67105-1 6/21119 7 4.00 12.57 -- 42420 3370 1 BAW 2 ASTM C109 67105-2 7/12/19 28 ASTM C617 ASTM C1231 67105-3 7/12/19 128 1 67105--4 7112/19 28 ASTM C1019 OTHER 67105-5 H Test Results Remarks: Results Reviewed By: Date: . Z —t'-1 Codes for Break Types: 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Effective 02/22/2018 Lynnwood (425) 485-5519 as Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The lMamretion provided on this report is prepared for the enWive use of the clent, and may r*t be reproduced many forme without the -I ten pennilmlon of the client and K-,, B Associates. This report lntllutee our impectoors dxervatlon and testing results cased.n aria conQtIon. and contractor acltvltiac This infornmtion is subject to review prior to final submittal. By signing this mourt, our inspector does not accept nespaneibiltty for validity of results. The same information has been provided by others on site. CAM.o -� & ASSOCIATES IN GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION July 2, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. ?orbk. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 HRK - Krazan& Ass ociate s,Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 22214 Hwy 99, Lynnwood, WA KA P.M.: Corbett Mercer CONCRETE REPORT NO.: o9618279CR053119-ZZ CONTRACTOR: WILCOX PERMIT M BLD2017-1119 INSPECTOR: Zelalem Zerihun JURISDICTION: City of Lynnwood _ WEATHER: P. Cloudy TEMP: 60's Field Data Concrete: Yes Other: Supplier: MILES Plant No. Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 6:30 C115 223496 5 T 70 ° 1 60 ° Location: Placement Area Retaining wall foundation at NE corner of the site <100' Remarks: * Batch weights are within tolerances Please Refer To Field Repot Number: 9618279DFR5312019ZZ Inspector: I Z. Z. 1 Reported Batch DATA Cement Type I!I I Mix No. cent. Lbs. F. Ash lbs. C. Agg. Lbs C. Agg. Lbs C. Agg. Lbs sand Ibs Water Admixture Design Actual 0255AC 517 1650 300 1340 267 160z Air Ent. 1.80z (ozl owl.) Water Added On Job Site (Gals.) 15 Field Test ASTM Method C143 C138 C1064 C173 C31 Other Laboratory Data Design Strength: 1 4000 @ 28 days Date Specimens Rec'd: [ 6/3/2019 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Birk I Typ Test Method ASTM C39 66946-1 6/7/19 7 4.00 12.57 -- 42310 3370 1 BAW 2 ASTM C109 66946-2 6/28/19 28 4.00 12.57 -- 53830 4280 1 BAW 2 ASTM C617 66946-3 6/28/19 28 4.00 1 12.57 -- 52750 4200 1 1 BAW 2 ASTM C1231 ASTM C1019 OTHER 66946-4 6/28/19 28 4.00 12.57 -- 51550 4100 1 BAW 2 66946-516/28/191 28 4.00 12.57 -- 51950 4130 1 1 BAW 2 Test Results Remarks: Conforming Results Reviewed By: ,�_ Date: —7.e2--( Codes for Break Types: Concrele Report 1 1 2 I 3 1 4 I 5 1 6 Offices Serving The Western United States Effective 10/3/2017 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The Information proridad on this report is Prepared for the excluspw use of the di and may not too reproduced In any format wthclient md the written permission of the and l4emAssociates. This S AssoThis report indicates our Inspector's oi,sa ion end testing resuts based on ate corrdtions and contractor sctivNes. Ttfl mfmma .. Is subject to renew prior to gmal submittal. By signing this report, our inspector does not accept responsibility for wlidity of resuts. The same information has been proAded by dhers on site. =� _ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION July 15, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Forett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK -■�LGiLG�<1&Associate s, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 6/14/2019 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 22214 Hwy 99 _ KA P.M.: Corbett Mercer CONCRETE REPORT NO.: n961R279CRn61619_WR CONTRACTOR: Wilcox PERMIT #: BLD 2017-1119 INSPECTOR: William Bui JURISDICTION: Lynnwood WEATHER: Cloudy TEMP: 67 ° Field Data Concrete: X Other:I Supplier: Mlles Plant No. Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 3: 25 pm C 182 224298 3.7 Location: stem walls Placement Area Remarks: Please Refer To Field Repot Number: 09618279DFR61419-WB Inspector :1 William Bui Reported Batch DATA Cement Type Design Actual Mix No. 0255AC 0255AC Cam. Lbs. 517 520 R Ash lbs. C. Agg. Lbs 1550 1541 C. Agg. Lbs 300 295 C. Agg. Lbs Sand Ibs 1340 1331 Water 315 gi 278 Admixture Admixture 16 Oz 16 Admixture Air Ent. 1.8 Oz 1.8 (czl cwt.) Water Added On Job Site (Gals.) 5 gl Field Test ASTM Method C172 C143 C138 C1064 C231 C31 Other Laboratory Data Design Strength: 4000..2 28 days Date Specimens Rec'd: 1 6/17/2019 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 67105-1 6/21/19 7 4.00 12.57 -- 42420 3370 1 BAW 2 ASTM C109 67105-2 7/12/19 28 4.00 12.57 -- 50990 4060 1 BAW 2 ASTM C617 67105-3 7/12/19 28 4.00 1 12.57 -- 50400 4010 1 BAW 2 ASTM C1231 67105-4 7/12/19 28 4.00 12.57 -- 50550 4020 1 BAW 2 ASTM C1019 67105-5 7/12/19 28 4.00 12.57 -- 50750 4040 1 BAW 2 OTHER Test Results Remarks:1 Results Reviewed By: Codes for Break Types: Al 1 2 3 Date: LLL 4 777 5 Conforming 6 Offices Serving The Western United States Concrete Report Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The Information provided on this report is prepared for the eadusive use of the client. and may no', be reproduced In any former without the written permission If the client and K sen a Associates. This report Indicates our inspaGars nbeervatlon and testing results Weed on site conditions and contractor adlvitles. This lnfarmarion is subject to review prior ta final submittal, By signing this report, our inapeetor does not accept responsibility for v,Iidfy of results, The same information has been provided by others an she. & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION September 27, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Ia / C, Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CVONIki CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK.doc ---(r0JZan&Ass ociate s, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 9/18/2018 PROJECT* 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 22214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: 09618279CR091818-W13 -1 CONTRACTOR: Wilcox PERMIT #: BLD 2017-1119 INSPECTOR: William Bui JURISDICTION: Edmonds WEATHER: Cloudv Field Data Concrete: Other: Supplier: Mlles I Plant No. Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 9: 15 1 C 055 1 212258 n/a 6 1 63 ° 1 51 ° Location: Placement Area Detention vault + elevator footing Remarks: Please Refer To Field Repot Number: 09618279DFR91818-WB Inspector : I William Bui Offices Serving The Western United States TEMP: 51 ° Reported Batch DATA Cement Type I/II 1 Design Actual Mix No. 025506C tern. Lbs. 517 517 F. Ash lbs. C. Agg. Lbs 1550 1541 C. Agg. Lbs 300 295 C. Agg. Lbs Sand lbs 1510 1499 water 310 01 279 1 31 Oz 1 31 1 Air Ent. (ozIcwt.) Water Added On Job Site (Gals.) 15 gl Field Test ASTM Method C172 C143 7 C138 C1064 7 C231 C31 7 Other Concrete Report Effective 02122/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client, and may not be reproduced In any fort wftho it the written permission of the client and K—n 8 Associates. This report indicates our inspector's obsenalian anti testilg rewlts based on site ccrltldians and contractor aetivi ies. This information is subject to review prior to final submittal. By signing this report, our Inspector does not accept responsibility for validity or results_ The same information has been provided by others on sbe. =- Krazan&Associate s,Inc. Geotechnical Engineering - Environmental Engineering Construction Testing and Inspection DATE: 9/18/2018 PROJECT* 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 22214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: n9618279CRn91818-WIR -2 CONTRACTOR: Wilcox PERMIT* BLD 2017-1119 INSPECTOR: William Bui JURISDICTION: Edmonds WEATHER: Cloudy TEMP: 55 ° Field Data Concrete: Other: Supplier: Mlles Plant No. Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 11: 05 1 C 185 1 212280 n/a 1 6 1 66 ° 1 55 ° Location: Placement Area Detention vault + elevator footing Remarks: Please Refer To Field Repot Number: 09618279DFR91818-WB Inspector :1 William Bui Reported Batch DATA Cement Type Design Actual Mix No. 025506C Cam. Lbs. 517 512 F. Ash lbs. C. Agg. Lbs 1550 1540 C. Agg. Lbs 300 295 C. Agg. Lbs Sand Ibs 1510 1499 Water 31091 279 Admixture Admixture Admixture 31 Oz 31 Air Ent. ( Oz / cm, ) Water Added On Job Site (Gals.) 15 gl Field Test ASTM Method C172 C143 7 C138 C1064 C231 C31 Other Laboratory Data Design Strength: 4000 @ 28 days I Date Specimens Rec'd: 1 9/19/2018 Cyl. Code Test Date Field Cure Age l Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 ASTM C109 ASTM C617 STM C1231 ASTM C1019 OTHER 64308-1 9/25/18 7 4.00 12.57 -- 52870 4210 2 BAW 2 64308-2 10/16/18 28 2 64308-3 10/16/18 28 1 2 1 64308-4 10/16/18 28 2 64308-5 H 2 Test Results Remarks: Results Reviewed By: I Date: .. Z Codes for Break Types: 1 c 2 R 3 � i 4 5 6 Offices Serving The Western United States Concrete Report Effective 0212212018 Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 The infarmatbn providetl on This report is preparetl ferthe exclusive use of the ct", antl may not be sp-luced in an/format whhout the wdben permissicn of Ihs client aM Krean 8 Associates. This report IMiosdm our inspectors observor on and testing results baser) on site wrMi ions and corar ac ractothilles. This Information is subject fo review prnrto final submittal. By signing this report, our insped,r does not accept responsibility for validity of results. The same Infomiatlon has been pmvidad by others on sae. & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION October 18, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Corbett Project o C WNVlkj TES, INC. ,ab Manager Division CC: CITY OF EDNIONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) BELT ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK.doc __Krazx I&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 10/4/2018 PROJECT #: 09618279 PROJECT: Doug Lynnwood Mazda _ LOCATION: 22214 Hiw_ay 99 _ KA P.M.: Jeff Mercer Field Data Concrete: 025506C Other: CONCRETE REPORT NO.: 09618279CR100418-JA -1 CONTRACTOR: WILCOX PERMIT #: BLD 2017 1119 INSPECTOR: Joseph Aranas JURISDICTION: City of Edmonds WEATHER: Partly Cloudy TEMP: 45 ° Supplier: MILES SAND & GRAVEL f Plant No. . Site Mix: Slump Mix Air Unit Time Truck# Ticket# %Air Inch Temp (F) Temp (F) Weight . 7:58 1 C082 111703 5 52 ° 1 45 ° Location: Vault Wall Placement Area Remarks: Place in a pump and Boom. Mechanically Consolidated. Admixture:MB POLY 997 Please Refer To Field Repot Number: Inspector Joseph Aranas Reported Batch DATA Cement Type Actual Mix No. UZbbUbl: UZbbUb Cem. Lbs, 517 515 F. Ash lbs. C. Agg. Lbs 7/e#571550 1540 C. Agg. Lbs PEA#8 300 296 C. Agg. Lbs Sand lbs 1510 1504 Water 258 258 Admixture31 Oz 31 oz Air Ent. (�ZI awl.) Water Added On Job Site (Gals.) 19 Field Test ASTM Method C172 C143 H C138 C1064 C231 C31 Other Laboratory Data Design Strength: 4000 @ 28 days Date Specimens Rec'd: 10/9/2018 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 64524-1 10/11/18 7 4.00 12.57 -- 53750 4280 1 BAW 1 ASTM C109 64524-2 1111/18 28 1 ASTM C617 64524-3 11/l/18 28 1 ASTM C1231 64524-4 11/1/18 28 1 ASTM C1019 64524-5 H 1 OTHER Test Results Remarks: Results Reviewed By: Date: Codes for Break Types: 1 2 3 4 71 5 6 Offices Serving The Western United States Concrete Report Effective 0212212018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Ths inf—ti.n provldet-this repo" is prepared for the exclusive use of the client, end may not be reproduced in any fonnotwtthout the~ pennsslon of the clieMand Waeen B Associates. This nifnl lMkatecour inspectors observation and testing results based on site cool ons end -natter activities. This Inf.—.tin is -bled to review prior to final submittal, By slgning this report, our Inspector does not accept reapo,Mbility for validity of results. The same information has been provided by dhors on, site. mill i"M �i .razoui&Associates,Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 10/4/2018 PROJECT* 09618279 PROJECT: Doug Lynnwood Mazda _ LOCATION: 22214 Hiway 99 KA P.M.: Jeff Mercer Field Data Concrete: 025506C Other: CONCRETE REPORT NO.: 09618279CR100418-JA -2 CONTRACTOR: WILCOX PERMIT #: BLD 2017 1119 INSPECTOR: Joseph Aranas JURISDICTION: Ci of Edmonds WEATHER: Partly Cloudy TEMP: 48 ° Supplier: MILES SAND & GRAVELI Plant No. Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 9:46 1 C141 i 111715 1 j 5_1 54 ° 1 48 ° Location Vault Wall Placement Area Remarks: Place in a pump and boom. Mechanically Consolidated. Admixture: MB POLY 997 Please Refer To Field Repot Number: Inspector: I Joseph Ara as 7-71 Reported Batch DATA Cement Type I/II Design Actual Mix No. 025506C 025506C Cem. Lbs. 517 520 F. Ash lbs. C. Agg. Lbs 7ren57 1550 1556 C. Agg. Lbs PEAK 300 296 C. Agg. Lbs sand Ibs 1510 1506 Water 258 258 Admixture 31 oz 31 oz Admixture Admixture Air Ent. (oz / avt. ) Water Added On Job Site (Gals.) Field Test ASTM Method C 172 C143 C138 C1064 C231 C31 H Other Laboratory Data Design Strength: 4000 @ 28 days Date Specimens Rec'd: 10/9/2018 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 64525-1 10/11/18 7 4.00 12.57 -- 50230 4000 2 BAW 1 ASTM C109 ASTM C617 ASTM C1231 ASTM C1019 OTHER 64525-2 11/1/18 28 2 64525-3 11/1/18 128 1 2 64525-4 11/1/18 28 2 64525-5 H 2 Test Results Remarks: Results Reviewed By:j Date: Ij Codes for Break Types: YP l 1 2 t �� J°.1 3 ( 4 } I L 5 6 Offices Serving The Western United States Concrete Report Effective 02122/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared forihe exclusive use of the client, and may rwf be reproduced in any former without the written permission of the client and 14aaen & Associates. This report indicates our Inspector's observation and tenting resuga based on sRe conditions and contractoraetivitles. This Infernagon a mblect to revie v prior to Mal submittal. By signing this repa:, our Inspector does nor accept responsibility for valldily oinsects. The same information has been pronded by othm m sfte. Kral &Associates,Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 10/4/2018 PROJECT #: 09618279 PROJECT: Doug Lynnwood Mazda LOCATION: 22214 Hiway 99 KA P.M.: Jeff Mercer Field Data Concrete: 0255AC Other: CONCRETE REPORT NO.: 09618279CR100418-JA -3 CONTRACTOR: WILCOX PERMIT #: INSPECTOR: Joseph Aranas JURISDICTION: WEATHER: Partly Cloudy Supplier: `MILES SAND & GRAVEL PlantNo.l 1 Site mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight L 11:00 [ C 138 1 111727 6 4 55 ° 50 ° Location Placement Area • Spread footing grid line @ 2/B,C, 3/B,C,D,F, 4/B,C,D,E,F. • Continuous footing grid line @ 1-5/A,1/A-F,2-4/F-F3,4-6/F3,5/C-F3 • Combine footing 3-3.5/E. Remarks: Place in a pump and Boom. Mechanically Consolidated. Admixture:MB POLY 997,MBAE90 Please Refer To Field Repot Number: Inspector: I Joseph Aranas TEMP: 50 ° Reported Batch DATA Cement Type 1 1/11 Design Actual Mix No. 0255AC 0255AC Cem. Lbs. 517 515 F. Ash lbs. C. Agg. Lbs 7/8#57 1550 1550 C. Agg. Lbs PEAK 300 297 C. Agg. Lbs Sand Ibs 1340 2333 Water 267 267 Admixture 170Z 17oz Air Ent. 2 20oz 2.20oz (OZ/Cwt.) Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 N C138 C1064 C231 C31 Other Laboratory Data Design Strength: 3000 @ 28 days I Date Specimens Rec'd: 1 10/9/2018 Cyl. Code Test Date I Field Cure Age Dia. Area wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 ASTM C109 64526-1 10/11/18 7 4.00 12.57 -- 50820 4040 2 BAW 1 64526-2 11/1/18 28 2 ASTM C617 ASTM C1231 ASTM C 1019 OTHER 64526-3 11/1/18 28 2 64526-4 11 /1 /18 28 2 64526-5 H 2 Test Results Remarks: Results Reviewed By: Date: Ir Codes for Break Types: I. 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is preparedfor the excivalve use of the client, and may not be reproduced in any`ormetwlthout the witten permission of the olientand Wamn 8 Associates. This report Indicates our inspectersobservefion and leimg resufts based on she conaNws end contractor actwhes. This information Is sutyset to review prior to final submittal. ey signing this report. our Inspector doas not accept responsibility for validity of results. The same intonation has been provided by others on site. �KrQzan&Ass ociate s, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 9/18/2018 PROJECT #: 09618279 PROJECT: Dou 's Lynnwood Mazda LOCATION: 22214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: n9R1R279CR091R1R_WR _1 CONTRACTOR: Wilcox PERMIT #: BLD 2017-1119 INSPECTOR: William Bui JURISDICTION: Edmonds WEATHER: Cloudv TEMP: 51 ° Field Data Concrete: Other: Supplier: Mlles _ Plant No. Site Mix: Slump Mix Air Unit Time Truck # Ticket# %Air Inch Temp (F) Temp (F) Weight 9: 15 1 C 055 1 212258 n/a 1 6 63 ° 51 ° Location: Placement Area Detention vault + elevator footing Remarks: Please Refer To Field Repot Number: 09618279DFR91818-WB Inspector:1 William Bui j Reported Batch DATA Cement Type Ill I Design Actual Mix No, 025506C Cem. Lbs, 517 517 F. Ash lbs. C. Agg. Lbs 1550 1541 C. Agg. Lbs 300 295 C. Agg. Lbs Send lbs 1510 1499 Water 310 ql 279 Admixture 31 Oz 31 Air Ent. ( oz / cwt. ) Water Added On Job Site (Gals.) 15 gl Field Test ASTM Method C172 C143 H C138 C1064 C231 C31 Other Laboratory Data Design Strength: E 4000 g 28 days Date Specimens Rec'd: 9/19/2018 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load j Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 64307-1 9/25/18 7 4.00 12.57 — 60600 4820 1 BAW 2 ASTM C109 ASTM C617 64307-2 10/16/18 28 4.00 12.57 -- 73060 5810 1 BAW 2 64307-3 10/16/18 28 4.00 12.57 — 73490 5850 1 BAW 2 ASTM C1231 64307-4 10/16/181 28 4.00 12.57 -- 73370 5840 1 BAW 2 ASTM C1019 OTHER 64307-5 10/16/181 28 4.00 12.57 -- 73520 5850 1 BAW 2 Concrete Report Test Results Remarks: Conforming Results Reviewed By: Date: III 71 Codes for Break Types:AL ✓ �, ^isV i 1 2 3 4 L� 5 6 Offices Serving The Western United States Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on Na report is prepared for the exclusive use of the client, and may not be reproduced In em/ format wRhgfl Me wrRter. permission of the chard and Kramn 8 Associates. This report IMkates our Inspedor5 obwrvalicn and testing resulhr band on site—difions and contractor activities. This information Is subject to revi-f dmto final submdtel. By signing Nis report, our Inspector does not accept responsibllity forwiidity of resuhs. The, same information has been provided by others an site. AIV .-OKrazamAssociates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 9/18/2018 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 22214 Hwy 99 KA P.M.: Corbett Mercer Field Data Concrete: Other: CONCRETE REPORT NO.: 0961827SCRO91818-WB -2 CONTRACTOR: Wilcox PERMIT #: BLD 2017-1119 INSPECTOR: William Bui JURISDICTION: Edmonds WEATHER: Cloud Supplier: Miles Plant No. Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 11: 05 C 185 1 212280 n/a 6 j 66 - 1 55 - I f Location: Placement Area Detention vault + elevator footing Remarks: Please Refer To Field Repot Number: 09618279DFR91818-WB Inspector : i William Bui TEMP: 55 Reported Batch DATA Cement Type Design Actual Mix No. 025506C Cem. Lbs. 517 512 F. Ash lbs. C. Agg. Lbs 1550 1540 C. Agg. Lbs 300 295 C. Agg. Lbs Sand lbs 1510 1499 Water 31091 279 Admixture Admixture Admixture 31 Oz 31 Air Ent. ( oz l cwt. ) Water Added On Job Site (Gals.) 15 gl Field Test ASTM Method C172 C143 C138 C1064 C231 C31 H Other Laboratory Data Design Strength:[__..40OU 28 days Date Specimens Rec'd: �911912018j Cyl. Code Test Date Field I Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 ASTM C109 ASTM C617 ASTM C1231 ASTM C1019 OTHER 64308-1 9/25/18 7 4.00 12.57 -- 52870 4210 2 BAW 2 64308-2 10/16/18 28 4.00 12.57 -- 66920 5320 2 BAW 2 64308-3 10/16/18 1 28 4.00 1 12.57 -- 67120 1 5340 2 BAW 2 64308-4 10/16/18 128 4.00 1 12.57 -- 67390 5360 2 BAW 2 64308-510/16/18 28 4.00 12.57 -- 67630 5380 2 BAW 2 Test Results Conforming Remarks: Results Reviewed By: Date: L Codes for Break Types: 1 2 3 4 5 �6 Offices Serving The Western United States Concrete Report Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The intamannn provided on this report is prepared W the exclusive use of the client, and may not be reproduced in any tormat vAthmul the written permission of the dient and Krumn & Associates. This report Indloafes our irepechx's steamboat and Iwting results based on site oondlions antl oonfreclor activiliss. This Information is subject W review prior to final submittal. By signing this report, our Inspector does not accept responsibllity for validity of results. The same information has been provided byoUv on s . 'aZan & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION November 2, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. 4A rett W.Mercer Project Manager/Lab Manager Pacific Northwest Division C WNVlkj CC: CITY OF EDMONDS (E-MAIL.) NED NELSON ARCHITECT (E-MAIL) B8&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK.doc aZl&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 10/4/2018 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 22214 Highway 99 KA P.M.: Corbett Mercer Field Data Concrete: 025506C Other: CONCRETE REPORT NO.: 09618279CR100418-JA -1 CONTRACTOR: WILCOX PERMIT #: BLD 2017-1119 INSPECTOR: Joseph Aranas _ JURISDICTION: City of Edmonds WEATHER: Partly Cloudy TEMP: 45 ° Supplier: I MILES SAND & GRAVEL Plant No. Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 7:58 C082 111703 5 1 52 ° 1 45 0 Location: Vault Wall Placement Area Remarks: Place in a pump and Boom. Mechanically Consolidated. Admixture:MB POLY 997 Please Refer To Field Repot Number: Inspector: I Joseph Aranas Reported Batch DATA Cement Type Ill I Actual Mix No. I UZbbUt% ULbbUI Cem. Lbs. 1 517 1 515 F. Ash lbs. C. Agg. Lbs 7/U57 155a 1540 C. Agg. Lbs PEA#8 3001 296 C. Agg. Lbs Sand Ibs 1510 1504 Water 258. 258 Admixture 31 oz 31 oz Air Ent. (Oz/c t.) Water Added On Job Site (Gals.) 19 Field Test ASTM Method C 172 C143 H C138 C1064 C231 C31 Other Laboratory Data Design Strength:] 4000 w 28 days Date Specimens Rec'd: 10/9/2018 Cyl. Code Test Date Field Cure Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 64524-1 10/11/18 4.00 12.57 -- 53750 4280 1 BAW 1 ASTM C109 64524-2 11/1/18 281814.00 12.57 -- 68480 5450 1 BAW 2 ASTM C617 ASTM C1231 1 ASTM C 1019 64524-3 11/l/18 1 28 4.00 12.57 — 68650 5460 1 BAW 2 64524-4 11/1/18 28 4.00 12.57 -- 68780 5470 1 BAW 12 64524-5 11/1/18 28 4.00 1 12.57 -- 68570 5460 1 BAW 12 1 OTHER Test Results Remarks: Results Reviewed By: Date: .. Y ( Conforming Codes for Break Types: ` L t ✓ 1 ri.. t 2 1�f4 3 (((� 4 {�{ 5 6 Offices Serving The Western United States Concrete Report Effective 0212212018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Theinfonnallwprovkedanthl. report is prepared for the exclusive use of the client• and may not be reproduced In any fo—d wlthoulthe written permission of the diets and lQemn B Associates. This report indicates our inspectors observation and testing results based waft codbom and contractor a.is. This information Is subject to review prior to final submittal. By agning this report, our Impactor does not accept resporrsibility furvelkily of results. The same in%a ion has been provided by adhere on slte. --=t razan&Associates,Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 10/4/2018 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda_ _ LOCATION: 22214 Highway 99 KA P.M.: Corbett Mercer Field Data Concrete: 025506C Other: CONCRETE REPORT NO.: 09618279CR100418-JA -2 CONTRACTOR: WILCOX PERMIT* BLD 2017-1119 INSPECTOR: Joseph Aranas _ JURISDICTION: City of Edmonds WEATHER: Partly Cloudy TEMP: 48 ° Supplier: MILES SAND & GRAVELS Plant No. j Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 9:46 1 C 141 1 111715 1 5 1 54 ° 1 48 ° Location: Vault Wall Placement Area Remarks: Place in a pump and boom. Mechanically Consolidated. Admixture: MB POLY 997 Please Refer To Field Repot Number: Inspector: I Joseph Aranas Reported Batch DATA Cement Type n Actual Mix No. I UL55Utj U255U( Cam. Lbs.1 517 1 520 F. Ash lbs. C. Agg. Lbs 7/8#57 1550 1556 C. Agg. Lbsj PEA#8 3ool 296 C. Agg. Lbs Sand Ibs 1510 1506 water 258 258 Admixture 31 oz 31 oz Air Ent. (oz/CWt.) Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 H C138 C1064 C231 C31 Other Laboratory Data Design Strength:! 4000 28 days j Date Specimens Rec'd: 1 10/9/2018 Cyl. Code I Test Date Field Cure Age Dia. Area wt. # Max Load Comp. Strength Set # Tested By Birk Typ Test Method ASTM C39 ASTM C109 ASTM C617 ASTM C1231 64525-1 10/11/18 7 4.00 12.57 -- 50230 4000 2 BAW 1 64525-2 11/1/18 28 4.00 1 12.57 -- 63290 5040 2 BAW 1 64525-3 11/1/18 28 4.00 12.57 -- 63630 5060 2 BAW 1 64525-4 11/1/18 28 4.00 12.57 -- 63560 5060 2 BAW 1 ASTM C1019 OTHER 64525-511/1/18 28 4.00 12.57 -- 63740 5070 2 BAW 1 Test Results Remark;:7 Results Reviewed By: Date: Conforming Codes for Break Types:L � 1 rrr' 2 � •ll 3 4 5 6 Offices Serving The Western United States Concrete Report Effective 021222018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the evalusive use of the client, and may not be reproduced in any formatvAhori the written permission of Me cllerdand lPzan B Associates. This report indicatesourinap 1W observation and testing results based on sfte condNms and contractor activities. This informadon is sutlect to review prior to flrai s ornihd. By signing this report, our inspector does not accept reaponsibllity ter valldlty of results. The same inknnad n has been provided byathen: on ehe. �KI'aZan & A s s o c i a t e s, I n c. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 10/4/2018 PROJECT #: 09618279 PROJECT: Dou 's Lynnwood Mazda LOCATION: 22214 Highway 99 KA P.M.: Corbett Mercer Field Data Concrete: 0255AC Other: CONCRETE REPORT NO.: 0961827SCR100418JA -3 CONTRACTOR: WILCOX PERMIT #: BLD2017-1119 INSPECTOR: Joseph Aranas JURISDICTION: _C� of Edmonds WEATHER: Partly Cloudy TEMP: 50 ° Supplierl MILES SAND & GRAVELI Plant No. Site Mix: Slump Mix Air Unit Time Truck# Ticket# %Air Inch Temp (F) Temp (F) Weight 11:00 _ C 138 j 111727 J 6 1 4 j 55 ° 1 50 ° Location: Placement Area • Spread footing grid line @ 2/B,C, 3/B,C,D,F, 4/B,C,D,E,F. • Continuous footing grid line @ 1-5/A,1/A-F,2-4/F-F3,4-6/F3,5/C-F3 • Combine footing 3-3.5/E. Remarks: Place in a pump and Boom. Mechanically Consolidated. Admixture:MB POLY 997,MBAE90 Please Refer To Field Repot Number: Inspector. I Joseph Aranas Reported Batch DATA Cement Type I/ll Design Actual Mix No. I 0255AC I 0255AC Cern-Lbs.1 517 1 515 F. Ash lbs. C. Agg. Lbs 7/8#57 1550 1550 C. Agg. Lbs PEA#8 300 297 C. Agg. Lbs Sand Ibs 1340 2333 Water 267 267 ldmixture 17oz 17oz Air Ent. 12 20OZ 12.20OZ ( Oz / cvtrt. ) Water Added On Job Site (Gals.) Field Test ASTM Method C 172 C143 H C138 C1064 C231 C31 Other Laboratory Data Design Strength: 3000 @ 28 days Date Specimens Rec'd: 10/9/2018 Cyl. Code Test Date Field Cure Age Dia. Area wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 64526-1 10/11/18 7 4.00 12.57 -- 50820 4040 2 BAW 1 ASTM C109 ASTM C617 ASTM C1231 ASTM C1019 OTHER 64526-2 11 /1 /18 28 4.00 12.57 -- 62800 5000 2 BAW 1 64526-3 11/1/18 28 4.00 12.57 -- 62560 4980 2 1 BAW 1 64526-4 11/1118 28 4.00 12.57 -- 62400 4960 2 BAW 1 64526-5 11/1/18 L 28 4.00 12.57 -- 62740 4990 2 BAW 1 Test Results Conforming Remarks: Results Reviewed By: Date: _ Codes for Break Types:v,) 1 2 i 3 4 --� L ll i� 5 LL 6 Offices Serving The Western United States Concrete Report Effective 02122/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is preparedfor the exclusive use of the client, and may not be reproduced in any format arimmall the Written permission of the client and Kr ns Assooiales. This report indicates our Inspectors obsevalion and testing resuls based on rile conditions end conbactoractitdties. This information is subject to review prior to final submittal. By signing this report, our inspectordoes not accept responsibilhy for valldfiy of results. The same informs im hes been provided by others on ails. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION November 20, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. C- orbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK AQL�an Associates,lnc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 10/22/2018 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 22214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: noaia��or_aim��n_ewT CONTRACTOR: Concrete Structures NW, LLC PERMIT #: BLD2017-1119 INSPECTOR: Christopher Wilson/Tuven Tran JURISDICTION: City of Edmonds WEATHER: Partly Cloudv TEMP: 49 ° Field Data Concrete: 025506C Other: Supplier: MILES SAND & GRAVEL Plant No. Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight [_2:25pml C187 1 614083 1 5 62 ° 1 49 ° Location: Placement Area Footing along line 5 from A to F3 Remarks: The concrete was placed by using a pump truck and was mechanically vibrated for the method of consolidation. Included in the concrete mix was #57 (7/8"), PEA#8, SAND CLASS 2, M8 POLY 997, Cement type 1-11, and water. Please Refer To Field Repot Number: 0961 8279DFR1 0222018CWT. DOC Inspector : Chris Wilson / Tuyen Train Laboratory Data Design Strength: 1 3000 psi @ 28 days Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strengtl 64753-1 10/29/18 7 4.00 12.57 -- 61570 4900 64753-2 11 /19118 28 4.00 12.57 -- 75040 5970 64753-311/19/18 28 4.00 12.57 -- 76470 6080 64753-4 11/19/181 28 4.00 12.57 -- 76300 5990 64753-5 11/19/181 1281 4.00 12.57 -- 75160 5980 Remarks: Codes for Break Types: Concrete Report By: Reported Batch DATA Cement Type Design Actual Mix No. 025506C 025506C Cem. Lbs. 517 515 F. Ash lbs. C. Agg. Lbs (7/8)1550 1546 C. Agg. Lbs (PEA) 300 300 C. Agg. Lbs Sand lbs (loss 2) tsto 1508 water 31 ql 19.3 gl Admixture (POLY) 31 Oz 30.8 oz Admixture Admixture Alr Ent ( oz / cwt. ) Water Added On Job Site (Gals.) 10 Field Test ASTM Method C172 C143 C138 C1064 C231 C31 I Other Date Specimens Rec'd: f 10/23/2018 Set Tested Brk # BY I TYF 1 BAW 2 1 BAW 1 1 BAW 1 1 BAW 1 1 BAW 1 1 1 2 1 3 1 4 I u5 Offices Serving The Western United States ASTM C39 ASTM C109 ASTM C617 ASTM C1231 ASTM C1019 OTHER 6 Test Results Conforming Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The infonnati.lo—ided onthisrepcd is prepared for theewl—e use of the client, and may not be reproduced in any format without the written permission of the client and Kraaan B Associates. This report indicates our inspectors obswdlon and testing results based on site conditionsand can tractor acdvttles. This IMametim is subject b review prbr b f d wbmitbl. 9Ysigning ttris rappt our inapeda does nM accept raspmsibiliryfa Widliy M results. The same iMam m has been Ixovided byothera m d . GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 6, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Q(ki)L (-- Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK ...!-d KfsaZan & A s s o c i a t e s, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 11 /7/2018 PROJECT* 09618279 PROJECT: Dou 's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Jeff Mercer CONCRETE REPORT NO.: 09R1A979CR11f171R_SR CONTRACTOR: Wilcox Construction PERMIT #: BLD2017 1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds WEATHER: Partly Cloudy Field Data Concrete: X Other: L Supplier: MILES Plant No. X Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 12:30 1 183 1 214782 1 Placement Area Location: Concrete was poured on wall of the building. Grid 1 to 5 through Grid A to F3. Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 140 yd3 was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFR11072018SS Inspector: I Susheel Sharma TEMP: 50 ° Reported Batch DATA Cement Type Design Actual Mix No. 0255AC 0255AC Cam. Lbs. 517 516 F. Ash lbs. C. Agg. Lbs #57 1550 1544 C. Agg. Lbs #8 300 296 C. Agg. Lbs Sand Ibs 1340 1329 Water 267 246 Admixture 17 17 Admixture Admixture Air Ent. 2.2 2.1 (oz / cm.) Water Added On Job Site (Gals.) 1 15 Field Test ASTM Method C172 C143 C138 C1064 C231 C31 H Other Laboratory Data Design Strength: 3000 @ 28 days Date Specimens Rec'd: , 11/8/21 Cyl. Test Field Wt. Max Comp. Set Tested Brk Test Method Code Date Cure Age Dia. Area # Load Strength # By Typ ASTM C39 64929-1 11/14/18 7 4.00 12.57 -- 51660 4110 1 BAW 1 ASTM C109 64929-2 12/5/18 28 4.00 12.57 -- 59460 4730 1 BAW 1 ASTM C617 64929-3 12/5/18 28 4.00 12.57 -- 58450 4650 1 BAW 1 ASTM C1231 64929-4 12/5/18 28 4.00 12.57 -- 60080 4780 1 BAW 1 ASTM C1019 64929-5 12/5/18 28 4.00 12.57 -- 59200 4710 1 BAW 1 OTHER EE L -- Test Results Remarks: Results Reviewed By: Date: Conforming j Codes for Break Types: Ell Y � 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Effective 02/2212018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 as Tacoma (253) 939-2500 The Intormetbn pmided on this report is prepared for the aKclusive — of the client, and may not be reproduced in any format without the wdltm permission of the client and Wazan 8 Associates. This report indicates our Inspedcr's observation and lasting results based on afe conditions and contractor actlMles. This information is subject to review prat to foal audmi8el. By signing this report, our inspector does not accept responsibility for validity of results. The same informellon has been provided by others on site. AN GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 13, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. f �A JJ,, - �, Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK JIM KIaZM& Ass oci ate s, I nc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection DATE: 12/3/2018 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda _ LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: 09618279CR120318-SS -1 CONTRACTOR: Wilcox Construction_ PERMIT* BLD2017 1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds _ WEATHER: Partly Cloudy TEMP Field Data Concrete: X Other: F- Supplier: MILES Plant No. L X Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 6:33 1 C115 1 215864 1 7 1/4 60 ° 35 ° Placement Area Location: Concrete was poured on wall of the foundation slab of building. Grid 1 to 5 through Grid A to F.3 Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 170 yd' was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFR12032018SS Inspector : Susheel Sharma 35 ° Reported Batch DATA Cement Type Design Actual Mix No. 18400F6 18400F6 Cam. Lbs. 450 451 F. Ash lbs. 70 73 C. Agg. Lbs #571650 1650 C. Agg. Lbs #8 200 196 C. Agg. Lbs Sand Ibs 1490 1475 Water 258 259 Admixture 31 31 Air Ent. (oz / cWt. ) Water Added On Job Site (Gals.) 10 Field Test ASTM Method C172 C143 I C138 C1064 C231 C31 Other Laboratory Data Design Strength: 3000 @ 28 days Date Specimens Rec'd: 12/4/2018 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 ASTM C109 65156-1 12/10/18 7 4.00 12.57 -- 45460 3620 1 BAW 1 65156-2 12/31/18 28 ASTM C617 ASTM C1231 ASTM C 1019 65156-3 12/31/18 28 65156-4 12/31/18 28 65156-5 H OTHER Remarks: Results Reviewed By: rM t ��I Date: Codes for Break Types: j I 1 5 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Test Results Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The Information provided on this raped is prepared f, the escl,,we use of fhe client, and may ,the reproduced in any formal without the ymiten permisslon of the clent and Krseen H Assoclates. This report Indicates our inspect,', abseryation old testing results based on site condbions and contractor activities. This Information is subject to review prior to final submittal. By slgniig Ihls report, our inspeclor does not accept responsibillty for validity of results. The same Information has been provided byethera on sde. IMAM ?�=' 1 K1 aan8iAssociates,Incc Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 12/3/2018 PROJECT #: 09618279 PROJECT: Dou 's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: 09618279CR120318-SS -2 CONTRACTOR: Wilcox Construction PERMIT #: BLD2017 1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds WEATHER: Partly Cloudy TEMP: 35 ° Field Data Concrete: X Other: Supplier: MILES Plant No.l X Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 9:40 1 C184 1 215889 7 1 64 ° 35 ° Location: Placement Area Concrete was poured on wall of the foundation slab of building. Grid 1 to 5 through Grid A to F.3 Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 170 yd3 was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFR12032018SS Inspector: Susheel Sharma 1 Reported Batch DATA Cement Type Design Actual Mix No. 18400F6 18400F6 Cam. Lbs. 450 446 F. Ash Ibs. 70 69 C. Agg, Lbs #57 1650 1644 C. Agg, Lbs #8 200 198 C. Agg. Lbs sane ibs 1490 1484 Water 258 259 Admixture 31 31 Air Ent. (oz / cwt. ) Water Added On Job Site (Gals.) 1 Field Test ASTM Method C172 C143 7 C138 C1064 C231 C31 Other Laboratory Data Design Strength: 1 3000 @ 28 days ] Date Specimens Rec'd: 1 12/4/2018 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 65156-1 12/10/18 7 4.00 12.57 -- 48920 3890 2 BAW 1 ASTM C109 65156-2 12/31/18 28 ASTM C617 65156-3 12/31/18 28 ASTM C1231 65156-4 12/31/18 28 ASTM C 1019 65156-5 H OTHER Remarks: Results Reviewed By: JUDate: —( N !Codes for Break Types:x0 ." P ) '�i� 11 L9 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Test Results Effective 0212212018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The Information provided on this mood is prepared for the exclusive use of the ciisnt, and may not be reproduced in any format wrthoul the written pemllssion of the client and K— B Aasooiates. This report indlcatea our inspeclMs observation and testing results based on site eanditions and contractor activPJes. This Information Is subject to review prior to final submittal By signing this mpod, our inspector does not accept responsibility for validity of results. The same information has been pmvided by others on she. Irs &ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 17, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 Willi Offices Serving the Western United States 09618279 BRK K1az;an&Ass ociate Sir Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 12/6/2018 PROJECT #: 09618279 PROJECT: Dou 's Lynnwood Mazda LOCATION: T2214 Hwy 99, Edmonds KA P.M.: Corbett Mercer CONCRETE REPORT NO.: 09618279CR120618-YA -1 CONTRACTOR: Wilcox PERMIT #: BLD2017 1119 INSPECTOR: Yosief Abraha JURISDICTION: Edmonds WEATHER: cloudy Field Data Concrete: x _ 1 Other: Supplier: MILES Plant No. 125 Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 2:00 1 C084 1 216116 1 6 1 60 ° 1 38 ° F j Location: Placement Area Wall (main level @ grid 5/C-D) and Footing (main level at grid D/5.5- 6) Remarks: The contractor placed the concrete using a pump truck and mechanical vibrator was used for consolidation. Please Refer To Field Repot Number: 09618279DFR1262018YA Inspector:1 Yosief Abraha TEMP: 38 ° Reported Batch DATA Cement Type Design Actual Mix No..18400F6 .184001`6 Gem. Les. 450 450 F. Ash lbs. 70 69 C, Agg. Lbs 7/8 1650 1644 C. Agg. Lbs 3/8 200 196 C. Agg. Lbs Sand Ibs 1490 1481 Water 31 l 29 I Admixture MB POLY 31oz 29oz Air Ent. (Oz/cwt.) Water Added On Job Site (Gals.) 10 Field Test ASTM Method C172 C143 C138 C1064 C231 C31 Other Laboratory Data Design Strength:1 3000psi @ 28 days I Date Specimens Rec'd: 1 12/7/2018 Cyl. Code I Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 ASTM C109 65201-1 12/13/18 7 4.00 12.57 -- 50540 4020 1 BAW 2 65201-2 1/3119 28 ASTM C617 ASTM C1231 65201-3 1/3/19 28 65201-4 1/3/19 281 ASTM C1019 I OTHER 65201-5 H I Remarks: f Results Reviewed Codes for Break Types: Concrete Report 1- 1 2 1 "3" 1 `4 Offices Serving The Western United States Test Results Tt—�, j 0 � Li5 6 Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prsoared 'or the —imim use of the client, and may not be reproduced in any format without the written permission of the client and Kwan B Associates. This report indicates our, inspector's observation and testing results based on site conditions and cuntrsclnr iimivdies. Ile Information is subject to revtew prior to Mal submiltal. By signing this report, our inspector does not accept respnnalblltly for validly of results. The same information has beer provlded by others on she. 'All ��VVQL an&Associates,Inc. _ Geotechnical Engineering as Environmental Engineering Construction Testing and Inspection DATE: 11/14/2018 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 22214'Hm 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: 09618279CR111418-DS CONTRACTOR: Wilcox PERMIT #: BLD2017-1119 INSPECTOR: Daniel Sleeman JURISDICTION: Lynnwood WEATHER: Cloudv Field Data Concrete: X Other: Supplier: Mlles Sand & Gravel _ Plant No. Site Mix: Slump Mix Air Unit Time Truck # Ticket # %Air Inch Temp (F) Temp (F) Weight 11:15 1 C082 1 113805 1 - 7.25 65 ° 1 51 Location: Placement Area Southwest corner of vault lid Grid line A/6 Remarks: Conveyed by pump truck, mechanically consolidated Please Refer To Field Repot Number: 09618279DFR111418DS Inspector :1 Daniel Sleeman Laboratory Data Cyl. Code Test Date Field Cure Ag 65007-1 11 /15/18 1 65007-2 11 /21 /18 7 65007-3 12/12/18 28 65007-4 12/12/18 28 65007-512/12/18 28 65007-612112/18 28 65007-712/12/18 28 Concrete Report Design Strength: 4000 28 days e Dia. Area Wt. # Max Load Comp. Strengtt 4.00 12.57 -- 8670 690 4.00 12.57 -- 52930 4210 4.00 12.57 -- 73430 5840 4.00 12.57 -- 75550 6010 4.00 12.57 -- 74410 5920 4.00 12.57 -- 75040 5970 4.00 12.57 -- 74670 5940 Remarks:! Results Reviewed ; Codes for Break Types: 1 I' 11 t, TEMP: 51 ° Reported Batch DATA Cement Type Ill I Design Actual Mix No. 025506C Cam. Lbs. 512 F. Ash lbs. C. Agg. Lbs #57 1542 C. Agg. Lbs #8 296 C. Agg. Lbs Sand Ibs 1498 water 245 Admixture MB POIV997 31 oz Air Ent. ( oz / cwt. ) Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 H C138 C1064 C231 C31 Other Date Specimens Rec'd: j 11/15/2018 Set Tested Brk # By Typ 1 BAW 2 1 BAW 1 1 BAW 1 1 BAW 1 1 BAW 1 1 BAW 1 1 BAW 1 ASTM C39 ASTM C109 ASTM C617 ASTM C1231 ASTM C1019 OTHER Test Results I _ Conforming 1 2 3 4 Offices Serving The Western United States Effective 0212212018 Lynnwood (425) 485-5519 as Poulsbo (360) 598-2126 as Tacoma (253) 939-2500 The intonation p,oMefen this report is prelom for theexdusive use of the client, and may not be reproduced in any format Mhout the wrinen p,�lsslonoftheclientandi°azan&Associates.Thisreportindlcatesourinspect%',observationand Ratingmsubbasedonsitecondki a and —li actor adlvilles. This information is subject to review poor to final submiaal. By signing Nls report, cur inspector does not accept responslbllity for validity of r 11s. The same information has been provided by others on s#a. tea` •w�i GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 18, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. '�Jj Corbett W. Mercer �' Project Manager/Lab Manager Pacific Northwest Division C WM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK =-KraZM& Ass oci ate s, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 12/10/2018 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer Field Data Concrete: X Other: CONCRETE REPORT NO.: 09618279CR121018-SS -1 CONTRACTOR: Wilcox Construction PERMIT #: BLD2017 1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds WEATHER: Partly Cloud TEMP: 44 ° Supplier: MILES Plant No. 1 X Site Mix. Slump Mix Air Unit Time Truck # Ticket # IN, Air Inch Temp (F) Temp (F) Weight 8:30 1 C 114 1 216179 4.8 6 1 53 ° 1 44 ° Location Placement Area Concrete was poured on the footing of building. Grid 5 to G through 'B to A Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 8 yd' was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFR12102018SS Inspector:1 Susheel Sharma Reported Batch DATA Cement Type Ill I Design Actual Mix No. 0255ACI 0255AC Cem. Lbs. 517 515 F. Ash Ibs. C. Agg. Lbs #57 1650 1657 C. Agg. Lbs #8 300 295 C. Agg. Lbs Sand Ibs 1340 1335 Water 267 237 Admixture 16 16 Admixture Admixture Air Ent. 1.8 1.75 (oz/cwl.) Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 C138 C1064 C231 C31 Other Laboratory Data Design Strength: L 3000 @ 28 days 1 Date Specimens Rec'd: 1 12/11/2018 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 65223-1 12/17/18 7 4.00 12.57 -- 54220 4310 1 BAW 1 ASTM C109 65223-2 1 /7119 28 ASTM C617 65223-3 1/7/19 1 28 1 ASTM C1231 65223-4 1/7/19 28 ASTM C1019 65223-5 H OTHERLd Test Results Remarks: Results Reviewed By: Date: Codes for Break Types: i 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Effective 0212212018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the evclusive use of the client, and may not be reproduced in any format without the mitten permission of the client and Kwan B Ass --as. ua,,,pat,rdteatssour inspector's observation and testing rasuas based on site conditions and contractor activities, This Information s subject to review prior to Mat submittal. By signing this epod, as Inspector does not accept responsild l'tly for valldlty of rasutls. The same information has been provided by oth— on site. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 19, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. P'.1 Cl- Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK MEAML -1&Associates,Inc. _ Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection DATE: 12/12/2018 PROJECT #: 09618279 PROJECT: Dou 's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: 09618279CRI21218-SS -1 CONTRACTOR: Wilcox Construction PERMIT #: BLD2017 1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds WEATHER: Cloud TEMP: 46 ° Field Data Concrete: X Other: Supplier: MILES Plant No. X Site Mix: Slump Mix Air Unit f Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 1:50 C 183 216286 5.2 1 7 3/4 1 56 ° 1 46 ° Location Placement Area Concrete was poured on wall of the building (1) Grid 5 to 7 through Grid 'B (2) Grid A to Grid C through Grid 7 (3) Grid 6 through Grid C to D (4) Grid D through Grid 5 to Grid 6 Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 15 yds was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number:- 09618279DFR12122018SS Laboratory Data Cyl. Code Test Date Field Cure 65255-1 12/19/18 65255-2 1 /9/19 65255-3 1 /9/19 65255-4 1 /9/19 Remarks: Inspector :I Susheel Sharma Design Strength: 3000 28 days Wt. Max Comp. Ige Dia. Area # Load Strength 7 4.00 12.57 --F 53240 4240 Reviewed Codes for Break Types: Concrete Report Reported Batch DATA Cement Type Design Actual Mix No. 0255AC 0255AC Cam. Lbs. 517 512 F. Ash lbs. C. Agg. Lbs #57 1650 1644 C. Agg, Lbs #8 300 296 C. Agg. Lbs Sand Ibs 1340 1333 Water 267 247 Admixture 16 16 Air Ent. 1.8 1 1.7 ( Oz / cwt. ) Water Added On Job Site (Gals.) 10 Field Test ASTM Method C 172 C143 C138 C1064 C231 C31 Other Date Specimens Rec'd: 1 12/13/2018 Date: Set Tested Brk # By Typ 1 BAW 11 esA» 1 1 2 13 -q 5 Offices Serving The Western United States Test Methc ASTM C39 ASTM C109 ASTM C617 ASTM C1231 ASTM C1019 OTHER 6 Test Results Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The infomation provided -this report is prepared for the mcl'usive use of the client, and may:mt be reproduced in any formal without the written permission of the cfent and Kman 8 Aasectates. This report ine icates our inspeslm's obee-flon and resting results based on site conditions and contractor activdies. This information Is subject 0 review pno final submittal. By signing this mpert, our inspector doors not accept responsibility, for validity of results. The same lnfonnatim has been provided bydhers on site. I r �r � �w.w GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 21, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. %r Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWMilkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198m Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK == K ari &Associates,lnc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Date: 12/14/2018 Project #: 09618279 Project: Doug's Lynnwood Mazda Location: 22214 Hwy 99 KA P.M.: Corbett Mercer MASONRY GROUT REPORT #: 09618279MGR121418-JT -1 Contractor: Wilcox Permit #: BLD2017-1119 Inspector: Joseph Taylor Jurisdiction: City of Lynnwood Weather: Cloudy Temp: 45 ° Field Data( GROUT ) Supplier Cadman Plant No. 33 Site Mix Slump Grout Temp. Air Temp. Max/Min Temp. Time Truck# Ticket # % Air (in.) (F) (F) (F) 7:36 440 584612 N/a 9.5 64 ° 45 ° Grout Box Used Number of units used to form specimens x Placement Area: Elev mech room 1-2/D-E Remarks: Pumped and vibrated pment Numbers: Inspector: Josepn 1 aylor Reviewed By: rtemarKs Results Reviewed By Codes for Break Types: Reported Batch Data Mix No. 35MG708 Design Actual Weights Weights cem.lbs. 658 659 F. Ash lbs. C. agg. lbs. t #8 821 821 C. agg. lbs. 2 C.agg. lbs. 3 Sand lbs. 1887 1884 Water lbs. 425 414 Air Ent. (oz) Other(oz) Other(oz) Other(oz) Other(oz) Water Added (gai.) Date Reviewed / TT VT a 5 0 1 2 3 4 5 6 Field Test Methods ASTM C143 ASTM C138 ASTM C1064 ASTM C173 ASTM C31 Other ASTM C231 Offices Serving The Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Form 04103 Eff°°ti- 10/32017 1 hein1'onna(ien provided oar this re port is prepared for the °fthe client- and rugnot be r.W.d.—J iu any format tvithnul the written permission of the client and Kraian&Associates. lhisreporhndicat� our in,p ,', ob—li , ud testing results hard -site ouditinns and cmriractar activities'Phis infomration is subj- to review prior In final ob,nitlul, Hysigning this reporl. our inspeclnrdoesout accept respmsihility for mhdily.1 dls. Tho same infarmdion hm tb— provided by others nn Ale. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 31, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS Doug's Lynnwood Mazda 22214 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. O,A,� Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) BELT ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK --=�'aZa1Z&Associate s, Inc. Geotechnical Engineering as Environmental Engineering Construction Testing and Inspection DATE: 12/3/2018 PROJECT #: 09618279 PROJECT: Doug's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: 09618279CR120318-SS -1 CONTRACTOR: Wilcox Construction PERMIT #: BLD2017 1119 INSPECTOR: Susheel Sharma JURISDICTION: City of Edmonds WEATHER: Partly Cloudy Field Data _ Concrete:I X Other: Supplier: MILES Plant No. X Site Mix: Slump Mix Air Unit Time Truck # Ticket # % Air Inch Temp (F) Temp (F) Weight 6`3 1 C115 1 215864 1 7 1/4_1 60 ° 1 35 ° 1 j Placement Area Location: Concrete was poured on wall of the foundation slab of building. Grid 1 to 5 through Grid A to F.3 Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 170 yd' was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFR12032018SS Inspector: ( Susheel Sharma j Laboratory Data Design Strength: 3000 a, 28 days j TEMP: 35 ° Reported Batch DATA Cement Type 1 1/11 Design Actual Mix No, 18400F6 18400F6 Cam. Lbs. 450 451 R Ash lbs. 70 73 C. Agg. Lbs #57 1650 1650 C. Agg. lbs #8 200 196 C. Agg. Lbs Sand lbs 1490 1475 Water 258 259 Admixture 31 31 Admixture Admixture Air Ent. (Oz/cWt.) Water Added On Job Site (Gals.) 10 Field Test ASTM Method C172 C143 C138 C1064 C231 C31 H Other Date Specimens Rec'd: 1 12/4/201 Cyl. Code I Test Date Field Cure Age Dia. Area Wt. # Max Load Comp. Strength Set # Tested By Brk Typ Test Method ASTM C39 65156-1 12/10/18 7 4.00 12.57 -- 45460 3620 1 BAW 1 ASTM C109 65156-2 12/31/18 28 4.00 12.57 -- 65600 5220 1 BAW 1 ASTM C617 65156-3 12/31/18 28 4.00 12.57 -- 65360 5200 1 BAW 1 ASTM C1231 65156-4 12/31/18 28 4.00 12.57 -- 64990 5170 1 BAW 1 ASTM C1019 65156-512131/18 28 4.00 12.57 -- 67120 5340 1 BAW 1 OTHER Concrete Report Test Results Remarks: Results Reviewed By: Date: j Conforming E { I" . Codes for Break Types: Ell � , 1 2 3 4 5 6 Offices Serving The Western United States Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The Information provided on this report is prepared for the mcluslve use of the client, and may not be reproduced in any formal vvilhoid the vnishm permission of the client and Krazen&Assoclates. This report indicates eur inspm Ws observation and testing results based on site coikfions and oentraotor acinvi iee This information is subject to review prior to foal subnaft. By signing this report, our inspector does not accept responsibility for validfy, of resufs. The same Informaton has been pmvided by Where on site. ..!JKMZC-U1 &Associates, Inc_ Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 12/3/2018 PROJECT #: 09618279 PROJECT: Dou4's Lynnwood Mazda LOCATION: 2214 Hwy 99 KA P.M.: Corbett Mercer CONCRETE REPORT NO.: 09618279CR120318-SS -2 CONTRACTOR: Wilcox Construction PERMIT #: BLD2017 1119 INSPECTOR: Susheel Sharma _ JURISDICTION: City of Edmonds WEATHER: fartly Cloudy Field Data Concrete:j X Other: Supplier:{ MILES Plant No. X� Site Mix: Slump Mix Air Unit Time Truck # _ Ticket # %Air Inch Temp (F) Temp (F) Weight 9:40 C 184 215889 1 7 64 '_L 35 ° Placement Area Location: Concrete was poured on wall of the foundation slab of building. Grid 1 to 5 through Grid A to F.3 Remarks: The contractor placed the concrete by pump and was mechanically consolidated and screed. Total 170 yd3 was casted which is a coloured one. One set of (5: 1- 7 days , 3-28 days and 1 Hold ) 4X8 cylinder were made. Please Refer To Field Repot Number: 09618279DFR12032018SS Inspector : F- Susheel Sharma TEMP: 35 ° Reported Batch DATA Cement Type Design Actual Mix No. 1840OF6 1840OF6 Cem. Lbs. 450 446 F. Ash lbs. 70 69 C. Agg. Lbs #57 1650 1644 C. Agg. Lbs #8 200 198 C. Agg. Lbs Sand Ibs 1490 1484 Water 258 259 Admixture 31 31 Admixture Admixture Air Ent. (oz / am. ). Water Added On Job Site (Gals.) Field Test ASTM Method C172 C143 C138 C1064 C231 C31 H Other Laboratory Data Design Strength: 3000 @ 28 days Date Specimens Rec'd: 12/4/2018 Cyl. Code Test Date Field Cure Age Dia. Area Wt. # Max Load Conn­P1 Strength Set # Tested By Birk Typ Test Method ASTM C39 65156-1 12/10/18 7 4.00 12.57 -- 48920 3890 2 BAW 1 ASTM C109 65156-2 12/31/18 28 4.00 12.57 -- 68180 5420 2 BAW 2 ASTM C617 65156-3 12/31/18 1 28 4.00 1 12.57 -- 68760 5470 2 BAW 2 ASTM C1231 ASTM C1019 V 65156-4 12/31/18 28 4.00 12.57 -- 69260 5510 2 BAW 2 65156-512/31/18 28 4.00 12.57 -- 69140 5500 2 BAW 2 OTHER Test Results Remarks: Results Reviewed By: Date:Conforming Codes for Break Types: 1 2 3 4 5 6 Offices Serving The Western United States Concrete Report Effective 02/22/2018 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The ln/ermann provided on this report is prepared for the escluslre use of the client, and may not be reproduced in arty format whhsut the vrtitten permission of the client and Kraran 8 Associates. This report indiceles our inspector's bibs ... tW and testing results based m site contltllons and cord,acber aotivdies. This inrunnabion is subject to review prior to Mal submittal. By signing this report, our Inspector does not accept responsibility for validity of results. The same information Ins been provided by others on site. Kr ;am azan & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION January 2, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, N & ASSOCIATES, INC. o W. ercer Project Manager/Lab Manager Pacific Northwest Division C WNVikj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc _ ___Kj-azm&As sociate s,Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection WELDING INSPECTION REPORT NO.: 18279SSR122718-DL DATE: 12/27/2018 CONTRACTOR: Wilcox / Blue Star Weldin_r PROJECT M 09618279 PERMIT #: BLD2017 1119 PROJECT: Dougs Mazda Lynnwood INSPECTOR: David Lane LOCATION: K� 99 Lynnwood Washington JURISDICTION: City of Lynnwood KA P.M.: Jeff Mercer f WEATHER: rain TEMP: 44 ° STRUCTURAL STEEL ❑ FIELD FISHOP WELDING F71 VISUAL ❑ MATERIAL ID Item(s) Inspected: Field welded connections of: A) Shear Tabs to embeds as per C/S4.2 B) HISS Column Splices C) Beam -over CMU Wall Connection as per L/S4.2 D) Pan Deck Stud welding and fastening. Location: Gridlines A-F3/1-5 Welder qualification I certification verified for: WABO qualifications verified for active BlueStar welders Position: ❑✓ FLAT ❑ VERTICAL ❑ OVERHEAD ❑ HORIZONTAL ❑ Filler Metal: Process: ❑ SMAW ❑✓ FCAW ❑ SAW ❑ GMAW ❑ Other: Weld Type: ❑ FILLET ❑ C.P. ❑ PLUG ❑ P.P. ❑ Other: Weld Size: ❑ 3/16" ❑ 1/4" ❑ 3/8" ❑ 5/16" ❑ Other: Codes: 0 AWS ❑ AISC ❑ ASME ❑✓ IBC ❑ Other: ❑� NOTES ❑ DISCREPANCIES 100 % COMPLETE krnved onsrte as per dispatch. Performed periodic visual inspection of the following field welded items: A) Shear Tabs to ;mbeds as per C/S4.2 were inspected along the perimeter of gridlines A-F/1-5. B) The 3 HSS Column Splices were visually nspected. As per the detail the weld joint was a 5/16" partial -penetration weld with a pre -placed internal sleeve in each HSS ;olumn. Due to the welds being completed, the fit -up, depth of preparation, and placement of the internal sleeve could not be lerified. C) The Beam -over CMU Wall Connection as per L/S4.2 was also included in the inspection, the welding was )crformed as -detailed but the bolt holes do not line up for attachment of beam to embed. Additional bolt holes or reaming of E) holes required for bolted connection. D) Pan Deck Stud welding and fastening was inspected at the above listed grid ;oordinates. Stud spacing and count was verified. Decking section laps were secured along the perimeter with shot pins in ;very valley. All seams were punched with proper spacing. All inspected welds were visually acceptable as per AWS D1.1, `lause 6 criteria. 0 Oev4d C Law CWt 1503w1 OC1 r--(P. 3l1rAg1t To the best of my knowledge, the above perfo med in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Puyallup (253) 939-2500 Structural Steel Report Revision 2 Effective 0122I2013 The information provided on this report is prepared f the exclusive use oflhe client.'nis report may aot be reproduced in any formal without the written permission ofthe client and Kraran & Assoeiales. This report indicates our inspectors obs tiem and resting reaulls based en site emrditlons and cortlrapor activities. This information is subject to review prior to f al mbnainal. By signing this report, our inspector does not accept responsibilily For validity ofresults. Ile same information has been provided by others on site. .. _ ;an & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 31, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, AN & ASSOCIATES, INC. 7 Corbett . Mercer Project . anager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09619279 DFR-doc �M<MZ Lll&Associates,Inc. _ Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection WELDING INSPECTION REPORT NO.: 09618279SSR123019-IV DATE: 12/30/2019 CONTRACTOR: WILCOX PROJECT #: 09618279 PERMIT #: BLD2018-1498 PROJECT: Dou 's L nnwood Mazda INSPECTOR: Itiaj Vahora LOCATION: 22214 Hwy 99 JURISDICTION: KA P.M.: Corbett Mercer WEATHER: Cloud TEMP: 46 ° STRUCTURAL STEEL ❑ FIELD F1 SHOP WELDING 0 VISUAL ❑ MATERIAL ID Item(si Inspected: Column- C1, C2, C3, C4, C5(2), C6(2) Location - Blue Star Welding- 6059 Guide Meridian, Bellingham WA Welder qualification / certification verified for: on file Position: ❑ FLAT ❑ VERTICAL ❑ OVERHEAD ❑ HORIZONTAL ❑ Filler Metal: Process: ❑ SMAW ❑ FCAW ❑ SAW ❑ GMAW ❑ Other: Weld Type: ❑ FILLET ❑ C.P. ❑ PLUG ❑ P.P. ❑ Other: Weld Size: ❑ 3/16" ❑ 1/4" ❑ 3/8" ❑ 5/16" ❑ Other: Codes: ❑ AWS ❑ AISC ❑ ASME ❑ IBC ❑ Other: NOTES ❑ DISCREPANCIES 100 % COMPLETE site per request for post weld visual inspect tils and AWS D1.1 section 6 requirements. ota18 columns inspected. To the best of my knowledge, the above WAS performed in accordance with approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Structural Steel Report Effective 10/312017 The information provided on this report is prepared for the exclusive use ofthe client. Tl is reportmay not be reproduced inany forne[without the written pnmission of the clientand Knven R. Associates. This report indicates our tospeclors observation and testing results based on siteconditi-s and cocamtm activities. This information is subject to review prior to final submittal. By sipi4 this report, our impeetm deev not accept responsibility for validity of results. The same information has been provided by others on site. 'aZ a1 &ASSOCIATES, INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION January 8, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. � 1,aJc.. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 Ass ociate s, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFRI32019EL DATE: 1/3/2019 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: PROJECT: Dou 's Lynnwood Mazda INSPECTOR: Edan Lewis LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P.M.: Corbett WEATHER: Cloudy TEMP: 40' F Krazan representative arrived on site as requested for proprietary anchor inspection for the connection between the existing foundation into future elevated slab deck on the first level of the building. Upon arrival, it was found that contractor had drilled holes into the existing foundation for the placement #4 rebar dowels @16" O.C. with minimum of 5" embedment. Simpson Set-XP epoxy was used for all anchors installed today. Approximately 75+ holes were anchored along the entire perimeter of the building. Representative observed the cleaning out of the holes, the embedment depth and the placement of the epoxy grout and rebar. Anchors were installed per manufacturer and industry standards. Reviewed By: JU kk,,- ASTM Test #: TAsset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This reportmay not be reproduced in any format without the written permission of the client and Kraran & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittaL By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. -�-- C1 & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION January 10, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, 7AN & ASSOCIATES, INC. . orbett tW­Mlercer Project Manager/Lab Manager Pacific Northwest Division CWNVIki CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198' Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doo Page 1 of 2 � an&Associates,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR182019JD-0 DATE: 1/8/2019 Set Count: 0 CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Doul's Lynnwood Mazda INSPECTOR: Jeff Dewey LOCATION: 22214 HWY 99 JURISDICTION: City of Edmonds KA P.M.: Corbett Mercer WEATHER: Rain TEMP: 41 A representative of Krazan and Associates arrived on -site as scheduled to perform construction observation. While on -site we observed that reinforcing steel had been placed prior to our arrival to the project site for the second level slab on grade and the second level slab on metal deck. Reinforcing steel was observed for grade, size, ties, splices, spacing, cleanliness, subgrade condition, and general overall placement. Reinforcing steel appeared to be placed as per the contract drawings and governing documents. Shane, superintendent with Wilcox, was notified of all observations prior to Krazan departing the project site. Second Level Slab on Metal fleck Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the occlusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krann & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site, _ Page 2 of 2 &Associate s, I nc. Geotechnical Engineering a Environmental Engineering Construction Testing and Inspection IN Field Report NO.: 09618279DFR182019JD-0 Second Level Slab on Grade _ _ 01'•-� p A CA —.AY WrMM - CAe'r pINrWPC rfPralr.K rRrr ■ :.^"d ror L rra;y [�I ma 1' �1J M M CA WAY W" M EIIFIIPM 9wl E iw Y3f AT a YlR NW1DN LaW .11r VapR WIA W1N1 E G-Ia Ok.IPF M 1M[ L MnNla IEIWIr PIaI .115 PCi BLOOI OFM4IYA NL FYIWdr INN LPr xAr P017AV COMOEI LAnIs 9lYL E WM1ACRwn Mdl M R6C1Am1FB NpAfr 6'AAY idol L� f v1 • lanr` — 110 Prno mM,x 'ppre((A(�am rArau . EIIItO1rLY sm f WL E RJUIm YP5 lMiAL I�IL COIrIGETlE1K�� � f1n1q M Wffi�ekaal.W: OImEM YASORf b E MOlIDMEEerP�6aBM YMi,W�I !ALL Iltl�nMY �YpICM Nei IMM7M�rff m AlMaar� 1A1i1' HAOt tlalW Oa1RI.�i a BAAWBq ALL AFMa®i N fr �� a lalfl.' AOrtO[A B[RI W M M Bao eWce � • �' P �B ryvsw. uii M a +R cal c-val 1RY V. Am c mw W.7a rtRrrR A L »tIFF a. opme R rear. d tWr aas MOeda m mm r fo We ammr as L A}R;' , " POa swiigt SCHEDULE ■ t�Pior SM VAL E MM" M AM M�. max K G.�aoo M ter Ay P AM a719Y awl E B " 6I,,= r$ w d10J 000CY rM colt m M! ML K F f-Y IOm A i-Om rf e pvxr- o[iFv krRi 1r•r oa) as E PBOIMEd FM ALL'KI � B[LA1L S3£ dl A" II= an. •la MMIw. or mMONq FW= a VALM MAIMC A moat S><cuzr. "M WE PO R (a1F) M xvar Brs IBM aA onfor'.; tons C S ', tad! SOMM IG . MM r SrT.MRL CPO dl WAI ElaWCllmn A We 70-W11- UP= A EMN ....... S BmEs mom t-p= n MM M i6imt . 1 1/l RKM 05 BAPS k SuLmA Ne! A .. Y1100(plimpam" 0 MP MOpC KIH GOB ...... ...3/{ dmES (}It BAR k 9IAILFA) .... t 1%= DIM U4 k Pa BAIfs) rBWiB antamm� uV Wales "I S SM M M W ASW AM1. OFFOIYWD BARS I/sE0 IN a� ffl[Pr� YA15 awl COl1aa A ASaI AIMS Ot Ada ■!> ul, SM RAM awl MWM To AM Ail (I,.3M P51), MM115 NOT VCM awl E 1/4' OWWWR rdIET MDMK ALL MM W E BY WARD E1F�OB4 S — usE FlMW E7o EIEORIOOFS, mafllNFQa ILNOFA510 E APPOMfL EOOAL NALL ILL IIOIES !1N NABS AS EELIFlFD BY WM XMm1 IALLM NMO Od REM ON OBAB711M K40M 9113 10 E A-307. MM IM75 MID COMga, WALL MW MUMN UMMOT M Me TAM£ IN&I Reinforcing Steel Notes from the Contract Drawings B FOPA BrON:C rPCL�,1 ARR.RY'>JEr] rye IItIK 4 �?Q. w1AC P'4o rrMrA f T`M QK§g -am lgr.�+cLEPEIM �111 oft "UM d[1 a rmvs n �e3s Q ARe1 r Uk7PFa NO: A WOOD M Npt BOLE &L W KS SIa 1 irw BOLT. Maw CUT 501 PIAIE NO COKMIT A- 7M ➢NERK d1W MAING PER M 6 o11mK" Max IKK BALM' ODON M ON mm BOUT Reviewed By: ASTM Test #: Asset Number(s): To the best of my knowledge, the above WAS performed for information purposes only. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 a Poulsbo (360) 598-2126 r Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report May not be reproduced in any format without the written permission of the client and Kraaan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. AM JOEBIM & ASSOCIATES. INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION January 11, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, N & ASSOCIATES, INC. Tett W: Mercer Project Manager/Lab Manager Pacific Northwest Division CWWlkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198t' Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 1 � &Associate s,Inc. Geotechnical Engineering a Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR192019SS-1 DATE: 1/9/2019 Set Count: 1 CONTRACTOR: Wilcox Construction PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Dou 's Lynnwood Mazda INSPECTOR: Susheel Sharma LOCATION: 22214 Hwy 99 JURISDICTION: Cit. of Edmonds KA P.M.: Jeff Mercer WEATHER: Shower TEMP: 431 F Krazan & Associates arrived on site per request for concrete inspection on time. Monitored load tickets, batch weights and water allowances. Concrete started poured by 6:10 am and completed by 11:30 am. Contactor placed 219 yd3 of concrete from plant of MILES Sand & Gravel. Contractor poured concrete from pump at the slab (main level) of the building at (1) Grid A to F3 through Grid 1 to 7 Set 1: Mix Code : 026006C : Permit No : BLD20171119: Disv Ticket No:216998 r. Slab on the buildin,2 One set of five cylinders (4X8) were made for compressive strength testing. Break scheduled for one in 1-16-19, three in 2-6-19 and one is kept for hold. Contractor used pump truck to transport the concrete and was mechanically consolidated. Designed strength of this concrete is 4000 psi. See Cylinder report 09618279CRO10919-SS-1 for break results. Set 2: Mix Code : 026006C : Permit No : BLD20171119: Disu Ticket No:217014 rd. Slab on the building One set of five cylinders (4X8) were made for compressive strength testing. Break scheduled for one in 1-16-19, three in 2-6-19 and one is kept for hold. Contractor used pump truck to transport the concrete and was mechanically consolidated. Designed strength of this concrete is 4000 psi. See Cylinder report 09618279CRO10919-SS-2 for break results. Site Photo 1: Concreting on slab (main level) of the buildings Reviewed By: ASTM Test #: I I Asset Number(s): To the best of my'* �)wledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: _ Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kraxan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. ..�-7� & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION January 14, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc '%AZM&Associates,Inc. Geotechnical Engineering a Environmental Engineering Construction Testing and Inspection DATE: 1 /10/2019 PROJECT #: 09618279 PROJECT: Dou 's Lynnwood Mazda LOCATION: 6059 Guide Meridian KA P.M.: JSM STRUCTURAL STEEL ❑ FIELD F11 SHOP WELDING WELDING INSPECTION REPORT NO.: 09618279SSR011019-DB CONTRACTOR: Blue Star PERMIT #:�15 INSPECTOR: Dave Bale JURISDICTION: Edmonds WEATHER: cloudy TEMP: 52 ° FIVISUAL ❑ MATERIAL ID Item(s) Inspected: 1/4" fillet welds for stair stinger assemblies, ST201, ST202, ST203, and for plate attachment to column C200. Also 1/8" fillet welds for connecting treads to stingers. Welds as per Blue Star Welding shop plans Welder qualification / certification verified for: Position: ❑✓ FLAT ❑ VERTICAL ❑ OVERHEAD Process: ❑ SMAW ❑✓ FCAW ❑ SAW Weld Type: ❑✓ FILLET ❑ C.P. ❑ PLUG Weld Size: ❑ 3/16" ❑✓ 1/4" ❑ 3/8" Codes: ❑✓ AWS ❑ AISC ❑ ASME NOTES DISCREPANCIES Welds ❑ ❑ HORIZONTAL GMAW ❑ ❑ Filler Metal: Other: ❑ P.P. ❑ Other: ❑ 5/16" IBC ❑ Other: ❑ ❑ , Other: 100 % COMPLETE AWS D1.1 visual criteria 1/8" To the best of my knowledge, the above performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Structural Steel Report Effective ] 0/3@Olt The int lion provided on this report is prepared for the exclusive use ofthe climt. This report maymi be reproduced in any fbrmat without the written permission ofthe diem a ad Kramn&Associates. This report indimtes our inspectors obmmtim and testing results based on site conditions and eontrador activities. This information is subject to review prim to final submittal. By signing this report, our inspector does not awopt re Wmil ility for validityofresdts. The same information has been provided by others on site. & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION February 25, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, AN & ASSOCIATES, INC. ett . Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc e �g Page 1 of 1 --, &Associates, I nc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR2192019DK DATE: 2/19/2019 Set Count: CONTRACTOR: Wilcox/Fairweather PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Mazda Lynnwood . �yY1�,ri, INSPECTOR: Don Keller LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P.M.: WEATHER: TEMP: Inspected the placement of ASTM A615 GR60 reinforcing steel for cmu walls @1&B-E 111 lift (0'-4'), @1&A-B, @E&3-4, @A&1-5,and @5&A-B 2nd lift (4'-8') Main Level. A,C,E,M,Q/S4.1, typ. Details S2.3, GSN, S 1.2. 5/31/16. Verified mix #35MG708 3,500 psi grout (2,000 psi required) provided by Cadman. Observed the placement of (10.0) cubic yards for areas stated above. Load placed continuously and within 90 minutes of batch time. Grout discharged into hopper and conveyed with pump. Grout mechanically consolidated twice as required. Cast 1 grout box @A&1 21 lift @8:15, mix 64; air 40, slump 8". As per contractor's request and Architect's direction cast 1 set of masonry prism @E&3 21 lift, @8:40, mix 64, air 40, slump 8". ,V�� 16 }, Reviewed Bv: To the best of my know] regulatory requirements. ASTM Test #: Asset the above WAS performed in accordance with the approved plans, specifications and Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittaL By signing this report, our inspector does not accept responsibility for validity of resins. The same information bas been provided by others on sit& & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION February 25, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, AN & ASSOCIATES, INC. ett . Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc e �g Page 1 of 1 --, &Associates, I nc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR2192019DK DATE: 2/19/2019 Set Count: CONTRACTOR: Wilcox/Fairweather PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Mazda Lynnwood . �yY1�,ri, INSPECTOR: Don Keller LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P.M.: WEATHER: TEMP: Inspected the placement of ASTM A615 GR60 reinforcing steel for cmu walls @1&B-E 111 lift (0'-4'), @1&A-B, @E&3-4, @A&1-5,and @5&A-B 2nd lift (4'-8') Main Level. A,C,E,M,Q/S4.1, typ. Details S2.3, GSN, S 1.2. 5/31/16. Verified mix #35MG708 3,500 psi grout (2,000 psi required) provided by Cadman. Observed the placement of (10.0) cubic yards for areas stated above. Load placed continuously and within 90 minutes of batch time. Grout discharged into hopper and conveyed with pump. Grout mechanically consolidated twice as required. Cast 1 grout box @A&1 21 lift @8:15, mix 64; air 40, slump 8". As per contractor's request and Architect's direction cast 1 set of masonry prism @E&3 21 lift, @8:40, mix 64, air 40, slump 8". ,V�� 16 }, Reviewed Bv: To the best of my know] regulatory requirements. ASTM Test #: Asset the above WAS performed in accordance with the approved plans, specifications and Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittaL By signing this report, our inspector does not accept responsibility for validity of resins. The same information bas been provided by others on sit& ram:: i i —w & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION February 28, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KI ZAN & ASSOCIATES, INC. Ctvrbett \N . Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 Will: Offices Serving llte Western United States 09618279 DFR.doc Page 1 of 1 r= Kraza8tAss ociate s, I nc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR2262019DB DATE: 2/26/2019 Set Count: CONTRACTOR: Wilcox _ PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Doug's Mazda INSPECTOR: Dave Bale LOCATION: 22214 Hwy 91 JURISDICTION: Edmonds KA P.M.: JSM WEATHER: sunny TEMP: 42 On site for reinforced masonry inspection. Grouted 8" CMU walls on grids A — 1 to 5, 5 - A to B.5 1 — A to C from 16' to 20' & on grids 1 — D to E and E — 1 to 5 from 8' to 12'. Reinforcing steel placement as per details A/S4.1 and on S2.3 masonry details. Grout placed by grout pump and mechanically consolidated. 10 cubic yards of mix #35MG708 supplied by Cadman for F'c = 2000. Cast four grout specimens for strength tests. Reviewed To the best of my knowl regulatory requirements. ASTM Test #: Asset Numberfs the above WAS performed in accordance with the approved plans, specifications and Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. Tbc same information has been provided by others on site. OF - AM ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION March 7, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, AN & ASSOCIATES, INC. r ett WfMercer Project Manager/Lab Manager Pacific Northwest Division CWMllkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 KIWan& A s s o c i a t e s, I n c. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection DATE: 3/4/2019 Field Report NO.: 09618279DFR342019DB Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Dou g's L nnwood Mazda INSPECTOR: Dave Bale LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P.M.: JSM WEATHER: sunny TEMP: 32 On site for reinforced masonry inspection. Today's grout pour was cancelled without notice to Krazan and Associates. Reviewed ASTM Test #: Asset To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. jga iiOF '�i &ASSOCIATES NC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION March 12, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. ett . Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 J(JWan 8, A s s o c i a t e s, I n C. Field Geotechnical Engineering 9 Environmental Engineering Construction Testing and Inspection Report NO.: 09618279DFR382019DK DATE: 3/8/2019 Set Count: CONTRACTOR: Wilcox/Fairweather Masonry PROJECT #: 09618279 PERMIT #: PROJECT: Dougg's Mazda of Lynnwood INSPECTOR: Don Keller LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P.M.: WEATHER: TEMP: Verified mix #35MG708 3,500 psi grout (2,000 psi required) provided by Cadman. Observed the placement of (5.0) cubic yards of grout for cmu walls @E&1-3.5, @1&E-D3rd lift (8'-12'). Grout placement scheduled for 8:00 am. I' load arrived on site @8:30. Load rejected by contractor @8:45 due oversized aggregate in mix. The aggregate was greater than the required 3/8" aggregate per approved design. 2nd load arrived on site @10:30. Contractor experienced an equipment malfunction with the pump @11:10. Contractor could no repair pump in a timely manner. 90 minutes had elapsed from batch time and the contractor rejected 3.0 of the 5.0 cubic yards delivered to the site. Grout that was placed was mechanically consolidated twice as required. Cast 1 grout box @E&1 3rd lift (8'-12') @11:00, mix 64, air 40, slump 9". - -k. 7z Reviewed By: �xASTM Test #: To the best of my fledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kra & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. lab= GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION March 15, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, AN & ASSOCIATES, INC. ett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CW W]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 1<17aZan &Associates,InC. Field Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection DATE: 3/13/2019 Report NO.: 09618279DFR3132019DB Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: PROJECT: Dou 's Lynnwood Mazda INSPECTOR: Dave Bale LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds _ KA P.M.: JSM WEATHER: partly cloud TEMP:47 On site for reinforced masonry inspection. Solid grouted 8" CMU walls for 4' lift on grid 5 — `B to A and 2nd lift for 8" CMU walls on grids C - 6 to 7, 6 — C to D, 7 —'A to C. Reinforcing steel placement as per detail on C/S4.1 and S2.3 masonry details. Grout placed by grout pump and mechanically consolidated. 7 cubic yards of mix # 35MG708 supplied by Cadman for F'c 2000. Cast four grout specimens for strength tests. c -- Reviewed By: ; ASTM Test #: Asset Number s): To the best of my kn edge, t e above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Puyallup (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kra an & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. ;.� .KraZaL� &ASSOCIATES, INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION March 25, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KR. AN & ASSOCIATES, INC. orbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 41`= m zan&Assoeiates,Inc. Field Geotechnical Engineering • Environmental Engineering Report NO.: 09618279DFR3212019TR Construction Testing and Inspection DATE: 3/21/2019 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: PROJECT: Doug's Mazda INSPECTOR: Taylor Rooney LOCATION: 22214 Highway 99 JURISDICTION: City of Edmonds KA P.M.: Jeff Mercer WEATHER: Sunny TEMP: 65' F Inspected Masonry wall construction for the top of wall lift located E/1-4, 1/A-E, A/1-5, 5/13'-A. Masonry wall construction was checked for square, plumb, block size, mortar type and joints, reinforcing steel size, grade, spacing, lap, and clearances, and embedded items. Mortar was basalite type S. Masonry wall construction appeared to conform to the details on S2.3 of approved plans and specifications. Inspected grouting of the masonry walls located E/1-4, 1/A-E, A/1-5, 5B'-A. Cadman delivered 18yd3 of approved mix 35MG708 . Grout was placed by line pump and was mechanically consolidated. One set of strength test prisms was cast from this mix. Grout placement appeared to conform to the approved plans and specifications. Reviewed By: I I / I ASTM Test #: I I Asset To the best of my knowledge,, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. I Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. --�--�_ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION March 27, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, AN & ASSOCIATES, INC. tt W. ercer Project Manager/Lab Manager Pacific Northwest Division C WM/Ikj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09619279 DFR.doc aZaZ & _Associates, Inc_ FIELD REPORT 1952 GEOT£CHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTION DATE:It Z.7 _ CONTRACTOR: PROJECT#: ` JURISDICTIONOWA PROJ T���`� L. *�.I��1 YA^J\ PERMIT#: �2011 � I,OCATION:2722)iA 1 INSPECTOR: 1my((" � KRAZAN PROJECT MANAGER:'( . �' Z.C77 Q WEATHER: Qdq 7 �2 TEMP: , L U = - 3 l�L C� X C _ ks� 2� � % C,>*Z 6Ir L 1..1 t- S Li 1 CLj C a9 ,�n�X 3 awn � .� .--vN -tt-- A Z (Z 471 Equipment/Asset Number(s): To the best of my knowled , •, the abov WAS WAS NOT performed in accordance with the ap roved plans, specifications, and regulatory requirements. Superint entative: Technici This report indicates our insp �r nervation and testing results based on the site condition and contractors activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validir of the results. Some information on this report may have been provided by others on site. The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. ()>fff`P_C gp-rvi ty the iNP_CtP_m 1111ItP_!t StAtPq _ �i = 1XaZ;an & ASSOCIATES INC . GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 1, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, "AZAN & ASSOCIATES, INC. I'orbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWNVlkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 '4�1(rUZajjt &Associate s, I nc. Geotechnical Engineering a Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR3282019DK DATE: 3/28/2019 Set Count: CONTRACTOR: Wilcox/Fairweather Masonry PROJECT #: 09618279 PERMIT #: BLD2017 1119 PROJECT: Doup-'s Mazda INSPECTOR: Don Keller LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P.M.: WEATHER: TEMP: Inspected the placement of AS FM A615 GR60 reinforcing steel and embed plates for emu walls @5&'B-D 5th lift (16'-20' and @'B-A.1&5-6 4th lift (12'-16') Main Level. A,K/S5.1,B,C/S5.2,G/S3.1,GSN,S 1.2,S 1.4. Revision 2 5/31/18. Verified mix #3MG708 3,500 psi grout (2,000 required) provided by Cadman. Observed the placement of (9.0) cubic yards of grout for areas stated above. Load placed continuously and within 90 minutes of batch time. Grout discharged into hopper and conveyed with pump. Grout mechanically consolidated twice as required. Note: Grout placement scheduled for 9:30. Load arrived @9:50. Grout placement began @10:00. Cast 1 grout box for emu walls @5&C 5' lift (16'-20') Main Level, @10:20 , mix 65, air 48, slump 9". Reviewed r i ASTM Test #: Asset To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. JIMPM 1<1.0"azan & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 3, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, AN & ASSOCIATES, INC. ett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc ® a11& Associate_s, Inc. FIELD REPORT 2161 GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTION DATE:..dV1_ 1:LJ } , 141. ` 1 10I -CONTRACTOR: %,J% L P PROJECT#:_ t .-57-7-c1 _ JURISDICTION: � y PROJEICTI,Z_105.. - `tom V)M,_n PERMIT #: ?� Ll�'L� LOCATION: �Ak a, _ INSPECTOR: w _ KRAZAN PROJECT MANAGER: 0 WEATHER: r.� TEMP: 9 reo1 C3 ` - ' 8 /xr CB 1-1_1:.. Cam)D ' Ts -L..Ll--,ti_!'^ /-UN iZ 1� � -7 7r .3 17 �-�.1�_-�.�_C � /�►-J�� ._t'ar� �✓Ig � C_1.a/�� eC� t-L. C '��Ll L�'r.= Equipment/Asset Number(s): r. To the best of my knot ed e, the above AS / AS NOT performed in accordance with th pproved plans, specifications, and regulatory requirements. Superi to d presentative: Techn' i n-. This report indicates our inspector's observation and testing results based on the site condition and contractors activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of the results. Some information on this report may have been provided by others on site. The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Ifitf rP_C SP_rvinfll thP- WP_-CtP-rn 11nitP_d .S'tatP_c Page 1 of 1 KraZM—�" &Associates,lnc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR412019TR DATE: 4/1/2019 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Doug's Mazda INSPECTOR: Taylor Rooney LOCATION: 22214 Highway 99 JURISDICTION: City of Edmonds KA P.M.: Jeff Mercer WEATHER: Sunny TEMP: 60' F Inspected anchor bolt installation for the roof joint hangars. 42- 3/"anchor bolts were installed into 6" deep holes. Holes were cleaned using the blow -brush -blow method. Anchor bolts were installed using Hilti RE500V3 batch 083416L3 exp 10/2019. Anchor bolt installation appeared to conform to the manufacturer's directions and the approved plans and specifications. Reviewed ASTM Test #: I I Asset To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kr man & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on sits ASSOCIA GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 5, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. ett . Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 �Kr[�Zan&Associates,InC. Field Geotecitnical Engineering • Environmental Engineering Report NO.: 09618279DFR4220191V Construction Testing and Inspection DATE: 4/2/2019 Set Count: CONTRACTOR: WILCOX PROJECT #: 09618279 PERMIT #: BLD 2017 1119 PROJECT: Do 's Mazda INSPECTOR: Itia' Vahora LOCATION: 22214 Hwy 99 JURISDICTION: City of Edmonds KA P.M.: JSM WEATHER: PCL TEMP: 45' F On site per request for structural reinforced concrete field testing with placement observations. Verified reinforcement placement, as shown below prior to concrete pour. Contractor poured mix#0255AC, 10 cys supplied by Miles S & G plant#125. Sampled for temperature, air and cast one set of cylinders for strength testing in the lab. See concrete report #09618279CR422109IV for more information. Location — Trash Enclosure Footing with slab at gridline B1/ 5-6 Sampled - (4) - 4 X 8 Cylinders. Reviewed By: I I / I I ASTM Test #: I I Asset To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. S �w �-�-V OF all & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 8, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KR;VAN & ASSOCIATES, INC. 'r ett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWNV]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc _K_ aZ_a.I1_ & Associates, Inc_ GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTION DATE: Ll - 4 PROJECT #:.42:g� t,5 //Y z 7 52 PROJECT i/ S 11W VZr7r7-i/ Z.17-1119e-- L-OCATION: 2-2Z/6Z i� !7-G% _m KRAZAN PROJECT MANAGER: FIELD REPORT 2072 CONTRACTOR: -1 e-& JURISDICTION: �2 PERMIT #: ZL o2o /"7 INSPECTOR:-7?C./!J WEATHER: TEMP: 6-6 N & -a` 12 ` -0 is % - 7. 7/i9' =- c - c %X - 7. X� / l' - D . a f � IVA �� .-�, �� x ;' ` 7 . C- /lf. 711 S - 7.r yrh �' /.s,.z<•. ��. / r. Equipment/Asset Number(s): To the best of my knowl g , the above AS / WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements. Superin en e sentative: Te_can: This report indicates our inspector's observation and testing results based on the site condition and contractor's activities. This in tion is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of the results. Some information on this report may have been provided by others ' ite. The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. IlfficPc SPrvinn the WpctPrn l/nitnid GtatPc _ e _ _ _ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 15, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. rbett . Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFRdoc Page 1 of 1 &Associates, Inc. Field Geotechnical Engineering . Environmental Engineering Report NO.: 09618279DFR4112019ZZ Construction Testing and Inspection DATE: 4/11/2019 Set Count: CONTRACTOR: WILCOX PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Do 's Lynnwood Mazda INSPECTOR: Zelalem Zerihun LOCATION: 22214 HWY 99, Edmonds, WA JURISDICTION: City of Edmonds KA P.M.: Corbett Mercer WEATHER: Cloudy TEMP: 50' F Krazan & Associates, Inc. (KAI) representative visited the above -named project as per contractor's request and performed reinforcing steel and grout inspections for CMU walls. Reinforcing Steel: • Reinforcing steel for 8" CMU walls placed by FAIRWEATHER MASONRY CO INC as per general notes S2.1 and typical details. • Locations inspected — top lifts D/5 5.9, 5.9/C — D, 5.9 — 7/C, 7/A — C, A/6 — 7, elevator shaft top lift, and trash enclosure walls 6' high. • Observed all CMU walls listed -above to ensure all reinforcing steels are placed per plan and to verify bar grade & size. CMU cells are clear with allowed height for grout pour. Grout Placement: ■ Grout mix ID#35MG708 supplied by CADMAN from plant # 34 and placed by line -pump for the CMU walls listed -above. • Contractor used "pencil" vibrator to consolidate the grout. • Grout sample was taken and cast specimen for compressive strength test. Please refer to 18279MGR041119ZZ for test results. Reviewed Bv: To the best of my kill regulatory requirements. ASTM Test #: Asset the above WAS performed in accordance with the approved plans, specifications and ve: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. 1K"_= &ASSOCIATES NC GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 17, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. I114-_� , for Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY O.F EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198t1 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 %Kmzan&Associates, Inc. Field Geotechnical Engineering e Environmental Engineering Construction Testing and Inspection Report NO.: 09618279DFR4152019JLG DATE: 4/15/2019 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Dou s L wood Mazda INSPECTOR: Jerry L. Gelder LOCATION: 22214 Hwy 99 Lynnwood JURISDICTION: City of Lynnwood KA P.M.: WEATHER: Partly Cloudy TEMP: 58' F Arrived onsite per contractors request to observe the installation of %" all thread bolts into existing CMU. Observed contractor installed the bolts for angle iron Line 1 Grid A to D, Line 5 Grid B to E and joist clips Line 5 Grid B to E (north side) and Line 6 Grid B to E at the roof line. Contractor had drilled and cleaned out the holes. The bolts were installed with required 5 1/2" Reviewed By: ASTM Test #: I I Asset To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. ---------!EEi� 1� MIL �i� ASS OCIA GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 23, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, 7rbett ASSOCIATES, INC. ercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc '■t1ClZM&Associates,Inc. Geotechnical Engineering *Environmental Engineering Construction Testing and Inspection WELDING INSPECTION REPORT NO.: 18279SSR042219-DL DATE: 4/22/2019 CONTRACTOR: Wilcox / Blue Star Welding PROJECT #: 09618279 PERMIT #: BLD2017 1119 PROJECT: Dougs Mazda Lynnwood INSPECTOR: David Lane LOCATION: Ji99 Lynnwood Washington JURISDICTION: City of Lynnwood KA P.M.: Jeff Mercer WEATHER: rain TEMP: 50 ° STRUCTURAL STEEL ❑ FIELD ❑✓ SHOP WELDING ❑✓ VISUAL ❑ MATERIAL ID Field welded connections of: A)l2x8x3/8" HSS Steel Framing as per S5.1 B) Open Web joists to joist seats and to transverse grider. A) NE corner @ D-E/4-5 Level 2-Roof. B) E/1-15 (West Wall) & C/1-5 (Girder) - Roof Level. Welder qualification / certification verified for: WABO qualifications verified for active BlueStar welders Position: Process: Weld Type: Weld Size: Codes: ❑`� FLAT ❑ SMAW ❑ FILLET ❑ 3116" ❑✓ AWS ❑ ❑ ❑ ❑ ❑ VERTICAL ❑ OVERHEAD FCAW ❑ SAW C.P. ❑ PLUG 1/4" ❑ 3/8" AISC ❑ ASME ❑ HORIZONTAL ❑ GMAW ❑ P.P. ❑ 5/16" ❑ IBC ❑ Filler Metal: ❑ Other: ❑ Other: ❑ Other: ❑ Other: NOTES DISCREPANCIES 100 % COMPLETE ❑ :Irnved onsite as per dispatch. Performed periodic visual inspection of the following field welded items: A) HSS tube steel I -aming to Knife Plate connections as per S5.1. This inspection was performed in the NE corner of the building at the above listed grid coordinates. All 12x8x3/8" tube steel members were welded to intersecting knife plates as detailed. B) Open web foists field welded connections to joist seats and girder were also inspected. Only the East wall and Centerline Girder connections were 100% completed at this time. Work is in progress. All inspected welds were visually acceptable as per aWS 131.1, Clause 6 criteria. Dam C Lam, cvvlM 1 71 'e T aC1 EXP. W11=1 To the best of my knowledge, the above WAS performed in accordanc i! h the approved plans, specifications and regulatory requirements. Superintendent/Representative: !J Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Puyallup (253) 939-2500 Shchual Steel Report Revision 2 Effective 01/22/2013 'no W lime pmvidedon thi3,q—ispmpetod fortheeu1wimuwoftheclim1. This mpon may not W oopoduco] in my f twilhoot the wdum pmmissimt uftheelimt and K­&As--atea. Thisnpnt inditxles ominapmdma ot>—tiou andtestingoomhs based on sitem Utiousandmnbenor eahitim. This in1bmdon i, mbia to msiew prim to Soaraubm0lal. By sigvmgthismWtourinspWmacesnmemopttespm,sbi&yforvaMtyofmsnits.Thesamemfolmatioohasbeenpmvidedbyoth-mshe. KX_ &ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 30, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. .orbettt ercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 ==V4.raZan&Associate s, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR4272019DK DATE: 4/27/2019 Set Count: CONTRACTOR: Wilcox/BSW PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Do 's Lynnwood Mazda INSPECTOR: Don Keller LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P.M.: CWM WEATHER: Sunny TEMP: Observed the placement of 5/8" and 3/4" threaded rod for ledgers @'B&5-6 (mezzanine and upper ledger), @'A&6-7, @C&6-7, @B&5-6, and @7&A-C Main Level. Holes drilled 3/4" round x 4 V2" deep and 7/8" round x 5 V2" deep and cleaned as per manufacturer's recommendation. Threaded rod epoxy grouted with counter clockwise twisting motion to remove air. Hilti Hit -RE 500 V3 Exp. 02/2020. D/S4.2,B/S5.1, GSN, S 1.3, S 1.4. Revision 2 6/31/18. Pao Reviewed B� : ASTM Test #: Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kraran & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site 4ffi0L11_ & ASSOCIATES INC . GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 7, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. r ett . Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/Ikj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 Wdtl: Offices Serving the Western United States 09618279 DFR.doc =a �41azan8,Associates,Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection WELDING INSPECTION REPORT NO.: 09618279SSR050119-ZZ DATE: 5/1/2019 CONTRACTOR: WILCOX PROJECT #: 09618279 PERMIT #: PROJECT: Dougs Mazda Lynnwood INSPECTOR: Zelalem Zerihun LOCATION: 22214 HWY 99, Edmonds, WA JURISDICTION: City_of Edmonds KA P.M.: Jeffrey S. Mercer WEATHER: Cloudy TEMP: 50's STRUCTURAL STEEL 71 FIELD ❑ SHOP WELDING r7l VISUAL ❑ MATERIAL ID Item(s) Inspected: Joist -to -Seat, Drag strut tubes to joist, see below for details. Location: Joist -to -Seat connections located on east and west end supports on roof level @ A/1 - 5 & E/1 — 5 and Drag Struts Tubes -to - Joists on south & north sides @ 1/A - E & 5/A — E. Welder qualification / certification verified for: Position: Process: Weld Type: Weld Size: Codes: ❑� NOTES WABO cards FLAT ❑ VERTICAL ❑ OVERHEAD 0 HORIZONTAL SMAW ❑ FCAW ❑ SAW ❑ GMAW FILLET ❑ C.P. ❑ PLUG ❑ P.P. 3/16" ❑ 1/4" ❑ 3/8" ❑ 5/16" AWS ❑ AISC ❑ ASME ❑ IBC ❑ DISCREPANCIES verified for active Blue Star welders. Filler Metal: ❑ Other: ❑ Other: ❑ Other: ❑ Other: E71 T-8 % COMPLETE On site and inspected welding for Joist -to -Seat connections located on east and west end supports on roof level @ A/1 - 5 & E/1 — 5 and for Drag Struts Tubes -to -Joists on south & north sides @ 1/A - E & 5/A — E. Also some of joists are welded to HSS near NE area. Also, contractor welded X-bridging near area 4/C — F as per plan. Roof diaphragm is not ready at this time. All welds are visually acceptable as per AWS D1.1. We reviewed joist manufacturer's drawings and noticed a callout for a plate (Stabilizer Plate) on CMU pilaster/wall as per 2/JE4.01 at the south end of the girder near 1/C. Currently the plate on CMU is NOT installed. Contractor will need to post -install the plate (DO NOT WELD BOTTOM CHORD TO PLATE) or provide manufacturer's acceptance without a stabilizer plate. To the best of my knowledge, the above WAS performed in accordance with a approved plans, specifications and regulatory requirements. Superintendent/Representative: + echnician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Structr"al Steel Report Effective 10/32017 The i if lion provided on t1ii report is prepared for the escluvive use oFWe clirnt. This report may not be rgmAumd in any format without Ne written pemtiesion of the client —I Krnzen & Associates. This report indicates ow inspectors observation end testing results based on siteconditions and contractor activities. This information is subject to review prior to final submittal. By signing tlds report, our inspector does not accept responsibility for validity ofresults. The same infomrstion has been provided by others on site. aZall _ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 9, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. C'7 orbett tMercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Krazarl&Associ ate s, Inc. Geotechnical Engineering. Environmental Engineering Construction Testing and Inspection WELDING INSPECTION REPORT NO.: 18279SSR050719-DL DATE: 5/7/2019 CONTRACTOR: Wilcox / Blue Star Welding PROJECT #: 096 88279 PERMIT #: BLD2017 1119 PROJECT: Dou s Mazda L nnwood INSPECTOR: David Lane LOCATION: Hwy 99 Lynnwood Washington JURISDICTION: City of Lynnwood KA P.M.: Jeff Mercer WEATHER: clear TEMP: 75 ° STRUCTURAL STEEL MFIELD ❑ SHOP WELDING M VISUAL ❑ MATERIAL ID Item(s) Inspected: Roof deck diaphragm welding and fastening as per decking schedule sheet S2.2. Location: Main Showroom Roof @ 1-5/A-E Weider qualification / certification verified for: JB Ragland WABO ID # W22388 Position: ❑ FLAT ❑ VERTICAL ❑ OVERHEAD ❑ HORIZONTAL ❑ Filler Metal: Process: ❑ SMAW ❑ FCAW ❑ SAW ❑ GMAW ❑ Other: Weld Type: ❑ FILLET ❑ C.P. ❑ PLUG ❑ P.P. ❑ Other: Puddle Weld Size: ❑ 3/16" ❑ 1/4" ❑ 3/8" ❑ 5/16" ❑✓ Other: 5/8" O.D. Codes: ❑ AWS ❑ AISC ❑ ASME ❑ IBC ❑ Other: NOTES ❑ DISCREPANCIES 75 % COMPLETE Arrived onsite as per dispatch. Performed periodic visual inspection of roof deck diaphragm welding and fastening as per sheet S2.2 at the above listed grid coordinates. As per note #3 of sheet S2.2; the welder was subjected to a field test for puddle welding. The results were acceptable, as the base material sheared around the weld metal. The roof deck was then inspected. Hilti shot pins were used in place of puddle welds at the majority of the locations. RFI438 was supplied which approved of the alternate connections. Upon inspection, the following discrepancies were noted: 1) Deck connections to top chord of joists are to be staggered and distributed evenly on both members of the Joists. Currently all connections are either made on one or the other upper chord. Missing connections are to be added. 2) Deck connections at West and East boundary elements spacing is 9-12". This shall be 6" on -center. Missing connections are to be added. hese defects have been identified and discussed with the erector for repair. Work is in progress. mn i5o3wt 1 EXP 31112 1 To the best of my knowledge, the above WAS performed for information pur oses only. Superintendent/Representative: echnician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Puyallup (253) 939-2500 St—hnral Steel Report Revision 2 Elrective 01122/2013 The inf lionprovidedon thisreporl isprepaocsl the exclusive useofthecli.L Thisrepon may not be reproduced in myf at without the writtenpcmnimion of the clientand Kruzan&Associates.'Ibis report indicetesour inspectersobservationandtestingresults based on site conditionsend contractor setivities. This information is subject to review prior to first subndllal. By signing this report, ow inspector does not accept responsibility for validity, of results. The same information has been provided by others on site. - an_ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 10, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, AN & ASSOCIATES,, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWNYlkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198"' Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc r Page 1 of 1 �. l &Associates,lnc. Geotechnical Engineering 9 Environmental Engineering Construction Testing and Inspection DATE: 5/8/2019 Field Report NO.: 09618279DFR582019DB Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Dou 's Lynnwood Mazda INSPECTOR: Dave Bale LOCATION: 22214 Hwy 99 JURISDICTION: Lynnwood KA P.M.: JSM WEATHER: cloudy TEMP: 63 On site for proprietary anchor bolt inspection. Observed installation of %z"x 6-1/2" diameter Titen screws attaching 2" x 8' treated top plates to parapet CMU wall at Sales building. Titen anchors were installed as per details A/S5.1, B/S5.1, & RE #67. Holes were drilled and cleaned. Reviewed Bv: To the best of my knowl regulatory requirements. ASTM Test #: Asset 7 , the above WAS performed in accordance with the approved plans, specifications and Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Puyallup (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in my format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector dos not accept responsibility for validity of results. The same information has been provided by others on site. <rOLZan& ASSOCIATES, INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 13, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. tt W. ercer Project Manager/Lab Manager Pacific Northwest Division CWM/Ikj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 Will, Offices Serving the Western United States 09618279 DFR.doc KrazanStAssoci ate s, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 5/10/2019 PROJECT M 09618279 PROJECT: Dougs Lynnwood Mazda LOCATION: 22214 Hwy 99 KA P.M.: JSM STRUCTURAL STEEL WELDING INSPECTION REPORT NO.: 18279SSR051019-DB CONTRACTOR: Wilcox PERMIT #: BId2017-1119 INSPECTOR: Dave Bale JURISDICTION: Lynnwood WEATHER: sunny TEMP: 70 ° 7 FIELD ❑ SHOP WELDING 7 VISUAL ❑MATERIAL ID Items Inspected: 3/16" fillet welds connecting joist to joist seats as per detail 1/S5.1. 3/16" fillet welds. 3/16" fillet welds connecting HSS drag struts to peerimeter angle and to joist as per detail B/S5.1. 1/4" fillet welds connecting shear plates to CMU wall embeds for WF beam attachment as per F/S5.1. 3/16" fillet welds connecting WF beams and joist to girder beam as per detail R/S5.1. Location: High roof welded connections between grids B / D - 5 / 7. Also high roof steel deck attachment to supports between grids A / E - 1 / 5. HILTI pins, button punches, and top seam welds as per RFI # 38 and S2.2 roof deck schedule and details Welder qualification / certification verged for. Position: ❑`� FLAT ❑✓ VERTICAL ❑ OVERHEAD Process: ❑ SMAW ❑`� FCAW ❑ SAW Weld Type: ❑`� FILLET ❑ C.P. ❑ PLUG Weld Size: ❑✓ 3/16" ❑`� 1/4" ❑ 3/8" Codes: ❑✓ AWS ❑ AISC ❑ ASME ❑✓ NOTES DISCREPANCIES ❑`� HORIZONTAL ❑ GMAW ❑ P.P. ❑ 5/16" ❑ IBC were visually acceptable per AWS D1.1 visual criteria. roof ❑✓ Filler Metal ❑ Other: ❑ Other: ❑ Other: ❑ Other: E71T 100 % COMPLETE A325 bolts i filled at WF connections for high tact. To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Puyallup (253) 939-2500 Structural Steel Report The information provided on this report is prepared for the exclusive use ofthe client. This report may not be reproduced in any fbrmat vilhM the written permission ofthe client and Kraaan & Associates. This report indicates our inspectors observation and testing results based ou site conditions and contractor activities. This inf lion is subject to review prior to final submittal. By signing this report, oor inspector does not accept responsibility for validity ofresults. The same information has been provided by others on site. 1 =� a -- aZC1J & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 16, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, N & ASSOCIATES, INC. Co t W. rercer Project Manager/Lab Manager Pacific Northwest Division CWM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc %RWKr0LM&Ass ociate s, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection WELDING INSPECTION REPORT NO.: 18279SSR051419-DL DATE: 5/1412019 CONTRACTOR: Wilcox / Blue Star Welding PROJECT* 096 88279 PERMIT #: BLD2017 1119 PROJECT: Dougs Mazda Lynnwood INSPECTOR: David Lane LOCATION: Hwy 99 Lynnwood Washington JURISDICTION: City of Lynnwood KA P.M.: Jeff Mercer WEATHER: rain TEMP: 50 ° STRUCTURAL STEEL aFIELD ❑ SHOP WELDING F71 VISUAL ❑ MATERIAL ID Item(s) Inspected: Review of inspector ZZ's report dated 5-1-19 with contractor South End Primary Girder - Near gridline 1/C. Welder qualification / certification verified for: WABO qualifications verified for active BlueStar welders Position: 0 FLAT ❑ VERTICAL ❑ OVERHEAD ❑ HORIZONTAL ❑ Filler Metal: Process: ❑ SMAW ❑ FCAW ❑ SAW ❑ GMAW ❑ Other: Weld Type: ❑ FILLET ❑ C.P. ❑ PLUG ❑ P.P. ❑ Other: Weld Size: ❑ 3/16" ❑ 1/4" ❑ 3/8" ❑ 5/16" ❑ Other: Codes: ❑ AWS ❑ AISC ❑ ASME ❑ IBC ❑ Other: NOTES ❑ DISCREPANCIES 100 % COMPLETE rrived onsite as per dispatch. Participated in review of Krazan & Associates, Inc. inspector Zee Z.'s field report (dated 5-1- 9) regarding the missing stabilization plate for the primary girder located in the main showroom. Upon review of the report nd structural drawings, it was confirmed that the south end of the girder is in need of a post -installed stabilization plate. It ias also noticed that the North stabilization plate is less than the detailed 3/4" thickness. The manufacturer/EOR is to be onsulted regarding these two discrepancies. To the best of my knowledge, the above WAS performed in accordanc;,14ithf the a proved plans, specifications and regulatory requirements. Superintendent/Representative: !! Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Puyallup (253) 939-2500 Structural Steel Report Revision 2 Effective 01/22/2013 The information provided on Iltis report is prepared for the exclusive use of the climt. This report may not be reproduced in any F t without the written permission of the diostmdK—o & Associates. This report indicates our inspectorsobservation sod testing re gts based on site eonditions and wntmctor activities. TMs inf lion is subject to miew prior to f al suhmittal. By sigrting Otis report, cur inspector does not accept responsibility for validity of insults. The some information has been pmvided by others on site. & ASSOCIATES INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 21, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, K AN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc �vl�Qil&Associates, Inc. Geotechnical Engineering a Environmental Engineering Construction Testing and Inspection DATE: 5/16/2019 PROJECT #: 09618279 PROJECT: Dou s Mazda Lynnwood LOCATION: Hwy 99 Lynnwood Washington KA P.M.: Jeff Mercer STRUCTURAL STEEL WELDING INSPECTION REPORT NO.: 18279SSR051619-DL CONTRACTOR: Wilcox / Blue Star Welding PERMIT #: BLD2017 1119 INSPECTOR: David Lane JURISDICTION: City of Lynnwood WEATHER: overcast TEMP: 55 ° ❑✓ FIELD ❑ SHOP WELDING ❑✓ VISUAL ❑ MATERIAL ID Items Inspected: A) Light gauge cold formed steel framing B) HVAC Frames C) Open -web joist bridging members D) 2x2xl/4" HSS drag tubes as per the structural drawings. Location: A) Showroom Storefront @ 3-5/E & 5/D-E & 5-5.4/D - SOD to Roof B) 5-6/A-B Low Roof C) 5-7/A-D Low Roof D) 5-6/13-C Low R Welder qualification / certification verified for: Position: ❑ FLAT 0 VERTICAL ❑ OVERHEAD Process: ❑ SMAW 0 FCAW ❑ SAW Weld Type: ❑ FILLET ❑ C.P. ❑ PLUG Weld Size: ❑ 3/16" ❑ 1/4" ❑ 3/8" Codes: ❑ AWS ❑ AISC ❑ ASME NOTES WABO qualifications verified for active BlueStar welders ❑ HORIZONTAL ❑ Filler Metal: ❑ GMAW ❑ Other: ❑ P.P. ❑ Other: ❑ 5/16" ❑ Other: ❑ IBC ❑ Other: 100 % COMPLETE rived onsite as per dispatch. Performed visual inspection of the following items: A) Light -gauge cold formed steel framing the showroom storefront was inspected at the above listed grid coordinates. 8" x 18 gauge CF studs were positioned 16" center. Splices, bridging, and fastening of the CF members was performed as detailed on sheet S2.4. The typical chomge detail was used for CMU wall connection at 5/D (1/2" screw -type anchors at 12" O.C.). B) Field welded nnections of the HVAC frames at gridlines 5-6/A-B on the Low Roof. C) Open -web joist bridging members from 5-7/A-D the low roof. D) 2x2xl/4" HSS drag tubes connections to low roof steel framing at 3 locations in way of gridlines 5-6/B- No discrepancies were noted. All inspected welds were visually acceptable as per AWS D1.1, clause 6 criteria. ❑ DISCREPANCIES 4e�DGupw 1 rx;1 up. 9r11NIM To the best of my knowledge, the above WAS performed in accordance w' Technician: d plans, specifications and regulatory requirements. Superintendent/Representative: Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Puyallup (253) 939-2500 Structural Steel Report Revision 2 Ef ixtive 01/22/2013 The infboustion provided on this report is prepared for the exclusive use oflhe client. This report may not be reproduced in any formutwithout the wntlen petrmssion ofthe client and Krarnn&Associates. This report indicates our inspectors observation sod testing results based on site conditions and contractor activities. :his infooration is subject to review prior to final submittal- By signing this report, our inspector does not accept responsibility for validity ofresults. The same inr matim has been provided by others m site_ AM -= `=K& ASSOCIATES _INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 23, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, aett ASSOCIATES, INC. ercer Project Manager/Lab Manager Pacific Northwest Division CWNYlkj CC: CITY OF EDNIONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 Will, Offices Serving Ili Western United States 09618279 DFR.doc U14(mZM & A s s o c i a t e s, I n c. _ Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection WELDING INSPECTION REPORT NO.: 09618279SSR052119-IV DATE: 5/21/2019 CONTRACTOR: WILCOX Construction PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Mazda INSPECTOR: Itia' Vahora LOCATION: 22214 Hwy 99 JURISDICTION: City of Lynnwood KA P.M.: Jeff Mercer WEATHER: Cloudy TEMP: 50 n STRUCTURAL STEEL FIELD ❑ SHOP WELDING FIVISUAL ❑ MATERIAL ID -Item(s) Inspected: Beam connections at gridline 6/'A-C; Metal deck at Mezzanine & Roof levels Location: Level 1, Mezzanine & Roof deck Welder qualification / certification verified for: on file Position: ❑ FLAT ❑ VERTICAL ❑ OVERHEAD ❑ HORIZONTAL ❑ Filler Metal: Process: ❑ SMAW ❑ FCAW ❑ SAW ❑ GMAW ❑ Other: Weld Type: ❑ FILLET ❑ C.P. ❑ PLUG ❑ P.P. ❑ Other: STUD 3/4" Weld Size: ❑ 3/16" ❑ 1/4" ❑ 3/8" ❑ 5/16" ❑ Other: 1/2" Puddle welds Codes: ❑ AWS ❑ AISC ❑ ASME ❑ IBC ❑ Other: M NOTES ❑ DISCREPANCIES 100 % COMPLETE On site per request for beam connections and approved plans details and AWS D1.1, 131.3. beam connection verified per details S4.2/ H & J size and location per RCO metal deck HSB-36 inspected for button punch requirements S2.1/S2.2 and puddle welds for %2" diameter, D2L's reinforcement and nelson studs 3/4" attached with stud gun. ;ridlines- Mezzanine level @ A-`B/ 5-6; Roof level A-E/ 1-5 and level 2 @5-7/'B-D To the best of my knowledge, the above WAS performed in accordwftwith t approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Stmcturel Steel Report Et%ctive 101312017 ne information provided enthus report is prepared for the exclusive use ofthe client. Ti6s report may not be reproduced in sny fanner without the written permission of the client and Kraran & Assecintes. This report indicates our inspectors observation and testing results based an site conditions and contractor activities. This information is subject 0 review prior to trial submittal. By signing this report, our inspector does not accept responsibility for validity afresulu. The same information has been provided by others on site, A_=_ -I a11 & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 24, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, T SOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWWlkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc r FIELD REPORT 2340 a1 & Associates, Inc. KraZ GEOTECHNICAL ENGINEERING _ • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTION DATE: F. 5ff I _ CONTRACTOR: ( cc& PROJECT#:lx _, JURISDICTION:�_V��J PR0J8C7PO a PERMIT #: I OCATION:_�� INSPECTOR: KRAZAN PROJECT MANAGER: rCeC C WEATHER: �j'�� �,1! � TEMP: S a �3'2t-- Equipment/Asset Number(s): To the best of my knowl e, Ili abo W / WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements. Superint d nt/ pre tative: Technician: This report indicates our inspector's observation and testing results based on the site condition and contractors activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of the results. Some information on this report may have been provided by others on site. The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. nffir_pc Sa_rvinn tha WPctPrn ilnitanl Statac _ K"aZan &ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 29, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. Corbett . Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDIVIONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving tit Western United States 09618279 DFR.doe Page 1 of 1 -a'a_ffl\1ClL an&Associates,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR5222019ZZ DATE: 5/22/2019 Set Count: CONTRACTOR: WILCOX PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Dou 's Lynnwood Mazda INSPECTOR: Zelalem Zerihun LOCATION: 22214 HWY 99, Edmonds, WA JURISDICTION: Citt of Edmonds _ KA P.M.: Corbett Mercer WEATHER: Cloudy TEMP: 65' F Krazan & Associates, Inc. (KAI) representative visited the above -named project as per contractor's request and performed reinforcing steel and adhesive inspections. Reinforcin Steel: ■ Reinforcing steel was placed for mezzanine floor slab located at 5 — 6/'B — `A+6' as per plan note (#4@ 18"OC EW). The pan deck attachment to supporting elements, means puddle welds and studs, were inspected previously as stated by contractor. Adhesive A lication: • Adhesive application observed for #4 dowels installation into fully grouted masonry walls. These dowels are for pan deck slab on mezzanine floor located @ 5 — 6/'B — `A+6'. Epoxy type used was SIWSON SET-XP with expiration date 11/16/20. Verified embedment depth, min 4.5" into CMU base material with a required maximum spacing and acceptable as per details C & D/S4.2. Contractor followed manufacturer's printed installation instruction (NIPII). Reviewed B ASTM Test #: I I Asset To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. .: '�or & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION June 4, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KI AN & ASSOCIATES, INC. Cor ett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981n Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc _ Page 1 of 1 i1(raZan �-� &Associates,lnc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR5312019ZZ DATE: 5/31/2019 Set Count: CONTRACTOR: WILCOX PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Doug's Lynnwood Mazda INSPECTOR: Zelalem Zerihun LOCATION: 22214 HWY 99, Edmonds, WA JURISDICTION: City of Edmonds KA P.M.: Corbett Mercer WEATHER: Cloudy TEMP: 60' F Krazan & Associates, Inc. (KAI) representative visited the above -named project as per contractor's request and performed reinforcing steel and concrete inspections. Reinforcing Steel: • Reinforcing steel was placed for retaining wall foundation on northeast area of the project on HWY 99 side as per plan and reinforced as per Sr2.19 City approved March 7th, 2019. Concrete: • Concrete mix ID#0255AC (4000psi) delivered from MILES and placed by pump for the retaining wall foundation. One set of 5 cylinders was cast for compressive strength test. Refer to report # 18279CRO53119ZZ for lab test results. 4 a Reviewed 13 ASTM Test #: I I Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may act be reproduced in any format without the written permission of the client and Knman & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. —KazCU_ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION June 10, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, 11 J kZAN & ASSOCIATES, INC. ett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 =lean&Associates, Inc. Field Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Report NO.: 09618279DFR652019ZZ DATE: 6/5/2019 Set Count: CONTRACTOR: WILCOX PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Doug's Lynnwood Mazda _ INSPECTOR: Zelalem Zerihun LOCATION: 22214 HWY 99, Edmonds, WA JURISDICTION: City of Edmonds KA P.M.: Corbett Mercer WEATHER: Cloudy TEMP: 65' F Krazan & Associates, Inc. (KAI) representative visited the above -named project as per contractor's request and performed adhesive inspection. Adhesive Application: Adhesive application observed for #5 dowels installation into retaining footing (for missing vertical bars during footing pour) and into existing retaining wall. These dowels are for retaining walls at NE section near stairs. Epoxy type used was SIWSON SET-XP with expiration date 11/16/20. Observed embedment depth — 8" for #5 vertical dowels into the footing and 6" embed for #5 horizontal dowels into existing retaining wall and spaced as per drawing Sr2.1. We observed epoxy dowels installation to make sure contractor followed manufacturer's printed installation instruction (MPII). Reviewed Bv: I 1 / ! I ASTM Test #: I I Asset To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. I Suverintendent/Renresentative: I Technician: I Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Knc,an & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. Kd^ClZ&ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION June 11, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. orbett . Mercer Project Manager/Lab Manager Pacific Northwest Division CWkV1ki CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 2 =- = rOffan&Associates, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR6102019JD-1 DATE: 6/10/2019 Set Count: 1 CONTRACTOR: Wilcox / Blue Star PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Dou 's Mazda INSPECTOR: Jeff Dewev LOCATION: 22214 HWY 99 JURISDICTION: City of Edmonds KA P.M.: Jeff Mercer WEATHER: Clear and Sunny TEMP: 581 F A representative of Krazan and Associates arrived on -site as scheduled to perform construction observation and materials testing. While on -site we observed the following operations: Drill and Epoxy - Blue Star performed drill and epoxy operations for the Main Level Plaza elevator core and the Main Level Plaza girder embed plate at C.0/1.0. (3) Different size holes were drilled: 5/8 for %Z bolts, 3/ for 5/8 bolts, and 7/8 for 3/4 bolts. Holes were drilled to a depth of 5" in the existing CMU solid grouted walls. Holes were then cleaned with a wire brush and blown out with compressed air. Blue Star utilized Hilti HIT -RE 500 V3 epoxy to fill the cleaned holes. The specified size all -thread was then inserted into the holes with a twisting motion until the anchor was seated. Epoxy was observed extruding from the holes. Drilled and epoxied anchors were placed in general compliance with project plans, specifications, and governing standards. Scott, assistant superintendent with Wilcox was notified of all observations prior to Krazan's departure from the project site. SPLIM DETAIL PO PLAN KA&..r—t Fr � w Y tr I tlY otMr voxr*L 00-W rlau" 1Jt Gecrmr [Pat ..,fix T 1 & =N/SKQ§ Avk Drill and Epoxy Detail Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. Page 2 of 2 V.X�Van&Associates, I nc. Geotechnical Engineering e Environmental Engineering Construction Testing and Inspection _0 Field Report NO.: 09618279DFR6102019JD-1 Main Level Plaza, Elevator Core r C.0/1.0, Girder Embed Plate Location Reviewed By: ASTM Test #: Asset N To the best of my knowledge, the above WAS performed for information purposes only. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kraran & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review, prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site LI^GlZ& ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION July 2, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. rbett . Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 1%�_ Kxaz am_&Associates, Inc. Field Geotechnical Engineering *Environmental Engineering Construction Testing and Inspection Report NO.: 09618279DFR6272019ZZ DATE: 6/27/2019 Set Count: CONTRACTOR: WILCOX PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Doug's Lynnwood Mazda INSPECTOR: Zelalem Zerihun _ LOCATION: 22214 HWY 99, Edmonds, WA JURISDICTION: City of Edmonds KA P.M.: Corbett Mercer WEATHER: Cloud TEMP: 70' F Krazan & Associates, Inc. (KAI) representative visited the above -named project as per contractor's request and performed cold -formed steel (CFS) framing inspection. Contractor requested this inspection for all interior CFS framings. We reviewed structural and architectural drawings that provided by a site foreman. Structural plans do not call out CFS framing as a structural member and CFS details not provided. We walked thru and observed all interior CFS framings as per architectural plans A2.1 & A2.3. It's my opinion that the CFS gauges, stud spacing, clip connections, pins, screws, and connections to existing structure (a load path) appears as per common practice of steel framing and matches the wall schedule A2.1. Reviewed By: t ASTM Test #: I Asset To the best of my knowledge, the above WAS performed for information purposes only. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission ofthe client and Kravan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to fmal submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. Kazan_ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION September 21, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. (2ett . Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc ['CraZan Page 1 of 1 &Associates, I nc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR9172018EL DATE: 9/17/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Doug's Lynnwood Mazda INSPECTOR: Edan Lewis LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds _ KA P.M.: JM WEATHER: Cloudy TEMP: 590 F Krazan Representative arrived on site as requested for reinforcing steel inspection. Upon arrival, it was found that the contractor completed the reinforcing steel placement for the footing/slab on grade for new storm vault. It was requested by the contractor to inspect the reinforcing steel for part of the continuous footing for the new vehicle inventory garage spanning on gridlines: A to B/1 and A/1 to 4. Reinforcing located in the locations referenced above appeared to conform to plans on structural pages: S 1.1 and S3.1 for the building and S6.1, S6.2 and S6.3 for the storm vault. Reviewed To the best of my`knowl regulatory requirements. I ASTM Test #: Asset the above WAS performed in accordance with the approved plans, specifications and Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. _ Page 1 of 1 ==='[(a&Associates, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR9182018WB DATE: 9/18/2018 Set Count: CONTRACTOR: Wilcox PROJECT M 09618279 PERMIT M BLD 2017-1119 PROJECT: Doug's Lynnwood Mazda INSPECTOR: William Bui LOCATION: 22214 Aurora N JURISDICTION: Edmonds KA P.M.: Corbett Mercer WEATHER: Cloudy TEMP: 52 Krazan representative arrived on site for observation, rebar, and testing sampling. Rebar #5 were lay top and bottom at 12" OC (at elevator). Concrete blocks lay under rebar. Rebar are tie firm in place and look good. Contractor poured about 190 cyds mix 025506C at Detention vault footing and elevator footing. The mix design has min compressive strength 4000 psi at 28 days. Two set of five cylinders 4x8 were cast All testing results are listed on concrete reports 09618279CR91818WB-1 and 09618279CR91818WB-2 Reviewed To the best of my knowl regulatory requirements. ASTM Test #: IAsset Number (s): , the above WAS performed in accordance with the approved plans, specifications and Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kmran & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prim to final submittaL By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. Ia.Z;a1 & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION October 3, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. r ett - . Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 VNX0jZan &Associates, I nc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR9272018DK DATE: 9/27/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #:gLJ32*13 PROJECT: Doug's Lvrinwood Mazda INSPECTOR: Don Keller LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P.M.: WEATHER: TEMP: Inspected the placement of ASTM A615 GR60 reinforcing steel for vault interior, exterior, baffle, and knee c.i.p. walls Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Knman & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site qiaMKraZ;an & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION October 8, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. ett . Mercer Project Manager/Lab Manager Pacific Northwest Division CWNV]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc qQ0KXaZa 1. & Associates, Inc. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTION DATE: .Z'O - 3 PROJECT* _ a--,7?6 f fl L 7 �/, PROJ T: ,0 z 41L LL� LOCATION:__�_.._._g KRAZAN PROJECT MANAGER: FIELD REPORT 0 616 CONTRACTOR: JURISDICTION: PERMIT 11119 INSPECTOR: _ ��i WEATHER:_.TEMP A _ ,. .r �■ . .ram t EquipmenVAsset Number(s): To the best of my know dge, the abov/ WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements. Super' t denU resentative: clan: This report indicates our 'ns is obse ation and testing results based on the site condition and contractor's activities. This in ation i subject to review or to final submittal. By signing this report, our inspector does not accept sibility for validity of the results. Some information on this report may have been provided by others on site. The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. if?fficpc Sprvinn the WPcta_rn ilnitpr*i StatPc Pagel of 2 ll&�Va 8tAss ociate s,Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFRIO42018JA DATE: 10/4/2018 Set Count: CONTRACTOR: WILCOX PROJECT #: 09618279 PERMIT #: BLD 2017 1119 PROJECT: D22& Lynnwood Mazda INSPECTOR: Joseph Aranas LOCATION: 22214 Hiway 99 JURISDICTION: City of Edmonds KAP.M.: Jeff Mercer WEATHER: Partly Cloudy TEMP:50 Krazan & Associates, Inc. Arrive on site as requested to perform concrete pour observation and sampling. • Vault Wall Contractor poured a total of 180 CY of concrete (MILES SAND & GRAVEL) using approve mix design 025506C having a minimum compressive strength design 4000 psi @ 28 days 1 set of Five 4x8 were cast for compressive strength testing. Test results are available on concrete 18279CR1042018JA-1, #9618279CR1042018JA-2. tom.:_-_ ��-_�.y-r+::.: -.~ V ._ �•_' - Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittaL By signing this report, our inspector does not accept responsibilityfor validityof results. The same information has been provided by others on site. Page 2 of 2 'IW&Associates,lnc. Field Geotechnical Engineering* Environmental Engineering Report NO.: 09618279DFR1042018JA Construction Testing and Inspection Krazan & Associates, Inc. Arrive on site as requested to perform concrete pour observation and sampling. • Spread footing grid line @ 2B,C, 3B,C,D,F, 4/B,C,D,E,F. • Continuous footing grid line @ 1-5/A,1/A-F,2-4/F-F3,4-6/F3,5/C-F3 • Combine footing 3-3.5/E. Contractor poured a total of 70 CY of concrete (MILES SAND & GRAVEL) using approve mix design 0255AC having a minimum compressive strength design 3000 psi @ 28 days 1 set of Five 4x8 were cast for compressive strength testing. Test results are availE Reviewed To the best of rnj,: wlc regulatory requirements. I ASTM Test #: Asset N the above WAS performed in accordance with the approved plans, specifications and Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kravan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity o£rsults. The same information has been provided by otbers on site. K.raz_ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION October 22, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. L.ett . Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/Ikj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc =��4(azan&Associate s,Inc. _ Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 10/18/2018 PROJECT #: 09618279 PROJECT: Lynnwood Mazda LOCATION: KA P.M.: Corbett Mercer STRUCTURAL STEEL WELDING INSPECTION REPORT NO.: 09618279SSR101818-IV CONTRACTOR: Blue Star Weldin PERMIT #: BLD2017-1119 INSPECTOR: Itiaj Vahora JURISDICTION: WEATHER: Sunny TEMP: 60 ° ❑ FIELD M SHOP WELDING M VISUAL ❑ MATERIAL ID Item(s) Inspected: Bearing Plate-BRP1, BRP2; Embed plate-EMP1, EMP2(28), EMP3(4), EMP4(2), EMP5, EMP6(2), EMP7(25), EMP8(2), EMP9(4), EMP10, EMP11, EMP12(4), EMP13(11), EMP14(8), EMP15(4), EMP16, EMP17, EMP18; Loose angle- LA30, LA32, LA35; Plate-LP2, LP3 Location: Blue Star Welding, 6059 Guide Meridian, Bellingham Welder qualification / certification verified for: Austin Holder,W21680;Daniel Starbuck, W10669; Eduardo Frances,W21421 Position: ❑ FLAT ❑ VERTICAL ❑ OVERHEAD ❑ HORIZONTAL ❑ Filler Metal: Process: ❑ SMAW ❑ FCAW ❑ SAW ❑ GMAW ❑ Other: Weld Type: ❑ FILLET ❑ C.P. ❑ PLUG ❑ P.P. ❑ Other: STUD GUN 1/2". 3/4" dia. Weld Size: ❑ 3/16" ❑ 1/4" ❑ 3/8" ❑ 5/16" ❑ Other: Codes: ❑ AWS ❑ AISC ❑ ASME ❑ IBC ❑ Other: F71NOTES ❑ DISCREPANCIES 90 % COMPLETE site per request for post weld visual inspection of embeds, plate and an tils and AWS D1.1 visual inspection criteria. and location per will attach plates to embeds on site for — EMP4, EMP6, EMP8, EMP10, 5/16" fillet weld required. attached stud to plate using gun, verified 360 degree coverage around base perimeter. To the best of my knowledge, the above S performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: AnWolkt 1-7 t +. Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 Structural Steel Report Effective 10/3/2017 Theinformationpmvidedoo th,, Tgmrt is prepared for tbe—lusiveuse of the client. This report may not be reproduced in any format without the written petrussionoftheclient and Krai—RAasooiam. Thfi-portindicatesorrinspWoraahac,vsbo,snd testing results basedonsitecanditionsmM —tmetor activities. This information is subject w review prim to fwl submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same inibmmtion has been provided by others on site. f(LaZan- & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION October 24, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. ett . Mercer Project anager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-1,4AIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198' Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 Willi Offices Serving the Western United States 09618279 DFR.doc �rr Page 1 of 1 4611.2■�azan&Assoc1ates, I nc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFRIO222018CWT DATE: 10/22/2018 Set Count: CONTRACTOR: Concrete Structures NW, LLC PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Do 's Lynnwood Mazda INSPECTOR: Chris Wilson/Tuyen Tran LOCATION: 22214 Hwy 99 JURISDICTION: City of Edmonds KA P.M.: Corbett Mercer WEATHER: Party Cloud TEMP: 49' F Krazan representatives arrived on site at 1:00PM to conduct concrete testing and to re -inspect steel reinforcement within F5.0 spread footings along line 5 from A to F3. Upon arrival spread footings where corrected and installed with (6) #6 bar E.W. with the appropriate depth of 15" with a 3" concrete clearance to earth. Tuyen Tran was the lead inspector aiding in training Chris Wilson. Don Keller was the inspector who previously inspected the site calling for the footings to be reinspected to due to insufficiency. Steel Reinforcement was approved by Tuyen Tran and Chris Wilson before concrete pour commenced. Footine (along line 5 from A to F3) Observed the contractor placing concrete approximately 10 cubic yards with mix No.025506C from MILES SAND & GRAVEL. The contractor placed concrete using a pump truck and mechanical vibrator was used for consolidation. Also checked batch ticket, water added and performed slump, and temperature tests. One set of (5:1-7days, 3-28days, and 1- Hold) 4X8 cylinders were made. Please refer to concrete report No. 9618279CR10222018CWT-1, for detailed mix -design, location of placement and compressive strength results. Photo 1: Footing along line 5 from A to F3 ASTM Test #: Asset To the best of ihy1howle4ge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. I Technician: l Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krarsn & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. Associa_t_es, Inc. FIELD REPORT 071 GEOTECHNICAL ENGINEERING ENVIRONMENTAL ENGINEERING J ^^ CONSTRUCTION TESTING AND INSPECTION DATE: ! L� Z L _ _��� _ CONTRACTOR: r o C PROJECT #:/ ,' Z 7_ JURISDICTION: PROJ'T: _ �� G��_.� PERMIT #: _ LOCATION: �,ZZ!y �� �J INSPECTOR: TE ?y KRAZAN PROJECT MANAGER: J WEATHER: n _ TEMP: �r 51 4r .:— Equipment/Asset Number(s): To the best of my know e, the abov / WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements. Super' to dent resentative: Tech n: This report indicates our i ❑r's obse ation and testing results based an the site condition and contractor's activide . his info on is su ect to r r to final submittal. By signing this report, our inspector does not accept responsibility for alidity of the results. Some information on this report may have been provided by others on s . The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. nffir_pc Sa_rvinn the WP_Ctprn l/nitprt StatpS --e!!M<ra an&Associates,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection DATE: 10/18/2018 PROJECT #: 09618279 PROJECT: Lynnwood Mazda LOCATION: KA P.M.: Corbett Mercer STRUCTURAL STEEL WELDING INSPECTION REPORT NO.: 09618279SSR101818-IV CONTRACTOR: Blue Star Welding; PERMIT #: BLD2017-1119 INSPECTOR: Itia' Vahora JURISDICTION: WEATHER:.Sunny TEMP: 60 ° ❑ FIELD F] SHOP WELDING F71 VISUAL ❑ MATERIAL ID Item(s) Inspected: Bearing Plate-BRP1, BRP2; Embed plate-EMP1, EMP2(28), EMP3(4), EMP4(2), EMP5, EMP6(2), EMP7(25), EMP8(2), EMP9(4), EMP10, EMP11, EMP12(4), EMP13(11), EMP14(8), EMP15(4), EMP16, EMP17, EMP18; Loose angle- LA30, LA32, LA35; Plate-LP2, LP3 Location: Blue Star Welding, 6059 Guide Meridian, Bellingham Welder qualification / certification verified for: Austin Holder,W21680;Daniel Position: ❑ FLAT ❑ VERTICAL ❑ OVERHEAD 0 HORIZONTAL Process: ❑ SMAW ❑ FCAW ❑ SAW ❑ GMAW Weld Type: 0 FILLET ❑ C.P. ❑ PLUG ❑ P.P. Weld Size: ❑ 3/16" ❑ 1/4" ❑ 3/8" ❑ 5/16" Codes: 0 AWS ❑ AISC ❑ ASME ❑ IBC F71NOTES ❑ DISCREPANCIES In site per request for post weld visual inspection of embeds, plate and angles. V etails and AWS D1.1 visual inspection criteria. W10669; Eduardo Frances,W21421 ❑ Filler Metal: ❑ Other: ❑✓ Other: ❑ Other: ❑ Other: STUD GUN 1/2", 3/4" dia. 90 % COMPLETE ontractor will attach plates to embeds on site for — EMP4, EMP6, EMP8, EMP10, 5/16" fillet weld required. ontractor attached stud to plate using gun, verified 360 degree coverage around base perimeter. To the best of my knowledge, the above ,WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 per Structural Steel Report Effective 10/32017 The information provided on this report is prepared for the exclusive use ofthe client. This report may not be reproduced in any format without the written permission ofthe client and Krems @ Associates. This report indicates our in spectors observation and testing results based an site wnditions and conhnctor activities. This information is subject to review prior to finel submittal. By signing this report, our inspector does not accept responsibilityfor validity ofresults. The same information has been provided by ollras on site. aZan & ASS0CIAT.ES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION October 29, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. et . Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/Ikj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 Witlt Offices Serving the Western United States 09618279 DFR.doc KraZarl & Associates, Inc. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING ' CONSTRUCTION TESTING AND INSPECTION DATE: Z a Z -- I PROJECT#: 67"'C? G 1* 2- 7 PROJECT LOCATION:_ KRAZAN PROJECT MANAGER: FIELD REPORT 0730 CONTRACTOR: 6tl� e-C.r..nr JURISDICTION: PERMIT #: INSPECTOR: ?- 2pP— WEATHER: TEMP: S S r2" 77— QAZ S Equipment/Asset Number(s): To the best of my knowl�,ergt, the v� e- rvA--S WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements. Superi enden esentative. Teee ician: _may This report indicates our inspector's observatio and testing results based on the site condiflon and contractor's activities. Thi ' formation s subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of the results. Some information on this report may have been provided by others on site. The information provided on this report is prepared for the exclusive use of the client.This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. �itfl!`p_C SSP_YVI/1PI the Wp_Ctp_m Ilnitpri RtatP_S Page 1 of 1 �K [ ;M&Associates, Inc. Geotechnical Engineering e Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFRI 0 192018DK DATE: 10/19/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2017 1119 PROJECT: Dou 's Lynnwood Mazda INSPECTOR: Don Keller LOCATION: JURISDICTION: KA P.M.: WEATHER: TEMP: Arrived on site @10:30 am. Inspected the placement of ASTM A615 GR60 reinforcing steel for continuous figs. and spread ftgs. @ 5& A-D. Details A,B/S3. 1,S2. 1,GSN, S1.1 Revision 2 5/31/18. Reinspection required: F5.0 spread ftgs were not 15" deep and did not have (6) #6 bars E.W. as per S2.1. Note: Contractor requested that I return to site this afternoon for reinspection. Returned to site @2:30. Performed reinspection on reinforcing steel for areas stated above. All discrepancies were brought into compliance with approved plans and contract documents. Performed inspection of ASTM A615 GR60 reinforcing steel for 8" C.I.P. wall @A&1-5 prior to form closure.A/S3.1, A/S4.1, GSN, S 1.1 Revision 2 5/31/18. Note: Work in progress to place embeds, cmu wall dowels, 2 #5 U bars, and 2 #5 bent bars as per A/S4.1. Reinspection required prior to concrete placement. 011 Reviewed By: ASTM Test #: Asset Number(s): To the best of wle ge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kaman & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector dos not accept rsponsibility for validity of results. The same information has been provided by others on site A S S 0 C I A GEOTECHNICAL ENGINEERING 9 ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION November 2, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. CZett7W�Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/Ikj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR. doe Page 1 of 1 ^(� &Associates, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFRIO312018DK DATE: 10/31/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Doug's Lynnwood Mazda INSPECTOR: Don Keller LOCATION: 22214 HWY 99 JURISDICTION: Edmonds KA P.M.: WEATHER: TEMP: Arrived on site at 12:30 for scheduled reinforcing steel inspection. Upon my arrival the contractor cancelled the inspection. Work was not complete at time of inspection. Contractor to reschedule once work is complete. No inspection services provided on this date. a Reviewed By: ASTM Test #: I I Asset Number(s): To the best of 1 owled e, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kr=n & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector dos not accept responsibility for validity of results. The same information has been provided by others on sits ��-�1,i=an& Assoc iate s,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection DATE: 10/31 /2018 PROJECT #: 09618279 PROJECT: Doucs Mazda Lvnnwood LOCATION: 6059 Guide -Meridian Rd. Bellinclham, WA. KA P.M.: Jeff Mercer STRUCTURAL STEEL WELDING INSPECTION REPORT NO.: 18279SSR103118-DL CONTRACTOR: Blue Star Welding; PERMIT #: TBD INSPECTOR: David Lane JURISDICTION: City of Lvnnwood WEATHER: rain TEMP: 44 ° ❑ FIELD 7 SHOP WELDING FIVISUAL ❑ MATERIAL ID Periodic visual inspection of Beam Units;B84, B83x2, B82, B74x2, B65, B60, B53, B44, B42, B37, B31, B29, B26, B23, B21, 616, B15, 1313, 1312, B5, B52, 1311, and B53 as per the shop drawings. Fabrication Facility Welder qualification / certification verified for: WABO qualifications verified for active BlueStar welders Position: 0 FLAT ❑✓ VERTICAL ❑ OVERHEAD ❑ HORIZONTAL ❑ Filler Metal: Process: ❑ SMAW ❑✓ FCAW ❑ SAW ❑ GMAW ❑ Other: Weld Type: ❑✓ FILLET ❑ C.P. ❑ PLUG ❑ P.P. ❑ Other: Weld Size: ❑✓ 3/16" ❑ 1/4" ❑ 3/8" ❑ 5/16" ❑ Other: Codes: ❑✓ AWS ❑ AISC ❑ ASME ❑✓ IBC ❑ Other: ❑� NOTES ❑ DISCREPANCIES 100 % COMPLETE lrrived onsite as per dispatch. Performed periodic visual inspection of Beam Units;B84, B83x2, B82, B74x2, B65, B60, B53, B44, B42, B37, B31, B29, B26, B23, B21, B16, B15, B13, B12, B5, B52, B11, and B53 as per the shop drawings. The ik% elds were sized and placed as -detailed on the pertaining drawing. No discrepancies were noted during the inspection. All ;inspected welds were visually acceptable as per AWS D1.1, Clause 6 criteria. L3aM C u= 4$p C%sn i 5o"71 t]C1 EXP. 3IUM1 To the best of my knowledge, the above A performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Puyallup (253) 939-2500 Structural S1ee1 Report Revision 2 Effective 0l/22/2013 The information p-ided on this repo,( is prepared In, the exclusive use ufthe client. This rugs n may not be reproduced in any f l witboul the written permission afthe client and Ksaran & Mandates. This repo indicates not inspectors observation and testing insults based on site conditions and wnlmctor sclivities. This information is subject to review prior to final submittal. Hy signing this omorl, ow i apector does not acoW responsibility Ibr validity nfresults. The seine inf nastion has been p-ided by others on site. & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION November 7, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KWAN & ASSOCIATES, INC. Cgr4ett Wy Mercer Project Manager/Lab Manager Pacific Northwest Division C WM/1ki CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 Ir. W-M V*JmaZan & A S s o c i a t e s, I nC. Field Geotechnical Engineering* Environmental Engineering Report NO.: 09618279DFRI 112018DK Construction Testing and Inspection DATE: 11/1/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Dou 's Lynnwood Mazda INSPECTOR: Don Keller LOCATION: 22214 HWY 99 JURISDICTION: Edmonds KA P.M.: WEATHER: TEMP: Inspected the placement of ASTM A615 GR60 reinforcing steel and embeds for c.i.p. walls prior to form closure @A- D&5-5.5 Lower Level. A/S3.1, A/S4.1, GSN, S1.1. 5/3/18. Note: Work in progress to place embed plates (2) #5 U bars, (2) #5 bent bars, and cmu wall dowels @ t.o.w Main Level elevation as per A/S4.1. Reinspection required prior to concrete placement. 91 Reviewed By: ASTM Test #: I Asset Numbe s): To the best of rrowled ;e, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kraran & Associates. This report indicates our insp.. observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility r; ility for validity of results. The same information has been provided by others on site. & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION November 9, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, 7AN & ASSOCIATES, INC. orbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/]kj CC: CITY OF EDMONDS (E-A9AIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 RKnyan&Asscciates,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR1172018SS-1 DATE: 11/7/2018 Set Count: 1 CONTRACTOR: Wilcox Construction PROJECT #: 09618279 PERMIT #: BLD20171119 PROJECT: Dou 's Lynnwood Mazda INSPECTOR: Susheel Sharma LOCATION: 22214 Hwy 99 JURISDICTION: City of Edmonds KA P.M.: Jeff Mercer WEATHER: Partly Cloud TEMP: 50 r Krazan & Associates arrived on site per request for concrete inspection on time. Monitored load tickets, batch weights and water allowances. Concrete started poured by 12:20 pm and completed by 5:00 pm. Contactor placed 140 yd3 of concrete from plant of MILES Sand & Gravel. Contractor poured concrete from pump at the wall of the building Grid 1 to Grid 5 through Grid A to F3. Set 1: Mix Code: 0255AC• Permit No: BLD20171119• Disp Ticket No:214782( wall on the buildin One set of five cylinders (4X8) were made for compressive strength testing. Break scheduled for one in 11-14, three in 12-05 and one is kept for hold. Contractor used pump truck to transport the concrete and was mechanically consolidated. Designed strength of this concrete is 3000 psi. See Cylinder report 09618279CRI 10718-SS-1 for break results. Reviewed bite rnoto 1: c:oncreting on wall of the ASTM Test #: building Asset Nu To the best of my k�lowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. J Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. Page 1 of 1 ICruzan & A s s o c i a t e s, I n c. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection DATE: 11/6/2018 Field Report NO.: 09618279DFR1162018DB Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Do 's LLynnwood Mazda INSPECTOR: Dave Bale LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P.M.: JSM WEATHER: partly cloudy TEMP: 50 On site for reinforcing steel inspection Inspected placement of embeds and trim reinforcing steel for main floor steel frame and hand rails at exterior walls between grids A / F.3 — 1 / 5.5 and at interior shear wall on grid E — 3 to 4. Reinforcing steel placement and embeds as per details A/S4.1 & B/S4.1. Reviewed By: ASTM Test #: Asset Number(s): To the best of my kri edge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsbility for validity of results. The same information bas been provided by others on site. '-?= =� Rf�all- & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION November 16, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. qijj�� C, Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division C WNVlkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198t1 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 Arm. ihom ,=Kra an&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFRI 1142018DS DATE: 11/14/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: PROJECT: Dou s Lynnwood Mazda INSPECTOR: Daniel Sleeman LOCATION: 22214 Hwy 99 JURISDICTION: Lynnwood KA P.M.: Corbett Mercer WEATHER: Cloudy TEMP: 51 ° F Krazan & Associates representative arrived on site as requested by contractor to inspect concrete pour for stormwater vault lid. Contractor had previously placed concrete lid panels on vault. Reinforcing steel was previously inspected by another Krazan & Associates representative. Contractor placed approximately 43 cyds of concrete to secure lid to vault walls. The mix used was 025506C. Concrete was conveyed by pump truck and mechanically consolidated. Representative tested temperature and slump of concrete. Representative prepared seven 4"X8" concrete cylinders for laboratory testing. See concrete report# 09618279CRI 11418DS for test results. Reviewed By: I I ASTM Test #: Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kmzan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. �K�aZan_ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION November 20, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 2 -2w-mj<jWajj &Associates,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFRI 1142018EL DATE: 11/14/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: PROJECT: Dou 's Lynnwood Mazda INSPECTOR: Edan Lewis LOCATION: 22214 Rwy 99 JURISDICTION: Edmonds' KA P.M.: Corbett WEATHER: Cloudv TEMP: 45' F Krazan Representative arrived on site as requested for reinforcing steel inspection. Upon arrival, it was found that the contractor completed the reinforcing steel placement for the new storm vault top slab. Reinforcing steel placed today covered the entire storm vault top slab. Reinforcing inspected today appeared to conform to plans on structural pages: S6.1, S6.2, S6.3 and all details on S6.4 for the storm vault. �v y r - r } St Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Ytr & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. Page 2 of 2 &Associates,lnc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection ASTM Test M Field Report NO.: 09618279DFR11142018EL Asset To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client This report may not be reproduced in any format without the written permission of the client and ]Crown & Associates. This report indicates ow inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector dos not accept responsibility for validity of results. The same information has been provided by others on site. �... a.,�AM J_ & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION November 27, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. ett . Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198'h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc ■<Xazan&Ass ociate s, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 11 /21 /2018 PROJECT #: 09618279 PROJECT: Dou 's Lynnwood Mazda LOCATION: KA P.M.: Corbett Mercer STRUCTURAL STEEL WELDING INSPECTION REPORT NO.: 09618279SSR112118-IV CONTRACTOR: Blue Star Welding PERMIT #: BLD2017-1119 INSPECTOR: Itia' Vahora JURISDICTION: Edmonds WEATHER: Lt Rain TEMP: 44 ° ❑ FIELD M SHOP WELDING r7i VISUAL ❑MATERIAL ID Items Inspected: Beams-1330, B10, B63, B74, B82, B43, B5, B12, B37, B15, B44, B31, B84, B42, B52, B65, B23, B26, B28; Columns-Cl, C2(2), C3, C4, C5, C6, C7, C8(2), C9, C10, C11, C13(2), C15(2), C16; Canopy frame-FR1; Ladder- MLD1 Location: 6059 Guide Meridian, Bellingham WA Welder qualification / certification verified for: on file Position: ❑ FLAT ❑ VERTICAL ❑ OVERHEAD ❑✓ HORIZONTAL ❑ Filler Metal: Process: ❑ SMAW ❑✓ FCAW ❑ SAW ❑ GMAW ❑ Other: Weld Type: ❑✓ FILLET ❑ C.P. ❑ PLUG ❑ P.P. ❑ Other: Weld Size: ❑✓ 3/16" ❑✓ 1/4" ❑ 3/8" ❑ 15/16" ❑ Other: Codes: ❑✓ AWS ❑ AISC ❑ ASME ❑ IBC ❑ Other: NOTES ❑ DISCREPANCIES 100 % COMPLETE site per request for post weld visual inspection of bear contractor drawings details and AWS D1.1, section 6. quantity inspected- beam (19), Column (18), Ladder (1), Canopy Frame (1) size and location To the best of my knowledge, the abov WA) performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 Structural Steel Report Effective 10/3/2017 Theinfammti®providedon this report is prepsred f the emiusiveuse ofthedient. Thisreport may not be reproduced in my,brmatwithout the written ye<nissiw of the clieotand Krssn&Assorates. Thisrm"tt indiratesminspemtobsavation and testing malts basedw site=ditioosand contmdm activities. This infmnstion is subject to review prim to final submittal. By signing Us repot, mn inspedor does not accept responsibility for vslidity ofmults. The same information has be® provided by others on site. LT & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION November 21, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully a" Corbett Wla Project Manager Pacific oDivision CWNUIkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Associates, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection DATE: 11 /20/2019 PROJECT #: 09618279 PROJECT: Dougs Mazda LOCATION: 22214 Hwy 99 KA P.M.: JSM STRUCTURAL STEEL WELDING INSPECTION REPORT NO.: 18279SSR112019-DB CONTRACTOR: Wilcox PERMIT #: BLD2017-1119 INSPECTOR: Dave Bale JURISDICTION: Edmonds WEATHER: sunny TEMP: 45 ° MFIELD ❑ SHOP WELDING M VISUAL ❑ MATERIALID Item(s) Inspected: 1/4" fillet welds for connecting three new 12 x 14 beams to existing main level frame at car lift as per SK14 Location: Welder qualification / certification verified for: Position: ❑ FLAT ❑'� VERTICAL ❑ OVERHEAD ❑ HORIZONTAL Process: ❑ SMAW ❑ FCAW ❑ SAW ❑ GMAW Weld Type: ❑`� FILLET ❑ C.P. ❑ PLUG ❑ P.P. Weld Size: ❑ 3/16" ❑`� 1/4" ❑ 3/8" ❑ 5/16" Codes: ❑`� AWS ❑ AISC ❑ ASME ❑ IBC NOTES ❑ DISCREPANCIES Is visually acceptable per AWS D1. ❑ Filler Metal: ❑ Other: ❑ Other: ❑ Other: ❑ Other: 100 % COMPLETE all plies infirm contact. To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 as Puyallup (253) 939-2500 Sumaral Steel Report The information provided on ft report is prepared for the m1asive°seofthe6w. This report may M be reproduced in my foametwkhew the wrdoeup—isaim oftheclimtaudKamn&Associatea. 7Li4rep. mdicatw ourmapatorsob--tioo mdtestibg asultabasedon site=dmona andconeodor activities. This mformetim is mbj Tto review priorto finel mbovtW. By aignmgthis ropml,om mapatm doesnote¢ept teapwslbility for validity ofremlls. The a9meiMormefion has bamprovided by othasm see. �- = �.�.�.� & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 4, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. ett W Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/Ikj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 a FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 &Associates,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFRI 1302018EL DATE: 11/30/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: Za PROJECT: Dous;'s L nnwood Mazda INSPECTOR: Edan Lewis LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds' KA P.M.: Corbett WEATHER: Cloudy TEMP: 41' F Krazan Representative arrived on site as requested for reinforcing steel inspection. Upon arrival, it was found that the contractor completed the reinforcing steel placement for the entire new slab on grade spanning on gridlines 1 to 5/A to F3 and footings on gridlines: 51C to D, 5/F2 to F3 and 1 to 2/E to F. Reinforcing inspected today appeared to conform to plans on structural pages: S 1.1 for slab and details J to L/S3.1 for the footings. Reviewed To the best of my Mow] regulatory requirements. t ; i ASTM Test #: Asset �7/ j2g�.7 the above WAS performed in accordance with the approved plans, specifications and Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krann & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prim to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by other, on site. K OF r-a a_ & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 5, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KI AN & ASSOCIATES, INC. ett .Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 —=I aLan&Associates, Inc. Geotechnical Engineering - Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR1242018JD-0 DATE: 12/4/2018 Set Count: 0 CONTRACTOR: Wilcox / Concrete Structures PROJECT #: 09618279 PERMIT #: PROJECT: Lynnwood Mazda INSPECTOR: Jeff Dewey LOCATION: 22214 Hwy. 99, Edmonds JURISDICTION: City of Edmonds KA P.M.: Jeff Mercer WEATHER: Clear and Sunny TEMP: 42 A representative of Krazan and Associates arrived on -site as scheduled to perform construction observation. While on -site, we observed the placement of reinforcing steel by Concrete Structures for the wall along gridline 5.0 from gridline C.0-D.O. The reinforcing placement was observed for size, grade, ties, splices, spacing, concrete coverage, cleanliness, and general overall placement. The reinforcing steel was not placed in general compliance with the project plans, specifications, and governing documents. Below are the listed discrepancy items. Detail K/53.01 specifies that the vertical reinforcing extending from the footing be spaced at 8" on center. The in - place reinforcing steel is currently extending from the footing at 12" on center. Krazan suggested that the contractor contact the project structural engineer for an approved fix. Additionally, Concrete Structures was scheduled to drill and epoxy the horizontal reinforcing from the previously constructed wall section to lap the horizontals for the wall section stated above. It was observed by the Krazan representative that the epoxy Concrete Structures intended to use was expired. Concrete Structures said that they needed to get more epoxy and that they would re -schedule accordingly. Scott, foreman with Wilcox, was notified of all observations prior to Krazan leaving the project site. Gridline 5.0 from C.0-13.0 Reviewed By: ASTM Test #: Asset Number(s): To the best of my knowledge, the above WAS performed for information purposes only. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. Page 1 of 1 �K� &Associates,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR1232018SS-1 DATE: 12/3/2018 Set Count: 1 CONTRACTOR: Wilcox Construction PROJECT #: 09618279 PERMIT #: BLD20171119 PROJECT: Do 's Lynnwood Mazda INSPECTOR: Susheel Sharma LOCATION: 22214 Hwy 99 JURISDICTION: Citv of Edmonds KA P.M.: Jeff Mercer WEATHER: Partly Cloudy TEMP: 35 Krazan & Associates arrived on site per request for concrete inspection on time. Monitored load tickets, batch weights and water allowances. Concrete started poured by 6:20 am and completed by 12:30 pm. Contactor placed 170 yd3 of concrete from plant of MILES Sand & Gravel. Contractor poured concrete from pump at the foundation slab of the building at Grid 1 to 5 through Grid A to F.3 Set 1: Mix Code : 18400F6 ; Permit No : BLD20171119: Diso Ticket No:215864 (u� Foundation Slab on the building One set of five cylinders (4X8) were made for compressive strength testing. Break scheduled for one in 12-10, three in 12-31 and one is kept for hold. Contractor used pump truck to transport the concrete and was mechanically consolidated. Designed strength of this concrete is 3000 psi. See Cylinder report 09618279CR120318-SS-1 for break results. Set 2: Mix Code: 18400F6 : Permit No: BLD20171119• Din) Ticket No:215889 a Foundation Slab on the building One set of five cylinders (4X8) were made for compressive strength testing. Break scheduled for one in 12-10, three in 12-31 and one is kept for hold. Contractor used pump truck to transport the concrete and was mechanically consolidated. Designed strength of this concrete is 3000 psi. See Cylinder report 09618279CR120318-SS-2 for break results. Site Photo 1: Concreting on foundation Slab of the building Reviewed Bv: ASTM Test #: Asset Number(s): To the best of my owledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in my format without the written permission of the client and Kra= & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site 7� & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 10, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, 7ZAN & ASSOCIATES, INC. orbett .Mercer Project Manager/Lab Manager Pacific Northwest Division CWNV]kj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 �'az1&Associates,Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR1262018YA DATE: 12/6/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD2017 1119 PROJECT: Dou 's Lynnwood Mazda INSPECTOR: Yosief Abraha LOCATION: 22214 Hwy 99, Edmonds JURISDICTION: city of Edmonds KA P.M.: Corbett Mercer WEATHER: cloudy TEMP: 38 Krazan representatives arrived at the site to conduct concrete inspection and testing. Wall [main level (& grid 5/C-D) and Footing [main level at grid D/5.5-6] Observed the contractor placing concrete approximately 10 cubic yards with mix No.18400176 from MILES. The contractor placed the concrete using a pump truck and mechanical vibrator was used for consolidation. Also checked batch tickets, water added and performed slump and temperature tests. One set of (5: 1-7days 3-28days, 1-Hold) 4X8 cylinders were made. Please refer to concrete report No. 9618279CR1262018YA-1 for detailed mix -design, location of placement and compressive strength results. i Reviewed By: ASTM Test #: L I Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory reouirements_ Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any fmmat without the written permission of the client and Kraran & Associates. This report indicates ouri�pedors observation and testing results based on site conditions and contractor activities. This information is subject to review prim to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information bas been provided by others on site. Page 1 of 1 MEFEL Aim === '6�an&Ass ociate s, Inc. Geotechnical Engineering - Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR1252018ZZ DATE: 12/5/2018 Set Count: CONTRACTOR: WILCOX PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Doug's Lynnwood Mazda INSPECTOR: Zelalem Zerihun _ LOCATION: 22214 HWY 99, Edmonds, WA JURISDICTION: City of Edmonds KA P.M.: Corbett Mercer WEATHER: P. Sunny TEMP: 36' F Krazan & Associates, Inc. (KAI) representative visited the above -named project as per contractor's request and performed reinforcing steel and adhesive inspections. Reinforcin Steel: + Typical continuous footing @ D/5 — 6 as per S 1.2 plan view was reinforced and acceptable as per G/S3.1. • Basement wall located south side of the electrical room @ 5/C — D was reinforced as per plan. For #5@12"OC spacing discrepancy, contractor has provided a preliminary EOR's approval (an email correspondence print out) in regarding the spacing. Contractor will need to prepare RFI based on the email and get EOR's approval for the record. Adhesive anchors: • Horizontal dowels #5 installed into existing basement wall @ 5/C & 5/D as per S 1.1 plan view. Also, continuous footing bars at D/5 & D/6 were tied to existing footing including dowels for the wall using epoxy. • Dowels #5@12"OC, Drill bit size — 3/4", embedment — 5" • Adhesive type used — SET-XP. • Product expiration date — 8/4/2020. • Adhesive was applied as per manufacturer's installation instructions. W Reviewed By: ASTM Test #: Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use ofthe client. This report may not be reproduced in any format without the written permission of the client and Krnzaa & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 11, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, 7KAN. & ASSOCIATES, INC. Wercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198'h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 &Associates,Inc. Geotechnical Engineering • Environmental Engineering Field Report NO.: 09618279DFRI272018DB Construction Testing and Inspection DATE: 12/7/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: PROJECT: Doug's Lynnwood Mazda INSPECTOR: Dave Bale LOCATION: 22130 Hw 99 JURISDICTION: Edmonds KA P.M.: JSM WEATHER: sunny TEMP: 40 On site for adhesive dowel inspection. Observed installation of #5 dowels into wall and slab on grade for 8" CMU walls at elevator as per detail K/S5.1. Verified 5" embedment into holes that were drilled and brushed clean. Used Simpson Set XP22 N, # 100017393, expires 08/4/20. Reviewed By: ASTM Test #: Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Sui ) erintendent/Representative : Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Ktaran & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. KXaZan &ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 12, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. ett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc -Eqe!� = aZan_ &ASSOCIATES GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION FORENSIC INVESTIGATION Date: Project No.: Project: Project Location: Krazan PM: December 10, 2018 096-18279 Doug's Lynnwood Mazda 22130 Hwy 99 JM FIELD REPORT Report No.: 09618279DFR121018-NG Contractor: Wilcox Permit No.: BLD20171119 Inspector: Niccolo Guiao Jurisdiction: City of Edmonds Weather: Cloudy Temp: 40's F A Krazan representative visited the project site today for a reinforcing steel placement inspection. Upon our arrival today, the concrete subcontractor was still working on the planned continuous footings for the 8-in CMU wall at grids `B-A/5-6. During our visit, we verified size, grade, count, spacing, lap splice, corner bars and clearances of the footing reinforcements. The footing reinforcements were adequately secured and supported to prevent significant movement during concrete placement. In our opinion, the footing reinforcements conform to the approved structural plans by B&T Design&Engineering, Inc. titled, "Dougs Lynnwood Mazda" dated 5/31/18 per details F/S2.3 and G/S3.1. Site Pictures It should be noted that another Krazan representative, Mr. Susheel Sharma was at the site to perform concrete placement inspection. To the best of my knowledge, the above WAS performed in general accordance to the approved plans and project specifications. Superintend en presentative: Technician: Niccolo Guiao 4303 —198t1 Street SW • Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States Page 1 of 1 -w=='aza1&Ass ociate s, Inc. Geotechnical Engineering e Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFRI2102018SS-1 DATE: 12/10/2018 Set Count: 1 CONTRACTOR: Wilcox Construction PROJECT #: 09618279 PERMIT #: BLD20171119 PROJECT: Dou 's Lynnwood Mazda INSPECTOR: Susheel Sharma LOCATION: 22214 Hwy 99 JURISDICTION: City of Edmonds KA P.M.: Jeff Mercer WEATHER: Partly Cloudy TEMP: 35 Krazan & Associates arrived on site per request for concrete inspection on time. Monitored load tickets, batch weights and water allowances. Concrete started poured by 8:30 am and completed by 9:30 pm. Contactor placed 8 yd3 of concrete from plant of MILES Sand & Gravel. Contractor poured concrete from pump at the foundation slab of the building at Grid 5 to G through'B to A. Set 1: Mix Code : 0255AC . Permit No : BLD20171119, Disp Ticket No-216179 (a? Footing on the building One set of five cylinders (4X8) were made for compressive strength testing. Break scheduled for one in 12-17-18, three in 1-7-19 and one is kept for hold. Contractor used pump truck to transport the concrete and was mechanically consolidated. Designed strength of this concrete is 3000 psi. See Cylinder report 09618279CRI21018-SS-1 for break results. /-I Site Photo 1: Concreting on footing of the building Reviewed By: ASTM Test #: Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. -�-"-8 a & ASSOCIATES, INC. o GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 14, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ICRA N & ASSOCIATES, INC. rb W. ercer Project Manager/Lab Manager Pacific Northwest Division C WM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 —1<j:aZa1&Associates, Inc. Field Geotechnical Engineering . Environmental Engineering Report NO.: 09618279DFR12122018DK Construction Testing and Inspection DATE: 12/12/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD20171119 PROJECT: Do 's Lynnwood Mazda INSPECTOR: Don Keller LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P.M.: WEATHER: TEMP: Inspected the placement of ASTM A615 GR60 reinforcing steel for stem walls @'A-`b&5-7 AND @7& "A-C. G/S3.1,GSN, S1.2. Reviewed ASTM Test #: Asset To the best of m,�kacswledire, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Rep resentative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written percussion of the client and Kra can & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept rsponsbility for validity of results. The same information has been provided by others on site. Page 1 of 1 -= &Associates,Inc. Geotechnical Engineering* Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR12122018SS-1 DATE: 12/12/2018 Set Count: 1 CONTRACTOR: Wilcox Construction PROJECT #: 09618279 PERMIT #: BLD20171119 PROJECT: Do 's Lynnwood Mazda INSPECTOR: Susheel Sharma LOCATION: 22214 Hwy 99 JURISDICTION: City of Edmonds KA P.M.: Jeff Mercer WEATHER: Cloudy TEMP: 46' F Krazan & Associates arrived on site per request for concrete inspection on time. Monitored load tickets, batch weights and water allowances. Concrete started poured by 1:30 pm and completed by 4:00 pm. Contactor placed 15 yd3 of concrete from plant of MILES Sand & Gravel. Contractor poured concrete from pump at the wall of the building at (1) Grid 5 to 7 through Grid `B (2) Grid A to Grid C through Grid 7 (3) Grid 6 through Grid C to D (4) Grid D through Grid 5 to Grid 6 Set 1: AM Code : 0255AC • Permit No : BLD20171119• DisR Ticket No:216286 & Foundation Slab on the building One set of five cylinders (4X8) were made for compressive strength testing. Break scheduled for one in 12-19-18, three in 1-9-19 and one is kept for hold. Contractor used pump truck to transport the concrete and was mechanically consolidated. Designed strength of this concrete is 3000 psi. See Cylinder report 09618279CR121218-SS-1 for break results. tions and Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the Mclusivc use of the client. This report may not be reproduced in any format without the written permission of the client and Kra & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information bas been provided by others on site. & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 18, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, 7AN & ASSOCIATES, INC. Jr cer Project Manager/Lab Manager Pacific Northwest Division CWNVlkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198' Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc Page 1 of 1 ^aZ&Associates, Inc. iaV* Field Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Report NO.: 09618279DFRI2142018JT-1 DATE: 12/14/2018 Set Count: 1 CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD 2017 1119 PROJECT: Dough's LL3tnnwood Mazda INSPECTOR: Joseph Taylor LOCATION: 22214 Hwy 99 JURISDICTION: Lynnwood KA P•M•: WEATHER: Cloudy TENT: 450 F A Krazan & Associates, Inc. representative was onsite to inspect the placement of reinforcing steel for the CMU walls at the elev. Mech. Room at 1-2/D-E (-9' 11") and the sprinkler room at F.3-F/4-5 (-9' 4"). At these locations, reinforcing steel appeared in general accordance with the project plans and specifications. Plans used were those prepared by B&T design and engineering dated 8/16/2017. The representative then observed and inspected the subsequent placing of grout at the locations previously mentioned. Truck arrived and the pour began at 9:10. Mix used was 35MG708. One set of 4 grout prisms were cast from the pour for compressive strength testing; please see grout masonry report for testing results. The pour concluded with a total of 8 cubic yards being placed. Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any feamat without the written permission of the client and Kra & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site ' bra &ASSOCIATES , INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 19, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, ZAN & ASSOCIATES, INC. C',4ett %i Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 1981" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFRdoc Page 1 of 1 "= an&Associates,InC. Field Geotechnical Engineering • Environmental Engineering Report NO.: 09618279DFRI2172018DS Construction Testing and Inspection DATE: 12/17/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD20171119 PROJECT: Dougs Lynnwood Mazda INSPECTOR: Daniel Sleeman LOCATION: 22214 Hwy 99� JURISDICTION: Lynnwood KA P.M.: Corbett Mercer WEATHER: overcast TEMP: 50' F Krazan & Associates representative arrived on site as requested by contractor for proprietary anchor inspection. Contractor informed me that they were not installing the anchors today. Will re -schedule. Reviewed To the best of my'hsr-wl regulatory requirements. ASTM Test #: Asset N the above WAS performed in accordance with the approved plans, specifications and Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in anv format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same infomtation has been provided by others on site. ram. — �� I i MWIN & ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION December 26, 2018 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. INC. Corbetti r r Pro ect a� r/Lab Manager Pacific Noilhwest Division CWNVlkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 DFR.doc LF Page 1 of 2 1%W1(an&Associates, I nc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR12212018SS-1 DATE: 12/21/2018 Set Count: 1 CONTRACTOR: Wilcox Construction PROJECT #: 09618279 PERMIT #: BLD20171119 PROJECT: Doug's Lynnwood Mazda INSPECTOR: Susheel Sharma LOCATION: 22214 Hwy 99 JURISDICTION: City of Edmonds KA P.M.: Jeff Mercer WEATHER: Mostly Cloud TEMP: 39 Krazan & Associates arrived on site per request for adhesive anchor inspection on time. 1 Adhesive Anchor Inspection: Checked the location of the anchor, dimension of holes ,dimension of anchor bolts and expiration date of epoxy. Upon our arrival today, the contractor drilled fifty nine (59) holes. Expire date of used epoxy was 10/2019. Prior to the placement of the epoxy on walls, the drilled holes was verified for cleanliness embedment. The contractor cleaned the holes using brush and air compressor. Photo 1: Cleaning holes # Location : Metal brace frames On Walls (1) Grid F3 through Grid 1 to 5 (2) Grid 5 through Grid C to D Contractor use HILTI epoxy tubes. Contractor used 3 epoxy tubes from HILTI where it has expiration date of 10/2019. Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. Page 2 of 2 -=—Kmzan&Associates,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Photo 2: U Contractor performed the installation project's drawings . Field Report NO.: 09618279DFR12212018SS-1 = 0114 ;d Epoxy from HILTI Photo 3 : Epoxy with expiration date as per manufacture's instructions and as mentioned in general and plans notes of this # Location : Metal Brace Frame on Walls 59 holes has been drilled having 11/16 inches diameter and depth of hole 4 3/4 inches. Contractor use 5/8 inches dia anchor bolts of having length 6'/z inches . Bolts were embedded 4 3/ inches into the wall. Contractor installed anchor bolts horizontally towards wall. The spacing of between the holes are 24" C/C. Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use ofthe client. This report may not be reproduced in any format without the written permission of the client and Kraran & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site, rr ' AN ���KraFl &ASSOCIATES GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION FORENSIC INVESTIGATION Date: Project No.: Project: Project Location: Krazan PM: December 19, 2018 096-18279 Doug's Lynnwood Mazda 22130 Hwy 99 JM FIELD REPORT Report No.: 09618279DFR121918-NG Contractor: Wilcox/ Blue Star Welding Permit No.: BLD20171119 Inspector: Niccolo Guiao Jurisdiction: City of Edmonds Weather: Cloudy Temp: 40-50's F A Krazan representative visited the project site today for an adhesive anchors inspection. Upon our arrival today, the steel erector contractor had drilled seventy two (72) 3/-in diameter holes along gridlines A-D/1 (count: 23), A-F.2/5 (count: 41) and E-F/lA (count: 8) except for near grids B/1 and B/5 wherein anchors of the 2-ft long angle plates have not been drilled. It should be noted that the angle plates vary in length and were temporarily erected using two (2) screw anchors, welds and vise grip clamps. One (1) anchor was not epoxy-ed along gridline B-C/5 due to rebar congestion. During our visit, we observed the steel erector contractor cleaned the drilled holes using wire brush and compressed air. Prior to the placement of epoxy and the planned anchors, the drilled holes cleanliness were verified with a min. embedment of 4 3/-in. We observed seventy two (72) 5/8-in diameter, 6-in long threaded rod epoxy-ed using Hilti RE-500 V3 with lot no. 082916L3 and expiration date of 10/2019. In our opinion, the steel erector contractor performed the installation per manufacturer's instruction, detail E/S4.1 of the approved structural plans provided by B&T titled, "Doug's Lynnwood Mazda" dated 08/16/17 and e-mail acceptance notification about the anchor embedment on 12/19/18 (1:14pm). It should be noted RFI to follow about the anchor embedment. To the best of my knowledge, the above WAS performed in general accordance to the approved plans and pro' ct specifications. Superintendent/Representative: Technician: Niccolo Guiao 4303 —198�h Street SW • Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States KRAZAN & ASSOCIATES, INC. Site Pictures Page No. 2 To the best of my knowledge, the above WAS performed in general accordance to the approved plans and project specifications. Superintendent/Representative: Technician: Niccolo Guiao Krazan & Associates, Inc. Offices Serving The Western United States Page 1 of 1 �iaZ 7&Associates, Inc. Field Geotechnical Engineering . Environmental Engineering Report NO.: 09618279DFRI2182018JT Construction Testing and Inspection DATE: 12/18/2018 Set Count: CONTRACTOR: Wilcox PROJECT #: 09618279 PERMIT #: BLD20171119 PROJECT: Doug's Lynnwood Mazda INSPECTOR: Joseph Taylor LOCATION: 22214 Hwy 99 JURISDICTION: Edmonds KA P•M•: WEATHER: Cloudy TEMP: 450 F A Krazan & Associates, Inc. representative was onsite to inspect the installation of slab dowels at gridlines 6-7/ `A-C (42 dowels) and 5-6/ `B-D (approx. 20 dowels before stopping). Dowels were #4 rebar embedded 5" at 18" O.C. using Simpson Set-xp epoxy according to plans by B&T design and engineering dated 8/16/2017. Holes were air blown and wire brushed prior to installation. Reviewed By: To the best of my know] regulatory requirements. Asset I , the above V AS 00t performed in accordance with the approved plans, specifications and .cian: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site -�I<ILOLZan & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION January 31, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 KA No. 096-18279 Permit: BLD2017-1119 RE: NON -CONFORMING CONSTRUCTION TESTING AND INSPECTION Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, DeZAN & ASSOCIATES, INC. W Mercer tt Project Manager/Lab Manager Pacific Northwest Division CWM/Ikj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) BELT ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198t1i Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09619279 DFR.doc Pagel of 3 MIL&Associates,Inc. 10h Geotechnical Engineering a Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFRI292019JD-1 DATE: 1/29/2019 Set Count: 1 CONTRACTOR: Wilcox / Fairweather Masonry PROJECT #: 09618279 PERMIT #: BLD2017-1119 PROJECT: Dou s Mazda INSPECTOR: Jeff Dewey LOCATION: 22214 HWY. 99 JURISDICTION: City of Edmonds KAP.M.: Jeff Mercer WEATHER: Clear TEMP:37 A representative of Krazan & Associates arrived on -site as scheduled to perform construction observations and materials testing. While on -site, we observed Fairweather Masonry constructing CMU interior and exterior walls at the following locations: Gridline A.0 from 1.0-5.0 (04'), 5.0 from `B.0-A.8 (04'), 1.0 from A.0-D.0 (0-4'), 1.5 from D.0-D.3 (0-4'), D.3 from 1.0-1.5 (0-4'), 7.0 from `A.0-C.0 (0-4'), C.0 from 6.0-7.0 (0-4'), and E.0 from 3.0-3.8 (0-4'). Constructed masonry walls were observed for reinforcing steel size, grade, splices, spacing, alignment, grout coverage, and general overall placement. Additionally, constructed CMU walls were observed for mortar joint thickness, mortar protrusions, bond beams, cleanliness, and general overall block placement. The stated masonry walls were in compliance with the project plans, specifications, and governing documents with the exception of the following items: 1. Missing (1) #5 vertical extending from the foundation at D.0/5.0. Project structural engineer gave verbal acceptance of dropping a second vertical that will not be embedded in the foundation. 2. Missing (1) #5 vertical extending from the foundation at D.3/1.5. Project structural engineer gave verbal acceptance of dropping a second vertical that will not be embedded in the foundation. 3. Missing (1) #5 vertical extending from the foundation at D.0/1.5. Project structural engineer gave verbal acceptance of dropping a second vertical that will not be embedded in the foundation. 4. Bond beam at the 4' elevation at gridlines B.2/1.0 had a lap splice less than the specified minimum. Additional reinforcing steel was added prior to grout placement. 5. Missing #5 vertical at B.9/7.0. Reinforcing was placed prior to grout placement. 6. Missing #5 vertical at C.0/6.1. Reinforcing was placed prior to grout placement. 7. Missing horizontal bond beam reinforcing at elevation 4' along 7.0 line from `A.0-A.5. Reinforcing was placed prior to grout placement. Additionally, we observed Fairweather Masonry place approximately 14.0 cubic yards of Cadman #35MG708 grout pumped to the point of placement for the above stated masonry walls. The grout was consolidated with a mechanical masonry vibrator and hand finished. An approximate '/2" keyway was left at the top of the grout lift. Slump and temperature testing was performed and the results were as follows: Slump — 10.75", Temperature — 60 degrees F. (1) Set of (4) compressive strength test specimens was cast for future compressive strength testing. Results will be forwarded upon completion. NOTE: Grout was scheduled for 9.30am but did not arrive until 10.15am. Shane, superintendent with Wilcox, was notified of all observations and test results prior to Krazan's departure from the project site. Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kmaan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on sites y�� �7 Page 2 of 3 l\LA an&Associates, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618279DFR1292019JD-1 South and West Sections of Grout Placement Area North Section of Grout Placement Area Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kr & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site, Page 3 of 3 r Kxazan&Associates,Inc. Field Geotechnical Engineering* Environmental Engineering Construction Testing and Inspection Reviewed By: r To the best of my knowledge, I �bor WAS and regulatory requirements. Report NO.: 09618279DFR1292019JD-1 Structural Plan View Asset Number(s): in accordance with the approved plans, specifications Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any foruut without the written permission of the client end Kra�an & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity ofresuls. The same information has been provided by others on site. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 3, 2019 Accounts Payable ADZAM INC. DBA DOUG'S MAZDA 22130 Hwy 99 Edmonds, WA 98026 RE: COMPRESSIVE STRENGTH TEST RESULTS - REVISED Doug's Lynnwood Mazda 22130 Hwy 99 Edmonds, Washington KA No. 096-18279 Permit: BLD2017-1119 Enclosed are copies of the compressive strength test results for the above referenced project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. 2 Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj CC: CITY OF EDMONDS (E-MAIL) NED NELSON ARCHITECT (E-MAIL) B&T ENGINEERING (E-MAIL) WILCOX CONSTRUCTION (E-MAIL) 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618279 BRK Krazan and Associates, Inc. Grout Report Form 4303 198th Street SW Lynnwood, WA 98036 Project No: 096-18279 Grout Code: 66291 Weather: Sunny Jurisdiction: City of Edmonds Project: Doug s Lynnwood Mazda Location: 22130 Hwy 99 Client: Adzam Inc. dba Douq's Mazda Field Data Pour Date: 4/4/19 Report No: 12633 Permit No. BLD2017 1119 Engineer: B&T Engineering Architect: Ned Nelson Architect Contractor: Wilcox Construction % Air (ASTM C-231) N/A Temp. (ASTM C-1064) 66 Slump (ASTM C-143) Flow Sampling (ASTM C-172) N/A Making (ASTM C-31) X Unit Wt. (ASTM C-138) N/A Other Consolidation Method Inspector: T. Tran Mechanical: X Manual: Field Notes: 8" CMU from 8' to 12' @ A76-7, 7/A'-C, C/6-7, 6/C-D, D/5-6 Placement by line pump. Please refer to Field Report No. 2072 Reported Batch Data Batch Time: 10:57 AM Sample Time: 12:00 PM Truck #: 422 Ticket #: 618210 Design Wts. Actual Wts. Mix No. 35MG708 35MG708 Cem. (Ibs) 658 657 F. Ash (Ibs) N/A N/A Agg. 1 (Ibs) 830 816 Sand (Ibs) 1887 1883 Water (Ibs) 425 412 Air Ent. (oz) N/A N/A Other(oz) N/A N/A Water Added on Job (gal) 10 Supplier: Cadman Plant Number: 34 Site Mix: Initial Curing Temps High -Low: Ambient Air Temperature: 56 Load Size: 7 yds Sample @ cy of cy Field Test Results Conforming X Non -Conforming Laboratory Data Design Strength: 2,000 @ 28 days Date Specimens Rec'd: 4/5/19 Laboratory Test Methods ASTM C-617 ASTM C-780 ASTM C-39 ASTM C-1019 X ASTM C-109 Other Cyl. Code Test Date Age Side 1 Side 2 Area Height % Plumb Load (Ibs) Strength (PSI) Set # Break Tested By 66291-1 4/11119 7 3.40 3.42 11.63 5.79 0.0% 36,830 3,170 1 3 BAW 66291-2 5/2/19 28 3.42 3.46 11.83 6.41 0.0% 49,410 4,180 1 3 BAW 66291-3 5/2/19 28 3.40 3.43 11.66 6.22 0.0% 46,980 4,030 1 3 BAW 66291-4 5/2/19 28 3.40 3.41 11.59 6.18 0.0% 47,790 4,120 1 3 BAW P.M. Review: w- I - Date Reviewed: -- 1 1 Lab Test Results Conforming X Lab Data Reviewed By: V Date Reviewed: Non -Conforming This information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Assoc. Grout Report Effective Date: 4/08/2009 Page 1 of 1 18300 NE Union Hill Road, Suite 200 Redmond, WA USA 98052-3333 Tel: (425) 883-0777 Fax: (425) 882-5498 GOLDER TO: Doug Ikegami - Doug's Lynnwood Mazda 22130 Highway 99 Edmonds, WA 98026 ONSITE: 0650 OFFSITE: 0715 SITE ACTIVITES THE FOLLOWING WAS NOTED: DATE: JOB NO: Thursday, Au ust 23, 2018 �1533298 PROJECT: Lynnwood Mazda Dealer LOCATION: Edmonds, WA CONTRACTOR: OWNER: Wilcox Construction Doug Ike ami WEATHER: TEMP ff): Overcast/Drizzle 50s PRESENT AT SITE: Golder — David Lam Wilcox Construction - Shane Golder used a'/2-inch diameter steel t-probe to check stormwater vault subgrade conditions. The vault pad was approximately 150 feet long by 30 feet wide. Contractor previously excavated for the vault subgrade. The vault subgrade generally consisted of moist, dense, silty sand with gravel and was firm and unyielding to the t-probe. Based on the field observations, the subgrade is considered suitable for supporting the anticipated vault. COPIES TO: Wilcox Construction SIGNED: File Margaret Pryor for David Lam — Field Technician Page 1 of 2 18300 NE Union Hill Road, Suite 200 Redmond, WA USA 98052-3333 Tel: (425) 883-0777 Fax: (425) 882-5498 LDER TO: Doug Ikegami - Doug's Lynnwood Mazda 22130 Highway 99 Edmonds, WA 98026 ONSITE:0745 OFFSITE:0815 SITE ACTIVITIES THE FOLLOWING WAS NOTED: DATE: Monday, March 25, 2019 JOB NO: 1533298 PROJECT: Lynnwood Mazda Showroom LOCATION: Lynnwood, WA CONTRACTOR: Wilcox Construction Inc. OWNER: Lynnwood Mazda WEATHER: Sunny TEMP (°F): 65 PRESENT AT SITE: Golder — Max Rossiter FOUNDATION COMPACTION TESTING: Golder was requested to assess condition of subgrade areas that were previously excavated. Golder representative, Max Rossiter, used a'h-inch diameter steel T-probe to check footing subgrade conditions. Footing subgrade generally consisted of moist, dense, silty sand with gravel and allowed less than 3" of penetration using the T-probe. The footing area on the Northwest corner of the site had a leveling rock base coarse approximately 3" thick in the location of the strip footing. Based on the field observations, the subgrade is considered suitable for supporting the anticipated footing. Figure 1: Footing subgrade on east side of site looking north (left) and south (right). Page 2 of 2 ,n `�,� ;; 3. ° .,•, ;.,.� ._:,�','�''° vim;; �,:: '.; .,.".. , ; .: ,� � .: . Figure 2: Footing subgrade located on Northwest corner of site. SIGNED: t� Margaret Pryor — Project Manager COPIES TO: Wilcox Construction File Page 1 of 2 18300 NE Union Hill Road, Suite 200 Redmond, WA USA 98052-3333 *> Tel: (425) 883-0777 Fax: (425) 882-5498 GOLDER TO: Doug Ikegami - Doug's Lynnwood Mazda 22130 Highway 99 Edmonds, WA 98026 ONSITE:1315 OFFSITE:1345 SITE ACTIVITIES THE FOLLOWING WAS NOTED: DATE: Wednesday, September 5th, 2018 JOB NO: �1533298 PROJECT: Lynnwood Mazda Dealership LOCATION: Lynnwood, WA CONTRACTOR: Wilcox Construction Inc. OWNER: Lynnwood Mazda WEATHER: Sunny w/ sparse clouds TEMP (°F): 70 PRESENT AT SITE: Golder — Christian Norris Wilcox — Shane, and four 4 other workers FOUNDATION COMPACTION TESTING: Golder was requested onsite to assess condition of subgrade soils within a foundation trench in native gravelly sand. A'/z-inch fiberglass T-Probe was used to check the subgrade in the area indicated in Figure 1. The native cut was approximately 1'/z feet below adacent grade and approximately 3'/2 feet in width. A majority of the subgrade trench was generally firm and is suitable for foundation support. There were two areas with silt subgrade soils about 3 to 4 feet in length where the t-probe was inserted to a depths ranging from 5 to 14 inches. Shane, Wilcox's site supervisor, was informed that the material in these areas needed to removed and replaced with properly placed structural fill. These areas are shown in Figure 1. Figure 1: (Not to Scale. Approximate measurements.) i JT�Ell . E I_ .n 0 LEGEND 0 Pa ssi ng [Yi eI ds 1/8" - 3"j 0 Failed [Yi0ds5"-S" j Removal Reg4CI yLlke4 -- e } DOUG'S LYNNWOOD MAZDA 22130 HIGHWAY-99 ECI�,. L "�` FOU\UAI I{]fV D AIN PLAN Page 2 of 2 SIGNED: C " / ! 4q� Christian Norris — Field Technician COPIES TO: Wilcox Construction File Page 1 of 2 18300 NE Union Hill Road, Suite 200 Redmond, WA USA 98052-3333 Tel: (425) 883-0777 Fax: (425) 882-5498 GOLDER TO: Doug Ikegami - Doug's Lynnwood Mazda 22130 Highway 99 Edmonds, WA 98026 ONSITE:1230 OFFSITE:1250 SITE ACTIVITIES THE FOLLOWING WAS NOTED: DATE: Friday, September 28, 2018 JOB NO: �1533298 PROJECT: Lynnwood Mazda Dealership LOCATION: Lynnwood, WA CONTRACTOR: Wilcox Construction Inc. OWNER: Lynnwood Mazda WEATHER: Sunny TEMP (°F): 70 PRESENT AT SITE: Golder — Margie Pryor Wilcox — Shane, and four 4 other workers FOUNDATION COMPACTION TESTING: Golder was requested to assess condition of subgrade areas that were previously checked on 9-5-2018. Areas of soft/loose subgrade soils were identified during the 9-5-18 site visit. The contractor removed the soft/loose soils and Golder checked the overexcavated areas using a'/z-inch fiberglass T-Probe in the areas shown in blue and red in Figure 1. The exposed subgrade soils in these areas were generally firm and were considered suitable for foundation support. Figure 1: (Not to Scale. Approximate measurements.) 01 _ i- 1 I -� 14. i {' I a 1 LEGEND �"' I[.I � OPasling {Yields ]�S"-3"j M Failed {Yields s"-a" I ` 0 Removal Req.l Clay like} n A N DOUG'S LYNNWOOD MAMA 22130 HIGHWAY-99 ���a,MW CECIL $.js=Cl►a1L FOUNDATION DRAIN PLAN Page 2 of 2 SIGNED: Margaret Pryor -Project Manager COPIES TO: Wilcox Construction File Page 1 of 2 18300 NE Union Hill Road, Suite 200 Redmond, WA USA 98052-3333 Tel: (425) 883-0777 Fax: (425) 882-5498 GOLDER TO: Doug Ikegami - Doug's Lynnwood Mazda 22130 Highway 99 Edmonds, WA 98026 ONSITE:1600 OFFSITE:1630 SITE ACTIVITIES THE FOLLOWING WAS NOTED: DATE: Friday, September 12, 2018 JOB NO: �1533298 PROJECT: Lynnwood Mazda Dealership LOCATION: Lynnwood, WA CONTRACTOR: Wilcox Construction Inc. OWNER: Lynnwood Mazda WEATHER: Sunny TEMP (°F): 65 PRESENT AT SITE: Golder — Max Rossiter FOUNDATION COMPACTION TESTING: Golder was requested to assess condition of subgrade areas that were previously excavated. Golder used a '/2-inch diameter steel T-probe to check footing subgrade conditions. Footing subgrade generally consisted of moist, dense, silty sand with gravel and allowed less than 3" of penetration using the T-probe. Based on the field observations, the subgrade is considered suitable for supporting the anticipated footing loads. Page 2 of 2 SIGNED: Ma Rossiter —Staff Engineer COPIES TO: Wilcox Construction File