Loading...
BLD2021-1532_Other_11.10.2021_10.05.54_AM_2512866(2061 246-7663 vvvvvv. tcklinorggf Ing, c:om Roofing Agreement TEKLa ROOFING . VaE • a Estimate prepared for Lyons Group: Estimate for removal and disposal of existing roof and 320 Dayton St installation of a new complete Tekline Roofing system. Edmonds, Wa 98020 No work with skylight. Circle the option(s) below of your choice Material Options: PVC Membrane 60 mil Lifetime warranty low sloped roofing system. $69,333.86 -System Roofing Material Color GREY Terms and Conditions • Sales tax is not included. Standard sales tax rates apply. • Prices proposed in this agreement are guaranteed for 15 days from date of agreement. Tekline will notify customer of any price increase prior to start of project. Customer/Tekline has the right to cancel with full refund prior to job start/materials ordered. • 10% deposit will be collected upon signing. 40%will be collected on the first day of project. Metal roofs 40%(non-refundable) will be collected when panels are ordered. Balance will be collected at completion of project. Payments not received within ten (10) days of completion will be subject to a five hundred dollar ($500) late charge and the unpaid amount and late charge will begin to accrue interest at ten percent (10%) per annum. If any party institutes suit against the other concerning this Agreement, or the work under it, the prevailing party shall be entitled to reasonable attorneys' fees and expenses. • If a project permit is obtained by Tekiine Roofing, owner will be responsible for cost of permits. • Tekline Roofing is not responsible for fasteners which penetrate through underside of roof deck. This includes but is not limited to open soffits, eaves and • Charges may apply for any additional existing layers of roofing which are not included in this agreement. • Tekline Roofing is not responsible for cracks in driveway resulting from delivery of material and/or delivery and pick up of disposal container. • Tekline Roofing is not responsible for cracks, splits and/or paint chips to siding resulting from removal of existing (lashings or installation of new flashings. Siding that is removed and re -installed will be caulked but may need to be painted (not Included). • Tekline Roofing is not responsible for damages to interior and/or exterior of building resulting from regular roofing activities or stress of roofing project. • Any additional work performed which Is not specified in this agreement will be performed at $96 per man hour plus materials with 30%OH&P on materials. Plywood will be replaced at $95 per sheet for 1/2" Cox. Additional roof layers found and torn off, will be billed at $ 90 square foot Workmanship Warranty.Tekllne warranties our workmanship for up to 10 years from the date of Installation. Signed Jake Lyon 9/2/2021 Print Name Date ;Tekline Roofing H glund August 18, 2021 Tekline Roofing • 635 fnduutry Or-ivc,, Tukvvtfa WA 981aB • Lic.1t l-EKUR•85OKO Page 1 (206) 246•7662 WWW. Ge.k1tnenaofrng.cam Roofing Specifications 7rEKL//1/E FK)OFING * r + r r r • Estimate prepared for Lyons Group: Estimate for removal and disposal of existing roof and 320 Dayton St installation of a new complete Tekline Roofing system. Edmonds, Wa 98020 General Specifications: Tear off: Removal and disposal of 1 layer(s) of roofing material is included in this estimate Insurance: Tekline is fully licensed, bonded and insured. License# TEKLIR*850KQ. All work in the following proposal is covered by Workman's Compensation, Public Liability and Completed Operations Insurance. Roof Deck Inspection: A full roof deck inspection will be performed after tear -off. Any rot or defective structure will be removed and replaced on a time and materials basis. Paint: All furnace vent pipes and all plumbing and electrical pipe flashings will be painted with a rust proof paint. Ponding Water: Tekline Roofing does not guarantee to eliminate all ponding water from roof. Causes include settling of building, structural inadequacies or roof/taper design. Clean up: Grounds will be thoroughly cleaned, and a magnetic nail sweep will be performed. Gutters will also be cleaned. Flat Specifications: Underlayment: Install a fire rated sheet underlayment to act as a fire retarder. Underlayment: Fanfold insulation sheet will be installed over roof deck. This will add R-value, act as vapor barrier and protect roofing membrane from being damaged. Includes synthetic vapor retarder between fanfold and roof deck. Flashings: All flashings used will be 26 gauge enamel coated flashings. The color of the flashing used will closely match the product color chosen. Fasteners: Galvanized screws and plates will be used to secure roofing to roof deck. Fan Vents: Replace all existing kitchen/bathroom fan vents with new metal stem vents Attic Ventilation: InstaII16 pre -fabricated curbed attic vents to ventilate attic. Plumbing Vents: Replace all existing pipe flashings with new pipe boots. Membrane Breathers: Vents will be installed to eliminate condensation between membrane and roof deck. Corner pieces: Specially manufactured inside and outside corner pieces will be used on all corners. Drains: Tekline will install new retrofit drain inserts into exisitng bell drains. No work with plumbing is included. Cap Metal: 26 gauge cap metal will be installed around perimeter of roof. Screws with grommets will be used to secure cap metal. Tekixne Roofing s 835 Industry Onvre. Tukw+ts WA 981 aa • Lic. N TEKLIR'850KO Page 2 TEKL/NE f206) 246-7662 PING J • ♦ ♦ F # www. teklinxroof ing. corn Ponding Water: Tekline does not guarantee to eliminate, and is not resposible for any ponding water due to existing roof design, structural inadequecies or settling of building. Minor ponding may occur with complete taper system installations. Signed Jake Lyon 9/2/2021 Print Name Date Tekline Roofing 9 — 2-- l Norm Hoglund August 18, 2021 Tekline Roofing • 635 Industry give. Tukwila wA 88188 • Lrc. N TEKUR'B5DKO Page 3