Loading...
Building Permit 2020'S IDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 980201 1 1.:1 www.edmondswa.gov wwm Type: RESIDENTIAL BLDG Owner/ Business: SHERLYN WONG Status: ISSUED Subtype: ALTERATION OR REMODEL Parcel No: 00434207702500 Site Address: 845 DAYTON ST EDMONDS,WA 98020-3337 Applied: 7/1/2020 Subdivision: 004342 Lot: 0 Issued: 12/17/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $6,000.00 Occupancy Type: R3 Construction Type: VB Expiration Date: 12/12/2021 Code Edition: 2015 No. Stories: 1 # of Dwelling Units: 1 Issued by: NED Scope of Work: WONG- REPLACE SOLARIUM WINDOWS WITH WALL/ROOF WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT SHERLYN WONG 845 DAYTON ST, EDMONDS WA (206)383-5031 SHERLYNCHAN@GMAIL.COM 98020 CONTACT SHERLYN WONG 845 DAYTON ST, EDMONDS WA (206)383-5031 sherlynchan@gmail.com 98020 CONTRACTOR OWNER OWNER CHEE K & SHERLYN Y WONG 845 DAYTON ST, EDMONDS WA (206)383-5031 98020-3337 INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 12/17/20 R9161 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $231.00 $231.00 12/17/20 R9161 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $196.35 $196.35 7/2/20 R6112 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 12/17/20 R9161 TOTALS: $473.85 $473.85 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, December 17, 2020 3:21:37 PM 1 of 2 'SIDENTIAL BLDG '- rmit PERMIT NUM City of Edmonds . ••� i66 1 1 1.:1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-3 EXTERIOR INSULATION B-3 ROOF SHEATHING B-4 DRYWALL FASTENING B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL Printed: Thursday, December 17, 2020 3:21:37 PM 2 of 2