Building Permit 2020'S IDENTIAL BLDG Permit
PERMIT NUM
City of Edmonds
www.edmondswa.gov
wwm
Type: RESIDENTIAL BLDG
Owner/ Business: PETER FERRERA
Status: ISSUED
Subtype: ALTERATION OR REMODEL
Parcel No: 00513100016001 Site Address: 17901 72ND AVE W EDMONDS,WA 98026-5507
Applied: 9/8/2020
Subdivision: 005183, 005131
Lot: 0
Issued: 12/15/2020
Fire Sprinklers: No Lot
Area: Zoning:
Final:
Valuation: $2,000.00 Occupancy Type: R3 Construction Type: VB
Expiration Date: 12/10/2021
Code Edition: 2015 No. Stories: 1 # of Dwelling Units: 1
Issued by: NED
Scope of Work: FERRERA- ENLARGE 2 WINDOWS verify scope of work in field
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
PETER FERRERA
17901 72ND AVENUE W,
(425)246-3040
FERRERPA65@GMAIL.COM
EDMONDS WA 98026
CONTACT
PETER FERRERA
17901 72ND AVENUE W,
(425)246-3040
ferrerpa65@gmail.com
EDMONDS WA 98026
CONTRACTOR
OWNER
OWNER
PETER A FERRERA
17901 72ND AVE W, EDMONDS
(425)246-3040
WA 98026
ML
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
12/15/20
R9094
PER PERMIT
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$175.00
$175.00
12/15/20
R9094
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$148.75
$148.75
9/9/20
R7463
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
12/15/20
R9094
TOTALS: $370.25 $370.25
CONDITIONS
CONDITION TYPE
STATUS NOTES
Printed: Tuesday, December 15, 2020 2:02:53 PM 1 of 2
'SIDENTIAL BLDG Permit
PERMIT NUM
City of Edmonds
2020 934,
-. •. •
il L
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
IL
INSPECTIONS
- Schedule Online
at: https://Inspection.MvBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-4 DRYWALL FASTENING
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL
Printed: Tuesday, December 15, 2020 2:02:53 PM 2 of 2