Loading...
Building Permit 2020'SIDENTIAL BLDG Permit PERMIT NUM City of Edmonds wWA.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: ROBIN MICHEL Status: ISSUED Subtype: ALTERATION OR REMODEL Parcel No: 00679200000200 Site Address: 7824175TH ST SW EDMONDS,WA 98026-5026 Applied: 6/25/2020 Subdivision: 005944, BLA AFN 200605095004, 006792 Lot: 0 Issued: 7/22/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $21,500.00 Occupancy Type: Construction Type: Expiration Date: 7/22/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: HAMBY- INTERIOR REMODEL WA State Contractor L & I #: REGENC189K5 City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME TO ADDRESS PHONE EMAIL APPLICANT ROBIN MICHEL 7305 SOUNDVIEW DRIVE, (206)930-2445 RWMICHEL@NWLINK.COM EDMONDS WA98026 CONTACT MICHEL DESIGN 7305 SOUNDVIEW DRIVE, (206)930-2445 rwmichel@nwlink.com EDMONDS WA98026 CONTRACTOR REGENT CONSTRUCTION INC 7305 SOUNDVIEW DR, (832)423-3879 EDMONDS WA98026 7824 175TH ST SW, EDMONDS OWNER MICHAEL E HAMBY WA 98026 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 7/22/20 R6561 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 7/22/20 R6561 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 7/22/20 R6561 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $75.00 $75.00 7/22/20 R6561 TRAP FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $15.00 $15.00 7/22/20 R6561 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $455.00 $455.00 7/22/20 R6561 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $386.75 $386.75 6/25/20 R5977 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 7/22/20 R6561 TOTALS: $1,078.25 $1,078.25 CONDITION TYPE STATUS NOTES Printed: Wednesday, July 22, 2020 12:10:16 PM 1 of 2 MIDENTIAL BLDG Permit PERMIT NUM City of Edmonds 2020 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests ALL BUILDING PERMITS FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. FOR CARBON MONOXIDE SYSTEMS INFORMATION ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION INSPECTIONS - Schedule Online at: https://Inspection.MvBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-3 PLUMB ROUGH IN B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 FRAMING B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Wednesday, July 22, 2020 12:10:16 PM 2 of 2