Loading...
Building Permit 2020'S IDENTIAL BLDG Permit PERMIT NU of Edmonds EdmondsCity 98020 1 1 1 wwm www.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: BRETT WIEMANN Status: ISSUED Subtype: ALTERATION OR REMODEL Parcel No: 00373600701403 Site Address: 21916 92ND AVE W EDMONDS,WA 98020-3973 Applied: 10/22/2020 Subdivision: 003736 Lot: 0 Issued: 11/12/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $20,000.00 Occupancy Type: Construction Type: VB Expiration Date: 11/12/2021 Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: DALE -REMODEL - CONVERT 1/2 GARAGE TO BATH/UTILITY P&M INCL WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT BRETT WIEMANN 3835 S EDMUNDS ST, SEATTLE (206)640-4736 BRETTWIEMANN@GMAIL.COM WA 98118 CONTACT BRETT WIEMANN 3835 S EDMUNDS ST, SEATTLE (206)640-4736 brettwiemann@gmail.com WA 98118 PO BOX 81144, SEATTLE WA CONTRACTOR OWNER 98108 PO BOX 81144, SEATTLE WA OWNER JOSHUA DALE REDWOOD LLC 98108 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 11/4/20 R8427 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 11/4/20 R8427 PERMITS APPLIANCE VENTS 001.000.322.10.000.00 $45.00 $45.00 11/4/20 R8427 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/4/20 R8427 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $165.00 $165.00 11/4/20 R8427 TRAP PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $427.00 $427.00 11/4/20 R8427 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $362.95 $362.95 10/29/20 R8362 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 11/4/20 R8427 WATER HEATER - INCLUDING 001.000.322.10.000.00 $15.00 $15.00 11/4/20 R8427 EXPANSION TANK TOTALS: $1,161.45 $1,161.45 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, November 12, 2020 4:25:49 PM 1 of 2 'SIDENTIAL BLDG '- rmit PERMIT NU City of Edmonds . ••� i66 1 1 1 www.edmondswa.gov i 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. FOR CARBON MONOXIDE SYSTEMS INFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. INSPECTIONS - Schedule Online at: https://Inspection.MVBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-3 MECH ROUGH IN B-3 PLUMB GROUND WK B-3 PLUMB ROUGH IN B-3 UNDERFLR FRAMING B-4 FRAMING B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Thursday, November 12, 2020 4:25:49 PM 2 of 2