Building Permit 2020'S IDENTIAL BLDG Permit
PERMIT NUM
City of Edmonds
www.edmondswa.gov
wwm
Type: RESIDENTIAL BLDG
Owner/ Business: HAKAN RUDBACK
Status: ISSUED
Subtype: ALTERATION OR REMODEL
Parcel No: 00484500300300
Site Address: 710 CEDAR ST EDMONDS,WA 98020-3417
Applied: 10/2/2020
Subdivision: 004845
Lot: 0
Issued: 10/26/2020
Fire Sprinklers: No
Lot Area: Zoning:
Final:
Valuation: $7,500.00
Occupancy Type: R3 Construction Type: VB
Expiration Date: 10/26/2021
Code Edition: 2015
No. Stories: 2 # of Dwelling Units: 1
Issued by: NED
Scope of Work: RUDBACK- REPAIR WATER AND INSECT DAMAGE
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
HAKAN RUDBACK
1414, EDMONDS WA 98020
(425)775-5170
HARUDBACK@HOTMAIL.COM
CONTACT
DEB RUDBACK
1414, EDMONDS WA 98020
(206)954-5083
rudback.hakan@gmail.com
CONTRACTOR
EDMONDS REMODEL INC
PO BOX 1692, EDMONDS WA
(206)227-1029
edmondsremodel@gmail.com
980201692
PO BOX 1414, EDMONDS WA
OWNER
HAKAN B A RUDBACK
98020
•' •
DESCRIPTION
ACCOUNT
AMOUNT PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00 $40.00
10/26/20
R8233
PER PERMIT
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$259.00 $259.00
10/26/20
R8233
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$220.15 $220.15
10/6/20
R7920
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50 $6.50
10/26/20
R8233
TOTALS: $525.65 $525.65
• •
CONDITION TYPE
STATUS NOTES
Printed: Monday, October 26, 2020 11:35:39 AM 1 of 2
'SIDENTIAL BLDG Permit
PERMIT NUM
City of Edmonds
I-
W, 6
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees
to indemnify defend and hold harmless the City of Edmonds, Washington, its officials,
FOR
employees, and agents from any and all claims for damages of whatever nature, arising
HOLD HARMLESS
INFORMATION
directly or indirectly from the issuance of this permit. Issuance of this permit shall not be
deemed to modify, waive or reduce any requirements of any City ordinance nor limit in
any way the City's ability to enforce any ordinance provision.
INSPECTIONS
- Schedule
Online
at: https://Inspection.MyBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-3 EXT WALL SHEATHING
B-3 EXTERIOR INSULATION
B-3 UNDERFLR FRAMING
B-4 DRYWALL FASTENING
B-4 FRAMING
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL
Printed: Monday, October 26, 2020 11:35:39 AM 2 of 2