SPECIAL INSPECTIONS WESTGATE VGENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0001
Service Date: 02/06/18
Report Date: 02/09/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2018-0034 (Shoring)
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Overcast
Attended preconstruction meeting at the jobsite. Attendees included representatives from City of Edmonds
Development Services Department, Henbart, Pan Geo, WG Clark Construction, South Snohomish County Fire
and Rescue, Quantum Engineering, Studio Meng Strazzara Architects, Carmona Construction (concrete sub) and
subcontractors for framing and site work.
Mayes Testing Engineers understands:
• Milton Thompson with the City of Edmonds should be added to report distribution lists.
• There will be (2) PT deck placements, the engineer and City of Edmonds inspector intend to attend pre -
placement deck walks.
• The City of Edmonds would like to be informed of all scheduled special inspections, and will try to make
concurrent inspections.
• Preconstruction meetings will be scheduled for Shoring and Post -Tensioned Concrete.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Charles Edgerton
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0001
Service Date: 02/06/18
Report Date: 02/09/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Studio Meng Strazzara Architects, Aidan Bird
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0001
Service Date: 02/06/18
Report Date: 02/13/18 Revision 1 - Additional Permit Number
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2018-0034 (Shoring)
BLD2016-1538 (Building)
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Overcast
Attended preconstruction meeting at the jobsite. Attendees included representatives from City of Edmonds
Development Services Department, Henbart, Pan Geo, WG Clark Construction, South Snohomish County Fire
and Rescue, Quantum Engineering, Studio Meng Strazzara Architects, Carmona Construction (concrete sub) and
subcontractors for framing and site work.
Mayes Testing Engineers understands:
• Milton Thompson with the City of Edmonds should be added to report distribution lists.
• There will be (2) PT deck placements, the engineer and City of Edmonds inspector intend to attend pre -
placement deck walks.
• The City of Edmonds would like to be informed of all scheduled special inspections, and will try to make
concurrent inspections.
• Preconstruction meetings will be scheduled for Shoring and Post -Tensioned Concrete.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Charles Edgerton
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0001
Service Date: 02/06/18
Report Date: 02/13/18 Revision 1 - Additional Permit Number
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0002
Service Date: 02/09/18
Report Date: 02/14/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2018-0034 (Shoring)
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Partly cloudy
Attended City of Edmonds mandated shoring pre -construction meeting at the job site. Attendees included
representatives from The City of Edmonds Development Services, Henbart, W.G. Clark, Pan Geo, Ground
Support PLLC, and Versatile Drilling.
Mayes Testing Engineers understands:
No structural toe concrete in piles. Mayes will be required to periodically test tieback grout, and perform
welding inspections, if necessary.
Shoring construction is scheduled to take approximately (3) weeks, starting on Tuesday, 02/13/18.
Permanent shotcrete walls may or may not be placed over the lagging.
Services: As requested MTE was on site for preconstruction meeting.
Mayes Testing Engineers Rep.: Charles Edgerton
Reported to:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0002
Service Date: 02/09/18
Report Date: 02/14/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0003
Service Date: 02/19/18
Report Date: 02/22/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2018-0034 (Shoring)
Samples: (4) 2x4" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Clear
Visually inspected corner plate welding to new soldier piles per detail 4/SH5.2 at the following locations:
1. Upper 15' section at top of soldier pile W1.
2. Upper 5' section at top of soldier pile W4.
Field fillet weldments at 2-12 spacing meets detail 4/SH5.2 and AWS D1.1 visual acceptance criteria. Welding
was performed by WABO certified welder James M. Garrett (ID# W10586, expiration 07/01/18) by FCAW
process.
Sampled tieback grout used at W44, W43 and W42 locations per geotech. Four (4) 2x4" specimens were cast for
3-day test needing 1500 f'c and 28-day test needing 3000 f'c. Mix proportions were (1) bag of type 1-11 cement to
(5) gallons of mixing water. Test specimens were stored in WG Clark heated trailer.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Todd Wirtz
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0003
Service Date: 02/19/18
Report Date: 02/22/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GROUT COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0003A
Service Date: 02/19/18
Report Date: 02/23/18
Task:
Client
MAYES TESTING ENGINEERS
r Arerra[Orl c...A.,
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project - M7171996
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 1,500 psi @ 3 days
3,000 psi @ 28 days
Mix ID: N/A
Supplier:
Batch Time: 1200 Plant: N/A
Truck No.: N/A Ticket No.: N/A
Field Test Data
Test
Slump (in):
Grout Temp. (F):
Ambient Temp. (F):
Laboratory Test Data
Result Specification
12
50
37
Sample Date:
02/19/18 Sample Time:1200
Sampled By:
Todd Wirtz
Weather Conditions:
Clear
Accumulative Yards:
see comment Batch Size: 1
Sample Size:
less than 1 square feet
Sample Location:
Hopper
Placement Location:
Tiebacks at W42 to W44
Form Material:
Plastic Mold No. Units:
Samples Plumb:
Yes
Temperature Range:
Min 70
Set
Specimen
Date
Date
Age Area
No.
ID
Received
Tested
(days) (sq in)
I
a
02/20/18
02/22/18
3 3.11
1
b
02/20/18
03/19/18
28
1
c
02/20/18
03/19/18
28
Initial Cure: Outside
Final Cure: Moist Room
Maximum
Compressive
Load
Strength Fracture
(lbs)
(psi) Type
17,090
5,490 2
Comments: Compressive strength of 3 day Cylinder complies with the specified strength.
1 batch 5 gallons of water to 1 bag cement, last sample damaged,splt in half when taken out of the mold
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Todd Wirtz
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C109, ASTM C138, ASTM C143, ASTM C1019, ASTM C1064
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cxoo09, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0003A
Service Date: 02/19/18
Report Date: 02/23/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GROUT COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0003A
Service Date: 02/19/18
Report Date: 03/20/18 Revision 1 - 28-day results
Task:
Client
MAYES TESTING ENGINEERS
r Arerra[Orl c...A.,
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project - M7171996
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 1,500 psi @ 3 days
3,000 psi @ 28 days
Mix ID: N/A
Supplier:
Batch Time: 1200 Plant: N/A
Truck No.: N/A Ticket No.: N/A
Field Test Data
Test
Slump (in):
Grout Temp. (F):
Ambient Temp. (F):
Laboratory Test Data
Result Specification
12
50
37
Set
Specimen
Date
No.
ID
Received
I
a
02/20/18
1
b
02/20/18
1
c
02/20/18
Initial Cure: Outside
Sample Date:
02/19/18 Sample Time:1200
Sampled By:
Todd Wirtz
Weather Conditions:
Clear
Accumulative Yards:
see comment Batch Size: 1
Sample Size:
less than 1 square feet
Sample Location:
Hopper
Placement Location:
Tiebacks at W42 to W44
Form Material:
Plastic Mold No. Units:
Samples Plumb:
Yes
Temperature Range:
Min 70
Date Age
Area
Tested (days)
(sq in)
02/22/18 3
3.11
03/19/18 28
3.11
Hold
Final Cure: Moist
Room
Maximum Compressive
Load
Strength Fracture
(lbs)
(psi) Type
17,090
5,490 2
34,320
11,030 2
Comments: Compressive strength of 28 day Cylinder complies with the specified strength.
1 batch 5 gallons of water to 1 bag cement, two samples damaged, last sample damaged,splt in half when taken out of the
mold
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Todd Wirtz
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C109, ASTM C138, ASTM C143, ASTM C1019, ASTM C1064
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cxoo09, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0003A
Service Date: 02/19/18
Report Date: 03/20/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GROUT COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0003A
Service Date: 02/19/18
Report Date: 03/27/18 Revision 2 - new break result
Task:
Client
MAYES TESTING ENGINEERS
r Arerra[Orl c...A.,
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project - M7171996
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 1,500 psi @ 3 days
3,000 psi @ 28 days
Mix ID: N/A
Supplier:
Batch Time: 1200 Plant: N/A
Truck No.: N/A Ticket No.: N/A
Field Test Data
Test
Slump (in):
Grout Temp. (F):
Ambient Temp. (F):
Laboratory Test Data
Result Specification
12
50
37
Sample Date:
02/19/18 Sample Time:1200
Sampled By:
Todd Wirtz
Weather Conditions:
Clear
Accumulative Yards:
see comment Batch Size: 1
Sample Size:
less than 1 square feet
Sample Location:
Hopper
Placement Location:
Tiebacks at W42 to W44
Form Material:
Plastic Mold No. Units:
Samples Plumb:
Yes
Temperature Range:
Min 70
Set
Specimen
Date
Date
Age
Area
No.
ID
Received
Tested
(days)
(sq in)
I
a
02/20/18
02/22/18
3
3.11
1
b
02/20/18
03/19/18
28
3.11
1
c
02/20/18
03/26/18
35
3.11
Initial Cure: Outside
Final Cure: Moist
Room
Maximum Compressive
Load
Strength
Fracture
(lbs)
(psi)
Type
17,090
5,490
2
34,320
11,030
2
28,760
9,250
2
Comments: Compressive strength of 35 day Cylinder complies with the 28 day specified strength.
1 batch 5 gallons of water to 1 bag cement, two samples damaged, last sample damaged,splt in half when taken out of the
mold
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Todd Wirtz
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C109, ASTM C138, ASTM C143, ASTM C1019, ASTM C1064
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cxoo09, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0003A
Service Date: 02/19/18
Report Date: 03/27/18 Revision 2 - new break result
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0004
Service Date: 02/20/18
Report Date: 02/23/18
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Client Project
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Project No.: M7171996
Permit No.: BLD2018-0034 (Shoring) Weather: Cloudy
Samples: (5) 2x4" cylinders (cast by contractor)
Waited on site for (3) hours to sample site mixed soil nail grout, however no grout was mixed. Left cylinder molds
with the contractor in the event that they placed grout into the tiebacks later.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0004
Service Date: 02/20/18
Report Date: 02/23/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GROUT COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0004A
Service Date: 02/20/18
Report Date: 02/26/18
Task:
Client
MAYES TESTING ENGINEERS
r Arerra[Orl c...A.,
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project - M7171996
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2018-0034 (Shoring)
Material Information Sample Information
Specified Strength: 1,500 psi @ 3 days
3,000 psi @ 28 days
Mix ID: Mixed onsite
Supplier:
Batch Time: Plant:
Truck No.: Ticket No.:
Field Test Data
Test Result
Slump (in):
Grout Temp. (F):
Ambient Temp. (F):
Laboratory Test Data
Specification
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Sample Size:
Sample Location:
Placement Location:
Form Material:
Samples Plumb:
Temperature Range:
02/20/18 Sample Time:
Cloudy
Batch Size:
Tie backs 5,6,7,8 &9
Plastic Mold No. Units:
Yes
Maximum
Compressive
Set Specimen Date
Date
Age Area
Load
Strength
Fracture
No.
ID Received
Tested
(days) (sq in)
(lbs)
(psi)
Type
l
a 02/21/18
02/23/18
3 3.11
11,840
3,810
2
1
b 02/21/18
02/23/18
3 3.11
12,190
3,920
2
Average (3 days)
3,860
1
c 02/21/18
03/20/18
28
1
d 02/21/18
03/20/18
28
1
e 02/21/18
03/20/18
28
Initial Cure:
Outside Plastic Lids
Final Cure: Moist Room
Comments:
Average compressive strength of 3 day Cylinder complies with the specified strength. **NP = Not Performed
Contractor made samples
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C109, ASTM C138, ASTM C143, ASTM C1019, ASTM C1064
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cxoo09, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0004A
Service Date: 02/20/18
Report Date: 02/26/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GROUT COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0004A
Service Date: 02/20/18
Report Date: 03/21/18 Revision 1 - 28-day results
Task:
Client
MAYES TESTING ENGINEERS
r Arerra[Orl c...A.,
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project - M7171996
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2018-0034 (Shoring)
Material Information Sample Information
Specified Strength: 1,500 psi @ 3 days
3,000 psi @ 28 days
Mix ID: Mixed onsite
Supplier:
Batch Time: Plant:
Truck No.: Ticket No.:
Field Test Data
Test Result
Slump (in):
Grout Temp. (F):
Ambient Temp. (F):
Laboratory Test Data
Specification
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Sample Size:
Sample Location:
Placement Location:
Form Material:
Samples Plumb:
Temperature Range:
Maximum
Set
Specimen
Date
Date
Age
Area
Load
No.
ID
Received
Tested
(days)
(sq in)
(lbs)
l
a
02/21/18
02/23/18
3
3.11
11,840
1
b
02/21/18
02/23/18
3
3.11
12,190
Average (3 days)
1
c
02/21/18
03/20/18
28
3.11
23,300
1
d
02/21/18
03/20/18
28
3.11
23,430
1
e
02/21/18
03/20/18
28
3.11
19,680
Average (28 days)
Initial Cure: Outside
Plastic Lids
Final Cure: Moist
Room
02/20/18 Sample Time:
Cloudy
Batch Size:
Tie backs 5,6,7,8 &9
Plastic Mold No. Units:
Yes
Compressive
Strength
Fracture
(psi)
Type
3,810
2
3,920
2
3,860
7,490
2
7,530
2
6,330
2
7,120
Comments: Average compressive strength of 28 day Cylinder complies with the specified strength. **NP = Not Performed
Contractor made samples
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C109, ASTM C138, ASTM C143, ASTM C1019, ASTM C1064
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cxoo09, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0004A
Service Date: 02/20/18
Report Date: 03/21/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0005
Service Date: 02/21/18
Report Date: 02/28/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2018-0034 (Shoring)
Samples: (4) 2x4" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Clear
Observed and sampled grout used at new retaining wall tie -backs P1, P2 and P3, as shown in drawings.
SAKRETE Portland Cement TYPE 1-11 was mixed with water to a flowable consistency. Four (4) 2x4" specimens
were cast for 3-day test needing 1500 f'c and 28-day test needing 3000 f'c. Test specimens were stored in WG
Clark heated trailer.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Mohammad Faizi
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0005
Service Date: 02/21 /18
Report Date: 02/28/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GROUT COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0005A
Service Date: 02/21/18
Report Date: 02/26/18
Task:
Client
MAYES TESTING ENGINEERS
r Arerra[Orl c...A.,
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project - M7171996
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2018-0034 (Shoring)
Material Information Sample Information
Specified Strength: 1,500 psi @ 3 days
3,000 psi @ 28 days
Mix ID: Site Mix
Supplier: SAKRETE
Batch Time: 1300 Plant:
Truck No.: NA Ticket No.: NA
Field Test Data
Test
Result Specification
Slump (in):
Grout Temp. (F): 58
Ambient Temp. (F): 38
Laboratory Test Data
Set
Specimen
Date
No.
ID
Received
l
a
02/22/ 18
1
b
02/22/ 18
1
c
02/22/ 18
1
d
02/22/18
Initial Cure: Inside
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Sample Size:
Sample Location:
Placement Location:
Form Material:
Samples Plumb:
Temperature Range:
Date
Age Area
Tested
(days) (sq in)
02/24/18
3 3.94
03/21/18
28
03/21/18
28
03/21/18
28
Final Cure: Moist Room
02/21/18 Sample Time:
Mohammad Faizi
Mostly Clear
Batch Size:
2x4
Site
New Retaining wall Tiebacks, P1, P2 &
P3
Plastic Mold No. Units: 4
Yes
Maximum Compressive
Load Strength Fracture
(lbs) (psi) Type
14,470 2
Comments: Compressive strength of 3 day Cylinder complies with the specified strength. **NP = Not Performed
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Mohammad Faizi
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C109, ASTM C138, ASTM C143, ASTM C1019, ASTM C1064
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cxoo09, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0005A
Service Date: 02/21 /18
Report Date: 02/26/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GROUT COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0005A
Service Date: 02/21/18
Report Date: 03/22/18 Revision 1 - 28-day results
Task:
Client
MAYES TESTING ENGINEERS
r Arerra[Orl c...A.,
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project - M7171996
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2018-0034 (Shoring)
Material Information Sample Information
Specified Strength: 1,500 psi @ 3 days
3,000 psi @ 28 days
Mix ID: Site Mix
Supplier: SAKRETE
Batch Time: 1300 Plant:
Truck No.: NA Ticket No.: NA
Field Test Data
Test
Result Specification
Slump (in):
Grout Temp. (F): 58
Ambient Temp. (F): 38
Laboratory Test Data
Set Specimen
Date
Date
Age
No. ID
Received
Tested
(days)
l a
02/22/18
02/24/18
3
1 b
02/22/18
03/21/18
28
1 c
02/22/18
03/21/18
28
1 d
02/22/18
03/21/18
28
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Sample Size:
Sample Location:
Placement Location:
Form Material:
Samples Plumb:
Temperature Range:
02/21/18 Sample Time:
Mohammad Faizi
Mostly Clear
Batch Size:
2x4
Site
New Retaining wall Tiebacks, P1, P2 &
P3
Plastic Mold No. Units: 4
Yes
Maximum
Compressive
Area
Load
Strength
(sq in)
(lbs)
(psi)
3.11
14,470
4,650
3.14
20,970
6,670
3.11
20,850
6,700
3.11
25,980
8,350
Average (28 days)
7,240
Fracture
Type
i
Initial Cure: Inside Final Cure: Moist Room
Comments: Average compressive strength of 28 day Cylinder complies with the specified strength. **NP = Not Performed
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Mohammad Faizi
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C109, ASTM C138, ASTM C143, ASTM C1019, ASTM C1064
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cxoo09, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0005A
Service Date: 02/21 /18
Report Date: 03/22/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0006
Service Date: 03/19/18
Report Date: 03/22/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
Item 1
Inspected continuous and spread footings at grid lines C1'/C1 to C4.5, C1/C1' to CT, CA/Cl to C5, C5/CA to CE,
CC to CF/C3 to 5, C1.37CA.8', C1.3'/CA.3', C1.3'/C2.2, C2/CF, CC.5/C2, CB/C2, CB/C3, CB/C4, CA'/C2' and
CA.5'/C2'.
Reinforcement was inspected for size, grade, lap and spacing per plans and RFI 7. Verified final clearances and
cleanliness prior to placement.
Item 2
Observed the placement of (140) cubic yards of Miles Sand & Gravel mix 12550F into footings noted above. The
concrete was placed via pump and mechanically consolidated, adjusted by QC. Cast (4) 4x8" cylinders for
compressive strength testing (3000 psi at 28 days required). Note: Edge of placement was blocked out for next
placement.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Andrew Bontrager
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0006
Service Date: 03/19/18
Report Date: 03/22/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0006A
Service Date: 03/19/18
Report Date: 03/27/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000 psi @ 28 days
Mix ID: 12550F
Supplier: Miles Sand and Gravel
Batch Time: Plant:
Truck No.: C183 Ticket No.: 204362
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result Specification
5
60
44
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
1 a 3.99
1 b 4.00
1 c 4.00
1 d 4.00
Initial Cure: Cure Box
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Area
Date
Date
(sq in)
Received
Tested
12.5
03/20/18
03/26/18
12.57
03/20/18
04/16/18
12.57
03/20/18
04/16/18
12.57
03/20/18
04/16/18
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Andrew Bontrager
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
03/19/18 Sample Time:
Andrew Bontrager
Sunny
60 Batch Size (cy): 10
Pump
10
Continuous and spread footings, grids
C 1'/C 1 to C4.5, C 1 /C 1' to C3', CA/Cl
to C5, C5/CA to CE, CC to CF/C3 to
5, C1.3'/CA.8,
C 1.3'/CA.3',C 1.3'/C2.2,C2/CF,CC.5/C
2,CB/C2, CB/C3,CB/C4,CA'/C2,CA.5
/C2'. Sampled 60 of 140 cy Adjusted
by QC
Age at
Maximum
Test
Load
(days)
(lbs)
7
77,410
28
28
28
Compressive
Strength Fracture
(psi) Type
6,190 2
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0006A
Service Date: 03/19/18
Report Date: 03/27/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0007
Service Date: 03/23/18
Report Date: 04/04/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Light rain
Performed reinforcing steel inspection for the following items per the approved contract documents details on
S100, S200 and S301, and per specifications:
• Continuous wall footings in grid lines CE to CC'/C2' to C4', CH to Cl/C6 to C7, CC'+21'/C1' to C2', and
CK/C6 to C7.
• Spread column footings at grid lines CB/C4 and CB.8'/C1.4'.
• Elevator pit slab at grid lines CB' to CC'/C2' to C3'.
Observed the placement of (90) cubic yards of Miles Sand and Gravel concrete mix 025506P for the footings
noted above. Concrete was placed by pump truck and mechanically vibrated for consolidation. A sample was
obtained and (1) set of (4) 4x8" test cylinders was cast for compressive strength testing (3000 psi at 28 days
required).
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Randal Dohrman
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0007
Service Date: 03/23/18
Report Date: 04/04/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0007A
Service Date: 03/23/18
Report Date: 04/23/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000
psi @ 28
days
Sample Date:
03/23/18 Sample Time: 1200
Sampled By:
Randal Dohrman
Mix ID: 025506P
Weather Conditions:
Lite rain
Supplier: Miles Sand and
Gravel
Accumulative Yards:
40 Batch Size (cy): 10
Batch Time: 1030
Plant:
Placement Method:
Pump
Truck No.: C185
Ticket No.:
204585
Water Added Before (gal):
15
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Wall footings, grids CE to CC'/C2' to
Slump (in):
5
C4', CH to Cl/C6 to C7, CC' +21'/C1'
Air Content (%):
to C2 and CK/C6 to C7. Column
Concrete Temp. (F):
59
footings at grids CB/C4 and
Ambient Temp. (F):
5
CB.8'/CI.4'. Elevator pit slab at grids
Plastic Unit Wt. (pcf):
CB' to CC'/C2' to C3'.
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type By
1 1 3.98
12.44
03/26/18 03/30/18
7 57,310
4,610 2
1 2 3.98
12.44
03/26/18 04/20/18
28 76,120
6,120 2 ARC
1 3 3.98
12.44
03/26/18 04/20/18
28 76,790
6,170 2 ARC
1 4 3.98
12.44
03/26/18 04/20/18
28 78,060
6,270 2 ARC
Average (28 days)
6,190
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Randal Dohrman
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0007A
Service Date: 03/23/18
Report Date: 04/23/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0008
Service Date: 03/30/18
Report Date: 04/12/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Clouds
Inspected reinforcing steel installed into Level P1 to 1 walls at grids CA/Cl to C5, C5/CA to CC and C1/CA to CC.
The reinforcing steel was inspected for grade, size, number, spacing and placement per contract documents.
Final verification of clearances and cleanliness to be made prior to concrete placement.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0008
Service Date: 03/30/18
Report Date: 04/12/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0009
Service Date: 04/03/18
Report Date: 04/09/18
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Client Project
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Project No.: M7171996
Permit No.: BLD2016-1538
Samples: N/A
Weather: Overcast
On site for inspection of Level P1 wall reinforcement bound by grids CB to CC' on line CC, as well as the columns
within those boundaries.
The walls were reviewed in accordance with detail 17/S-301, and the columns were inspected according to the
schedule on page S-301 detail 15 of the structural drawings. Verified bar type, grade, spacing, size, etc.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Joel Morder
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0009
Service Date: 04/03/18
Report Date: 04/09/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0010
Service Date: 04/05/18
Report Date: 04/10/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Rainy, 40's
On site for reinforcing steel inspection of Level P1 (Parking Level) concrete wall. The wall reinforcement has
been inspected for size, grade, spacing and clearance per the structural drawing S200, details 17/S301 and
1/S303 and found in conformance with the specifications and approved structural drawings, except that (2")
clearance on the outer surface of the concrete wall is not maintained per detail drawing 17/S301. The following
are the locations of concrete wall inspected today:
1. On line Cc'.5 from grid line Cl'to C3'.
2. On northwest side of ramp wall from line C3' to C3'.5.
3. On line C1' from line Cc' to Cc'.5.
PRELIMINARY INSPECTION
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0010
Service Date: 04/05/18
Report Date: 04/10/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0012
Service Date: 04/09/18
Report Date: 04/23/18
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Client Project
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Project No.: M7171996
Permit No.: BLD-2016-1538 Weather: Clear
Samples: (4) 4x8" cylinders
Inspected walls from Level P1 to Level 1 at grid line CC'.5/C1' to C3', northwest wall of the ramp from grids C3' to
C35, and grid C'/CC' to CC.5' with adjusted 2" clearance to outside face of wall. This clears Mayes Testing
Engineers (MTE) preliminary report M7171996.0010 for service date 04/05/18 by Asteway Kidane.
Monitored, sampled, and tested from (120) cubic yards of Miles mix 155000PT placed in above mentioned walls;
and walls from Level P1 to Level 1 at grid lines C5/CA to CD, CA/Cl to C5, C1/CA to CE.7, and C1'/CE.7 to CB'.
Concrete placed by pump and mechanically consolidated. Cast (4) 4x8" test cylinders for compressive strength
testing (4000 psi at 28 days).
Inspected reinforcing steel for 8" and 10" concrete walls at grid lines C3.37CE to CB' and CE to CD/C3 to C4 per
General Structural Notes, and email confirming submittal #18 allowing #4 horizontals in 8" walls instead of #5
horizontals. Inspected wall reinforcing for size, grade, and spacing.
CORRECTIVE ACTIONS TAKEN
The 2" clearance was adjusted and all reinforcing items listed in MTE preliminary report M7171996.0010 were
completed, clearing that report.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Harold Edmonds
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0012
Service Date: 04/09/18
Report Date: 04/23/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0012A
Service Date: 04/09/18
Report Date: 05/08/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 4,000
psi @ 28
days
Sample Date:
04/09/18 Sample Time: 0755
Sampled By:
Harold Edmonds
Mix ID: 155000PT
Weather Conditions:
Clear
Supplier: Miles Sand and
Gravel
Accumulative Yards:
120 Batch Size (cy): 10
Batch Time: 0631
Plant:
Placement Method:
Truck No.: C183
Ticket No.:
205072
Water Added Before (gal):
20
Field Test Data
Water Added After (gal):
Sample Location:
First lift of wall at CA/C4
Test
Result
Specification
Placement Location:
Walls from Level P1 to 1, grids
Slump (in):
6
C5/CA to CD, CA/CI to C5, C1/CA
Air Content (%):
4.8
to CE.7, C1'/CE.7 to CB', CC.5'/C1' to
Concrete Temp. (F):
64
C3', ramp/C3' to C3.5', and C'/CC' to
Ambient Temp. (F):
55
CC.5'.
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type By
1 1 3.98
12.44
04/10/18 04/16/18
7 70,700
5,680 2 ARC
1 2 3.98
12.44
04/10/18 05/07/18
28 108,070
8,690 3 HRB
1 3 4.00
12.57
04/10/18 05/07/18
28 100,220
7,980 2 HRB
1 4 3.98
12.44
04/10/18 05/07/18
28 104,650
8,410 2 HRB
Average (28 days)
8,360
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Harold Edmonds
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0012A
Service Date: 04/09/18
Report Date: 05/08/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0013
Service Date: 04/11/18
Report Date: 04/16/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD-2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.: M7171996
Weather: Occasional showers
The contractor epoxy grouted vertical wall dowels to previously cast footings per RFI 15 at storage room wall,
grids C3.5'/CB.4' to CB7, C3.77CB.7' and C3.7/CD. Holes were of required 8" depth and cleaned with brush
and compressed air. Simpson SET-XP epoxy (lot 2170808D, expiration 05/08/19) was mixed and applied with a
static mixing brush per Simpson's directions.
Reinforcing steel was inspected prior to form closure in one-sided forms for walls at grids C3' to C4'/CB' to CC'
and stairwell walls and for columns on this level. The reinforcing was found to be in conformance with approved
plans and specifications. A final inspection for clearances and cleanliness should be made prior to concrete
placement.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Charles Edgerton
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0013
Service Date: 04/11 /18
Report Date: 04/16/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0014
Service Date: 04/13/18
Report Date: 05/02/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (8) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Light rain
Prior to concrete placement at the ventilation slab -on -grade at grid lines CD and west of C1, #5 reinforcing steel
slab dowels were epoxy grouted into the previously -placed perimeter wall per RFI 003. The #5 dowels for the
slab -on -grade were installed at 12" on center each way with an 8" embedment depth using project -approved
Simpson SET-XP epoxy.
Performed final reinforcing steel inspection and observed the placement of (110) cubic yards of Miles Sand and
Gravel mix 155000PT for the walls from foundation to the Level 1 deck at grid lines CA' to CC'/C2' to C4% C1'/CC'
to CC' plus 22'; and for the walls in Stair 1 and Stair 2. Concrete was placed by concrete pump and mechanically
vibrated for consolidation. Cast a set of (4) 4x8" test cylinders for compressive strength testing (4000 psi at 28
days required).
Observed the placement of (28) cubic yards of Miles Sand and Gravel concrete mix 12550F for the columns from
foundation to the Level 1 deck at grid lines CB/C2, CB/C3, CB/C4 and CC.5/C2; for the ventilation slab -on -grade
at grid line CD west of C1 and for topping of the walls noted above. Concrete was placed by concrete pump and
mechanically vibrated for consolidation. Cast a set of (4) 4x8" test cylinders for compressive strength testing
(5000 psi at 28 days required).
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Randal Dohrman
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0014
Service Date: 04/13/18
Report Date: 05/02/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0014A
Service Date: 04/13/18
Report Date: 04/24/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on C011 r
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 155000PT
Supplier: Miles Sand and Gravel
Batch Time: 0630 Plant: 125
Truck No.: C114 Ticket No.: 205271
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
5 4 -7
No.
ID
(in)
1
1
3.98
1
2
4.00
1
3
4.00
1
4
4.00
Initial Cure:
Cure Box
56 55 - 95
43
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.44
04/16/18
04/20/18
7 54,070
12.57
04/16/18
05/11/18
28
12.57
04/16/18
05/11/18
28
12.57
04/16/18
05/11/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Randal Dohrman
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
04/13/18 Sample Time: 0730
Randal Dohrman
Light rain
20 Batch Size (cy): 10
Chute
Level P1 to L1 walls, grid lines CT
to C4'/CA' to CC'
Compressive
Strength Fracture Tested
(psi) Type By
4,350 2 ARC
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0014A
Service Date: 04/13/18
Report Date: 04/24/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.001413
Service Date: 04/13/18
Report Date: 04/24/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 12550F
Supplier: Miles Sand & Gravel
Batch Time: 1300 Plant: 125
Truck No.: C184 Ticket No.: 205417
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
43/4 4 -7
No.
ID
(in)
1
1
3.99
1
2
4.00
1
3
4.00
1
4
4.00
Initial Cure:
Cure Box
57 55 - 95
50
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.5
04/16/18
04/20/18
7 58,430
12.57
04/16/18
05/11/18
28
12.57
04/16/18
05/11/18
28
12.57
04/16/18
05/11/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Randal Dohrman
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
04/13/18 Sample Time: 1400
Randal Dohrman
Lite rain
8 Batch Size (cy): 9
Pump
Chute
Columns, foundation to Level 1, at
grid lines CB/C2, CB/ C3
Compressive
Strength Fracture Tested
(psi) Type By
4,670 2 ARC
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0014B
Service Date: 04/13/18
Report Date: 04/24/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0015
Service Date: 04/18/18
Report Date: 04/23/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD-2016-1538
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Clear
On site to verify and inspect reinforcing steel and observe concrete placement — (10) yards of Miles Sand &
Gravel mix 1255OF placed via pump into mechanical vent shaft at lines C1/CD and (8) columns from CD south to
CC', P1 to L1 Level. The concrete was mechanically vibrated for consolidation. Reinforcing steel at shaft was
per RFI #3, with #4 horizontal dowels at 12" on center. Cast (4) 4x8" cylinders for compressive strength testing.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Edward Bauman
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0015
Service Date: 04/18/18
Report Date: 04/23/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0015A
Service Date: 04/18/18
Report Date: 04/26/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on C011 r
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 12550F
Supplier: Miles Sand and Gravel
Batch Time: 1339 Plant: 125
Truck No.: C055 Ticket No.: 205601
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
6 5 -7
No.
ID
(in)
1
1
3.99
1
2
4.00
1
3
4.00
1
4
4.00
Initial Cure:
Cure Box
60 50 - 90
53
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.5
04/19/18
04/25/18
7 64,380
12.57
04/19/18
05/16/18
28
12.57
04/19/18
05/16/18
28
12.57
04/19/18
05/16/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Edward Bauman
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
04/18/18 Sample Time: 1440
Edward Bauman
Clear
10 of 10 Batch Size (cy): 10
Pump
10
Column at line CC'
Mechanical shaft at grids Cl/CD and
(8) columns from lines CD south to
line CC'.
Compressive
Strength Fracture Tested
(psi) Type By
5,150 2 ARC
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0015A
Service Date: 04/18/18
Report Date: 04/26/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0015A
Service Date: 04/18/18
Report Date: 05/17/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on C011 r
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 12550F
Supplier: Miles Sand and Gravel
Batch Time: 1339 Plant: 125
Truck No.: C055 Ticket No.: 205601
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result Specification
6 5 -7
60 50 - 90
53
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
04/18/18 Sample Time: 1440
Edward Bauman
Clear
10 of 10 Batch Size (cy): 10
Pump
10
Column at line CC'
Mechanical shaft at grids Cl/CD and
(8) columns from lines CD south to
line CC'.
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam.
Area
Date
Date
Test
Load
Strength
Fracture
Tested
No. ID (in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
By
1 1 3.99
12.5
04/19/18
04/25/18
7
64,380
5,150
2
ARC
1 2 3.98
12.44
04/19/18
05/16/18
28
84,410
6,780
3
ZSR
1 3 3.99
12.5
04/19/18
05/16/18
28
87,260
6,980
2
ZSR
1 4 3.98
12.44
04/19/18
05/16/18
28
83,890
6,740
2
ZSR
Average
(28 days)
6,840
Initial Cure: Cure Box
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Edward Bauman
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0015A
Service Date: 04/18/18
Report Date: 05/17/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0016
Service Date: 04/23/18
Report Date: 04/30/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (12) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Clear
Reinforcement and Concrete Inspection
Verified the reinforcement for size, grade, quantity, spacing, lap splice and clearance for the slab -on -grade, Level
P1 (except the ramp slab -on -grade). Reinforcement was inspected according to approved plans details found on
pages S100, S200, and details14/S300, 11/S300, and submittal #14 S.O.G.
Note: Per Note #5 on page S200, no typical slab reinforcement was required, since contractor is using fiber
mesh concrete for this slab.
Monitored the placement of approximately (195.5) cubic yards of Miles Sand and Gravel concrete with fiber
mesh, mix 026006P, placed for the above noted slab -on -grade (approximately 12,500 square feet). Concrete
was placed by concrete pump and manually consolidated. Tested mix and cast (12) 4x8" test cylinders for
compressive strength testing with a required 3000 psi at (28) days.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Ilir Dardania
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0016
Service Date: 04/23/18
Report Date: 04/30/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0016A
Service Date: 04/23/18
Report Date: 05/02/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000 psi @ 28 days
Mix ID: 026006P
Supplier: Miles Sand & Gravel
Batch Time: 0509 Plant: 125
Truck No.: C185 Ticket No.: 205732
Field Test Data
Test Result Specification
Slump (in): 6 1/2
Air Content (%):
Concrete Temp. (F): 57
Ambient Temp. (F): 41
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Date:
04/23/18
Sampled By:
Ilir Dardania
Weather Conditions:
Clear
Accumulative Yards:
30
Placement Method:
Pump
Water Added Before (gal):
25
Water Added After (gal):
Sample Location:
Sample Time: 0630
Batch Size (cy): 10
Placement Location: Slab on grade (S.O.G) Level P1
(except the ramp slab -on -grade).
Approximately 12,500 square feet.
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam.
Area
Date
Date
Test
Load
Strength
Fracture Tested
No. ID (in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type By
1 A 3.99
12.5
04/24/18
04/30/18
7
50,420
4,030
2 ARC
1 B 4.00
12.57
04/24/18
05/21/18
28
1 C 4.00
12.57
04/24/18
05/21/18
28
1 D 4.00
12.57
04/24/18
05/21/18
28
Initial Cure: Cure Box
Final Cure: Moist Room
Min Temp: 61
Max Temp: 61
Comments: Not tested for plastic unit weight.
Approximately 195.5
cubic yards of concrete
were placed via concrete pump.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Ilir Dardania
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Pagel of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0016A
Service Date: 04/23/18
Report Date: 05/02/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000 psi @ 28 days
Mix ID: 026006P
Supplier: Miles Sand & Gravel
Batch Time: 0625 Plant: 125
Truck No.: C139 Ticket No.: 205745
Field Test Data
Test Result Specification
Slump (in): 6
Air Content (%):
Concrete Temp. (F): 58
Ambient Temp. (F): 44
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Date:
04/23/18
Sampled By:
Ilir Dardania
Weather Conditions:
Clear
Accumulative Yards:
100
Placement Method:
Pump
Water Added Before (gal):
20
Water Added After (gal):
Sample Location:
Sample Time: 0745
Batch Size (cy): 10
Placement Location: Slab on grade (S.O.G) Level P1
(except the ramp slab -on -grade).
Approximately 12,500 square feet.
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam.
Area
Date
Date
Test
Load
Strength
Fracture Tested
No. ID (in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type By
2 A 3.99
12.5
04/24/18
04/30/18
7
60,220
4,820
2 ARC
2 B 4.00
12.57
04/24/18
05/21/18
28
2 C 4.00
12.57
04/24/18
05/21/18
28
2 D 4.00
12.57
04/24/18
05/21/18
28
Initial Cure: Cure Box
Final Cure: Moist Room
Min Temp: 61
Max Temp: 61
Comments: Not tested for plastic unit weight.
Approximately 195.5
cubic yards of concrete
were placed via concrete pump.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Ilir Dardania
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Page 2 of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0016A
Service Date: 04/23/18
Report Date: 05/02/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000
psi @ 28
days
Sample Date:
04/23/18 Sample Time: 1030
Sampled By:
Ilir Dardania
Mix ID: 026006P
Weather Conditions:
Clear
Supplier: Miles Sand &
Gravel
Accumulative Yards:
179.5 Batch Size (cy): 10
Batch Time: 0916
Plant:
125
Placement Method:
Pump
Truck No.: C141
Ticket No.:
205782
Water Added Before (gal):
15
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Slab on grade (S.O.G) Level P1
Slump (in):
6
(except the ramp slab -on -grade).
Air Content (%):
Approximately 12,500 square feet.
Concrete Temp. (F):
61
Ambient Temp. (F):
52
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type By
3 A 3.98
12.44
04/24/18 04/30/18
7 54,660
4,390 2 ARC
3 B 4.00
12.57
04/24/18 05/21/18
28
3 C 4.00
12.57
04/24/18 05/21/18
28
3 D 4.00
12.57
04/24/18 05/21/18
28
Initial Cure: Cure Box
Final Cure: Moist Room Min Temp: 61 Max Temp: 61
Comments: Not tested for plastic unit weight.
Approximately 195.5
cubic yards of concrete were placed via concrete pump.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Ilir Dardania
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Page 3 of 3
Distribution Page
Report Number: M7171996.0016A
Service Date: 04/23/18
Report Date: 05/02/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0016A
Service Date: 04/23/18
Report Date: 05/22/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information
Specified Strength: 3,000 psi @ 28 days
Mix ID: 026006P
Supplier: Miles Sand & Gravel
Batch Time: 0509 Plant: 125
Truck No.: C185 Ticket No.: 205732
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result Specification
6 1/2
57
41
Sample Information
Sample Date:
04/23/18 Sample Time: 0630
Sampled By:
Ilir Dardania
Weather Conditions:
Clear
Accumulative Yards:
30 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
25
Water Added After (gal):
Sample Location:
Placement Location:
Slab on grade (S.O.G) Level P1
(except the ramp slab -on -grade).
Approximately 12,500 square feet.
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam.
Area
Date Date Test Load
Strength
Fracture
Tested
No. ID (in)
(sq in)
Received Tested (days) (lbs)
(psi)
Type
By
1 A 3.99
12.5
04/24/18 04/30/18 7 50,420
4,030
2
ARC
1 B 3.99
12.5
04/24/18 05/21/18 28 62,020
4,960
2
ARC
1 C 3.99
12.5
04/24/18 05/21/18 28 60,040
4,800
2
ARC
1 D 3.99
12.5
04/24/18 05/21/18 28 61,790
4,940
2
ARC
Average (28 days)
4,900
Initial Cure: Cure Box
Final Cure: Moist Room Min Temp: 61
Max Temp:
61
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Approximately 195.5
cubic yards of concrete were placed via concrete pump.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Ilir Dardania
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Pagel of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0016A
Service Date: 04/23/18
Report Date: 05/22/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000 psi @ 28 days
Mix ID: 026006P
Supplier: Miles Sand & Gravel
Batch Time: 0625 Plant: 125
Truck No.: C139 Ticket No.: 205745
Field Test Data
Test Result Specification
Slump (in): 6
Air Content (%):
Concrete Temp. (F): 58
Ambient Temp. (F): 44
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Date:
04/23/18
Sampled By:
Ilir Dardania
Weather Conditions:
Clear
Accumulative Yards:
100
Placement Method:
Pump
Water Added Before (gal):
20
Water Added After (gal):
Sample Location:
Sample Time: 0745
Batch Size (cy): 10
Placement Location: Slab on grade (S.O.G) Level P1
(except the ramp slab -on -grade).
Approximately 12,500 square feet.
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam.
Area
Date Date Test Load
Strength
Fracture
Tested
No. ID (in)
(sq in)
Received Tested (days) (lbs)
(psi)
Type
By
2 A 3.99
12.5
04/24/18 04/30/18 7 60,220
4,820
2
ARC
2 B 3.99
12.5
04/24/18 05/21/18 28 72,260
5,780
2
ARC
2 C 4.00
12.57
04/24/18 05/21/18 28 67,100
5,340
2
ARC
2 D 3.99
12.5
04/24/18 05/21/18 28 70,140
5,610
2
HRB
Average (28 days)
5,580
Initial Cure: Cure Box
Final Cure: Moist Room Min Temp: 61
Max Temp:
61
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Approximately 195.5
cubic yards of concrete were placed via concrete pump.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Ilir Dardania
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0016A
Service Date: 04/23/18
Report Date: 05/22/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information
Specified Strength: 3,000 psi @ 28 days
Mix ID: 026006P
Supplier: Miles Sand & Gravel
Batch Time: 0916 Plant: 125
Truck No.: C141 Ticket No.: 205782
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
6
61
52
Set Specimen Avg Diam. Area Date
Sample Information
Sample Date:
04/23/18 Sample Time: 1030
Sampled By:
Ilir Dardania
Weather Conditions:
Clear
Accumulative Yards:
179.5 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
15
Water Added After (gal):
Sample Location:
Placement Location:
Slab on grade (S.O.G) Level P1
(except the ramp slab -on -grade).
Approximately 12,500 square feet.
Age at Maximum Compressive
Date Test Load Strength Fracture Tested
No.
ID (in)
(sq in)
Received Tested (days) (lbs)
(psi)
Type
By
3
A 3.98
12.44
04/24/18 04/30/18 7 54,660
4,390
2
ARC
3
B 3.98
12.44
04/24/18 05/21/18 28 70,200
5,640
2
HRB
3
C 3.97
12.38
04/24/18 05/21/18 28 69,670
5,630
2
HRB
3
D 3.98
12.44
04/24/18 05/21/18 28 71,080
5,710
2
HRB
Average (28 days)
5,660
Initial Cure: Cure Box
Final Cure: Moist Room Min Temp: 61
Max Temp: 61
Comments:
Average compressive strength of 28 day cylinders complies with the specified strength.
Not tested for plastic unit
weight.
Approximately 195.5 cubic yards of concrete were placed via concrete pump.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Ilir Dardania
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list. Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 3 of 3
Distribution Page
Report Number: M7171996.0016A
Service Date: 04/23/18
Report Date: 05/22/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0017
Service Date: 04/27/18
Report Date: 05/04/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (8) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Overcast
On site to inspect reinforcing steel for spread footing. The contractor was not ready for inspection. No reinforcing
steel had been installed prior to this Inspector's arrival. Notified that the concrete was postponed until after 8:00
a.m. Reinforcing steel was completed at 8:30 a.m. Inspected reinforcing steel for size, grade, spacing, clearance
and placement. Both the spread footing and column were inspected at grid lines CL/C5.8.
Observed placement of (14) cubic yards of Miles Sand and Gravel mix 12550F. This inspector was informed that
there were two mixes being used to place the footing and column but only one mix was used for both elements.
The concrete was placed by chute and mechanically vibrated for consolidation. Cast (2) sets of (4) 4x8" test
cylinders for compressive strength testing (5000 psi at 28 days required).
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Jacob Keas
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0017
Service Date: 04/27/18
Report Date: 05/04/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0018
Service Date: 05/04/18
Report Date: 05/09/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Cloudy
Inspected reinforcing steel for the footings at grid lines CL/C6.6, CL/C7.6, CL/C8.9, CL/C10.1, CL/C11, CL.8/C11,
CJ/C10, CK/C10; and the 10" wall footings along grid lines C11/CJ to CK, K/C5.2 to C5.6 and K/C8.6 to C10.5.
Reinforcing was inspected for size, grade spacing and clearances per plan view and typical details.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0018
Service Date: 05/04/18
Report Date: 05/09/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0019
Service Date: 05/07/18
Report Date: 05/16/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle, WA 98106
Permit No.: BLD2016-1538
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.:
Weather:
M7171996
Overcast
On site for inspection of concrete for spread footings at grids CL/6.6, C7.6. C8.9, C10.1, C11, CL.8/C11, CJ/C10
and CK/10. Inspected for continuous wall footings at grids C11/CJ to CK, C5.2 to C5.6 and C8.6 to C18.5.
Reviewed the reinforcing steel for pads at grids CH/C9.3, C10.1 and C10.5; reinforcement was placed in
accordance with details 3 and 15 on page S301 of the structural drawings. Verified bar size, spacing, splices and
clearances.
Observed placement of Miles Sand & Gravel mix 025506P. The concrete was pumped into place and
consolidated through mechanical vibration. Sampled and tested concrete for slump and temperature. Cast (4)
4x8" cylinders for compressive strength testing (3000 psi at 28 days required). Ensured debris removal from
forms prior to concrete placement.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Joel Morder
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0019
Service Date: 05/07/18
Report Date: 05/16/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0019A
Service Date: 05/07/18
Report Date: 05/15/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000 psi @ 28 days
Mix ID: 025506P
Supplier: Miles
Batch Time: 0814 Plant: Everett
Truck No.: C062 Ticket No.: 206445
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
5 Max 5
No.
ID
(in)
1
A
3.99
1
B
4.00
1
C
4.00
1
D
4.00
Initial Cure:
Cure Box
67
55
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.5
05/08/18
05/14/18
7 58,710
12.57
05/08/18
06/04/18
28
12.57
05/08/18
06/04/18
28
12.57
05/08/18
06/04/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Joel Morder
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
05/07/18 Sample Time: 0920
Joel Morder
Overcast
10 Batch Size (cy): 10
Pump
10
0
Continuous footing, Level 1, CI I/CJ
Continuous footing, Level l,gridline
C11/CJ to CK, C5.2 to C5.6, C8.6
to C18.5. Spread footings at Level 1,
grids CL/C7.6. CL/C8.9, CL/C10.1,
CL/C 11, CL.8/C 11, CJ/C 10, CK/C 10.
Level 1 pads at grids CH/C9.3,
C 10. 1, C 10. 5, and C9/CK.
Compressive
Strength Fracture Tested
(psi) Type By
4,700 2 KWB
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0019A
Service Date: 05/07/18
Report Date: 05/15/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0019A
Service Date: 05/07/18
Report Date: 06/05/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000
psi @ 28 days
Sample Date:
05/07/18 Sample Time: 0920
Sampled By:
Joel Morder
Mix ID: 025506P
Weather Conditions:
Overcast
Supplier: Miles
Accumulative Yards:
10 Batch Size (cy): 10
Batch Time: 0814
Plant:
Everett
Placement Method:
Pump
Truck No.: C062
Ticket No.:
206445
Water Added Before (gal):
10
Water Added After (gal):
0
Field Test Data
Sample Location:
Continuous footing, Level 1, CI I/CJ
Test
Result
Specification
Placement Location:
Continuous footing, Level l,gridline
Slump (in):
5
Max 5
C11/CJ to CK, C5.2 to C5.6, C8.6
Air Content (%):
to C18.5. Spread footings at Level 1,
Concrete Temp. (F):
67
grids CL/C7.6. CL/C8.9, CL/C10.1,
Ambient Temp. (F):
55
CL/C11, CL.8/C11, CJ/C10, CK/C10.
Plastic Unit Wt. (pcf):
Level 1 pads at grids CH/C9.3,
Yield (Cu. Yds.):
C10.1, C10.5, and C9/CK.
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type By
1 A 3.99
12.5
05/08/18 05/14/18
7 58,710
4,700 2 KWB
1 B 4.00
12.57
05/08/18 06/04/18
28 71,900
5,720 2 KWB
1 C 4.00
12.57
05/08/18 06/04/18
28 73,320
5,830 2 KWB
1 D 4.00
12.57
05/08/18 06/04/18
28 72,020
5,730 5 KWB
Average (28 days)
5,760
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Joel Morder
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0019A
Service Date: 05/07/18
Report Date: 06/05/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0020
Service Date: 05/08/18
Report Date: 05/11/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD 2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Attended a post -tensioned concrete pre -construction meeting at the jobsite with representatives from City of
Edmonds Development Services, WG Clark, Quantum Consulting Engineers, Carmona Construction and PTC.
Mayes Testing Engineers (MTE) understands:
• There will be (3) PT placements on (2) levels.
• Yardage for these placements will be about (362) to (386) cubic yards.
• Approved mix design is Miles Sand & Gravel mix 156000.
• Field -cured cylinders must attain a strength of 3500 psi prior to stressing operations.
• Carmona Construction will be responsible for ordering/rejecting concrete.
• Carmona plans on having (2) stressing crews.
• The Level 2 deck has PT beams which will require special attention.
• MTE will cast cylinders which will be left on deck (field -cured) to determine the in -situ strength of the deck
prior to stressing.
The first deck is currently scheduled for placement on Monday, 05/14/18. Inspection of the deck by MTE is
scheduled for Thursday, 05/10/18, with a final inspection and walk-through with the engineer on Friday, 05/11/18.
Services: As requested MTE was on site for preconstruction meeting.
Mayes Testing Engineers Rep.: Charles Edgerton
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0020
Service Date: 05/08/18
Report Date: 05/11/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -TENSION OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0021
Service Date: 05/10/18
Report Date: 05/17/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Cloudy
On site for inspection of Level 1 post -tension slab (all tendons). At this time, all tendons are placed and profiled.
Electrical contractor still routing and chairing flexible conduit lines. Plumber still needs to place steel sleeves at
penetrations at anchorage zones. Area around Stair 2, per S1 calls for #5 dowels at 12" on center, each way, top
and bottom. Corner reinforcing steel needs top mat installed per detail 3 on S302. Contractor installed missing
vertical dowels at various locations per RFI 22. Epoxy used was Simpson XP (expiration 11/19/19). Holes were
drilled to a depth of 12" and properly cleaned out.
PRELIMINARY INSPECTION
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0021
Service Date: 05/10/18
Report Date: 05/17/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -TENSION OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0022
Service Date: 05/11/18
Report Date: 05/17/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Partly cloudy
This is a follow-up report from 05/10/18. Completed the Level 1 post -tension slab inspection. Items listed from
prior day's report have been completed. This includes the items listed from Quantum's engineer walk-through on
05/10/18.
Item still to be completed prior to concrete placement is the cleaning of debris from the deck.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0022
Service Date: 05/11 /18
Report Date: 05/17/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -TENSION OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0023
Service Date: 05/14/18
Report Date: 05/21/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (18) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Clear
On site for final inspection of Level 1 post -tension slab. Deck debris was removed prior to concrete placement.
Total of (350) cubic yards of Miles Sand & Gravel mix 156000 placed via boom pump and mechanically
consolidated. Three sets of cylinders were cast: Set 1- (4) lab -cures; Set 2- (4) lab -cures and (3) field -cures; Set
3- (4) lab -cures and (3) field -cures.
Inspected 10" wall reinforcement, Level 1 to 2, along grid lines C11/CJ to CK, CM/C8.7 to C10.5 and CM/C5.2 to
C5.7. Inside vertical dowels along grid CM from C10.4 to C10.5 are outside the wall. Contractor drilled new
holes to a depth of 10" and installed dowels using Simpson XP epoxy (expiration 11/19/19) to achieve minimal
clearances.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Additional Inspector on site: Earl Uy
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev. 10 Page 1 of 1
Distribution Page
Report Number: M7171996.0023
Service Date: 05/14/18
Report Date: 05/21/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.002313
Service Date: 05/14/18
Report Date: 05/21/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 0700 Plant: Everett
Truck No.: C139 Ticket No.: 206769
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result Specification
6
68
63
Sample Date:
05/14/18 Sample Time: 0830
Sampled By:
Earl Uy
Weather Conditions:
Sunny
Accumulative Yards:
100 Batch Size (cy): 10
Placement Method:
pump
Water Added Before (gal):
15
Water Added After (gal):
Sample Location:
Placement Location:
Level 1 Post -tension deck
Laboratory Test Data Age at Maximum Compressive
Set
Specimen
Avg Diam.
Area
Date
Date
Test Load Strength Fracture Tested
No.
ID
(in)
(sq in)
Received
Tested
(days) (lbs) (psi) Type By
1
a
4.00
12.57
05/15/18
05/21/18
7
1
b
4.00
12.57
05/15/18
06/11/18
28
1
c
4.00
12.57
05/15/18
06/11/18
28
1
d
4.00
12.57
05/15/18
06/11/18
28
Initial
Cure: Cure
Box
Final Cure: Moist Room Min Temp: 60 Max Temp: 60
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Earl Uy
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Pagel of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.002313
Service Date: 05/14/18
Report Date: 05/21/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 0900 Plant: Everett
Truck No.: C082 Ticket No.: 206786
Field Test Data
Test Result Specification
Slump (in): 6
Air Content (%):
Concrete Temp. (F): 70
Ambient Temp. (F): 73
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Date:
05/14/18
Sampled By:
Earl Uy
Weather Conditions:
Sunny
Accumulative Yards:
240
Placement Method:
pump
Water Added Before (gal):
0
Water Added After (gal):
Sample Location:
Sample Time: 1030
Batch Size (cy): 10
Placement Location: Level 1 Post -tension deck
Laboratory Test Data Age at Maximum Compressive
Set
Specimen
Avg Diam.
Area
Date
Date
Test
Load Strength
Fracture Tested
No.
ID
(in)
(sq in)
Received
Tested
(days)
(lbs) (psi)
Type By
2
e
4.00
12.57
05/15/18
05/18/18
4 F
61,020 4,860
2 ARC
2
a
4.00
12.57
05/15/18
05/21/18
7
2
b
4.00
12.57
05/15/18
06/11/18
28
2
c
4.00
12.57
05/15/18
06/11/18
28
2
d
4.00
12.57
05/15/18
06/11/18
28
2
f
05/15/18
Hold
2
g
05/15/18
Hold
Initial
Cure: Cure
Box
Final Cure: Moist Room
Min Temp: 60
Max Temp: 60
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Earl Uy
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Page 2 of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.002313
Service Date: 05/14/18
Report Date: 05/21/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 1030 Plant: Everett
Truck No.: C185 Ticket No.: 206796
Field Test Data
Test Result Specification
Slump (in): 6
Air Content (%):
Concrete Temp. (F): 73
Ambient Temp. (F): 75
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Date:
05/14/18 Sample Time: 1200
Sampled By:
Earl Uy
Weather Conditions:
Sunny
Accumulative Yards:
320 Batch Size (cy): 10
Placement Method:
pump
Water Added Before (gal):
14
Water Added After (gal):
Sample Location:
Placement Location:
Level 1 Post -tension deck
Laboratory Test Data Age at Maximum Compressive
Set
Specimen
Avg Diam.
Area
Date
Date
Test
Load Strength
Fracture Tested
No.
ID
(in)
(sq in)
Received
Tested
(days)
(lbs) (psi)
Type By
3
e
3.99
12.5
05/15/18
05/18/18
4 F
54,400 4,350
2 ARC
3
a
4.00
12.57
05/15/18
05/21/18
7
3
b
4.00
12.57
05/15/18
06/11/18
28
3
c
4.00
12.57
05/15/18
06/11/18
28
3
d
4.00
12.57
05/15/18
06/11/18
28
3
f
05/15/18
Hold
3
g
05/15/18
Hold
Initial
Cure: Cure
Box
Final Cure: Moist Room
Min Temp: 60
Max Temp: 60
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Earl Uy
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Page 3 of 3
Distribution Page
Report Number: M7171996.0023B
Service Date: 05/14/18
Report Date: 05/21/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.002313
Service Date: 05/14/18
Report Date: 05/22/18 Revision 1 - 7-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 0700 Plant: Everett
Truck No.: C139 Ticket No.: 206769
Field Test Data
Test Result Specification
Slump (in): 6
Air Content (%):
Concrete Temp. (F): 68
Ambient Temp. (F): 63
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Date:
05/14/18 Sample Time: 0830
Sampled By:
Earl Uy
Weather Conditions:
Sunny
Accumulative Yards:
100 Batch Size (cy): 10
Placement Method:
pump
Water Added Before (gal):
15
Water Added After (gal):
Sample Location:
Placement Location:
Level 1 Post -tension deck
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam.
Area
Date
Date
Test
Load
Strength
Fracture Tested
No. ID (in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type By
1 a 3.97
12.38
05/15/18
05/21/18
7
72,120
5,830
3 HRB
1 b 4.00
12.57
05/15/18
06/11/18
28
1 c 4.00
12.57
05/15/18
06/11/18
28
1 d 4.00
12.57
05/15/18
06/11/18
28
Initial Cure: Cure Box
Final Cure: Moist Room
Min Temp: 60
Max Temp: 60
Comments: Compressive strength of 7 day cylinders complies with the 3 day specified strength.
Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Earl Uy
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Pagel of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.002313
Service Date: 05/14/18
Report Date: 05/22/18 Revision 1 - 7-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 0900 Plant: Everett
Truck No.: C082 Ticket No.: 206786
Field Test Data
Test Result Specification
Slump (in): 6
Air Content (%):
Concrete Temp. (F): 70
Ambient Temp. (F): 73
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Date:
05/14/18
Sampled By:
Earl Uy
Weather Conditions:
Sunny
Accumulative Yards:
240
Placement Method:
pump
Water Added Before (gal):
0
Water Added After (gal):
Sample Location:
Sample Time: 1030
Batch Size (cy): 10
Placement Location: Level 1 Post -tension deck
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam.
Area
Date
Date
Test
Load
Strength
Fracture
Tested
No. ID (in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
By
2 e 4.00
12.57
05/15/18
05/18/18
4 F
61,020
4,860
2
ARC
2 a 3.98
12.44
05/15/18
05/21/18
7
81,870
6,580
2
HRB
2 b 4.00
12.57
05/15/18
06/11/18
28
2 c 4.00
12.57
05/15/18
06/11/18
28
2 d 4.00
12.57
05/15/18
06/11/18
28
2 f
05/15/18
Hold
2 g
05/15/18
Hold
Initial Cure: Cure Box
Final Cure: Moist Room
Min Temp: 60
Max Temp:
60
Comments: Compressive strength of 7 day cylinders complies with the 3 day specified strength.
Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Earl Uy
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.002313
Service Date: 05/14/18
Report Date: 05/22/18 Revision 1 - 7-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 1030 Plant: Everett
Truck No.: C185 Ticket No.: 206796
Field Test Data
Test Result Specification
Slump (in): 6
Air Content (%):
Concrete Temp. (F): 73
Ambient Temp. (F): 75
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Date:
05/14/18 Sample Time: 1200
Sampled By:
Earl Uy
Weather Conditions:
Sunny
Accumulative Yards:
320 Batch Size (cy): 10
Placement Method:
pump
Water Added Before (gal):
14
Water Added After (gal):
Sample Location:
Placement Location:
Level 1 Post -tension deck
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam.
Area
Date
Date
Test
Load
Strength
Fracture
Tested
No. ID (in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
By
3 e 3.99
12.5
05/15/18
05/18/18
4 F
54,400
4,350
2
ARC
3 a 3.98
12.44
05/15/18
05/21/18
7
75,450
6,060
2
HRB
3 b 4.00
12.57
05/15/18
06/11/18
28
3 c 4.00
12.57
05/15/18
06/11/18
28
3 d 4.00
12.57
05/15/18
06/11/18
28
3 f
05/15/18
Hold
3 g
05/15/18
Hold
Initial Cure: Cure Box
Final Cure: Moist Room
Min Temp: 60
Max Temp:
60
Comments: Compressive strength of 7 day cylinders complies with the 3 day specified strength.
Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Earl Uy
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 3 of 3
Distribution Page
Report Number: M7171996.0023B
Service Date: 05/14/18
Report Date: 05/22/18 Revision 1 - 7-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.002313
Service Date: 05/14/18
Report Date: 06/12/18 Revision 2 - new break results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 0700 Plant: Everett
Truck No.: C139 Ticket No.: 206769
Field Test Data
Test Result Specification
Slump (in): 6
Air Content (%):
Concrete Temp. (F): 68
Ambient Temp. (F): 63
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Date:
05/14/18 Sample Time: 0830
Sampled By:
Earl Uy
Weather Conditions:
Sunny
Accumulative Yards:
100 Batch Size (cy): 10
Placement Method:
pump
Water Added Before (gal):
15
Water Added After (gal):
Sample Location:
Placement Location:
Level 1 Post -tension deck
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam.
Area
Date
Date
Test
Load
Strength
Fracture
Tested
No. ID (in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
By
1 a 3.97
12.38
05/15/18
05/21/18
7
72,120
5,830
3
HRB
1 b 3.98
12.44
05/15/18
06/11/18
28
85,290
6,860
2
HRB
1 c 3.98
12.44
05/15/18
06/11/18
28
93,040
7,480
2
HRB
1 d 3.98
12.44
05/15/18
06/11/18
28
90,260
7,260
2
HRB
Average
(28 days)
7,200
Initial Cure: Cure Box
Final Cure: Moist Room
Min Temp: 60
Max Temp:
60
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Earl Uy
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Pagel of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.002313
Service Date: 05/14/18
Report Date: 06/12/18 Revision 2 - new break results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @
3 days
Sample Date:
05/14/18
Sample Time:
1030
5,000 psi @ 28 days
Sampled By:
Earl Uy
Mix ID: 156000
Weather Conditions:
Sunny
Supplier: Miles Sand and Gravel
Accumulative Yards:
240
Batch Size (cy):
10
Batch Time: 0900 Plant:
Everett
Placement Method:
pump
Truck No.: C082 Ticket No.:
206786
Water Added Before (gal):
0
Field Test Data
Water Added After (gal):
Sample Location:
Test Result
Specification
Placement Location:
Level 1 Post -tension deck
Slump (in): 6
Air Content (%):
Concrete Temp. (F): 70
Ambient Temp. (F): 73
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength
Fracture
Tested
No. ID (in) (sq in)
Received Tested
(days) (lbs)
(psi)
Type
By
2 f 4.00 12.57
05/15/18 05/17/18
3 F 59,540
4,740
2
JHK
2 e 4.00 12.57
05/15/18 05/18/18
4 F 61,020
4,860
2
ARC
2 a 3.98 12.44
05/15/18 05/21/18
7 81,870
6,580
2
HRB
2 b 3.98 12.44
05/15/18 06/11/18
28 98,690
7,930
2
HRB
2 c 3.98 12.44
05/15/18 06/11/18
28 95,760
7,700
2
HRB
2 d 3.99 12.5
05/15/18 06/11/18
28 96,190
7,690
3
HRB
Average (28 days)
7,770
2 g
05/15/18
Hold
Initial Cure: Cure Box
Final Cure: Moist
Room Min Temp: 60
Max Temp:
60
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Earl Uy
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.002313
Service Date: 05/14/18
Report Date: 06/12/18 Revision 2 - new break results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 1030 Plant: Everett
Truck No.: C185 Ticket No.: 206796
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
3 f 3.98
Result Specification
6
3 e
3.99
3 a
3.98
3 b
3.99
3 c
3.98
3 d
4.00
73
75
Area
(sq in)
12.44
12.5
12.44
12.5
12.44
12.57
Date
Received
05/15/18
05/15/18
05/15/18
05/15/18
05/15/18
05/15/18
Date
Tested
05/17/18
05/18/18
05/21/18
06/11/18
06/11/18
06/11/18
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at
Maximum
Test
Load
(days)
(lbs)
3 F
54,460
4 F
54,400
7
75,450
28
96,890
28
105,420
28
95,510
Average
(28 days)
05/14/18 Sample Time: 1200
Earl Uy
Sunny
320 Batch Size (cy): 10
PUMP
14
Level 1 Post -tension deck
Compressive
Strength
Fracture
Tested
(psi)
Type
By
4,380
2
JHK
4,350
2
ARC
6,060
2
HRB
7,750
2
HRB
8,470
2
HRB
7,600
3
HRB
7,940
3 g 05/15/18 Hold
Initial Cure: Cure Box Final Cure: Moist Room Min Temp: 60 Max Temp: 60
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Earl Uy
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 3 of 3
Distribution Page
Report Number: M7171996.0023B
Service Date: 05/14/18
Report Date: 06/12/18 Revision 2 - new break results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0024
Service Date: 05/16/18
Report Date: 05/22/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (8) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny, 60's
Perimeter Wall Placements
The perimeter wall sections between grid lines CJ and CK on C11, C5.2 and C5.6 on NE perimeter wall, C8.6
and C10.5 on NE perimeter wall were placed today. Reinforcing steel was inspected prior to closing forms, and
after closing forms, clearance to the face of concrete. The reinforcing was found to be in compliance with the
approved plans. The walls were placed using Miles Sand & Gravel mix 155000PT via pump with mechanical
consolidation. Compliance testing samples of the mix were taken.
Wall Footing Placements
The wall footing sections between grid lines CH to CJ.2 and C8 to C9, and column footing on grids CJ/C9 were
placed today. Reinforcing steel was inspected prior to concrete placing and found to be in compliance with the
approved plans. The footing was placed using Miles Sand & Gravel mixes 155000PT and 12550F via pump with
mechanical consolidation. Compliance testing samples of the mixes were taken.
Column Inspection
Completed inspection of the ground level to first level columns located at grid lines CJ/C10, CK/C10, CL/C10,
CK/C9 and CL/C9. The reinforcing has been inspected for size, grade, spacing, clearance and placement, and
appears to have been installed per the approved plans and details.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0024
Service Date: 05/16/18
Report Date: 05/22/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0024A
Service Date: 05/16/18
Report Date: 05/24/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 155000PT
Supplier: Miles Sand and Gravel
Batch Time: 1232 Plant:
Truck No.: C187 Ticket No.: 206930
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
1 1 3.99
1 2
1 3
1 4
Initial Cure: Cure Box
Result Specification
7
73
68
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.5 05/17/18
05/23/18
7 50,560
05/17/18
06/13/18
28
05/17/18
06/13/18
28
05/17/18
06/13/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
05/16/18 Sample Time: 1340
Asteway Kidane
Sunny 60's
20 Batch Size (cy): 10
19
Walls between grids CJ & CK on C 11
line, C5.2 & C5.6 and C8.6 & C10.5
on NE wall and wall footing between
grids CH to CJ.2 & C8 to C9.
Compressive
Strength Fracture Tested
(psi) Type By
4,040 2 ARC
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0024A
Service Date: 05/16/18
Report Date: 05/24/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0024A
Service Date: 05/16/18
Report Date: 06/14/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 4,000
psi @ 28
days
Sample Date:
05/16/18 Sample Time: 1340
Sampled By:
Asteway Kidane
Mix ID: 155000PT
Weather Conditions:
Sunny 60's
Supplier: Miles Sand and
Gravel
Accumulative Yards:
20 Batch Size (cy): 10
Batch Time: 1232
Plant:
Placement Method:
Truck No.: C187
Ticket No.:
206930
Water Added Before (gal):
19
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Walls between grids CJ & CK on C 11
Slump (in):
7
line, C5.2 & C5.6 and C8.6 & C10.5
Air Content (%):
on NE wall and wall footing between
Concrete Temp. (F):
73
grids CH to CJ.2 & C8 to C9.
Ambient Temp. (F):
68
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type By
1 1 3.99
12.5
05/17/18 05/23/18
7 50,560
4,040 2 ARC
1 2 3.99
12.5
05/17/18 06/13/18
28 76,460
6,120 2 HRB
1 3 3.99
12.5
05/17/18 06/13/18
28 79,450
6,350 2 HRB
1 4 4.00
12.57
05/17/18 06/13/18
28 79,540
6,330 2 HRB
Average (28 days)
6,270
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0024A
Service Date: 05/16/18
Report Date: 06/14/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.002413
Service Date: 05/16/18
Report Date: 05/24/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000 psi @ 28 days
Mix ID:
12550F
Supplier:
Miles Sand and Gravel
Batch Time:
1509 Plant:
Truck No.:
C057 Ticket No.: 206951
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
1 1 3.98
1 2
1 3
1 4
Initial Cure: Cure Box
Result Specification
6
74
68
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.44 05/17/18
05/23/18
7 56,050
05/17/18
06/13/18
28
05/17/18
06/13/18
28
05/17/18
06/13/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods:
05/16/18 Sample Time: 1610
Asteway Kidane
Sunny 60's
10 Batch Size (cy): 10
Pump
Wall footing between grids CH to
CJ.2 & C8 to C9 and column footing
on grids CJ/C9.
Compressive
Strength Fracture Tested
(psi) Type By
4,510 2 ARC
Reviewed By: ZZ, _
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0024B
Service Date: 05/16/18
Report Date: 05/24/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.002413
Service Date: 05/16/18
Report Date: 06/14/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000
psi @ 28
days
Sample Date:
05/16/18 Sample Time: 1610
Sampled By:
Asteway Kidane
Mix ID: 12550F
Weather Conditions:
Sunny 60's
Supplier: Miles Sand and
Gravel
Accumulative Yards:
10 Batch Size (cy): 10
Batch Time: 1509
Plant:
Placement Method:
Pump
Truck No.: C057
Ticket No.:
206951
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Wall footing between grids CH to
Slump (in):
6
CJ.2 & C8 to C9 and column footing
Air Content (%):
on grids CJ/C9.
Concrete Temp. (F):
74
Ambient Temp. (F):
68
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type By
1 1 3.98
12.44
05/17/18 05/23/18
7 56,050
4,510 2 ARC
1 2 3.99
12.5
05/17/18 06/13/18
28 76,550
6,120 2 HRB
1 3 4.00
12.57
05/17/18 06/13/18
28 80,530
6,410 2 HRB
1 4 3.98
12.44
05/17/18 06/13/18
28 78,480
6,310 2 HRB
Average (28 days)
6,280
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods:
Reviewed By: ZZ, _
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0024B
Service Date: 05/16/18
Report Date: 06/14/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -TENSION OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0025
Service Date: 05/18/18
Report Date: 05/24/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Partly cloudy
Item 1: Received compressive strength test results from the 4x8" field cured test cylinders that were cast from
the Level 1 post -tension (PT) slab from Mayes Testing Engineer Lynnwood laboratory as follows: 4740 psi for
Set 1 and 4380 psi for Set 2. Verified the stressing rams have current calibration reports. A completed stressing
record has been forwarded to the Engineer and contractor for approval. See attached stressing record.
Item 2: Inspected the reinforcement at Elevator 1 and 2 from Level 1 to 2. At this time the southwest corner has
not been completed. Reinforcing was inspected for size, grade and spacing. Inspected column reinforcement at
grid lines C11/CI, C11/CL, C11/CL.8, C7.8/CL, C6.8/CL and C9.2/CJ, Level 1 to 2. Reinforcing inspected for
size, grade and tie spacing.
PRELIMINARY INSPECTION
Item 1 needs to be reviewed by the Engineer.
Complete elevator reinforcement at the southwest corner noted in Item 2.
Additional Inspector on site: Mike Thompson
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.10 Page 1 of 1
Post -Tensioning
Stressing Record 1/11
Project # :
M7171996
Contractor: WG Clark
Name:
Village at Westgate
Cast Date: 5/14/2018 Stress Date(s): 5/18/2018
Pour ID :
Level 1
Inspectors: David Schmutzler/ Mike Thompson
Equipment Set #1
Equipment Set #2 Equipment Set #3
Ram #:
PT029
Ram # : PT028 Ram # : PT027
Gauge #:
PT029
Gauge #: PT028 Gauge #: PT027
Calib. Date:
4/6/2018
Calib Date: 4/6/2018 Calib. Date: 4/6/2018
Gauge (psi):
5300
Gauge(psi): 5250 Gauge (psi): 5250
Minimum Tol.:
1/4 Specified
Strength (psi): 3500 Minimum 4ge (d): 4 Strengths (psi): 4740/ 4380
ID
#
Tendon
Color
Length
ft
Calc
Elon
Actual
Elon
-Tol.
7%
+Tol.
7%
ERR.
FLAG
First End
Gross
Mark
I Net
Second End
Gross Mark I Net
Location :Remarks
1
YELLOW
54
4 1/8
3 3/4
3 7/8
4 3/8
- 1/8
4 3/4
1
.......................................................................................................................................................................................................................................................................................................................................................................
3 3/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII
C3'/CC'-CD' Distributed
2
:YELLOW
54
4 1/8
4 1/4
3 7/8
4 3/8
5 1/4
1
4 1/4
IIIIIIIIIIIIIIII IIIIIIIIIIII'
3
:YELLOW;
54
4 1/8
3 3/4
3 7/8
4 3/8
-1/8
4 3/4
1
3 3/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
4
.....................
;YELLOW ....................................
............................................
54 ....._
4 1/8
................................
4 1/8
.................................. .................................
3 7/8
4 3/8
..................................................................
5 1/8
.............................. ..........
1
......................................
4 1/8
................................
IIIIIIIIIIIIIIII; IIIIIIIIIIII
.......................... ......... ...._......... ......... ....... ....... ...................................... ................................................................................
........................ ...... ...... ...... .................. ...... ...... ...... .................. ....
5
;YELLOW
54
4 1/8
4 1/4
3 7/8
4 3/8
...............................................................................................................................................................................................
5 1/4
1
4 1/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII ...........................................................................................................................................................................................................................
6
:YELLOW:
54
4 1/8
4 1/8
3 7/8
4 3/8
5 1/8
..............._.............................................................................................................._..........................................................................................................................................................................................................................................................
1
4 1/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
7
;YELLOW
54
4 1/8
4
3 7/8
4 3/8
5
1
4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
8
;YELLOW
54
4 1/8
4 1/4
3 7/8
...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
4 3/8
5 1/4
1
4 1/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
9
YELLOW
.................................................
54
4 1/8
4 1/4
3 7/8
..............._....
4 3/8
...........
5 1/4
...............
1
4 1/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
10
.....................
:YELLOW;
............................................ .........................................
54
4 1/8
_.................................
3 7/8
...................................................................
3 7/8
4 3/8
_..................................................................
4 7/8
....................................... _.......................................
1
3 7/8
................................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
.......................... ..... ..... ._....... ....................... ...................................... .................................................................................
....................................................................................................
11
.....................
;YELLOW
............................................ .........................................
54
4 1/8
_................................
4 1/4
.................................. .................................
3 7/8
4 3/8
...............................
..................................
5 1/4
.......................................
1
................... ...... ...... ........
4 1/4
........ ...... ............ ......
IIIIIIIIIIIIIIII :IIIIIIIIIIII
......... .................._....................................................... .................................................................................
....................................................................................................
12
.....................
;YELLOW;
............................................ .........................................
54
4 1/8
_..............................................................
4 1/4 ......................................
3 7/8
4 3/8
...............................
..................................
5 1/4
............................... ...............................................
1
4 1/4
................................
IIIIIIIIIIIIIIII :IIIIIIIIIIII
................... ......... _..............
13
:YELLOW:
54
4 1/8
4 1/4
3 7/8 .._
4 3/8
........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
5 1/4
1
4 1/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
14
:YELLOW:
54
4 1/8
4
3 7/8
4 3/8
5
1
4
IIIIIIIIIIIIIIII' IIIIIIIIIIII
15
;YELLOW;
54
4 1/8
; 4 1/4
3 7/8
; 4 3/8
5 1/4
1
4 1/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII
16
;YELLOW:
54
4 1/8
4 1/4
3 7/8
4 3/8
5 1/4
1
4 1/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII
M7171996.0025.1.x1s MAYES TESTING ENGINEERS
ID Tendon
................................................................................................_.....................................................................................................................................
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location
Remarks
/1
# Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
17 ;YELLOW:
54
4 1/8
4 1/4
3 7/8
4 3/8
'
5 1/4 :
1
4 1/4
IIIIIIIIIIIIIIII' IIIIIIIIIIII
18 ;YELLOW
54
4 1/8
4 1/4
3 7/8
4 3/8
5 1/4
1
4 1/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII
19 BROWN
45
3 3/8
31/2
31/8
3 5/8
41/2
1
31/2
IIIIIIIIIIIIIIII IIIIIIIIIIII
C2'/ CB.7'-CC'
Distributed
20 ;BROWN
45
3 3/8
3
31/8
3 5/8
-1/8
4
1
3
IIIIIIIIIIIIIIII IIIIIIIIIIII
21 BROWN:
45
; 3 3/8
31/2
31/8
3 5/8
41/2
1
31/2
IIIIIIIIIIIIIIII' IIIIIIIIIIII
22 BROWN
45
3 3/8
3
31/8
3 5/8
-1/8
4
1
3
IIIIIIIIIIIIIIII :IIIIIIIIIIII'
23 BROWN:
45
3 3/8
31/4
31/8
3 5/8
41/4
1
3 1/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
24 BROWN:
......................................... ......................... ...................................
45 ......_................................
3 3/8
3 1/4
.................................. .................................
31/8
3 5/8
............ .....................................................
4 1/4
................................ ...............................................
1
3 1/4
................................
IIIIIIIIIIIIIIII; IIIIIIIIIIII
.................... ..................._................................ ......................................
........ ...... ...... ...... ...... ...... ...... ...... ...... ...... .................
.....................................................................................................
25 :GRN-ORA .........................................
29
; 21/8
_...................................................................
: 1 7/8 .................................
1 7/8
: 2 3/8
...............................
..................................
2 7/8
.......................................
1
.......................................
1 7/8
................................
IIIIIIIIIIIIIIII: IIIIIIIIIIII
........................... .................................................................................
.........
CT/ CB.7'-CC'
...... ...... ...... ................... ..... ...... .......................
Distributed
........... ...... ....... ...... ...... ...... ..........................................................
26 SRN-oRA
..................... ............................................ .........................................
29
21/8
_................................
1 7/8
.................................. .................................
1 7/8
2 3/8
................... ....... .....
...... ...... ......................
2 7/8
.......................................
1
............. ...... ...... ...... ........
1 7/8
................................
IIIIIIIIIIIIIIII :IIIIIIIIIIII
......... ...... ...... ...... ....... ..... ....... ...............................................................
........ ...... ...... ...... .....................................................
....................................................................................................
27 SRN-oRA
29
21/8
21/8
1 7/8
2 3/8
3 1/8
1
21/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII ..........................................................................................................................................................................................................................
28 SRN-oRA
..................... ............................................ .........................................
29
; 21/8
_................................
: 2
...................... ............ .................................
1 7/8
2 3/8
...............................
..................................
3
............................. ...... ....
1
............. ...... ...... ..............
2
................................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
................... ..........................................................................................
.........
...... ...... ...... .....................................................
....................................................................................................
29 GRN-ORA
29
21/8
1 3/4
1 7/8
2 3/8
-1/8
2 3/4
1
; 1 3/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII'
30 SRN-oRA .........................................
..................... ............................................
29
21/8
_................................
1 7/8
................................... ................................._................................
1 7/8
2 3/8
..................................
2 7/8
....................................... _.......................................
1
1 7/8
................................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
....................................... _.......................................................................................................................................
..............
....................................................................................................
31 ;ORANGE
..................... ....................................... ..... .........................................
77
6
_................................
6 1/8
.................................. .................................
5 5/8
6 3/8
..................................................................
7 1/8
.......................................
1
............. ...... ...... ...... ........
6 1/8
................................
IIIIIIIIIIIIIIII: IIIIIIIIIIII
......... .............................._.........................................................................................................................................................................................................................................................
C4'/CB.3'-CB.6'
:Distributed
32 :ORANGE:
..................... ............................................ .........................................
77
6
_................................
6
.................................. .........................................................................................................................................
5 5/8
6 3/8
7
1
............. ...... ...... ..............
6
................................
IIIIIIIIIIIIIIII :IIIIIIIIIIII
.......................... ........ ..... .......... ...... ....... ...... .........................................
........ ...... ...... ...... .....................................................
........................ ...... ...... ...... ..........................................................
33 :ORANGE:
77
6
61/8
5 5/8
6 3/8
71/8
1
61/8
IIIIIIIIIIIIIIII: IIIIIIIIIIII
34 :ORANGE:
..................... .....................................................................................
77
6
_................................
61/8
....................................................................
5 5/8
6 3/8
_...................................................................
71/8
...................................... _.......................................
1
61/8
................................
IIIIIIIIIIIIIIII; IIIIIIIIIIII ;.......................... .....
............................... ........_................................
...... ..........
...... ...... ...... .............................. .......................
........................ ...... ...... ...... ..........................................................
35 :ORANGE:
..................... ............................................ .........................................
77
6
_...................................................................
61/8 .................................
5 5/8
: 6 3/8
...............................
..................................
71/8
.......................................
1
............. ...... ...... ..............
61/8
.................... .................................................................
IIIIIIIIIIIIIIII; IIIIIIIIIIII
... ...... ...... ..................................
...... ..........
...... ...... ...... .....................................................
........................ ...... ...... ...... ..........................................................
36 :ORANGE:
77
6
61/4
5 5/8
6 3/8
71/4
1
; 6 1/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
37 :ORANGE:
77
; 6
; 6 1/4
5 5/8
: 6 3/8
:
71/4 ;
1
61/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
...................................................................................................................................................................................................................................................
38 :ORANGE:
77
; 6
61/4
5 5/8
: 6 3/8
71/4 ;
1
: 61/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
39 ............................................71/8
40 : BROWN :
45
3 3/8
3 3/8
3 1/8
3 5/8
4 3/8 ;
1
3 3/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
C2'/ CB.2'
Distributed
41 : BROWN
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._...............................................................................................................................................................................................................................................
45
; 3 3/8
: 31/2
31/8
: 3 5/8
41/2 ;
1
: 31/2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
42 : BROWN :
45
3 3/8
: 31/2
31/8
..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
: 3 5/8
41/2
1
3 1/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
43 : ORA-SIL :
25
1 7/8
1 7/8
1 5/8
: 2 1/8
2 7/8
1
1 7/8
IIIIIIIIIIIIIIII IIIIIIIIIIII ;
C3'/ CB.2
Distributed
44 : ORA-SIL :
25
; 1 7/8
: 1 3/8
1 5/8
: 21/8
: -1/4
2 3/8 ;
1
: 1 3/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII ;
:two pulls
MAYES TESTING ENGINEERS
M7171996.0025.1.xls
ID
.................................................................................................._.....................................................................................................................................
Tendon
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location Remarks
/1
#
Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
45
ORA-SIL
25
1 7/8
1 3/8
1 5/8
2 1/8
-1/4
2 3/8
1
1 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII ;
!two pulls
46
.........................................................................................................._....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
GREEN
78
6 1/8
61/8
5 3/4
61/2
7 1/8
1
6 1/8
IIIIIIIIIIIIIIII: IIIIIIIIIIII
C4'/ CA.4-CB' Distributed
47
GREEN
78
61/8
6 3/8
5 3/4
61/2
7 3/8
1
6 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
48
;GREEN
78
61/8
61/8
5 3/4
61/2
71/8
1
61/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
49
GREEN
78
61/8
61/2
5 3/4
61/2
71/2
1
61/2
IIIIIIIIIIIIIIII' IIIIIIIIIIII
50
.............:....................
GREEN
..... ..... ......_.........................................
78
61/8
_..........................................................................................................................................................................................................................................................................................
61/4
5 3/4
61/2
71/4
1
; 61/4
IIIIIIIIIIIIIIII IIIIIIIIIIII'.........................................................................................................................................................................................................................
51
;GREEN
78
61/8
61/2 ................................_........................................................................................................._...........................................................................................................
5 3/4
61/2
7 1/2
1
61/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
... _....... ......................... ..........................................................................................................................................................................................................................
52
.........................................................................................................._........................................................................................................................................................................................................................................................................................................................._.........................................................................................................................................................................................................................................................
GREEN
78
61/8
61/2
5 3/4
61/2
71/2
1
6 1/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
53
GREEN
78
6 1/8
_..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
6 3/8
5 3/4
6 1/2
7 3/8
1
6 3/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
54
GREEN
78
61/8
61/2
5 3/4
61/2
71/2
1
61/2
IIIIIIIIIIIIIIII: IIIIIIIIIIII
55
;GREEN
78
; 61/8
6
5 3/4
6 1/2
7 ;
1
6
IIIIIIIIIIIIIIII; IIIIIIIIIIII..........................................................................................................................................................................................................................
56
;GREEN
78
61/8
5 7/8
5 3/4
6 1/2
6 7/8
1
5 7/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
57
GREEN I
78
61/8
61/4
5 3/4
61/2
71/4
1
; 61/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
58
GREEN
78
61/8
61/4
..................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
5 3/4
61/2
71/4 ;
1
61/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII ;
59
.........................................................................................................._........................................................................................................................................................................................................................................................................................................................._.........................................................................................................................................................................................................................................................
GREEN
78
61/8
6 3/8
5 3/4
61/2
7 3/8 ;
1
6 3/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
60
.....................
GREEN
............................................ .........................................
78
_61/8
................................
6 3/8
.................................. .................................
5 3/4
61/2
............................. ....
..................................
7 3/8
............................... .....................
1 ...... ...... ..............
6 3/8
................................
IIIIIIIIIIIIIIII :IIIIIIIIIIII
.......................... ....... ...... .......... ...... ....... ......... ......................................
............................................................................... ........................ ...... ...... ...... ..........................................................
61
GREEN
78
61/8
5 7/8
5 3/4
61/2
6 7/8
1
5 7/8
I :IIIIII
IIIIIIIIIIIIIIIIIIIII
62
;GREEN
78
; 61/8
6 1/4
5 3/4
6 1/2
7 1/4 ;
1
.............................................................................................................._..........................................................................................................................................................................................................................................................
6 1/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
63
GREEN
78
61/8
61/4
5 3/4
61/2
71/4 ;
1
........................................................................................................................................................................................................................................................................................................................................................................
61/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
64
GREEN
78
61/8
5 7/8
5 3/4
........
61/2
_ .......................
6 7/s
1
5 7/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
65
GREEN
78
; 61/8
61/4
5 3/4
61/2
71/4 ;
1
6 1/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
66
.....................
;GREEN
............................................ .........................................
78
; 6 1/8
_................................
6 1/8
............................. ...... .................................
5 3/4
6 1/2
..................................................................
7 1/8 ;
.......................................
1
............. ...... ...... ...... ........
61/8
.....................................
IIIIIIIIIIIIIIII IIIIIIIIIIII
... .................. .... ..._...... ......... ....... .... ...................................... ................................................................................
....................................................................................................
67
.........................................................................................................._..........................................................................................
GREEN
78
61/8
61/4
5 3/4
61/2
.....
71/4
1
; 6 1/4
................................................
IIIIIIIIIIIIIIII IIIIIIIIIIII
68
..........................
GREEN
....................................................._......................................................................................
78
61/8
6
5 3/4
............._...............................
6 1/2
............................................................................................................................................................
7
1
6
IIIIIIIIIIIIIIII: IIIIIIIIIIII
......._.............................
69
GREEN
78
; 61/8
5 7/8
5 3/4
61/2
6 7/8 ;
1
5 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
70
GREEN
78
6 1/8
6 1/4
5 3/4
6 1/2
7 1/4 ;
1
.......................................................................................................................................................................................................................................................................................................................................................................
6 1/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
71
GREEN
78
61/8
6 3/8
5 3/4
6 1/2
7 3/s
1
; 6 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
72
;GREEN
78
; 61/8
61/2
5 3/4
61/2
71/2 ;
1
61/2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
MAYES TESTING ENGINEERS
M7171996.0025.1.xls
ID
.................................................................................................._.....................................................................................................................................
Tendon
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location
Remarks
/1
#
Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
73
.....................
:ORANGE;
......................................................................................
77
6
................................:.........
5 5/8
.............
5 5/8
6 3/8
........ ......,.....................
6 5/8 ..:........
1 ...........
5 5/8
IIIIIIIIIIIIIIII IIIIIIIIIIIII
_ _ _......._.....,......................................................._...._..................................,
C4'/ CA'-CA.4'
Distributed
.............................................................................................
74
.....................
;ORANGE
............................................ ........................................._...............................................................................................................................................................................................................................................................................................................................................................................................
77
6
5 5/8
5 5/8
6 3/8
6 5/8
1
5 5/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
........ ...... ...... ...... ...... ...............................................
........................ ...... ...... ...... ..........................................................
75
:ORANGE:
.............
77
6
5 7/8
5 5/8
6 3/8
6 7/8
1
5 7/8
IIIIIIIIIIIIIIII IIIIIIIIIIIII
76
.....................
:ORANGE:
.....................................................................................
77
6
_.................................
5 5/8
.... ...... ...... ...... .............................................
5 5/8
6 3/8
_.......................... ......
...... ...... ......................
6 5/8
....................................... _..............
1 ..... ...... ..............
5 5/8
................................
IIIIIIIIIIIIIIII IIIIIIIIIIIII I
.......................... ............. _....... .......... ....... ........ .............. ..... ...... ......
...... ..........
...... ...... ...... .....................................................
........................ ...... ...... ...... ...................................................... ....
77
.....................
:ORANGE:
........... ............................... .........................................
77
6
_................................
5 7/8
.................................. .................................
5 5/8
6 3/8
_...............................
..................................
6 7/8
.......................................
1
.......................................
5 7/8
................................
IIIIIIIIIIIIIIII' IIIIIIIIIIII
.................. .......... ..... ................. ......................................
................................................................................
....................................................................................................
78
oRANGE
77
6
6
5 5/8
................._.............................
6 3/8
7
1
...............................................................................
6
IIIIIIIIIIIIIIII :IIIIIIIIIIII
.. _......................................................................................................................................................................................................................
79
:ORANGE: ........................................_...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
77
6
6
5 5/8
6 3/8
7
1
6
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
80
;ORANGE
77
6
61/8
5 5/8
6 3/8
7 1/8
1
61/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
81
:ORANGE ........................................_..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
77
6
6 1/4
5 5/8
6 3/8
7 1/4
1
6 1/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
82
:ORANGE:
77
6
5 7/8
5 5/8
6 3/8
6 7/8
1
5 7/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
83
:ORANGE:
..................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
77
6
61/4
5 5/8
6 3/8
71/4
1
6 1/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
84
.....................
:ORANGE
............................................ .........................................
77
6
_.............................................................................................................................................................................................................................................................................................................................................................
6 1/4
5 5/8
6 3/8
71/4
1
: 61/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII..................................
.........
...... ...... ...... .....................................................
........................ ...... ...... ...... ..........................................................
85
:ORANGE
77
6
6 1/2 ..................
5 5/8
6 3/8
118
7 1/2
1
.........................................................
6 1/2 ..........
IIIIIIIIIIIIIIII: IIIIIIIIIIII' .........................................................................................................................................................................................................................
86
:ORANGE: ........................................_...................................................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
77
6
6 1 /2
5 5/8
6 3/8
1 /8
7 1 /2
1
: 6 1 /2
IIIIIIIIIIIIIIII :IIIIIIIIIIII
87
.....................
:ORANGE
............................................ .........................................
77
6
_................................
6 1 /2
.................................. .................................
5 5/8
: 6 3/8
...............................
: 1 /8
..................................
7 1 /2
............................... ...................................................................................................................._.......................................................................................................................................................................................................................................................
1
: 6 1 /2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
88
.....................
: D-6
............................................ .........................................
82
_6 3/8
................................
6 1/8
.................................. ..................................
5 7/8
6 7/8
...............................
..................................
7 1/8
............................... .....................
1 ...... ...... ..............
6 1/8
................................
IIIIIIIIIIIIIIII :IIIIIIIIIIII
................... .......................
C1'/CH.5
Distributed
89
.....................
: D-6
............................................ ...................................
82 ......_............................................................................................................................................................................................................................................................................................................................................
s 3/8
6
5 7/8
: 6 7/8
7
1
6
IIIIIIIIIIIIIIII :IIIIIIIIIIII
............. ......................................
........ ...... ...... ...... .....................................................
........................ ...... ...... ...... ..........................................................
90
: D-6
82
6 3/8
: 6 3/4
5 7/8
: 6 7/8
:
7 3/4
1
: 6 3/4
IIIIIIIIIIIIIIII I I I I I I I I I I I I I
91
: D-5
..................................................................._...................................................................
85
6 5/8
6 3/4 .................................
6 1/8
: 71/8
...............................
..................................
7 3/4
............................... ...............................................................................
1
: 6 3/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII
............................... ........................................ .................................
.... ....
C1'/CH.2
...... ...... ...... ...... ............ ...... ...... .............................
Distributed
....................................................................................................
92
.....................
: D-5
............................................ .........................................
85
6 5/8
_...................................................................
6 7/8 .................................
61/8
: 71/8
...............................
..................................
7 7/8
.......................................
1
.................................................................................
6 7/8
IIIIIIIIIIIIIIII IIIIIIIIIIIII
93
.....................
: D-5 ..........................................
............................................ .
85
6 5/8
_...................................................................
: 71/8 .................................
61/8
: 71/8
_................................
: ..................................
s 1/8
....................................... _.......................................
1
7 1/8
................................
IIIIIIIIIIIIIIII IIIIIIIIIIII I
................................. ...... _.................. .............. ......................................
.................................................................
......................................................................
.............................................
94
: D-4
....................................................................._................................................................................................................................................................................................................................................................................................................
89
6 7/8
: 6 7/8
6 3/8
: 7 3/8
:
7 7/8
1
6 7/8
IIIIIIIIIIIIIIII IIIIIIIIIIIII I
_....................................................................................................................................................................................................................................................
C1'/CH
Distributed
95
D-4
............................................................._.........................................................................................................................................................
89
6 7/8
7 3/8
6 3/8
7 3/s
8 3/8
1
7 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
D-4
89
67/8
71/4
63/8
73/8
81/4
1
7 1/496
II1
.. ............I.............
97
: D-3
64
5
5
4 5/8
: 5 3/8
:
6
1
5
IIIIIIIIIIIIIIII :IIIIIIIIIIIII
C1'/CG.5
:Distributed
98
D-3
..................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
64
5
4 7/8
4 5/8
5 3/8
5 7/8
1
4 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
99
: D-3
64
5
5 1/8
4 5/s
: 5 3/8
61/8
1
51/8
IIIIIIIIIIIIIIII IIIIIIIIIIIII
100
: D-2
60
4 5/8
: 4 3/4
4 1/4
: 5
5 3/4
1
: 4 3/4
IIII1111111111111111111111111 I
C17CG
:Distributed
MAYES TESTING ENGINEERS
M7171996.0025.1.xls
ID
.................................................................................................._................................................................................................................................
Tendon
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location ;Remarks
/1
#
Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
101
D-2
60
4 5/8
41 /2
41 /4
; 5
51 /2
1
41 /2
IIIIIIIIIIIIIIII IIIIIIIIIIII
... _.... _.... _........ _.....
102
.........................................................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
D-2
60
4 5/8
4 5/8
4 1 /4
5
5 5/8
1
4 5/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
103
................................................................................................._..........................................................................................................................................................................................................................................................................................
D-1
57
4 3/8
4 3/8
41/8
4 5/8
5 3/8
1
4 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
C1'/CF.9 Distributed
............................................................................................................................................................
104 ;
D-1
57
4 3/8
41/2
41/8
4 5/8
51/2
1
41/2
IIIIIIIIIIIIIIII IIIIIIIIIIII
105 ;
D-1
57
4 3/8
4 3/8
41/8
' 4 5/8
5 3/8
1
4 3/8
IIIIIIIIIIIIIIII' IIIIIIIIIIII
106 ;
BLUE
39
2 7/8
2 3/4
2 5/8
..............._.............................
3 1/8
3 3/4
.......................
1
.....................................................
2 3/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII'
..............................................................................................................................................................................................................................
C1/CE.9-CF.6 Distributed
107 ;
BLUE
39
2 7/8
2 7/8
2 5/8
31/8
3 7/8
1
2 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
108 I
BLUE
39
2 7/8
2 7/8
2 5/8
3 1/8
3 7/8
1
2 7/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
109
BLUE
..................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
39
2 7/8
2 3/4
2 5/8
; 31/8
3 3/4
1
2 3/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
110
BLUE
39
2 7/8
2 3/4
2 5/8
31/8
3 3/4
1
2 3/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII
111 ;
BLUE
39
2 7/8
3
2 5/8
31/8
4
1
3
......................................................................._................................
IIIIIIIIIIIIIIII; IIIIIIIIIIII......................... ......
...... ..........
...... ...... ...... ......................... ..... ....................... ........................ ...... ...... ...... ..........................................................
112
BLUE
39
2 7/8
2 5/8
2 5/8
...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
31/8
3 5/8
1
2 5/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
113 ;
BLUE
39
2 7/8
; 2 5/8
2 5/8
31/8
3 5/8
1
2 5/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
....................................................................................................
114 ;
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
BLUE
39
2 7/8
2 3/4
2 5/8
3 1/8
3 3/4
1
2 3/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
115 I
BLUE
39
2 7/8
; 2 7/8
2 5/8
; 31/8
;
3 7/8
..........................................................................................................................................................................................................................................................................................................................................................................................
1
2 7/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
116 ;
.....................
BLUE
............................................ .........................................
39
_2 7/8
................................
3
.................................. .................................
2 5/8
; 31/8
...............................
..................................
4
.......................................
1
......................... ...... ........
3
........................... .....
IIIIIIIIIIIIIIII :IIIIIIIIIIII
......... ...... .................. ...... ................................ ........ ...............................
............................................................................... ....................................................................................................
117 ;
.....................
BLUE .........................................
............................................
39
2 7/8
_................................
2 7/8
.................................. .................................
2 5/8
31/8
...............................
..................................
3 7/8
.......................................
1
.......................................
2 7/8
................................
IIIIIIIIIIIIIIII :IIIIIIIIIIII
........................... ...... ...... ......... ........ ...... ...... .........................................
........ ...... ...... ...... ..................................................... ....................................................................................................
118 ;
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
BLUE
39
2 7/8
3
2 5/8
; 3 1/8
;
4
1
3
IIIIIIIIIIIIIIII; IIIIIIIIIIII
119 ;
.....................
BLUE
............................................ .
39
.........................................
2 7/s
_...................................................................
; 2 5/8 .................................
2 5/8
; 3 1/8
...............................
..................................
3 5/8
.......................................
1
.......................................
2 5/8
................................
IIIIIIIIIIIIIIII; IIIIIIIIIIII
............................... ........................................ ...............................
...... ..........
...... ...... ...... ................................................. .... ...... ...... ............. ...... ...... ...... ..........................................................
120 ;
...................................
BLUE
39
2 7/8
2 7/8
2 5/s
; 31/8
3 7/s
1
2 7/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
121 ;SILVER
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
;
51
3 7/8
3 5/8
3 5/8
41/8
4 5/8
1
3 5/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
C1/CD.9-CE.6 Distributed
122 I
.....................
SILVER ;
............................................ ...................................
51 ......
3 7/8
_................................
; 4
............................. ...... .................................
3 5/8
; 41/8
...............................
; ..................................
5
.......................................
1
........................................................................
4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
....... ..................._.........................................................
................................................................................
........................ ...... ...... ...... ..........................................................
123 ;SILVER
.....................
............................................ .........................................
51
3 7/8
_........................................................................................................................................
4
3 5/8
; 41/8
...... ......................
5
.......................................
1
......................... ...... ........
4
... ..... ...... ..................
IIIIIIIIIIIIIIII :IIIIIIIIIIII
......... ..................................................................................................................................................................................................................................
124
...................................
SILVER
51
3 7/8
4
3 5/8
41/8
5
1
4
IIIIIIIIIIIIIIII: IIIIIIIIIIII
......... ........ _.............................
125
SILVER
............................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._...............................................................................................................................................................................................................................................
51
3 7/8
4
3 5/8
; 41/8
;
5
1
4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
126 ;
SILVER
..................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
51
3 7/8
; 3 7/8
3 5/8
; 4 1/8
4 7/8
1
3 7/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
127 ;SILVER
51
3 7/8
3 3/4
3 5/8
; 41/8
4 3/4
1
3 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
128
SILVER
51
3 7/8
3 3/4
3 5/8
4 1/8
4 3/4
1
3 3/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
MAYES TESTING ENGINEERS
M7171996.0025.1.xls
ID
.................................................................................................._................................................................................................................................
Tendon
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location ;Remarks
/1
#
Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
129
...........:
SILVER
...........................:..........................................................................
51
3 7/8
3 5/8
3 5/8
..........................................;.....................
4 1/8
'
4 5/8
1
........ ..... .....
: . 3 5/8
IIIIIIIIIIIIIIII' IIIIIIIIIIII I
..._..._ _ : __......._.........................................
........ ..... ..... ..... .................................................... ....................................................................................................
130 ;SILVER
51
3 7/8
4
3 5/8
41/8
5
1
4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
131 ;SILVER
51
3 7/8
41/8
3 5/8
41/8
5 1/8
1
4 1/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
132
SILVER
51
........................................_...................................................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
3 7/8
4 1/8
3 5/8
4 1/8
5 1/8
1
4 1/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
133
........................................................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
WHITE
80
6 1/4
6 1/2
5 3/4
6 3/4
7 1/2
1
6 1/2
IIIIIIIIIIIIIIII IIIIIIIIIIII
C1/CA-CD.5 Distributed
134
WHITE
80
6 1/4
6 3/8
5 3/4
6 3/4
7 3/8
1
6 3/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII'
135
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
WHITE
80
6 1 /4
6 1 /2
5 3/4
6 3/4
7 1 /2
1
6 1 /2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
136
WHITE
80
6 1 /4
6 1 /8
5 3/4
6 3/4
7 1 /8
1
6 1/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
137
WHITE
80
........................................_..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
6 1 /4
6 1 /2
5 3/4
6 3/4
7 1 /2
1
6 1 /2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
138
WHITE
80
6 1 /4
6 1 /8
5 3/4
6 3/4
7 1 /8
1
6 1/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
139 I
WHITE
..................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
80
6 1 /4
6 1 /4
5 3/4
6 3/4
7 1 /4
1
6 1 /4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
140
.........................................................................................................._...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
WHITE
80
6 1 /4
6 1 /4
5 3/4
6 3/4
7 1 /4
1
6 1 /4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
141
WHITE
80
61/4
6
5 3/4
..............._.......................
6 3/4
7
1
6
IIIIIIIIIIIIIIII: IIIIIIIIIIII'
................
142
WHITE
80
........................................_...................................................................................................._........................................................................................................._.......................................................................
6 1 /4
5 7/8
5 3/4
6 3/4
6 7/8
1
5 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
....................................... _.............. .......................................................................................................................................
....................................................................................................
143
WHITE
80
6 1 /4
6 3/8
5 3/4
6 3/4
7 3/8
1
6 3/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
144
.........................................................................................................._..................................................................................................................................................................................................................................................................................................
WHITE
80
6 1 /4
6 1 /8
5 3/4
6 3/4
7 1 /8
1
6 1 /8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
..........................
145
WHITE
80
6 1 /4
6 1 /8
5 3/4
6 3/4
...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................
7 1 /8
1
6 1/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
146 I
.....................
WHITE
............................................ .........................................
80
6 1 /4
_................................
6 1 /4
....................................................................
5 3/4
6 3/4
_..................................................................
7 1 /4
....................................... _
1
.......................................
6 1 /4
................................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII .......................... ..... ...... ..........
....................................... _.............. ..................
...... ...... ...... .............................. ....................... ........................ ...... ...... ...... ..........................................................
147
.........................................................................................................._...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
WHITE
80
6 1 /4
6 1 /4
5 3/4
6 3/4
7 1 /4
1
6 1 /4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
148
.................................
WHITE
80
61 /4
6
5 3/4
........._.........................
6 3/4
7
1
6
IIIIIIIIIIIIIIII IIIIIIIIIIII
149
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
WHITE
80
6 1/4
6 1/2
5 3/4
6 3/4
7 1/2
1
6 1/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
150
......................................................................................................._..................................................................................................._........................................................................................................................................................................................................
WHITE
80
6 1 /4
6 1 /4
5 3/4
6 3/4
7 1 /4
1
16 1 /4
1 1 1 1 1 1 1 1 1 1 1 1 1 1 11: I I I I I I I I I I I I
_.................................................. ...... ..........
...... ...... ...... .............................. ....................... ........................ ...... ...... ...... ..........................................................
151 °
..................
WHITE
................................................_...........................................................................
80
6 1/4
5 7/8
5 3/4
6 3/4
6 7/8
1
5 7/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
152
WHITE
80
6 1/4
6 3/8
5 3/4
6 3/4
7 3/8
1
6 3/8
IIIIIIIIIIIIIIII: IIIIIIIIIIII
153
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._...............................................................................................................................................................................................................................................
WHITE
80
6 1/4
6 3/8
5 3/4
6 3/4
7 3/8
1
6 3/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
154
WHITE
80
........................................_..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
6 1 /4
6
5 3/4
6 3/4
7
1
6
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
155
WHITE
80
6 1 /4
6 1 /2
5 3/4
6 3/4
7 1 /2
1
6 1 /2
IIIIIIIIIIIIIIII IIIIIIIIIIII
156
71/4
1
6 1 /4WHITE
1
I I I I I I I I I I I
MAYES TESTING ENGINEERS
M7171996.0025.1.xls
ID Tendon .......................................
Length
Calc
_................................,............................................................................................,
Actual
-Tol.
+Tol.
ERR.
.........
First End
................,...................................7............................
Second End
...................................................................................................................................................................:....................................................................................................
Location Remarks
# Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
157 : WHITE
80
6 1 /4
6 1 /4
5 3/4
6 3/4
'
7 1 /4
1
6 1 /4
IIIIIIIIIIIIIIII 'IIIIIIIIIIII I
158 WHITE
80
6 1 /4
6 1 /2
5 3/4
6 3/4
7 1 /2
1
6 1 /2
IIIIIIIIIIIIIIII :IIIIIIIIIIII
159 ; WHITE :
................................................................................_..........................................................................................................................................................................................................................................................................................
80
6 1 /4
6 1 /4
5 3/4
; 6 3/4
7 1 /4
1
6 1 /4
IIIIIIIIIIIIIIII IIIIIIIIIIII
.............................................................
........................................................................................................................................................
160 : WHITE
80
6 1 /4
6 1 /8
5 3/4
6 3/4
7 1 /8
1
6 1 /8
IIIIIIIIIIIIIIII I I
161 WHITE
80
6 1/4
6 1/8
5 3/4
6 3/4
7 1/8
1
6 1/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
162 WHITE
.............:.............................
80
6 1 /4
6 1 /8
........................
5 3/4
6 3/4
7 1 /8
1
6 1 /8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
...............
163 ; WHITE
..................... ............................................ ........................................._...................................................................................................._........................................................................................................._........................................................................................................
80
6 1/4
6 3/8
5 3/4
6 3/4
7 3/8
1
6 3/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
...... _................................. ......................................................................................................................
....................................................................................................
164 ; WHITE
80
6 1 /4
6 1 /2
5 3/4
6 3/4
7 1 /2
1
6 1 /2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
165 WHITE ........................................_..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
80
6 1 /4
6 1 /2
5 3/4
6 3/4
7 1 /2
1
6 1 /2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
166 WHITE
80
6 1 /4
6 1 /2
5 3/4
6 3/4
7 1 /2
1
6 1 /2
IIIIIIIIIIIIIIII :IIIIIIIIIIII
167 : WHITE
80
6 1 /4
6 1 /4
5 3/4
6 3/4
7 1 /4
1
6 1 /4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII..........................................................................................................................................................................................................................
168 WHITE
.........................................................................................................._...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
80
6 1 /4
6 1 /4
5 3/4
6 3/4
7 1 /4
1
6 1 /4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
169 RED -GRIN
73
5 1 /2
5 3/4
5 1 /8
5 7/8
6 3/4
1
5 3/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII '
CA/C2 ;Banded
170 :RED -GRIN
73
5 1 /2
5 1 /2 ......................................_........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
5 1 /8
5 7/8
6 1 /2
1
5 1 /2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
171 ;RED -GRIN ..........................................
..................... ............................................
73
5 1/2
_................................
5 3/4
.................................. .................................
5 1/8
5 7/8
...............................
..................................
6 3/4
................................ ...............................................
1
5 3/4
.................................
IIIIIIIIIIIIIIII; IIIIIIIIIIII
.............................. ..... ._....... .......... ....... ....... ...................................... ................................................................................
........................ ...... ...... ...... ..........................................................
172 ;RED -GRIN
73
5 1/2
; 5 5/8
5 1/8
; 5 7/8
6 5/8
1
5 5/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
..........................
173 :RED -GRIN
73
5 1/2
5 3/4
5 1/8
5 7/8
6 3/4
1
5 3/4
................................................................................................................................................................................................................................................................................................................................
IIIIIIIIIIIIIIII :IIIIIIIIIIII
174 ;RED -GRIN
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
73
5 1/2
5 7/8
5 1/8
5 7/8
6 7/8
1
5 7/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
175 ;RED -GRIN
..................................................................._...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
73
5 1/2
; 5 7/8
5 1/8
5 7/8
6 7/8
1
5 7/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
176 :RED -GRIN
73
5 1/2
5 5/8
5 1/8
; 5 7/8
6 5/8
1
5 5/8
....................
IIIIIIIIIIIIIIII IIIIIIIIIIII
............................._................................
177 ;RED -GRIN
..................... ............................................ .........................................
73
5 1 /2
_................................
5 1 /2
................................... .................................
5 1/8
5 7/8
_................................
..................................
6 1 /2
....................................... _
1
.......................................
5 1 /2
................................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
....................................... _................................ ......................................................................................................................
....................................................................................................
178 :RED -GRIN
73
5 1/2
; 5 1/8
5 1/8
; 5 7/8
6 1/8
1
: 5 1/8
IIIIIIIIIIIIIIII' IIIIIIIIIIII I
179 ;RED -GRIN
..................... ............................................ .........................................
73
51/2
_...................................................................
; 6 .................................
51/8
; 5 7/8
...............................
118
..................................
7
.......................................
1
............. ...... ...... ..............
6
................................
IIIIIIIIIIIIIIII IIIIIIIIIIII
............ ....
180 ;RED -GRIN
73
5 1/2
5 5/8
5 1/8
5 7/8
6 5/8
1
5 5/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
181 ;RED -GRIN ........................................_...................................................................................................._........................................................................................................._.............................................................................................................._................................................................................................................................................................................................................................................
73
5 1/2
6
51/8
5 7/8
1/8
7
1
6
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
182 ;RED -GRIN
..................... ....................................... ..... .......
73
..................................
5 1 /2
_.....................................
; 5 1 /4
...... ...... ...... ............ .................................
5 1 /8
; 5 7/8
....... ...... ...... ....... ......
............ ......................
6 1 /4
..... ...... ...... ...... ...... ..........
1
..................................................................................................................................................................................................................................................
5 1 /4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
................. ....................................................................................................
183 ;RED -GRIN
73
5 1/2
5 3/4
5 1/8
; 5 7/8
6 3/4
1
5 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
184 :RED -GRIN
73
5 1/2
5 3/4
5 1/8
5 7/8
6 3/4
1
: 5 3/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
11
MAYES TESTING ENGINEERS
M7171996.0025.1.xls
ID Tendon
.................................................................................................._................................................................................................................................
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location Remarks
/1
# Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
185 :RED-GRN;
:
73
; 5 1 /2
........................................
: 5 1 /2
5 1 /8
: 5 7/8
'
6 1 /2
1
......... .......................
5 1 /2
IIIIIIIIIIIIIIII' IIIIIIIIIIII
_ _...............................................................
__................................................................................................................
RED :
62
; 43/4
47/8
43/8
; 51/8
57/8
1
; 47/8
CA/C3
'Banded
187 RED
62
. 4 3/4
4 3/4
4 3/8
5 1 /8
5 3/4
1
4 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
188 RED ........................................_...................................................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
62
4 3/4
4 7/8
4 3/8
51/8
5 7/8 ;
1
4 7/8
IIIIII I I I I I I I I I I I I I I I I I I I I I I
189 RED :
62
4 3/4
4 7/8
4 3/8
5 1/8
5 7/8
1
.............................................................................................................................................................................................................................................................................................................................................
:4 7/8
IIIIIIIIIIIIIIII' IIIIIIIIIIII
190 ' RED
62
4 3/4
4 7/8
........................
4 3/8
.................
5 1 /8
...............................
5 7/8
1
...............................................................................
4 7/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
....._..............................
......................................................................................................
191 RED
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
62
4 3/4
5
4 3/8
5 1 /8
6
1
5
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
192 RED :
62
4 3/4
4 3/4
4 3/8
5 1 /8
5 3/4 :
1
4 3/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
193 RED :
.........................................................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
62
4 3/4
4 3/4
4 3/8
51 /8
5 3/4
1
:4 3/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
194 RED
62
4 3/4
4 7/8
4 3/8
5 1 /8
5 7/8
1
4 7/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
195 RED
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
62
4 3/4
4 3/4
4 3/8
51 /8
5 3/4
1
4 3/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
196 ; RED :
..................... ............................................ .........................................
62
4 3/4
_.............................................................................................................................................................................................................................................................................................................................................................
4 7/8
4 3/8
5 1 /8
5 7/8
1
:4 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII .................................. .........
...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
197 RED
62
4 3/4
4 1 /2
4 3/8
51/8
5 1 /2
1
; 4 1 /2
IIIIIIIIIIIIIIII IIIIIIIIIIII
198 ; RED ........................................_...................................................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
62
4 3/4
4 3/4
4 3/8
51 /8
5 3/4
1
4 3/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
199 ; RED :
62
4 3/4
4 5/8
4 3/8
51 /8
................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
5 5/8 :
1
4 5/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
200 RED :
62
4 3/4
4 5/8
4 3/8
51 /8
...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................
5 5/8
1
:4 5/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
201 RED
62 ......_
4 3/4
..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
4 3/4
4 3/8
51/8
5 3/4
1
4 3/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII
202 : RED
62
4 3/4
4 3/4
4 3/8
51/8
1
5 3/4
1
4 3/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
203 ; RED :
..................... .................. ..................................................................._...................................................................
62
4 3/4
; 4 3/4 .................................
4 3/8
; 51 /8
...............................
..................................
5 3/4
............................... .....................
1 ...... ...... ..............
:4 3/4
.................................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
.............................. ........................................ ............................... ...... ..........
...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
204 RED
62
: 4 3/4
4 5/8
4 3/8
; 51/8
5 5/8 :
1
4 5/s
IIIIIIIIIIIIIIII IIIIIIIIIIII
205 : RED
62
4 3/4
4 5/8
4 3/8
51/8
5 5/8 ;
1
4 5/8
I II II II I I I I I I I I1 IIIIIIIIIIII
206 RED :
..................................................................._.............................................................................................................................................................................................................................................................................................................
62
; 4 3/4
4 3/4
4 3/8
5 1/s
;
5 3/4 ; :
1
4 3/4
IIIIIIIIIIIIIIII' IIIIIIIIIIII
_................... ...................................... ................................................................................
........................ ...... ...... ...... ..........................................................
207 ; RED
62
4 3/4
41/2
4 3/8
; 51/8
...................................................................................................................................................................
51/2 :
1
: ; 41/2 ....................
IIIIIIIIIIIIIIII IIIIIIIIIIII
208 ; RED
62
4 3/4
4 1/2
4 3/8
51/8
5 1/2 ;
1
41/2
IIIIIIIIIIIIIIII: IIIIIIIIIIII
209 ;RED-ORA
50
3 3/4
3 3/4 ................................_........................................................................................................._.............................................................................................................._...............................................................................................................................................................................................................................................
31/2
; 4
4 3/4 ;
1
3 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII ;
CA/C4 Banded
210 ;RED-ORA
50
: 3 3/4
; 31/2
31/2
; 4
41/2
1
: 3 1/2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII .......................................................................................................................................................................................................................
211 ;RED-oR/
50
3 3/4
31/2
3 1/2
; 4
4 1/2
1
3 1/2
IIIIIIIIIIIIIIII IIIIIIIIIIII
212 :RED-ORA
50
; 3 3/4
31/2
31/2
4
41/2 ;
1
31/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
MAYES TESTING ENGINEERS
M7171996.0025.1.xls
ID Tendon
.................................................................................................._.....................................................................................................................................
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location ;Remarks
/1
# Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
213 :RED-ORA
50
3 3/4
3 3/8
31/2
4
-1/8
4 3/8
1
3 3/8
IIIIIIIIIIIIIIII' IIIIIIIIIIII I
214 ;RED-oRA
..................... .................. ..................................................................._..........................................................................................................................................................................................................................................................................................................................................................
50
3 3/4
3 1 /2
3 1 /2
4
4 1 /2
1
3 1 /2
IIIIIIIIIIIIIIII :IIIIIIIIIIII.....................................
........ ...... ...... ...... ..................................................... ....................................................................................................
215 :RED-oR/
..................... ....................................... ..... .......
50
..................................
3 3/4
_...................................................................
3 5/8 .................................
31/2
4
.................................................................
4 5/8
.......................................
1
.......................................
3 5/8
.......................... ......
IIIIIIIIIIIIIIII IIIIIIIIIIII
........
216 :RED-ORA
..................... .....................................................................................
50
3 3/4
_................................
31/2
....................................................................
31/2
4
_..................................................................
41/2
....................................... _
1
.......................................
31/2
................................
IIIIIIIIIIIIIIII IIIIIIIIIIII
.......................... ............._................. ....... ....... ...................................... ................................................................................
....................................................................................................
217 ;RED-ORA
50
3 3/4
: 3 5/8
31/2
: 4
4 5/8
1
: 3 5/8
IIIIIIIIIIIIIIII' IIIIIIIIIIII
218 RED-ORA
50
3 3/4
3 5/8
3 1/2
4
4 5/8
1
3 5/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
219 :RED-ORA
50
3 3/4
3 3/4
3 1/2 .._
4
........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
4 3/4
1
: 3 3/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
220 :RED-oRA
50
3 3/4
3 5/8
31/2
4
4 5/8
1
: 3 5/8
.................................................................................................................................................................................................................................................................................................................................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
221RED-ORA
50
3 3/4
: 3 3/4
31/2
: 4
4 3/4
1
3 3/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
222 :RED-oR/
.........................................................................................................._............................................................................................................................................................................................................................................................................................................................................
50
3 3/4
3 1/2
3 1/2
4
4 1/2
1
31/2
IIIIIIIIIIIIIIII: IIIIIIIIIIII
............. ......................................
........ ...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
223 :RED-ORA
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
50
3 3/4
3 1/2
3 1/2
4
4 1/2
1
: 31/2
IIIIIIIIIIIIIIII IIIIIIIIIIII
224 ;RED-SIL
96
7 1/4
7 1/4
6 3/4
7 3/4
8 1/4
1
........................................................................................................................................................................................................................................................................................................................................................................
7 1/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII
CC'/C3.5' Banded
225 RED-SIL
96
7 1/4
7 1/4
6 3/4
7 3/4
8 1/4
1
7 1/4
IIIIIIIIIIIIIIII IIIIIIIIIIII'
226 : RED-SIL :
..................... ......................................................................................
96
7 1/4
_.................................
6 3/4
............................. ...... .................................
6 3/4
7 3/4
_............................... ...................................
7 3/4
....................................... _.......................................
1
: 6 3/4
................................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
....................................... _.........................................................................................................................................................................................................................................................
227 : RED-SIL
96
7 1 /4
7 1 /4
6 3/4
7 3/4
8 1 /4
1
7 1 /4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII ..........................................................................................................................................................................................................................
228 ;RED-SIL
..................................................................._..................................................................................................................................................................................................................................................................................................
96
7 1 /4
7 1 /4
6 3/4
7 3/4
8 1 /4
1
7 1 /4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
229 RED-SIL
............
96
7 1/4
7 3/4
6 3/4
7 3/4
8 3/4
1
7 3/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
230 RED-SIL
96
7 1/4
7 1/2
6 3/4
7 3/4
8 1/2 :
1
........................................................................................................................................................................................................................................................................................................................................................................
7 1/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
231 : RED-SIL :
96
7 1/4
7 1/4
6 3/4
7 3/4
8 1/4
1
........................................................................................................................................................................................................................................................................................................................................................................
7 1/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
232 RED-SIL :
96
7 1/4
7 3/4
6 3/4
7 3/4
8 3/4 :
1
7 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
................. _................................
233 : RED-SIL :
96
7 1/4
: 7 1/2
6 3/4
: 7 3/4 :
8 1/2
1
7 1/2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
234 : RED-SIL
..................... .................. ..................................................................._
96
7 1/4
................................
: 7 5/8
............................. ...... .................................
6 3/4
: 7 3/4
............................... ..................................
8 5/8
.......................................
1
..........................................................
7 5/8
........... ...
IIIIIIIIIIIIIIII; IIIIIIIIIIII
....... ................. ......_....................................................... ................................................................................
....................................................................................................
235 : RED SIL
.................................................................._...............................................................................................................................................................................................................
96
7 1/4
7 1/2
6 3/4
7 3/4
8 1/2
1
. 7 1/2
IIIIIIIIIIIIIIII :IIIIIIIIIIII
236 : RED-SIL :
...................................................
96
7 1 /4
7 1 /2
6 3/4
7 3/4
8 1 /2
1
7 1 /2
IIIIIIIIIIIIIIII :IIIIIIIIIIII .........................................................................................................................................................................................................................
237 ;RED-BRN:
128
9 7/8
10 1/8
9 1/8
:10 5/8
11 1/8
1
: 10 1/8
IIIIIIIIIIIIIIII: IIIIIIIIIIII I
CD'/C2' :Banded
238 :RED-BRN:
128
9 7/8
10 1/8
9 1/8
:10 5/8
11 1/8
1
.......................................................................................................................................................................................................................................................................................................................................................................
10 1/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
239 :RED-BRN:
128
9 7/8
10 1/8
9 1/8
10 5/8
11 1/8 :
1
10 1/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
240 :RED-BRN
128
9 7/8
: 10 1/8
9 1/8
: 10 5/8:
11 1/8 :
1
: 10 1/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
MAYES TESTING ENGINEERS
M7171996.0025.1.xls
ID Tendon
.............................................................................................._................................................................................................................................
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location Remarks
/1
# Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
241 ;RED-BRN:
128
; 9 7/8
10 1 /8
9 1 /8
: 10 5/8
11 1 /8
1
10 1 /8
I I I I I I I I I I I I I11I' I I I I I I I I I I I1:
242 ;RED-BRN
..................... ............................................ .........................................
128
9 7/8
_....................................................................
10
91 /8
...............................
:10 5/8
.................................................................
11
............................. ..........
1
............. ...... ...... ..............
1 o
................................
IIIIIIIIIIIIIIII :IIIIIIIIIIII
.............................. ............................................................................... .........
...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
243 :RED-BRN:
..........
128
9 7/8
9 5/8
9 1/8
:10 5/8:
10 5/8
1
9 5/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
244 :RED-BRN;
128
9 7/8
9 3/8
9 1/8
:10 5/8
10 3/8
1
9 3/8
IIIIIIIIIIIIIIII : IIIIIIIIIIII
245 ;RED-BRN:
..................... .................. ...... ................... .........................................
128
9 7/8
_...................................................................
9 5/8 ..
9 1/8
...............................
:10 5/8:
..................................................................
10 5/8
......................................
1
......................... ...... ........
9 5/8
........ ..... ....................
IIIIIIIIIIIIIIII IIIIIIIIIIII
.... ......................................................................... ................................................................................
........................ ...... ...... ...... .................. ...... ...... ............................
246 RED-BRN
128
9 7/8
: 9 3/4
91/8
:10 5/8
10 3/4
1
; 9 3/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
247 :RED-BRN: ........................................_...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
128
9 7/8
9 1 /2
9 1 /8
: 10 5/8
10 1 /2
1
9 1 /2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
248 :RED-BRN;
..................... ............................................ .........................................
128
9 7/8
_................................
9 7/8
.................................. .................................
9 1/8
:10 5/8
............................... ..................................
10 7/8
.................................. .............................................
1
9 7/8
.................................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
................... ..................._................................ ......................................
............................................................................... ........................ ...... ...... ...... ..........................................................
249 ;RED-BRN;
.........................................................................................................._.........................................................................................................................................................................................................................................................................................................................................................
128
9 7/8
9 7/8
9 1/8
10 5/8 :
10 7/8
1
9 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII......................................
........ ...... ...... ...... ..................................................... ........................ ...... ...... ...... ......................................................... ..
250 :RED-BRN:
128
9 7/8
9 3/8
9 1/8
:10 5/8
10 3/8
1
9 3/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
251 :RED-BRN:
..................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._.......
128
9 7/8
: 9 1 /2
9 1 /8
10 5/8 :
10 1 /2
1
9 1 /2
111111111111111111111I111111
....... .................. ......................... ...... ...... ..........
...... ...... ...... ......................... ..... ....................... ........................ ...... ...... ...... ..........................................................
252 :RED-BRN:
..................... ............................................ .........................................
128
9 7/8
_...................................................................
9 5/8 .................................
9 1/8
:10 5/8
.................................................................
10 5/8
.......................................
1
..................................................................................................................................................
9 5/8
1111111111111111111111111111;.................................. .........
...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
253 RED-BRN
128
9 7/8
9 7/8
9 1 /8
10 5/8
10 7/8
1
9 7/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
254 :RED-BRN:
128
; 9 7/8
: 9 1/2
..................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
9 1/8
: 10 5/8:
10 1/2 :
1
9 1/2
llllllllllllllll llllll111111:
255 :RED-WHT
126
; 9 3/4
10 1/4
1. ..................................................................._................................................................................................................................................................................................................_.........................................................................................................................................................................................................................................................
9 1/8
:10 3/8
11 1/4
1
: 10 1/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII ;
C1.5'/CD' Banded
256 :RED-WHT
126
9 3/4
9 3/4
9 1/8
10 3/8
....
10 3/4
1
9 3/4
llllllllllllllll :IIIIIIIIIIII
257 :RED-WHT
126
9 3/4
: 9 7/8
9 1/8
10 3/8
10 7/8 :
1
9 7/8
lllllllllllHi llllllllllll
258 RED-WHl
126
; 9 3/4
9 5/8
9 1 /8
:10 3/8
10 5/8
1
9 5/8
1111111111111111111111111111
259 :RED-WHT
126
; 9 3/4
9 5/8
9 1/8
:10 3/8
10 5/8
..........................................................................................................................................................................................................................................................................................................................................................................................
1
9 5/8
1111111111111111111111111111;
260 ..................
.......................................
261 :RED-WHT:
126
; 9 3/4
:10 1 /8
9 1 /8
: 10 3/8
11 1 /8 :
1
: 10 1 /8
1111111111111111111111111111
.......................................................................................................................................................................................................................................................
262 :RED-WHT
126
; 9 3/4
10
9 1/8
:10 3/8
11 ;
1
: 10
llllllllllllllll' IIIIIIIIIIII
263. RED-WHT
126
9 3/4
9 3/4
9 1/8
10 3/8
10 3/4
1
9 3/4
llllllllllllllll :IIIIIIIIIIII
264 :RED-WHT:
126
9 3/4
9 3/4
9 1/8
10 3/8
10 3/4
1
9 3/4
1111111111111111ZIIIIIIIIIII
265 :RED-WHT: ........................................_...................................................................................................._........................................................................................................._.............................................................................................................._...............................................................................................................................................................................................................................................
126
; 9 3/4
10 1 /4
9 1 /8
: 10 3/8
11 1 /4
1
: 10 1 /4
1111111111111111111111111111:
93/4
10 1/891/8
10 3/8266RT
11 1/8:
1
10 1/8ED
...........................................1...............................................................................
.I..I..I ..I..I..I...1...;.....................................
...................................................................................................................................................................................
267 :RED-WHT:
126
9 3/4
9 7/8
9 1/8
10 3/8
10 7/8 :
1
9 7/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
268 :RED-WHT:
126
; 9 3/4
: 10
9 1/8
: 10 3/8:
11 ;
1
: 10
llllllllllllllll IIIIIII11111:
MAYES TESTING ENGINEERS
M7171996.0025.1.xls
ID Tendon
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
Location Remarks 1
# Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
269 :RED-WHT..
126
9 3/4
10 1 /4
9 1 /8
10 3/8
11 1 /4
1
10 1 /4
IIIIIIIIIIIIIII' IIIIIIIIIIII I
____
270 ;RED-WHT
..................... ............................................ .........................................
126
9 3/4
_...................................................................
9 3/4 .................................
9 1/8
10 3/8
................................
..... ...... ......................
10 3/4
..... ...... ...... ...... ...... ..........
1
...................................................................................................................................................................................................................................................................
9 3/4
(IIIIIIIIIIIIIII :IIIIIIIIIIII
.................................................................................................... ..
271 :RED-WHT
126
9 3/4
9 7/8
9 1/8
10 3/8
10 7/8
1
9 7/8
(IIIIIIIIIIIIIII IIIIIIIIIIII
272 ;RED-WHT
126
9 3/4
9 3/4
9 1/8
10 3/8
10 3/4
1
9 3/4
(IIIIIIIIIIIIIII IIIIIIIIIIII
273 ;RED-WHT; ........................................_...................................................................
126
9 3/4
9 7/8 ................................................................................................................................................................................................................................................
9 1/8
10 3/8
10 7/8
1
19 7/8
(IIIIIIIIIIIIIII' IIIIIIIIIIII
...... ................................... ...... ...... .....
..... ...... ...... ...... ........................ ...... ....................... ........................ ...... ...... ...... .................. ...... ...... ............................
274 RED-WHT
126
9 3/4
9 7/8
9 1 /8
10 3/8
10 7/8
1
9 7/8
I II II I I I I I I I I I I I :IIIIIIIIIIII
275 ;RED-W HT;
126
9 3/4
9 1 /2
9 1 /8
10 3/8
10 1 /2
1
19 1 /2
(IIIIIIIIIIIIIII ;IIIIIIIIIIII
/11
MAYES TESTING ENGINEERS
M7171996.0025.1.xls
Distribution Page
Report Number: M7171996.0025
Service Date: 05/18/18
Report Date: 05/24/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0026
Service Date: 05/21/18
Report Date: 05/25/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Item 1: Observed the placement of (10) cubic yards of Miles mix 12550F into the Level 1 to 2 columns at grid
lines CJ/C10, CK/C10, CL/C10, CJ/C9.2, CK/C9, CL/C9, CL/C7.8, CL/C6.8 and CL.9/C11. Concrete was placed
by pump and mechanically consolidated. Cast (4) 4x8" test cylinders for compressive strength testing to reach
5000 psi at (28) days. Note: Column reinforcing was previously inspected on 05/16/18 and 05/18/18 and found
in conformance.
Item 2: Inspected reinforcing steel for the stem walls at grid lines CJ.9 to CK.1/C7.2 to C8.1, C1.1 to CJ/C8.5 to
C9 and C1.2/C7 to C7.9. Reinforcement was inspected for size, grade, lap and spacing per General Structural
Notes. Verify final clearances prior to placement. Note: Verified completion of southwest corner of elevator
core.
Note: Columns at grid lines CL/C11 and CH/Cl 1 need to correct tie spacing (#3 ties at 3" on center) for Zone B
for the entire lap length of Lb (#7 = 49"). The contractor will schedule column inspection after corrections are
completed.
PRELIMINARY INSPECTION
Item 2, columns at grid lines CL/C11 and C1.1/C11 need to correct tie spacing (#3 ties at 3" on center) for Zone B
for the entire lap length of Lb (#7 = 49").
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Andrew Bontrager
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0026
Service Date: 05/21 /18
Report Date: 05/25/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0026A
Service Date: 05/21/18
Report Date: 06/19/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000
psi @ 28
days
Sample Date:
05/21/18 Sample Time: 1300
Sampled By:
Andrew Bontrager
Mix ID: 12550F
Weather Conditions:
Partly Sunny
Supplier: Miles
Accumulative Yards:
10 of 10 Batch Size (cy): 10
Batch Time: 1139
Plant:
Placement Method:
Pump
Truck No.: C056
Ticket No.:
207179
Water Added Before (gal):
15
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Level 1 to 2 Columns at grids
Slump (in):
6
CL/C10, CJ/C9.2, CK/C9, CL/C9,
Air Content (%):
CL/C7.8, CL/C6.8, CL.9/C11,
Concrete Temp. (F):
72
CJ/C10, CK/C10.
Ambient Temp. (F):
70
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type By
1 a 3.99
12.5
05/22/18 05/28/18
7 54,060
4,320 2 ARC
1 b 3.98
12.44
05/22/18 06/18/18
28 70,450
5,660 2 KWB
1 c 3.99
12.5
05/22/18 06/18/18
28 71,660
5,730 2 KWB
1 d 3.99
12.5
05/22/18 06/18/18
28 72,680
5,810 2 KWB
Average (28 days)
5,740
Initial Cure: Outside
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Andrew Bontrager
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0026A
Service Date: 05/21 /18
Report Date: 06/19/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0027
Service Date: 05/22/18
Report Date: 05/29/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
Inspected Parking Level P1 to Level 1, 8" and 10" walls at grid line CH/C6 to C9 with the 8" walls at C7.9 and C8.
Reinforcing appears to be per details of S301, SSK 25 and wall schedule of General Notes. Clearances,
cleanliness and water stop to be verified prior to placement.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0027
Service Date: 05/22/18
Report Date: 05/29/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0028
Service Date: 05/23/18
Report Date: 05/31 /18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
Reviewed Mayes Testing Engineers (MTE) report M7171996.0027 and verified waterstop placed on footing in a
bead of CETSEAL in walls from Level P1 to L1 at grid lines CH from C6 to C9 and (2) at C7.9 and C8. Verified
clearances prior to placement.
Observed placement of Miles mix 155000PT placed by pump and vibrated for consolidation. Cast (4) 4x8" test
cylinders for compressive strength testing.
Inspected reinforcing steel for the column cages from Level P1 to L1 at grid lines C4'/CA'.8, C4'/CA'.6, CA/C4.6,
CB.1/C3.9, CB.1/C3.1, CE/C3, CE.1/C3, CA'/C2', CA'.5/C2', and CL/C5.8.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Michael Mattox
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0028
Service Date: 05/23/18
Report Date: 05/31/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0028A
Service Date: 05/23/18
Report Date: 05/31/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 155111PI
Supplier: Miles Sand and Gravel
Batch Time: 1134 Plant: Mt. Vernon
Truck No.: C054 Ticket No.: 207299
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
5 1/2
73
70
No.
ID
(in) _
1
1
3.99
1
2
4.00
1
3
4.00
1
4
4.00
Initial Cure:
Outside
Plastic Lids
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.5
05/24/18
05/30/18
7 55,640
12.57
05/24/18
06/20/18
28
12.57
05/24/18
06/20/18
28
12.57
05/24/18
06/20/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Michael Mattox
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
05/23/18 Sample Time: 1228
Michael Mattox
Sunny
Batch Size (cy):
Level P 1 to L 1 ramp walls, grids CH
from C6 to C9 and 2 /C7.9 and 2/CB
Compressive
Strength Fracture Tested
(psi) Type By
4,450 2 HRB
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000t, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0028A
Service Date: 05/23/18
Report Date: 05/31/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0029
Service Date: 05/25/18
Report Date: 06/06/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD-2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Cloudy
Performed reinforcing steel inspection for the following items per the following details and specifications:
1. Columns, Level 1 to Level 2, at grid lines CL/C11, Cl/Cl 1, CH/C9.3, C10 and C10.4, and CC/C5 per
approved plans details S201A and detail 15/S301.
2. Walls from Level 1 to Level 2 at grid lines CA/C2.8 to C3, CA'/C3.3' to C4', C3.8 to C4/CE to CE.8,
CC'/C3' to C3.3', C5/CC to CE/, and C1.2/C5.8 to C7 per approved plans details S201A, S100 and S303.
3. Walls, Level 1 to Level 2, with attached columns at grid lines CE/C3 to C4 and C1/CC to CE placed per
approved plans details S100, S201A, and S303. The columns and #4 reinforcing steel with hooks
connecting them need to be verified prior to closing the column side of formwork. Other items can be
closed with formwork.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Randal Dohrman
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0029
Service Date: 05/25/18
Report Date: 06/06/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0030
Service Date: 05/29/18
Report Date: 06/06/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD-2016-1538
Samples: (8) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Cloudy
On site for concrete placement and sampling. Approximately (63) cubic yards of Miles mix 0260A6P was placed
by boom pump for slab -on -grade at surface parking lot. Additionally, (10) cubic yards of mix 12550F was placed
at the column from Level 1 to Level 2 at grid lines CL/C5.8. A sample was obtained from both mixes and (4) 4x8"
test cylinders were cast from each mix for compressive strength testing.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0030
Service Date: 05/29/18
Report Date: 06/06/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.003013
Service Date: 05/29/18
Report Date: 06/06/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000 psi @ 28 days
Mix ID: 0260A6P
Supplier: Miles
Batch Time: 0631 Plant:
Truck No.: C186 Ticket No.: 207452
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
5
4.0
66
53
No.
ID
(in)
1
1
3.98
1
2
4.00
1
3
4.00
1
4
4.00
Initial Cure:
Cure Box
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.44
05/30/18
06/05/18
7 56,590
12.57
05/30/18
06/26/18
28
12.57
05/30/18
06/26/18
28
12.57
05/30/18
06/26/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
05/29/18 Sample Time:
David Schmutzler
Cloudy
31.5 Batch Size (cy): 10.5
Pump
10
Slab on Grade at SW corner of
property
Compressive
Strength Fracture Tested
(psi) Type By
4,550 2 KWB
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0030B
Service Date: 05/29/18
Report Date: 06/06/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.003013
Service Date: 05/29/18
Report Date: 06/27/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000
psi @ 28
days
Sample Date:
05/29/18 Sample Time:
Sampled By:
David Schmutzler
Mix ID: 0260A6P
Weather Conditions:
Cloudy
Supplier: Miles
Accumulative Yards:
31.5 Batch Size (cy):
10.5
Batch Time: 0631
Plant:
Placement Method:
Pump
Truck No.: C186
Ticket No.:
207452
Water Added Before (gal):
10
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Slab on Grade at SW corner of
Slump (in):
5
property
Air Content (%):
4.0
Concrete Temp. (F):
66
Ambient Temp. (F):
53
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type
By
1 1 3.98
12.44
05/30/18 06/05/18
7 56,590
4,550 2
KWB
1 2 3.98
12.44
05/30/18 06/26/18
28 68,730
5,520 3
KWB
1 3 3.98
12.44
05/30/18 06/26/18
28 70,760
5,690 2
KWB
1 4 3.97
12.38
05/30/18 06/26/18
28 69,960
5,650 2
KWB
Average (28 days)
5,620
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0030B
Service Date: 05/29/18
Report Date: 06/27/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0030C
Service Date: 05/29/18
Report Date: 06/06/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID:
12550F
Supplier:
Miles
Batch Time:
0838 Plant:
Truck No.:
C084 Ticket No.: 207463
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
4
No.
ID
(in)
2
1
3.98
2
2
4.00
2
3
4.00
2
4
4.00
Initial Cure:
Cure Box
67
54
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.44
05/30/18
06/05/18
7 60,260
12.57
05/30/18
06/26/18
28
12.57
05/30/18
06/26/18
28
12.57
05/30/18
06/26/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
05/29/18 Sample Time:
David Schmutzler
Cloudy
10 Batch Size (cy): 10
Pump
Column, Level 1 to 2, grids CL/C5.8
Compressive
Strength Fracture Tested
(psi) Type By
4,840 5 KWB
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0030C
Service Date: 05/29/18
Report Date: 06/06/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0030C
Service Date: 05/29/18
Report Date: 06/27/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000
psi @ 28
days
Sample Date:
05/29/18 Sample Time:
Sampled By:
David Schmutzler
Mix ID: 12550F
Weather Conditions:
Cloudy
Supplier: Miles
Accumulative Yards:
10 Batch Size (cy): 10
Batch Time: 0838
Plant:
Placement Method:
Pump
Truck No.: C084
Ticket No.:
207463
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Column, Level 1 to 2, grids CL/C5.8
Slump (in):
4
Air Content (%):
Concrete Temp. (F):
67
Ambient Temp. (F):
54
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type By
2 1 3.98
12.44
05/30/18 06/05/18
7 60,260
4,840 5 KWB
2 2 3.98
12.44
05/30/18 06/26/18
28 89,600
7,200 2 KWB
2 3 3.98
12.44
05/30/18 06/26/18
28 89,000
7,150 2 KWB
2 4 3.98
12.44
05/30/18 06/26/18
28 88,350
7,100 2 KWB
Average (28 days)
7,150
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0030C
Service Date: 05/29/18
Report Date: 06/27/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -INSTALLED ANCHORS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0031
Service Date: 06/01/18
Report Date: 06/06/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD-2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Cloudy, 50's
Onsite to inspect and observe epoxy grouting of (4) #5 vertical dowels with 6" minimum embedment into wall
footing; and (22) #4 dowels with 5" minimum embedment into existing foundation wall for new wall piers at
residential entry at grid lines CAA/C4. Verified that holes were drilled to their required depth, cleaned, and
dowels installed per manufacturer specifications and per RFI 27, detail SSK-26A. Contractor was able to obtain
verbal approval from engineer -of -record to use Simpson SET-XP epoxy (lot 201 E160E, expiration 08/2019).
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Earl Uy
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0031
Service Date: 06/01 /18
Report Date: 06/06/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0032A
Service Date: 06/04/18
Report Date: 06/08/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Overcast
On site to verify and monitor completion of concrete placement. Inspected last (3) loads of Miles Sand & Gravel
mix 155000PT. See Carl Reynolds' report (service date 06/04/18) for locations.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Edward Bauman
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0032A
Service Date: 06/04/18
Report Date: 06/08/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.003213
Service Date: 06/04/18
Report Date: 06/12/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 155000PT
Supplier: Miles
Batch Time: 0700 Plant:
Truck No.: C185 Ticket No.: 106419
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
6
No. ID
(in)
1 d
3.98
1 a
4.00
1 b
4.00
1 c
4.00
Initial Cure: Onsite Cooler
71
57
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.44
06/06/18
06/11/18
7 53,540
12.57
06/06/18
07/02/18
28
12.57
06/06/18
07/02/18
28
12.57
06/06/18
07/02/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
06/04/18 Sample Time:
Carl Reynolds
Cloudy
Batch Size (cy): 10
Pump
Level 1 to2 walls and columns
Compressive
Strength Fracture Tested
(psi) Type By
4,300 2 HRB
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.003213
Service Date: 06/04/18
Report Date: 06/12/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 155000PT
Supplier: Miles
Batch Time: 1000 Plant:
Truck No.: C082 Ticket No.: 106428
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
6
No. ID
(in)
2 a
3.98
2 1
4.00
2 b
4.00
2 c
4.00
Initial Cure: Onsite Cooler
69
58
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.44
06/06/18
06/11/18
7 61,540
12.57
06/06/18
07/02/18
28
12.57
06/06/18
07/02/18
28
12.57
06/06/18
07/02/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
06/04/18 Sample Time:
Carl Reynolds
Cloudy
Batch Size (cy):
Pump
Level 1 to2 walls and columns
Compressive
Strength Fracture Tested
(psi) Type By
4,950 2 HRB
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Page 2 of 2
Distribution Page
Report Number: M7171996.0032B
Service Date: 06/04/18
Report Date: 06/12/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.003213
Service Date: 06/04/18
Report Date: 07/03/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000
psi @ 28
days
Sample Date:
06/04/18 Sample Time:
Sampled By:
Carl Reynolds
Mix ID: 155000PT
Weather Conditions:
Cloudy
Supplier: Miles Sand and
Gravel
Accumulative Yards:
Batch Size (cy):
10
Batch Time: 0700
Plant:
Placement Method:
Pump
Truck No.: C185
Ticket No.:
106419
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Level 1 to2 walls and columns
Slump (in):
6
Air Content (%):
Concrete Temp. (F):
71
Ambient Temp. (F):
57
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type
By
1 d 3.98
12.44
06/06/18 06/11/18
7 53,540
4,300 2
HRB
1 a 3.98
12.44
06/06/18 07/02/18
28 70,770
5,690 2
KWB
1 b 3.98
12.44
06/06/18 07/02/18
28 73,170
5,880 2
KWB
1 c 3.97
12.38
06/06/18 07/02/18
28 71,360
5,760 2
KWB
Average (28 days)
5,780
Initial Cure: Onsite Cooler
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.003213
Service Date: 06/04/18
Report Date: 07/03/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000
psi @ 28
days
Sample Date:
06/04/18 Sample Time:
Sampled By:
Carl Reynolds
Mix ID: 155000PT
Weather Conditions:
Cloudy
Supplier: Miles Sand and
Gravel
Accumulative Yards:
Batch Size (cy):
Batch Time: 1000
Plant:
Placement Method:
Pump
Truck No.: C082
Ticket No.:
106428
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Level 1 to2 walls and columns
Slump (in):
6
Air Content (%):
Concrete Temp. (F):
69
Ambient Temp. (F):
58
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type
By
2 a 3.98
12.44
06/06/18 06/11/18
7 61,540
4,950 2
HRB
2 1 3.97
12.38
06/06/18 07/02/18
28 79,070
6,390 2
KWB
2 b 3.98
12.44
06/06/18 07/02/18
28 84,900
6,820 2
KWB
2 c 3.98
12.44
06/06/18 07/02/18
28 80,770
6,490 2
KWB
Average (28 days)
6,570
Initial Cure: Onsite Cooler
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 2
Distribution Page
Report Number: M7171996.0032B
Service Date: 06/04/18
Report Date: 07/03/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0033
Service Date: 06/07/18
Report Date: 06/28/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
Performed reinforcing steel inspection for the following items:
M7171996
Cloudy
The columns from Level 1 to Level 2 at grid lines CA.2'/C1' and CB'/Cl' per details on S201A, detail
15/S301 and per specifications.
The columns with attached 8" wall from Level 1 to Level 2 at grid lines CA/5'/C4' and CB'/C4' per S2/1A,
detail 7/S300 and per specifications.
The wall section from Level 1 to Level 2 at grid line C7/CH to Cl per details on S201A, S100, detail
13/S303 and per specifications.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Randal Dohrman
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0033
Service Date: 06/07/18
Report Date: 06/28/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0034
Service Date: 06/08/18
Report Date: 06/13/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
590F
Observed placement of (12) cubic yards of Miles mix 12550F at the following locations:
• The piers from Level 1 to Level 2 at grid lines C4'/CA.3' and C4'/CB'.
• The columns from Level 1 to Level 2 at grid lines C2'/C1.3', C1/CB, C2/CB, C2/CD, C4'/CA.6, C4'/CA.8,
C3/CE.3, C2'/CA', C2'/CA.5, C1'/CF.8, C1'/Cl.8 and Cl'/CB'.
Reinforcing was previously verified. Concrete was placed via pump hose and mechanically consolidated.
Obtained test specimens and cast (4) 4x8" test cylinders for compressive strength testing (5000 psi at 28 days).
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Charles Solway
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0034
Service Date: 06/08/18
Report Date: 06/13/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0034A
Service Date: 06/08/18
Report Date: 06/19/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID: 12550F
Supplier: Miles Sand and Gravel
Batch Time: 0636 Plant: 125
Truck No.: C186 Ticket No.: 106650
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
1 1 3.98
1 2
1 3
1 4
Initial Cure: Cure Box
Result Specification
6
67
59
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.44 06/11/18
06/15/18
7 53,180
06/11/18
07/06/18
28
06/11/18
07/06/18
28
06/11/18
07/06/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Charles Solway
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
06/08/18 Sample Time: 0745
Charles Solway
590
12 Batch Size (cy): 10
Pump
15
Level L1 to L2 column at C1/CB
Level L1 to L2, 12 columns and 2
piers
Compressive
Strength Fracture Tested
(psi) Type By
4,270 2 JHK
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0034A
Service Date: 06/08/18
Report Date: 06/19/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0034A
Service Date: 06/08/18
Report Date: 07/09/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000
psi @ 28
days
Sample Date:
06/08/18 Sample Time: 0745
Sampled By:
Charles Solway
Mix ID: 12550F
Weather Conditions:
590
Supplier: Miles Sand and
Gravel
Accumulative Yards:
12 Batch Size (cy): 10
Batch Time: 0636
Plant:
125
Placement Method:
Pump
Truck No.: C186
Ticket No.:
106650
Water Added Before (gal):
15
Field Test Data
Water Added After (gal):
Sample Location:
Level L1 to L2 column at C1/CB
Test
Result
Specification
Placement Location:
Level L1 to L2, 12 columns and 2
Slump (in):
6
piers.
Air Content (%):
Concrete Temp. (F):
67
Ambient Temp. (F):
59
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type By
1 1 3.98
12.44
06/11/18 06/15/18
7 53,180
4,270 2 JHK
1 2 3.99
12.5
06/11/18 07/06/18
28 74,990
6,000 3 HRB
1 3 3.99
12.5
06/11/18 07/06/18
28 73,770
5,900 2 HRB
1 4 3.98
12.44
06/11/18 07/06/18
28 74,690
6,000 2 HRB
Average (28 days)
5,970
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Charles Solway
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0034A
Service Date: 06/08/18
Report Date: 07/09/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0035
Service Date: 06/11/18
Report Date: 06/14/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (8) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny, 60's
On site for concrete observation for fiber mesh concrete slab -on -grade and reinforced concrete ramp slab -on -
grade at the following locations:
1. Between lines C5.3 and C11 from grids CK to CL.5 on southeast side boundary and along line CC'.5 on
north side boundary.
2. Between line CH and CK from line C9 to C11.
3. For 6" concrete slab -on -grade ramp.
Reinforcing steel has been verified for size, grade, clearance and spacing prior to concrete placement per
structural drawing S201, S301 and RFI 013 and 025. A total of (167) cubic yards of Miles concrete mix 026006P
was delivered and a representative sample was obtained. Cast (8) 4x8" test cylinders for compressive strength
testing.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0035
Service Date: 06/11 /18
Report Date: 06/14/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0035A
Service Date: 06/11/18
Report Date: 06/19/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000 psi @ 28 days
Mix ID:
026006P
Supplier:
Miles Sand & Gravel
Batch Time:
0730 Plant:
Truck No.:
C059 Ticket No.:
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
6
64
56
Set Specimen Avg Diam.
No. ID (in) _
1 A 3.98
1 B
1 C
1 D
Initial Cure: Outside Plastic Lids
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.44 06/12/18
06/18/18
7 47,800
06/12/18
07/09/18
28
06/12/18
07/09/18
28
06/12/18
07/09/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
06/11/18 Sample Time: 0800
Asteway Kidane
Sunny, 50's
20 Batch Size (cy): 10
Pump
1. Slab -on -grade between grid lines
C5.3 and CI I from lines CK to CL.5
on SE side boundary and along line
CC'.5 on N side boundary. 2.
Between grid lines CH and CK from
line C9 to C11. 3. For 6" concrete
slab -on -grade ramp.
Compressive
Strength Fracture Tested
(psi) Type By
3,840 2 KWB
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0035A
Service Date: 06/11/18
Report Date: 06/19/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000 psi @ 28 days
Mix ID: 026006P
Supplier: Miles Sand & Gravel
Batch Time: 1102 Plant:
Truck No.: C059 Ticket No.: 106736
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
6
69
60
Set Specimen Avg Diam.
No. ID (in) _
2 A 3.98
2 B
2 C
2 D
Initial Cure: Outside Plastic Lids
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.44 06/12/18
06/18/18
7 47,420
06/12/18
07/09/18
28
06/12/18
07/09/18
28
06/12/18
07/09/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
06/11/18 Sample Time: 1200
Asteway Kidane
Sunny, 60's
160 Batch Size (cy): 10
Pump
1. Slab -on -grade between grid lines
C5.3 and CI I from lines CK to CL.5
on SE side boundary and along line
CC'.5 on N side boundary. 2.
Between grid lines CH and CK from
line C9 to C11. 3. For 6" concrete
slab -on -grade ramp.
Compressive
Strength Fracture Tested
(psi) Type By
3,810 5 KWB
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 2 of 2
Distribution Page
Report Number: M7171996.0035A
Service Date: 06/11 /18
Report Date: 06/19/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0035A
Service Date: 06/11/18
Report Date: 07/10/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000 psi @ 28
days
Sample Date:
06/11/18 Sample Time: 0800
Sampled By:
Asteway Kidane
Mix ID: 026006P
Weather Conditions:
Sunny, 50's
Supplier: Miles Sand & Gravel
Accumulative Yards:
20 Batch Size (cy): 10
Batch Time: 0730 Plant:
Placement Method:
Pump
Truck No.: C059 Ticket No.:
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test Result
Specification
Placement Location:
1. Slab -on -grade between grid lines
Slump (in): 6
C5.3 and CI I from lines CK to CL.5
Air Content (%):
on SE side boundary and along line
Concrete Temp. (F): 64
CC'.5 on N side boundary. 2.
Ambient Temp. (F): 56
Between grid lines CH and CK from
Plastic Unit Wt. (pcf):
line C9 to C11. 3. For 6" concrete
Yield (Cu. Yds.):
slab -on -grade ramp.
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture Tested
No. ID (in) (sq in)
Received Tested
(days) (lbs)
(psi) Type By
1 A 3.98 12.44
06/12/18 06/18/18
7 47,800
3,840 2 KWB
1 B 3.99 12.5
06/12/18 07/09/18
28 66,390
5,310 2 HRB
1 C 3.99 12.5
06/12/18 07/09/18
28 68,940
5,510 2 HRB
1 D 3.98 12.44
06/12/18 07/09/18
28 67,690
5,440 2 HRB
Average (28 days)
5,420
Initial Cure: Outside Plastic Lids
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0035A
Service Date: 06/11/18
Report Date: 07/10/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,000 psi @ 28
days
Sample Date:
06/11/18 Sample Time: 1200
Sampled By:
Asteway Kidane
Mix ID: 026006P
Weather Conditions:
Sunny, 60's
Supplier: Miles Sand & Gravel
Accumulative Yards:
160 Batch Size (cy): 10
Batch Time: 1102 Plant:
Placement Method:
Pump
Truck No.: C059 Ticket No.:
106736
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test Result
Specification
Placement Location:
1. Slab -on -grade between grid lines
Slump (in): 6
C5.3 and CI I from lines CK to CL.5
Air Content (%):
on SE side boundary and along line
Concrete Temp. (F): 69
CC'.5 on N side boundary. 2.
Ambient Temp. (F): 60
Between grid lines CH and CK from
Plastic Unit Wt. (pcf):
line C9 to C11. 3. For 6" concrete
Yield (Cu. Yds.):
slab -on -grade ramp.
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture Tested
No. ID (in) (sq in)
Received Tested
(days) (lbs)
(psi) Type By
2 A 3.98 12.44
06/12/18 06/18/18
7 47,420
3,810 5 KWB
2 B 3.98 12.44
06/12/18 07/09/18
28 60,990
4,900 2 HRB
2 C 3.99 12.5
06/12/18 07/09/18
28 63,430
5,070 2 HRB
2 D 3.98 12.44
06/12/18 07/09/18
28 58,390
4,690 2 HRB
Average (28 days)
4,890
Initial Cure: Outside Plastic Lids
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 2
Distribution Page
Report Number: M7171996.0035A
Service Date: 06/11 /18
Report Date: 07/10/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0037
Service Date: 06/15/18
Report Date: 06/21 /18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Clear
On site to inspect 8" and 10" wall reinforcement from Level 1 to Level 2 at grid lines C6 to C9/CH to CJ. Dowels
not installed at stairs along grid C8. Contractor intends to post -install these dowels. No detail provided for this
condition.
PRELIMINARY INSPECTION
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0037
Service Date: 06/15/18
Report Date: 06/21/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0038
Service Date: 06/19/18
Report Date: 06/26/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
Observed the placement of (96.5) cubic yards of Miles Sand and Gravel mix 155000PT for the Level 1 to 2 walls
at grid lines CK/C6 to C7.5, C6 to C9/CH to CJ and C1/C5 angled wall. Reinforcing inspected on 06/04/18,
06/15/18, and a final inspection was conducted today including cleanliness and clearances. Concrete was placed
by pump and mechanically vibrated. Cast one (1) set of (4) 4x8" test cylinders for compressive strength testing
(4000 psi at 28 days).
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0038
Service Date: 06/19/18
Report Date: 06/26/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0038A
Service Date: 06/19/18
Report Date: 06/27/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 155000PT
Supplier: Miles
Batch Time: 1244 Plant: 125
Truck No.: 686 Ticket No.: 107115
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result
Specification
5 3/4
Max 6
5.0
4.5 - 7.5
79
50 - 90
80
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
06/19/18 Sample Time: 1354
David Bernier
Sun
25 Batch Size (cy): 10
Pump
15
L 1 to L2 wall, grids C 1 /C5
L 1 to L2 wall
Laboratory Test Data Age at Maximum Compressive
Set
Specimen Avg Diam. Area
Date
Date
Test
Load Strength
Fracture Tested
No.
ID (in) (sq in)
Received
Tested
(days)
(lbs) (psi)
Type By
1
a 3.98 12.44
06/20/18
06/26/18
7
50,890 4,090
2 KWB
1
b
06/20/18
07/17/18
28
1
c
06/20/18
07/17/18
28
1
d
06/20/18
07/17/18
28
Initial
Cure: Cure Box
Final Cure: Moist Room
Min Temp: 68
Max Temp: 121
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0038A
Service Date: 06/19/18
Report Date: 06/27/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0038A
Service Date: 06/19/18
Report Date: 07/18/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information
Specified Strength: 4,000 psi @
Mix ID: 155000PT
Supplier: Miles Sand and Gravel
Batch Time: 1244 Plant:
Truck No.: 686
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Information
28 days Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
125
Ticket No.: 107115
Result
Specification
5 3/4
Max 6
5.0
4.5 - 7.5
79
50 - 90
80
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
06/19/18 Sample Time: 1354
David Bernier
Sunny
25 Batch Size (cy): 10
Pump
15
Level L1 to L2 wall, grids C1/C5
Level L1 to L2 wall.
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam.
Area
Date
Date
Test
Load
Strength
Fracture
Tested
No. ID (in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
By
1 a 3.98
12.44
06/20/18
06/26/18
7
50,890
4,090
2
KWB
1 b 3.98
12.44
06/20/18
07/17/18
28
62,490
5,020
2
KWB
1 c 3.98
12.44
06/20/18
07/17/18
28
67,480
5,420
2
KWB
1 d 3.98
12.44
06/20/18
07/17/18
28
66,220
5,320
2
KWB
Average
(28 days)
5,260
Initial Cure: Cure Box
Final Cure: Moist Room
Min Temp: 68
Max Temp:
121
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list. Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0038A
Service Date: 06/19/18
Report Date: 07/18/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -TENSION OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0039
Service Date: 07/10/18
Report Date: 07/13/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.: M7171996
Weather: Overcast, partly sunny
Level 2 South Post -Tension (PT) Deck
Began inspection of Level 2, south PT deck between grid lines CH to CL+/C5 to C11. Inspected the
reinforcement for size, grade, lap and spacing per plans. Inspected tendons for count and profile per Shop
drawings and RFI 029. The following need completion or are in process:
1. Install (5) #4 top and (2) #4 bottom at concrete walls along the exterior at grid lines CH/C6.5 to C8.5,
C11/CJ to CK, CL+/C5 to C5.7, and CL+/C8.5 to C10.5 per Engineer's verbal instruction.
2. Install (2) #5 in haunch of grillage hairpins per detail 15/S302 (Engineer verbal okay with #4).
3. Install (1) #5 in haunch of 90° hook bar in steps per detail 17/S303 (Engineer verbal okay with #4).
4. Install corner reinforcement shown on S202A (type per details 3/S302 and 11/S303).
5. Install "added" #4 at 24" on center between grid lines CK.7 to CL+ on grid C5.5. Completed.
6. Verify the installation of any trim reinforcement for hold-downs and penetrations.
7. Install #5 at 12" top with 90' hook and #4 at 12" bottom for stair landing at grid lines CJ.5/C8 per detail
18/S304.
8. Install #4 curb/landing dowels at grid lines Cl/C8.
Attended Engineer walk of Level 2 south PT deck between grid lines CH to CL+/C5 to C11 with T. Shoentrup with
Quantum. The Engineer noted corrections to the deck in Structural Field Report (see attached). Verify final
clearances and cleanliness prior to placement.
PRELIMINARY INSPECTION
Confirm corrections of Items noted above and on Engineer's directive.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Andrew Bontrager
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
QUANTUM 1 C O N S U L T I N G E N G I N E E R S
STRUCTURAL OBSERVATIONS FIELD REPORT
TO: DATE:
Sergio Ortega July 10, 2018 (Tuesday)
W.G. Clark Construction — Project Engineer 10:30 AM —1:30 PM
BY: PROJECT:
Todd Schoentrup, P.E. The Village at Westgate, Edmonds, WA
Level 2 PT Slab (South)
PROJECT NUMBER:
16369.02
Attendees: Todd Schoentrup, Quantum; Rick Sains, W.G. Clark;
Andrew Bontrager, Mayes Testing Engineers
Conditions: Mostly Sunny, 70 degrees
07/10/2018 — Quantum Consulting Engineers Site Visit — Level 2 PT Slab
Structural Observations
At the time of my site visit, all of the post -tensioning cables and a majority of the slab reinforcing
was installed for the Level 2 PT Slab. The work to install the remaining slab reinforcing was
ongoing during my time at the project site. The MEP sleeves and electrical conduit were also
installed, with the sub -contractor set to return to replace some of the plastic pipe sleeves with the
required steel pipe sleeves near the tendon anchorage.
The South end of the second floor deck, between Grids C5 and C11, has been inspected by Mayes
and the Special Inspector will also provide W.G. Clark with a list of corrections in addition to the
verbal direction that was given during our walkthrough. Some of the corrections listed below have
already been addressed during our time at the site, but the Mayes inspector is scheduled to return to
the site on Wednesday (07/11/18) to perform a final inspection of all noted correction items for
compliance prior to the scheduled concrete placement on Thursday (07/12/18).
Most of the structural elements visually observed during the site visit appeared to be in general
conformance with the structural drawings and the shop drawings; however, the following corrective
actions are required:
1.) At (2) exterior balcony/deck locations near Grid C11, a plastic drain pipe sleeve
has been installed in the PT anchor "crush zone' as shown in detail 6/S302.
These non -compliant pipe sleeves have been discussed with the contractor and
sub -contractor and they will be replaced with steel pipe sleeves as noted in the
detail.
2.) There are missing slab edge bars at many locations around the perimeter as
shown in detail 11/S303. It is acceptable to use #4 slab edge bars in lieu of the #5
specified bars. At all slab edges with perimeter wall anchor bolts, make sure the
1511 THIRD AVENUE
SUITE 323
SEATTLE, WA 98101
TEL 206.957.3900
FAX 206.957.3901
www.quantumce.com
Field Report — The Village at Westgate — Level 2 PT Slab (South)
July 11, 2018
Page 2
slab edge reinforcing is located between the row of anchor bolts and the slab edge.
In addition at the elevated slab corners, the #4 top and bottom bars have not been
installed as shown in detail 3/S302. Refer to the structural plans (S202A) and the
approved Level 2 reinforcing shop drawings for the slab reinforcing required at
the perimeter locations.
3.) There is a group of (6) MEP sleeves located in close proximity near Grids C9 and
CJ that shall be trimmed out with (2) #4 bars on each side (top and bottom) and
extend 12" past the group at each end similar to detail 3/S303.
4.) Provide additional #6 slab bars (top and bottom) at all shear wall holdown
locations per detail 20/S400. If equivalent reinforcing is located around the
holdown anchors, then the #6 bars are not required to be added to the rebar that
is already in place. The slab bars at the holdown anchors were being installed
during our time at the project site.
5.) Provide (4) #6 x 10'-0" (min.) top bars centered over the (2) columns near the slab
edge corner at Grids C11 and CH. The #6 top bars are indicated on both the
structural plans (S202A) and the approved Level 2 reinforcing shop drawings.
We discussed the missing top bars with the contractor and sub -contractor during
our walkthrough.
6.) Provide additional #5 top bars x 10'-0" long at 6" on -center (8 bars minimum)
each side of the closure strip near Grid CK at the end of the banded tendon group.
Extend the bars into the closure strip from each side and lap bars 3'-0" minimum.
7.) At each perimeter concrete wall location below, there is no longitudinal crack
control reinforcing in the PT slab as shown on detail 5/S303. We directed the
contractor and sub -contractor to install (5) #4 top bars and additional #4 bottom
bars at 12" o.c. (as needed) between the typical slab reinforcing along the entire
length of the walls.
8.) Provide #3 hairpin ties as shown in detail 7/S302 for the banded tendons that are
skewed/sweep around the stair #3 opening near Grids CI and CJ. The tendon
sweep location was pointed out to the inspector during our walkthrough. The
hairpins at the banded tendons were being installed during our time at the project
site.
9.) Along Grid CL between Grids C7 and C8, there is an intermediate stressing
pocket for the banded tendons. Shear keys in accordance with sketch SSK-27B
and detail 20/S300 for this construction joint need to be added at the edges of the
stressing pocket.
Field Report — The Village at Westgate — Level 2 PT Slab (South)
July 11, 2018
Page 3
10.) There was a missing shear wall holdown (H4) found near Grids CK and C5.5.
Also, there was no holdown (H4) installed at the stair #3 opening per RFI #31
response. Both holdowns shall be installed with 10" minimum embed into the
Level 2 PT slab per detail 20/5400. The contractor was notified of these holdown
locations and he said they will be installed per the structural drawings prior to the
slab placement.
11.) There are missing slab diagonal bars at the stair #3 opening per detail 2/S302. In
addition, the #4 wall/slab dowels are missing for the small section of concrete
slab above stair #3 per 18/S304. Furthermore, provide #5 hooked top bars at 12"
on -center along the slab edge at the top of the stairs similar to detail 17/S303.
These slab bars and dowels were discussed with the special inspector and the
contractor.
12.) At many locations, the PT tendons and slab reinforcing are touching the MEP
sleeve penetrations or the electrical conduit. The tendons and conduit shall be
adjusted slightly to provide some clearance for concrete placement.
13.) There is a relatively small amount of flexible conduit running through the slab.
The conduit locations and separation between the adjacent conduit runs were
discussed with the special inspector and the contractor.
14.) Several of the slab bottom bars were observed to be touching the deck formwork.
In general, all bars and dowels should be adjusted (as needed) to provide
minimum clearances for concrete placement.
15.) There are a number of steel embed plates with headed studs attached to the deck
form boards. These will be used to attach the residential balconies and canopies
per detail 18/5303 and appear to be acceptable as installed. The installation of the
embed plates was ongoing during our time at the project site.
16.) Clean the slab of all debris. Replace all damaged or knocked over rebar and
tendon chairs.
GENERAL COMMENTS
The comments described here are based on visual observations made during a brief visit to the
project site, which was intended to examine the project's general conformance with the structural
plans and details. This is not to be interpreted as an official inspection, which should still be
provided by the independent special inspection agency and the building official as required by the
project. Please forward this report to the building department and the special inspector as required.
Feel free to contact us if you have any questions or comments.
Distribution Page
Report Number: M7171996.0039
Service Date: 07/10/18
Report Date: 07/13/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -TENSION OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0040
Service Date: 07/11/18
Report Date: 07/17/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
Level 2 South Post -Tension (PT) Deck:
Completed inspection of Level 2 south PT deck between grid lines CH to CL+/C5 to C11. Inspected the
reinforcement for size, grade, lap and spacing per plans. Inspected tendons for count and profile per shop
drawings and RFI 029. Verified completion of the following items:
1. Install (5) #4 top and (2) #4 bottom at concrete walls along the exterior at grid lines CH/C6.5 to C8.5,
C11/CJ to CK, CL+/C5 to C5.7, and CL+/C8.5 to C10.5 per Engineer's verbal instruction. Complete.
2. Install (2) #5 in haunch of grillage hairpins, per Engineer, verbal okay with #4. Complete.
3. Install (1) #5 in haunch of 90' hook bar in steps, per Engineer, verbal okay with #4. Complete.
4. Install corner reinforcement shown on S202A (Typ. per details 3/S302 and 11/S303). Complete.
5. Install "added" #4 at 24" on center between grid lines CK.7 to CL+ on grid C5.5. Complete.
6. Verify the installation of any trim reinforcement for hold-downs and penetrations. Complete.
7. Install #5 at 12" top with 900 hook and #4 at 12" bottom for stair landing at grid lines CJ.5/C8 per detail
18/S304. Complete.
8. Install #4 curb/landing dowels at grids Cl/C8. Complete.
The engineer noted corrections to the deck in Structural Field Report (see attachment), the items that pertained
to this deck are now completed.
Verify Final Clearances and Cleanliness prior to placement
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.10 Page 1 of 2
POST -TENSION OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0040
Service Date: 07/11/18
Report Date: 07/17/18
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Client Project
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle. WA 98106 Proiect No.: M7171996
Level 2 North PT Deck:
Began inspection of Level 2 north PT deck between grid lines CA to CL/C1 to C6. Inspected the reinforcement
for size, grade, lap and spacing per plans. Inspected tendons for count and profile per Shop drawings. The
following need completion or in the process of completion:
1. Install concrete wall reinforcement along the exterior, various locations, per detail 5/S303.
2. Install (2) #5 in haunch of grillage hairpins per detail 15/S302.
3. Install (1) #5 in haunch of 90' hook bar in steps at various locations per detail 17/S303.
4. Install #6 reinforcement at 6" on center for BM3 along grid CC'/Cl' to C2', per Engineer's verbal direction.
5. Install remaining top mat at grids CH/C6, CG/C4.5, CF.5/C3.5, CC.5/C1, CA/C3, and CB/C5.
6. Verify the installation of any trim reinforcement for hold-downs and penetrations.
Verify final clearances and cleanliness prior to placement. Engineer Walk Scheduled for Monday 07/16/18.
PRELIMINARY INSPECTION
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Andrew Bontrager
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 2 of 2
QUANTUM 1 C O N S U L T I N G E N G I N E E R S
STRUCTURAL OBSERVATIONS FIELD REPORT
TO: DATE:
Sergio Ortega July 10, 2018 (Tuesday)
W.G. Clark Construction — Project Engineer 10:30 AM —1:30 PM
BY: PROJECT:
Todd Schoentrup, P.E. The Village at Westgate, Edmonds, WA
Level 2 PT Slab (South)
PROJECT NUMBER:
16369.02
Attendees: Todd Schoentrup, Quantum; Rick Sains, W.G. Clark;
Andrew Bontrager, Mayes Testing Engineers
Conditions: Mostly Sunny, 70 degrees
07/10/2018 — Quantum Consulting Engineers Site Visit — Level 2 PT Slab
Structural Observations
At the time of my site visit, all of the post -tensioning cables and a majority of the slab reinforcing
was installed for the Level 2 PT Slab. The work to install the remaining slab reinforcing was
ongoing during my time at the project site. The MEP sleeves and electrical conduit were also
installed, with the sub -contractor set to return to replace some of the plastic pipe sleeves with the
required steel pipe sleeves near the tendon anchorage.
The South end of the second floor deck, between Grids C5 and C11, has been inspected by Mayes
and the Special Inspector will also provide W.G. Clark with a list of corrections in addition to the
verbal direction that was given during our walkthrough. Some of the corrections listed below have
already been addressed during our time at the site, but the Mayes inspector is scheduled to return to
the site on Wednesday (07/11/18) to perform a final inspection of all noted correction items for
compliance prior to the scheduled concrete placement on Thursday (07/12/18).
Most of the structural elements visually observed during the site visit appeared to be in general
conformance with the structural drawings and the shop drawings; however, the following corrective
actions are required:
1.) At (2) exterior balcony/deck locations near Grid C11, a plastic drain pipe sleeve
has been installed in the PT anchor "crush zone' as shown in detail 6/S302.
These non -compliant pipe sleeves have been discussed with the contractor and
sub -contractor and they will be replaced with steel pipe sleeves as noted in the
detail.
2.) There are missing slab edge bars at many locations around the perimeter as
shown in detail 11/S303. It is acceptable to use #4 slab edge bars in lieu of the #5
specified bars. At all slab edges with perimeter wall anchor bolts, make sure the
1511 THIRD AVENUE
SUITE 323
SEATTLE, WA 98101
TEL 206.957.3900
FAX 206.957.3901
www.quantumce.com
Field Report — The Village at Westgate — Level 2 PT Slab (South)
July 11, 2018
Page 2
slab edge reinforcing is located between the row of anchor bolts and the slab edge.
In addition at the elevated slab corners, the #4 top and bottom bars have not been
installed as shown in detail 3/S302. Refer to the structural plans (S202A) and the
approved Level 2 reinforcing shop drawings for the slab reinforcing required at
the perimeter locations.
3.) There is a group of (6) MEP sleeves located in close proximity near Grids C9 and
CJ that shall be trimmed out with (2) #4 bars on each side (top and bottom) and
extend 12" past the group at each end similar to detail 3/S303.
4.) Provide additional #6 slab bars (top and bottom) at all shear wall holdown
locations per detail 20/S400. If equivalent reinforcing is located around the
holdown anchors, then the #6 bars are not required to be added to the rebar that
is already in place. The slab bars at the holdown anchors were being installed
during our time at the project site.
5.) Provide (4) #6 x 10'-0" (min.) top bars centered over the (2) columns near the slab
edge corner at Grids C11 and CH. The #6 top bars are indicated on both the
structural plans (S202A) and the approved Level 2 reinforcing shop drawings.
We discussed the missing top bars with the contractor and sub -contractor during
our walkthrough.
6.) Provide additional #5 top bars x 10'-0" long at 6" on -center (8 bars minimum)
each side of the closure strip near Grid CK at the end of the banded tendon group.
Extend the bars into the closure strip from each side and lap bars 3'-0" minimum.
7.) At each perimeter concrete wall location below, there is no longitudinal crack
control reinforcing in the PT slab as shown on detail 5/S303. We directed the
contractor and sub -contractor to install (5) #4 top bars and additional #4 bottom
bars at 12" o.c. (as needed) between the typical slab reinforcing along the entire
length of the walls.
8.) Provide #3 hairpin ties as shown in detail 7/S302 for the banded tendons that are
skewed/sweep around the stair #3 opening near Grids CI and CJ. The tendon
sweep location was pointed out to the inspector during our walkthrough. The
hairpins at the banded tendons were being installed during our time at the project
site.
9.) Along Grid CL between Grids C7 and C8, there is an intermediate stressing
pocket for the banded tendons. Shear keys in accordance with sketch SSK-27B
and detail 20/S300 for this construction joint need to be added at the edges of the
stressing pocket.
Field Report — The Village at Westgate — Level 2 PT Slab (South)
July 11, 2018
Page 3
10.) There was a missing shear wall holdown (H4) found near Grids CK and C5.5.
Also, there was no holdown (H4) installed at the stair #3 opening per RFI #31
response. Both holdowns shall be installed with 10" minimum embed into the
Level 2 PT slab per detail 20/5400. The contractor was notified of these holdown
locations and he said they will be installed per the structural drawings prior to the
slab placement.
11.) There are missing slab diagonal bars at the stair #3 opening per detail 2/S302. In
addition, the #4 wall/slab dowels are missing for the small section of concrete
slab above stair #3 per 18/S304. Furthermore, provide #5 hooked top bars at 12"
on -center along the slab edge at the top of the stairs similar to detail 17/S303.
These slab bars and dowels were discussed with the special inspector and the
contractor.
12.) At many locations, the PT tendons and slab reinforcing are touching the MEP
sleeve penetrations or the electrical conduit. The tendons and conduit shall be
adjusted slightly to provide some clearance for concrete placement.
13.) There is a relatively small amount of flexible conduit running through the slab.
The conduit locations and separation between the adjacent conduit runs were
discussed with the special inspector and the contractor.
14.) Several of the slab bottom bars were observed to be touching the deck formwork.
In general, all bars and dowels should be adjusted (as needed) to provide
minimum clearances for concrete placement.
15.) There are a number of steel embed plates with headed studs attached to the deck
form boards. These will be used to attach the residential balconies and canopies
per detail 18/5303 and appear to be acceptable as installed. The installation of the
embed plates was ongoing during our time at the project site.
16.) Clean the slab of all debris. Replace all damaged or knocked over rebar and
tendon chairs.
GENERAL COMMENTS
The comments described here are based on visual observations made during a brief visit to the
project site, which was intended to examine the project's general conformance with the structural
plans and details. This is not to be interpreted as an official inspection, which should still be
provided by the independent special inspection agency and the building official as required by the
project. Please forward this report to the building department and the special inspector as required.
Feel free to contact us if you have any questions or comments.
Distribution Page
Report Number: M7171996.0040
Service Date: 07/11 /18
Report Date: 07/17/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -TENSION OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0041
Service Date: 07/12/18
Report Date: 07/17/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (21) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
Level 2 South Post -Tension (PT) Deck
All items listed in Mayes Testing Engineers (MTE) preliminary report M7171996.0039, service date 07/10/18,
concerning this deck and the Engineer Field report were found to be completed. This report clears MTE
preliminary report M7171996.0039.
Observed the placement of (383) cubic yards of Miles Sand and Gravel mix 156000 into Level 2, south PT deck
between grid lines CH to CL+/C5 to C11. Concrete was placed by pump and was mechanically consolidated.
Cast (3) sets of (3) 4x8" field cure and (4) sets of (3) 4x8" lab cure test cylinders for compressive strength testing
to reach 5000 psi at (28) days (3500 psi before stressing operations). Note: Some of the beginning loads during
slump tests, exceeded the maximum slump of 6" (allowed water was not exceeded). Also, upon placement, a
bracing for the deck gave -way and subcontractor was instructed to wait so it could be secured; while waiting, a
possible cold joint may have occurred along grid lines C6/CI to CJ.5 and CJ.5/C5.5 to C6.
CORRECTIVE ACTIONS TAKEN
All items from MTE preliminary report M7171996.0039 and Engineer's Field Report have been corrected or
completed, clearing MTE preliminary report 0039.
PRELIMINARY INSPECTION
Pending break results.
Additional Inspector on site: Marco Martinez
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Andrew Bontrager
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.10 Page 1 of 1
Distribution Page
Report Number: M7171996.0041
Service Date: 07/12/18
Report Date: 07/17/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004113
Service Date: 07/12/18
Report Date: 07/16/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
3,500 psi @ 4 days
Mix ID:
156000
Supplier:
Miles Sand and Gravel
Batch Time:
0501 Plant: Everett
Truck No.:
C141 Ticket No.: 209287
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
8
No.
ID
(in)
1
5
3.98
1
6
3.98
1
7
3.98
1
1
1
2
1
3
1
4
Initial Cure:
Cure Box
74
55
Sample Date:
07/12/18 Sample Time: 0555
Sampled By:
Marco Martinez
Weather Conditions:
Sunny
Accumulative Yards:
80 Batch Size (cy): 10
Placement Method:
pump
Water Added Before (gal):
5
Water Added After (gal):
0 Slump After (in); 8
Sample Location:
truck chute
Placement Location:
Level 2 PT Deck South between
gridlines CH to CL+/C5 to C11.
Age at Maximum
Area
Date
Date
Test
Load
(sq in)
Received
Tested
(days)
(lbs)
12.44
07/13/18
07/16/18
4 F
77,880
12.44
07/13/18
07/16/18
4 F
76,380
12.44
07/13/18
07/16/18
4 F
75,750
07/13/18
07/19/18
7
07/13/18
08/09/18
28
07/13/18
08/09/18
28
07/13/18
08/09/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight. F = Field Cured
3500 psi at 4 day for field cures to stress
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Marco Martinez
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Compressive
Strength
Fracture
Tested
(psi)
Type
By
6,260
2
JHK
6,140
2
JHK
6,090
2
JHK
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Pagel of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004113
Service Date: 07/12/18
Report Date: 07/16/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000
psi @
28 days
Sample Date:
07/12/18 Sample Time: 0810
3,500
psi @
4 days
Sampled By:
Marco Martinez
Mix ID: 156000
Weather Conditions:
Sunny
Supplier: Miles Sand and
Gravel
Accumulative Yards:
220 Batch Size (cy): 10
Batch Time: 0700
Plant:
Everett
Placement Method:
pump
Truck No.: C082
Ticket No.:
209303
Water Added Before (gal):
0
Water Added After (gal):
0 Slump After (in); 6.75
Field Test Data
Sample Location:
truck chute
Test
Result
Specification
Placement Location:
Level 2 PT Deck South between
Slump (in):
6 3/4
gridlines CH to CL+/C5 to C11.
Air Content (%):
Concrete Temp. (F):
75
Ambient Temp. (F):
63
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
No.
ID
(in)
2
5
3.98
2
6
3.98
2
7
3.98
2
1
2
2
2
3
2
4
Initial Cure:
Cure Box
Age at Maximum
Area
Date
Date
Test
Load
(sq in)
Received
Tested
(days)
(lbs)
12.44
07/13/18
07/16/18
4 F
74,680
12.44
07/13/18
07/16/18
4 F
72,730
12.44
07/13/18
07/16/18
4 F
67,420
07/13/18
07/19/18
7
07/13/18
08/09/18
28
07/13/18
08/09/18
28
07/13/18
08/09/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight. F = Field Cured
3500 psi at 4 day for field cures to stress
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Marco Martinez
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Compressive
Strength
Fracture
Tested
(psi)
Type
By
6,000
2
JHK
5,850
2
JHK
5,420
2
JHK
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004113
Service Date: 07/12/18
Report Date: 07/16/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000
psi @
28 days
Sample Date:
07/12/18 Sample Time: 0940
3,500
psi @
4 days
Sampled By:
Marco Martinez
Mix ID: 156000
Weather Conditions:
Sunny
Supplier: Miles Sand and
Gravel
Accumulative Yards:
310 Batch Size (cy): 10
Batch Time: 0836
Plant:
Everett
Placement Method:
pump
Truck No.: C060
Ticket No.:
209318
Water Added Before (gal):
0
Water Added After (gal):
0 Slump After (in); 6.25
Field Test Data
Sample Location:
truck chute
Test
Result
Specification
Placement Location:
Level 2 PT Deck South between
Slump (in):
6 1/4
gridlines CH to CL+/C5 to C11.
Air Content (%):
Concrete Temp. (F):
77
Ambient Temp. (F):
68
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
No.
ID
(in)
3
5
3.98
3
6
3.99
3
7
3.98
3
1
3
2
3
3
3
4
Initial Cure:
Cure Box
Age at Maximum
Area
Date
Date
Test
Load
(sq in)
Received
Tested
(days)
(lbs)
12.44
07/13/18
07/16/18
4 F
72,660
12.5
07/13/18
07/16/18
4 F
75,880
12.44
07/13/18
07/16/18
4 F
70,280
07/13/18
07/19/18
7
07/13/18
08/09/18
28
07/13/18
08/09/18
28
07/13/18
08/09/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight. F = Field Cured
3500 psi at 4 day for field cures to stress
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Marco Martinez
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Compressive
Strength
Fracture
Tested
(psi)
Type
By
5,840
2
JHK
6,070
2
JHK
5,650
3
JHK
Reviewed By: ZZt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000t, 11-16-12, xev.6 Page 3 of 3
Distribution Page
Report Number: M7171996.0041 B
Service Date: 07/12/18
Report Date: 07/16/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004113
Service Date: 07/12/18
Report Date: 07/20/18 Revision 1 - 7-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Sample Date:
07/12/18 Sample Time:
0555
3,500 psi @
4 days
Sampled By:
Marco Martinez
Mix ID: 156000
Weather Conditions:
Sunny
Supplier: Miles Sand and Gravel
Accumulative Yards:
80 Batch Size (cy):
10
Batch Time: 0501 Plant:
Everett
Placement Method:
pump
Truck No.: C141 Ticket No.:
209287
Water Added Before (gal):
5
Water Added After (gal):
0 Slump After (in);
8
Field Test Data
Sample Location:
truck chute
Test Result
Specification
Placement Location:
Level 2 PT Deck South between
Slump (in): 8
gridlines CH to CL+/C5 to C11.
Air Content (%):
Concrete Temp. (F): 74
Ambient Temp. (F): 55
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date
Test Load
Strength Fracture
Tested
No. ID (in) (sq in)
Received
Tested
(days) (lbs)
(psi) Type
By
1 5 3.98 12.44
07/13/18
07/16/18
4 F 77,880
6,260 2
JHK
1 6 3.98 12.44
07/13/18
07/16/18
4 F 76,380
6,140 2
JHK
1 7 3.98 12.44
07/13/18
07/16/18
4 F 75,750
6,090 2
JHK
1 1 3.98 12.44
07/13/18
07/19/18
7 85,350
6,860 2
TJW
1 2
07/13/18
08/09/18
28
1 3
07/13/18
08/09/18
28
1 4
07/13/18
08/09/18
28
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Compressive strength of 7 day cylinders complies with the 4 day specified strength. Not tested for plastic unit
weight. F = Field Cured
3500 psi at 4 day for field cures to stress
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Marco Martinez
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Pagel of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004113
Service Date: 07/12/18
Report Date: 07/20/18 Revision 1 - 7-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Sample Date:
07/12/18 Sample Time:
0810
3,500 psi @
4 days
Sampled By:
Marco Martinez
Mix ID: 156000
Weather Conditions:
Sunny
Supplier: Miles Sand and Gravel
Accumulative Yards:
220 Batch Size (cy):
10
Batch Time: 0700 Plant:
Everett
Placement Method:
pump
Truck No.: C082 Ticket No.:
209303
Water Added Before (gal):
0
Water Added After (gal):
0 Slump After (in);
6.75
Field Test Data
Sample Location:
truck chute
Test Result
Specification
Placement Location:
Level 2 PT Deck South between
Slump (in): 6 3/4
gridlines CH to CL+/C5 to C11.
Air Content (%):
Concrete Temp. (F): 75
Ambient Temp. (F): 63
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date
Test Load
Strength Fracture
Tested
No. ID (in) (sq in)
Received
Tested
(days) (lbs)
(psi) Type
By
2 5 3.98 12.44
07/13/18
07/16/18
4 F 74,680
6,000 2
JHK
2 6 3.98 12.44
07/13/18
07/16/18
4 F 72,730
5,850 2
JHK
2 7 3.98 12.44
07/13/18
07/16/18
4 F 67,420
5,420 2
JHK
2 1 3.98 12.44
07/13/18
07/19/18
7 79,360
6,380 2
TJW
2 2
07/13/18
08/09/18
28
2 3
07/13/18
08/09/18
28
2 4
07/13/18
08/09/18
28
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Compressive strength of 7 day cylinders complies with the 4 day specified strength. Not tested for plastic unit
weight. F = Field Cured
3500 psi at 4 day for field cures to stress
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Marco Martinez
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 3
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004113
Service Date: 07/12/18
Report Date: 07/20/18 Revision 1 - 7-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Sample Date:
07/12/18 Sample Time:
0940
3,500 psi @
4 days
Sampled By:
Marco Martinez
Mix ID: 156000
Weather Conditions:
Sunny
Supplier: Miles Sand and Gravel
Accumulative Yards:
310 Batch Size (cy):
10
Batch Time: 0836 Plant:
Everett
Placement Method:
pump
Truck No.: C060 Ticket No.:
209318
Water Added Before (gal):
0
Water Added After (gal):
0 Slump After (in);
6.25
Field Test Data
Sample Location:
truck chute
Test Result
Specification
Placement Location:
Level 2 PT Deck South between
Slump (in): 6 1/4
gridlines CH to CL+/C5 to C11.
Air Content (%):
Concrete Temp. (F): 77
Ambient Temp. (F): 68
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date
Test Load
Strength Fracture
Tested
No. ID (in) (sq in)
Received
Tested
(days) (lbs)
(psi) Type
By
3 5 3.98 12.44
07/13/18
07/16/18
4 F 72,660
5,840 2
JHK
3 6 3.99 12.5
07/13/18
07/16/18
4 F 75,880
6,070 2
JHK
3 7 3.98 12.44
07/13/18
07/16/18
4 F 70,280
5,650 3
JHK
3 1 3.98 12.44
07/13/18
07/19/18
7 73,150
5,880 2
TJW
3 2
07/13/18
08/09/18
28
3 3
07/13/18
08/09/18
28
3 4
07/13/18
08/09/18
28
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Compressive strength of 7 day cylinders complies with the 4 day specified strength. Not tested for plastic unit
weight. F = Field Cured
3500 psi at 4 day for field cures to stress
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Marco Martinez
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list. Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 3 of 3
Distribution Page
Report Number: M7171996.0041 B
Service Date: 07/12/18
Report Date: 07/20/18 Revision 1 - 7-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0041B
Service Date: 07/12/18
Report Date: 08/10/18 Revision 2 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000
psi @ 28 days
Sample Date:
07/12/18 Sample Time:
0555
3,500
psi @
4 days
Sampled By:
Marco Martinez
Mix ID: 156000
Weather Conditions:
Sunny
Supplier: Miles Sand and
Gravel
Accumulative Yards:
80 Batch Size (cy):
10
Batch Time: 0501
Plant:
Everett
Placement Method:
pump
Truck No.: C141
Ticket No.:
209287
Water Added Before (gal):
5
Water Added After (gal):
0 Slump After (in);
8
Field Test Data
Sample Location:
truck chute
Test
Result
Specification
Placement Location:
Level 2 PT Deck South between
Slump (in):
8
gridlines CH to CL+/C5 to C11.
Air Content (%):
Concrete Temp. (F):
74
Ambient Temp. (F):
55
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received
Tested
(days) (lbs)
(psi) Type
By
1 5 3.98
12.44
07/13/18
07/16/18
4 F 77,880
6,260 2
JHK
1 6 3.98
12.44
07/13/18
07/16/18
4 F 76,380
6,140 2
JHK
1 7 3.98
12.44
07/13/18
07/16/18
4 F 75,750
6,090 2
JHK
1 1 3.98
12.44
07/13/18
07/19/18
7 85,350
6,860 2
TJW
1 2 4.00
12.57
07/13/18
08/09/18
28 111,530
8,880 5
KWB
1 3 3.97
12.38
07/13/18
08/09/18
28 109,270
8,830 3
KWB
1 4 3.97
12.38
07/13/18
08/09/18
28 105,970
8,560 2
KWB
Average (28 days)
8,750
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight. F = Field Cured
3500 psi at 4 day for field cures to stress
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000i, 11-16-12, xev.6 Page 1 of 6
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
MAYES TESTING ENGINEERS
Report Number: M7171996.004113
alre«aconCO =A"
Service Date: 07/12/18
20225 Cedar Valley Rd Ste 110
Report Date: 08/10/18 Revision 2 - 28-day results
Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171996
Westgate Village LLC
Village at Westgate
Henbart, LLC
10032 Edmonds Way
Attn: Anthony Jansen
Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106
Permit No.: BLD2016-1538
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Marco Martinez
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 6
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0041B
Service Date: 07/12/18
Report Date: 08/10/18 Revision 2 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000
psi @ 28 days
Sample Date:
07/12/18 Sample Time:
0810
3,500
psi @
4 days
Sampled By:
Marco Martinez
Mix ID: 156000
Weather Conditions:
Sunny
Supplier: Miles Sand and
Gravel
Accumulative Yards:
220 Batch Size (cy):
10
Batch Time: 0700
Plant:
Everett
Placement Method:
pump
Truck No.: C082
Ticket No.:
209303
Water Added Before (gal):
0
Water Added After (gal):
0 Slump After (in);
6.75
Field Test Data
Sample Location:
truck chute
Test
Result
Specification
Placement Location:
Level 2 PT Deck South between
Slump (in):
6 3/4
gridlines CH to CL+/C5 to C11.
Air Content (%):
Concrete Temp. (F):
75
Ambient Temp. (F):
63
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received
Tested
(days) (lbs)
(psi) Type
By
2 5 3.98
12.44
07/13/18
07/16/18
4 F 74,680
6,000 2
JHK
2 6 3.98
12.44
07/13/18
07/16/18
4 F 72,730
5,850 2
JHK
2 7 3.98
12.44
07/13/18
07/16/18
4 F 67,420
5,420 2
JHK
2 1 3.98
12.44
07/13/18
07/19/18
7 79,360
6,380 2
TJW
2 2 3.98
12.44
07/13/18
08/09/18
28 98,600
7,930 5
KWB
2 3 3.97
12.38
07/13/18
08/09/18
28 100,400
8,110 2
KWB
2 4 3.97
12.38
07/13/18
08/09/18
28 98,780
7,980 2
KWB
Average (28 days)
8,010
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight. F = Field Cured
3500 psi at 4 day for field cures to stress
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000i, 11-16-12, xev.6 Page 3 of 6
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
MAYES TESTING ENGINEERS
Report Number: M7171996.004113
alre«aconCO =A"
Service Date: 07/12/18
20225 Cedar Valley Rd Ste 110
Report Date: 08/10/18 Revision 2 - 28-day results
Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171996
Westgate Village LLC
Village at Westgate
Henbart, LLC
10032 Edmonds Way
Attn: Anthony Jansen
Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106
Permit No.: BLD2016-1538
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Marco Martinez
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 4 of 6
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0041B
Service Date: 07/12/18
Report Date: 08/10/18 Revision 2 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000
psi @ 28 days
Sample Date:
07/12/18 Sample Time:
0940
3,500
psi @
4 days
Sampled By:
Marco Martinez
Mix ID: 156000
Weather Conditions:
Sunny
Supplier: Miles Sand and
Gravel
Accumulative Yards:
310 Batch Size (cy):
10
Batch Time: 0836
Plant:
Everett
Placement Method:
pump
Truck No.: C060
Ticket No.:
209318
Water Added Before (gal):
0
Water Added After (gal):
0 Slump After (in);
6.25
Field Test Data
Sample Location:
truck chute
Test
Result
Specification
Placement Location:
Level 2 PT Deck South between
Slump (in):
6 1/4
gridlines CH to CL+/C5 to C11.
Air Content (%):
Concrete Temp. (F):
77
Ambient Temp. (F):
68
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received
Tested
(days) (lbs)
(psi) Type
By
3 5 3.98
12.44
07/13/18
07/16/18
4 F 72,660
5,840 2
JHK
3 6 3.99
12.5
07/13/18
07/16/18
4 F 75,880
6,070 2
JHK
3 7 3.98
12.44
07/13/18
07/16/18
4 F 70,280
5,650 3
JHK
3 1 3.98
12.44
07/13/18
07/19/18
7 73,150
5,880 2
TJW
3 2 3.98
12.44
07/13/18
08/09/18
28 103,500
8,320 2
KWB
3 3 3.98
12.44
07/13/18
08/09/18
28 101,200
8,130 2
KWB
3 4 3.99
12.5
07/13/18
08/09/18
28 99,700
7,970 2
KWB
Average (28 days)
8,140
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight. F = Field Cured
3500 psi at 4 day for field cures to stress
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000i, 11-16-12, xev.6 Page 5 of 6
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
MAYES TESTING ENGINEERS
Report Number: M7171996.004113
alre«aconCO =A"
Service Date: 07/12/18
20225 Cedar Valley Rd Ste 110
Report Date: 08/10/18 Revision 2 - 28-day results
Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171996
Westgate Village LLC
Village at Westgate
Henbart, LLC
10032 Edmonds Way
Attn: Anthony Jansen
Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106
Permit No.: BLD2016-1538
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Marco Martinez
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list. Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 6 of 6
Distribution Page
Report Number: M7171996.0041 B
Service Date: 07/12/18
Report Date: 08/10/18 Revision 2 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -TENSION OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0042
Service Date: 07/16/18
Report Date: 07/23/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Clear
1. Received the compressive strength test results from the Mayes Testing Engineers Lynnwood laboratory for
the Level 2 south post -tension (PT) slab: Set #1 was 6260 psi, Set #2 was 6000 psi and Set #3 was 5840 psi.
After verifying the stressing equipment has a current calibration report, contractor began stressing the deck.
A completed stressing record has been forwarded to the engineer and contractor. Received a phone call and
confirming email from the Engineer accepting the stressing report. Please see attached stressing record for
details.
2. Performed a preliminary inspection and engineer walk on the Level 2 north PT slab. At time of inspection
work was still in progress - installing patio embed plates, hold-down bolts, added trim steel at openings. Per
the conversation with the Engineer, the added #6 bars require a hook at the closure strip to have the required
development length.
PRELIMINARY INSPECTION
Item 2 needs to be completed.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Equipment Set #1
Equipment Set #2
Equipment Set #3
Ram # :
PTCO27
...........................................................................
Ram # : PTC093
..................................................................................
Ram # : PTCO26 ......................................
Gauge # :
PTCO27
..........................................................................
Gauge # : PTC093
..................................................................................
Gauge # : PTCO26
.............................................................................
Calib. Date:
4/6/2018
Calib Date: 4/9/2018
Calib. Date: 7/12/2018
Gauge (psi):
5250
..........................................................................
Gauge(psi): 5300
..................................................................................
Gauge (psi): 5300
..............................................................................
Minimum Tol.:
1/4
Specified Strength (psi): 3500 kge (d): 4
Strengths (psi): 6260, 6000, 5840
ID
Tendon
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
Location :Remarks
#
Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
I Net
Gross Mark I Net
.........................................................................................................._..........................................................................................................................................................................................................
D-1
32'
23/8
21/8
25/81
31/2
1
21/221/2
..........................................................................................................................
.......l............................................
Dist.
...................................................................................................................................................................................
2
D-1
32'
2 3/8
2 5/8
2 1 /8
2 5/8
3 5/8
1
2 5/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
3
D-1
32'
2 3/8
2 1 /2
2 1 /8
2 5/8
3 1 /2
1
2 1 /2
111111111111111 11111I I I1I11
.....................................................................................................
D-1 .
32'
_23/8
..................................................................................................................................................................................................
21/8
25/84
31/2
1
.......................................
2 1 /221/2
................................
...I ..I..l..I...I..l..I...I ..I..1..1..I...I..I..l..l..I....... I..1...................................
.............................................................................................................................................................................
5
.........................................................................................................._..................................................................................................................................................................................................................................................................................................
D-2
36'
2 5/8
2 3/8
2 3/8
2 7/8
3 3/8
1
2 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
Dist.
6
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
D-2
36'
2 5/8
2 3/8
2 3/8
2 7/8
3 3/8
1
2 3/8
I1111IIII111IIII :IIIIIIIIIIII
7
.........................................................................................................._................................................................................................................................................................................................................................................................................................................
I D-2
36'
2 5/8
2 3/8
2 3/8
2 7/8
3 3/8
1
2 3/8
I I111I I I l I I l I I I1 I l l l l l l l I I l l
_........................................................
............................................................................... ....................................................................................................
D-2
36'
23/8
27/825/8
31/28 ........
1
......2 1/2
IIIIIlIII11II I11I11IIIII121/2
............................................................................................
...................................................................................................................................................................................
9
D-3
39'
3
2 1 /2
2 3/4
3 1 /4
-1/4
3 1 /2
1
2 1 /2
IIIIIIIIIIIIIIII :IIIIIIIIIIII
10
.....................
D-3
.....................................................................................
39'
3
_................................
2 3/8
....................................................................
2 3/4
3 1 /4
_...............................
-3/8
...................................
3 3/8
....................................... _
1
.......................................
2 3/8
................................
I11II ( I I I I I I I I I I I I
.......................... ..........._.............. ......... ....... ...................................... .................................................................................
........................ ...... ...... ...... ...................................................... ....
..........................................................................................................
D-3
39'
_................................
..................................
31/4
-1/4
31/2 ...........................................................................
121/2311
2 1 /223/4 .......I
I..I..I I I I I I I I I IIIIIIIIIII..........................................................................................................................................................................................................................
12
D-3
39'
3
2 3/8
2 3/4
3 1 /4
...............................................................................................................................................................................................
- 3/8
3 3/8
1
2 3/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
13
D-4
44'
3 1 /4
2 3/4
3
3 1 /2
- 1 /4
3 3/4
1
2 3/4
1111111 11111 ( I I I ;IIIIIIIIIIII
14D-4
44'
. ......................................._....................................................................................................................................................................................................................................
31/4
23/4
3
31/2
-1/4
33/4
1 ..............
123/4
...................................................................
I I1 I I l I l I11I l I l.I
....I..I...I..I..I..I.........................................
...................................................................................................................................................................................
15
D-4
44'
3 1 /4
2 3/4
3
3 1 /2
-1 /4
3 3/4
1
2 3/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
16
D-4
44'
3 1 /4
3 3/8
3
3 1 /2
4 3/8
1
3 3/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
M7171996.0042.2.x1s MAYES TESTING ENGINEERS
ID
.................................................................................................._.....................................................................................................................................
Tendon
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location Remarks
/1
#
Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
17
D-5
47'
3 5/8
31/2
3 3/8
3 7/8
41/2
1
31/2
IIIIIIIIIIIIIIII IIIIIIIIIIII
... _.... _.... _........ _.....
18
.........................................................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
D-5
47'
3 5/8
3 3/8
3 3/8
3 7/8
4 3/8
1
3 3/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
19
.........
D-5
47'
3 5/8
3 3/8
3 3/8
3 7/8
4 3/8
1
3 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
20
D-5
47'
3 5/8
31/2
3 3/8
3 7/8
41/2
1
31/2
IIIIIIIIIIIIIIII IIIIIIIIIIII
21
.........................................................................................................._....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
D-6
51'
; 3 7/8
3 5/8
3 5/8
41/8
4 5/8
1
3 5/8
IIIIIIIIIIIIIIII' IIIIIIIIIIII
22
D-6
51'
3 7/8
3 3/4
3 5/8
41/8
4 3/4
1
; 3 3/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
23
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
D-6
51'
3 7/8
3 7/8
3 5/8
4 1 /8
4 7/8
1
3 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
24
D-6
51'
3 7/8
3 7/8
3 5/8
41 /a
4 7/8
1 ...................................................................................................................................................................................................................................................................................................................................................
3 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
25
D-7
54'
41/8
4
3 7/8
4 3/8
5
1
4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII.........................................................................................................................................................................................................................
26
D-7
54'
41/8
3 7/8
3 7/8
4 3/8
4 7/8
1
3 7/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
27
D-7
..................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
54'
41/8
3 7/8
3 7/8
4 3/8
4 7/8
1
3 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
28
.........................................................................................................._...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
D-7
54'
41/8
3 7/8
3 7/8
4 3/8
4 7/8
1
3 7/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
29
D-7
54'
41/8
3 7/8
3 7/8
4 3/8
4 7/8
1
; 3 7/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
30
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
D-7 ;
54'
; 41/8
41/8
3 7/8
4 3/8
51/8 ;
1
; 41/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
31
.........................................................................................................._........................................................................................................................................................................................................................................................................................................................._.........................................................................................................................................................................................................................................................
D-7
54'
; 4 1 /8
4
3 7/8
4 3/8
5 ;
1
4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
32
D-7
54'
41 /8
4
3 7/8
4 3/8
5
1
4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
...............................................................................................
33
.........................................................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
D-8
58'
; 4 3/8
41/8
41/8
4 5/8
5 1/8 ;
1
; 41/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
34
D-8 ;
58'
; 4 3/8
41 /4
41/8
4 5/8
51/4 ;
1
; 4 1 /4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
35
D-8
58'
4 3/8
41/2
4 1/8
4 5/8
51/2
1
.......................................................................................................................................................................................................................................................................................................................................................................
4 1/2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
36
D-8
58'
; 4 3/8
4 3/8
41/8
4 5/8
5 3/8 ;
1
; 4 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
_................................
37
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
D-9 ;
61'
; 4 3/4
4 3/4
4 3/8
5 1 /8
5 3/4 ;
1
4 3/4
I II11II I I I I1I1I1 I I I II I I I I I II
38
.........................................................................................................._.............................................................................................................................................................................................................................................................................................................
D-9
61'
; 4 3/4
41/2
4 3/8
51/8
51/2
1
41/2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
_....................................................... ................................................................................
....................................................................................................
39
D-9
61'
4 3/4
4 3/4
4 3/8
51 /8
...............................................................................................................................................................................................
5 3/4
1
; 4 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII...........................................................................................................................................................................................................................
40
D-9
61'
; 4 3/4
5
4 3/8
51/8
6 ;
1
5
IIIIIIIIIIIIIIII :IIIIIIIIIIII
41
D-10 ;
65'
........................................_...................................................................................................._........................................................................................................._.............................................................................................................._...............................................................................................................................................................................................................................................
; 5
; 5
4 5/8
5 3/8
6 ;
1
; 5
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
42
.........................................................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
D-10
65'
5
5
4 5/8
5 3/8
6 ;
1
5
IIIIIIIIIIIIIIII ; I I IIIIIIIIII
43
D-10
65'
5
5
4 5/s
5 3/8
6
1
5
IIIIIIIIIIIIIIII IIIIIIIIIIII
44
D-10 ;
65'
; 5
; 5
4 5/8
5 3/8
6 ;
1
; 5
IIIIIIIIIIIIIIII :IIIIIIIIIIII
MAYES TESTING ENGINEERS
M7171996.0042.2.xls
ID
.................................................................................................._................................................................................................................................
Tendon
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location ;Remarks
/1
#
Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
45
WHITE
81'
61/4
6 3/8
5 3/4
6 3/4
7 3/8
1
6 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII I
... _.... _.... _........ _.....
Dist.
46
;WHITE
81'
........................................_..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
61/4
6 3/8
5 3/4
6 3/4
7 3/8
1
6 3/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
47
WHITE
..........
81'
61/4
6 1/2
5 3/4
6 3/4
7 1/2
1
6 1/2
IIIIIIIIIIIIIIII IIIIIIIIIIII
61/4
63/8
53/4
63/4WHITE
73/8
148
6 3/8
IIIIIIIIIIIIIIII I IIII I II I III
49
WHITE
81'
61/4
61/2
5 3/4
6 3/4
71/2
1
6 1/2
IIIIIIIIIIIIIIII' IIIIIIIIIIII
50
.............:.............................
I WHITE
81'
6 1/4
6 1/2
........................
5 3/4
6 3/4
7 1/2
1
6 1/2
IIIIIIIIIIIIIIII :IIIIIIIIIIII'
51
;WHITE
81'
61/4
61/4
..................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
5 3/4
6 3/4
7 1/4
1
61/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
52
.....................
WHITE
............................................ .........................................
81'
6 1 /4
_................................
6 3/8
.................................. .................................
5 3/4
6 3/4
...............................
..................................
7 3/8
.......................................
1
.............................................................................................................._................................
6 3/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII......................................
............................................................................... ....................................................................................................
53
.........................................................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
WHITE
81'
61/4
61/4
5 3/4
6 3/4
71/4
1
6 1/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
54
WHITE
81'
61/4
5 3/4
5 3/4
6 3/4
6 3/4
1
5 3/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
55
WHITE
81'
61/4
6 3/8
5 3/4
6 3/4
7 3/8
1
6 3/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII ..........................................................................................................................................................................................................................
56
;WHITE
81'
6 1 /4
6 1 /4
5 3/4
...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
6 3/4
71 /4 :
1
61 /4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
57
WHITE
81'
61/4
5 3/4
5 3/4
6 3/4
6 3/4
1
5 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
58
WHITE
81'
61/4
61/2
5 3/4
6 3/4
7 1/2
1
61/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
59
.......................
WHITE
........................................... .........................................
81'
61 /4
_................................
61 /4
.................................. ..................................
5 3/4
6 3/4
...............................
..................................
7 1 /4
.......................................
1
............. ...... ...... ...... ........
6 1/4
................................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
......... .............................._......................................................................
........ ...... ...... ...... ......................... ..... ....................... ....................................................................................................
60
.....................
WHITE
.................. .......................... ....................................
81' ....._.
61/4
...............................
61/8
.................................. .................................
5 3/4
6 3/4
...............................
...... ...... ......................
71/8
.......................................
1
.......................................
61/8
............... ..... ...... ......
IIIIIIIIIIIIIIII :IIIIIIIIIIII
......... ...... .................. ...... .................. ..... ...... .........................................
........ ...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
61
WHITE
81'
6 1/4
6 1/4
5 3/4
6 3/4
...............................................................................................................................................................................................................................................................................................................................................................................................................................................
71/4
1
6 1/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII
62
;WHITE
81'
6 1/4
6
5 3/4
6 3/4
7
1
6
IIIIIIIIIIIIIIII; IIIIIIIIIIII..........................................................................................................................................................................................................................
63
;WHITE
81'
61/4
6
5 3/4
6 3/4
7
1
.......................................................................................................................................................................................................................................................................................................................................................................
6
IIIIIIIIIIIIIIII; IIIIIIIIIIII
64 .................................
WHITE
81'
6 1/4
61/8
5 3/4
6 3/4
71/8
1
6 1/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
65
WHITE
81'
........................................_...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
61/4
61/4
5 3/4
6 3/4
71/4
1
61/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
66
;WHITE
81'
6 1/4
6 1/4
5 3/4
6 3/4
71/4
1
6 1/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
...............................................................................
67
;WHITE
81'
6 1/4
61/8
5 3/4
6 3/4
7 1/8
1
61/8
.
IIIIIIIIIIIIIIII :IIIIIIIIIIII
68
WHITE
81'
6 1/4
61/8
5 3/4
6 3/4
71/8
1
6 1/8
IIIIIIIIIIIIIIII: IIIIIIIIIIII
...... _ ......................................................................................................................................................................................................................................................
69
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._...............................................................................................................................................................................................................................................
WHITE
81'
61/4
61/4
5 3/4
6 3/4
71/4
1
6 1/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
70
;WHITE
81'
6 1 /4
.................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
5 7/8
5 3/4
6 3/4
6 7/8
1
5 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
71
WHITE
81'
6 1/4
6 1/4
5 3/4
6 3/4
7 1/4
1
6 1/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
72
;WHITE
81'
61/4
6 1/2
5 3/4
6 3/4
7 1/2
1
6 1/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
MAYES TESTING ENGINEERS
M7171996.0042.2.xls
ID
.................................................................................................._.....................................................................................................................................
Tendon
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location ;Remarks
/1
#
Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
73
WHITE
81'
61/4
6
5 3/4
6 3/4
'
7
1
6
IIIIIIIIIIIIIIII IIIIIIIIIIII
74 ;WHITE
..................... ............................................
.........................................
81'
6 1/4
_.................................
61/8
................................. .................................
5 3/4
6 3/4
............................ ....
...... ...... ......................
71/8
.......................................
1
.............................................................................................................................................................................................................................................
61/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
...................... ....................................................................................................
75
WHITE
81'
61/4
6 3/4
5 3/4
6 3/4
7 3/4
1
6 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
...................................................................................................................................................................................................................................................................................
76 ;WHITE
81'
........................................_...................................................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
61 /4
6 3/8
5 3/4
6 3/4
7 3/8
1
16 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII I
77 ;WHITE
..................... ........................
................... .........................................
81'
6 1/4
_................................
6 1/4
.................................. .................................
5 3/4
6 3/4
...............................
..................................
71/4
.......................................
1
................... ...... ...... ........
6 1/4
........ ...... ...... ...... ......
IIIIIIIIIIIIIIII' IIIIIIIIIIII
......... ......................................................................... ................................................................................
....................................................................................................
78
WHITE
81'
61/4
6 5/8
5 3/4
6 3/4
758
1
6 5/8
IIIIIIIIIIIIIIII IIIIIIIIIIII'
79
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
WHITE
81'
61/4
61/2
5 3/4
6 3/4
71/2
1
61/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
80
WHITE
81'
61/4
6
5 3/4
6 3/4
7
1
6
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
81 ;WHITE
..................... .......................................
..... .........................................
81'
_61/4
................................
6
.................................. .................................
5 3/4
6 3/4
..................................................................
7
.......................................
1
.......................................
6
................................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
........................... ..................................................................................
........ ...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
82
..................... ............................................
WHITE .........................................
81'
61/4
_................................
61/4
.................................. .................................
5 3/4
6 3/4
...............................
..................................
71/4
.......................................
1
.......................................
61/4
.......................... ......
IIIIIIIIIIIIIIII: IIIIIIIIIIII
......... ...... ...... ...... ........ .... ................. ...... ...... .........................................
........ ...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
83
WHITE
81'
61/4
6
5 3/4
6 3/4
7
1
6
IIIIIIIIIIIIIIII ;IIIIIIIIIIII ..........................................................................................................................................................................................................................
84 ;WHITE
..................... ..................
..................................................................._.............................................................................................................................................................................................................................................................................................................................................................
81'
61 /4
6
5 3/4
6 3/4
7
1
6
IIIIIIIIIIIIIIII ;IIIIIIIIIIII.................................. .........
...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
85
WHITE
81'
61/4
61/4
5 3/4
6 3/4
71/4
1
6 1/4
IIIIIIIIIIIIIIII IIIIIIIIIIII'
86
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
WHITE
81'
61/4
61/2
5 3/4
6 3/4
7 1/2
1
6 1/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
87 ;WHITE
..................... .......................................
..... .........................................
81'
6 1 /4
_................................
6 3/8
.................................. .................................
5 3/4
6 3/4
........................... ....
...... ...... ......................
7 3/8
.......................................
1
............. ...... ...... ...... ........
6 3/8
................................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
.................. .............._....................................................... ..... ...... ..........
...... ...... ...... .............................. ....................... ........................ ...... ...... ...... ..........................................................
88 ;WHITE
..................... ............................................
....................................
81' ....._.
6 1 /4
...............................
6
.................................. .................................
5 3/4
6 3/4
...............................
..................................
7
.......................................
1
.......................................
6
................................
IIIIIIIIIIIIIIII I I I I I I I I I I I I
......... .......
89
.........................................................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
WHITE
81'
6 1/4
6 1/4
5 3/4
6 3/4
71/4
1
61/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII
90
WHITE
81'
6 1/4
6 1/4
5 3/4
6 3/4
71/4
1
61/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII..........................................................................................................................................................................................................................
91 ;WHITE
..................... ............................................
.........................................
81'
61/4
_...................................................................
61/4 .................................
5 3/4
6 3/4
...............................
..................................
71/4
.......................................
1
............. ...... ...... ...... ........
6 1/4
.............. ...... ...... ......
IIIIIIIIIIIIIIII; IIIIIIIIIIII
......... ...... ....................................................................................... ...... ..........
...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
92
WHITE
81'
6 1/4
6 1/2
5 3/4
6 3/4
7 1/2
1
61/2
IIIIIIIIIIIIIIII IIIIIIIIIIII
Dist.
93
WHITE
81'
61/4
61/2
5 3/4
6 3/4
71/2
1
61/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
94
WHITE
81'
61/4
6 3/8
5 3/4
6 3/4
7 3/8
1
6 3/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
95 ;WHITE
81'
61/4
61/4
5 3/4
6 3/4
71/4
1
................................................
61/4 ..........
IIIIIIIIIIIIIIII :IIIIIIIIIIII ...........................................................................................................................................................................................................................
96
.........................................................................................................._................................................................................................................................................................................................................................................................................................
WHITE
81'
61/4
61/2
5 3/4
6 3/4
71/2
1
6 1/2
IIIIIIIIIIIIIIII :IIIIIIIIIIII
........................ _ .............................
97
WHITE
81'
61/4
6
5 3/4
6 3/4
7
1
6
IIIIIIIIIIIIIIII IIIIIIIIIIII
98
WHITE
81'
61 /4
6
5 3/4
6 3/4
7
1
6
IIIIIIIIIIIIIIII ;IIIIIIIIIIII .........................................................................................................................................................................................................................
99
WHITE
81'
61/4
6
5 3/4
6 3/4
7
1
6
IIIIIIIIIIIIIIII IIIIIIIIIIII
100
WHITE
81'
61/4
6
5 3/4
6 3/4
7
1
6
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
MAYES TESTING ENGINEERS
M7171996.0042.2.xls
ID
.................................................................................................._.....................................................................................................................................
Tendon
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location Remarks
/1
#
Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
101
WHITE
81'
61/4
; 6
5 3/4
; 6 3/4
'
7
1
6
IIIIIIIIIIIIIIII IIIIIIIIIIII ;
... _.... _.... _........ _.....
102
WHITE
81'
61/4
; 6
5 3/4
; 6 3/4
7 ;
1
6
IIIIIIIIIIIIIIII :IIIIIIIIIIII
103
WHITE
..........
81'
6 1/4
6 1/4
5 3/4
6 3/4
7 1/4
1
6 1/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
104
WHITE
81'
61 /4
6
5 3/4
6 3/4
7
1
6
IIIIIIIIIIIIIIII I I I I I I I I I I I I
105 ;GREEN
.....................
............................................ .........................................
85'
61/2
_................................
6 3/4
.................................. .................................
6
7
...............................
..................................
7 3/4
.......................................
1
................... ...... ...... ........
6 3/4
........ ...... ...... ...... ......
IIIIIIIIIIIIIIII' IIIIIIIIIIII
......... ................................... ...................................... ................................................................................
....................................................................................................
106
GREEN
................................._.......
85'
61/2
6 3/4
6
7
7 3/4
........
1
; 6 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII'
............................_..............................
107
......... ..... ........................................................................................._................................
GREEN
85'
6 1/2
6 5/8
................................... ..................................
6
7
_........................... .............................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
7 5/8
1
6 5/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
108
GREEN
85'
61/2
61/2
6
7
71/2
1
61/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
109.
GREEN
85'
61/2
61/2
6
7
71/2
1
.......................................................................................................................................................................................................................................................................................................................................................................
6 1/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
110 ;GREEN
85'
; 61/2
61/2
6
7
7 1/2
1
61/2
IIIIIIIIIIIIIIII: IIIIIIIIIIII
111 ;
GREEN
85'
61/2
6 3/8
6
7
7 3/8
1
6 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII ;
112 ;GREEN
..................................................................._...................................................................
85'
61/2
61/4 .................................
6
7
...............................
..................................
71/4 :
............................... ..........................................................................................................................................................
1
61/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII .................................. .........
...... ...... ...... ..................................................... ....................................................................................................
113
GREEN
85'
61/2
61/8
6
7
71/8
1
; 61/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII;
114
GREEN
85'
; 61/2
61/4
6
..............................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
; 7
7 1/4 ;
1
61/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII
115
GREEN
..................................................................._........................................................................................................................................................................................................................................................................................................................._.........................................................................................................................................................................................................................................................
85'
; 6 1/2
6 1/2
6
; 7
71/2 ;
1
6 1/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
116
GREEN
85'
61/2
61/2
6
7
71/2
1
......................................................................................................................................................................................................................................................................................................................................................................
61/2
IIIIIIIIIIIIIIII :IIIIIIIIIIII
117 ;GREEN
85'
61/2
61/4
6
; 7
71/4 ;
1
; 61/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
118:
GREEN
85'
; 61/2
61/4
6
; 7
71/4 ;
1
61/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII;
119 ;GREEN
..................................................................._...................................................................
85'
6 1/2
; 61/8 ................................................................................................................................................................................................................
6
7
71/8
1
61/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII ;
............................... ........................................ ............................... ...... ..........
...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
120
GREEN
85'
61/2
61/2
6
7
71/2
1
; 61/2':
IIIIIIIIIIIIIIII IIIIIIIIIIII
121 ;GREEN
.....................
............................................ .........................................
85'
; 61/2
_...................................................................
6 .................................
6
; 7
_................................
..................................
7 ;
....................................... _..................................................................................................
1
6
IIIIIIIIIIIIIIII; IIIIIIIIIIII;
.... ........ _....... ........... ........ ............................................................................................................................
....................................................................................................
122
.........................................................................................................._.........................................................................................................................................................................................................................................................................................................
GREEN
85'
; 61/2
61/8
6
7
71/8
1
6 1/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
_.............................................................................................................................................................................................................................................
1;GREEN
23
.........................................................................................................._......................................................................................................................................................................................................................................................................
85'
6 1/2
61/8
6
7
7 1/8
1
; 61/8 ....................
IIIIIIIIIIIIIIII IIIIIIIIIIII
124 ..................................... ;GREEN
s5'
; 6 1/2
6 1/4
6
; 7
7 1/4 ;
1
; 6 1/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII .........................................................................................................................................................................................................................
125
GREEN
85'
; 61/2
.................................
61/4
...................................................................
6
; 7
_..................................................................
71/4 ;
....................................... _.......................................................................
1
61/4
IIIIIIIIIIIIIIII; IIIIIIIIIIII;
.............. ........................._............................................................
............................................................................... ....................................................................................................
126 ;GREEN
..................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
85'
61/2
; 61/2
6
7
7 1/2
1
6 1/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
127 ;GREEN
85'
6 1/2
6 7/8
6
7
7 7/s
1
6 7/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
128 ;GREEN
85'
; 61/2
6 7/8
6
; 7
7 7/8 ;
1
6 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
MAYES TESTING ENGINEERS
M7171996.0042.2.xls
ID
.................................................................................................._................................................................................................................................
Tendon
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location Remarks
/1
#
Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
129 ;
GREEN
85'
61/2
61/2
6
7
71/2
1
61/2
IIIIIIIIIIIIIIII IIIIIIIIIIII
130 ;
GREEN
85'
6 1/2
6 1/2
6
7
7 1/2
1
6 1/2
IIIIIIIIIIIIIIII: IIIIIIIIIIII
131 ;GREEN
s5'
61/2
6 7/8
6
7
7 7/8
1
6 7/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
132
GREEN
85'
6 1/2
6 3/4
6
7
7 3/4
1
6 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
133'
GREEN
85'
61/2
61/2 .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
6
7
7 1/2
1
6 1/2
IIIIIIIIIIIIIIII' IIIIIIIIIIII
134
GREEN
85'
6 1/2
6 3/4
6
7
7 3/4
1
; 6 3/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII'
13.5
......... ..... ...............
GREEN
........ ............. .................................
85'
.... ................_.................................
61/2
7
............................. ...... .................................
6
7
_...............................
...................................
8
....................................... _.........................
1 ...............................................................................
7
IIIIIIIIIIIIIIII; IIIIIIIIIIII;
...... _..........................................................................................................................................................................................................................................................
136
GREEN
85'
61/2
61/2
6
7
7 1/2
1
6 1/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
137.
.........................................................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
GREEN
85'
6 1/2
61/2
6
7
7 1/2
1
6 1/2
IIIIIIIIIIIIIIII; IIIIIIIIIIII
138
GREEN
85'
; 61/2
6 7/8
6
7
7 7/8
1
6 7/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
139 ;GREEN
;
85'
61/2
6 3/4
6
7
7 3/4
1
6 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII ;
140 ;GREEN
..................................................................._...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
85'
61/2
6 7/8
6
7
7 7/8 :
1
6 7/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
141
GREEN
85'
6 1/2
6 3/4
6
7
7 3/4
1
; 6 3/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII'
142
GREEN
................................................................._;...................................................................:.............................._:............................._.........................................................................:.............................................................................................................._...................
85'
; 61/2
7
6
; 7
8
1
7
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
.............. .....................................................................................................................
....................................................................................................
143 ;GREEN
85'
; 61/2
6 7/8
6
; 7
.......................................................................................................................................................................................................................................................................................................................................................................................................................................................................
7 7/8 ;
1
6 7/8
IIIIIIIIIIIIIIII; IIIIIIIIIIII
144 ;GREEN
.....................
............................................ ....................................
85' ....._................................
61/2
6 3/4
.................................. .................................
6
7
...............................
..................................
7 3/4
.......................................
1
.......................................
6 3/4
.......................... ......
IIIIIIIIIIIIIIII :IIIIIIIIIIII
......... .......
145 ;GREEN
.....................
....................................... ..... .........................................
85'
6 1/2
_................................
6 1/4
.................................. .....................................................................................................................................................................................................................................................................
6
7
7 1/4
1
6 1/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
.... .............. ......................................
................................................................................ ........................ ...... ...... ...... ..........................................................
146 ;GREEN
.....................
;
.....................................................................................
85'
; 61/2
_.................................
7
...................................................................
6
; 7
_..................................................................
8
....................................... _.......................................
1
7
................................
IIIIIIIIIIIIIIII; IIIIIIIIIIII
............................... ........_................................ .......................... ..... ...... ..........
...... ...... ...... .............................. ....................... ........................ ...... ...... ...... ..........................................................
147
GREEN
85'
61/2
7
6
7
8
1
........................................................................................................................................................................................................................................................................................................................................................................
7
IIIIIIIIIIIIIIII; IIIIIIIIIIII;
148
GREEN
85'
6 1/2
6 3/8
6
7
7 3/8
1
; 6 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
149 ;
.....................
WHITE ;
............................................ .........................................
81'
; 6 1/4
_...................................................................
6 1/8 .................................
5 3/4
6 3/4
_................................
..................................
7 1/8 ;
....................................... _.......................................
1
6 1/8
.......................... .......................................
IIIIIIIIIIIIIIII; IIIIIIIIIIII
....... .................. .............. ...................................... .................................................................
Dist. ...................................................................................................................
150 ;
........... ...........
WHITE
......................................... .........................................
81'
; 6 1 /4
_..................................................................................................._........................................................................................................................................................................................................
6 1 /8
5 3/4
6 3/4
7 1 /8 :
1
6 1 /8
IIIIIIIIIIIIIIII IIIIIIIIIIII
_.............................................................................................................................................................................................................................................
151 °
..................
WHITE
................................................_...........................................................................
81'
6 1/4
6 1/4
5 3/4
6 3/4 .....................................................................................................................................
7 1/4
1
6 1/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
.
152
.........................................................................................................._..............................................................................................................................................................................................................................................................................................
WHITE
81'
; 6 1/4
6
5 3/4
6 3/4
7 ;
1
6
IIIIIIIIIIIIIIII: IIIIIIIIIIII
.........................................................
153 ;
WHITE ;
81'
; 6 1/4
...................................................................................................._........................................................................................................._.............................................................................................................._.....................................................................................................................................................................................................................................................
6 1/4
5 3/4
6 3/4
7 1/4 ;
1
6 1/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
154
WHITE ;
..................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
81'
6 1 /4
6 1 /8
5 3/4
6 3/4
7 1 /8
1
6 1 /8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
155
WHITE
81'
6 1 /4
6
5 3/4
6 3/4
7 ;
1
6
IIIIIIIIIIIIIIII IIIIIIIIIIII
156 ;
WHITE ;
81'
; 6 1 /4
5 7/8
5 3/4
6 3/4
6 7/8 ;
1
5 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
MAYES TESTING ENGINEERS
M7171996.0042.2.xls
ID Tendon .......................................
Length
Calc
_................................,............................................................................................,
Actual
-Tol.
+Tol.
ERR.
.........
First End
................,...................................7............................
Second End
...................................................................................................................................................................:....................................................................................................
Location Remarks
# Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
157 WHITE
81'
61 /4
: 6
5 3/4
: 6 3/4 '
7
1
6
IIIIIIIIIIIIIIII IIIIIIIIIIII
158 WHITE
81'
6 1 /4
; 6 1 /8
5 3/4
; 6 3/4
7 1 /8
1
61/8
IIIIIIIIIIIIIIII I I I I I I111111
159 WHITE
.........................
81'
6 1 /4
6 1 /2
5 3/4
: 6 3/4
7 1 /2
1
6 1 /2
IIIIIIIIIIIIIIII IIIIIIIIIIII
....................... ... ..._...............................
160 ; WHITE ;
81'
61 /4
6
5 3/4
6 3/4
7
1
6
IIIIIIIIII I I I I I I I I I I I I I I I I I I
161 D-BRN-RE
................................................................................................._........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
149'
11 1/2
11 1/4
10 3/4;12
1/4
12 1/4
1
11 1/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
Banded
162 -,D-BRN-RI
.............:......................................_.......
149'
11 1 /2
......................................................................................_
11 3/4
10 3/4
12 1 /4
12 3/4
1
11 3/4
1111111111111111 I I I
....._..............................
163 D-BRN-RI
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
149'
11 1 /2
: 11 1 /8
10 3/4
12 1 /4 :
12 1 /8
1
11 1 /8
1111111111111111 l I l I11111111 l
164 D-BRN-RI
149'
11 1 /2
: 11 1/4:
10 3/4
:12 1 /4
12 1 /4
1
11 1 /4
l l l l l l l l l l l l l l l l 111111111111
165 D-BRN-RI
.........................................................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
149'
11 1/2
12 1/4
10 3/4
;12 1/4 ;
13 1/4
1
12 1/4
llllllllllllllll Illlllllllll
166 D-BRN-RI
.........................................................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
149'
11 1/2
: 11 3/8
10 3/4:12
1/4
12 3/8
1
11 3/8
IIIIIIIIIIIIIIII: IIIIIIIIIIII
167 D-BRN-RI
149'
11 1 /2
: 11 1 /8
10 3/4
: 12 1 /4
12 1 /8
1
11 1 /8
1111111111111111111111111111..........................................................................................................................................................................................................................
168 ;RED-ORA
..................... ....................................... ..... .......
86'
...... ...... ...... ................
6 5/8
_.....................................
; 6 1/4
...... ...... ...... ...... ...... ......
61/8
...... ...... ...... ...... ......
; 71/8
............................ ..................................
7 1/4
................................... ..................................................................................................................
1
6 1/4
IIIIIIIIIIIIIIII: IIIIIIIIIIII
.......................................................................
................................................................................
Banded CL....................................................................................................
169 ;RED-ORA
86'
6 5/8
6 7/8
61/8
71/8
7 7/8
1
6 7/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
170 ;RED-ORA
86'
6 5/8
6 3/4
6 1/8 .._
7 1/8
........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
7 3/4
1
6 3/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
Banded CL
171 ;RED-ORA
..................... ............................................ ........................................._....................................................................................................
86'
6 5/8
; 6 3/8
6 1/8
; 7 1/8 ;
............................... ..................................
7 3/8
.......................................
1
............. ...... ...... ...... ........
6 3/8
.............. ...... ........ .........
llllllllllllllll Illlllllllll l
............. ............. ._....... .......... ....... ........ .......................... .....
...... ..........
...... ...... ...... .............................. ....................... ........................ ...... ...... ...... ..........................................................
172 ;RED-ORA
86'
6 5/8
6 7/8
61/8
; 71/8
7 7/8
1
6 7/8
llllllllllllllll :IIIIIIIIIIII
.........................
173 ;RED-ORA
..................... ............................................ ...................................
86'
......_................................................................................................................................................................................................................................................................................................................................
6 5/8
61/4
61/8
71/8
71/4
1
6 1/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
....... .................. ......................................
........ ...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
174 ;RED-ORA
86'
6 5/8
6 7/8
61/8
; 71/8 ;
7 7/8
1
6 7/8
1111111111111111111111111111..........................................................................................................................................................................................................................
175 ;RED-ORA
..................................................................._...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
86'
6 5/8
; 7
61/8
; 71/8
8
1
7
IIIIIIIIIIIIIIII :IIIIIIIIIIII
176 ;RED-ORA
86'
6 5/8
6 7/8
6 1/8
7 1/8
7 7/8
1
6 7/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
177 :RED-ORA
..................... ............................................ .........................................
86'
6 5/8
_................................
7
....................................................................
61/8
71/8
_............................... ...................................
8
....................................... _...............................................................................................
1
7
1111111111111111 111111111111..........................................................................................................................................................................................................................
............... _................................
178 ;RED-ORA
86'
6 5/8
; 6 3/4
61/8
; 7 1/8 ;
..........................................................................................................................................................................................................
7 3/4
1
6 3/4
IIIIIIIIIIIIIIII' IIIIIIIIIIII I
..............................................................................................................................................................................................................................................
179 ;RED-ORA ........................................_..................................................................................................................................................................................................................................................................................................
86'
6 5/8
; 6 7/8
61/8
; 71/8
7 7/8
1
6 7/8
llllllllllllllll :IIIIIIIIIIII
180 :RED-ORA
..................... ....................................... ..... .......
86'
..................................
_6 5/8
................................
7
.................................. .................................
61/8
71/8
............................... ..................................
8
.......................................
1
.......................................
7
................................
IIIIIIIIIIIIIIII: IIIIIIIIIIII
....................................... ..............................
181 ;RED-ORA
86'
6 5/8
: 7 1 /8
6 1 /8
7 1 /8 :
8 1 /8
1
71/8
1111111111111111 l l I l I l I l l l l l l
182 ;RED-ORA
86'
6 5/8
; 7
61/8
..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
; 71/8
8
1
7
1111111111111111111111111111
183 :RED-ORA
86'
6 5/8
6 3/4
61/8
71/8
7 3/4
1
6 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
184 ;RED-ORA
86'
6 5/8
6 7/8
61/8
71/8
7 7/8
1
6 7/8
llllllllllllllll :IIIIIIIIIIII
11
MAYES TESTING ENGINEERS
M7171996.0042.2.xls
ID Tendon
.................................................................................................._.....................................................................................................................................
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location ;Remarks
/1
# Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross
Mark
Net
185 :RED-ORA
86'
6 5/8
7
61/8
71/8 '
8
1
7
IIIIIIIIIIIIIIII
... _.... _.... _........
IIIIIIIIIIII
_.....
186 ;RED-ORA
86'
6 5/8
: 6 3/4
6 1/8
7 1/8
7 3/4
1
6 3/4
IIIIIIIIIIIIIIII
IIIIIIIIIIII
187 :RED-oRA
86'
6 5/8
...........
7
61/8
71/8
8
1
7
IIIIIIIIIIIIIIII
.............................................................
IIIIIIIIIIII
188 :RED-ORA
..................... .....................................................................................
86'
6 5/8
_................................
6 3/4
....................................................................
6 1/8
7 1/8
_..................................................................
7 3/4
....................................... _
1
.......................................
6 3/4
................................
IIIIIIIIIIIIIIII
.......................... ............._...........
IIIIIIIIIIII
...... ....... .......
...................................... ................................................................................
....................................................................................................
189 :RED-ORA
..................... ........................ ................... .........................................
86'
6 5/8
_................................
: 6 1/2
.................................. .......................................................................................................................................................
6 1/8
: 7 1/8
7 1/2
1 ..... ...... ...... ........
: 6 1/2
........ ...... ...... ...... ......
IIIIIIIIIIIIIIII'
......... .......................
IIIIIIIIIIII
...... .............
...................... ...... ...... .................................................................................
....................................................................................................
190 RED-oRA
.............:........................................
86'
6 5/8
7
61/8
.......................
71/s
8
1
7
IIIIIIIIIIIIIIII
............................_..............................
;IIIIIIIIIIII
191 :RED-ORP
..................... .................. ..................................................................._.....................................................
86'
6 5/8
6 7/8
.............. .................................
6 1/8
7 1/8
_..........................................................................................
7 7/8
............... _.............................
1 ..........
: 6 7/8
.................................................................
IIIIIIIIIIIIIIII;
...
IIIIIIIIIIII
... _.................................
..........................................................................................................................................................................................................................
192 ;RED-ORA
86'
6 5/8
6 3/4
6 1/8
7 1/8
7 3/4
1
: 6 3/4
IIIIIIIIIIIIIIII;
IIIIIIIIIIII
193 : RED-SIL :
..................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
141'
10 1/2
.: 10 1/4
9 3/4
:11 1/4
11 1/4 :
1
10 1/4
1
1
Banded CK
194 RED-SIL :
141'
10 1/2
: 11 1/8
9 3/4
. :11 1/41
...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................
11 1/8 :
1
10 1/8
2
1
1
195 : RED-SIL : ........................................_...................................................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
141'
10 1/2
11 1/8
9 3/4
: 11 1/4
11
1
: 10
2 1/8
1
1 1/8
196 : RED-SIL :
141'
10 1/2
11
9 3/4
:11 1/4
10 1/4
1
: 9 1/4
2 3/4
1
1 3/4
Banded CK
197 RED-SIL
...................................................
141'
10 1 /2
10 7/8
9 3/4
.:11 1 /4 :
............................................................................................................................................................................................................................................................................................................................................................................................................................................................................
11 3/8 :
1
10 3/8
1 1 /2
1
1 /2
198 : RED-SIL : ........................................_...................................................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
141'
10 1 /2
: 11 1 /8
9 3/4
: 11 1 /4 :
11 1 /2 :
1
: 10 1 /2
1 5/8
1
5/8
199 : RED-SIL :
141'
10 1 /2
10 5/8
9 3/4
:11 1 /4
...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................
11 1 /8
1
: 10 1 /8
1 1 /2
1
1 /2
200 : RED-SIL .
..................... ............................................ .........................................
141'
10 1/2
_.........................................................................................................................................................................................................................................................................................................................
: 10 1/2
9 3/4
:11 1/4:
10 1/2 :
1
9 1/2
2
1
..... ................................................................................................................................................
1
....................................................................................................
201 : RED-SIL :
..................... ............................................ ........................................._...................................................................................................
141'
10 1/2
: 11
9 3/4
:11 1/41
............................... ..................................
12
.......................................
1
.......................................
11
................................
1
.......................................
1
................................
......................................
........ ...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
202 : RED-SIL :
141'
10 1 /2
10 7/8
9 3/4
11 1 /4
11 1 /4
1
: 10 1/4
1 5/8
1
5/8
203 : RED-SIL : .........................................
141'
10 1 /2
_...................................................................
: 10 7/8 .................................
9 3/4
:11 1 /4 :
............................... ..................................
11 5/8 :
.......................................
1
..............................................................................................................
10 5/8
1 1 /4
1
..... ...... .....................
1/4
............. ...... ...... ...... ...... ..........
...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
204 : RED-SIL :
141'
10 1/2
: 11
9 3/4
111 1/4:
12
1
11
1
1
205 : RED-SIL :
..................... ............................................ .........................................
141'
10 1 /2
_................................
: 10 1 /2
................................... .................................
9 3/4
: 11 1 /4 :
_............................... ...................................
11 1 /2 :
....................................... _...................................................................................................
1
: 10 1 /2
1 ...........
1
_.................. .......................................................................................................................................................................................................................................
206 : RED-SIL :
141'
10 1 /2
: 10 3/8
9 3/4
:11 1 /4
11 1 /8
1
: 10 1 /8
1 1 /4
1
1/4
207 : RED-SIL .
141'
10 1 /2
10 3/4
9 3/4
11 1 /4 :
11 1 /2 :
1
10 1 /2
1 1 /4
1
1/4
208 : RED-SIL :
141'
10 1 /2
_......
: 10 7/8
9 3/4
:11 1 /4 :
11 1 /2 :
1
10 1 /2
1 3/8
1
3/8
209 : RED :
141'
10 1/2
10 1/4
9 3/4
: 11 1/4
11
1
10
1 1/4
1
1/4
210 : RED-SIL :
141'
10 1 /2
: 10 5/8 ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
9 3/4
:11 1 /4 :
11 3/8 :
1
. 10 3/8
1 1 /4
1
1/4
211 : RED-SIL :
141'
10 1/2
: 10 1/4
9 3/4
111 1/4:
11
1
10
1 1/4
1
1/4
212 : RED-SIL :
141'
10 1/2
: 10 1/4
9 3/4
: 11 1/41
11
1
: 10
1 1/4
1
1/4
MAYES TESTING ENGINEERS
M7171996.0042.2.xls
ID Tendon
.........................................................................................................._................................................................................................................................................
Length
Calc
Actual
-Tol.
+Tol.
ERR.
.......................................
First End
Second End
Location Remarks
/1
# Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
213 RED-S I L
141'
10 1 /2
10 1 /2
9 3/4
11 1 /4
11 1 /4
1
10 1 /4
__
1 1 /4 1 1 /4
214 ; RED-S I L ;
..................... ............................................ .........................................
141'
_10 1/2:
...................................................................
10 1/2:
.................................
9 3/4
11 1 /4 ;
............................... ......................
.............
11 1 /4
................................. .......
1
............ ...... ...... ...... .......
10 1 /4
........ .................................................
1 1 /4 1 1 /4
... ............ ................................ ................... ...... ...... ......
.......... ...... ...... ...... ..................................................... ............................................ .........................................................
215 RE D-S I L
141'
10 1 /2
; 10 3/8
9 3/4
;11 1 /4 ;
11 1 /8
1
10 1 /8
1 1 /4 1 1 /4
216 ;RED-S I L ; ..........................................
..................... ............................................
141'
10 1 /2
_................................
10 5/8
....................................................................
9 3/4
11 1 /4
_...................................................................
11 1 /8
...................................... _.......................................
1
10 1 /8
................................
1 1 /2 1 1/2
....................................... _................................ ......................................
................................................................................ ....................................................................................................
217 ;RED-S I L ;
141'
10 1/2:
10 3/4
9 3/4
............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
:11 1 /4
11 1 /8
1
; 10 1 /8
1 5/8 1 5/8
218 rD-BLU-RE
69'
5 3/8
5 1/2
5
5 3/4
6 1/2
1
5 1/2
IIIIIIIIIIIIIIII' IIIIIIIIIIII'
Blockout
219 r-D-BLU-RE
69'
5 3/8
5 3/4 ......................................_........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
5
5 3/4
6 3/4
1
5 3/4
111111111111111 111IIIIIIIII
220 rD-BLU-RE
69'
5 3/8
; 5 3/8
5
5 3/4
6 3/8
1
5 3/8
1111111111111111 IIIIIIIIIIII
221 :D-BLU-RE
69'
_5 3/8
; 51 /8
................................................................................................................................................
........
5
53/4
61/8
..................................................................
51/8
IIIIIIIIIIIII .I ..I..I..I...I ..I..I..I...I
........................................................................
...............................................................................................................................................................................
222 D-BLU-RE
69'
5 3/8
5 1/2
5
5 3/4
6 1/2
1
5 1/2
IIIIIIIIIIIIIIII: IIIIIIIIIIII
Blockout
223 W-BLU-RE
69'
5 3/8
5 3/8
5
5 3/4
6 3/8
1
5 3/8
1111111111111I I I ;IIIIIIIIIIII..........................................................................................................................................................................................................................
224 D-BLU-RE
..................................................................._...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
69'
5 3/8
; 5 5/8
5
5 3/4
6 5/8
1
5 5/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
225 ED-BLU-RE
69'
5 3/8
5 3/8
5
5 3/4
6 3/8
1
5 3/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
226 D-BLU-RE
69'
5 3/8
5 1 /2
5
5 3/4
6 1 /2
1
51 /2
IIIIIIIIIIIIIIII :IIIIIIIIIIII
227 D-GRN-RI
119'
9
_..................................................................................................._................................................................................................................................................................................................................_........................................................................................................................................................................................................................................................
9
8 3/8
9 5/8
10
1
9
IIIIIIIIIIIIIIII :IIIIIIIIIIII
Banded CJ
228 D-GRN-Rf
119'
: 9
9 1/4
8 3/8
........................
9 5/8
.........................................................................................................................................
10 1/4 ;
1
9 1/4
Illlllllllllllll :IIIIIIIIIIII
.
D-GRN-RI
........................................................................................................._.................................................................................................................................................................................................................................................................................I.1..1..1.1..1.I
.
119'
9
91/4
83/8
95/8229
10 1 /4
1
9 1 /4
.... .I..I...I..I...I..I.I.I...I..I..I..I...I.........................................
...................................................................................................................................................................................
230 D-GRN-RI
119'
9
9 1 /8
8 3/8
; 9 5/8 ;
10 1 /8 ;
1
9 1 /8
I l l l l l l l l l I l l l l l I l l l l l l l l l l l
231 D-GRN-RI
119'
9
81 /2
8 3/8
; 9 5/s
91 /2
1
81 /2
I111111111111l11 11l111111111
232 D-GRN-Rf
119'
9
8 5/8
8 3/8
; 9 5/8
9 5/8
1
8 5/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
.............
233 D-GRN-RI
119
..................................................................
I..I...I..I..I...I...... .I...I..I..I..I...I.............................................................................................................................................................................................................................
234 D-GRN-RI
.........................................................................................................._..................................................................................................._................................................................................................................................................................................................
119'
9
8 3/4
8 3/8
9 5/8
9 3/4
1
8 3/4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
_.......................................................
................................................................................ ........................ ...... ...... ...... ..........................................................
235 D-GRN RI
119'
9
81/2
8 3/8
9 5/8
9 1/2
1
8 1/2
IIIIIIIIIIIIIIII :IIIIIIIIIIII
236 D-GRN-Ri
................................................
119'
9
9 1 /4
8 3/8
9 5/8
10 1 /4
1
9 1 /4
I111111I I I I I I I I I I I I I I I I I I I I1
237 D-GRN-RI
119'
9
9 1/8 ................................_........................................................................................................._.............................................................................................................._...............................................................................................................................................................................................................................................
8 3/8
9 5/8
10 1/8 ;
1
9 1/8
Illlllllllllllll Illlllllllll
238 D-GRN-RI
.........................................................................................................._..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
119'
9
8 3/8
8 3/8
; 9 5/8
9 3/8
1
8 3/8
Illlllllllllllll llllllllllll
239 D-GRN-RI
119'
9
8 3/8
8 3/8
9 5/8
9 3/8
1
8 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
240 D-GRN-RI
119'
9
8 3/8
8 3/8
9 5/8
9 3/8
1
8 3/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
MAYES TESTING ENGINEERS
M7171996.0042.2.xls
ID Tendon
................................................................................................_.....................................................................................................................................
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
.. ........
Location ;Remarks
/1
# Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
241 D-GRN-RI
119'
9
8 5/8
8 3/8
9 5/8
9 5/8
1
8 5/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
242 ED-SURE-RE
:.................. .......................... :........................................
106'
8 1/4
_...................................................................
8 5/8 .......................................................................................................................................................................................................................................................
7 5/8
8 7/8
9 5/8
1
8 5/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
......................................................................
.....
Banded CH
... ........................................................................ ....................................................................................................
243 ED-SI L-RE
106'
8 1 /4
8 1 /2
7 5/8
8 7/8
............
9 1 /2
1
8 1 /2
IIIIIIIIIIIIIIII IIIIIIIIIIII
...................................................................................................................................................................................................................................................................................
244 ED-SURE
..................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._.........................................................................................................................................................................................................................................................
106'
8 1/4
8 3/8
7 5/8
8 7/8
9 3/8
1
8 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
245 ED-SURE-RE .........................................
..................... ............................................ .
106'
8 1/4
_...................................................................
8 3/8 .................................
7 5/8
8 7/8
...............................
..................................
9 3/8
.............................. ......................
1 ...... ...... ...... ........
8 3/8
.............. ..... ..............
IIIIIIIIIIIIIIII IIIIIIIIIIII
.... .................................. .... ......................................
................................................................................
........................ ...... ...... ...... .................. ...... ...... ............................
246 ED-SURE-RE
106'
8 1/4
...........................................
8 3/8 ;................................................................,............................................
7 5/8
8 7/8
9 3/8 ,.......................................,.
1
8 3/8
......
IIIIIIIIIIIIIIII :IIIIIIIIIIII'
............................_........................................................................................................................................................................................................................................................
247D-SIL-RE
................................................................._....................................................................:................................_.........................................................................................................:.............................................................................................................._...................................................................................................................................................._
106'
8 1 /4
8 1 /4
7 5/8
8 7/8
9 1 /4
1
8 1 /4
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
....................................................................................................
248 W-SURE-RE
..................... ............................................ .........................................
106'
8 1/4
_................................
8 3/4
.................................. .................................
7 5/8
8 7/8
_...............................
..................................
9 3/4
............................... ......................................................................................................................_.......................................................................
1
8 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
Banded CH
................... ........... ................... ............................... ....................................................................................................
249 ED-SIL-RE
..................... ............................................ .........................................
106'
81/4
_...................................................................
8 .................................
7 5/8
8 7/8
...............................
..................................
9
.......................................
1
............. ...... ...... ...... ........
s
.......................... ......
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
......... ...... ...... .................................................................................
...... .....
.... ....... ...... ...... ...... ...... ...... ...... ...... ...... ................. ........................ ...... ...... ...... ..........................................................
250 'ZED -ORAL
68'
5
................................:..................................................................................................,................................................................................................................;.......................................................................,.......................................................................................................................................................,....................................................................................................
4 3/4
4 5/8
5 3/8
5 3/4
1
4 3/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII
Stressing blockout
251 ZED-oRA
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._..........................................................................................................................................................................................................................................................
68'
5
4 7/8
4 5/8
5 3/8
5 7/8
1
4 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
252 QED-OM
..................... .................. .......................... ....................................
68' ....._.
5
.............................................................
5 ......................................
4 5/8
5 3/8
...............................
..................................
6
.......................................
1
.......................................
5
........ ...... ...... ...... ......
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
......... ...... ...... ...... ..................................................................................
.........
...... ...... ...... ..................................................... ....................................................................................................
253 RED-ORA2
68'
5
4 3/4
4 5/8
5 3/8
5 3/4
1
4 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
254 RED -OM-
..................... ............................................ .........................................
68'
5
_................................
4 3/4
.............................. ...... .................................
4 5/8
5 3/8
_...............................
...................................
5 3/4
....................................... _.........................................................................................
1
4 3/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
......... ............_.....................................................................................................................................................
....................................................................................................
255 ZED -ORAL
68'
5
_............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
4 7/8
4 5/8
5 3/8
5 7/8
1
4 7/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
256 RED OM
..................... ............................................ .........................................
68'
5
_................................
5 3/8
.................................. .................................
4 5/8
5 3/s
...............................
..................................
6 3/8
.......................................
1
......................... ...... ........
5 3/8
........ ...... ...... ...... ......
IIIIIIIIIIIIIIII IIIIIIIIIIII
......... .......
257 RED -OM- ..........................................
..................... ............................................
68'
5
_...................................................................
51 /4 .................................
4 5/8
5 3/8
...............................
..................................
6 1 /4
.......................................
1
.......................................
5 1 /4
................................
IIIIIIIIIIIIIIII :IIIIIIIIIIII
....................................... ......................................................................
........ ...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
258 RED -OM
68'
5
5 3/8
4 5/8
5 3/s
6 3/8
1
5 3/8
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
259 RED -OM--
..................... ............................................ .........................................
68'
5
_...................................................................
5 3/8 .................................
4 5/8
5 3/8
..................................................................
6 3/8
.......................................
1
............. ...... ...... ...... ........
5 3/8
.............. ..... ..................
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
.... ...... .......................................................................................
...... ..........
...... ...... ...... ..................................................... ........................ ...... ...... ...... ..........................................................
260 QED-oRA
68'
5
5 3/8
4 5/s
5 3/s
6 3/s
1
5 3/8
IIIIIIIIIIIIIIII IIIIIIIIIIII
261 RED -OM
68'
5
51 /4
4 5/8
5 3/8
61 /4
1
51 /4
IIIIIIIIIIIIIIII
262 'ZED-ORA-
.........................................................................................................._.............................................................................................................................................................................................................................................................................................................
68'
5
5 1/2
4 5/8
5 3/8
1/8
6 1/2
1
5 1/2
IIIIIIIIIIIIIIII IIIIIIIIIIII
_...........................................................................................................................................................................................................................................
263 qED-ORAL
68'
5
51/4
4 5/8
5 3/8
61/4
1
5114
IIIIIIIIIIIIIIII IIIIIIIIIIII
264 QED-oRA
68'
5
5 3/8
4 5/8
5 3/s
6 3/8
1
5 3/8
IIIIIIIIIIIIIIII :IIIIIIIIIIII
265 RED -ORAL
.........................................................................................................._...................................................................................................._........................................................................................................._.............................................................................................................._...............................................................................................................................................................................................................................................
68'
5
5 1/2
4 5/8
5 3/8
1/8
6 1/2
1
5 1/2
IIIIIIIIIIIIIIII ;IIIIIIIIIIII
266 QED -ORAL
..................... ............................................ ........................................._................................
68'
5
5 1/2
.................................. .................................
4 5/8
5 3/8
...............................
1/8
..................................
6 1/2
.......................................
1
............. ...... ...... ..............
5 1/2
................................
IIIIIIIIIIIIIIII; IIIIIIIIIIII
...................................................................................................
........................................................................
................. ....................................................................................................
267 QED -ORAL
68'
5
5 1 /2
4 5/8
5 3/8
118
6 1 /2
1
5 1 /2
IIIIIIIIIIIIIIII I I I I I I I I I I I I
268 kED-OFW
68'
5
5
4 5/8
5 3/8
6
1
5
IIIIIIIIIIIIIIII :IIIIIIIIIIII
MAYES TESTING ENGINEERS
M7171996.0042.2.xls
ID Tendon
Length
Calc
Actual
-Tol.
+Tol.
ERR.
First End
Second End
Location Remarks 1
# Color
ft
Elon
Elon
7%
7%
FLAG
Gross
Mark
Net
Gross Mark Net
269 RED -ORAL
68'
5
51/4
4 5/8
5 3/8
'
61/4
1
51/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
27.0. ED-oRA ....................................
... ........... ............. ................... .... ....
68' ....._.................................
5
:5 1/4
................................. .................................
4 5/8
5 3/8
............................ ....
...... ...... ................... ....
61/4
......................................
1
.......................................
51/4
................................
IIIIIIIIIIIIIIII :IIIIIIIIIIII
...................................... ................................. ......................................
............................................................................... ....................................................................................................
271 QED-oRA
68'
5
51/4
4 5/8
5 3/8
61/4
1
51/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
272 RED-OFW
68'
5
51/4
4 5/8
5 3/8
61/4
1
51/4
IIIIIIIIIIIIIIII IIIIIIIIIIII
...................................................................................................................................................................................................................................................................
273 QED-RA
O2
68'
5
5 3/8
4 5/8
' 5 3/8
6 3/8
1
5 3/8
IIIIIIIIIIIIIIII' IIIIIIIIIIII
274 QED -ORAL
68'
5
5 1/4
4 5/8
5 3)
61/4
1
5 1/4
IIIIIIIIIIIIIIII :IIIIIIIIIIII °
tressing blockout
/11
MAYES TESTING ENGINEERS
M7171996.0042.2.xls
Distribution Page
Report Number: M7171996.0042
Service Date: 07/16/18
Report Date: 07/23/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -TENSION OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0043
Service Date: 07/17/18
Report Date: 07/26/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Partly cloudy
Performed a final inspection of Level 2 north post -tension (PT) slab. Contractor installed patio embeds along
grids C1' and C5. Per conversation with Todd Schoentrup additional # 5 reinforcing steel has been installed at
beam at grid line CB'/C1.9' due to the tendon clearances from where the tendons sweep out of the beam. Deck
has been cleaned off. Miscellaneous trim steel has been installed.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list
Reviewed By:
Timothy G. Beckerle, PE
Principal
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000l, 10-16-13, Rev.10 Page 1 of 1
Distribution Page
Report Number: M7171996.0043
Service Date: 07/17/18
Report Date: 07/26/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
i� Alrerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004413
Service Date: 07/18/18
Report Date: 07/24/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 0457 Plant: Everett
Truck No.: C144 Ticket No.: 108304
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result Specification
5
75
61
Laboratory Test Data
Set Specimen Avg Diam. Area
No. ID (in) (sq in)
I 1
1 2
1 3
1 4
Initial Cure: Cure Box
Sample Date:
07/18/18 Sample Time: 0550
Sampled By:
Armando Luaces
Weather Conditions:
Cloudy
Accumulative Yards:
70 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
5
Water Added After (gal):
Sample Location:
Placement Location:
Level 2 north post -tension slab.
Age at Maximum
Date
Date
Test Load
Received
Tested
(days) (lbs)
07/19/18
07/25/18
7
07/19/18
08/15/18
28
07/19/18
08/15/18
28
07/19/18
08/15/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Armando Luaces
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Compressive
Strength Fracture Tested
(psi) Type By
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004413
Service Date: 07/18/18
Report Date: 07/24/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 0644 Plant: Everett
Truck No.: C137 Ticket No.: 209579
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
5
76
61
Set Specimen Avg Diam. Area
No. ID (in) (sq in)
2 1
2 2
2 3
2 4
Initial Cure: Cure Box
Sample Date:
07/18/18 Sample Time: 0748
Sampled By:
Armando Luaces
Weather Conditions:
Cloudy
Accumulative Yards:
220 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
5
Water Added After (gal):
Sample Location:
Placement Location:
Level 2 north post -tension slab.
Age at Maximum
Date
Date
Test Load
Received
Tested
(days) (lbs)
07/19/18
07/25/18
7
07/19/18
08/15/18
28
07/19/18
08/15/18
28
07/19/18
08/15/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Armando Luaces
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Compressive
Strength Fracture Tested
(psi) Type By
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004413
Service Date: 07/18/18
Report Date: 07/24/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 0833 Plant: Everett
Truck No.: C141 Ticket No.: 209599
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
5 1/2
No.
ID
(in)
3
1
3.98
3
2
3.98
3
3
3.98
3
4
3
5
3
6
3
7
Initial Cure:
Cure Box
74
61
Sample Date:
07/18/18 Sample Time: 0930
Sampled By:
Armando Luaces
Weather Conditions:
Cloudy
Accumulative Yards:
370 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
6
Water Added After (gal):
Sample Location:
Placement Location:
Level 2 north post -tension slab.
Age at Maximum
Area
Date
Date
Test
Load
(sq in)
Received
Tested
(days)
(lbs)
12.44
07/19/18
07/23/18
5 F
65,580
12.44
07/19/18
07/23/18
5 F
65,840
12.44
07/19/18
07/23/18
5 F
64,840
07/19/18
07/25/18
7
07/19/18
08/15/18
28
07/19/18
08/15/18
28
07/19/18
08/15/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Armando Luaces
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Compressive
Strength
Fracture
Tested
(psi)
Type
By
5,270
2
ZSR
5,290
3
ZSR
5,210
3
ZSR
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 3 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004413
Service Date: 07/18/18
Report Date: 07/24/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 1027 Plant: Everett
Truck No.: C137 Ticket No.: 209619
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
5 3/4
No.
ID
(in)
4
1
3.98
4
2
3.98
4
3
3.98
4
4
4
5
4
6
4
7
Initial Cure:
Cure Box
76
61
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area
Date
Date
Test
Load
(sq in)
Received
Tested
(days)
(lbs)
12.44
07/19/18
07/23/18
5 F
64,700
12.44
07/19/18
07/23/18
5 F
65,230
12.44
07/19/18
07/23/18
5 F
65,710
07/19/18
07/25/18
7
07/19/18
08/15/18
28
07/19/18
08/15/18
28
07/19/18
08/15/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Armando Luaces
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
07/18/18 Sample Time: 1125
Armando Luaces
Partly Cloudy
500 Batch Size (cy): 10
Pump
8
Level 2 north post -tension slab.
Compressive
Strength
Fracture
Tested
(psi)
Type
By
5,200
2
ZSR
5,240
3
ZSR
5,280
3
ZSR
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 4 of 4
Distribution Page
Report Number: M7171996.0044B
Service Date: 07/18/18
Report Date: 07/24/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004413
Service Date: 07/18/18
Report Date: 07/27/18 Revision 1 - 7-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 0457 Plant: Everett
Truck No.: C144 Ticket No.: 108304
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
1 1 3.97
1 2
1 3
1 4
Initial Cure: Cure Box
Result Specification
5
75
61
Sample Date:
07/18/18 Sample Time: 0550
Sampled By:
Armando Luaces
Weather Conditions:
Cloudy
Accumulative Yards:
70 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
5
Water Added After (gal):
Sample Location:
Placement Location:
Level 2 north post -tension slab.
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.38 07/19/18
07/25/18
7 75,460
07/19/18
08/15/18
28
07/19/18
08/15/18
28
07/19/18
08/15/18
28
Final Cure: Moist Room
Compressive
Strength Fracture Tested
(psi) Type By
6,100 2 AWB
Comments: Compressive strength of 7 day cylinders complies with the 3 day specified strength. Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Armando Luaces
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004413
Service Date: 07/18/18
Report Date: 07/27/18 Revision 1 - 7-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 0644 Plant: Everett
Truck No.: C137 Ticket No.: 209579
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
2 1 3.97
2 2
2 3
2 4
Initial Cure: Cure Box
Result Specification
5
76
61
Sample Date:
07/18/18 Sample Time: 0748
Sampled By:
Armando Luaces
Weather Conditions:
Cloudy
Accumulative Yards:
220 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
5
Water Added After (gal):
Sample Location:
Placement Location:
Level 2 north post -tension slab.
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.38 07/19/18
07/25/18
7 81,520
07/19/18
08/15/18
28
07/19/18
08/15/18
28
07/19/18
08/15/18
28
Final Cure: Moist Room
Compressive
Strength Fracture Tested
(psi) Type By
6,590 3 AWB
Comments: Compressive strength of 7 day cylinders complies with the 3 day specified strength. Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Armando Luaces
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004413
Service Date: 07/18/18
Report Date: 07/27/18 Revision 1 - 7-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500
psi @
3 days
Sample Date:
07/18/18 Sample Time:
0930
5,000
psi @ 28 days
Sampled By:
Armando Luaces
Mix ID: 156000
Weather Conditions:
Cloudy
Supplier: Miles Sand and
Gravel
Accumulative Yards:
370 Batch Size (cy):
10
Batch Time: 0833
Plant:
Everett
Placement Method:
Pump
Truck No.: C141
Ticket No.:
209599
Water Added Before (gal):
6
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Level 2 north post -tension slab.
Slump (in):
5 1/2
Air Content (%):
Concrete Temp. (F):
74
Ambient Temp. (F):
61
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received
Tested
(days) (lbs)
(psi) Type
By
3 1 3.98
12.44
07/19/18
07/23/18
5 F 65,580
5,270 2
ZSR
3 2 3.98
12.44
07/19/18
07/23/18
5 F 65,840
5,290 3
ZSR
3 3 3.98
12.44
07/19/18
07/23/18
5 F 64,840
5,210 3
ZSR
3 4 3.98
12.44
07/19/18
07/25/18
7 81,020
6,510 3
AWB
3 5
07/19/18
08/15/18
28
3 6
07/19/18
08/15/18
28
3 7
07/19/18
08/15/18
28
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Compressive strength of 7 day cylinders complies with the 3 day specified strength. Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Armando Luaces
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 3 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004413
Service Date: 07/18/18
Report Date: 07/27/18 Revision 1 - 7-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500
psi @
3 days
Sample Date:
07/18/18 Sample Time:
1125
5,000
psi @ 28 days
Sampled By:
Armando Luaces
Mix ID: 156000
Weather Conditions:
Partly Cloudy
Supplier: Miles Sand and
Gravel
Accumulative Yards:
500 Batch Size (cy):
10
Batch Time: 1027
Plant:
Everett
Placement Method:
Pump
Truck No.: C137
Ticket No.:
209619
Water Added Before (gal):
8
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Level 2 north post -tension slab.
Slump (in):
5 3/4
Air Content (%):
Concrete Temp. (F):
76
Ambient Temp. (F):
61
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received
Tested
(days) (lbs)
(psi) Type
By
4 1 3.98
12.44
07/19/18
07/23/18
5 F 64,700
5,200 2
ZSR
4 2 3.98
12.44
07/19/18
07/23/18
5 F 65,230
5,240 3
ZSR
4 3 3.98
12.44
07/19/18
07/23/18
5 F 65,710
5,280 3
ZSR
4 4 3.98
12.44
07/19/18
07/25/18
7 77,810
6,250 2
AWB
4 5
07/19/18
08/15/18
28
4 6
07/19/18
08/15/18
28
4 7
07/19/18
08/15/18
28
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Compressive strength of 7 day cylinders complies with the 3 day specified strength. Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Armando Luaces
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: c
�N�'cha,'e_7�'ll S. Dolder, PE
Senior Principal
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 4 of 4
Distribution Page
Report Number: M7171996.0044B
Service Date: 07/18/18
Report Date: 07/27/18 Revision 1 - 7-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
i� Alrerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004413
Service Date: 07/18/18
Report Date: 08/16/18 Revision 2 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500
psi @
3 days
Sample Date:
07/18/18 Sample Time:
0550
5,000
psi @ 28 days
Sampled By:
Armando Luaces
Mix ID: 156000
Weather Conditions:
Cloudy
Supplier: Miles Sand and
Gravel
Accumulative Yards:
70 Batch Size (cy):
10
Batch Time: 0457
Plant:
Everett
Placement Method:
Pump
Truck No.: C144
Ticket No.:
108304
Water Added Before (gal):
5
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Level 2 north post -tension slab.
Slump (in):
5
Air Content (%):
Concrete Temp. (F):
75
Ambient Temp. (F):
61
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type
By
1 1 3.97
12.38
07/19/18 07/25/18
7 75,460
6,100 2
AWB
1 2 3.98
12.44
07/19/18 08/15/18
28 97,440
7,830 2
KWB
1 3 3.98
12.44
07/19/18 08/15/18
28 92,490
7,430 2
KWB
1 4 3.98
12.44
07/19/18 08/15/18
28 89,670
7,210 2
KWB
Average (28 days)
7,490
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Armando Luaces
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004413
Service Date: 07/18/18
Report Date: 08/16/18 Revision 2 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500
psi @
3 days
Sample Date:
07/18/18 Sample Time:
0748
5,000
psi @ 28 days
Sampled By:
Armando Luaces
Mix ID: 156000
Weather Conditions:
Cloudy
Supplier: Miles Sand and
Gravel
Accumulative Yards:
220 Batch Size (cy):
10
Batch Time: 0644
Plant:
Everett
Placement Method:
Pump
Truck No.: C137
Ticket No.:
209579
Water Added Before (gal):
5
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Level 2 north post -tension slab.
Slump (in):
5
Air Content (%):
Concrete Temp. (F):
76
Ambient Temp. (F):
61
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type
By
2 1 3.97
12.38
07/19/18 07/25/18
7 81,520
6,590 3
AWB
2 2 3.97
12.38
07/19/18 08/15/18
28 106,940
8,640 2
KWB
2 3 3.98
12.44
07/19/18 08/15/18
28 105,010
8,440 2
KWB
2 4 3.98
12.44
07/19/18 08/15/18
28 99,240
7,980 2
KWB
Average (28 days)
8,350
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Armando Luaces
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 2 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004413
Service Date: 07/18/18
Report Date: 08/16/18 Revision 2 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500
psi @
3 days
Sample Date:
07/18/18 Sample Time:
0930
5,000
psi @ 28 days
Sampled By:
Armando Luaces
Mix ID: 156000
Weather Conditions:
Cloudy
Supplier: Miles Sand and
Gravel
Accumulative Yards:
370 Batch Size (cy):
10
Batch Time: 0833
Plant:
Everett
Placement Method:
Pump
Truck No.: C141
Ticket No.:
209599
Water Added Before (gal):
6
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification
Placement Location:
Level 2 north post -tension slab.
Slump (in):
5 1/2
Air Content (%):
Concrete Temp. (F):
74
Ambient Temp. (F):
61
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received
Tested
(days) (lbs)
(psi) Type
By
3 1 3.98
12.44
07/19/18
07/23/18
5 F 65,580
5,270 2
ZSR
3 2 3.98
12.44
07/19/18
07/23/18
5 F 65,840
5,290 3
ZSR
3 3 3.98
12.44
07/19/18
07/23/18
5 F 64,840
5,210 3
ZSR
3 4 3.98
12.44
07/19/18
07/25/18
7 81,020
6,510 3
AWB
3 5 3.97
12.38
07/19/18
08/15/18
28 97,550
7,880 2
KWB
3 6 3.97
12.38
07/19/18
08/15/18
28 96,610
7,800 2
KWB
3 7 3.97
12.38
07/19/18
08/15/18
28 94,890
7,670 5
KWB
Average (28 days)
7,780
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Armando Luaces
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 3 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.004413
Service Date: 07/18/18
Report Date: 08/16/18 Revision 2 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 3,500 psi @ 3 days
5,000 psi @ 28 days
Mix ID: 156000
Supplier: Miles Sand and Gravel
Batch Time: 1027 Plant: Everett
Truck No.: C137 Ticket No.: 209619
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
5 3/4
No.
ID
(in)
4
1
3.98
4
2
3.98
4
3
3.98
4
4
3.98
4
5
3.97
4
6
3.97
4
7
3.97
Initial Cure: Cure Box
76
61
Area
(sq in)
12.44
12.44
12.44
12.44
12.38
12.38
12.38
Date
Received
07/19/18
07/19/18
07/19/18
07/19/18
07/19/18
07/19/18
07/19/18
Date
Tested
07/23/18
07/23/18
07/23/18
07/25/18
08/15/18
08/15/18
08/15/18
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at
Maximum
Test
Load
(days)
(lbs)
5 F
64,700
5 F
65,230
5 F
65,710
7
77,810
28
98,860
28
97,090
28
99,710
Average
(28 days)
Final Cure: Moist Room
07/18/18 Sample Time: 1125
Armando Luaces
Partly Cloudy
500 Batch Size (cy): 10
Pump
8
Level 2 north post -tension slab.
Compressive
Strength
Fracture
Tested
(psi)
Type
By
5,200
2
ZSR
5,240
3
ZSR
5,280
3
ZSR
6,250
2
AWB
7,990
3
KWB
7,840
2
KWB
8,060
2
KWB
7,960
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Armando Luaces
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 4 of 4
Distribution Page
Report Number: M7171996.0044B
Service Date: 07/18/18
Report Date: 08/16/18 Revision 2 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -TENSION OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0046
Service Date: 07/24/18
Report Date: 07/30/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Clear
Upon arrival, was informed the contractors were not ready for scheduled inspection. Spoke with the
superintendent and the inspection has been rescheduled for 07/25/18.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list
Reviewed By:
Timothy G. Beckerle, PE
Principal
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000l, 10-16-13, Rev.10 Page 1 of 1
Distribution Page
Report Number: M7171996.0046
Service Date: 07/24/18
Report Date: 07/30/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
i� Alrerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -TENSION OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0047
Service Date: 07/25/18
Report Date: 08/01 /18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Clear
Received the acceptance on the Level 2 north post -tension stressing log from Quantum Engineering, with the
exception of the (3) tendons that were not stressed at the beam along grid CB'. The contractor has torch -cut the
tendons and installed grease caps.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list
Reviewed By:
Timothy G. Beckerle, PE
Principal
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000l, 10-16-13, Rev.10 Page 1 of 1
Distribution Page
Report Number: M7171996.0047
Service Date: 07/25/18
Report Date: 08/01 /18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
i� Alrerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -INSTALLED ANCHORS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0049
Service Date: 08/08/18
Report Date: 08/14/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
On site to inspect the installation of post -installed anchors into existing detention vault per structural detail
18/S301 and RFI dated 08/07/18. Contractor epoxy grouted #5 90' hook bar dowels into existing vault slab with
6" embedment at 16" spacing; and 18" embedment at 16" spacing all around the perimeter of the vault. Holes
were drilled with a 3/4" diameter hammer drill bit and were cleaned with appropriate size nylon brush and
compressed air with extension nozzle in accordance with manufacturer printed installation instructions. The
adhesive used was Simpson Strong -Tie SET-XP (lot SET-XP22-N 1000007510, expiration 04/2020). An
adequate amount of adhesive was used to completely encapsulate the entire embedded portion of the dowels.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Marco Martinez
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0049
Service Date: 08/08/18
Report Date: 08/14/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -INSTALLED ANCHORS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0050
Service Date: 08/09/18
Report Date: 08/14/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
Inspected holes drilled for #4 horizontal dowel bars into columns for stem walls. Holes were drilled 6" deep and
proper cleaning with compressed air and wire brush was observed. Approved Simpson SET-XP (lot
1000005153, expiration 03/2020) was used. Locations: Grid lines CH from C8.6 to C11; C11 from CH to CJ; and
(1) column at grid lines C5/CA'.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Michael Mattox
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0050
Service Date: 08/09/18
Report Date: 08/14/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0051
Service Date: 08/10/18
Report Date: 08/16/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (5) 4x8" cylinders
On site for the following:
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
1- Reinforced concrete placement of structural topping slab over existing detention vault. Reinforcing was per
revised detail 18/S3.01-SSK 29; stem walls at grid lines CJ/C11 to CH/C9. Reinforcing was per detail
16/S.01. Contractor placed (40) cubic yards of Miles mix 155000PT by chute and vibrated. Cast (1) set of (5)
4x8" test cylinders for compressive strength testing (4000 psi at 28 days). Contractor requested a 3-day test
break.
2- Epoxy grouted dowel bar installation at column and walls for stem walls from grid lines CC/Cl to CA/C4.
Holes drilled to 6" embedment depth, cleaned, and Simpson SET-XP (lot 1000010421, expiration 03/2020)
was used to place and insert the #4 reinforcing steel dowels.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0051
Service Date: 08/10/18
Report Date: 08/16/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0051A
Service Date: 08/10/18
Report Date: 08/14/18
Task:
Client
Project
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC
Village at Westgate
Henbart, LLC
10032 Edmonds Way
Attn: Anthony Jansen
Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106
Project Number: M7171996
Material Information
Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 155000PT
Supplier: Miles
Batch Time: 0945 Plant:
Truck No.: C055 Ticket No.: 109349
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result Specification
6 4 -6
4.7 4.5 - 7.5
81 50 - 90
75
Sample Date:
08/10/18 Sample Time: 1050
Sampled By:
David Bernier
Weather Conditions:
Sun
Accumulative Yards:
4 Batch Size (cy): 10.5
Placement Method:
chute
Water Added Before (gal):
20
Water Added After (gal):
Sample Location:
vault lid
Placement Location:
Vault lid and stem walls.
Laboratory Test Data Age at
Set
Specimen
Avg Diam.
Area
Date
Date
Test
No.
ID
(in)
(sq in)
Received
Tested
(days)
1
a
3.98
12.44
08/13/18
08/13/18
3
1
b
4.00
12.57
08/13/18
08/17/18
7
1
c
4.00
12.57
08/13/18
09/07/18
28
1
d
4.00
12.57
08/13/18
09/07/18
28
1
e
4.00
12.57
08/13/18
09/07/18
28
Initial
Cure: Outside
in shade
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Maximum
Compressive
Load
Strength
(lbs)
(psi)
39,440
3,170
Fracture Tested
Type By
3 ZSR
Reviewed By: zzt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cR000t, 11-16-12, Rev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0051A
Service Date: 08/10/18
Report Date: 08/14/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0051A
Service Date: 08/10/18
Report Date: 08/20/18 Revision 1 - 7-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 155000PT
Supplier: Miles Sand and Gravel
Batch Time: 0945 Plant:
Truck No.: C055 Ticket No.: 109349
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result Specification
6 4 -6
4.7 4.5 - 7.5
81 50 - 90
75
Sample Date:
08/10/18 Sample Time: 1050
Sampled By:
David Bernier
Weather Conditions:
Sun
Accumulative Yards:
4 Batch Size (cy): 10.5
Placement Method:
chute
Water Added Before (gal):
20
Water Added After (gal):
Sample Location:
vault lid
Placement Location:
Vault lid and stem walls.
Laboratory Test Data Age at
Set
Specimen
Avg Diam.
Area
Date
Date
Test
No.
ID
(in)
(sq in)
Received
Tested
(days)
1
a
3.98
12.44
08/13/18
08/13/18
3
1
b
4.00
12.57
08/13/18
08/17/18
7
1
c
4.00
12.57
08/13/18
09/07/18
28
1
d
4.00
12.57
08/13/18
09/07/18
28
1
e
4.00
12.57
08/13/18
09/07/18
28
Initial
Cure: Outside
in shade
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Maximum Compressive
Load
Strength
(lbs)
(psi)
39,440
3,170
49,750
3,960
Fracture
Tested
Type
By
3
ZSR
2
HRB
Reviewed By: zzt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0051A
Service Date: 08/10/18
Report Date: 08/20/18 Revision 1 - 7-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0051A
Service Date: 08/10/18
Report Date: 09/10/18 Revision 2 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 4,000
psi @ 28
days
Sample Date:
08/10/18 Sample Time:
1050
Sampled By:
David Bernier
Mix ID: 155000PT
Weather Conditions:
Sun
Supplier: Miles Sand and
Gravel
Accumulative Yards:
4 Batch Size (cy):
10.5
Batch Time: 0945
Plant:
Placement Method:
chute
Truck No.: C055
Ticket No.:
109349
Water Added Before (gal):
20
Field Test Data
Water Added After (gal):
Sample Location:
vault lid
Test
Result
Specification
Placement Location:
Vault lid and stem walls.
Slump (in):
6
4 - 6
Air Content (%):
4.7
4.5 - 7.5
Concrete Temp. (F):
81
50 - 90
Ambient Temp. (F):
75
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type
By
1 a 3.98
12.44
08/13/18 08/13/18
3 39,440
3,170 3
ZSR
1 b 4.00
12.57
08/13/18 08/17/18
7 49,750
3,960 2
HRB
1 c 3.98
12.44
08/13/18 09/07/18
28 66,330
5,330 2
HRB
1 d 3.99
12.5
08/13/18 09/07/18
28 68,820
5,500 3
HRB
1 e 3.98
12.44
08/13/18 09/07/18
28 66,880
5,380 2
HRB
Average (28 days)
5,400
Initial Cure: Outside in shade
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0051A
Service Date: 08/10/18
Report Date: 09/10/18 Revision 2 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
WOOD FRAME OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0052
Service Date: 08/14/18
Report Date: 08/17/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
Inspected Level 3, floor diaphragm nailing at grid lines CH-CL from C6 to C11. Diaphragm nailing and nailing to
shear wall below were per plans. Strapping was not installed at time of inspection.
PRELIMINARY INSPECTION
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Barry Tuttle
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0052
Service Date: 08/14/18
Report Date: 08/17/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
WOOD FRAME OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0053
Service Date: 08/20/18
Report Date: 08/24/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Hazy
On site for the following:
1- Inspected diaphragm nailing, sheathing and blocking on Level 3 at grid lines CA to C6/C1 to C4. Verified
nailing, sheathing and blocking were per framing details and note 49/S1.01.
2- Verified Level 2 to Level 3 6x6" posts on perimeter (shown on S202c) had (4) A35 clips per detail 19/S4.02.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0053
Service Date: 08/20/18
Report Date: 08/24/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0054
Service Date: 08/20/18
Report Date: 08/28/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Item 1
Level 2: Inspected reinforcing for the closure strip at grid line CC'/Cl' to C4' and the stress pocket at grid lines
CL/C8. Verified reinforcing as per detail 8/S-302. Stress pockets have been previously grouted.
Item 2
Observed concrete placement of (7) cubic yards of Miles mix 155000PT at the following Level 1 locations:
A. The stem walls (6" wide by 24" high) at grid lines CA/Cl to C5, C1/CA to CC, C5/CA to CE, C4'/CA' to
CA.3 and C4'/CB' to CB.6. Reinforcing was previously verified.
B. The curb, 6" wide by 6" high by approximately 80' long in the southwest parking area.
Concrete was place via truck chute and wheelbarrow and mechanically consolidated. Cast (4) 4x8" test cylinders
for compressive strength testing requiring 4000 psi at (28) days.
Item 3
Inspected epoxy dowel installation for wall from Level L1 to L2 at grid line C11/CK to CL. Verified reinforcing and
embedment as per change order SSK-28. Simpson SET-XP (expiration 03/2020) adhesive was used. Holes
were brushed and blown clean.
Note: SSK-28 calls for dowels to be epoxied on all sides; horizontal in columns on both sides and verticals at top
and bottom of wall. Today, bottom and both sides were epoxied. Tops of wall dowels will be epoxied at a later
date.
PRELIMINARY INSPECTION
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Charles Solway
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0054
Service Date: 08/20/18
Report Date: 08/28/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0054A
Service Date: 08/20/18
Report Date: 08/28/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 155000PT
Supplier: Miles
Batch Time: 1037 Plant:
Truck No.: C115 Ticket No.: 210974
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
1 1 3.98
1 2
1 3
1 4
Initial Cure: Cure Box
Result Specification
5
5.4
81
67
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.44 08/21/18
08/27/18
7 54,900
08/21/18
09/17/18
28
08/21/18
09/17/18
28
08/21/18
09/17/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Charles Solway
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
08/20/18 Sample Time: 1215
Charles Solway
60's
7 Batch Size (cy): 7
Wheelbarrow
Curbs
Level L1 stem wall and curbs in
southwest parking area.
Compressive
Strength Fracture Tested
(psi) Type By
4,410 5 KWB
Reviewed By: zzt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0054A
Service Date: 08/20/18
Report Date: 08/28/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.0054A
Service Date: 08/20/18
Report Date: 09/18/18 Revision 1 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 4,000
psi @ 28
days
Sample Date:
08/20/18 Sample Time:
1215
Sampled By:
Charles Solway
Mix ID: 155000PT
Weather Conditions:
60's
Supplier: Miles Sand and
Gravel
Accumulative Yards:
7 Batch Size (cy):
7
Batch Time: 1037
Plant:
Placement Method:
Wheelbarrow
Truck No.: C115
Ticket No.:
210974
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Curbs
Test
Result
Specification
Placement Location:
Level L1 stem wall and curbs in
Slump (in):
5
southwest parking area.
Air Content (%):
5.4
Concrete Temp. (F):
81
Ambient Temp. (F):
67
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type
By
1 1 3.98
12.44
08/21/18 08/27/18
7 54,900
4,410 5
KWB
1 2 3.98
12.44
08/21/18 09/17/18
28 70,470
5,660 2
KWB
1 3 3.98
12.44
08/21/18 09/17/18
28 67,160
5,400 2
KWB
1 4 3.98
12.44
08/21/18 09/17/18
28 73,960
5,940 5
KWB
Average (28 days)
5,670
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Charles Solway
Reported To:
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0054A
Service Date: 08/20/18
Report Date: 09/18/18 Revision 1 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0055
Service Date: 08/23/18
Report Date: 08/28/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Cloudy
Item 1: Lateral Wood Framing Inspection
Inspected the nailing of the Level L3 floor sheathing between grid lines CA to CA'/C1 to C5. Nailing was found to
be per approved plans.
Item 2: Stair 3 Epoxy Doweling
Observed drilling and cleaning holes into hardened concrete walls for epoxy grouted dowels to be installed for
Stair 3 from Levels L1 to L2. Observed installation of (64) #4 horizontal dowels for the above -noted stair. The
epoxy operation was done according to RFI 31, and epoxy manufacturer's printed instructions. Epoxy adhesive
used was Simpson Strong Tie SET-XP (expiration 05/2020). Note: The reinforcement of the stairs was not
ready for inspection, contractor stated that they will have Mayes Testing Engineers (MTE) inspect it tomorrow
prior to concrete placement.
Item 3: Reinforcement Inspection
Verified the reinforcing steel, for size, grade, quantity, spacing, lap splice, and clearance, for the added wall from
Levels L1 to L2 at grid line C11/CL to CK. Inspection was performed according to RFI 34, which calls for #5
reinforcing at 12" on center each way; currently, there is #4 horizontal reinforcement installed. Contractor stated
that they will correct it, and have MTE re -inspect it tomorrow prior to concrete placement. Also, the contractor
stated that the (top) vertical epoxy grouted dowel installation into the Level L2 slab for the same wall will be
inspected prior to concrete placement (per contractor, the side and bottom epoxy grouted dowel operation was
previously inspected).
PRELIMINARY INSPECTION
Items 2 and 3 to be completed and verified prior to placement.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Ilir Dardania
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0055
Service Date: 08/23/18
Report Date: 08/28/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.005613
Service Date: 08/24/18
Report Date: 08/28/18
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID:
156000
Supplier:
Miles
Batch Time:
0644 Plant:
Truck No.:
c060 Ticket No.: 109883
Field Test Data
Test Result Specification
Slump (in): 6 4 - 6
Air Content (%):
Concrete Temp. (F): 69 50 - 90
Ambient Temp. (F): 62
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Date:
08/24/18 Sample Time: 0747
Sampled By:
David Bernier
Weather Conditions:
Overcast
Accumulative Yards:
5 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
Sample Location:
Closure strip
Placement Location:
Closure strip, wall and stair #3.
Laboratory Test Data Age at Maximum Compressive
Set
Specimen Avg Diam. Area
Date
Date
Test Load
Strength Fracture Tested
No.
ID (in) (sq in)
Received
Tested
(days) (lbs)
(psi) Type By
1
a 3.99 12.5
08/27/18
08/27/18
3 51,840
4,150 3 JHK
1
b
08/27/18
08/28/18
4
1
c
08/27/18
08/31/18
7
1
d
08/27/18
09/21/18
28
1
e
08/27/18
09/21/18
28
1
f
08/27/18
09/21/18
28
Initial
Cure: Outside Plastic Lids
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0056B
Service Date: 08/24/18
Report Date: 08/28/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.005613
Service Date: 08/24/18
Report Date: 09/04/18 Revision 2 - 7-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000 psi @ 28 days
Mix ID:
156000
Supplier:
Miles Sand and Gravel
Batch Time:
0644 Plant:
Truck No.:
c060 Ticket No.: 109883
Field Test Data
Test Result Specification
Slump (in): 6 4 - 6
Air Content (%):
Concrete Temp. (F): 69 50 - 90
Ambient Temp. (F): 62
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Date:
08/24/18 Sample Time: 0747
Sampled By:
David Bernier
Weather Conditions:
Overcast
Accumulative Yards:
5 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
Sample Location:
Closure strip
Placement Location:
Closure strip, wall and stair #3.
Laboratory Test Data Age at Maximum Compressive
Set
Specimen
Avg Diam.
Area
Date
Date
Test
Load
Strength
Fracture
Tested
No.
ID
(in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
By
1
a
3.99
12.5
08/27/18
08/27/18
3
51,840
4,150
3
JHK
1
b
3.98
12.44
08/27/18
08/28/18
4
63,700
5,120
2
KWB
1
c
3.98
12.44
08/27/18
08/31/18
7
68,250
5,490
2
HRB
1
d
08/27/18
09/21/18
28
1
e
08/27/18
09/21/18
28
1
f
08/27/18
09/21/18
28
Initial
Cure: Outside
Plastic Lids
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0056B
Service Date: 08/24/18
Report Date: 09/04/18 Revision 2 - 7-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171996.005613
Service Date: 08/24/18
Report Date: 09/24/18 Revision 3 - 28-day results
Task:
Client
Project - M7171996
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Permit No.: BLD2016-1538
Material Information Sample Information
Specified Strength: 5,000
psi @ 28
days
Sample Date:
08/24/18 Sample Time:
0747
Sampled By:
David Bernier
Mix ID: 156000
Weather Conditions:
Overcast
Supplier: Miles Sand and
Gravel
Accumulative Yards:
5 Batch Size (cy):
10
Batch Time: 0644
Plant:
Placement Method:
Pump
Truck No.: c060
Ticket No.:
109883
Water Added Before (gal):
0
Field Test Data
Water Added After (gal):
Sample Location:
Closure strip
Test
Result
Specification
Placement Location:
Closure strip, wall and stair #3.
Slump (in):
6
4 - 6
Air Content (%):
Concrete Temp. (F):
69
50 - 90
Ambient Temp. (F):
62
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date
Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received Tested
(days) (lbs)
(psi) Type
By
1 a 3.99
12.5
08/27/18 08/27/18
3 51,840
4,150 3
JHK
1 b 3.98
12.44
08/27/18 08/28/18
4 63,700
5,120 2
KWB
1 c 3.98
12.44
08/27/18 08/31/18
7 68,250
5,490 2
HRB
1 d 3.98
12.44
08/27/18 09/21/18
28 96,620
7,770 2
KWB
1 e 3.98
12.44
08/27/18 09/21/18
28 101,890
8,190 2
KWB
1 f 3.98
12.44
08/27/18 09/21/18
28 97,580
7,840 5
KWB
Average (28 days)
7,930
Initial Cure: Outside Plastic
Lids
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: zzt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000t, 11-16-12, xev.6 Page 1 of 1
Distribution Page
Report Number: M7171996.0056B
Service Date: 08/24/18
Report Date: 09/24/18 Revision 3 - 28-day results
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
WOOD FRAME OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0057
Service Date: 08/30/18
Report Date: 09/05/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
Inspected diaphragm nailing and nailing to shear wall below for the Level 4 diaphragm at grid lines C5.9 to C11
from CH to CL. Additionally, inspected strapping for parapet located at Level 4 on grid line C1 VCH to CL;
installed per detail 6/S403.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Barry Tuttle
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0057
Service Date: 08/30/18
Report Date: 09/05/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) W.G. Clark Construction Co, Kurt Robinson
(1) W.G. Clark Construction Co, Murph "Rex" Cruse
(1) W.G. Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
WOOD FRAME OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0058
Service Date: 09/06/18
Report Date: 09/10/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
On site for lateral wood framing inspection of Level 4 floor diaphragm sheathing and nailing at grid lines C5.9 to
CE/C1 to C4. Inspected sheathing and nailing per Notes 48/S101 and 2/S101 (6" edge nailing and 12" field
nailing with 8d nails, sheathing 23/32" tongue and groove, APA rated).
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0058
Service Date: 09/06/18
Report Date: 09/10/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
WOOD FRAME OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0059
Service Date: 09/07/18
Report Date: 09/13/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
On site for the following:
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Indoors
Item 1: Inspected all interior shear walls on Level 2 for sheathing, nailing, A35 clips and hold-downs. All walls on
this level are Type 3 per detail 10/S400; hold-downs were per schedule on S202C. Walls inspected are per plan
with the following exceptions:
A. Shear wall at grid line CC/Cl to C2 not complete.
B. At most corridors and bathroom shear walls, the contractor ran plywood into solid blocking and nailed (2)
rows — (1) at the rim and (1) into the solid blocking at edge nail pattern. This was done instead of using
A35 clips. Contractor needs to provide clarification from the engineer that this is acceptable.
Item 2: Verified all Level 3 to Level 4 perimeter 6x6" posts have A35 clips per detail 19/S4.02.
PRELIMINARY INSPECTION
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0059
Service Date: 09/07/18
Report Date: 09/13/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0060
Service Date: 09/12/18
Report Date: 09/17/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Partly cloudy
Inspected balance of Level 4 floor plywood nailing from previous inspections on 08/30/18 and 09/06/18. Floor
plywood nailing at Level 4 now complete at interior areas per the structural pans and details. Small north end
deck to be confirmed later.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Thomas Cain
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0060
Service Date: 09/12/18
Report Date: 09/17/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
WOOD FRAME OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0061
Service Date: 09/13/18
Report Date: 09/19/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Overcast
Shear walls for Level 3 were inspected. Nailing pattern, top clips and plate nailing were found to be per approved
plans and specifications. Most of the strapping is in place, but will not be nailed off until the building is loaded.
The contractor epoxy -grouted (6) 7/8" diameter all -thread rods to the Level 2 slab in Units 233, 226 and 225 per
SSK-30 and SSK-31. Holes were found to be of required 8" depth and were cleaned with brush and compressed
air. Simpson SET-XP two-part epoxy (lot 100000153, expiration 03/2020) was mixed and applied per Simpson's
directives.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Charles Edgerton
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0061
Service Date: 09/13/18
Report Date: 09/19/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
WOOD FRAME OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0062
Service Date: 09/21/18
Report Date: 09/26/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Overcast
Inspected diaphragm nailing and nailing to shear wall below. Diaphragm nailing was per plan. Location: Roof
Level at grid lines CB to C11 from CG to CL.5.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Barry Tuttle
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0062
Service Date: 09/21 /18
Report Date: 09/26/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
WOOD FRAME OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0063
Service Date: 10/01/18
Report Date: 10/05/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Rain
Inspected shear wall nailing, clip hardware and bottom plate connection. Nailing, clip hardware and bottom
connection installed per schedule 10/S400. Location: Level 4 at grid lines C1 to C11 from CB to CL.
Inspected A35 clip installation at 6x6 posts. The A35 clips are installed per detail 19/S402 and RFI 28. Location:
Level 4 exterior posts at balcony on grid lines C1 to C11 from CB to CL.
Inspected hold-down installation. Hold downs installed per schedule 15/S400. Location: Grid lines CA to C11
from CIF to CL.
Inspection of roof diaphragm nailing. Nailing installed per plan. Location: Roof Level at grid lines CB to CD from
C1 to C6.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Barry Tuttle
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0063
Service Date: 10/01 /18
Report Date: 10/05/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
WOOD FRAME OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0064
Service Date: 10/03/18
Report Date: 10/09/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Overcast
Inspected diaphragm nailing for roof. Nailing installed per plan. Location: Roof Level at grid lines CA to CH from
C1 to C5.
Inspected shear nailing for elevator penthouses and exterior shear walls. Shear nailing was per plan. Location:
Roof Level penthouses at grid lines CB to CC from C2' to C3'. Exterior walls from Level 2 to Level 4 and parapet
west of grid line CL/C5 to C11.
Inspected parapet connections to roof diaphragm. Parapet connections were per plan. Location: Roof Level at
grid lines C1 to C11 from CB to CL.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Barry Tuttle
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0064
Service Date: 10/03/18
Report Date: 10/09/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0065
Service Date: 10/16/18
Report Date: 10/19/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Clear
On site to verify and inspect the completion of exterior shear wall panel nailing.
All exterior walls were inspected from lines C1' x H' north around building to lines CA x C1, second floor to roof.
Nails were added where needed to meet specifications. Work is per details S202, S203 and S204.
On site to verify and inspect the completion of the erection and welding of the store front framing.
Exterior framing was inspected from lines C8 x C1 south around the east side of the building to lines C11 x CJ.
Note: 4" x 4" tube steel column bases at lines C8 x C1 and C5 were welded on (3) of (4) sides. The column at
lines C11 and CH was welded on (2) of (4) sides; and the 8" x 4" tube steel beam on line C11 from CJ to CH was
welded on (3) of (4) sides.
These field conditions were verbally approved by Quantum. Work and welding was per RFI 8.2, RFI 37 and AWS
D.1.1 criteria..
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Edward Bauman
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0065
Service Date: 10/16/18
Report Date: 10/19/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Sand & Gravel, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
WOOD FRAME OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0066
Service Date: 10/31/18
Report Date: 11 /05/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Overcast
Inspection of exterior shear wall nailing. The shear wall nailing is per plans. Locations: Level 2 to Roof parapet
at grid lines CA/C1 to C5, C1 to C5/CA to CH and C1 VCH to CL. Exterior shear nailing is complete.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Barry Tuttle
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0066
Service Date: 10/31 /18
Report Date: 11/05/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Resources, LLC, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
WOOD FRAME OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0067
Service Date: 12/20/18
Report Date: 12/26/18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLD2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Indoor
On site to inspect typical floor to floor hold-down straps at shear walls per detail 15/S400. Inspected all of Floor 3
upper and lower strapping. Any areas needing attention were completed prior to our departure.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0067
Service Date: 12/20/18
Report Date: 12/26/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Resources, LLC, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
STRUCTURAL STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0068
Service Date: 12/27/18
Report Date: 12/31 /18
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLDG 2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Cloudy
Level 2: Balcony Shear Clip Welding to Embed Plates
Visually inspected field welding of clips to embed plates to meet submittal 056 and details 1/101.10 and 19/S402
after a few undersized weldments were increased to 1/4" minimum specified size. Also, reviewed RFI 30,
requiring an added 3/4" thick weld plate welded to the existing embeds requiring a 5/16" fillet on (3) sides; all of
these welds were undersized and additional weldment was added to meet 5/16" minimum fillet weld size callout.
All weldments now meet AWS D1.1 visual acceptance criteria
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Todd Wirtz
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0068
Service Date: 12/27/18
Report Date: 12/31/18
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Resources, LLC, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0069
Service Date: 12/31/18
Report Date: 01 /04/19
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLDG 2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Clear
Level 3 framing plan S2.03.
Verified Level 2 to 3 transitional nailing of the vertical hold-down strapping per shear wall schedule at all interior
shear walls, with wrong strapping connection resolved at two (2) locations.
Typical balcony/clevis connections including Juliette balcony/clevis connections from underside of Level 3 to
underside of Level 4 were inspected this visit. Verified installations and connectors per detail 19/S4.02, and per
attached RFI's #28 and #40.
After missed rows of 10d nailing at 6" on center to joists were resolved at Juliette balcony, joists perpendicular,
and (2) loose through -bolt connections were tightened down. Note: Room 206 through -bolt connection at one
(1) location needs to be replaced and will get re -inspected next site visit.
PRELIMINARY INSPECTION
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Todd Wirtz
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
W.G.CLARK
CONSTRUCTION CO.
RFI# 28
Wood Framing Clarifications
Date Sent: 6/15/2018 RFI Source:
Request for Information
Project: 785 The Village at Westgate
W.G. Clark Construction
Needed by: 6/27/2018 Sub FQ Reference:
Priority Rating: High Document Ref.: G003;A301;A302;S202C-S205;S400-S403
Potential Schedule Impact: U Potential Cost Impact: U
Potential impact to: Wood framing, window installation/sizing, unit venting, balcony sizing, holdown
installation.
Location: All wood framing levels - everywhere.
Question:
Please see the attached RFI#28—Sk. I -Sk. 6 in reference to the following items:
1)Exterior header beams cannot be below or flush with the top of the double top plates due to the height of the
windows/doors/sliding doors — as shown per detail 10/S401. Please confirm it is acceptable to revise the typical
exterior hea
plates.
ier detail as shown in Sk.1, with the header beam being treated as a flush beam above
Confirmed; The exterior headers can be flush with the floor and roof
framing. See details 182/S402 for flush beam condition (where occurs).
Also, refer to Sk.1 for additional comments.
the double top
2)Please confirm it is acceptable to configure the interior wall typical header condition (12/S400) to be similar to
the exteri
:)r typical header — as a flush beam/header above the double top framing plates. See Sk.2
Confirmed; The interior flush headers are acceptable. See detail 11/S401
for additional information at flush beam end connection (where occurs).
3)Please confirm if placement of holdowns is supposed to be within the shear wall or outside of the shear wall.
Particularly, are there supposed to be holdowns on the exterior walls or corridor walls? We would prefer to keep
the holdowns within the shear walls — inside of the units, with the exception of the corridor walls clearly called -
out as SW -A
. See Sk.3 for locations in question.
Holdown locations on the structural plans are approximate and can be shifted slightly
to fit within the shear wall length noted. See Sk.3 for additional comments.
4)Window types W7, W 10, & W 19 rest on the bottom plate at L2; placement of anchor bolts is not achievable
below these windows without reducing the size of the windows. Please confirm it is acceptable to recess the
anchor bolt
Slate and nut as shown in SkA
Confirmed; It is acceptable to recess the anchor bolts (1" max) at
the exterior walls (as needed). See SkA for additional comments.
5)Please confirm it is acceptable to recess the balcony/railing weld plates to be flush with the exterior ply
sheathing; this method will facilitate waterproofing (future BE RFI), and will also reduce conflicts with depth of
siding and the plate nuts/bolts. See Sk.5
Confirmed; It is acceptable for the connection plates to be flush
with the exterior sheathing. See Sk.5 for additional comments
6)Please confirm it is acceptable to blockout the framing for unit venting as shown in Sk.6. Max opening size
anticipated is 16"xl6" inside dimensions).
Confirmed; The blockout for the unit venting ducts shown
on Sk.6 is acceptable at the exterior wall framing.
7)Please confirm it is acceptable to utilize Simpson Strong -Tie 5/8" Titen HD anchor bolts (5" embedment) at
locations where anchor bolts are required, but may have been lost during concrete placement at the L2 PT deck.
Confirmed; It is acceptable to use 5/8" dia. Titen HD screw anchors with 5" min. embed
(as needed) to attach the wall sill plates at the L2 PT deck. The contractor shall notify
the FOR (Quantum) prior to installing the anchors. In addition, all PT tendons and slab
reinforcement shall be located by X-ray prior to anchor installation.
1945 Yale Place E. • Seattle, WA 98102 Phone: (206) 624-5244 Fax: (206) 682-7126 www.wgclark.com
W.G.CLARK
CONSTRUCTION CO. Request for Information
Radar imaging will be conducted prior to placement.
8)Please confii
9)Please confii
VV/1LL I T I-C I I ZA" VV L/
CENTER WALL OF STAIRS
CONFIRMED- AZ/SMS
arally
required. 2x8 framing, as currently shown, may still be needed per energy requirements in order to fit insulation.
In essence, either option is structurally acceptable?
2x6 wall framing is structurally acceptable at the exterior walls.
(See email response dated 06/20/2018)
Sergio Ortega
Project Engineer
EMail sorte a ,wgclark.com
Response (indicate below or by attachment):
Respond to this address
W.G. Clark/Jobsite
10032 Edmonds Way
Edmonds, WA 98020
Phone:
2X6 R-21 WATT
ACCEPTABLE FOR
PERIMETER WALLS
SEE UPDATED RFI #17
RESPONSE FOR NEW
ENERGY CALCS - AZ/SMS
By: Todd Schoentrup (Quantum)
Date: 06/28/2018
1945 Yale Place E. • Seattle, WA 98102 Phone: (206) 624-5244 Fax: (206) 682-7126 www.wgclark.com
RFI#28 Sk.1
WHERE HEADER INTERRUPTS
DOUBLE TOP PLATE,
PROVIDE M5TA24 U.O.N.—
DOUBLE TOP PLATE
A35 AT EXTERIOR
HEADERS OVER
6-0" IN LENGTH —
(6) IOd-F NAILS —
PLATE KING STUD U I / EDOUBLE PLATE AT
IXTERIOR OPENIINNG5 1 \
TRIM STUD POST PER
PLAN AND DETAIL
HEADER PER PLAN,
12/5400 (AT EXTERIOR
WALL5, PROVIDE MIN. (2)
COORDINATE PLACEMENT OF
HEADERS WITH ARCH.
2x STUDS AT HEADERS
4'-0" AND LONGER)
IOd-F NAILS ® 8" O.G., TYP.
AT BUILT-UP STUDS
TYPICAL HEADER DETAIL 50ALe: NONE I 10
TOP CONNECTION bx P05T PER PLAN
PER I9/5403
35 EACH SIDE OF
OST w/ 8d COMMON
LON&
2, b" 36 NAIL5 @ 4" O.G.
MAX. TO BLK6.
4
4
BALCONY PER
PLAN, DESIGNED G520 STRAP w/
BY OTHERS (4) IOd NAILS TO
EACH BLK6.
RY"xb" w/ 'TER
BOLTS (3) BAYS OF%4' L5L
BLK6., ALI6N w/
BALCONY CONNECTION
FLY2NIO OYO" wl
(4) %`4) THRU-BOLTS RIM BEAM PER PLAN
® T' O.G. EACH WAY
fEY4'x2"x2" NA5HER5, TYP.
TYPICAL BALCONY CONNECTION (BOTTOM) scale: NONe I C+
Rim Joist Per Plan
Party Walls Beyond
6x6 Posts Per Plan
Confirmed; The flush header is
Flush Header Beam. acceptable per details 182/S402
Please confirm this is acceptable
Slider Door Opening
2x Exterior Wall Studs
3x Framing Plate L2 Only
2x Framing Plate a L3 & L4
la2x stud is required at edge of each 6x6 post
in order to provide room for A35 clip, as
shown on the right, as well as to allow for
the balcony clevis attachment t
outward and provide a wider bE
Some window configurations di
for more than (1) 2x at the edg(
due to the spacing between the
Please confirm the framing as
and to the right is acceptable.
Examples of where there is not
room to add more 2X studs incl
Types 131, A2, A3, & A4
Window Opening
Continuous Trimmer
Studs As Bearing Studs.
Please confirm this is
acceptable
OK; Provide (2) studs minimum at each
side of header at exterior wall (UO.N.)
King Studs Per Plan
RFI#28 Sk.2
EXTEND BEAM TO MATCH POST
Od F NAILS
DEPTH BELOW. ADD 50LID BLKG.
9
WHERE BEAM WIDTH<STUD WIDTH
STAGGERED
50LID WOOD BLKG.
BELOW POST
PER 7/5401, TYP.
SECTION A
PER PLAN II
II/5401
ALIGN FACE
1.
0/5401
OF P05T5,TYP.
HAND
BUILT-UP STUD
P05T PER
SCHEDULE
A
SPAN
v
BEAM
FLUSH BEAM CONDITION
P05T AT BEAM END SCHEDULE - INTERIOR WALL
Nailers for door
frame and casing
HEADER CONDITION
POST AT BEAM END SCHEDULE
BEAM
SPAN
NO OF 2x 5TUD5 IN
BUILT-UP POST ABOVE
L2
L3
L4
4'-0"
2/2
2/2
2/2
4'-0" - S'-0"
3/2
2/2
2/2
> 6-0"
4/5
3/2
2/2
ADD SOLID BLKG.
T1, NO. OF 2x& STUDS, TYP.
WHERE HDR WIDTH
e NO. OF 2x4 STUDS, TYP.
< STUD WIDTH
I.
USE HF#2 OR BETTER FOR ALL BUILT-UP POSTS
2.
THI5 TABLE DOES NOT APPLY TO HEADERS IN EXTERIOR
WALL5. SEE DETAIL 10/5401 FOP BEAM END POSTS AT
EXTERIOR WALL5.
BUILT-UP
3.
THI5 TABLE APPLIES UNLESS BUILT-UP STUD POSTS ARE
STUD P05T
SHOWN ON PLAN.
PER SCHEDULE
4.
EQUIVALENT OR GREATER GRO55-5ECTIONAL AREA OF
3x'5 OR 4x'5 MAY BE USED IN PLACE OF BUILT-UP 2x POSTS.
5.
USE DF#I FOR 4x& AND &x& POSTS.
SOALE: NONE
IL
Party walls beyond
Confirmed
Please confirm headers at unit
entries, and all unit interior doors
can be configured as a flush beam
condition per detail 12/S400
Typical door framing would be
configured as shown on the image
to the left.
Please confirm trimmer studs con
be used as bearing studs so long as
the trimmers are continuous from
bottom plate to top plate as shown
here.
N
irmed; Provide (2) fullht studs minimum at each of headers (UO.N.)
0
CE
CF
N
1A)
zo
�
�
19
F_
N
CLP
C1 C4' C2
C3'
13/5401
C2'
sj
C1'
13/5401
6+6
bj
bib
C3 C4 C5
I I I
D 'SOX \11 ''OX
I I I
Jb
5/5401
v
PRE-FABRI GATED
BALCONY TO BE
DE516NED A5 A
DEFERRED
SUBMITTAL, TYP. /
�\< �X
I0.
\'0.,
Preferred placement of holdowns near
exterior walls, and corridor walls is within
the unit party wall.
Locations within the plan below imply
placement of some of the H Ds are at the
exterior walls or within small sections of
corridor wall. Areas highlighted in red are
of greater concern wit the available
Stud Packs per room/wall, or placement near windows
HD Schedule that already have several posts/stud packs
to the sides.
Exterior Wall
Please confirm if there is flexibility with the
placement of the holdowns; what are the
parameters?
Particularly, can the highlighted HDs be
shear walls
placed on the inside of the corresponding
t is shown on
walls similar to the image on the left?
-ations
are acceptable
Preferred location is shown by yellow dots
lesign intent.
on the floor plan below.
HDU
Party Walls
HOLOOWN 50HEDULE
MARK
HOEDOWN / GAP
NO. STUDS
NO. STUDS
HI
HOU2 / 2.3K
(5) 2x4
(3) 2x6
H2
HOU4 / 3.3K
(5) 2x4
(4) 2x6
H3
HOU5 / 4.IK
(5) 2x4
(4) 2x6
H4
HDU8 / 5.7K
(6) 2x4
(4) 2x6
H5
HDUII / 8.IK
(6) 2x4
(5) 2x6
NOTES:
I. "NO. STUDS" 15 TOTAL NUMBER OF WALL END STUDS
Q A5 5HONN ON 20/5400, U.O.N. ON PLANS. STUDS
SHALL BE DF#2 OR BETTER.
2. THE HOEDOWN CAPACITIES SHOWN IN THE SCHEDULE
I ND I GATE THE REOU I RED ALLOWABLE TEN51 LE GAPAG I TY
OF THE THREADED R005 AND ANCHOR BOLTS.
AA3 , , J, \ \ /16/5505, TYP.
AT BALCONY — — — — — — — — — — — C G
r�
15/5401
i
H4� H4 ®r- I I ^ ®r- I I ®r-
2/54011I 12/5401
— — — I2/5401 — G
-— — — — — — — — — — 71
H3 �' I 1 s� I I I I I 12/5401
/ i r H5 l \
77J
Eel
-P' II x b
5W-3
GD
< X
12" GONG. POST-
TENSIONED SLAB. /8 ^ 13/5401
�+ `\ T.O. SLAB go/ _ I8/5401 13/5401 v
-4
Ncn®r-
12/5401
1
b+b
IL
----
I I I I I -
1 6 6 I I I I 6 I
I I I I I
I I I
15'-7" 26-3 1 /2" 23'-2" 12'-11 " 46-10 1 /2" 16-10 1 /2" 26-11 " 22'-5 1 /2" 21'-2" 23'-1 "
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11
LEVEL 2 AOOD FRAM I NG PLAN
SCALE: I/V = 11-0"
Stuu OMENG
STRAZZARA
ARCHITECTURE
PLANNING
CONSULTING
2001 WESTERN AVE SUITE 200
Seattle, WA USA 98101
206 587 3797 tel
206 587 0588
www.studioms.com
1511 THIRD AVENUE
SUITE 323
SEATTLE, WA 98101
TEL 206.957.3900
Q U A N T U M FAX 206.957.3901
CONSULTING ENGINEERS www.quantumce.com
CLIENT/OWNER
Westgate Village
LLC
Westgate
Edmonds
10032 EDMONDS WAY
EDMONDS, WA, 98020
TITLE
STAMP
KEY PLAN
PROJECT NUMBER
16369.01
ISSUED FOR:
DATE:
BUILDING PERMIT
3/15/17
BUILDING PERMIT
CORRECTION #1
6/23/17
2 BUILDING PERMIT
CORRECTION #2
9/29/17
3 BUILDING PERMIT
CORRECTION #3
11/20/17
CONSTRUCTION
ISSUE 11 /30/17
APPROVAL BY:
DRAWN BY: SC
CHECKED BY: TJS/SKK
SHEET CONTENTS
LEVEL 2 WOOD
FRAMING PLAN
SHEET NUMBER
S202C
RFI#28 SkA
3x8 Plate
Confirmed; The recessed anchor
bolts are acceptable at the
exterior walls (as required) for
the window/door locations.
Please confirm this configuration
is acceptable where required.
3"x3"x1/4" washer Required at AB locations below
plate within 41/2" WT W10, & W19 windows.
diameter countersink
Configuration may also be
required at interior locations
where walls are congested due
to stud packs/posts.
12" PT Deck The interior anchor locations will
need to be reviewed on an
individual basis (where required)
J-Bolt w/ 7"
embed per plan
If condition above is not permissible, another 2x
member will need to be added to the bottom framing
plate in order to conceal the anchor bolt; this will
reduce the size of the window by another 1 1/2".
RFI#28 Sk.5
DBL. TOP PLATE
A35 EACH SIDE OF P05T
TO TOP PLATE
6x POST PER PLAN
2'
6
52' 1/5402 $
3/4" MAX.)
MAX.
2/5402
AT SIM.
R Y211, TYP.
w/ I"0
#3 5.5. CLE:EACH
5.5. PIN AT END I
114 5.5. ROD
i4
rrP.
4
CANOPY/BALCONY
BOTTOM
CONNECTIONPER
PER PLAN, DESIGNED
111/5402
BY OTHERS
AND Ib/5303
TYPICAL CMOPY/BAILOMY CONNECTION (TOP) - DIAGONAL BRACE 56ALE: NONE
l C
TOP CONNECTION
bx P05T PER PLAN
PER 19/5403
A35 EACH 51DE OF
POST w/ Sd COMMON
NAILS (2VY LONG)
6"
Sd NAILS ® 4" O.G.
i4 MAX.
TO BLKG.
%4
BALCONY PERPLAN,
7DALCON'r
DE516NEDAP
w/
BY OTHERS
ILS TO
G.T
Y1"X6" w/ (2) %4"BOLTS
F 13/4" L5L
IGN w/
CONNECTION
T-
PER PLAN
R Y4"x2"x2" AA5HER5, TYP.
TYPICAL BALCONY CONNECTION (BOTTOM)
SCALE NorvEA
Please confirm it is acceptable to
recess the balcony clevis and bottom
connection knife plates so that face
of plate and ply sheathing are on the
same plane, as shown on the image
to the right.
6x6 Post
Clevis, or bottom
connection weld plate
Confirmed; The connection
plate may align with the
exterior sheathing as shown
on the right.
Ply Sheathing
MPlease confirm it is acceptable to
reverse the direction of the weld
plate bolts so the nuts are on the
inside of the building, as opposed to
the outside as shown on details
19/S402 & 19/S403.
3/4" re*Wil
on the clevis plate
bo tillbe required on the
inside of the 6x6 in order to allow F
the GWB to sit flush against the
post and not add additional furring
on the inside of the unit.
No recess required on the bottom
connection (19/S402).
1" (max) recess is acceptable at the
interior face of the 6x6 post to allow
for adequate thread length at the nut
Window
Frame
End of bolt at
inside of unit
N/01
2x
Weld Plate
RFI#28 Sk-6
Please confirm this arrangement is an acceptable
configuration where a typical 16" o.c. from bottom
plate to top plate would not allow sufficient room for
Unit Venting Ducts the unit venting spacing requirements.
Unit Venting
Opening Blocking
2x @ 16" o.c.
for Ply and GWB
attachment
Confirmed; The unit venting
is acceptable as shown at
the exterior wall framing.
(1'-6" max blockout width)
W.G.CLARK
CONSTRUCTION CO.
RFI# 40
Juliette Railing Connection
Request for Information
Date Sent: 9/6/2018
RFI Source:
Needed by: 9/11/2018
Sub FQ Reference:
Priority Rating: High
Document Ref.:
Potential Schedule Impact:
Potential impact to: Wood Framing; Juliette Railing Install
Location: Wood framed levels
Question:
Project: 785 The Village at Westgate
W.G. Clark Construction
S402
U Potential Cost Impact: U
Per conversation with EOR, it is our understanding that detail 5/S402 is to be applied at Juliette railings.
SEE SSK-35A
The following items are to be considered in the response.
- Detail 5/S402 shows only an I joist parallel condition. Please provide a detail for perpendicular joist condition.
- L3 and L4 joists have already been installed, so aligning the joists with the thru-bolt would not be
feasible at this time. SEE SSK-35 B
- The configuration of the balcony plates (per manufacturer - Submittal #63) differs from the channel shown on
5/S402
- Per manufacturer confirmation request, please confirm it is acceptable to use lag screws from the
outside of the knife plate to attach to the rim joist. BALCONY ATTACHMENT TO RIM JOIST/ B EAM
PER THE MANLFACTLRER'S DRAWINGS
- Please confirm it is acceptable to use lag screws from the HTT5 (inside building) to attach to the rim
joist.
- The lags from the outside and the lags from the inside will need to be offset from each
other. ICONFIRMED
- The Juliettes span 48" from center of post to center of post.
- Please confirm if more than l4 HTT5s are required per Juliette.
Provide (3) HTT5 equally spaced
Thanks. �(24" o.c. max) at each Juliette balcony.
Sergio Ortega
Project Engineer
EMail sortegakwtclark.com
Response (indicate below or by attachment):
See attached sketches (SSK-35A8B)
Respond to this address:
W.G. Clark/Jobsite
10032 Edmonds Way
Edmonds, WA 98020
Phone:
By: Todd Schoentrup (Quantum)
Date: 0 9/ 10 / 2 018
1945 Yale Place E. • Seattle, WA 98102 Phone: (206) 624-5244 Fax: (206) 682-7126 www.wgclark.com
NOTES:
I. FOR INFORMATION NOT
NOTED, SEE 2/5402.
BALCONY PER ARCH.
DE516NED BY OTHERS
5/ 8"0 x 5" LONG
LAG SCREW TO RIM, I/
TYP. AT HTT5 �
RIM BEAM PER PLAN
M4"xlI%a" MIN.)
WALL PER PLAN
(WHERE OCCURS)
1i
HTT3 AT EACH EDGE OF BALCONY
AND 24" O.G. IN BETWEEN w/ (26)
IOd NAILS TO BLOGKIN6
GM5TG16 STRAP x 4'-0". FILL ALL
NAIL HOLES w/ 16d SINKER NAILS,
AL 16N STRAP OVER BLOGKI N6
lot tttttj
-,Y2X 1 1 /a L-Jl-
MIN. (3) BAY5 AT
BALCONY CONN, TYP.
G520 STRAP x 4'-0"
FILL ALL NAIL HOLES
w/ IOd NAILS
1'-4" MIN.
2'-O" MAX.
DETAIL 5/S402, SIM.
QUANTUM I CONSULTING ENGINEERS
WESTGATE EDMONDS 09/10/2018 16369.02
1511 THIRD AVENUE project date project no.
SUITE323 JULIETTE BALCONY - JOISTS PARALLEL TJS
SEATTLE, WA 98101 designer sheet
TEL 206.957.3900
FAX 206.957.3901 STUDIO MENG STRAZZARA SSK-35A
www.quantumce.com client checked by
BALCONY PER ARCH.
DE516NED BY OTHERS
5/8"0 x 5" LONG �
LAG SCREW TO RIM, I/
TYP. AT HTT5 ,C
RIM BEAM PER PLAN
(5% "xl l%8" MIN.)
WALL PER PLAN
WHERE OCCUR5
HTT5 WITHIN 6" OF EACH
ED&E OF BALCONY AND
24" O.G. IN BETWEEN w/
(26) IOd NAILS TO J015T
2x WEB FILLER
BOTH 51DE5 w/ (2)
ROW5 OF IOd NAILS
6" O.G. TO J015T
Sd NAIL5
6" O.G. TO
J015T
NOTES:
FOR INFORMATION NOT
NOTED, 5EE 1/ S4 0 2
2. SEE SSK-35A FOR
BALCONY CONNECTION
AT JOIST PARALLEL TO
EXTERIOR WALL FRAMING
QUANTUM I CONSULTING ENGINEERS
WESTGATE EDMONDS
1511 THIRD AVENUE project
SUITE323 JILIETTE BALCONY - JOISTS PERPENDICILAR
SEATTLE, WA 98101
TEL 206.957.3900
FAX 206.957.3901 STIAIO MENG STRAZZARA
www.quantumce.com client
6k
09/10/2018 16369.02
date project no.
TJ S
designer sheet
SSK-35B
checked by
Distribution Page
Report Number: M7171996.0069
Service Date: 12/31 /18
Report Date: 01/04/19
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Resources, LLC, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Irerracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
POST -INSTALLED ANCHORS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0070
Service Date: 01/28/19
Report Date: 01 /30/19
Client
Westgate Village LLC
Henbart, LLC
Attn: Anthony Jansen
4025 Delridge Way SW
Seattle. WA 98106
Permit No.: BLDG-2016-1538
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Village at Westgate
10032 Edmonds Way
Edmonds, WA
Project No.
Weather:
M7171996
Sunny
Onsite to observe the drilling and epoxy grouting of (5) weld plates with (4) tieback anchors on each. Per RFI 51
dated 12/20/18, holes were drilled to depth, blown and brushed clean. Simpson SET-XP epoxy (expiration
07/07/20, lot 1000015948) was placed and plates were installed. At the (2) overhead plates, braces were placed
to keep plates from creeping.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By: �r-��
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
Distribution Page
Report Number: M7171996.0070
Service Date: 01 /28/19
Report Date: 01/30/19
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Resources, LLC, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Ire'rracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
EARTHWORK OBSERVATION REPORT MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171996.0071
Service Date: 05/02/19 20225 Cedar Valley Rd Ste 110
Report Date: 05/09/19 Lynnwood, WA 98036-6365
425-742-9360
Client Project
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Project No.: M7171996
Permit No.: BLD2016-1538
Samples: (1) Proctor
Weather: Cloudy
Conducted soils compaction tests along the previously installed and backfilled trenches for water lines. Attached
are compaction results and a map locating test locations.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Thomas Cain
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By
Terry Deroor
Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000l, 10-16-13, Rev.10 Page 1 of 1
MAYES TESTING ENGINEERS
AZrerracon coMPANY
Project Name: Village at Westgate
Project No.: M7171996.0071
Photo Attachment Page
Date: 05/02/19
fi' qP FlRC /
WA
It. VICE LI
12 F W' DF
RRE LANE
WATER IMPS kRE NOT LOCATED DOPING
VEY, AND ARE REPRESENTED BASED DN
AVON OF E}MNc VAL"B ABD
URTENANCES, AND HOPING AVAILABLE
AMAREN FROM OLINPIC NEW wATER AND
ER PSTRICT, LOCATOR
15 TO RE TAKEN
APIRRSINATE ONLY
Si YA1WNaf
5 01AIMI
r
E7'k'O[NER
Y
� , \,
w,a,below.
C8 ulil
N
Nou
a s
EN fK NYINANT 7 "_
/ +' ,ri0 fEdNNN
114 �VKulni RfxEW r. G"IV�I BP IwNW Otls
RFV"I a „r eisolT + WESTGATE MIXED USE WATE
o PERMITEDMONDS WAY AND 100TH AVE W
d 1Z
EDMONDS, WA
Photo Attachment Page 1 of 1
MAYES TESTING ENGINEERS
.Wrommw s°,, -
20225 Cedar }Val lay Road Suite 110 Ph 425.742.9360
L}-nnwood. WA 98036 Fax 425 745 1737
SOIL
FIELD DENSITY TEST REPORT
Page 1 of 1
Project No.: M7171996 Date: 5/2/2019
Project: Village at Westgate
Inspector: Tom Cain
Test
No.
Location
Depth or
Elevation
(feet)
Probe
Depth
(inches)
Moisture (%)
Dry Density (lb/cu.ft.)
Compaction
(%)
Compaction
Requirement
Minimum (%)
Pass
Fail
Type of Material and
Use
Optimum
Optimum
Corrected
Field
Test
Maximum
Corrected
Field
Test
1
see map
0
10
9.2
7.4
139.2
131.7
95%
95
x
MTE Lab #3331
2
see map
0
10
9.6
7.3
124.1
124.6
100%
95
x
PanGeo TP-1
3
see map
0
10
9.6
7.3
124.1
122.4
99%
95
x
PanGeo TP-1
4
see map
0
10
9.2
8.6
139.2
131.5
94%
95
x
MTE Lab #3331
5
see map
0
10
7.3
8.6
124.1
118
95%
95
x
PanGeo TP-1
6
see map
0
10
9.2
7.4
139.2
132
95%
95
x
MTE Lab #3331
7
see map
0
10
9.2
9
139.2
132.3
95%
95
x
MTE Lab #3331
Compaction Standard Used
WSDOT T606 WSDOT FOP for AASHTO T180 F ASTM D698 ASTM D 1557 x
Compaction Test Method Used
WSDOT FOP for AASHTO T310 ASTM D6938 x
Comments:
MTE Nuclear Gauge No.:
25 Density Std. Count:
Moisture Std. Count:
MTE 1400-2C, Rev 4,11.01.17
Distribution Page
Report Number: M7171996.0071
Service Date: 05/02/19
Report Date: 05/09/19
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Resources, LLC, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Ire'rracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
nCedar
WA 980 6636511 o
Lynnwood, MA YES TES Tf G ENGINEERS
425-742-9360
n lrereaoan COMPANY
LABORATORY COMPACTION CHARACTERISTICS OF SOIL REPORT
Report Number: M7171996.0071A
Service Date: 05/02/19
Report Date: 05/07/19
Task:
Client Project
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Project No. M7171996
Laboratory Reference # 3331
Sample Description: Tan silty sand with gravel Delivered By: T. Cain
Sample Location: On site water trenches Date Sampled: 5/2/2019 Date Delivered: 5/2/2019
Sampled By: T. Cain
Test Results:
Test Method: ASTM D-1557 Method B / C 127 / D 4718 (if needed)
139.2 pcf @ 6.3 %
See attached analysis sheet
Material sampled in accordance with aooroariate standard. (ASTM D75. AASHTO T2)
Services: Special Inspection/Materials Testing
Tested By: Hanna Birkvold
Report Distribution
See attached distribution list. p� ywgvrt u �t {fit ice+
Reviewed By:
Zenaida Revilla
Laboratory Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full
without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other
apparently similar or identical materials.
cT0002, 10-16-13, Rev.8 Page 1 of 1
MAYES TESTING ENGINEERS, INC.
A lfeffa[Ofl COMPANY
20225 Cedar Valley Road, Suite 110 Ph 425-742-9360
Moisture Density Relationship Test
Lynnwood, WA 98036 Fax 425-745-1737
Client: Westgate Village LLC
Report Date: 5/7/2019
Seattle, WA
Date Tested: 5/6/2019
Project: Village at Westgate
Project Number: M7171996
Test Method: ASTM D-1557 Method B / C 127 / D 4718 (if needed) Lab Number: 3331
Mechanical X
Wet Preparation F-]
Test Results
Dry Preparation Hand Tamper
Optimum Water Content % 1 6.3
Date Received: 5/2/2019
Max Dry Density lbs/ft'l 139.2
Source of Sample: On site water trenches
Sieve Analysis
Description of Sample: Tan silty sand with gravel
Sieve Size Percent Retained
ssumed Bulk Specific Gravity of Oversize: 2.67
3/4 11 %
ero Void line plotted at an assumed SpG of: 2.68
3/8 20%
ax. Density Uncorrected: 133.8
#4 28%
141
140
139
138
137
134
133
132
131
130
0.0
I I I I I I I I I I I I I
Maximum Dry Density
139.2 pcf
Optimum Water Content
6.3 %
1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0
Water Content, % of dry Weight
Tested By: H. Birkvold
Information in this report applies only to the actual samples tested and shall not be reproduced except in full, without the approval of Mayes Testing Engineers, Inc.
M7171996.0071A.1/5/7/2019 MTE Form # 149, Rev 2, 6/02
Distribution Page
Report Number: M7171996.0071A
Service Date: 05/02/19
Report Date: 05/07/19
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Resources, LLC, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Ire'rracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
STRUCTURAL STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
Arerracan co.....
Report Number: M7171996.0072
Service Date: 05/30/19
Report Date: 06/04/19
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Client Project
Westgate Village LLC Village at Westgate
Henbart, LLC 10032 Edmonds Way
Attn: Anthony Jansen Edmonds, WA
4025 Delridge Way SW
Seattle, WA 98106 Project No.: M7171996
Permit No.: BLD2016-1538
Samples: N/A
Weather: --
Inspected structural steel erection, welding, and bolting for (3) entry canopies at retail spaces. Confirmed
connections conform to the structural plans with welds visually acceptable per AWS D-1.1.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Thomas Cain
Reported to: WG Clark Construction Company
Contractor: WG Clark Construction Company
Report Distribution:
See attached distribution list.
Reviewed By
Terry Deroor
Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000l, 10-16-13, Rev.10 Page 1 of 1
Distribution Page
Report Number: M7171996.0072
Service Date: 05/30/19
Report Date: 06/04/19
Task:
Distribution List
(1) Westgate Village LLC, Anthony Jansen
(1) City of Edmonds WA, Leif Bjorback
(1) City of Edmonds WA, Milton Thompson
(1) Henbart, Anthony Jansen
(1) Mayes Testing Engineers, Inc, Trip Edgerton
(1) Miles Resources, LLC, Michael Craig
(1) Quantum Consulting Engineers, Sandro Kodama
(1) Quantum Consulting Engineers, Todd Schoentrup
(1) Studio Meng Strazzara Architects, Alex Ziemba
(1) Studio Meng Strazzara Architects, Chris Davidson
(1) WG Clark Construction Co, Kurt Robinson
(1) WG Clark Construction Co, Murph "Rex" Cruse
(1) WG Clark Construction Co, Sergio Ortega
MAYES TESTING ENGINEERS
A Ire'rracon COMPANY
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360