Loading...
M7171248.1020ARev2CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: M7171248.1020A Service Date: 11/20/17 Report Date: 01/16/18 Revision 2 - 56-day results Task: Client Edmonds School District #15 Attn: Julie Martin 20420 68th Avenue West Lynnwood, WA 98036 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: 40TR435 Supplier: Cadman Concrete Batch Time: 0615 Plant: Monroe Truck No.: 346 Ticket No.: 439488 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Result Specification 6 58 49 Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 a 4.00 1 b 4.00 1 c 4.00 Area Date (sq in) Received 12.57 11/21/17 12.57 11/21/17 12.57 11/21/17 Project - M7171248 MAYES TESTING ENGINEERS alrerra[on CO"A" 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Edmonds SD Madrona K-8 Replacement 9300 236th St SW Edmonds, WA Permit No.: BLD2017-0041 Sample Information Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: 11/20/17 Sample Time: 0802 Yavita Kotomaimoce Rain 20 Batch Size (cy): 11 Pump 10 Truck chute Slab -on -grade area for the Audio /DHH SLP Room 110, HH PSYCH/ Counselling Room 100, SLP Room 108, West end of the Boiler/Mechanical Room 125, Common Storage Room 127, Electrical Room 128. Age at Maximum Date Test Load Tested (days) (lbs) 11/27/17 7 38,920 12/18/17 28 48,540 12/18/17 28 49,340 Average (28 days) Compressive Strength Fracture (psi) Type 3,100 2 3,860 2 3,930 3 3,890 1 d 4.00 12.57 11/21/17 01/15/18 56 53,830 4,280 2 Initial Cure: Onsite Cooler Final Cure: Moist Room Comments: Compressive strength of 56 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Mayes Testing Engineers, Inc. Services: Special Inspections / Materials Testing Mayes Testing Engineers, Inc. Rep.: Yavita Kotomaimoce Reported To: Contractor: FORMA Construction Company Report Distribution: See attached distribution list. Reviewed By: zzt?-:1 � Robert Gardner Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cx000t, 11-16-12, xev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: M7171248.1020A Service Date: 11 /20/17 Report Date: 01/16/18 Revision 2 - 56-day results Task: Distribution List (1) City of Edmonds WA, Milton Thompson (1) Coughlin Porter Lundeen, Laura Nettesheim (1) Coughlin Porter Lundeen, Rachel Vranizan (1) Edmonds School District #15, Michael Nelson (1) Edmonds School District #15, Taine Wilton (1) Forma Construction Company, Ben Guttromson (1) Forma Construction Company, Jason Pennington (1) Forma Construction Company, Loren Calvert (1) Forma Construction Company, Morgan Salcido (1) Forma Construction Company, Pat Saum (1) Mahlum Architects, Brandon Moggio (1) Mahlum Architects, Corrie Rosen (1) Mayes Testing Engineers, Inc, Tom Cain (1) Shannon & Wilson Inc, Martin Page MAYES TESTING ENGINEERS A Irerracon COMPANY 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360