SPECIAL INSPECTIONS MAGICCONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0008A
Service Date: 10/10/17
Report Date: 11/08/17 Revision 1 - 28-day results
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 0260A6P
Supplier: Miles Sand & Gravel
Batch Time: 0644 Plant:
Truck No.: C186 Ticket No.: 197518
Field Test Data
Test Result Specification
Slump (in): 5
Air Content (%): 5.0
Concrete Temp. (F): 65
Ambient Temp. (F): 45
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2016-1684
Sample Information
Sample Date:
10/10/17 Sample Time: 0806
Sampled By:
Ilir Dardania
Weather Conditions:
Cloudy
Accumulative Yards:
20 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
Placement Location:
Detention Vault Lid. Total of 50
cubic yards placed.
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg
Diam.
Area
Date
Date
Test
Load
Strength
Fracture
No. ID
(in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
1 A
3.99
12.5
10/11/17
10/17/17
7
65,390
5,230
2
1 B
4.00
12.57
10/11/17
11/07/17
28
74,160
5,900
2
1 C
4.00
12.57
10/11/17
11/07/17
28
77,010
6,130
2
1 D
4.00
12.57
10/11/17
11/07/17
28
76,920
6,120
2
Average (28 days)
6,050
Initial Cure: Cure Box
Final Cure: Moist Room
Min Temp: 0
Max Temp:
0
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic
unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Ilir Dardania
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Leif Bjorback Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
MAYES TESTING ENGINEERS
Report Number: M7171461.000813
alre«acon CO"A"
Service Date: 10/10/17
20225 Cedar Valley Rd Ste 110
Report Date: 11/08/17 Revision 1 - 28-day results
Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2016-1684
Material Information
Sample Information
Specified Strength: 3,000 psi @ 28 days
Sample Date:
10/10/17 Sample Time: 0950
Sampled By:
Ilir Dardania
Mix ID: 025003P
Weather Conditions:
Overcast
Supplier: Miles Sand & Gravel
Accumulative Yards:
10 Batch Size (cy): 10
Batch Time: 0827 Plant:
Placement Method:
Pump
Truck No.: C183 Ticket No.: 197535
Water Added Before (gal):
15
Field Test Data
Water Added After (gal):
0
Sample Location:
Test Result Specification
Placement Location:
Elevator Pit Footing at grid lines
Slump (in): 5
E.1/4.1, and at the following Spread
Air Content (%):
Footings: E/4, G/4, G/3.5, G/3, G/2,
Concrete Temp. (F): 64
E.5/1.2, E/2, E/3, D.5/2, D/3, D/4,
Ambient Temp. (F): 50
C.5/2, C/2, C/3, C/4, B.5/2, and
Plastic Unit Wt. (pcf):
A.5/4. Total of 60 cubic yards placed.
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum Compressive
Set Specimen Avg Diam. Area Date
Date Test
Load Strength Fracture
No. ID (in) (sq in) Received
Tested (days)
(lbs) (psi) Type
2 A 3.99 12.5 10/11/17
10/17/17 7
50,770 4,060 2
2 B 4.00 12.57 10/11/17
11/07/17 28
66,720 5,310 2
2 C 4.00 12.57 10/11/17
11/07/17 28
67,790 5,390 2
2 D 4.00 12.57 10/11/17
11/07/17 28
67,020 5,330 2
Average (28 days) 5,350
Initial Cure: Cure Box Final Cure: Moist Room Min Temp: 0 Max Temp: 0
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Ilir Dardania
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung
(1) Foushee & Associates, Inc., Craig Miller
(1) Foushee & Associates, Inc., Paul Wasell
Test Methods:
(1) City of Edmonds WA, Leif Bjorback
(1) Foushee & Associates, Inc., Jeremy Webb
(1) Mayes Testing Engineers, Inc, Todd Wirtz
Reviewed By: ZZ, _
Robert Gardner
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page I of I
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0010A
Service Date: 10/18/17
Report Date: 11/16/17 Revision 1 - 28-day results
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 3,000 psi @ 28 days
Mix ID:
025003P
Supplier:
Miles Sand and Gravel
Batch Time:
0600 Plant:
Truck No.:
114 Ticket No.: 197948
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
4
60
49
Set Specimen
Avg Diam.
No. ID
(in)
1 a
3.99
1 b
3.98
1 cd
3.98
1 d
3.98
Area
Date
(sq in)
Received
12.5
10/19/17
12.44
10/19/17
12.44
10/19/17
12.44
10/19/17
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2016-1684
Sample Information
Sample Date:
10/18/17 Sample Time: 0800
Sampled By:
David Schmutzler
Weather Conditions:
Cloudy
Accumulative Yards:
5 Batch Size (cy): 5
Placement Method:
Pump
Water Added Before (gal):
5
Water Added After (gal):
Sample Location:
Placement Location:
Elevator pit walls and adjoining
plinth.
Age at Maximum
Date
Test
Load
Tested
(days)
(lbs)
10/25/17
7
52,250
11/15/17
28
68,730
11/15/17
28
66,220
11/15/17
28
70,770
Average (28 days)
Compressive
Strength
Fracture
(psi)
Type
4,180
2
5,520
2
5,320
2
5,690
2
5,510
Initial Cure: Cure Box Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Total of 5 cubic yards placed
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Leif Bjorback Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Donna Pollard Senior Project Field Manager
(1) Mayes Testing Engineers, Inc, Todd Wirtz
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0011A
alre«aconCO =A"
Service Date: 10/19/17
20225 Cedar Valley Rd Ste 110
Report Date: 11/17/17 Revision 1 - 28-day results
Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2016-1684
Material Information
Sample Information
Specified Strength: 3,000 psi @ 28 days
Sample Date: 10/19/17 Sample Time:
Sampled By: Carl Reynolds
Mix ID: 025003P
Weather Conditions: Rain
Supplier: Miles Sand and Gravel
Accumulative Yards: 138 Batch Size (cy): 10
Batch Time: 0600 Plant:
Placement Method: Pump
Truck No.: C138 Ticket No.: 96870
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test Result Specification
Placement Location: Footings, grids 7.5 to 12/A to H
Slump (in): 5
Air Content (%):
Concrete Temp. (F): 74
Ambient Temp. (F): 63
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum Compressive
Set Specimen Avg Diam. Area Date
Date Test Load Strength Fracture
No. ID (in) (sq in) Received
Tested (days) (lbs) (psi) Type
1 a 4.00 12.57 10/20/17
10/26/17 7 47,720 3,800 2
1 b 4.00 12.57 10/20/17
11/16/17 28 65,140 5,180 2
1 c 4.00 12.57 10/20/17
11/16/17 28 63,500 5,050 2
1 d 4.00 12.57 10/20/17
11/16/17 28 66,070 5,260 2
Average (28 days) 5,160
Initial Cure: Cure Box Final Cure: Moist Room Min Temp: 0 Max Temp: 0
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Leif Bjorback Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0013A
Service Date: 10/26/17
Report Date: 11/03/17
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 3,000 psi @ 28 days
Mix ID:
025003p
Supplier:
Miles sand and gravel
Batch Time:
0618 Plant:
Truck No.:
C115 Ticket No.: 198414
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result Specification
5
64
53
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
1 1 3.99
1 2
1 3
1 4
Initial Cure: Cure Box
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2016-1684
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Area Date
Date
(sq in) Received
Tested
12.5 10/27/17
11 /02/ 17
10/27/17
11/23/17
10/27/17
11/23/17
10/27/17
11/23/17
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Anas Mandi
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Leif Bjorback
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
10/26/17 Sample Time: 0720
Anas Mandi
Cloudy
10 Batch Size (cy): 110
Pump
15
From chute of truck
Wall and column footings on grids
H/1 to 8, 5/A to H, l/A to H and A/1
to 7.5.
Age at
Maximum
Test
Load
(days)
(lbs)
7
39,560
28
28
28
Compressive
Strength Fracture
(psi) Type
3,160 2
Reviewed By: ZZt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0013A
Service Date: 10/26/17
Report Date: 11/28/17 Revision 1 - 28-day results
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 3,000 psi @ 28 days
Mix ID:
025003p
Supplier:
Miles Sand and Gravel
Batch Time:
0618 Plant:
Truck No.:
C115 Ticket No.: 198414
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
5
64
53
Set Specimen
Avg Diam.
No. ID
(in)
1 1
3.99
1 2
4.00
1 3
4.01
1 4
4.02
Area
Date
(sq in)
Received
12.5
10/27/17
12.57
10/27/17
12.63
10/27/17
12.69
10/27/17
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2016-1684
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
10/26/17 Sample Time: 0720
Anas Mandi
Cloudy
10 Batch Size (cy): 110
Pump
15
From chute of truck
Wall and column footings on grids
H/1 to 8, 5/A to H, l/A to H and A/1
to 7.5.
Age at Maximum
Date
Test
Load
Tested
(days)
(lbs)
11/02/17
7
39,560
11/23/17
28
57,090
11/23/17
28
55,410
11/23/17
28
56,570
Average (28 days)
Compressive
Strength
Fracture
(psi)
Type
3,160
2
4,540
2
4,390
2
4,460
2
4,460
Initial Cure: Cure Box Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Anas Mandi
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Leif Bjorback
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
Reviewed By: ZZt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0014
Service Date: 11/01/17
Report Date: 11 /08/17
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2016-1684
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Inspected manhole wall reinforcement at southwest corner of vault. The reinforcement was inspected for size,
grade, lap and spacing per detail 1/SV2.2. Verified final clearances. Note: Horizontal dowels on wall A and C
called for #6 bars, contractor had #5 bars installed. Contractor elected to add a second #5 bar at each location to
substitute for a single #6 bar.
Observed the placement of (5) cubic yards of Miles Sand & Gravel mix #0260A6P into manhole walls noted
above. The concrete was placed via pump and mechanically consolidated. Cast (4) 4x8" cylinders for
compressive strength testing (4000 psi required at 28 days).
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Andrew Bontrager
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Leif Bjorback
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By: ��-�"
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, Robert Gardner
Wasell Todd Wirtz
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0014A alre«acon CO"A"
Service Date: 11/01/17 20225 Cedar Valley Rd Ste 110
Report Date: 11/09/17 Lynnwood, WA 98036-6365
Task: 425-742-9360
Client Project
Magic Toyota Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung 21300 Highway 99
20910 Highway 99 Edmonds, WA
Lynnwood, WA 98036
Project Number: M7171461
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 0260AP
Supplier: Miles
Batch Time: Plant:
Truck No.: C114 Ticket No.: 198876
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
5
63
49
Set
Specimen
Avg Diam.
No.
ID
(in)
1
1
3.99
1
2
4.00
1
3
4.00
1
4
4.00
Initial Cure: Outside
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Area
Date
Date
(sq in)
Received
Tested
12.5
11 /02/ 17
11 /08/ 17
12.57
11 /02/ 17
11 /29/ 17
12.57
11 /02/ 17
11 /29/ 17
12.57
11 /02/ 17
11 /29/ 17
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
11/01/17 Sample Time:
Andrew Bontrager
Dark
5 Batch Size (cy): 5
Pump
10
Manhole wall at southwest corner of
vault
Age at
Maximum
Test
Load
(days)
(lbs)
7
53,230
28
28
28
Compressive
Strength Fracture
(psi) Type
4,260 2
Mayes Testing Engineers Rep.: Andrew Bontrager
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Leif Bjorback Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0014A
Service Date: 11/01/17
Report Date: 11/30/17 Revision 1 - 28-day results
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 0260AP
Supplier: Miles Sand and Gravel
Batch Time: Plant:
Truck No.: C114 Ticket No.: 198876
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
5
63
49
Set Specimen
Avg Diam.
No. ID
(in)
1 1
3.99
1 2
4.00
1 3
4.00
1 4
4.00
Area
Date
(sq in)
Received
12.5
11/02/17
12.57
11/02/17
12.57
11/02/17
12.57
11/02/17
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2016-1684
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
11/01/17 Sample Time:
Andrew Bontrager
Dark
5 Batch Size (cy): 5
Pump
10
Manhole wall at southwest corner of
vault
Age at Maximum
Date
Test
Load
Tested
(days)
(lbs)
11/08/17
7
53,230
11/29/17
28
64,320
11/29/17
28
65,830
11/29/17
28
64,350
Average (28 days)
Compressive
Strength
Fracture
(psi)
Type
4,260
2
5,120
2
5,240
2
5,120
2
5,160
Initial Cure: Outside Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Andrew Bontrager
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Leif Bjorback Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Donna Pollard Senior Project Field Manager
(1) Mayes Testing Engineers, Inc, Todd Wirtz (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
FABRICATION SHOP OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0019
Service Date: 12/07/17
Report Date: 12/13/17
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.: M7171461
Permit No.: BLD-2016-1684 Weather: Cloudy
Samples: N/A
At McFabco, 635 S. Elmgrove Street, Seattle, WA received WABO cards for welders performing the work: Thien
H. Nguyen (ID #W21116, Exp. 04/01/18), and Terry W. Greenwood (ID #W00383, Exp. 04/01/18). Reviewed
welding procedures on WPS forms and then verified feeds, speeds, and that the filler metal is A5.2 and a
representative sample of welds. Completed visually inspecting 1/4" flare bevel groove welds on parts labeled
13EM and 12EM on McFabco Steel drawings. Completed visually inspecting the welding of headed shear studs
on parts labeled 22EM, 25EM and 27EM on McFabco Steel drawings. Visually inspected 1/4" flare bevel groove
welds on (67) parts labeled 11 EM and (16) parts labeled 14EM on McFabco Steel drawings. Welding inspected
per AWS D1.1 visual criteria.
CORRECTIVE ACTION TAKEN
This closes the preliminary report, service date 12/01/17.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Harold Edmonds
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, Robert Gardner
Wasell Donna Pollard
(1) Mayes Testing Engineers, Inc, (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Todd Wirtz Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
POST -INSTALLED ANCHORS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0020
Service Date: 12/08/17
Report Date: 12/15/17
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Sunny, 40's
On site to observe and inspect the installation of #5 dowels into existing footing. The dowels are being installed
for the thickened slab edge between grid lines A/1 to 4 and A to G/1, per email from Muni Vimawala with PSM
Engineers. The holes were inspected for size, depth, clearance and cleanliness. Substrate temperature was
verified at 47°F. Simpson AT-XP epoxy was used to epoxy the dowels into existing concrete. The holes were
drilled to a depth of 6" and cleaned per the manufacturer's recommendation, using a bottle brush and
compressed air. There were (44) dowels placed today.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Jacob Keas
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, Robert Gardner
Wasell Donna Pollard
(1) Mayes Testing Engineers, Inc, (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Todd Wirtz Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0022
Service Date: 12/12/17
Report Date: 12/18/17
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: (8) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Partly cloudy
Inspected reinforcing steel and observed the placement of (219) cubic yards of Miles Sand & Gravel mix
#026006P concrete at the slab -on -grade section between grid lines A to E.4/1 to 5. The concrete was placed via
pump and mechanically consolidated. Eight 4x8" cylinders were cast for compressive strength testing. The studs
on the HSS embeds at the south and southeast entryways are 6" long in lieu of the 8" shown on detail 6/S2.2.
The contractor consulted with the structural engineer and addressed the condition by adding supplemental #4
bars as shown on the attached sketch. See Mayes Testing Engineers inspection report #M7171461.0021 for
additional information.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: John Chebul
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, Robert Gardner
Wasell Donna Pollard
(1) Mayes Testing Engineers, Inc, (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Todd Wirtz Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
2e_ 9.1*.
Ll E2L ��"
PC.
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0022A nlrerracon CO"A"
Service Date: 12/12/17 20225 Cedar Valley Rd Ste 110
Report Date: 01/10/18 Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task: 425-742-9360
Client Project
Magic Toyota Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung 21300 Highway 99
20910 Highway 99 Edmonds, WA
Lynnwood, WA 98036
Project Number: M7171461
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 026006P
Supplier: Miles
Batch Time: 0920 Plant:
Truck No.: C116 Ticket No.: 200781
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result Specification
5 1/2
67
41
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
1 a 3.99
1 b 3.99
1 c 4.00
1 d 3.99
Area
Date
(sq in)
Received
12.5
12/13/17
12.5
12/13/17
12.57
12/13/17
12.5
12/13/17
Sample Date:
12/12/17
Sampled By:
John Chebul
Weather Conditions:
Overcast
Accumulative Yards:
219
Placement Method:
Pump
Water Added Before (gal):
21
Water Added After (gal):
Sample Location:
Sample Time:
Batch Size (cy): 10
Placement Location: Slab on grade, gridlines A to E.4/1 to
5.
Age at Maximum
Date
Test
Load
Tested
(days)
(lbs)
12/19/17
7
61,670
01/09/18
28
77,740
01/09/18
28
79,080
01/09/18
28
73,800
Average (28 days)
Compressive
Strength
Fracture
(psi)
Type
4,930
2
6,220
2
6,290
2
5,900
2
6,140
Initial Cure: Cure Box Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
680 oz. MB NC 534.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: John Chebul
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0022A nlrerracon CO"A"
Service Date: 12/12/17 20225 Cedar Valley Rd Ste 110
Report Date: 01/10/18 Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task: 425-742-9360
Client Project
Magic Toyota Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung 21300 Highway 99
20910 Highway 99 Edmonds, WA
Lynnwood, WA 98036
Project Number: M7171461
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days
Mix ID:
026006P
Supplier:
Miles
Batch Time:
1011 Plant:
Truck No.:
C059 Ticket No.: 200793
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result Specification
5
68
43
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
2
a 4.00
2
b 4.00
2
c 4.00
2
d 4.00
Area
Date
(sq in)
Received
12.57
12/13/17
12.57
12/13/17
12.57
12/13/17
12.57
12/13/17
Sample Date:
12/12/17 Sample Time:
Sampled By:
John Chebul
Weather Conditions:
Partly cloudy
Accumulative Yards:
219 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
20
Water Added After (gal):
Sample Location:
Placement Location: Slab on grade, gridlines A to E.4/1 to
5.
Age at Maximum
Date
Test
Load
Tested
(days)
(lbs)
12/19/17
7
59,350
01/09/18
28
70,850
01/09/18
28
71,980
01/09/18
28
73,070
Average (28 days)
Compressive
Strength
Fracture
(psi)
Type
4,720
2
5,640
2
5,730
2
5,810
2
5,730
Initial Cure: Cure Box Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
680 oz. MB NC 534.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: John Chebul
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
Reviewed By: ZZt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 2 of 2
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0023
Service Date: 12/14/17
Report Date: 12/21/17
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Partly cloudy
On site to inspect reinforcement of precast panels 18, 43, 51, 53 and 57. Panel 18 is missing ledger embeds per
detail A on S3.1, and #6 bar sandwiched at embed per detail 5 on S6.0. Panel 43 is missing ledger embed and
panel to panel embeds. Panel 51 is missing panel to panel embeds. Panel 53 is missing panel to panel embeds.
Panel 57 is missing panel to panel embeds.
PRELIMINARY INSPECTION
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, Robert Gardner
Wasell Donna Pollard
(1) Mayes Testing Engineers, Inc, (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Todd Wirtz Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0024
Service Date: 12/15/17
Report Date: 12/21 /17
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Cloudy
On site for final reinforcement inspection on panels 18, 43, 51, 53 and 57. Per report service date 12/14/17,
missing embeds and added reinforcing steel were installed. Total of (75) cubic yards of Miles Sand & Gravel mix
0260A6P placed. Observed the mechanical consolidation of the concrete. One set of (4) 4x8" cylinders was cast
for compressive strength testing.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, Robert Gardner
Wasell Donna Pollard
(1) Mayes Testing Engineers, Inc, (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Todd Wirtz Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0024A
Service Date: 12/15/17
Report Date: 12/26/17
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 5,000 psi @ 28 days
Mix ID:
0260A6P
Supplier:
Miles
Batch Time:
0800 Plant:
Truck No.:
C144 Ticket No.: 99869
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
4 3/4
4.2
68
39
Set
Specimen
Avg Diam.
No.
ID
(in)
1
1
4.00
1
2
4.00
1
3
4.00
1
4
4.00
Initial Cure: Cure Box
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Area
Date
Date
(sq in)
Received
Tested
12.57
12/19/17
12/22/ 17
12.57
12/19/17
01/12/18
12.57
12/19/17
01/12/18
12.57
12/19/17
01/12/18
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
12/15/17 Sample Time:
David Schmutzler
Cloudy
20 of 75 Batch Size (cy): 10
Pump
Tilt panels 18, 43, 51, 53 and 57
Age at
Maximum
Test
Load
(days)
(lbs)
7
59,850
28
28
28
Compressive
Strength Fracture
(psi) Type
4,760 2
Mayes Testing Engineers Rep.: David Schmutzler
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Donna Pollard Senior Project Field Manager
(1) Mayes Testing Engineers, Inc, Todd Wirtz (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0024A
Service Date: 12/15/17
Report Date: 01/15/18 Revision 1 - 28-day results
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 5,000 psi @ 28 days
Mix ID:
0260A6P
Supplier:
Miles Sand and Gravel
Batch Time:
0800 Plant:
Truck No.:
C144 Ticket No.: 99869
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
4 3/4
4.2
68
39
Set Specimen
Avg Diam.
No. ID
(in)
1 1
4.00
1 2
4.00
1 3
4.00
1 4
4.00
Area
Date
(sq in)
Received
12.57
12/19/17
12.57
12/19/17
12.57
12/19/17
12.57
12/19/17
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
12/15/17 Sample Time:
David Schmutzler
Cloudy
20 of 75 Batch Size (cy): 10
Pump
Tilt panels 18, 43, 51, 53 and 57.
Age at Maximum
Date
Test
Load
Tested
(days)
(lbs)
12/22/17
7
59,850
01/12/18
28
73,640
01/12/18
28
77,300
01/12/18
28
75,200
Average (28 days)
Compressive
Strength
Fracture
(psi)
Type
4,760
2
5,860
2
6,150
2
5,980
2
6,000
Initial Cure: Cure Box Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0025A
Service Date: 12/20/17
Report Date: 01/19/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 3,000 psi @ 28 days
Mix ID: 025003P
Supplier: Miles Sand and Gravel
Batch Time: Plant:
Truck No.: Ticket No.:
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
6
63
40
Set Specimen
Avg Diam.
No. ID
(in)
1 1
4.00
1 2
4.00
1 3
3.99
1 4
3.99
Area
Date
(sq in)
Received
12.57
12/21/17
12.57
12/21/17
12.5
12/21/17
12.5
12/21/17
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
12/20/17 Sample Time: 0715
Keenan Schulz
Overcast
10 Batch Size (cy): 10
Pump
Wall Footing 10.5 and 8 line and east
of H line.
Age at Maximum
Date
Test
Load
Tested
(days)
(lbs)
12/27/17
7
46,420
01/17/18
28
68,980
01/17/18
28
65,190
01/17/18
28
66,480
Average (28 days)
Compressive
Strength
Fracture
(psi)
Type
3,690
3
5,490
2
5,210
2
5,320
2
5,340
Initial Cure: Cure Box Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Keenan Schulz
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0026
Service Date: 12/21/17
Report Date: 12/28/17
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD-2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.: M7171461
Weather: Overcast, 35°F
On site to inspect (16) tilt -up concrete panel reinforcing and embeds. Inspected panels 19, 22, 23, 24, 25, 26, 27,
28, 41, 55, 65, 67, 68, 69, 70 and 70. Inspection as follows:
1. Panel base connection embeds installed per details 1, 2 and 3 of S2.3.
2. Panel reinforcing per schedules S6.4 and S6.5.
3. Panels 22, 24, 25, 26, 27, 28, 41, 55 and 65 are complete.
4. Preliminary Item. The following panels are missing sandwich reinforcing at embed Nelson studs per
schedule S6.0: #67, 68, 69, 70 and 71.
5. Panel 19 has had added bar per engineer's directive, (8) #5 were added each face horizontally above
opening.
PRELIMINARY INSPECTION
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, Robert Gardner
Wasell Donna Pollard
(1) Mayes Testing Engineers, Inc, (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Todd Wirtz Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0027A
Service Date: 12/22/17
Report Date: 01/22/18 Revision 1 - 28-day results
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @
Mix ID:
0260A6P
Supplier:
Miles
Batch Time:
0808
Truck No.:
037
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
28 days Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Plant: 125
Ticket No.: 100083
Result
Specification
43/4
3 -5
4.6
3.5 - 6.5
66
50 - 90
37
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
12/22/17 Sample Time: 0915
David Bernier
overcast
54 Batch Size (cy): 10
PUMP
20
panel #19
Pre -cast wall panels
67-68-69-70-71-65-19-22-5 5-26-27-2
8-23-24-25-41.
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg Diam.
Area
Date
Date
Test
Load
Strength
Fracture
No. ID (in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
1 a 4.00
12.57
12/26/17
12/29/17
7
54,350
4,330
5
1 b 4.00
12.57
12/26/17
01/19/18
28
72,080
5,740
2
1 c 4.00
12.57
12/26/17
01/19/18
28
74,250
5,910
2
1 d 4.00
12.57
12/26/17
01/19/18
28
71,280
5,670
2
Average (28 days)
5,770
Initial Cure: Cure Box
Final Cure: Moist Room
Min Temp: 60
Max Temp:
60
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not
tested for plastic
unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung
(1) Foushee & Associates, Inc., Craig Miller
(1) Foushee & Associates, Inc., Paul Wasell
(1) PSM Consulting Engineers, Muni Vimawala
(1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Jeremy Webb
(1) Mayes Testing Engineers, Inc, Todd Wirtz
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0027A
Service Date: 12/22/17
Report Date: 01/22/18 Revision 1 - 28-day results
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @
Mix ID:
0260A6P
Supplier:
Miles
Batch Time:
0927
Truck No.:
c059
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
28 days Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Plant: 125
Ticket No.: 100094
Result Specification
5 3 -5
4.3 3.5 - 6.5
68 50 - 90
37
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
12/22/17 Sample Time: 1045
David Bernier
overcast
125 Batch Size (cy): 10
PUMP
15
panel # 27
Pre -cast wall panels
67-68-69-70-71-65-19-22-5 5-26-27-2
8-23-24-25-41.
Laboratory Test Data
Age at
Maximum
Compressive
Set
Specimen Avg
Diam.
Area
Date
Date
Test
Load
Strength
Fracture
No.
ID
(in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
2
a
3.98
12.44
12/26/17
12/29/17
7
47,070
3,780
2
2
b
4.00
12.57
12/26/17
01/19/18
28
63,540
5,060
2
2
c
3.98
12.44
12/26/17
01/19/18
28
64,810
5,210
2
2
d
4.00
12.57
12/26/17
01/19/18
28
65,810
5,240
3
Average (28 days)
5,170
Initial Cure:
Cure Box
Final Cure: Moist
Room
Min Temp: 60
Max Temp:
60
Comments:
Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 2 of 2
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0028
Service Date: 12/26/17
Report Date: 12/29/17
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Partly cloudy
On site for reinforcing steel inspection for 6" slab -on -grade at grid lines 7.5 to 8 from A to E and 5 to 11/G.1
(storage 164). The reinforcing steel was found to be the correct size, type, lap, spacing and clearances. Slab
areas mentioned above were protected from frost with insulated blankets and tarps. Work conforms per notes
and details on S2.0.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Detterich
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0029
Service Date: 12/27/17
Report Date: 01 /02/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Cloudy
Observed concrete placement of (40) yards of Miles Sand & Gravel mix 026006P for slab -on -grade at grid lines
7.5 to 8 from A to E, and 10.5 to 11/G.1 (storage #164). The concrete was placed via pump truck and
mechanically consolidated with a vibrator. Concrete slump and temperature tests were conducted and concrete
was found to conform to concrete specifications. Reinforcing steel was previously inspected on 12/26/17 (DFR
028) and was found to be in conformance. Refer to report 0029A for concrete test results.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Detterich
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0029A
Service Date: 12/27/17
Report Date: 01/04/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 3,000 psi @ 28 days
Mix ID: 026006P
Supplier: Miles Sand and Gravel
Batch Time: 0704 Plant: 125
Truck No.: C115 Ticket No.: 201292
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result Specification
3 Max 5
63 50 - 90
35
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
12/27/17 Sample Time: 0800
Sampled By:
David Detterich
Weather Conditions:
Cloudy
Accumulative Yards:
10 of 40 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
0
Sample Location:
7.5/A
Placement Location:
Slab -on -grade at gridlines 7.5 to 8
from A to E, and 10.5 tol 1/G.1
(Storage #164)
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg
Diam.
Area
Date
Date
Test
Load
Strength Fracture
No. ID
(in)
(sq in)
Received
Tested
(days)
(lbs)
(psi) Type
1 A
3.98
12.44
12/28/17
01/03/18
7
62,290
5,010 2
1 B
4.00
12.57
12/28/17
01/24/18
28
1 C
4.00
12.57
12/28/17
01/24/18
28
1 D
4.00
12.57
12/28/17
01/24/18
28
Initial Cure: Cure Box
Final Cure: Moist
Room
Min Temp:
61 Max Temp: 61
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Detterich
Reported To: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
Reviewed By: ZZt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
MAYES TESTING ENGINEERS
Report Number: M7171461.0029A
alre«acon CO"A"
Service Date: 12/27/17
20225 Cedar Valley Rd Ste 110
Report Date: 01/25/18 Revision
1 - 28-day results
Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 3,000 psi @
28 days
Sample Date:
12/27/17 Sample Time: 0800
Sampled By:
David Detterich
Mix ID: 026006P
Weather Conditions:
Cloudy
Supplier: Miles Sand and Gravel
Accumulative Yards:
10 of 40 Batch Size (cy): 10
Batch Time: 0704 Plant:
125
Placement Method:
Pump
Truck No.: C115 Ticket No.:
201292
Water Added Before (gal):
0
Field Test Data
Water Added After (gal):
0
Sample Location:
7.5/A
Test Result
Specification
Placement Location:
Slab -on -grade at gridlines 7.5 to 8
Slump (in): 3
Max 5
from A to E, and grid line G.1/10.5
Air Content (%):
to l (Storage 4164)
Concrete Temp. (F): 63
50 - 90
Ambient Temp. (F): 35
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum Compressive
Set Specimen Avg Diam.
Area Date
Date Test
Load Strength Fracture
No. ID (in)
(sq in) Received
Tested (days)
(lbs) (psi) Type
1 A 3.98
12.44 12/28/17
01/03/18 7
62,290 5,010 2
1 B 3.98
12.44 12/28/17
01/24/18 28
74,670 6,000 3
1 C 3.98
12.44 12/28/17
01/24/18 28
78,550 6,310 5
1 D 3.98
12.44 12/28/17
01/24/18 28
75,220 6,050 2
Average (28 days) 6,120
Initial Cure: Cure Box
Final Cure: Moist Room Min Temp: 61 Max Temp: 61
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Detterich
Reported To: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0030
Service Date: 01/04/18
Report Date: 01/10/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Overcast
On site to inspect panel reinforcement for (19) tilt -up precast panels. Inspected panel reinforcement using on -site
approved plans (rev. 4 dated 11 /06/17).
1) As inspection progressed discrepancies were addressed prior to our departure with the exception of
bottom of pilaster trim bars (2) #5 at panels 32, 61, 62, 63.
2) Panels 52, 54, 56, 50, 21, 58a, 58b, 42, 66, 40, 16, 15, 17, 63, 62, 61, 60, 32, 64 are per plans.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0031
Service Date: 01/05/18
Report Date: 01/10/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: (8) 4x8" cylinders
On site for the following:
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.: M7171461
Weather: Drizzle at times
1. Upon arrival verified that items noted in our 05 January 2018 report M7171461.0030 had been installed.
2. Contractor placed (165) cubic yards of Miles Sand & Gravel mix 026A6P via pump for (19) tilt -up wall panels.
The concrete was mechanically vibrated for consolidation. Panels placed as follows: 15, 16, 17, 21, 32, 40,
42, 50, 52, 54, 56, 58A, 5813, 60, 61, 62, 63, 64, 66. Cast (2) sets of (4) 4x8" cylinders for compressive
strength testing (4000 psi at 28 days required).
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0031A
Service Date: 01/05/18
Report Date: 01/15/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID:
026A6P
Supplier:
Miles Sand and Gravel
Batch Time:
0656 Plant:
Truck No.:
C185 Ticket No.: 100365
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
01/05/18 Sample Time: 0750
Sampled By:
David Bernier
Weather Conditions:
Drizzle at times
Accumulative Yards:
25 Batch Size (cy): 10.5
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
Sample Location: Panels 15, 16, 17, 21, 32, 40, 42, 50,
Result Specification 52, 54, 56, 58A, 58B, 60, 61, 62, 63,
5 1 /2 64, 66.
4.8 Placement Location: (19) tilt -up wall panels.
64
42
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg
Diam.
Area
Date
Date
Test
Load
Strength Fracture
No. ID
(in)
(sq in)
Received
Tested
(days)
(lbs)
(psi) Type
1 1
3.98
12.44
01/08/18
01/12/18
7
56,660
4,550 2
1 2
4.00
12.57
01/08/18
02/02/18
28
1 3
4.00
12.57
01/08/18
02/02/18
28
1 4
4.00
12.57
01/08/18
02/02/18
28
Initial Cure: Cure Box
Final Cure: Moist
Room
Min Temp:
60 Max Temp: 60
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0031A
Service Date: 01/05/18
Report Date: 01/15/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID:
026A6P
Supplier:
Miles Sand and Gravel
Batch Time:
0817 Plant:
Truck No.:
C139 Ticket No.: 100374
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
01/05/18 Sample Time: 0915
Sampled By:
David Bernier
Weather Conditions:
Drizzle at times
Accumulative Yards:
165 Batch Size (cy): 10.5
Placement Method:
Pump
Water Added Before (gal):
0
Water Added After (gal):
Sample Location: Panels 15, 16, 17, 21, 32, 40, 42, 50,
Result Specification 52, 54, 56, 58A, 58B, 60, 61, 62, 63,
5 64, 66.
4.3 Placement Location: (19) tilt -up wall panels.
65
46
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg
Diam.
Area
Date
Date
Test
Load
Strength Fracture
No. ID
(in)
(sq in)
Received
Tested
(days)
(lbs)
(psi) Type
2 1
4.00
12.57
01/08/18
01/12/18
7
55,410
4,410 2
2 2
4.00
12.57
01/08/18
02/02/18
28
2 3
4.00
12.57
01/08/18
02/02/18
28
2 4
4.00
12.57
01/08/18
02/02/18
28
Initial Cure: Cure Box
Final Cure: Moist
Room
Min Temp:
60 Max Temp: 60
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 2 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
MAYES TESTING ENGINEERS
Report Number: M7171461.0031A
alre«aconCO =A"
Service Date: 01/05/18
20225 Cedar Valley Rd Ste 110
Report Date: 02/05/18
Revision
1 - 28-day results
Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 4,000
psi @
28 days
Sample Date:
01/05/18 Sample Time: 0750
Sampled By:
David Bernier
Mix ID: 026A6P
Weather Conditions:
Drizzle at times
Supplier: Miles Sand and Gravel
Accumulative Yards:
25 Batch Size (cy): 10.5
Batch Time: 0656
Plant:
Placement Method:
Pump
Truck No.: C185
Ticket No.:
100365
Water Added Before (gal):
0
Field Test Data
Water Added After (gal):
Sample Location:
Panels 15, 16, 17, 21, 32, 40, 42, 50,
Test
Result
Specification
52, 54, 56, 58A, 58B, 60, 61, 62, 63,
Slump (in):
5 1/2
64, 66.
Air Content (%):
4.8
Placement Location:
(19) tilt -up wall panels 15, 16, 17, 21,
Concrete Temp. (F):
64
32, 40, 42, 50, 52, 54, 56, 58A, 58B,
Ambient Temp. (F):
42
60, 61, 62, 63, 64, 66.
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum Compressive
Set Specimen Avg
Diam.
Area Date
Date Test
Load Strength Fracture
No. ID
(in)
(sq in) Received
Tested (days)
(lbs) (psi) Type
1 1
3.98
12.44 01/08/18
01/12/18 7
56,660 4,550 2
1 2
3.99
12.5 01/08/18
02/02/18 28
70,870 5,670 4
1 3
4.00
12.57 01/08/18
02/02/18 28
73,400 5,840 3
1 4
4.00
12.57 01/08/18
02/02/18 28
72,080 5,740 3
Average (28 days) 5,750
Initial Cure: Cure Box
Final Cure: Moist Room Min Temp: 60 Max Temp: 60
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung
(1) Foushee & Associates, Inc., Craig Miller
(1) Foushee & Associates, Inc., Paul Wasell
(1) PSM Consulting Engineers, Muni Vimawala
(1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Jeremy Webb
(1) Mayes Testing Engineers, Inc, Todd Wirtz
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
MAYES TESTING ENGINEERS
Report Number: M7171461.0031A
alre«aconCO =A"
Service Date: 01/05/18
20225 Cedar Valley Rd Ste 110
Report Date: 02/05/18
Revision
1 - 28-day results
Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 4,000
psi @
28 days
Sample Date:
01/05/18 Sample Time: 0915
Sampled By:
David Bernier
Mix ID: 026A6P
Weather Conditions:
Drizzle at times
Supplier: Miles Sand and Gravel
Accumulative Yards:
165 Batch Size (cy): 10.5
Batch Time: 0817
Plant:
Placement Method:
Pump
Truck No.: C139
Ticket No.:
100374
Water Added Before (gal):
0
Field Test Data
Water Added After (gal):
Sample Location:
Panels 15, 16, 17, 21, 32, 40, 42, 50,
Test
Result
Specification
52, 54, 56, 58A, 58B, 60, 61, 62, 63,
Slump (in):
5
64, 66.
Air Content (%):
4.3
Placement Location:
(19) tilt -up wall panels 15, 16, 17, 21,
Concrete Temp. (F):
65
32, 40, 42, 50, 52, 54, 56, 58A, 58B,
Ambient Temp. (F):
46
60, 61, 62, 63, 64, 66.
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum Compressive
Set Specimen Avg
Diam.
Area Date
Date Test
Load Strength Fracture
No. ID
(in)
(sq in) Received
Tested (days)
(lbs) (psi) Type
2 1
4.00
12.57 01/08/18
01/12/18 7
55,410 4,410 2
2 2
3.99
12.5 01/08/18
02/02/18 28
68,970 5,520 2
2 3
3.99
12.5 01/08/18
02/02/18 28
71,720 5,740 2
2 4
3.99
12.5 01/08/18
02/02/18 28
70,040 5,600 2
Average (28 days) 5,620
Initial Cure: Cure Box
Final Cure: Moist Room Min Temp: 60 Max Temp: 60
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 2 of 2
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0032
Service Date: 01/10/18
Report Date: 01/15/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD-2017-0501
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Overcast
On site for inspection of reinforcing at (11) tilt -up panels - #'s 1, 2, 3, 4, 100, 101, 102, 9, 10, 11 and 12, and
observed the following:
Embeds installed per plans.
Corner trim installed per plans.
Main reinforcing installed per plans.
Preliminary Item. Remainder of items need inspection prior to concrete placement, embed trim per S6.0, (2) #5
trim bars at bottom of all pilasters per S6.0, and panel #1 pilaster ties need tying and clearances.
PRELIMINARY INSPECTION
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0033
Service Date: 01/11/18
Report Date: 01/16/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Inspected reinforcement for wall panels #5 and 6. The reinforcement was inspected for size, grade, lap and
spacing per details 5 and 6/S6.3. Verify final clearances and embed installation prior to placement.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Andrew Bontrager
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0034
Service Date: 01/15/18
Report Date: 01/19/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD-2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Sunny
On site to inspect the reinforcing steel for tilt -up panels #29, 30, 33 and 34. The reinforcing steel was inspected
for size, grade, spacing, clearance and placement, and appears to have been installed per the approved plans
and details.
Inspected slab -on -grade between grid lines H to H.5/8 to 9.3. The reinforcing steel needs to be adjusted to 12"
on center spacing. Notified contractor. Corrections will be made prior to placement. Inspector to verify
completion prior to placement.
PRELIMINARY INSPECTION
Slab -on -grade spacing needs correction.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Jacob Keas
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0035
Service Date: 01/16/18
Report Date: 01 /23/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.
Samples:
BLD2017-0493
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.: M7171461
Weather: Rainy and sunny
(11) 4x8" cylinders, (4) beams — (2 damaged)
Item 1: Reinforcing Steel (Preliminary Close -Out)
On site to inspect the reinforcing steel for slab -on -grade. The reinforcing steel was inspected for size, grade,
spacing, clearance and placement, and appears to have been installed per approved plans and details. The
reinforcing steel was inspected between grid lines H and H.5/8 to 9.3. This report will close out the preliminary
item noted in report, service date 01/15/18.
Item 2: Concrete Placement
Observed and sampled for concrete placed in wall tilt -up panels. Observed the placement of (200) cubic yards of
Miles Sand & Gravel mix 0260A6P. The concrete was placed via concrete pump truck then mechanically
vibrated for consolidation. Two sets of samples were cast for compressive strength testing. Set 1 was a
combination of (3) 4x8" cylinder field -cures, (4) 4x8" cylinders for lab, (2) beams (the beams were damaged after
being cast). Contractor was informed. Informed contractor that Mayes Testing Engineers will re -cast beams with
2nd sample set. Set 2 was a combination of (4) 4x8" cylinders and (2) beams. Air test was performed prior to the
start of placement - result of 4.2%. Field -cures were placed on the panel for 4x8" cylinders, beams were placed
next to Panel 7.
Items Placed
Slab -on -grade at grid lines H to H.5/8 to 9.3.
Tilt -up panels #'s 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 33, 34, 30, 29, 100, 101 and 102.
CORRECTIVE ACTION TAKEN
Preliminary item noted in report service date 01/15/18 is closed.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Jacob Keas
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.003513
Service Date: 01/16/18
Report Date: 01/22/18
Task:
MAYES TESTING ENGINEERS
alre«aconCO =A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 4,000
psi @ 28 days
Sample Date:
01/16/18 Sample Time:
Sampled By:
Jacob Keas
Mix ID: 0260A6P
Weather Conditions:
Rain
Supplier: Miles Sand and
Gravel
Accumulative Yards:
42 Batch Size (cy): 10.5
Batch Time:
Plant:
Placement Method:
Pump
Truck No.: 2463
Ticket No.: 201921
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result Specification
Placement Location:
Tilt -up wall panels, 1, 2, 3, 4, 5, 6, 7,
Slump (in):
6
8, 9, 10, 11, 12, 33, 34, 30, 29, 100,
Air Content (%):
4.2
101, and, 102. also slab -on -grade,
Concrete Temp. (F):
67
grids H to H.5/8 to 9.3.
Ambient Temp. (F):
51
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg
Diam.
Area
Date
Date
Test
Load
Strength
Fracture
No. ID
(in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
1 1
3.99
12.5
01/17/18
01/22/18
6 F
54,680
4,370
2
1 2
3.98
12.44
01/17/18
01/22/18
6 F
50,250
4,040
2
1 3
4.00
12.57
01/17/18
01/22/18
6 F
1 4
4.00
12.57
01/17/18
01/23/18
7
1 5
4.00
12.57
01/17/18
02/13/18
28
1 6
4.00
12.57
01/17/18
02/13/18
28
1 7
4.00
12.57
01/17/18
02/13/18
28
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Jacob Keas
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.003513
Service Date: 01/16/18
Report Date: 01/22/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 0260A6P
Supplier: Miles Sand and Gravel
Batch Time: Plant:
Truck No.: 2463 Ticket No.: 201937
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
6
4.4
70
53
Set
Specimen
Avg Diam.
No.
ID
(in)
2
3
4.00
2
4
4.00
2
5
4.00
2
6
4.00
Initial Cure: See Comments
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Area
Date
Date
(sq in)
Received
Tested
12.57
01/17/18
01/23/18
12.57
01/17/18
02/13/18
12.57
01/17/18
02/13/18
12.57
01/17/18
02/13/18
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Jacob Keas
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
01/16/18 Sample Time:
Jacob Keas
Rain
168 Batch Size (cy): 10.5
Pump
Tilt -up wall panels, 1, 2, 3, 4, 5, 6, 7,
8, 9, 10, 11, 12, 33, 34, 30, 29, 100,
101, and, 102. also slab on grade,
grids H to H.5/8 to 9.3
Age at Maximum
Test Load
(days) (lbs)
7
28
28
28
Compressive
Strength Fracture
(psi) Type
Reviewed By: ZZt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 2 of 2
14 AYES TESTING ENGINEERS, /NC.
Al CAr P&MY
Report Number: M7171461.003513
Service Date: 01/16/18
Report Date: 01/22/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project Project No. M7171461
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Date Made: 01/16/18 Set 2 of 2
LABORATORY FLEXURAL TEST REPORT
Field Data (ASTM C31-C172-C78)
Air Temp: 4.4 o F
Weather: Rain
Product: Concrete
Supplier: Miles Sand and Gravel
Ticket No.: 201937
Sample Temp: (ASTM C1064) 70 o F
Slump: (ASTM C143) 6 in.
Entrained Air: 4.4
(ASTM C231 and C173)
PLACEMENT LOCATION & NOTES:
Tilt -up wall panels 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 33, 34, 30, 29, 100, 101 and 102.
Flexural Test Results (ASTM C78)*
Avg. Meas.
Span
Beam
Modulus of
Sample No.
Lab No.
Date Made
Date Tested
Age
Width Depth
(1 8)
Length
Load / Ibs
Rupture (psi)
1
01/16/18
01/23/18
6
5.92
6.00
18
22
7200
610
2
01/16/18
01/23/18
6
6.04
6.02
18
22
6120
505
"Samples were not tested per ASTM C78 (samples not soaked in water 20 hours before testing) as requested by Paul Wasell.
Samples Cast By: J. Keas
Tested By: J. Kane
Report Distribution
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1)Foushee& Associates, Inc., Craig Miller (1)Foushee& Associates, Inc., Jeremy Webb Reviewed By:
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Robert Gardner
(1) PSM Consulting Engineers, Muni Vimawala Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full
without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other
apparently similar or identical materials.
MTE 1140-3C , Rev 2, 06/13/11
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.003513
Service Date: 01/16/18
Report Date: 01/22/18 Revision 1 -
Task:
MAYES TESTING ENGINEERS
alre«aconCO =A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 4,000
psi @ 28 days
Sample Date:
01/16/18 Sample Time:
Sampled By:
Jacob Keas
Mix ID: 0260A6P
Weather Conditions:
Rain
Supplier: Miles Sand and
Gravel
Accumulative Yards:
42 Batch Size (cy): 10.5
Batch Time:
Plant:
Placement Method:
Pump
Truck No.: 2463
Ticket No.: 201921
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result Specification
Placement Location:
Tilt -up wall panels, 1, 2, 3, 4, 5, 6, 7,
Slump (in):
6
8, 9, 10, 11, 12, 33, 34, 30, 29, 100,
Air Content (%):
4.2
101, and, 102. also slab -on -grade,
Concrete Temp. (F):
67
grids H to H.5/8 to 9.3.
Ambient Temp. (F):
51
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg
Diam.
Area
Date
Date
Test
Load
Strength
Fracture
No. ID
(in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
1 3
3.99
12.5
01/17/18
01/19/18
3 F
39,300
3,140
2
1 1
3.99
12.5
01/17/18
01/22/18
6 F
54,680
4,370
2
1 2
3.98
12.44
01/17/18
01/22/18
6 F
50,250
4,040
2
1 4
4.00
12.57
01/17/18
01/23/18
7
1 5
4.00
12.57
01/17/18
02/13/18
28
1 6
4.00
12.57
01/17/18
02/13/18
28
1 7
4.00
12.57
01/17/18
02/13/18
28
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Jacob Keas
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.003513
Service Date: 01/16/18
Report Date: 01/22/18 Revision 1 -
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 0260A6P
Supplier: Miles Sand and Gravel
Batch Time: Plant:
Truck No.: 2463 Ticket No.: 201937
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
6
4.4
70
53
Set
Specimen
Avg Diam.
No.
ID
(in)
2
3
4.00
2
4
4.00
2
5
4.00
2
6
4.00
Initial Cure: See Comments
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Area
Date
Date
(sq in)
Received
Tested
12.57
01/17/18
01/23/18
12.57
01/17/18
02/13/18
12.57
01/17/18
02/13/18
12.57
01/17/18
02/13/18
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Jacob Keas
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
01/16/18 Sample Time:
Jacob Keas
Rain
168 Batch Size (cy): 10.5
Pump
Tilt -up wall panels, 1, 2, 3, 4, 5, 6, 7,
8, 9, 10, 11, 12, 33, 34, 30, 29, 100,
101, and, 102. also slab on grade,
grids H to H.5/8 to 9.3
Age at Maximum
Test Load
(days) (lbs)
7
28
28
28
Compressive
Strength Fracture
(psi) Type
Reviewed By: ZZt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 2 of 2
14 AYES TESTING ENGINEERS, /NC.
Al CAr P&MY
Report Number: M7171461.003513
Service Date: 01/16/18
Report Date: 01/22/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Revision 1 -
Project Project No. M7171461
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Date Made: 01/16/18 Set 2 of 2
LABORATORY FLEXURAL TEST REPORT
Field Data (ASTM C31-C172-C78)
Air Temp: 4.4 o F
Weather: Rain
Product: Concrete
Supplier: Miles Sand and Gravel
Ticket No.: 201937
Sample Temp: (ASTM C1064) 70 o F
Slump: (ASTM C143) 6 in.
Entrained Air: 4.4
(ASTM C231 and C173)
PLACEMENT LOCATION & NOTES:
Tilt -up wall panels 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 33, 34, 30, 29, 100, 101 and 102.
Flexural Test Results (ASTM C78)*
Avg. Meas.
Span
Beam
Modulus of
Sample No.
Lab No.
Date Made
Date Tested
Age
Width Depth
(1 8)
Length
Load / Ibs
Rupture (psi)
1
01/16/18
01/23/18
6
5.92
6.00
18
22
7200
610
2
01/16/18
01/23/18
6
6.04
6.02
18
22
6120
505
"Samples were not tested per ASTM C78 (samples not soaked in water 20 hours before testing) as requested by Paul Wasell.
Samples Cast By: J. Keas
Tested By: J. Kane
Report Distribution
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1)Foushee& Associates, Inc., Craig Miller (1)Foushee& Associates, Inc., Jeremy Webb Reviewed By:
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Robert Gardner
(1) PSM Consulting Engineers, Muni Vimawala Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full
without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other
apparently similar or identical materials.
MTE 1140-3C , Rev 2, 06/13/11
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.003513
Service Date: 01/16/18
Report Date: 01/24/18 Revision 2 - 7-day results
Task:
MAYES TESTING ENGINEERS
alre«aconCO =A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 4,000
psi @ 28 days
Sample Date:
01/16/18 Sample Time:
Sampled By:
Jacob Keas
Mix ID: 0260A6P
Weather Conditions:
Rain
Supplier: Miles Sand and
Gravel
Accumulative Yards:
42 Batch Size (cy): 10.5
Batch Time:
Plant:
Placement Method:
Pump
Truck No.: 2463
Ticket No.: 201921
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result Specification
Placement Location:
Tilt -up wall panels, 1, 2, 3, 4, 5, 6, 7,
Slump (in):
6
8, 9, 10, 11, 12, 33, 34, 30, 29, 100,
Air Content (%):
4.2
101, and, 102. also slab -on -grade,
Concrete Temp. (F):
67
grids H to H.5/8 to 9.3.
Ambient Temp. (F):
51
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at
Maximum
Compressive
Set Specimen Avg
Diam.
Area
Date
Date
Test
Load
Strength
Fracture
No. ID
(in)
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
1 3
3.99
12.5
01/17/18
01/19/18
3 F
39,300
3,140
2
1 1
3.99
12.5
01/17/18
01/22/18
6 F
54,680
4,370
2
1 2
3.98
12.44
01/17/18
01/22/18
6 F
50,250
4,040
2
1 4
3.99
12.5
01/17/18
01/23/18
7
59,610
4,770
2
1 5
4.00
12.57
01/17/18
02/13/18
28
1 6
4.00
12.57
01/17/18
02/13/18
28
1 7
4.00
12.57
01/17/18
02/13/18
28
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Jacob Keas
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.003513
Service Date: 01/16/18
Report Date: 01/24/18 Revision 2 - 7-day results
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 0260A6P
Supplier: Miles Sand and Gravel
Batch Time: Plant:
Truck No.: 2463 Ticket No.: 201937
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
6
4.4
70
53
Set
Specimen
Avg Diam.
No.
ID
(in)
2
3
3.98
2
4
4.00
2
5
4.00
2
6
4.00
Initial Cure: See Comments
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Area
Date
Date
(sq in)
Received
Tested
12.44
01/17/18
01/23/18
12.57
01/17/18
02/13/18
12.57
01/17/18
02/13/18
12.57
01/17/18
02/13/18
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Jacob Keas
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
01/16/18 Sample Time:
Jacob Keas
Rain
168 Batch Size (cy): 10.5
Pump
Tilt -up wall panels, 1, 2, 3, 4, 5, 6, 7,
8, 9, 10, 11, 12, 33, 34, 30, 29, 100,
101, and, 102. also slab on grade,
grids H to H.5/8 to 9.3
Age at
Maximum
Test
Load
(days)
(lbs)
7
58,310
28
28
28
Compressive
Strength Fracture
(psi) Type
4,690 4
Reviewed By: ZZt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 2 of 2
14 AYES TESTING ENGINEERS, /NC.
Al CAr P&MY
Report Number: M7171461.003513
Service Date: 01/16/18
Report Date: 01/24/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Revision 2 - 7-day results
Project Project No. M7171461
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Date Made: 01/16/18 Set 2 of 2
LABORATORY FLEXURAL TEST REPORT
Field Data (ASTM C31-C172-C78)
Air Temp: 4.4 o F
Weather: Rain
Product: Concrete
Supplier: Miles Sand and Gravel
Ticket No.: 201937
Sample Temp: (ASTM C1064) 70 o F
Slump: (ASTM C143) 6 in.
Entrained Air: 4.4
(ASTM C231 and C173)
PLACEMENT LOCATION & NOTES:
Tilt -up wall panels 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 33, 34, 30, 29, 100, 101 and 102.
Flexural Test Results (ASTM C78)*
Avg. Meas.
Span
Beam
Modulus of
Sample No.
Lab No.
Date Made
Date Tested
Age
Width Depth
(1 8)
Length
Load / Ibs
Rupture (psi)
1
01/16/18
01/23/18
6
5.92
6.00
18
22
7200
610
2
01/16/18
01/23/18
6
6.04
6.02
18
22
6120
505
"Samples were not tested per ASTM C78 (samples not soaked in water 20 hours before testing) as requested by Paul Wasell.
Samples Cast By: J. Keas
Tested By: J. Kane
Report Distribution
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1)Foushee& Associates, Inc., Craig Miller (1)Foushee& Associates, Inc., Jeremy Webb Reviewed By:
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Robert Gardner
(1) PSM Consulting Engineers, Muni Vimawala Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full
without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other
apparently similar or identical materials.
MTE 1140-3C , Rev 2, 06/13/11
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
MAYES TESTING ENGINEERS
Report Number: M7171461.003513
alre«aconCO =A"
Service Date: 01/16/18
20225 Cedar Valley Rd Ste 110
Report Date: 02/14/18 Revision 3 - 28-day results
Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 4,000 psi @ 28 days
Sample Date:
01/16/18 Sample Time:
Sampled By:
Jacob Keas
Mix ID: 0260A6P
Weather Conditions:
Rain
Supplier: Miles Sand and Gravel
Accumulative Yards:
42 Batch Size (cy): 10.5
Batch Time: Plant:
Placement Method:
Pump
Truck No.: 2463 Ticket No.: 201921
Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test Result Specification
Placement Location:
Tilt -up wall panels, 1, 2, 3, 4, 5, 6, 7,
Slump (in): 6
8, 9, 10, 11, 12, 33, 34, 30, 29, 100,
Air Content (%): 4.2
101, and 102. also slab -on -grade,
Concrete Temp. (F): 67
grids H to H.5/8 to 9.3.
Ambient Temp. (F): 51
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum Compressive
Set Specimen Avg Diam. Area Date
Date Test
Load Strength Fracture
No. ID (in) (sq in) Received
Tested (days)
(lbs) (psi) Type
1 3 3.99 12.5 01/17/18
01/19/18 3 F
39,300 3,140 2
1 1 3.99 12.5 01/17/18
01/22/18 6 F
54,680 4,370 2
1 2 3.98 12.44 01/17/18
01/22/18 6 F
50,250 4,040 2
1 4 3.99 12.5 01/17/18
01/23/18 7
59,610 4,770 2
1 5 3.98 12.44 01/17/18
02/13/18 28
68,270 5,490 5
1 6 3.98 12.44 01/17/18
02/13/18 28
72,050 5,790 2
1 7 3.98 12.44 01/17/18
02/13/18 28
76,810 6,170 2
Average (28 days) 5,820
Initial Cure: Cure Box Final Cure: Moist
Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight. F = Field Cured
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Jacob Keas
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.003513
Service Date: 01/16/18
Report Date: 02/14/18 Revision 3 - 28-day results
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 0260A6P
Supplier: Miles Sand and Gravel
Batch Time: Plant:
Truck No.: 2463 Ticket No.: 201937
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
6
4.4
70
53
Set
Specimen
Avg Diam.
No.
ID
(in)
2
3
3.98
2
4
3.99
2
5
3.98
2
6
3.98
Area
Date
(sq in)
Received
12.44
01/17/18
12.5
01/17/18
12.44 01/17/18
12.44 01/17/18
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on C011 r
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
01/16/18 Sample Time:
Jacob Keas
Rain
168 Batch Size (cy): 10.5
Pump
Tilt -up wall panels, 1, 2, 3, 4, 5, 6, 7,
8, 9, 10, 11, 12, 33, 34, 30, 29, 100,
101, and 102. also slab on grade,
grids H to H.5/8 to 9.3
Age at Maximum
Date
Test
Load
Tested
(days)
(lbs)
01/23/18
7
58,310
02/13/18
28
73,240
02/13/18
28
71,470
02/13/18
28
73,300
Average (28 days)
Compressive
Strength
Fracture
(psi)
Type
4,690
4
5,860
2
5,740
2
5,890
2
5,830
Initial Cure: See Comments Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight. F = Field Cured
cams were field cured per contractor's request. Lab samples in cure box.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.:
Jacob Keas
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung
(1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller
(1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell
(1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig
(1) PSM Consulting Engineers, Muni Vimawala
Reviewed By: ZZt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 2 of 2
14 AYES TESTING ENGINEERS, /NC.
Al CAr P&MY
Report Number: M7171461.003513
Service Date: 01/16/18
Report Date: 02/14/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Revision 3 - 28-day results
Project Project No. M7171461
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Date Made: 01/16/18 Set 2 of 2
LABORATORY FLEXURAL TEST REPORT
Field Data (ASTM C31-C172-C78)
Air Temp: 4.4 o F
Weather: Rain
Product: Concrete
Supplier: Miles Sand and Gravel
Ticket No.: 201937
Sample Temp: (ASTM C1064) 70 o F
Slump: (ASTM C143) 6 in.
Entrained Air: 4.4
(ASTM C231 and C173)
PLACEMENT LOCATION & NOTES:
Tilt -up wall panels 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 33, 34, 30, 29, 100, 101 and 102.
Flexural Test Results (ASTM C78)*
Avg. Meas.
Span
Beam
Modulus of
Sample No.
Lab No.
Date Made
Date Tested
Age
Width Depth
(1 8)
Length
Load / Ibs
Rupture (psi)
1
01/16/18
01/23/18
6
5.92
6.00
18
22
7200
610
2
01/16/18
01/23/18
6
6.04
6.02
18
22
6120
505
"Samples were not tested per ASTM C78 (samples not soaked in water 20 hours before testing) as requested by Paul Wasell.
Samples Cast By: J. Keas
Tested By: J. Kane
Report Distribution
(1) Magic Toyota, Peter Chung
(1) City of Edmonds WA, Milton Thompson
(1)Foushee& Associates, Inc., Craig Miller
(1)Foushee& Associates, Inc., Jeremy Webb Reviewed By:
(1) Foushee & Associates, Inc., Paul Wasell
(1) Mayes Testing Engineers, Inc, Todd Wirtz Robert Gardner
(1) Miles Sand&Gravel, Michael Craig
(1) PSM Consulting Engineers, Muni Vimawala Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full
without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other
apparently similar or identical materials.
MTE 1140-3C , Rev 2, 06/13/11
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0036
Service Date: 01/24/18
Report Date: 01 /30/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: (8) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Proiect No.: M7171461
Weather: Rain
On site for inspection of the tilt panel wall to be placed at grids A to B/7.7 to 8. Reinforcing steel was inspected
and found to be in compliance with detail 70/S6.6.
Observed the placement of (10) yards of Miles Sand & Gravel concrete mix 1531<24HR via truck chute, and
consolidated through vibration. Sampled and tested for slump and temperature. Cast (8) 4x8" cylinders for
compressive strength testing (4000 psi at 28 days required). Contractor requested (4) field -cure cylinders with at
least (1) cylinder to be tested at 24 hrs.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Joel Morder
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0036A alre«aconCO =A"
Service Date: 01/24/18 20225 Cedar Valley Rd Ste 110
Report Date: 01/26/18 Lynnwood, WA 98036-6365
Task: 425-742-9360
Client Project
Magic Toyota Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung 21300 Highway 99
20910 Highway 99 Edmonds, WA
Lynnwood, WA 98036
Project Number: M7171461
Material Information Sample Information
Specified Strength: 2,500
psi @
4,000
psi @
Mix ID:
153K24HR
Supplier:
Miles
Batch Time:
1
Truck No.:
1 days
28 days
115 Plant: Everett
C059 Ticket No.: 202193
Field Test Data
Test Result
Slump (in): 5
Air Content (%):
Concrete Temp. (F): 65
Ambient Temp. (F): 45
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set
Specimen
Avg Diam.
No.
ID
(in)
1
A
3.98
1
E
4.00
1
F
4.00
1
G
4.00
1
H
4.00
1
B
1
C
1
D
Initial Cure: Covered with Plastic
Sample Date: 01/24/18 Sample Time: 1230
Sampled By: Joel Morder
Weather Conditions: Rain
Accumulative Yards: 10 Batch Size (cy): 10
Placement Method: Direct Discharge
Water Added Before (gal): 20
Water Added After (gal):
Sample Location: Tilt panel wall to be placed at A - B/7.7
Specification - 8
Placement Location: Tilt panel wall to be placed at grids A
to 13/7.7 to 8
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.44
01/25/18
01/25/18
1 F 20,100
12.57
01/25/18
01/31/18
7
12.57
01/25/18
02/21/18
28
12.57
01/25/18
02/21/18
28
12.57
01/25/18
02/21/18
28
01/25/18
Hold
01/25/18
Hold
01/25/18
Hold
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight. F = Field Cured
Contractor requested 4 field cures to be cast, 1 of which to break at 24 hours.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Joel Morder
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
Compressive
Strength Fracture
(psi) Type
1,620 3
Reviewed By: ZZt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0036A
Service Date: 01/24/18
Report Date: 01/29/18 Revision 1 - additional fiel cure breaks
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 2,500
psi @
4,000
psi @
Mix ID:
153K24HR
Supplier:
Miles
Batch Time:
1
Truck No.:
1 days
28 days
115 Plant: Everett
C059 Ticket No.: 202193
Field Test Data
Test Result
Slump (in): 5
Air Content (%):
Concrete Temp. (F): 65
Ambient Temp. (F): 45
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set
Specimen
Avg Diam.
No.
ID
(in)
1
A
3.98
1
B
3.99
1
C
3.98
1
E
4.00
1
F
4.00
1
G
4.00
1
H
4.00
1
D
Initial Cure: Covered with Plastic
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date: 01/24/18 Sample Time: 1230
Sampled By: Joel Morder
Weather Conditions: Rain
Accumulative Yards: 10 Batch Size (cy): 10
Placement Method: Direct Discharge
Water Added Before (gal): 20
Water Added After (gal):
Sample Location: Tilt panel wall to be placed at A - B/7.7
Specification - 8
Placement Location: Tilt panel wall to be placed at grids A
to 13/7.7 to 8
Age at
Maximum
Compressive
Area
Date
Date
Test
Load
Strength
Fracture
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
12.44
01/25/18
01/25/18
1 F
20,100
1,620
3
12.5
01/25/18
01/26/18
2 F
27,620
2,210
2
12.44
01/25/18
01/26/18
2 F
32,780
2,630
2
12.57
01/25/18
01/31/18
7
12.57
01/25/18
02/21/18
28
12.57
01/25/18
02/21/18
28
12.57
01/25/18
02/21/18
28
01/25/18
Hold
2
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight. F = Field Cured
Contractor requested 4 field cures to be cast, 1 of which to break at 24 hours.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Joel Morder
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
Reviewed By: ZZt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0036A
Service Date: 01/24/18
Report Date: 02/01/18 Revision 2 - 7-day results
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 2,500
psi @
4,000
psi @
Mix ID:
153K24HR
Supplier:
Miles
Batch Time:
1
Truck No.:
1 days
28 days
115 Plant: Everett
C059 Ticket No.: 202193
Field Test Data
Test Result
Slump (in): 5
Air Content (%):
Concrete Temp. (F): 65
Ambient Temp. (F): 45
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set
Specimen
Avg Diam.
No.
ID
(in)
1
A
3.98
1
B
3.99
1
C
3.98
1
E
3.98
1
F
4.00
1
G
4.00
1
H
4.00
1
D
Initial Cure: Covered with Plastic
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date: 01/24/18 Sample Time: 1230
Sampled By: Joel Morder
Weather Conditions: Rain
Accumulative Yards: 10 Batch Size (cy): 10
Placement Method: Direct Discharge
Water Added Before (gal): 20
Water Added After (gal):
Sample Location: Tilt panel wall to be placed at A - B/7.7
Specification - 8
Placement Location: Tilt panel wall to be placed at grids A
to 13/7.7 to 8
Age at
Maximum
Compressive
Area
Date
Date
Test
Load
Strength
Fracture
(sq in)
Received
Tested
(days)
(lbs)
(psi)
Type
12.44
01/25/18
01/25/18
1 F
20,100
1,620
3
12.5
01/25/18
01/26/18
2 F
27,620
2,210
2
12.44
01/25/18
01/26/18
2 F
32,780
2,630
2
12.44
01/25/18
01/31/18
7
101,200
8,130
2
12.57
01/25/18
02/21/18
28
12.57
01/25/18
02/21/18
28
12.57
01/25/18
02/21/18
28
01/25/18
Hold
2
Final Cure: Moist
Room
Comments: Compressive strength of 7 day cylinders complies with the 1 day specified strength. Not tested for plastic unit
weight. F = Field Cured
Contractor requested 4 held cures to be cast, 1 of which to break at 24 hours.
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cx000i, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0036A
Service Date: 01/24/18
Report Date: 02/01/18 Revision 2 - 7-day results
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Mayes Testing Engineers Rep.: Joel Morder
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 2 of 2
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0037
Service Date: 01/30/18
Report Date: 02/02/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Clear
On site for inspection of epoxy grouted 3/4" diameter all -thread anchor rods per RFI-084. Inspected (3) embed
panel repairs on grid line 5. Holes were inspected for size, embedment depth and cleanliness prior to using Hilti
HIT -RE 500 V3 epoxy (expiration 08/2018). A total of (29) anchor rods were installed per plans.
Visually inspected welding of panel embed plates per S 2.3 drawing for connection types A, B and C. Outside
perimeter and inside locations inspected were found acceptable except at two locations:
1) Panel 70 at grid line 8, west of B.8 has (4) embed plates missing;
2) Panel 7 at grid line 5 has one embed plate missing.
Contractor is currently making repairs to remove concrete prior to grout placement. Remaining embeds at bottom
of panels were found acceptable to plan.
PRELIMINARY INSPECTION
Embed plates missing at Panel 70 at grid line 8, west of B.8, and Panel 7 at grid line 5.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Mark Vassallo
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
GROUT OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0038
Service Date: 01/31/18
Report Date: 02/09/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: (2) 2" cubes
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Cloudy
Inspected panel #70 on grid 8 bottom connection per schedule S2.3 and found welds completed. Panel #7 work
not yet completed. At panels #8 and 9, per RFI 84, verified nuts are in snug -tight condition. Took a sample of the
grout placed at panel bases. Total of (6) cubic yards of Cadman mix 1510SKGF placed via grout pump.
PRELIMINARY INSPECTION
Panel #7 work not completed.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
GROUT COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0038A r Arerr..o^ aMPA.,
Service Date: 01/31/18 20225 Cedar Valley Rd Ste 110
Report Date: 02/08/18 Lynnwood, WA 98036-6365
Task: 425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 5,000 psi a)
28 days
Sample Date: 01/31/18 Sample Time:
Sampled By: David Schmutzler
Mix ID: 1510SKGF
Weather Conditions: Cloudy
Supplier: Miles
Accumulative Yards: 6 Batch Size: 6
Batch Time: Plant:
Sample Size: 2X2X2
Truck No.: C013 Ticket
No.: 202493
Sample Location:
Placement Location: Tilt panel base grout
Field Test Data
Form Material: Brass Molds No. Units:
Test Result
Specification
Samples Plumb: Yes
Slump (in):
Temperature Range:
Grout Temp. (F): 64
Ambient Temp. (F): 43
Laboratory Test Data
Maximum Compressive
Set Specimen Date
Date
Age
Area Load Strength Fracture
No. ID Received
Tested
(days)
(sq in) (lbs) (psi) Type
l a 02/01/18
02/07/18
7
4.04 23,620 5,850 1
1 b 02/01/18
02/07/18
7
4.10 23,790 5,800 1
1 c 02/01/18
02/07/18
7
4.12 24,410 5,920 1
Average (7 days) 5,860
1 d 02/01/18
02/28/18
28
1 e 02/01/18
02/28/18
28
1 f 02/01/18
02/28/18
28
Initial Cure: Cure Box
Final
Cure: Moist
Room
Comments:
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) PSM Consulting Engineers, Muni Vimawala
Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C109, ASTM C138, ASTM C143, ASTM C1019, ASTM C1064
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cxoo09, 11-16-12, xev.6 Page 1 of 1
GROUT COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0038A r Arerr..o^ aMPA.,
Service Date: 01/31/18 20225 Cedar Valley Rd Ste 110
Report Date: 03/01/18 Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task: 425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 5,000 psi a)
28 days
Sample Date: 01/31/18 Sample Time:
Sampled By: David Schmutzler
Mix ID: 1510SKGF
Weather Conditions: Cloudy
Supplier: Miles
Accumulative Yards: 6 Batch Size: 6
Batch Time: Plant:
Sample Size: 2X2X2
Truck No.: C013 Ticket
No.: 202493
Sample Location:
Placement Location: Tilt panel base grout
Field Test Data
Form Material: Brass Molds No. Units:
Test Result
Specification
Samples Plumb: Yes
Slump (in):
Temperature Range:
Grout Temp. (F): 64
Ambient Temp. (F): 43
Laboratory Test Data
Maximum Compressive
Set Specimen Date
Date Age
Area Load Strength Fracture
No. ID Received
Tested (days)
(sq in) (lbs) (psi) Type
l a 02/01/18
02/07/18 7
4.04 23,620 5,850 1
1 b 02/01/18
02/07/18 7
4.10 23,790 5,800 1
1 c 02/01/18
02/07/18 7
4.12 24,410 5,920 1
Average (7 days) 5,860
1 d 02/01/18
02/28/18 28
4.12 34,720 8,430 1
1 e 02/01/18
02/28/18 28
4.16 34,340 8,250 1
1 f 02/01/18
02/28/18 28
4.08 32,930 8,070 1
Average (28 days) 8,250
Initial Cure: Cure Box
Final Cure: Moist
Room
Comments: Average compressive strength of 28 day Cube complies with the specified strength. **NP = Not Performed
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Reviewed By:
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C109, ASTM C138, ASTM C143, ASTM C1019, ASTM C1064
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cxoo09, 11-16-12, xev.6 Page 1 of 1
POST -INSTALLED ANCHORS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0039
Service Date: 02/01/18
Report Date: 02/06/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Cloudy
Per RFI # 93, corrective work was performed on misaligned ledger angle installed at panel 18. Contractor
installed 3/4" diameter all -thread to an embedment of 4" using Simpson XP epoxy (expiration 08/20/18). Seven of
the (23) holes drilled have degradation to the reinforcing steel due to the use of a reinforcing steel cutter; per note
2 of the RFI, no reinforcing steel was to be cut. Spoke with engineer -of -record and superintendent about the
situation, and the engineer is requiring a scan to be performed to verify what element was cut.
NONCONFORMING CONDITIONS
A scan is required to verify cut reinforcement.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
POST -INSTALLED ANCHORS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0040
Service Date: 02/06/18
Report Date: 02/12/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.: M7171461
Weather: Overcast, 45°F
Observed the epoxy grouting of 3/4" diameter all -thread concrete anchors at the Panel 7 to foundation connection
and the Panel 18 to Panel 40 connection per RFI 084R2 and RFI 097. Simpson AT-XP epoxy was used
(lot F1039F1160, expiration 10/10/18).
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Mercado
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
POST -INSTALLED ANCHORS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0041
Service Date: 02/01/18
Report Date: 02/09/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Cloudy
Contractor installing 3/4" diameter x 16" long anchor bolts with 12" of embedment for interior columns. Post -
installed anchors okayed per RFI 5. Observed anchors being installed at grid lines 9 to 10/A.8 to B.8. Holes
were properly cleaned out and Simpson XP epoxy was utilized (expiration 08/20/18).
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
STRUCTURAL STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0042
Service Date: 02/13/18
Report Date: 02/16/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
Performed visual inspection of field fillet weldments at the following locations:
1. P/C wall panel corner connections per details 5, 6 and 9/S6.0.
2. WF beam clips to P/C wall panel embeds per detail 7/S6.1.
3. WF girder clips to P/C wall panel embeds per detail 8/S6.1.
4. Deck ledger angles to P/C wall embeds per detail A/S3.1.
M7171461
Clear
Field welds meet plans and AWS D1.1 visual acceptance criteria, after some welds sized upward due to root gap
at ledger angles, and one weld repair at corner wall panel to panel connection.
Regarding panel #7, the epoxied in 3/4" all -threads are now torque -verified to 40 foot-pounds per RFI 084R2
connection fix.
Regarding panel #18, the epoxied in 3/4" all -threads are now torque -verified to 40 foot-pounds per RFI 097
connection fix.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Todd Wirtz
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
FABRICATION SHOP OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0043
Service Date: 02/15/18
Report Date: 02/20/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Inside
At McFabco Steel, South 635 Elm Street, Seattle, WA for inspection of 1/4" fillet welds at stiffener plates on piece
marks 302A and 303F. Found welds visually acceptable per AWS D1.1 acceptance criteria.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Schmutzler
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
POST -INSTALLED ANCHORS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0044
Service Date: 02/19/18
Report Date: 03/05/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLDG2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Cloudy
On site to observe and inspect epoxy grouting of dowels into wall for slab -on -metal -deck connection. The holes
were drilled to a depth of 6" and cleaned per the manufacturer's instructions. The contractor does not have a cold
weather epoxy approved. It is currently below the minimum required temperature for installation. The contractor
has sent a submittal for a cold weather epoxy to the engineer for approval.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Jacob Keas
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
POST -INSTALLED ANCHORS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0045
Service Date: 02/21/18
Report Date: 03/02/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.:
Weather:
M7171461
Cloudy
On site for inspection of post -installed anchors for the Level 2 Mezzanine slab to wall and ramp to wall bound by
grid lines D to H/11 to 12.
The ramp to wall anchorage was installed per detail C/S4.1, and the Level 2 Mezzanine was completed per detail
B/S3.1. Prior to epoxy placement, hole depth and cleanliness were verified. Contractor used Hilti HIT-HY 200-R
epoxy (lot 042017, expiration 11/2018).
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Joel Morder
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
FABRICATION SHOP OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0046
Service Date: 02/21/18
Report Date: 02/27/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.: M7171461
Weather: Clear
Performed welding inspection at the McFabco Steel Co. shop in Seattle, WA. Received WABO cards for Jason R
Huerta (#W17049, 07/01/18), Zsolt Prepuk (#W21935, 10/01/18), Thien H Nguyen (#W21116, 04/01/18), Jeffrey
A Daniels (#W17708, 04/01/18), and Terry W Greenwood (#W00383, 04/01/18). Received WPS #3.14159.
Received the National Standard Certificate for Tru-Core FC71 T, which is usable for demand -critical welds.
Visually inspected welds and general conformance of columns labeled 404A, 40513, 405C, 406C, 407A, 40713,
407C, 408A, 40813, 409A and 409B on McFabco Steel Co. drawings dated 11/01/17 revision 2. The through -
plate on column 404A was plug -welded and then covered by a plate so first on site inspected each pass of the
plug weld and then plate that completes the column 404A.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Harold Edmonds
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0047
Service Date: 02/20/18
Report Date: 02/27/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLDG2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Follow-up to Mayes Testing Engineers NCR field report 0039, service date 02/01/18, indicating reinforcing steel
damaged during drilling operations into the concrete wall panel. A scan was required and performed to verify cut
reinforcement and that was done after issuance of field report. Received attached email from Foushee- Jeremy
Webb dated 02/15/18 indicating PSM engineer- Muni Vimawala accepting wall panel condition where only the
horizontal reinforcing steel bars were damaged. We consider this matter to be closed, with no remedial action
required by the enaineer-of-record.
CORRECTIVE ACTION TAKEN
Received attached email from Foushee- Jeremy Webb dated 02/15/18 indicating PSM engineer- Muni Vimawala
accepting wall panel condition where only the horizontal reinforcing steel bars were damaged; Mayes Testing
Engineers nonconforming report 0039, service date 02/01/18, is now closed.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Todd Wirtz
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
From: Jeremy Webb <jwebb@foushee.com>
Sent: Tuesday, February 20, 2018 12:20 PM
To: Wirtz, Todd A
Cc: dhestes_aia@frontier.com; Paul Wasell; Craig Miller; Butch Gleason; Muni
Vimawala
Subject: RE: MT - non -conforming inspection reports
Todd,
Can you please issue a revised report clearing this up?
Thanks,
Jeremy
From: Jeremy Webb
Sent: Friday, February 16, 2018 2:14 PM
To: Twirtz (Twirtz@Mayestesting.com) <Twirtz@Mayestesting.com>
Cc:'dhestes_aia@frontier.com' <dhestes aia@frontier.com>; Paul Wasell <pwasell@foushee.com>;
Craig Miller <cmiller@foushee.com>; Butch Gleason (bgleason@foushee.com)
<bgleason@foushee.com>;'Muni Vimawala' <muniv@psm-engineers.com>
Subject: RE: MT - non -conforming inspection reports
Todd,
Per our conversation, please find both the imaging report from SRI as well as Muni's response
(CC'ed here) indicating the installation is acceptable.
Please provide a revision to report #39 removing the NCR.
Thanks,
Jeremy
From: Jeremy Webb
Sent: Thursday, February 15, 2018 1:17 PM
To:'Muni Vimawala' <muniv@psm-engineers.com>
Cc: dhestes aia@frontier.com; Paul Wasell <pwasell@foushee.com>; Craig Miller
<cmiller@foushee.com>; Butch Gleason (bgleason@foushee.com) <bgleason@foushee.com>
Subject: RE: MT - non -conforming inspection reports
Muni,
Will do. This report was written prior to the imaging. Once we imaged the panel and got
confirmation from you that the panel will be okay (considering we only hit horizontal bar) I
believe the email was presented to the special inspector. This should have already been cleared
up.
Paul, Butch
Can we please get this cleared up with the inspector?
Thanks,
Jeremy
From: Muni Vimawala [mailto:muniv@psm-engineers.com]
Sent: Thursday, February 15, 2018 1:11 PM
To: Jeremy Webb <jwebb@foushee.com>
Cc: dhestes aia@frontier.com; Paul Wasell <pwasell@foushee.com>; Craig Miller
<cmiller@foushee.com>
Subject: MT - non -conforming inspection reports
Hi Jeremy,
I got a call from Todd of Mays Testing regarding the attached NCR. Will you please make sure that the
inspector is aware of all our written communications regarding any deviation from drawings or
resolutions to non -confirming reports? This is required so that they can issue a confirming report for the
same item. Without this we may have trouble issuing project closeout certificate from them and us!
Thanks.
Muni Vimawala, P.E., S.E.
PSM Engineers
Direct: 206-239-7714
Office: 206-622-4580 X 136
www.psm-engineers.com
POST -INSTALLED ANCHORS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0048
Service Date: 02/23/18
Report Date: 03/05/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLDG2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
280F
Observed the installation of the post -installed #6 dowels that join the parking garage roof slab to the exterior
precast walls. The contractor has completed installing these dowels in the parking garage roof locations, with the
exception of those located in the following areas: west wall from grid line 7 to line 10, and along the north wall
from grids 11/C.5 to H-line. Installation in all other areas was completed with #6x2'0" reinforcing dowels which
were secured with Hilti HIT-HY 200-R epoxy every 12" along the perimeter wall per detail C on page S4.1.
Adhesive application and dowel installation were also found to be performed in accordance with the instructions
provided in the specified ICC ESR 3187.
Note: The contractor has received approval to use the Hilti HIT-HY 200-R adhesive anchoring system via
RFI 091.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Shannon Burgess
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
GENERAL OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0049
Service Date: 02/26/18
Report Date: 03/01 /18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLDG2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
430F
Item 1: Observed the installation of the post -installed #6 dowels that join the parking garage roof slab to the
exterior precast walls. The contractor has now completed installing these dowels in the specified locations along
the parking garage roof. Dowel installation was completed with #6x2'0" reinforcing dowels spaced 12" along the
precast wall; per detail C on page S4.1. Adhesive application and dowel installation were also found to be
performed in accordance with the instructions provided in the specified ICC ESR 3187. Note: Epoxy was Hilti
HIT-HY 200-R (lot 13691991, expiration 03/11/18).
Item 2: Performed visual inspection on the welded shear connectors and puddle welds located along the steel
decking that supports the parking garage roof. This inspection revealed missing shear studs along the W24x94
beam located at grid G/8.5. The contactor has indicated that additional shear studs would be added at this
location on a later date. Follow-up inspection will be required to verify. All other areas were found to contain the
number of shear connectors specified in the Parking Roof framing drawings. Visual appearance of the inspected
welds also satisfied the acceptance criteria provided in AWS D1.1.
Note: The contractor has received approval to use the Hilti HIT-HY 200-R adhesive anchoring system via
RFI 091.
NONCONFORMING CONDITIONS
Missing shear connector on parking garage roof decking at grid G/8.5 (reference Item 2 above).
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Shannon Burgess
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0051
Service Date: 03/02/18
Report Date: 03/07/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: (16) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.: M7171461
Weather: Overcast, 40°F
On site to finalize the reinforcing steel inspection for the slab -on -metal -deck between grid lines 5 to 11/A to H, the
ramp between grid lines B.8 to G.8/11 to 12, and the co -generator room mezzanine. Up to (10) workers were
making the needed corrections noted in report M7171461.0050 prior to the concrete placement. One of the boom
pumps had a mechanical failure delaying concrete placement and affording time for corrections to be made.
Verified that reinforcing was chaired and tied correctly immediately prior to the concrete placement.
Approximately (350) cubic yards of Miles concrete mix 07450GF were placed using (2) boom pumps. The
concrete was mechanically consolidated. Sixteen (16) 4x8" cylinders were cast for compression strength testing
(4000 psi at 28 days required).
Miles QC was on site throughout the concrete placement and City of Edmonds Inspector Milton visited briefly.
CORRECTIVE ACTION TAKEN
This report closes report M7171461.0050.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Mercado
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, Robert Gardner
Wasell Todd Wirtz
(1) Miles Sand & Gravel, Michael (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Craiq Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0051A
Service Date: 03/02/18
Report Date: 03/12/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 07450GF
Supplier: Miles
Batch Time: Plant:
Truck No.: C057 Ticket No.: 203643
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
5
67
37
Set
Specimen
Avg Diam.
No.
ID
(in)
1
1
4.00
1
2
4.00
1
3
4.00
1
4
4.00
Initial Cure: Cure Box
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Area
Date
Date
(sq in)
Received
Tested
12.57
03/05/18
03/09/18
12.57
03/05/18
03/30/18
12.57
03/05/18
03/30/18
12.57
03/05/18
03/30/18
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Mercado
Reported To: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
03/02/18 Sample Time:
David Mercado
Overcast
130 Batch Size (cy): 10
Pump
15
Slab -on -metal -deck
Slab -on -metal -deck within grids 5 to
11/A to H, ramp within grids B.8 to
G.8/11 to 12.
Age at
Maximum
Test
Load
(days)
(lbs)
7
56,620
28
28
28
Compressive
Strength Fracture
(psi) Type
4,510 1
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0051A
Service Date: 03/02/18
Report Date: 03/12/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 07450GF
Supplier: Miles
Batch Time: Plant:
Truck No.: C144 Ticket No.: 203650
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
9
64
38
Set
Specimen
Avg Diam.
No.
ID
(in)
2
1
3.98
2
2
4.00
2
3
4.00
2
4
4.00
Initial Cure: Cure Box
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
03/02/18 Sample Time:
Sampled By:
David Mercado
Weather Conditions:
Overcast
Accumulative Yards:
200 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
38
Water Added After (gal):
Sample Location:
Slab -on -metal -deck
Placement Location:
Slab -on -metal -deck within grids 5 to
11/A to H, ramp within grids B.8 to
G.8/11 to 12.
Area
Date
Date
(sq in)
Received
Tested
12.44
03/05/18
03/09/18
12.57
03/05/18
03/30/18
12.57
03/05/18
03/30/18
12.57
03/05/18
03/30/18
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Mercado
Reported To: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Age at
Maximum
Test
Load
(days)
(lbs)
7
47,990
28
28
28
Compressive
Strength Fracture
(psi) Type
3,860 2
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 2 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0051A
Service Date: 03/02/18
Report Date: 03/12/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 07450GF
Supplier: Miles
Batch Time: Plant:
Truck No.: C144 Ticket No.: 203665
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
6
62
40
Set
Specimen
Avg Diam.
No.
ID
(in)
3
1
3.97
3
2
4.00
3
3
4.00
3
4
4.00
Initial Cure: Cure Box
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Area
Date
Date
(sq in)
Received
Tested
12.38
03/05/18
03/09/18
12.57
03/05/18
03/30/18
12.57
03/05/18
03/30/18
12.57
03/05/18
03/30/18
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Mercado
Reported To: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
03/02/18 Sample Time:
David Mercado
Overcast
319 Batch Size (cy): 10
Pump
10
Slab -on -metal -deck
Slab -on -metal -deck within grids 5 to
11/A to H, ramp within grids B.8 to
G.8/11 to 12.
Age at
Maximum
Test
Load
(days)
(lbs)
7
61,520
28
28
28
Compressive
Strength Fracture
(psi) Type
4,970 5
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 3 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0051A
Service Date: 03/02/18
Report Date: 03/12/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 07450GF
Supplier: Miles
Batch Time: Plant:
Truck No.: C013 Ticket No.: 203667
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
6
62
42
Set
Specimen
Avg Diam.
No.
ID
(in)
4
1
3.98
4
2
4.00
4
3
4.00
4
4
4.00
Initial Cure: Cure Box
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Area
Date
Date
(sq in)
Received
Tested
12.44
03/05/18
03/09/18
12.57
03/05/18
03/30/18
12.57
03/05/18
03/30/18
12.57
03/05/18
03/30/18
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Mercado
Reported To: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
03/02/18 Sample Time:
David Mercado
Overcast
339 Batch Size (cy): 10
Pump
15
Ramp
Slab -on -metal -deck within grids 5 to
11/A to H, ramp within grids B.8 to
G.8/11 to 12.
Age at
Maximum
Test
Load
(days)
(lbs)
7
54,790
28
28
28
Compressive
Strength Fracture
(psi) Type
4,400 2
Reviewed By: ZZt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 4 of 4
STRUCTURAL STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0052
Service Date: 03/02/18
Report Date: 03/07/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Cloudy
On site for structural steel welding inspection in accordance with AWS D 1.1 specifications. Inspected roof
elevation welding between grid lines 1 to 5 from A to H. Roof joists to columns per detail 1/S5.2 and joist to
embed ledger angle per detail 2/S5.2 were inspected. Lines A, C, D, E and H were inspected and acceptable
along grid 1. Ledger angle splice welds inspected per detail 8/S1.4 along grid H are acceptable. Angles welded
to joists at SW corner per detail K/S5.1 were acceptable between grids G to H from 1 to 1.2 lines. Mechanical
framing welding inspected per roof opening details on S1.3 drawing. Beam shear clips welded along 1-line at
grids B, C, D and E are acceptable.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Mark Vassallo
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
STRUCTURAL STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0053
Service Date: 03/07/18
Report Date: 03/12/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Sunny
Performed visual inspection of roof deck puddle welds and DeltaGrip® grip -lock side seam crimps. Inspected the
high roof at grid lines 1 to 5/A to H; oil room roof and stair roof and found per details on S7.1.
Inspected welds for (2) roof davits on high roof and found welding per detail 9 on S1.4. Noted cold galvanizing
spray was applied to weld area.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Michael Mattox
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
POST -INSTALLED ANCHORS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0054
Service Date: 03/13/18
Report Date: 03/16/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLDG2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Under cover
On site for inspection of post -installation of #6 bar dowels at mezzanine level, per detail A/S3.1, #6 bar dowels x
24" at 12" on center with 4" of embedment. Holes were drilled to depth and clean. Simpson SET-XP epoxy was
placed and dowel bars inserted. Procedure appears per ICC-ESR 2508. Epoxy information: lot 107F092E,
expiration 07/18/18. Approximately (270) bars were installed at grid lines A/4 to 5, 5/A to H, H/1 to 5 and 1/G to
H.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: David Bernier
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0056
Service Date: 03/15/18
Report Date: 03/20/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Monitored and tested placement of (100) cubic yards of Miles Sand & Gravel concrete mix 07450GF at the
mezzanine level slab -on -metal -deck. The concrete was placed via pump and mechanically consolidated.
Reinforcing steel was inspected prior to placement; noted corrections required by Mayes Testing Engineers
(MTE) preliminary report, service date 03/14/18, have been corrected. This report closes out report, service date
03/14/18. One set of (4) 4x8" cylinders was cast for compressive strength testing.
Monitored installation of (8) 3/4" diameter all -thread anchor bolts for entrance columns at grids A/1.7 and 1/A.5.
Holes were drilled to required depth of 12", and brushed and blown clean prior to installation. The epoxy used
was Simpson SET-XP (lot 107E092E, expiration 07/18/19). Installation was performed in accordance to RFI 05.
CORRECTIVE ACTION TAKEN
Noted corrections required by MTE Preliminary Report, service date 03/14/18, have been corrected. MTE
Preliminary Report 0055, service date 03/14/18, is closed.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, Robert Gardner
Wasell Todd Wirtz
(1) Miles Sand & Gravel, Michael (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Craiq Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0056A
Service Date: 03/15/18
Report Date: 03/23/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID:
07450GF
Supplier:
Miles
Batch Time:
0530 Plant:
Truck No.:
C059 Ticket No.: 103013
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
6
64
45
Set
Specimen
Avg Diam.
No.
ID
(in)
1
a
3.98
1
b
4.00
1
c
4.00
1
d
4.00
Initial Cure: Outside
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Area
Date
Date
(sq in)
Received
Tested
12.44
03/16/18
03/22/18
12.57
03/16/18
04/12/18
12.57
03/16/18
04/12/18
12.57
03/16/18
04/12/18
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
03/15/18 Sample Time:
Carl Reynolds
Cloudy
150 Batch Size (cy): 10
Pump
Mezzanine Level slab -on -metal deck.
Age at
Maximum
Test
Load
(days)
(lbs)
7
68,310
28
28
28
Compressive
Strength Fracture
(psi) Type
5,490 2
Mayes Testing Engineers Rep.: Carl Reynolds
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0056A
Service Date: 03/15/18
Report Date: 04/13/18 Revision 1 - 28-day results
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID:
07450GF
Supplier:
Miles
Batch Time:
0530 Plant:
Truck No.:
C059 Ticket No.: 103013
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Result Specification
6
64
45
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
1 a 3.98
1 b 3.98
1 c 3.97
1 d 3.98
Area
Date
(sq in)
Received
12.44
03/16/18
12.44
03/16/18
12.38
03/16/18
12.44
03/16/18
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
03/15/18 Sample Time:
Carl Reynolds
Cloudy
150 Batch Size (cy): 10
Pump
Mezzanine Level slab -on -metal deck.
Age at Maximum
Date
Test
Load
Tested
(days)
(lbs)
03/22/18
7
68,310
04/12/18
28
89,570
04/12/18
28
97,340
04/12/18
28
94,120
Average (28 days)
Compressive
Strength
Fracture
(psi)
Type
5,490
2
7,200
2
7,860
2
7,570
2
7,540
Initial Cure: Outside Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0057
Service Date: 03/26/18
Report Date: 03/30/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Clouds
Inspected reinforcing steel installed into the following locations: Alignment pit slabs at grids E to G/10 to 11 and
catch basin at grid 9.2/A to B.8. The reinforcing steel was inspected for grade, size, number, spacing and
placement per details A/S2.2 and A/S1.2. Final inspection of clearances and cleanliness to be made prior to
concrete placement.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0058
Service Date: 03/27/18
Report Date: 04/02/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Clouds
Monitored and tested placement of (10) cubic yards of Miles Sand & Gravel concrete mix 025003P at alignment
pit slabs, grids E to G/10 to 11, catch basin, grid 9.2/A to B.8 and light pole bases on top level. The concrete was
placed via buggy and mechanically consolidated. Reinforcing steel was inspected prior to placement and found
to be installed according to contract documents. One (1) set of (4) 4x8" cylinders was cast for compressive
strength testing.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates, Inc., Craig (1) Foushee & Associates, Inc., Reviewed By:
Miller Jeremy Webb
(1) Foushee & Associates, Inc., Paul (1) Mayes Testing Engineers, Inc, Robert Gardner
Wasell Todd Wirtz
(1) Miles Sand & Gravel, Michael (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Craiq Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0058A
Service Date: 03/27/18
Report Date: 04/04/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 3,000 psi @ 28 days
Mix ID:
025003P
Supplier:
Miles Sand and Gravel
Batch Time:
0700 Plant:
Truck No.:
C115 Ticket No.: 103432
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
5
65
44
Set
Specimen
Avg Diam.
No.
ID
(in)
1
a
3.98
1
b
4.00
1
c
4.00
1
d
4.00
Initial Cure: Inside
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Area
Date
Date
(sq in)
Received
Tested
12.44
03/28/18
04/03/18
12.57
03/28/18
04/24/18
12.57
03/28/18
04/24/18
12.57
03/28/18
04/24/18
Final Cure: Moist
Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
03/27/18 Sample Time:
Carl Reynolds
Clouds
10 Batch Size (cy): 10
Buggy
Alignment pit slabs, grids E to G/10
to 11, catch basin, grid line 9.2/A to
B.8, and light pole bases.
Age at
Maximum
Test
Load
(days)
(lbs)
7
43,410
28
28
28
Compressive
Strength Fracture
(psi) Type
3,490 2
Mayes Testing Engineers Rep.: Carl Reynolds
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates, Inc., Craig Miller (1) Foushee & Associates, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0058A
alre«aconCO =A"
Service Date: 03/27/18
20225 Cedar Valley Rd Ste 110
Report Date: 04/25/18 Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 3,000 psi @ 28
days Sample Date:
03/27/18 Sample Time:
Sampled By:
Carl Reynolds
Mix ID: 025003P
Weather Conditions:
Clouds
Supplier: Miles Sand and Gravel
Accumulative Yards:
10 Batch Size (cy): 10
Batch Time: 0700 Plant:
Placement Method:
Buggy
Truck No.: C115 Ticket No.:
103432 Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test Result
Specification Placement Location:
Alignment pit slabs, grids E to G/10
Slump (in): 5
to 11, catch basin, grid line 9.2/A to
Air Content (%):
B.8, and light pole bases.
Concrete Temp. (F): 65
Ambient Temp. (F): 44
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture Tested
No. ID (in) (sq in)
Received Tested (days) (lbs)
(psi) Type By
1 a 3.98 12.44
03/28/18 04/03/18 7 43,410
3,490 2
1 b 4.00 12.57
03/28/18 04/24/18 28 63,280
5,040 2 ARC
1 c 4.00 12.57
03/28/18 04/24/18 28 65,390
5,200 2 ARC
1 d 3.97 12.38
03/28/18 04/24/18 28 61,620
4,980 2 ARC
Average (28 days)
5,070
Initial Cure: Inside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0059
Service Date: 04/06/18
Report Date: 04/19/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLDG2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Overcast
Reinforcing steel was inspected for slabs -on -grade and topping slabs, grids 12 to 8/A to H and 1 to 5/E to H, and
at a trench drain, grid H/5 to 6.5. Reinforcing was found to be per the approved plans and specifications. A final
inspection for clearances and cleanliness should be made just prior to concrete placement.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Charles Edgerton
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates Co, Inc., (1) Foushee & Associates Co, Inc., Reviewed By:
Craiq Miller Jeremy Webb
(1) Foushee & Associates Co, Inc., (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Paul Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0060A
Service Date: 04/12/18
Report Date: 04/23/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 07450GF
Supplier: Miles Sand & Gravel
Batch Time: 0713 Plant:
Truck No.: C184 Ticket No.: 104089
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
6 1/2
No. ID
(in)
1 A
3.99
1 B
4.00
1 C
4.00
1 D
4.00
Initial Cure: Inside
67
40
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
04/12/18 Sample Time: 0810
Sampled By:
Asteway Kidane
Weather Conditions:
Cloudy 40's
Accumulative Yards:
50 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
30
Water Added After (gal):
Sample Location:
Placement Location:
Slab -on -grade and topping slabs,
grids12 to 8/A to H, 1 to 5/E to H and
at a trench drain, H line/ 5 to 6.5.
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.5
04/16/18
04/19/18
7 69,290
12.57
04/16/18
05/10/18
28
12.57
04/16/18
05/10/18
28
12.57
04/16/18
05/10/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Compressive
Strength Fracture Tested
(psi) Type By
5,540 2 ARC
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0060A
Service Date: 04/12/18
Report Date: 04/23/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID:
07450GF
Supplier:
Miles Sand & Gravel
Batch Time:
1024 Plant:
Truck No.:
C185 Ticket No.: 104130
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
Result Specification
7
No. ID
(in)
2 A
3.98
2 B
4.00
2 C
4.00
2 D
4.00
Initial Cure: Inside
68
46
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
04/12/18 Sample Time: 1120
Sampled By:
Asteway Kidane
Weather Conditions:
Cloudy 40's
Accumulative Yards:
190 Batch Size (cy): 10
Placement Method:
Pump
Water Added Before (gal):
25
Water Added After (gal):
Sample Location:
Placement Location:
Slab -on -grade and topping slabs, grids
12 to 8/A to H, 1 to 5/E to H and at a
trench drain, H line/5 to 6.5.
Age at Maximum
Area
Date
Date
Test Load
(sq in)
Received
Tested
(days) (lbs)
12.44
04/16/18
04/19/18
7 59,440
12.57
04/16/18
05/10/18
28
12.57
04/16/18
05/10/18
28
12.57
04/16/18
05/10/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Compressive
Strength Fracture Tested
(psi) Type By
4,780 2 ARC
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000l, 11-16-12, xev.6 Page 2 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0060A
alre«acon CO"A"
Service Date: 04/12/18
20225 Cedar Valley Rd Ste 110
Report Date: 05/11/18
Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 4,000
psi @ 28
days Sample Date:
04/12/18 Sample Time: 0810
Sampled By:
Asteway Kidane
Mix ID: 07450GF
Weather Conditions:
Cloudy 40's
Supplier: Miles Sand &
Gravel
Accumulative Yards:
50 Batch Size (cy): 10
Batch Time: 0713
Plant:
Placement Method:
Pump
Truck No.: C184
Ticket No.:
104089 Water Added Before (gal):
30
Field Test Data
Water Added After (gal):
Sample Location:
Test
Result
Specification Placement Location:
Slab -on -grade and topping slabs,
Slump (in):
6 1/2
grids12 to 8/A to H, 1 to 5/E to H and
Air Content (%):
at a trench drain, H line/ 5 to 6.5.
Concrete Temp. (F):
67
Ambient Temp. (F):
40
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture Tested
No. ID (in)
(sq in)
Received Tested (days) (lbs)
(psi) Type By
1 A 3.99
12.5
04/16/18 04/19/18 7 69,290
5,540 2 ARC
1 B 3.98
12.44
04/16/18 05/10/18 28 93,440
7,510 5 KWB
1 C 3.98
12.44
04/16/18 05/10/18 28 90,490
7,270 5 KWB
1 D 3.98
12.44
04/16/18 05/10/18 28 93,310
7,500 6 KWB
Average (28 days)
7,430
Initial Cure: Inside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0060A
alre«acon CO"A"
Service Date: 04/12/18
20225 Cedar Valley Rd Ste 110
Report Date: 05/11/18 Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 4,000 psi @ 28
days Sample Date:
04/12/18 Sample Time: 1120
Sampled By:
Asteway Kidane
Mix ID: 07450GF
Weather Conditions:
Cloudy 40's
Supplier: Miles Sand & Gravel
Accumulative Yards:
190 Batch Size (cy): 10
Batch Time: 1024 Plant:
Placement Method:
Pump
Truck No.: C185 Ticket No.:
104130 Water Added Before (gal):
25
Field Test Data
Water Added After (gal):
Sample Location:
Test Result
Specification Placement Location:
Slab -on -grade and topping slabs, grids
Slump (in): 7
12 to 8/A to H, 1 to 5/E to H and at a
Air Content (%):
trench drain, H line/5 to 6.5.
Concrete Temp. (F): 68
Ambient Temp. (F): 46
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture Tested
No. ID (in) (sq in)
Received Tested (days) (lbs)
(psi) Type By
2 A 3.98 12.44
04/16/18 04/19/18 7 59,440
4,780 2 ARC
2 B 3.98 12.44
04/16/18 05/10/18 28 80,720
6,490 5 KWB
2 C 3.99 12.5
04/16/18 05/10/18 28 81,770
6,540 2 KWB
2 D 3.99 12.5
04/16/18 05/10/18 28 83,000
6,640 2 KWB
Average (28 days)
6,560
Initial Cure: Inside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 2 of 2
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0061
Service Date: 04/17/18
Report Date: 04/23/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Sunny, 40's
Topping Slab Placement
Observed placement of topping slab between grid lines G.9 and B.9 from 12 to 11. A total of (126) cubic yards of
Miles Sand & Gravel concrete mix 07450GF was placed via pump with mechanical consolidation. Reinforcing
steel was inspected for clearance and cleanliness prior to concrete placement, and was found to be per the
specification requirements. A set of (4) 4x8" cylinders was cast for compressive strength testing.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates Co, Inc., (1) Foushee & Associates Co, Inc., Reviewed By:
Craiq Miller Jeremy Webb
(1) Foushee & Associates Co, Inc., (1) Mayes Testing Engineers, Inc, Robert Gardner
Paul Wasell Todd Wirtz
(1) Miles Sand & Gravel, Michael (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Craiq Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0061A
Service Date: 04/17/18
Report Date: 04/25/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID:
07450GF
Supplier:
Miles Sand & Gravel
Batch Time:
0707 Plant:
Truck No.:
C013 Ticket No.: 104278
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
1 1 3.98
1 2
1 3
1 4
Initial Cure: Inside
Result Specification
7
69
44
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date: 04/17/18 Sample Time: 0820
Sampled By: Asteway Kidane
Weather Conditions: Sunny 40's
Accumulative Yards: 50 Batch Size (cy): 10
Placement Method:
Water Added Before (gal): 50
Water Added After (gal):
Sample Location:
Placement Location: Topping slab between grid lines G.9
and B.9 from grids 12 to 11
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.44 04/19/18
04/24/18
7 56,820
04/19/18
05/15/18
28
04/19/18
05/15/18
28
04/19/18
05/15/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Compressive
Strength Fracture Tested
(psi) Type By
4,570 2 ARC
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000l, 11-16-12, Rev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0061A
alre«aconCO =A"
Service Date: 04/17/18
20225 Cedar Valley Rd Ste 110
Report Date: 05/16/18 Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 4,000 psi @ 28
days Sample Date:
04/17/18 Sample Time: 0820
Sampled By:
Asteway Kidane
Mix ID: 07450GF
Weather Conditions:
Sunny 40's
Supplier: Miles Sand & Gravel
Accumulative Yards:
50 Batch Size (cy): 10
Batch Time: 0707 Plant:
Placement Method:
Truck No.: C013 Ticket No.:
104278 Water Added Before (gal):
50
Field Test Data
Water Added After (gal):
Sample Location:
Test Result
Specification Placement Location:
Topping slab between grid lines G.9
Slump (in): 7
and B.9 from grids 12 to 11
Air Content (%):
Concrete Temp. (F): 69
Ambient Temp. (F): 44
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture Tested
No. ID (in) (sq in)
Received Tested (days) (lbs)
(psi) Type By
1 1 3.98 12.44
04/19/18 04/24/18 7 56,820
4,570 2 ARC
1 2 3.99 12.5
04/19/18 05/15/18 28 74,140
5,930 2 KWB
1 3 3.99 12.5
04/19/18 05/15/18 28 73,940
5,910 2 KWB
1 4 3.99 12.5
04/19/18 05/15/18 28 75,430
6,030 2 KWB
Average (28 days)
5,960
Initial Cure: Inside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
REINFORCING STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0062
Service Date: 04/23/18
Report Date: 04/27/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Clear
Inspected the reinforcing steel installation on slab -on -grade for the area located on grids lines 5 to 7.5/A to H.
The reinforcing steel was inspected for size, grade, lap length and clearances per approved plans.
Note (preliminary):
Chairs need to be placed to keep the reinforcing steel at the middle of the slab.
PRELIMINARY INSPECTION
Preliminary for the note above.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Anas Mandi
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates Co, Inc., (1) Foushee & Associates Co, Inc., Reviewed By:
Craiq Miller Jeremy Webb
(1) Foushee & Associates Co, Inc., (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Paul Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0063
Service Date: 04/25/18
Report Date: 04/30/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: (8) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Sunny, 50's
Observed placement of the slab -on -grade between grid lines A to H and 8 to 5. A total of (212) cubic yards of
Miles Sand & Gravel concrete mix 07450GF was placed via pump with mechanical consolidation. Reinforcing
steel was previously inspected and found to conform to approved plans.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates Co, Inc., (1) Foushee & Associates Co, Inc., Reviewed By:
Craiq Miller Jeremy Webb
(1) Foushee & Associates Co, Inc., (1) Mayes Testing Engineers, Inc, Robert Gardner
Paul Wasell Todd Wirtz
(1) Miles Sand & Gravel, Michael (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Craiq Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0063A
Service Date: 04/25/18
Report Date: 05/03/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 07450GF
Supplier: MIiles Sand & Gravel
Batch Time: 0716 Plant:
Truck No.: C082 Ticket No.: 104745
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
7 1/2
Set Specimen Avg Diam.
No. ID (in)
1 1 3.98
1 2
1 3
1 4
Initial Cure: Inside
73
52
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2016-1684
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.44 04/26/18
05/02/18
7 58,860
04/26/18
05/23/18
28
04/26/18
05/23/18
28
04/26/18
05/23/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
04/25/18 Sample Time: 0825
Asteway Kidane
Sunny, 50's
60 Batch Size (cy): 10
Pump
15
Slab -on -grade between grid lines A to
Hand 8to5
Compressive
Strength Fracture Tested
(psi) Type By
4,730 2 HRB
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000l, 11-16-12, Rev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0063A
Service Date: 04/25/18
Report Date: 05/03/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID: 07450GF
Supplier: MIiles Sand & Gravel
Batch Time: 0956 Plant:
Truck No.: C062 Ticket No.: 104768
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Set Specimen Avg Diam.
No. ID (in)
2 1 3.99
2 2
2 3
2 4
Initial Cure: Inside
Result Specification
8
70
52
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2016-1684
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.5 04/26/18
05/02/18
7 62,700
04/26/18
05/23/18
28
04/26/18
05/23/18
28
04/26/18
05/23/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
04/25/18 Sample Time: 1045
Asteway Kidane
Sunny, 50's
179.5 Batch Size (cy): 10
Pump
19
Slab -on -grade between grid lines A to
Hand 8to5
Compressive
Strength Fracture Tested
(psi) Type By
5,010 2 HRB
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000l, 11-16-12, Rev.6 Page 2 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0063A
alre«acon CO"A"
Service Date: 04/25/18
20225 Cedar Valley Rd Ste 110
Report Date: 05/24/18 Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2016-1684
Material Information
Sample Information
Specified Strength: 4,000 psi @ 28
days Sample Date:
04/25/18 Sample Time: 0825
Sampled By:
Asteway Kidane
Mix ID: 07450GF
Weather Conditions:
Sunny, 50's
Supplier: MIiles Sand & Gravel
Accumulative Yards:
60 Batch Size (cy): 10
Batch Time: 0716 Plant:
Placement Method:
Pump
Truck No.: C082 Ticket No.:
104745 Water Added Before (gal):
15
Field Test Data
Water Added After (gal):
Sample Location:
Test Result
Specification Placement Location:
Slab -on -grade between grid lines A to
Slump (in): 7 1/2
H from 8 to 5
Air Content (%):
Concrete Temp. (F): 73
Ambient Temp. (F): 52
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture Tested
No. ID (in) (sq in)
Received Tested (days) (lbs)
(psi) Type By
1 1 3.98 12.44
04/26/18 05/02/18 7 58,860
4,730 2 HRB
1 2 3.99 12.5
04/26/18 05/23/18 28 82,420
6,590 2 ARC
1 3 3.99 12.5
04/26/18 05/23/18 28 82,040
6,560 2 ARC
1 4 3.99 12.5
04/26/18 05/23/18 28 81,640
6,530 2 ARC
Average (28 days)
6,560
Initial Cure: Inside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0063A
alre«acon CO"A"
Service Date: 04/25/18
20225 Cedar Valley Rd Ste 110
Report Date: 05/24/18 Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2016-1684
Material Information
Sample Information
Specified Strength: 4,000 psi @ 28
days Sample Date:
04/25/18 Sample Time: 1045
Sampled By:
Asteway Kidane
Mix ID: 07450GF
Weather Conditions:
Sunny, 50's
Supplier: MIiles Sand & Gravel
Accumulative Yards:
179.5 Batch Size (cy): 10
Batch Time: 0956 Plant:
Placement Method:
Pump
Truck No.: C062 Ticket No.:
104768 Water Added Before (gal):
19
Field Test Data
Water Added After (gal):
Sample Location:
Test Result
Specification Placement Location:
Slab -on -grade between grid lines A to
Slump (in): 8
H from 8 to 5
Air Content (%):
Concrete Temp. (F): 70
Ambient Temp. (F): 52
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture Tested
No. ID (in) (sq in)
Received Tested (days) (lbs)
(psi) Type By
2 1 3.99 12.5
04/26/18 05/02/18 7 62,700
5,010 2 HRB
2 2 3.99 12.5
04/26/18 05/23/18 28 78,400
6,270 2 ARC
2 3 3.98 12.44
04/26/18 05/23/18 28 81,720
6,570 2 ARC
2 4 3.99 12.5
04/26/18 05/23/18 28 76,520
6,120 2 ARC
Average (28 days)
6,320
Initial Cure: Inside
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Asteway Kidane
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 2 of 2
STRUCTURAL STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0064
Service Date: 05/07/18
Report Date: 05/14/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Clear
Visually inspected weldments on Stair 206, 228, 119, 225 and 230. Welding completed by WABO certified
welders and conformed to AWS D1.1 visual acceptance criteria and contract documents.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates Co, Inc., (1) Foushee & Associates Co, Inc., Reviewed By:
Craiq Miller Jeremy Webb
(1) Foushee & Associates Co, Inc., (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Paul Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0065
Service Date: 05/18/18
Report Date: 05/25/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLDG-2017-0493
Samples: (16) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Cloudy
Performed final reinforcing steel inspection for the Level 2 Parking topping slab and ramp. Verified the reinforcing
steel was placed per the approved contract document details C and H/S4.1, RFI-158, and specifications.
Observed the placement of approximately (325) cubic yards of Miles Sand & Gravel concrete mix 12600AFG for
the Level 2 Parking topping slab and ramp. The concrete was placed via concrete pump truck and mechanically
vibrated for consolidation. Samples were taken and (4) sets of (4) 4x8" cylinders were cast for compressive
strength testing (5000 psi at 28 days required). Air content tests were performed, all passing: Set 1- 4.9%, Set 2-
5.9%, Set 3- 6%, and Set 4- 6.2%.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Additional Inspector on site: Zachary Mamlock
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Randal Dohrman
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates Co, Inc., (1) Foushee & Associates Co, Inc., Reviewed By:
Craiq Miller Jeremy Webb
(1) Foushee & Associates Co, Inc., (1) Mayes Testing Engineers, Inc, Robert Gardner
Paul Wasell Todd Wirtz
(1) Miles Sand & Gravel, Michael (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Craiq Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.006513
alre«acon
CO"A"
Service Date: 05/18/18
20225 Cedar Valley Rd Ste 110
Report Date: 06/19/18
Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 5,000
psi @ 28
days Sample Date:
05/18/18 Sample Time:
0600
Sampled By:
Randal Dohrman
Mix ID: 12600AFG
Weather Conditions:
Cloudy
Supplier: Miles Sand &
Gravel
Accumulative Yards:
10.5 Batch Size (cy):
10.5
Batch Time: 0500
Plant:
125 Placement Method:
Pump
Truck No.: C115
Ticket No.:
207034 Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
truck chute
Test
Result
Specification Placement Location:
Level 2 parking slab and ramp
Slump (in):
5 1/2
4 - 7
Air Content (%):
4.9
3-7
Concrete Temp. (F):
65
55 - 85
Ambient Temp. (F):
52
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received Tested (days) (lbs)
(psi) Type
By
1 1 3.99
12.5
05/22/18 05/25/18 7 57,800
4,620 2
ARC
1 2 3.97
12.38
05/22/18 06/15/18 28 74,860
6,050 3
ZSR
1 3 3.98
12.44
05/22/18 06/15/18 28 77,300
6,210 3
ZSR
1 4 3.97
12.38
05/22/18 06/15/18 28 83,930
6,780 3
ZSR
Average (28 days)
6,350
Initial Cure: Cure Box
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Randal Dohrman
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000l, 11-16-12, Rev.6 Page 1 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.006513
alre«acon
CO"A"
Service Date: 05/18/18
20225 Cedar Valley Rd Ste 110
Report Date: 06/19/18
Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 5,000
psi @ 28
days Sample Date:
05/18/18 Sample Time:
0700
Sampled By:
Randal Dohrman
Mix ID: 12600AFG
Weather Conditions:
Cloudy
Supplier: Miles Sand &
Gravel
Accumulative Yards:
94.5 Batch Size (cy):
10.5
Batch Time: 0600
Plant:
125 Placement Method:
Pump
Truck No.: C013
Ticket No.:
207042 Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
truck chute
Test
Result
Specification Placement Location:
Level 2 parking slab and ramp
Slump (in):
5 1/4
4 - 7
Air Content (%):
5.2
3-7
Concrete Temp. (F):
67
55 - 85
Ambient Temp. (F):
53
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received Tested (days) (lbs)
(psi) Type
By
2 1 3.99
12.5
05/22/18 05/25/18 7 61,150
4,890 2
ARC
2 2 3.98
12.44
05/22/18 06/15/18 28 77,530
6,230 5
ZSR
2 3 3.98
12.44
05/22/18 06/15/18 28 81,820
6,580 3
ZSR
2 4 3.98
12.44
05/22/18 06/15/18 28 83,120
6,680 3
ZSR
Average (28 days)
6,500
Initial Cure: Cure Box
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Randal Dohrman
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000l, 11-16-12, Rev.6 Page 2 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.006513
alre«acon
CO"A"
Service Date: 05/18/18
20225 Cedar Valley Rd Ste 110
Report Date: 06/19/18
Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 5,000
psi @ 28
days Sample Date:
05/18/18 Sample Time:
0800
Sampled By:
Randal Dohrman
Mix ID: 12600AFG
Weather Conditions:
Cloudy
Supplier: Miles Sand &
Gravel
Accumulative Yards:
199.5 Batch Size (cy):
10.5
Batch Time: 0700
Plant:
125 Placement Method:
Pump
Truck No.: C146
Ticket No.:
207052 Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
truck chute
Test
Result
Specification Placement Location:
Level 2 parking slab and ramp
Slump (in):
6 1/4
4 - 7
Air Content (%):
5.9
3-7
Concrete Temp. (F):
66
55 - 85
Ambient Temp. (F):
54
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received Tested (days) (lbs)
(psi) Type
By
3 1 3.98
12.44
05/22/18 05/25/18 7 60,780
4,890 2
ARC
3 2 3.98
12.44
05/22/18 06/15/18 28 78,680
6,320 2
ZSR
3 3 3.98
12.44
05/22/18 06/15/18 28 71,080
5,710 3
ZSR
3 4 3.98
12.44
05/22/18 06/15/18 28 71,420
5,740 3
ZSR
Average (28 days)
5,930
Initial Cure: Cure Box
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Randal Dohrman
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000l, 11-16-12, Rev.6 Page 3 of 4
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.006513
alre«acon
CO"A"
Service Date: 05/18/18
20225 Cedar Valley Rd Ste 110
Report Date: 06/19/18
Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 5,000
psi @ 28
days Sample Date:
05/18/18 Sample Time:
0900
Sampled By:
Randal Dohrman
Mix ID: 12600AFG
Weather Conditions:
Cloudy
Supplier: Miles Sand &
Gravel
Accumulative Yards:
290 Batch Size (cy):
10.5
Batch Time: 0800
Plant:
125 Placement Method:
Pump
Truck No.: C013
Ticket No.:
207064 Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
truck chute
Test
Result
Specification Placement Location:
Level 2 parking slab and ramp
Slump (in):
6
4 - 7
Air Content (%):
6.1
3-7
Concrete Temp. (F):
67
55 - 85
Ambient Temp. (F):
54
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received Tested (days) (lbs)
(psi) Type
By
4 1 3.98
12.44
05/22/18 05/25/18 7 61,030
4,910 2
ARC
4 2 3.98
12.44
05/22/18 06/15/18 28 73,760
5,930 3
ZSR
4 3 3.98
12.44
05/22/18 06/15/18 28 73,440
5,900 3
ZSR
4 4 3.97
12.38
05/22/18 06/15/18 28 75,960
6,140 3
ZSR
Average (28 days)
5,990
Initial Cure: Cure Box
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Randal Dohrman
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000l, 11-16-12, Rev.6 Page 4 of 4
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0066
Service Date: 06/06/18
Report Date: 06/13/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Clear
Monitored and tested placement of (50) cubic yards of Miles Sand & Gravel concrete mix 025503P at SE portal
footing and dumpster enclosure footing. The concrete was placed via tailgate and mechanically consolidated.
Reinforcing steel was inspected prior to placement and found to be installed per details D and 4/S2.3 and notes
on S2.0. One set of (4) 4x8" cylinders was cast for compressive strength testing.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates Co, Inc., (1) Foushee & Associates Co, Inc., Reviewed By:
Craiq Miller Jeremy Webb
(1) Foushee & Associates Co, Inc., (1) Mayes Testing Engineers, Inc, Robert Gardner
Paul Wasell Todd Wirtz
(1) Miles Sand & Gravel, Michael (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Craiq Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
cr000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: M7171461.0066A
Service Date: 06/06/18
Report Date: 06/14/18
Task:
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Material Information
Specified Strength: 4,000 psi @ 28 days
Mix ID:
025503P
Supplier:
Miles Sand and Gravel
Batch Time:
1230 Plant:
Truck No.:
C058 Ticket No.: 106564
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
5
70
62
Set Specimen Avg Diam.
No. ID (in) _
1 a 3.97
1 b
1 c
1 d
Initial Cure: Outside Plastic Lids
Project - M7171461
MAYES TESTING ENGINEERS
alrerra[on CO"A"
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Permit No.: BLD2017-0493
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.38 06/07/18
06/13/18
7 43,680
06/07/18
07/04/18
28
06/07/18
07/04/18
28
06/07/18
07/04/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
06/06/18 Sample Time:
Carl Reynolds
Clear
50 Batch Size (cy): 10
Chute
SE Portal footing and dumpster
enclosure footing
Compressive
Strength Fracture Tested
(psi) Type By
3,530 2 HRB
Mayes Testing Engineers Rep.: Carl Reynolds
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000l, 11-16-12, Rev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.0066A
alre«acon CO"A"
Service Date: 06/06/18
20225 Cedar Valley Rd Ste 110
Report Date: 07/05/18 Revision 1 - 28-day results Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Material Information
Sample Information
Specified Strength: 4,000 psi @ 28
days Sample Date:
06/06/18 Sample Time:
Sampled By:
Carl Reynolds
Mix ID: 025503P
Weather Conditions:
Clear
Supplier: Miles Sand and Gravel
Accumulative Yards:
50 Batch Size (cy): 10
Batch Time: 1230 Plant:
Placement Method:
Chute
Truck No.: C058 Ticket No.:
106564 Water Added Before (gal):
Field Test Data
Water Added After (gal):
Sample Location:
Test Result
Specification Placement Location:
SE Portal footing and dumpster
Slump (in): 5
enclosure footing.
Air Content (%):
Concrete Temp. (F): 70
Ambient Temp. (F): 62
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date Date Test Load
Strength Fracture Tested
No. ID (in) (sq in)
Received Tested (days) (lbs)
(psi) Type By
1 a 3.97 12.38
06/07/18 06/13/18 7 43,680
3,530 2 HRB
1 b 3.99 12.5
06/07/18 07/04/18 28 53,840
4,310 5 KJP
1 c 3.99 12.5
06/07/18 07/04/18 28 55,400
4,430 5 KJP
1 d 3.99 12.5
06/07/18 07/04/18 28 55,150
4,410 5 KJP
Average (28 days)
4,380
Initial Cure: Outside Plastic Lids
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Carl Reynolds
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson Reviewed By:
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb Robert Gardner
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000l, 11-16-12, Rev.6 Page 1 of 1
STRUCTURAL STEEL OBSERVATIONS REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0067
Service Date: 06/18/18
Report Date: 06/21 /18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Sunny
Inspected the welding of trash enclosure tilt -up wall panels #100, 101 and 012. Found welding per typical panel
weld details and welds were visually acceptable per AWS D1.1 acceptance criteria.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Michael Mattox
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates Co, Inc., (1) Foushee & Associates Co, Inc., Reviewed By:
Craiq Miller Jeremy Webb
(1) Foushee & Associates Co, Inc., (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Paul Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0068A
Service Date: 06/21/18
Report Date: 06/27/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLD2017-0597 (Exterior Sign)
Samples: (4) 4x8" cylinders
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Overcast
On site for reinforcing steel and concrete inspection for the (2) subject exterior sign foundations at approximate
grid lines A to B/1 to 1.5. Verified reinforcing steel for grade, size, spacing, clearance and placement per detail
D/S2.3. Verified threaded rod anchor bolt diameter and placement per detail D/S2.3.
Approximately (23) cubic yards of Miles Sand & Gravel mix 0260A6P concrete was placed for the (2) foundations
(required 3500 psi compressive strength and 5.5% air entrainment). The concrete was placed via pump truck
and was mechanically consolidated. Sampled the concrete and cast (4) 4x8" cylinders for compressive strength
testing. Concrete was tested as shown below:
Slump
Air
Concrete
Ambient
Load Size
Temperature
Temperature
4-1/2"
4.0%
70OF
650F
10.5 cubic yards
Additionally, as requested by Foushee, we observed the precast trash enclosure exterior embed plate welds along
the bottom of the enclosure were covered (for weather protection) with hand packed non -shrink grout per detail
100/S6.5.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Additional Inspector on site: Stuart Carter
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Troy Salas
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates Co, Inc., (1) Foushee & Associates Co, Inc., Reviewed By:
Craiq Miller Jeremy Webb
(1) Foushee & Associates Co, Inc., (1) Mayes Testing Engineers, Inc, Robert Gardner
Paul Wasell Todd Wirtz
(1) Miles Sand & Gravel, Michael (1) PSM Consulting Engineers, Muni Senior Project Field Manager
Craiq Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS
Report Number: M7171461.006813 alre«acon CO"A"
Service Date: 06/21/18 20225 Cedar Valley Rd Ste 110
Report Date: 06/29/18 Lynnwood, WA 98036-6365
Task: 425-742-9360
Client Project - M7171461
Magic Toyota Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung 21300 Highway 99
20910 Highway 99 Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0597 (Exterior Sign)
Material Information Sample Information
Specified Strength: 3,500 psi @ 28 days
Mix ID: 0260A6P
Supplier: Miles Sand & Gravel
Batch Time: 0939 Plant: Everett plant
Truck No.: C013 Ticket No.: 208446
Field Test Data
Test
Slump (in):
Air Content (%):
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Result Specification
4 1/2
4.0
70
65
Set Specimen Avg Diam.
No. ID (in)
1 1 3.99
1 2
1 3
1 4
Initial Cure: Cure Box
Sample Date:
Sampled By:
Weather Conditions:
Accumulative Yards:
Placement Method:
Water Added Before (gal):
Water Added After (gal):
Sample Location:
Placement Location:
Age at Maximum
Area Date
Date
Test Load
(sq in) Received
Tested
(days) (lbs)
12.5 06/22/18
06/28/18
7 45,650
06/22/18
07/19/18
28
06/22/18
07/19/18
28
06/22/18
07/19/18
28
Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Troy Salas
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
06/21/18 Sample Time: 1140
Troy Salas
Overcast
10.5 Batch Size (cy): 10.5
Pump
15
Truck chute
Exterior signage foundations
Compressive
Strength Fracture Tested
(psi) Type By
3,650 5 HRB
Reviewed By: ZZt?, I �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR000l, 11-16-12, Rev.6 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
MAYES TESTING ENGINEERS
Report Number: M7171461.006813
alre«acon
CO"A"
Service Date: 06/21/18
20225 Cedar Valley Rd Ste 110
Report Date: 07/20/18
Revision 1
- 28-day results
Lynnwood, WA 98036-6365
Task:
425-742-9360
Client
Project - M7171461
Magic Toyota
Magic Toyota Facility Replacement Edmonds
Attn: Peter Chung
21300 Highway 99
20910 Highway 99
Edmonds, WA
Lynnwood, WA 98036
Permit No.: BLD2017-0597 (Exterior Sign)
Material Information
Sample Information
Specified Strength: 3,500
psi @ 28 days
Sample Date:
06/21/18 Sample Time:
1140
Sampled By:
Troy Salas
Mix ID: 0260A6P
Weather Conditions:
Overcast
Supplier: Miles Sand &
Gravel
Accumulative Yards:
10.5 Batch Size (cy):
10.5
Batch Time: 0939
Plant:
Everett plant
Placement Method:
Pump
Truck No.: C013
Ticket No.:
208446
Water Added Before (gal):
15
Field Test Data
Water Added After (gal):
Sample Location:
Truck chute
Test
Result
Specification Placement Location:
Exterior signage foundations.
Slump (in):
4 1/2
Air Content (%):
4.0
Concrete Temp. (F):
70
Ambient Temp. (F):
65
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Laboratory Test Data
Age at Maximum
Compressive
Set Specimen Avg Diam. Area
Date
Date Test Load
Strength Fracture
Tested
No. ID (in)
(sq in)
Received
Tested (days) (lbs)
(psi) Type
By
1 1 3.99
12.5
06/22/18
06/28/18 7 45,650
3,650 5
HRB
1 2 3.98
12.44
06/22/18
07/19/18 28 62,830
5,050 3
HRB
1 3 3.97
12.38
06/22/18
07/19/18 28 57,270
4,630 2
HRB
1 4 3.98
12.44
06/22/18
07/19/18 28 61,550
4,950 2
HRB
Average (28 days) 4,870
Initial Cure: Cure Box
Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Mayes Testing Engineers
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Troy Salas
Reported To:
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton Thompson
(1) Foushee & Associates Co, Inc., Craig Miller (1) Foushee & Associates Co, Inc., Jeremy Webb
(1) Foushee & Associates Co, Inc., Paul Wasell (1) Mayes Testing Engineers, Inc, Todd Wirtz
(1) Miles Sand & Gravel, Michael Craig (1) PSM Consulting Engineers, Muni Vimawala
Reviewed By: ZZt?-:1 �
Robert Gardner
Senior Project Field Manager
Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Cx000l, 11-16-12, xev.6 Page 1 of 1
WELDING OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0069
Service Date: 07/23/18
Report Date: 07/26/18
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLDG-2017-0493
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Clear
On site for structural steel welding inspection in accordance with AWS D1.1 specifications. Inspected (4)
outrigger connections of HSS 4x4 tube steel per detail A sheet 300 drawing. Welding inspected per detail C-C of
sheet 300, RFI-2 and email dated 07/11/18 by Muni Vimawala with PSM Consulting Engineers. Plates have been
extended and welded per plans. Stability kickers installed and welded per plans. Front entry sign welding found
acceptable.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Mark Vassallo
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates Co, Inc., (1) Foushee & Associates Co, Inc., Reviewed By: �
Craiq Miller Jeremy Webb
(1) Foushee &Associates Co, Inc., (1) Mayes Testing Engineers, Inc, Timothy G. Beekerle, PE
Paul Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Principal
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1
WELDING OBSERVATION REPORT
MAYES TESTING ENGINEERS
nlrerracan cmernxv
Report Number: M7171461.0069
Service Date: 07/23/18
Report Date: 08/29/18 Revision 1 - Permit Number
Client
Magic Toyota
Attn: Peter Chung
20910 Highway 99
Lynnwood, WA 98036
Permit No.: BLDG-2016-1684
Samples: N/A
20225 Cedar Valley Rd Ste 110
Lynnwood, WA 98036-6365
425-742-9360
Project
Magic Toyota Facility Replacement Edmonds
21300 Highway 99
Edmonds, WA
Project No.
Weather:
M7171461
Clear
On site for structural steel welding inspection in accordance with AWS D1.1 specifications. Inspected (4)
outrigger connections of HSS 4x4 tube steel per detail A sheet 300 drawing. Welding inspected per detail C-C of
sheet 300, RFI-2 and email dated 07/11/18 by Muni Vimawala with PSM Consulting Engineers. Plates have been
extended and welded per plans. Stability kickers installed and welded per plans. Front entry sign welding found
acceptable.
To the best of our knowledge, the items inspected today are in conformance with approved plans and
specifications.
Services: Special Inspections / Materials Testing
Mayes Testing Engineers Rep.: Mark Vassallo
Reported to: Foushee & Associates, Inc.
Contractor: Foushee & Associates, Inc.
Report Distribution:
(1) Magic Toyota, Peter Chung (1) City of Edmonds WA, Milton
Thompson
(1) Foushee & Associates Co, Inc., (1) Foushee & Associates Co, Inc., Reviewed By:
Craiq Miller Jeremy Webb
(1) Foushee & Associates Co, Inc., (1) Mayes Testing Engineers, Inc, ?EpRobert Gardner
Paul Wasell Todd Wirtz
(1) PSM Consulting Engineers, Muni Senior Project Field Manager
Vimawala
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT000t, 10-16-13, Rev.lo Page 1 of 1