Loading...
ENG-COMMENTS 1 with covenantOF ED_4 O �St. 1 890 DATE: April 7, 2020 CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION (425)771-0220 City Website: www.edmondswa.gov TO: Rob Michel rwmichel@nwlink.com FROM: Jeanie McConnell Engineering Program Manager j eanie.mcconnell@edmondswa. gov RE: Application 4: BLD2020-0017 Project: Kisan — Fill/Grade Permit Project Address: 22810 Edmonds Way During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents with a written response to each of the items below to a permit coordinator. City of Edmonds handouts, standard details and development code can be referenced on the City website. GENERAL 1. Provide an itemized engineers cost estimate for both on -site and off -site (right-of-way) improvements, including traffic control and all utility installations. Use the King County Bond Quantity Worksheet (available on the county website) and utilize "write-in" sections where appropriate. a. The amount of the bond will be based on 120% of the City approved estimate for the off - site improvements. b. A 3.3% inspection fee is calculated for the project based on 100% of the City approved estimate for the entire project improvements. 2. Please add a note to plans stating "A separate right-of-way construction permit is required for all work within the city right-of-way." Please note, a ROW permit application with contractor's signature shall be provided to the city prior to issuance of civil construction plans. 3. Incorporate the water and sewer plans into the Sheet Indexing and number plan sheets accordingly. 4. A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the enclosed covenant, including notarization and any required exhibits and submit to the city. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction final location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. 5. Trash Enclosure: Please contact the hauler to confirm their requirements prior to resubmitting your plan to the City for further review. Following review by the hauler, please submit a revised plan to the City for further review and ultimately approval. When it has been confirmed that City requirements have been met, the City will provide confirmation to the applicant indicating such. The applicant will then be responsible for submitting a site plan showing the final proposed trash enclosure location, including dimensions, to the local hauler. The hauler for the subject property is Republic Services. A copy of the plan, signed by the hauler indicating their approval, will need to be returned to the City prior to building permit issuance. 6. A structural peer review of the storm vault is required. At your earliest convenience, please submit an electronic copy of the stormwater vault structural plans, calcs, and civil construction plans to a permit coordinator at onlinepermitskedmondswa.gov. If the submittal is over 25MB, please contact your permit coordinator, Kristin Johns, by email at kristin.johnskedmondswa.gov for specific instructions on how to upload plans to our FTP site. 7. I respectfully ask of Donna Breske that for every civil plan submittal to the City of Edmonds, not just the subject application, that she please include complete City of Edmonds standard details. Please replace all City standard details within the plan set accordingly. 8. Include construction sequence within the plan set. Refer to sample on City website. 9. Include General Construction Notes within the plan set. Refer to sample on City website. 10. Sample notes may need to be revised to reflect current APWA/WSDOT version and add year of DOE Stormwater Manual. 11. A 3.5' pedestrian easement is shown behind the sidewalk. As this is a public pedestrian easement, the approval of such shall be brought before City Council. The first step is a Council Committee process and the second step is approval before the full Council. The following shall be provided by the applicant: a. Vicinity Map b. Site Plan showing improvements and location of easement The next available meeting date is currently unknown due to the adjustments that have been made to the Council agendas in response to COVID-19. When all required information has been received from the applicant, the public pedestrian easement will be placed on the next available committee meeting, which is held on the 2nd Tuesday of every month. Following the Council committee meeting, the item will be placed on the Council consent agenda on the next available meeting date. 12. Please provide a copy of the recorded agreement between Sterling and Kisan, if one exists. The City currently has an un-recorded copy and some of the review comments provided herein are based off of that agreement. If any changes were made to the agreement prior to recording, please identify those items specifically with the next plan submittal. 13. The Sterling/Kisan agreement references a new easement for access into the property. Please provide a copy of this easement with the next plan submittal. 14. Please note, additional comments not included in this review, may be produced after reviewing the next submittal. Page 2 of 6 Sheet I of 5 — SITE PLAN 1. Revise plan sheet to only show items related to frontage, easements, site building layout, etc. Create separate Composite Utility Plan and move utility information to that plan sheet. 2. Will any on -site utilities need to be located within easements or will property ownership/management be under one entity? 3. Clearly show the limits of the slope easement referenced along the property frontage. 4. Revise Sheet Index to include water, sewer and traffic control plan sheets. 5. The plans currently list 3 revisions, however this is the first set being reviewed for the subject building permit. Please revise notes accordingly. 6. Update Fire District info to state South County Fire. 7. The plans propose yellow reflective markers in one area and domes in another area. Please provided a detail on the plans that specifically identifies what is intended for each. 8. Will any directional signage be installed within the area to be delineated by yellow reflective markers that would indicate direction of travel to the individual properties? 9. The area in between the yellow reflective markers might be a good location to install the required fire/aid address signage. The City's Public Works Operations and Maintenance Department fabricates Fire/Aid address signs. Add a note to the plans that requires the contractor/property owner to contact the Engineering Division by email at en ing eeringpemits(c�r�,edmondswa.gov 2-weeks in advance of the requested sign fabrication. A fee of $100 will be added to the building permit to cover this cost. 10. A stop bar and stop sign shall be installed for vehicles existing the Sterling property, as well as for vehicles exiting the Kisan site. Update the site plan and include standard details for each. 11. A walkway has been shown along the west side of the site access, but the connection to the City sidewalk at this location conflicts with existing surface utilities — please see below. It seems to be more appropriate to provide a connection to the sidewalk on the west side of these utilities. _� ...ate- s- 12. Update plans to show existing crosswalks at the intersection. 13. Add a note to the plans that states the painted stop bars, crosswalks, etc. will be restriped, as required, prior to project completion. 14. A single direction curb ramp has been shown on the east side of the driveway approach, but a corner curb ramp will be required that allows for an Edmonds Way crossing, in addition to the driveway. Revise plans. Page 3 of 6 15. Update plans to show removal and replacement of the driveway approach to provide ADA compliance. This is consistent with the agreement between Sterling/Kisan and appears to be necessary in order to provide an ADA compliant curb ramp at the intersection. 16. Show existing traffic loops for egress traffic at the intersection. Add note to plans that loops shall remain in -tact and/or be replaced as needed to maintain proper detection of vehicles approaching the intersection. 17. The plans indicate vertical curb and gutter will be installed along the frontage, but please clarify that the existing driveway approaches will need to be removed and replaced. 18. The sidewalk and curb details are referenced on Sheet 6. Update to appropriate plan sheet. 19. Add note to plans that the existing sidewalk frontage improvements shall be maintained as long as possible during the course of construction. 20. Update plans to include all restoration anticipated within Edmonds Way. A note shall also be added to specifically address overlay requirements as follows: • Utility patches with less than 20-feet of separation shall be combined and full width or half width overlay will be required depending on the extent of disturbance. Where utility patches fall entirely within one travel lane, the overlay shall extend to the centerline of roadway. Where utility patches extend into both travel lanes then a full width overlay is required. 21. Show proposed street tree locations — • 40-ft spacing, 3" caliper, 7-ft branching height 22. A note has been added that the street tree species will be determined during the building permit phase of the project, which is the current phase. I will work to get an answer as to the specific species and will request that this note be updated at that time. In addition, please add the following notes: • City Parks Maintenance Department to be contacted at 425-771-0230 to inspect the root ball of the tree prior to installation. • Plastic tree root barrier to be installed, per City requirements, during installation of street trees. 23. A 3.5' pedestrian easement is shown behind the sidewalk. Revise to state Public Pedestrian Easement. 24. It also appears as though a water utility easement may be provided behind the sidewalk as well. Please update the plans, as needed, to show any easements that may be required by the OVWSD. 25. Include standard details for the "c-curb", Fire Lane striping/signage and extruded curb within the plan set. 26. The trash enclosure has been identified on the plans, but no details for the construction of the slab, including dimensions, have been provided or referenced. Please revise. 27. Please clarify where dry utilities will enter into Bldg B — I was not able to find the stub location on the plans. Sheet 2 of 5 — ROAD AND DRAINAGE 1. A note has been added that relates to the trash enclosure that states "Ensure dumpsters have operable covers as a measure of source control". This note makes sense as it relates to protection of the storm system, but as a design requirement, should be included in the specific trash enclosure detail. Review accordingly. Page 4 of 6 Sheet 3 of 5 — GRADING 1. Provide cross sections through various points in the driveway and provide a profile of the driveway. 2. Lighten storm vault line type on this plan sheet so the driveway and related slopes are more visible. 3. Clearly show pavement limits for the access road. 4. Provide cross section of west property line showing the existing pavement and rockeries on the Sterling property and the proposed rockery down to finished grade on the Kisan property. 5. A walkway has been shown along the east side of the driveway, connecting to the public sidewalk. Spot elevations have been provided and the plans state 8.3% slope, however, in checking the slope based on spot elevations, it will exceed 8.3%. Please provide a cross section from the public sidewalk to the entrance of the development showing the proposed slope of the walkway as well as the adjacent landscape area between the public sidewalk and that portion of the walkway that runs parallel to the sidewalk. 6. Show proposed grading contours through the access connecting to Edmonds Way. Sheet 4 of 5 — TESC 1. Revise sheet title to also state DEMO. 2. Show tree protection measures around trees to remain throughout the project. 3. The silt fence and clearing limits have been shown to extend to the back corner of the property, however, it doesn't appear as though any work will occur in that area. Please revise plans to be consistent with the work being performed. 4. Revise note that states "remove entire extruded curb" to clarify that a portion of the curb is to be removed to provide access during construction, but a portion of the curb shall remain until such time it is replaced as part of the project. 5. A note on the plans states an existing driveway on Edmonds Way shall be used as a temporary construction entrance, however, the construction entrance is being established with access through the intersection. Remove this note from the plans. 6. Add notes to the plans indicating removal of existing driveway approaches along Edmonds Way. 7. Revise water and sewer demo notes to more specifically address cut and cap requirements. Water shall remain at the site during construction and shall be protected by a backflow/AVB. 8. Will a chain link fence be installed during construction? If so, please show. 9. Show job shack location, if any. Sheet 4 of 5 — NOTES AND DETAILS 1. Renumber details so there is not duplicate numbering. It is understood that different plan sheets are referenced, but it is still confusing to have for instance, multiple 43 details. Sheets 1 and 2 — SEWER AND WATER PLAN SHEETS 1. Update plans to show connection of water meters to water main. The location of all utilities will need to be accounted for when determining placement of street trees. 2. Show blue reflector to be placed in pavement to identify fire hydrant location. Refer to City standard detail ET 1. 3. OVWSD approved/signed plans shall be submitted to the City prior to permit issuance. Page 5 of 6 Sheet X of X — TRAFFIC CONTROL 1. Please submit a traffic control plan for review and approval. 2. Disruption fees will be charged for closure of sidewalk areas. Clearly specify areas of closure and indicate the timeframe for which you request the closure. STORMWATER ENGINEER REVIEW Refer to separate plan review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at zachary.richardson(a,edmondswa.2ov with any specific questions you may have regarding his comments. Pagc 6 of 6 After recording return to: City Clerk City of Edmonds 121 Fifth Avenue North Edmonds, WA 98020 Document Title(s) Declaration of Covenant - Private Stormwater Facility Reference Number(s) of Related Documents City of Edmonds (permit number) Grantor(s) (Last, First and Middle Initial) Grantee(s) (Last, First and Middle Initial) City of Edmonds Legal Description (abbreviated form; i.e., lot, plat or section, township, range, quarter/quarter) Assessor's Property Tax Parcel/Account Number at the Time of Recording: The Auditor/Recorder will rely on the information provided on this form. The staff will not read the document to verify the accuracy or completeness of the indexing information provided herein. DECLARATION OF COVENANT Private Stormwater Facility WHEREAS, the undersigned Declarant(s) have installed one or more stormwater facilities under Edmonds Community Development Code Chapter 18.30 known as a "low impact development best management practices (LID BMP)" as selected below: ❑ Permeable Pavement ❑ ❑ Rain Garden / Bioretention Cell ❑ ❑ Drywell ❑ Infiltration Trench Gravelless Chamber Other WHEREAS, the City of Edmonds has allowed installation of the LID BMP, subject to the execution and recording of this Declaration of Covenant; NOW, THEREFORE, THE UNDERSIGNED DECLARANT(S), being the owners of the real property ("the Property") located at the following address: in the City of Edmonds, Washington, and legally described on Exhibit A attached hereto and incorporated herein by this reference as if set forth in full, hereby covenants and agrees, on behalf of himself/herself/themselves/itself and his/her/their/its successors and assigns, as follows: Declarant(s) warrant that he/she/they are the owners of the property described on Exhibit A and have the authority to impose this covenant on the property and bind all future owners, successors, and assigns of the Declarant(s). The Declarant(s), future owners, successors, and assigns of the Declarant(s) shall be referred to collectively as "Owners." 2. The Owners of the Property agree that the Property contains one or more stormwater management facilities referred to as an "LID BMP," which was installed to mitigate the stormwater quantity and quality impacts of some or all of the impervious or non-native pervious surfaces on the property. "Low impact development" means development conducted in a way that seeks to minimize or completely prevent alterations to the natural hydrology of the site. Low impact development includes site planning and design to reduce alterations of natural soil and vegetation cover, minimize impervious surfaces, and specific practices that help to replicate natural hydrology such as permeable pavements, green roofs, soil amendments, bioretention systems, and dispersion of runoff. 3. The Owners shall maintain the size, placement, and design of the LID BMP as depicted on the approved site plan, Exhibit B, and design details shall be maintained and may not be changed without written approval either from the Engineering Division of the City of Edmonds or through a future development permit from the City of Edmonds. Chemical fertilizers and pesticides shall not be used where LID BMP is located. All costs of maintenance and repair shall be the sole responsibility of the Owners. 4. The Owners shall inspect LID BMPs annually for physical defects. After major storm events, the system shall also be checked to ensure that the overflow system is working properly. The Owners also shall maintain all LID BMPs so they function as designed on a year-round basis. 5. The City of Edmonds is hereby granted by the Owners the right, but not the obligation, to enter upon the Property described on Exhibit A at all reasonable times for the purpose of inspecting the private stormwater LID BMP facility. If, as the result of any such inspection, the City of Edmonds determines that the LID BMP is in disrepair, requires maintenance or repair, or is otherwise not functioning as provided in the BMP site plan, the City Engineer or his designee shall have the right, but not the obligation, to order the Owners to maintain or repair the same. 6. If the City of Edmonds determines that the LID BMP requires maintenance or repair pursuant to Section 5, the City of Edmonds shall provide notice to the Owners of the deadline within which such maintenance or repair must be completed. Said notice may further advise that, should the violator fail to perform required maintenance or make repairs within the established deadline, the work may be done by the city or a contractor designated by the City Engineer and the expense thereof shall be charged to the Owners. The City's officers, agents, employees, and contractors shall have the right, which is hereby granted by the Owners, to enter upon the Property described on Exhibit A in order to perform such work. The Owners shall bear the cost of all work performed. 7. The Owners shall indemnify, defend and hold harmless the City of Edmonds, its officers, officials, employees and agents from any and all claims, demands, suits, penalties, losses, damages, judgments, attorneys' fees and/or costs of any kind whatsoever, arising out of or in any way resulting from the approval of the LID BMP(s), the installation and presence of the LID BMP(s), and the acts or omissions of the Owners, their officers, employees, contractors, and agents relating to the construction, operation and maintenance of the LID BMP(s) on the Property, except for the City's intentional and willful tortious acts, and waive and release the City of Edmonds from any and all claims for damages and injunctive relief which the Owners may themselves have now or in the future, by reason of the construction, maintenance and operation of said LID BMP(s). 8. This covenant shall run with the land and be binding upon the Owners. Dated: DECLARANT(S): (Signature) (Print Name) (Signature) (Print Name) State of Washington ss. County of Snohomish APPROVED: CITY OF EDMONDS (Signature) (Print Name) (Title) On this day personally appeared before me {Declarant(s)} to me known to be the individual, or individuals described in and who executed the within and foregoing instrument, and acknowledged that he/she/they signed the same as his/her/their free and voluntary act and deed, for the uses and purposes therein mentioned. SUBSCRIBED AND SWORN before me this day of , 201_. (Signature) (Name legibly printed or stamped) Notary Public in and for the State of Washington. Residing at: My commission expires Exhibit A Legal description Exhibit B Site Plan