Loading...
Kisan Stormwater Vault Comment Letter (BLD2020.0017) 04.30.20C � ENGINEERING April 30, 2020 civil & structural engineering & planning City of Edmonds Public Works & Utilities Department Attn: Jeanie McConnell 1215th Avenue North Edmonds, WA 98020 RE: Project Name: Kisan —Stormwater Vault Address: 22810 Edmonds Way Plan Review No: BLD2020-0017 Dear Ms. McConell, We have reviewed the Kisan Stormwater Detention Vault. The following documents were provided for our review. Document Company Date Civil Drawings Donna Breske & Associates, LLC 12/11/19 Structural Drawings Sound Structural Solutions 01/02/20 Structural Calculations Sound Structural Solutions 01/02/20 We have the following review comments in regard to the above referenced project. 1. Please provide a copy of the geotechnical report by Earth Solutions NW (Report #: ES-5932) referenced on sheet S1 of the structural drawings. 2. Please provide a general letter of conformance by the geotechnical engineer of record. 3. The vault widths and lengths on sheet S3 of the structural drawings do not appear to match the vault width and length shown on the vault plan on sheet 2 of the civil drawings. Please provide updated civil and/or structural drawings with matching dimensions. 4. The manhole locations shown on "CONCRETE VAULT DIMENSIONS AND PRECAST CONCRETE LID LAYOUT" on sheet 2 of the civil drawings do not match the manhole locations shown on sheet S5 of the structural drawings shown on "DENTENTION VAULT PANEL LAYOUT PLAN". 5. The civil plans do not show a section of the vault showing vault depth and cover. Please provide updated civil plans showing vault sections with elevations showing the depth of vault and soil cover, or provide top of vault and bottom of vault elevations on the vault plan or grading plan. 6. The civil drawings show a detail for a "CONTROL STRUCTURE WITHIN VAULT" that shows the bottom of the control structure 4' below the low water surface. This does not appear to be shown in the structural drawings or structure calculations. Please show the location of the control structure on the structural drawings and verify the vault walls in this location have been designed for the increased depth. 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 1 f.425.778.5536 www.cgengineering.com Kisan Stormwater Detention Vault Review April 30, 2020 CG Project Number: 20024.02 Page 2 of 2 7. Per IBC 2015 section 1605.2 and ACI 318-14 section 5.3, the vault walls should be analyzed for the factored load combination 1.2D+1.OE+1.OL+1.6H which is not included in the structural calculations. Please provide structural calculations with the referenced factored load combination. 8. Please provide a calculation to determine if transverse footing reinforcement is required. 9. If the bottom of the vault is sloped, please update the plan to show the extent of slope (also referenced in details WSP and WPP). If you have any questions please do not hesitate to call. Sincerely, CG Engineering �' '&I— L#.- Joe Galusha, PE, SE. LEED AP Associate Principal C 4M ENGINEERING 250 4th Avenue South, Suite 20 Edmonds, WA 98020 ph.425.778.8500 1 f.425.778. www.cgengineering.com