Loading...
M7191427.0018ACONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191427.0018A Service Date: 10/22/19 Report Date: 10/30/19 Task: Client Project - M7191427 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Edmonds Senior Center Edmonds Senior Center Activity Center Attn: Daniel Johnson 220 Railroad Ave 220 Railroad Ave Edmond, WA PO Box 717 Edmonds, WA 98020 Permit No.: BLD2018-1658 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 61818 Supplier: CalPortland Batch Time: 1206 Plant: 260 Truck No.: 687 Ticket No.: 2210991 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 1 3.99 1 2 1 3 1 4 1 5 Initial Cure: Cure Box Result Specification 7 5 -7 6.9 4.5 - 7.5 70 54 Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.5 10/23/19 10/29/19 7 54,730 10/23/19 11/19/19 28 10/23/19 11/19/19 28 10/23/19 11/19/19 28 10/23/19 Hold Final Cure: Moist Room Comments: Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Jeremy Christensen Reported To: Contractor: WG Clark Construction Co. Report Distribution: See attached distribution list. Airf«-con CO"A" 10/22/19 Sample Time: 1304 Jeremy Christensen Showers 10 of 100 Batch Size (cy): 10 Grade beam, grid line A/2 Compressive Strength Fracture Tested (psi) Type By 4,380 2 KWB Reviewed By: �Ii�laJ c' S. Dolder, PE Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. cR000t, 11-16-12, Rev.6 Page 1 of 1 Distribution Page Report Number: M7191427.0018A Service Date: 10/22/19 Report Date: 10/30/19 Task: Distribution List (1) Edmonds Senior Center, Daniel Johnson (1) City of Edmonds WA, Leif Bjorback (1) City of Edmonds WA, Milton Thompson (1) Environmental Works, Inc., Alise Kuwahara Day (1) Environmental Works, Inc., Sally Knodell (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) Reid Middleton, Katy Brawner (1) Reid Middleton, Paul Crocker (1) WG Clark Construction Co, Greg Jackson (1) WG Clark Construction Co, Jim Bray (1) WG Clark Construction Co, Nekia Williams-Wolle MAYES TESTING ENGINEERS i� Alrerracon COMPANY 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360