SPECIAL INSPECITON REPORTS 1653STRUCTURAL STEEL OBSERVATIONS REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0003A Service Date: 03/13/20 Report Date: 03/18/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Rain Reviewed detail 2 on S5.2 for the soldier pile splice. The web is a bolted connection with a splice plate and the outside pile flanges are shown to welded with a 5/16" bevel weld. Inspected the fit -up prior to welding and advised the contractor that the bevel size needed to be increased to provide the 5/16" fillet. This bevel was ground with a grinder as required. Inspected the weld after completion and cooling and found the welding was visually acceptable per AWS D1.1 visual inspection criteria. This was for the southern -most "H" pile. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Michael Mattox Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Kristin Johns Schroder (1) Environmental Works, Inc., Nic (1) Mayes Testing Engineers, Inc, Morin Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Greg Jackson Reviewed By: _4 ___ Heath Defoor, PE Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 SAMPLE PICK-UP REPORT Report Number: M7191337.0005 Service Date: 03/25/20 Report Date: 03/30/20 MAYES TESTING ENGINEERS nlrerracan cmernxv 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Project No.: M7191337 Permit No.: BLD2018-1653 Weather: Overcast/high 40's Samples: (1) sample of 5/8" crushed rock (Proctor) Took a sample of imported 5/8" crushed rock material from the on -site stockpile and transported to Mayes Testing Engineers Lynnwood, WA laboratory for optimum moisture -density determination testing (Proctor). Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Karl Pauly Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae Reviewed By: _4 ___ Heath Defoor, PE Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 POST -INSTALLED ANCHORS REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0014 Service Date: 05/26/20 Report Date: 06/03/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Cloudy Observed the anchorage into hardened concrete of (16) 1/2"-diameter threaded rods horizontally, with a 2-3/4" embedment, and (16) 3/4"-diameter threaded rods vertically, with a 4-1/2" embedment. Project -approved Hilti HIT-HY 200-R (lot 1800 27 L2, expiration 02/2021) was used for attaching the FCD vault to the slab/foundation per the approved contract documents, detail 6/CB-3.3 and per manufacturer specifications. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Randal Dohrman Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae Reviewed By: - Heath Defoor, PE Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusiveiy for fhe use of fhe client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 GENERAL OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0002 Service Date: 09/13/19 Report Date: 09/23/19 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLDG 2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 N/A Attended the City of Edmonds pre -construction meeting for the Waterfront Redevelopment project. Mayes Testing Engineers' responsibility will be the following items listed, and discussed at this meeting: 1) Reinforced concrete including anchor bolts. There are revisions made to steel reinforcement at stairs and cantilever wall. 2) Structural steel/welding (field and shop). WG Clark to coordinate shop welding inspection with their shop fabricator. 3) Asphalt testing optional as discussed with City of Edmonds- Henry Schroeder. The geotechnical engineer will do the site soils compaction testing. WG Clark- Greg Jackson is the lead superintendent for both the Senior Center and Waterfront Redevelopment projects. Services: As requested MTE was on site for preconstruction meeting. Mayes/Terracon Rep.: Todd Wirtz Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Kristin Johns Schroder (1) Environmental Works, Inc., Nic (1) Mayes Testing Engineers, Inc, Morin Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Greg Jackson Reviewed By: _4 ___ Heath Defoor, PE Senior Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 SAMPLE PICK-UP REPORT Report Number: M7191337.0005 Service Date: 03/25/20 Report Date: 03/30/20 MAYES TESTING ENGINEERS nlrerracan cmernxv 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Project No.: M7191337 Permit No.: BLD2018-1653 Weather: Overcast/high 40's Samples: (1) sample of 5/8" crushed rock (Proctor) Took a sample of imported 5/8" crushed rock material from the on -site stockpile and transported to Mayes Testing Engineers Lynnwood, WA laboratory for optimum moisture -density determination testing (Proctor). Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Karl Pauly Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae Reviewed By: _4 ___ Heath Defoor, PE Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 EARTHWORK OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0007 Service Date: 03/26/20 Report Date: 03/30/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Overcast On site to perform field density testing on waterline trench (12'x15'x4' deep) imported backfill subgrade. May Valley Excavation performed the earthwork. Soil Fill Placement Observation At the time of arrival, noticed the material to be used as fill at the area were import materials visually classified as 5/8" crushed rock. Material was observed to be adequately moisture -conditioned and placed in lifts approximately 1' thick. Compaction efforts were applied utilizing a HoPac. The fill placed was observed to be firm and stable after the compaction efforts. Field density tests were conducted utilizing a nuclear density gauge. The test results met the minimum specified compaction requirement of 95%. Refer to the attached Field Density Test Report for individual test data. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Babatunde Soyinka Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae Reviewed By: _4 ___ Heath Defoor, PE Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 MAYES TESTING ENGINEERS .Wrommw s,,, - 20225 Cedar }Val lay Road Suite 110 Ph 425.742.9360 L}-nnwood. WA 98036 Fax 425 745 1737 SOIL FIELD DENSITY TEST REPORT Page 1 of 1 Project No.: M7191337 Date: 03/27/20 Project: City of Edmonds Waterfront Redevelopment Inspector: Babatunde O. (Jimi) Soyinka Test No. Location Depth or Elevation (feet) Probe Depth (inches) Moisture (%) Dry Density (lb/cu.ft.) Compaction (%) Compaction Requirement Minimum (%) Pass Fail Type of Material and Use Optimum Optimum Corrected Field Test Maximum Corrected Field Test 1 Waterline utility trench 2 10 6.1 6.1 5.8 133.4 133.4 126.8 95% 95 X 5/8" crushed gravel 2 Waterline utility trench 1 12 6.1 6.1 5.4 133.4 133.4 127.5 96% 95 X 5/8" crushed gravel 3 Waterline utility trench SG 12 6.1 6.1 5.7 133.4 133.4 127.4 96% 95 X 5/8" crushed gravel Compaction Standard Used WSDOT T606 WSDOT FOP for AASHTO T180 F ASTM D698 ASTM D 1557 X Compaction Test Method Used WSDOT FOP for AASHTO T310 ASTM D6938 X Comments: MTE Nuclear Gauge No.: 38115 Density Std. Count: 2356 Moisture Std. Count: 657 MTE 1400-2C, Rev 4,11.01.17 CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0008 Service Date: 05/08/20 Report Date: 05/14/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (5) 4x8" cylinders 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Sunny Verified foundation wall footing reinforcing steel for bar size and grade, lap splice and development lengths and cover and clearances. The installations are in conformance with the structural general notes and detail 7/S5.01. Observed satisfactory pump placement and mechanical consolidation of CalPortland concrete mix 633331 (5000 f'c). The field test results were: Slump, 4-1/4"; Concrete Temperature, 70°F; and Entrained Air, 3.8%, which was low. The application is not weather exposed, but the contractor and the onsite CalPortland Quality Control representative were notified and made aware that the target per contract documents is 5.5%. One (1) set of (5) 4x8" cylinders was cast for compressive strength testing, as follows: (1) 3-day field -cure break; and (1) 7-day and (3) 28-day lab -cure breaks (5000 f'c). To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Todd Wirtz Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae Reviewed By: _4 ___ Heath Defoor, PE Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0008A Service Date: 05/08/20 Report Date: 05/12/20 Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: 633331 Supplier: CalPortland Batch Time: 1230 Plant: 282 Truck No.: 8295 Ticket No.: 2324769 Field Test Data Test Result Specification Slump (in): 4 1/4 3 - 7 Air Content (%): 3.8 Concrete Temp. (F): 70 50 - 90 Ambient Temp. (F): 70 Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 a 3.98 1 b 1 c 1 d 1 e Initial Cure: Outside Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.44 05/11/20 05/11/20 3 F 51,380 05/11/20 05/15/20 7 05/11/20 06/05/20 28 05/11/20 06/05/20 28 05/11/20 06/05/20 28 Final Cure: Moist Room Comments: Not tested for plastic unit weight. F = Field Cured Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Todd Wirtz Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz Airf«-con CO"A" 05/08/20 Sample Time: 1330 Todd Wirtz Sunny 10 Batch Size (cy): 10 Pump 18 End of truck chute discharge Retaining wall footing Compressive Strength Fracture Tested (psi) Type By 4,130 2 HRB Reviewed By: _ Heath Defo Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0008A Service Date: 05/08/20 Report Date: 05/18/20 Revision 1 - 7-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Mix ID: 633331 Supplier: CalPortland Batch Time: 1230 Plant: 282 Truck No.: 8295 Ticket No.: 2324769 Field Test Data Test Result Specification Slump (in): 4 1/4 3 - 7 Air Content (%): 3.8 Concrete Temp. (F): 70 50 - 90 Ambient Temp. (F): 70 Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Set Specimen Avg Diam. No. ID (in) _ 1 a 3.98 1 b 3.99 1 c 1 d 1 e Initial Cure: Outside Plastic Lids Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.44 05/11/20 05/11/20 3 F 51,380 12.5 05/11/20 05/15/20 7 72,830 05/11/20 06/05/20 28 05/11/20 06/05/20 28 05/11/20 06/05/20 28 Final Cure: Moist Room Comments: Not tested for plastic unit weight. F = Field Cured Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Todd Wirtz Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz Airf«-con CO"A" 05/08/20 Sample Time: 1330 Todd Wirtz Sunny 10 Batch Size (cy): 10 Pump 18 End of truck chute discharge Retaining wall footing Compressive Strength Fracture Tested (psi) Type By 4,130 2 HRB 5,820 2 HRB Reviewed By: _ Heath Defo Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 GENERAL OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0009 Service Date: 05/14/20 Report Date: 05/19/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Cloudy Inspected the 8" retaining wall reinforcing steel at the west property line per detail 7/S5.1. The reinforcing steel bars were checked for size, spacing and lap splices. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: David Schmutzler Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae Reviewed By: ___ Heath Defoor, PE Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0010 Service Date: 05/15/20 Report Date: 05/20/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (4) 4x8" cylinders 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Partly cloudy The contractor placed approximately (10) cubic yards of CalPortland mix 633331 in forms for an 8"- thick retaining wall on the west property line. Reinforcing steel in this form had previously been inspected and found to be in conformance with approved plans and specifications. A representative sample of this mix was obtained, and (4) 4x8" cylinders were cast for laboratory curing and compressive strength testing. Approximately (7.5) yards of this same mix were placed by the same contractor in a footing at the Edmonds Senior Center in the adjacent lot. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Charles Edgerton Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae Reviewed By: ___ Heath Defoor, PE Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0010A Service Date: 05/15/20 Report Date: 05/26/20 Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 633331 Supplier: CalPortland Batch Time: 1123 Plant: 282 Truck No.: 7342 Ticket No.: 2328973 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Result Specification 6 5.8 75 61 Set Specimen Avg Diam. No. ID (in) _ 1 a 3.98 1 b 1 c 1 d Initial Cure: Outside Plastic Lids Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.44 05/18/20 05/22/20 7 61,730 05/18/20 06/12/20 28 05/18/20 06/12/20 28 05/18/20 06/12/20 28 Final Cure: Moist Room Comments: Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Charles Edgerton Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz Airf«-con CO"A" 05/15/20 Sample Time: Charles Edgerton Partly cloudy 10 Batch Size (cy): 10 Boom Pump 10 0 8" thick retaining wall on the west property line 8" thick retaining wall on the west property line, FDC vault slab footing at SE corner of Senior Center (adjacent job by same contractor). Compressive Strength Fracture Tested (psi) Type By 4,960 2 HRB Reviewed By: 4-4- th Defoor, PE Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0010A Service Date: 05/15/20 Report Date: 06/15/20 Revision 1 - 28-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Airf«-con CO"A" Specified Strength: 5,000 psi @ 28 days Sample Date: 05/15/20 Sample Time: Sampled By: Charles Edgerton Mix ID: 633331 Weather Conditions: Partly cloudy Supplier: CalPortland Accumulative Yards: 10 Batch Size (cy): 10 Batch Time: 1123 Plant: 282 Placement Method: Boom Pump Truck No.: 7342 Ticket No.: 2328973 Water Added Before (gal): 10 Field Test Data Water Added After (gal): 0 Sample Location: 8" thick retaining wall on the west Test Result Specification property line Slump (in): 6 Placement Location: 8" thick retaining wall on the west Air Content (%): 5.8 property line, FDC vault slab footing Concrete Temp. (F): 75 at SE corner of Senior Center Ambient Temp. (F): 61 (adjacent job by same contractor). Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 a 3.98 12.44 05/18/20 05/22/20 7 61,730 4,960 2 HRB 1 b 3.98 12.44 05/18/20 06/12/20 28 87,670 7,050 2 HRB 1 c 3.99 12.5 05/18/20 06/12/20 28 84,630 6,770 2 HRB 1 d 3.98 12.44 05/18/20 06/12/20 28 90,650 7,290 2 HRB Average (28 days) 7,030 Initial Cure: Outside Plastic Lids Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Charles Edgerton Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CANCELLED SERVICE REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0011 Service Date: 05/18/20 Report Date: 05/20/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Mayes Testing Engineers (MTE) arrived on site at the requested time to perform field density testing. MTE was informed by Scott (WG Clark Construction) that the contractor was not ready for testing at that time and requested that MTE return in the afternoon. Upon return, MTE was informed that the contractor was still not ready for testing and will reschedule services for a later date. Services: Cancelled Services Mayes/Terracon Rep.: Jarom Gray Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae Reviewed By: ___ Heath Defoor, PE Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 EARTHWORK OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0012 Service Date: 05/19/20 Report Date: 05/26/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Cloudy Performed field density testing on the south ramp subgrade between the retaining wall and the sheet pile wall. The material appeared to be 5/8" crushed rock. The Proctor value obtained on 03/25/20 was used for comparison of the field results. Please refer to the attached Soil Field Density Test Report for details. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Jarom Gray Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae Reviewed By: - Heath Defoor, PE Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusiveiy for fhe use of fhe client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 MAYES TESTING ENGINEERS .Wrommw s,,, - 20225 Cedar }Val lay Road Suite 110 Ph 425.742.9360 L}-nnwood. WA 98036 Fax 425 745 1737 Project No Page 1 M7191337 Of 1 Date: 05/ 19/20 SOIL Project: City of Edmonds Waterfront Redevelopment FIELD DENSITY TEST REPORT Inspector: Jarom Gray Test No. Location Depth or Elevation (feet) Probe Depth (inches) Moisture (%) Dry Density (Ib/cu.ft.) Compaction (%) Compaction Requirement Minimum (%) Pass Fail Type of Material and Use Optimum Optimum Corrected Field Test Maximum Corrected Field Test 1 South side of ramp FG 10 6.1 6.1 4.2 133.4 133.4 129.2 97% 95 X 5/8" crushed rock 2 North side of ramp FG 10 6.1 6.1 5.7 133.4 133.4 127.3 95% 95 X 5/8" crushed rock Compaction Standard Used WSDOT T606 WSDOT FOP for AASHTO T180 F ASTM D698 ASTM D 1557 x Compaction Test Method Used WSDOT FOP for AASHTO T310 ASTM D6938 x Comments: Data at ramp subgrade MTE 1400-2C, Rev 4,11.01.17 STRUCTURAL STEEL OBSERVATIONS REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0013 Service Date: 05/19/20 Report Date: 05/27/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018 1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Cloudy Inspected the 5/8"-diameter headed studs welded to the sheet piles located at the sea wall per RFI 3 and RFI 17. Found welds to be acceptable per AWS D1.1 visual acceptance criteria. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: David Schmutzler Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae Reviewed By: - Heath Defoor, PE Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusiveiy for fhe use of fhe client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0015 Service Date: 05/27/20 Report Date: 06/01 /20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (5) 4x8" cylinders 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Sunny, 70's Observed the placement of (50) cubic yards of CalPortland mix 633331 concrete into the reinforced sheet pile wall and pile cap south of the ramp/north stairs to the south end existing reinforced wall, near the north end of the building. The reinforcing steel was inspected prior to placement for proper spacing, grade, size, lap splice lengths, clearances and cleanliness. All reinforcement appeared to conform to the provided specifications, plans, RFI's and details B, C and D/S3.2 and A/S4.1. At the transition between pile cap sections (details B/S3.2 and D/S3.2), the top horizontal #5 bars need to be installed through the construction joint to provide the lap splice development into the next phase of the pour. This was completed before concrete placement. Concrete was properly placed using a pump truck, then mechanically consolidated using a vibrator. During testing, the slump was observed at 8" at the truck chute, which is high (6" specified); but added water was in tolerance, and the City Inspector and concrete foreman were notified. The temperature of the concrete was 760, and air was measured at 5.1 %. One (1) set of (5) 4x8" cylinders was cast for compressive strength testing (f'c 5000 psi at 28 days). To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Matthew Howey Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae Reviewed By: Timothy G. Beckerle, PE Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0015A Service Date: 05/27/20 Report Date: 06/03/20 Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 633331 Supplier: CalPortland Batch Time: 1235 Plant: 291 Truck No.: 76667 Ticket No.: 2335171 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Result Specification 8 5.1 76 70 Set Specimen Avg Diam. No. ID (in) _ 1 A 4.00 1 B 1 C 1 D 1 E Initial Cure: Outside Plastic Lids Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 05/28/20 05/30/20 3 44,470 05/28/20 06/03/20 7 05/28/20 06/24/20 28 05/28/20 06/24/20 28 05/28/20 06/24/20 28 Final Cure: Moist Room Comments: Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Matthew Howey Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz Airf«-con CO"A" 05/27/20 Sample Time: 1345 Matthew Howey Sunny, 70's 29.5 Batch Size (cy): 10 Pump 30 Sheet pile wall and pile cap south of ramp Compressive Strength Fracture Tested (psi) Type By 3,540 2 HRB Reviewed By: 4-4- th Defoor, PE Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0015A Service Date: 05/27/20 Report Date: 06/05/20 Revision 1 - 7-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 633331 Supplier: CalPortland Batch Time: 1235 Plant: 291 Truck No.: 76667 Ticket No.: 2335171 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Set Specimen Avg Diam. Result Specification 8 5.1 76 70 No. ID (in) 1 _ A 4.00 1 B 3.99 1 C 1 D 1 E Initial Cure: Outside Plastic Lids Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 05/28/20 05/30/20 3 44,470 12.5 05/28/20 06/03/20 7 61,270 05/28/20 06/24/20 28 05/28/20 06/24/20 28 05/28/20 06/24/20 28 Final Cure: Moist Room Comments: Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Airf«-con CO"A" 05/27/20 Sample Time: 1345 Matthew Howey Sunny, 70's 29.5 Batch Size (cy): 10 Pump 30 Sheet pile wall and pile cap south of ramp Compressive Strength Fracture Tested (psi) Type By 3,540 2 HRB 4,900 2 HRB Mayes/Terracon Rep.: Matthew Howey Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Eric Carter Reviewed By: (1) City of Edmonds WA, Milton Thompson (1) Environmental Works, Inc., Nic Morin Kevin Graham (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager (1) Reid Middleton, Blaine McRae Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0015A Service Date: 05/27/20 Report Date: 06/25/20 Revision 2 - 28-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Airf«-con CO"A" Specified Strength: 5,000 psi @ 28 days Sample Date: 05/27/20 Sample Time: 1345 Sampled By: Matthew Howey Mix ID: 633331 Weather Conditions: Sunny, 70's Supplier: CalPortland Accumulative Yards: 29.5 Batch Size (cy): 10 Batch Time: 1235 Plant: 291 Placement Method: Pump Truck No.: 76667 Ticket No.: 2335171 Water Added Before (gal): 30 Field Test Data Water Added After (gal): Sample Location: Test Result Specification Placement Location: Sheet pile wall and pile cap south of Slump (in): 8 ramp Air Content (%): 5.1 Concrete Temp. (F): 76 Ambient Temp. (F): 70 Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 05/28/20 05/30/20 3 44,470 3,540 2 HRB 1 B 3.99 12.5 05/28/20 06/03/20 7 61,270 4,900 2 HRB 1 C 3.98 12.44 05/28/20 06/24/20 28 82,070 6,600 2 HRB 1 D 3.99 12.5 05/28/20 06/24/20 28 83,090 6,650 2 HRB 1 E 3.99 12.5 05/28/20 06/24/20 28 79,560 6,360 2 HRB Average (28 days) 6,530 Initial Cure: Outside Plastic Lids Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Matthew Howey Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 SAMPLE PICK-UP REPORT Report Number: M7191337.0016 Service Date: 05/28/20 Report Date: 06/01 /20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (1) Proctor MAYES TESTING ENGINEERS nlrerracan cmernxv 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Sunny 70's Collected (2) 40-pound bags of onsite aggregate for Proctor testing (ASTM D1557). The CalPortland Type 17 engineered material appeared to be a gray sandy gravel and is to be used as trench backfill. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Matthew Howey Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae Reviewed By: Timothy G. Beckerle, PE Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 nCedar WA 980 6636511 o Lynnwood, A ES TES TI G ENGINEERS 425-742-9360 n 1rereaoa;l7 COMPANY LABORATORY COMPACTION CHARACTERISTICS OF SOIL REPORT Report Number: M7191337.0016A Service Date: 06/01/20 Report Date: 06/02/20 Task: Client Project City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Project No. M7191337 Laboratory Reference # 4663 Sample Description: Type 17 gravel (gray sand with gravel) Supplier of Material: CalPortland Sample Location: Jobsite Date Sampled: 5/28/2020 Date Delivered: 5/28/2020 Sampled By: M. Howey Delivered By: M. Howey Proposed Use: Trench Backfill Test Results: Sieve Analysis (C136, C117) See attached analysis sheet Test Method: ASTM D-1557 Method C / C 127 / D 4718 (if needed) 131.9 pcf @ 5.9 % See attached analysis sheet Material sampled in accordance with appropriate standard. (ASTM D75, AASHTO T2) Services: Special Inspection/Materials Testing Tested By: Hanna Birkvold Report Distribution (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Eric Carter uibvrf A (1) City of Edmonds WA, Milton Thompson (1) Environmental Works, Inc., Nic Morin Reviewed By: (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Mayes Testing Engineers, Inc, Todd Wirtz Zenaida Revilla (1) Reid Middleton, Blaine McRae Laboratory Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0002, 10-16-13, Rev.8 Page 1 of 1 MAYES TESTING ENGINEERS, INC. Alferracon COMPANY 20225 Cedar Valley Road, Suite 110 Ph 425-742-9360 Moisture Density Relationship Test Lynnwood, WA 98036 Fax 425-745-1737 Client: City of Edmonds WA Edmonds, WA Project: City of Edmonds Waterfront Redevelopment Test Method: ASTM D-1557 Method C / C 127 / D 4718 (if needed) Wet Preparation F-] Mechanical X Dry Preparation Hand Tamper Date Received: 5/28/2020 Source of Sample: CalPortland Description of Sample: Type 17 gravel (gray sand with gravel) Zero Void line plotted at an assumed SpG of: 2.6 Max. Density Uncorrected: 131. 135 134 133 132 131 m 0 130 0 129 128 127 126 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Water Content, % of dry Weight Report Date: 6/2/2020 Date Tested: 6/1 /2020 Project Number: M7191337 Lab Number: 4663 i est Kesuits mum Water Content % 5.9 Max Dry Density lbs/ft'l 131.9 Sieve Analysis Sieve Size Percent Retained 3/4 4% 3/8 22% #4 37% 8.0 9.0 10.0 11.0 12.0 Tested By: H. Birkvold Information in this report applies only to the actual samples tested and shall not be reproduced except in full, without the approval of Mayes Testing Engineers, Inc. M7191337.0016A.1/6/2/2020 MTE Form # 149, Rev 2, 6/02 EARTHWORK OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0019 Service Date: 06/02/20 Report Date: 06/05/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No.: M7191337 Weather: Partly cloudy, 60's Observed and performed necessary in situ density tests for the backfill of the radiused retaining wall. Upon arrival at the site, it was noted that the material to be used as backfill for the radiused retaining wall was visually classified as imported gray sand with gravel (CalPortland Type 17). (See Mayes Testing Engineers (MTE) Laboratory Compaction Characteristics of Soil Report 0016A, service date 06/01/20). The fill material was observed to be adequately moisture conditioned and was placed in loose lifts approximately 12" to 18" thick. Compaction efforts were applied utilizing a Komatsu PC138US excavator with a vibratory hoe -pack attachment. At the time MTE departed, the contractor was planning on placing a second lift on the south end when more fill material was received. The first lift was tested and passed at 2' below grade. All lifts observed today appeared firm and stable during compaction efforts. Field density tests were performed utilizing nuclear method ASTM D6938. The test results met the minimum specified compaction requirement of 95% and 90% within 3' of the retaining wall, per recommendations by geotechnical engineer Sean Gertz (Landeau Associates) provided via email. Refer to the attached Soil Field Density Test Report for individual test data. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Matthew Howey Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz Reviewed By: - Kevin Graham (1) Reid Middleton, Blaine McRae Senior Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 MAYES TESTING ENGINEERS '11rirrxontb , 2M5 Cedar Valley Road. ^auia 110 Ph 42&742.9360 Lynmvood. WA 36U36 Fax 425745 1737 SOIL FIELD DENSITY TEST REPORT Page 1 of 1 Project No.: M7191337 Date: 06/02/20 Project: City Of Edmonds Waterfront Redevelopment Inspector: Matt Howey Test No. Location Depth or Elevation (feet) Probe Depth (inches) Moisture (%) Dry Density (Ib/eu.ft.) Compaction N Compaction Requirement Minimum (%) Pass Fail Type of Material and Use Optimum Optimum Corrected Field Test Maximum Correcte d Field Test 1 South Radiused Retaining Wall Backfill 2 10 5.9 5.9 4.6 131.9 131.9 124.9 95% 95 X Type 17 2 Mid Radiused Retaining Wall Backfill 3 1 10 5.9 5.9 1 5.5 131.9 131.9 1 121.9 92% 90 X Type 17 3 North Radiused Retaining Wall Backfill 3 10 5.9 5.9 5.6 131.9 131.9 119.8 91 % 90 X Type 17 4 North Radiused Retaining Wall Backfill 2 10 5.9 5.9 4.6 131.9 131.9 124 94% 90 X Type 17 5 Mid Radiused Retaining Wall Backfill 2 10 5.9 5.9 4.4 131.9 131.9 125.6 95% 90 X Type 17 6 Mid Radiused Retaining Wall Backfill 1 10 5.9 5.9 4.3 131.9 131.9 126.4 96% 95 X Type 17 7 North Radiused Retaining Wall Backfill 1 10 5.9 5.9 4 131.9 131.9 128.3 97% 95 X Type 17 8 North Radiused Retaining Wall Backfill 0.5 10 5.9 5.9 4 131.9 131.9 127.2 96% 95 X Type 17 9 Mid Radiused Retaining Wall Backfill 0.5 10 5.9 5.9 4.8 131.9 131.9 126.7 96% 95 X Type 17 Compaction Standard Used WSDOT T606 WSDOT FOP for AASHTO T180 ASTM D698 ASTM D 1557 X Compaction Test Method Used WSDOT FOP for AASHTO T310 ASTM D6938 X Comments: Curb grade is Datum (0 Feet) MTE Nuclear Gauge No.: 30426 Density Std. Count: 1878 Moisture Std. Count: 602 MTE 1400-2C, Rev 4, 11.01.17 CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0020 Service Date: 06/03/20 Report Date: 06/08/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (5) 4x8" cylinders 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Sunny, 60's Observed the placement of (14.5) cubic yards of CalPortland mix 633331 concrete into the reinforced sheet pile wall (north end), the stair footing and the sheet pile cap (south end pour, Phase 2, below the precast cap). The reinforcing steel was inspected prior to placement for proper spacing, grade, size, lap splice lengths, clearances and cleanliness. All reinforcement appeared to conform to the provided specifications; plans; RFI's 31, 34 and 35; details B/S3.2 and A/S-2.4; and details on SK-05. The concrete was properly placed using the truck chute, then mechanically consolidated using a vibrator. During testing, the slump was observed at 6" at the truck chute. The concrete temperature was 75°F, and the air entrainment was measured at 4.8%. One (1) set of (5) 4x8" cylinders was cast for compressive strength testing (f'c 5000 psi at 28 days). To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Matthew Howey Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Donna Pollard Todd Wirtz Reviewed By: _Ll- 11 Thomas Cain (1) Reid Middleton, Blaine McRae Senior Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0020A Service Date: 06/03/20 Report Date: 06/08/20 Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 633331 Supplier: CalPortland Batch Time: 1154 Plant: 282 Truck No.: 8298 Ticket No.: 2340201 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 a 4.00 1 b 1 c 1 d 1 e Initial Cure: Outside Result Specification 6 4.8 75 61 Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 06/04/20 06/06/20 3 51,010 06/04/20 06/10/20 7 06/04/20 07/01/20 28 06/04/20 07/01/20 28 06/04/20 07/01/20 28 Final Cure: Moist Room Comments: Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Matthew Howey Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz Airf«-con CO"A" 06/03/20 Sample Time: 1250 Matthew Howey Sunny, 60's 10 Batch Size (cy): 10 Chute 0 Sheet pile wall, north end Compressive Strength Fracture Tested (psi) Type By 4,060 2 MRS c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0020A Service Date: 06/03/20 Report Date: 06/11/20 Revision 1 - 7-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 633331 Supplier: CalPortland Batch Time: 1154 Plant: 282 Truck No.: 8298 Ticket No.: 2340201 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 a 4.00 1 b 3.98 1 c 1 d 1 e Initial Cure: Outside Result Specification 6 4.8 75 61 Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.57 06/04/20 06/06/20 3 51,010 12.44 06/04/20 06/10/20 7 67,890 06/04/20 07/01/20 28 06/04/20 07/01/20 28 06/04/20 07/01/20 28 Final Cure: Moist Room Comments: Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Matthew Howey Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie Airf«-con CO"A" 06/03/20 Sample Time: 1250 Matthew Howey Sunny, 60's 10 Batch Size (cy): 10 Chute 0 Sheet pile wall, north end Compressive Strength Fracture Tested (psi) Type By 4,060 2 MRS 5,460 2 HRB c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0020A Service Date: 06/03/20 Report Date: 07/03/20 Revision 2 - 28-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Airf«-con CO"A" Specified Strength: 5,000 psi @ 28 days Sample Date: 06/03/20 Sample Time: 1250 Sampled By: Matthew Howey Mix ID: 633331 Weather Conditions: Sunny, 60's Supplier: CalPortland Accumulative Yards: 10 Batch Size (cy): 10 Batch Time: 1154 Plant: 282 Placement Method: Chute Truck No.: 8298 Ticket No.: 2340201 Water Added Before (gal): 0 Field Test Data Water Added After (gal): Sample Location: Test Result Specification Placement Location: Sheet pile wall, north end Slump (in): 6 Air Content (%): 4.8 Concrete Temp. (F): 75 Ambient Temp. (F): 61 Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 a 4.00 12.57 06/04/20 06/06/20 3 51,010 4,060 2 MRS 1 b 3.98 12.44 06/04/20 06/10/20 7 67,890 5,460 2 HRB 1 c 3.99 12.5 06/04/20 07/01/20 28 84,650 6,770 2 MRS 1 d 4.00 12.57 06/04/20 07/01/20 28 86,010 6,840 2 MRS 1 e 3.99 12.5 06/04/20 07/01/20 28 93,310 7,460 3 MRS Average (28 days) 7,030 Initial Cure: Outside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Matthew Howey Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0021 Service Date: 06/10/20 Report Date: 06/12/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (4) 4x8" cylinders 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No.: M7191337 Weather: Partly cloudy, 63°F Inspected the concrete placement of the promenade 6" structural slab -on -grade. The reinforcing steel conforms to plan page S2.2 and associated details. Monitored and sampled the placement of (18) cubic yards of CalPortland mix 63333i by truck chute, with mechanical consolidation. Air entrainment of the first load on arrival was 4.2%. Cast (1) set of (4) 4x8" cylinders for compressive strength testing. Per S1.1, f'c of 5000 psi at 28 days is required. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Carl Harrington Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0021A Service Date: 06/10/20 Report Date: 06/18/20 Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 63333i Supplier: CalPortland Batch Time: 1021 Plant: Kenmore (260) Truck No.: 7666 Ticket No.: 2345177 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Result Specification 6 1/2 4.2 76 63 Laboratory Test Data Set Specimen Avg Diam. Area No. ID (in) (sq in) 1 A 3.98 12.44 1 B 1 C 1 D Initial Cure: Covered with Blanket Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Date Date Test Load Received Tested (days) (lbs) 06/12/20 06/17/20 7 60,710 06/12/20 07/08/20 28 06/12/20 07/08/20 28 06/12/20 07/08/20 28 Final Cure: Moist Room Comments: Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Carl Harrington Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie Airf«-con CO"A" 06/10/20 Sample Time: 1120 Carl Harrington Partly Cloudy 10 of 18 Batch Size (cy): 10 Chute 15 0 Prominade structural slab -on -grade, North end. Prominade structural slab -on -grade. Compressive Strength Fracture Tested (psi) Type By 4,880 2 KWB c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0021A Service Date: 06/10/20 Report Date: 07/10/20 Revision 1 - 28-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Airf«-con CO"A" Specified Strength: 5,000 psi @ 28 days Sample Date: 06/10/20 Sample Time: 1120 Sampled By: Carl Harrington Mix ID: 63333i Weather Conditions: Partly Cloudy Supplier: CalPortland Accumulative Yards: 10 of 18 Batch Size (cy): 10 Batch Time: 1021 Plant: Kenmore (260) Placement Method: Chute Truck No.: 7666 Ticket No.: 2345177 Water Added Before (gal): 15 Water Added After (gal): 0 Field Test Data Sample Location: Prominade structural slab -on -grade, Test Result Specification North end. Slump (in): 6 1/2 Placement Location: Prominade structural slab -on -grade. Air Content (%): 4.2 Concrete Temp. (F): 76 Ambient Temp. (F): 63 Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 A 3.98 12.44 06/12/20 06/17/20 7 60,710 4,880 2 KWB 1 B 3.99 12.5 06/12/20 07/08/20 28 82,640 6,610 2 HRB 1 C 3.99 12.5 06/12/20 07/08/20 28 78,330 6,260 2 HRB 1 D 3.98 12.44 06/12/20 07/08/20 28 80,140 6,440 2 HRB Average (28 days) 6,440 Initial Cure: Covered with Blanket Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Carl Harrington Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 GENERAL OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0022 Service Date: 06/25/20 Report Date: 06/30/20 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Project No.: M7191337 Permit No.: BLD2018-1653 Weather: Sunny Samples: N/A After arrival at the jobsite, the contractor canceled the inspection; and it was then rescheduled Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Randal Dohrman Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 EARTHWORK OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0023 Service Date: 07/01/20 Report Date: 07/08/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Overcast On site to perform field density testing on frontage sewage line using imported backfill up to subgrade, close to Railroad Avenue. WG Clark Construction Company performed the earthwork activities. Soil Fill Placement Observation At the time of arrival, noticed the material to be used as fill at the area was import material visually classified as recycled concrete. Material was observed to be adequately moisture -conditioned and placed in lifts approximately 1' thick. Compacting efforts were applied utilizing a HoPac and hand plate compactor. The fill placed was observed to be firm and stable after the compaction efforts. Field density tests were conducted utilizing a nuclear density gauge. The test results met the minimum specified compaction requirement of 95%. Refer to the attached Field Density Test Report for individual test data, To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Babatunde Soyinka Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 MAYES TESTING ENGINEERS 20225 Cedar }Val lay Road Suite 110 Ph 425.742.9360 L}-nnwaod. WA 98036 Fax 425 745 1737 SOIL FIELD DENSITY TEST REPORT Page 1 of 1 Project No.: M7191337 Date: 7/1/2020 Project: City of Edmonds Waterfront Redevelopment Inspector: Jimi Soyinka Test No. Location Depth or Elevation (feet) Probe Depth (inches) Moisture (%) Dry Density (Ib/cu.ft.) Compaction (%) Compaction Requirement Minimum (%) Pass Fail Type of Material and Use Optimum Optimum Corrected Field Test Maximum Corrected Field Test 1 Sewage/Railroad Ave. SG 10 5.9 5.9 5.1 131.9 131.9 124.8 95% 95 Recycled cone. 2 Sewage/Railroad Ave. SG 10 5.9 5.9 4.6 131.9 131.9 125 95% 95 Recycled conc. Compaction Standard Used WSDOT T606 WSDOT FOP for AASHTO T180 F ASTM D698 ASTM D 1557 X Compaction Test Method Used WSDOT FOP for AASHTO T310 1 ASTM D6938 X Comments: MTE Nuclear Gauge No.: 20939 Density Std. Count: 1578 Moisture Std. Count: 543 MTE 1400-2C, Rev 4,11.01.17 CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0024 Service Date: 07/14/20 Report Date: 07/17/20 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Project No.: M7191337 Permit No.: BLD2018-1653 Weather: Sunny Samples: (4) 4x8" cylinders Inspected (9) holes drilled into hardened concrete for the epoxy anchoring of wall dowels for the upper wall at the north staircase (#5 bars at 12" on center each way) #5 bars x 43" long were anchored using Hilti HY20OR epoxy (lot # 1759 27 L2, expires 02/2021). Holes were cleaned and ready for epoxy. Inspected the reinforcing steel for north stair footings. Reviewed several drawings, RFI's and SSK's for the changes to the configuration. Found the reinforcing to be per plans. Observed the placement of (19.5) cubic yards of CalPortland mix 633331 via pump and vibrated for consolidation. Cast (1) set of (4) 4x8" cylinders for compressive strength testing (5000 psi at 28 days). To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Michael Mattox Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0024A Service Date: 07/14/20 Report Date: 08/12/20 Revision 1 - 28-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Airf«-con CO"A" Specified Strength: 5,000 psi @ 28 days Sample Date: 07/14/20 Sample Time: 1338 Sampled By: Michael Mattox Mix ID: 633331 Weather Conditions: Sunny Supplier: CalPortland Accumulative Yards: 10 Batch Size (cy): 10 Batch Time: 1250 Plant: 260 Placement Method: Pump Truck No.: 7428 Ticket No.: 2369165 Water Added Before (gal): 0 Water Added After (gal): 0 Field Test Data Sample Location: Test Result Specification Placement Location: North Stair footings Slump (in): 6 1/2 Air Content (%): 6.1 Concrete Temp. (F): 82 Ambient Temp. (F): 72 Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 1 3.98 12.44 07/16/20 07/21/20 7 66,200 5,320 2 KWB 1 2 3.98 12.44 07/16/20 08/11/20 28 83,240 6,690 2 ZAJ 1 3 3.99 12.5 07/16/20 08/11/20 28 81,330 6,500 2 ZAJ 1 4 3.99 12.5 07/16/20 08/11/20 28 84,510 6,760 2 ZAJ Average (28 days) 6,650 Initial Cure: Outside Plastic Lids Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Michael Mattox Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0025 Service Date: 07/17/20 Report Date: 07/22/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (4) 4x8" cylinders 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Overcast Final inspection of reinforcing steel for the north stair walls. The reinforcing steel was per plans and RFI 46. Observed placement of (10) cubic yards of CalPortland mix 633331. The concrete was placed via truck chute and was mechanically consolidated. The concrete was sampled; and (4) 4x8" cylinders were cast for compressive strength testing, with 5000 psi at 28 days required. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Barry Tuttle Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0025A Service Date: 07/17/20 Report Date: 07/27/20 Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 63333I Supplier: CalPortland Batch Time: 1216 Plant: 260 Truck No.: 7426 Ticket No.: 2372258 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Result Specification 4 1/2 76 66 Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Airf«-con CO"A" 07/17/20 Sample Time: 1300 Barry Tuttle Overcast 10 Batch Size (cy): 10 Chute From truck chute North stair walls Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 a 3.97 12.38 07/21/20 07/24/20 7 72,800 5,880 5 KWB 1 b 07/21/20 08/14/20 28 1 c 07/21/20 08/14/20 28 1 d 07/21/20 08/14/20 28 Initial Cure: Outside Plastic Lids Final Cure: Moist Room Min Temp: 60 Max Temp: 65 Comments: Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Barry Tuttle Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Eric Carter (1) City of Edmonds WA, Milton Thompson (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Currie c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0025A Airff-conCO"A" Service Date: 07/17/20 20225 Cedar Valley Rd Ste 110 Report Date: 08/17/20 Revision 1 - 28-day results Lynnwood, WA 98036-6365 Task: 425-742-9360 Client Project - M7191337 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Specified Strength: 5,000 psi @ Mix ID: 63333I Supplier: CalPortland Batch Time: 1216 Truck No.: 7426 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Sample Information 28 days Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Plant: 260 Ticket No.: 2372258 Result Specification 4 1/2 76 66 Set Specimen Avg Diam. Area Date Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Date Test Load 07/17/20 Sample Time: 1300 Barry Tuttle Overcast 10 Batch Size (cy): 10 Chute From truck chute North stair walls Compressive Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 a 3.97 12.38 07/21/20 07/24/20 7 72,800 5,880 5 KWB 1 b 3.99 12.5 07/21/20 08/14/20 28 91,930 7,350 2 ZAJ 1 c 3.99 12.5 07/21/20 08/14/20 28 96,520 7,720 2 ZAJ 1 d 3.99 12.5 07/21/20 08/14/20 28 95,750 7,660 2 ZAJ Average (28 days) 7,580 Initial Cure: Outside Plastic Lids Final Cure: Moist Room Min Temp: 60 Max Temp: 65 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Barry Tuttle Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Eric Carter Reviewed By: (1) City of Edmonds WA, Milton Thompson (1) Environmental Works, Inc., Nic Morin Thomas Cain (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Mayes Testing Engineers, Inc, Todd Wirtz Senior Project Field Manager (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Currie Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 POST -INSTALLED ANCHORS REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0026 Service Date: 07/22/20 Report Date: 07/25/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Cloudy, 60's Observed installation of epoxy -grouted dowels for stairs. Eighty-five (85) #5 reinforcing steel dowels, with a drill depth of 6", were installed per RFI 045. The holes were verified for correct drill depth and cleanliness prior to installation. Hilti HIT-HY 200-R (expiration 02/2021) was used according to manufacturer instructions. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Ahmmed Ahmmed Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0027 Service Date: 07/24/20 Report Date: 07/29/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (4) 4x8" cylinders 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Cloudy Performed a reinforcing steel inspection for the following elements per the approved contract document details and specifications: • The north beach stair risers and landings per detail A/S4.4. • The bioretention planter walls per detail 3/CS4.1. Observed the placement of (18) cubic yards of CalPortland concrete mix 633331 (a required 5000 psi at 28 days) for the north beach stair risers and landings. The concrete was placed by direct discharge and mechanically vibrated for consolidation. A sample was taken, and (1) set of (4) 4x8" cylinders was cast. The field test results were the following: • Air: 4.5% • Slump: 5" • Concrete Temperature: 76°F • Ambient Temperature: 570F To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Randal Dohrman Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0027A Service Date: 07/24/20 Report Date: 08/24/20 Revision 1 - 28-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Airf«-con CO"A" Specified Strength: 3,000 psi @ 28 days Sample Date: 07/24/20 Sample Time: 0700 Sampled By: Randal Dohrman Mix ID: 63333I Weather Conditions: Partly cloudy Supplier: CalPortland Accumulative Yards: 9 Batch Size (cy): 9 Batch Time: 0600 Plant: 260 Placement Method: Direct Discharge Truck No.: 7428 Ticket No.: 2376481 Water Added Before (gal): Field Test Data Water Added After (gal): Sample Location: truck chute Test Result Specification Placement Location: North beach stair Slump (in): 5 1/2 Air Content (%): 4.5 Concrete Temp. (F): 76 Ambient Temp. (F): 57 Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 1 3.98 12.44 07/27/20 07/31/20 7 71,310 5,730 2 KWB 1 2 3.98 12.44 07/27/20 08/21/20 28 94,760 7,620 2 KWB 1 3 3.98 12.44 07/27/20 08/21/20 28 95,790 7,700 2 KWB 1 4 3.98 12.44 07/27/20 08/21/20 28 93,220 7,490 2 KWB Average (28 days) 7,600 Initial Cure: Outside Plastic Lids Final Cure: Moist Room Max Temp: 65 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Randal Dohrman Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0028 Service Date: 08/20/20 Report Date: 08/26/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (4) 4x8" cylinders 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Sunny Observed reinforced concrete placement of the south stairs footing. Inspected reinforcing steel was per SSK-05 and RFI 052. The contractor placed (17) cubic yards of CalPortland mix 633331 by pump and vibrated for consolidation. Cast (1) set of (4) 4x8" cylinders for compressive strength testing, with 5000 psi at 28 days required. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: David Bernier Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0028A Service Date: 08/20/20 Report Date: 08/31/20 Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 63333I Supplier: CalPortland Batch Time: 1436 Plant: 260 Truck No.: 7687 Ticket No.: 2395575 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 a 3.99 1 b 1 c 1 d Initial Cure: Outside in shade Result Specification 6 4 -7 4.6 4.5 - 7.5 79 50 - 90 76 Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.5 08/21/20 08/27/20 7 58,990 08/21/20 09/17/20 28 08/21/20 09/17/20 28 08/21/20 09/17/20 28 Final Cure: Moist Room Comments: Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: David Bernier Reported To: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Eric Carter (1) City of Edmonds WA, Milton Thompson (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Currie Airf«-con CO"A" 08/20/20 Sample Time: 1542 David Bernier Sunny 3 Batch Size (cy): 10 PUMP 0 0 South stars footing South stairs footing Compressive Strength Fracture Tested (psi) Type By 4,720 2 ZAJ c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0028A Service Date: 08/20/20 Report Date: 09/18/20 Revision 1 - 28-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Airf«-con CO"A" Specified Strength: 5,000 psi @ 28 days Sample Date: 08/20/20 Sample Time: 1542 Sampled By: David Bernier Mix ID: 63333I Weather Conditions: Sunny Supplier: CalPortland Accumulative Yards: 3 Batch Size (cy): 10 Batch Time: 1436 Plant: 260 Placement Method: pump Truck No.: 7687 Ticket No.: 2395575 Water Added Before (gal): 0 Water Added After (gal): 0 Field Test Data Sample Location: South stars footing Test Result Specification Placement Location: South stairs footing Slump (in): 6 4 - 7 Air Content (%): 4.6 4.5 - 7.5 Concrete Temp. (F): 79 50 - 90 Ambient Temp. (F): 76 Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 a 3.99 12.5 08/21/20 08/27/20 7 58,990 4,720 2 ZAJ 1 b 3.99 12.5 08/21/20 09/17/20 28 80,380 6,430 2 MRS 1 c 3.99 12.5 08/21/20 09/17/20 28 81,930 6,550 4 MRS 1 d 3.99 12.5 08/21/20 09/17/20 28 83,550 6,680 2 MRS Average (28 days) 6,550 Initial Cure: Outside in shade Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: David Bernier Reported To: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Eric Carter (1) City of Edmonds WA, Milton Thompson (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Currie Reviewed By: Kevin Graham Department Manager II Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 GENERAL OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0029 Service Date: 08/25/20 Report Date: 08/28/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (4) 4x8" cylinders 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Sunny Performed concrete placement observation at the south stair upper footing. Prior to the placement, the reinforcing steel installation was inspected per RFI 52, RFI 52.1, S1.2, detail 7/S5.1 and associated documents. The installation was found to be substantially in conformance with the approved plan documents. Verified clearances and cleanliness. Monitored and sampled the placement of approximately (7) cubic yards of CalPortland concrete mix 633331 via chute/direct discharge, with mechanical consolidation. Cast (1) set of (4) 4x8" cylinders for compressive strength testing. Per schedule S1.1, a minimum f'c of 5000 psi at 28 days is required. The lab -cure sample cylinders were placed in a box covered with plastic for initial site curing (see Concrete Sample Log below for more information). Concrete Sample Log Service Cubic Total Mix Batch Order Samples PSI Slump/ Air Yards Cubic Set No. Plant No. Cast Required Spread Entrainment Temperature Sampled Yards Element Type 1 633331 260 0029A 4 5000 6" 5% 83°F 7 7 Footing To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Biniyam Hailemariam Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0029A Service Date: 08/25/20 Report Date: 09/04/20 Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 63333I Supplier: CalPortland Batch Time: 1404 Plant: 260 Truck No.: 7426 Ticket No.: 2398614 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Result Specification 6 5.0 83 75 Laboratory Test Data Set Specimen Avg Diam. Area No. ID (in) (sq in) 1 1 3.99 12.5 1 2 1 3 1 4 Initial Cure: Covered with Plastic Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Date Date Test Load Received Tested (days) (lbs) 08/26/20 09/01/20 7 82,110 08/26/20 09/22/20 28 08/26/20 09/22/20 28 08/26/20 09/22/20 28 Final Cure: Moist Room Comments: Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Biniyam Hailemariam Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie Airf«-con CO"A" 08/25/20 Sample Time: 1500 Biniyam Hailemariam Sunny 7 of 7 Batch Size (cy): 7 Chute 15 Chute South stair upper footing. Compressive Strength Fracture Tested (psi) Type By 6,570 2 MRS c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0029A Service Date: 08/25/20 Report Date: 09/23/20 Revision 1 - 28-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Airf«-con CO"A" Specified Strength: 5,000 psi @ 28 days Sample Date: 08/25/20 Sample Time: 1500 Sampled By: Biniyam Hailemariam Mix ID: 63333I Weather Conditions: Sunny Supplier: CalPortland Accumulative Yards: 7 of 7 Batch Size (cy): 7 Batch Time: 1404 Plant: 260 Placement Method: Chute Truck No.: 7426 Ticket No.: 2398614 Water Added Before (gal): 15 Field Test Data Water Added After (gal): Sample Location: Chute Test Result Specification Placement Location: South stair upper footing. Slump (in): 6 Air Content (%): 5.0 Concrete Temp. (F): 83 Ambient Temp. (F): 75 Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 1 3.99 12.5 08/26/20 09/01/20 7 82,110 6,570 2 MRS 1 2 3.99 12.5 08/26/20 09/22/20 28 99,850 7,990 2 JBD 1 3 3.99 12.5 08/26/20 09/22/20 28 97,120 7,770 2 JBD 1 4 3.98 12.44 08/26/20 09/22/20 28 103,440 8,310 2 JBD Average (28 days) 8,020 Initial Cure: Covered with Plastic Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Biniyam Hailemariam Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie Reviewed By: Kevin Graham Department Manager II Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0030 Service Date: 08/28/20 Report Date: 09/04/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (4) 4x8" cylinders 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Sunny Inspected the reinforcing steel placed into the South stair walls. Found according to detail 7 on S5.1. Sampled mix # 633331 from Cal Portland. Entrained air tested by QC and the result was 4.5%, the slump was 4.75", concrete temperature was 81 OF and the ambient temp was 65°F. Cast (4) test cylinders for compressive strength testing (5,000 psi required). All concrete placed by pump and vibrated for consolidation. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Michael Mattox Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0030A Service Date: 08/28/20 Report Date: 09/08/20 Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 63333I Supplier: CalPortland Batch Time: 1107 Plant: 260 Truck No.: 7665 Ticket No.: 2401112 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Result Specification 4 3/4 4.5 81 65 Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Airf«-con CO"A" 08/28/20 Sample Time: 1229 Michael Mattox Sunny 5 Batch Size (cy): 5 Pump 15 0 South stair walls Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 1 3.99 12.5 08/29/20 09/04/20 7 61,440 4,910 2 .1BD 1 2 08/29/20 09/25/20 28 1 3 08/29/20 09/25/20 28 1 4 08/29/20 09/25/20 28 Initial Cure: Outside Plastic Lids Final Cure: Moist Room Max Temp: 56 Comments: Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Michael Mattox Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0030A Service Date: 08/28/20 Report Date: 09/28/20 Revision 1 - 28-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Airf«-con CO"A" Specified Strength: 5,000 psi @ 28 days Sample Date: 08/28/20 Sample Time: 1229 Sampled By: Michael Mattox Mix ID: 63333I Weather Conditions: Sunny Supplier: CalPortland Accumulative Yards: 5 Batch Size (cy): 5 Batch Time: 1107 Plant: 260 Placement Method: Pump Truck No.: 7665 Ticket No.: 2401112 Water Added Before (gal): 15 Water Added After (gal): 0 Field Test Data Sample Location: Test Result Specification Placement Location: South stair walls Slump (in): 4 3/4 Air Content (%): 4.5 Concrete Temp. (F): 81 Ambient Temp. (F): 65 Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 1 3.99 12.5 08/29/20 09/04/20 7 61,440 4,910 2 JBD 1 2 3.98 12.44 08/29/20 09/25/20 28 83,750 6,730 2 KWB 1 3 3.99 12.5 08/29/20 09/25/20 28 80,260 6,420 2 KWB 1 4 3.98 12.44 08/29/20 09/25/20 28 80,140 6,440 2 KWB Average (28 days) 6,530 Initial Cure: Outside Plastic Lids Final Cure: Moist Room Max Temp: 56 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Michael Mattox Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie c Reviewed By: Thomas Cain Senior Project Field Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 POST -INSTALLED ANCHORS REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0031 Service Date: 09/01/20 Report Date: 09/04/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Sunny Inspected the holes drilled for the epoxy anchoring of #5 reinforcing steel bars into the south stair walls for the steps. Per the General Notes on S1.2, #5 bars are to be epoxy anchored with 7" of embedment. Upon inspection, it was noted that the holes were 6" deep. Asked Dylan with WG Clark Construction about this; and he stated that he directed the installer to drill 6" so that the back of the wall would not blow out during drilling, which does occur when the holes are drilled too close to the outside face of the wall. Noted that the hook bars anchored at the bottom of the stairs were 7-1/2" deep. All holes were brushed and blown clean, as required. Hilti HIT-HY 200 (lot 1452 24 L2, expiration 06/2021) was used for the installation. The holes were filled, and the reinforcing steel bars were installed. PRELIMINARY INSPECTION The engineer should review the reduced embedment for acceptance prior to concrete placement. Dylan has made contact with the engineer and is waiting for a response. Additional Inspector onsite: Abdullah Sultani Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Michael Mattox Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0032 Service Date: 09/03/20 Report Date: 09/08/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (4) 4x8" cylinders 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Clear Performed the final inspection of reinforcing steel for the south beach stairs. The reinforcing steel was found to be per plans. Observed placement of (12) cubic yards of CalPortland mix 633331. The concrete was placed via truck chute and was mechanically consolidated. The concrete was sampled, and (4) 4x8" cylinders were cast for compressive strength testing (5000 psi requirement). To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Barry Tuttle Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 GENERAL OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0033 Service Date: 09/22/20 Report Date: 09/24/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD18-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Cloudy CORRECTIVE ACTION TAKEN Follow-up to Mayes Testing Engineers (MTE) preliminary inspection report 0031, service date 09/01/20, by Inspector Mike Mattox, which called for 7" epoxy embedment depth per the structural General Notes for adhesive reinforcing steel anchors into the south stair walls. Dylan (WG Clark Construction) was informed, and the engineer -of -record (Chris Halamek) responded on 09/17/20 with acceptance of the lesser 6" embedment depth referenced in MTE inspection report 0031. MTE preliminary inspection report 0031, service date 09/01/20, is now closed. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Project management Mayes/Terracon Rep.: Todd Wirtz Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 W.G.CLARK CONSTRUCTION CO. RFI# 56 Stair Wall Rebar Embedment Request for Information Project: 874 Edmonds Waterfront Redevelopment Date Sent: 9/8/2020 RFI Source: Needed by: 9/22/2020 Sub FQ Reference: Priority Rating: High Document Ref.: Potential Schedule Impact: Question: W.G. Clark Construction Potential Cost Impact: See attached for a Mayes inspection report for the south stair rebar on 9/1. The inspector called out the following... Inspected the holes drilled for the epoxy anchoring of #5 reinforcing steel bars into the south stair walls for the steps. Per the General Notes on S 1.2, #5 bars are to be epoxy anchored with 7" of embedment. Upon inspection, it was noted that the holes were 6" deep. Asked Dylan with WG Clark Construction about this; and he stated that he directed the installer to drill 6" so that the back of the wall would not blow out during drilling, which does occur when the holes are drilled too close to the outside face of the wall. Please see attached sketch/ report and confirm this is acceptable. Scott McMicken Project Engineer EMail smcmicken(a-),wgclark.com Response (indicate below or by attachment): Respond to this address: W.G. Clark Construction/Jobsite 220 Railroad Avenue Edmonds, WA 98020 Phone: By: Date: 1945 Yale Place E. • Seattle, WA 98102 • (206) 624-5244 www.wgclark.com POST -INSTALLED ANCHORS REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0031 Service Date: 09/01/20 Report Date: 09/04/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Sunny Inspected the holes drilled for the epoxy anchoring of #5 reinforcing steel bars into the south stair walls for the steps. Per the General Notes on S1.2, #5 bars are to be epoxy anchored with 7" of embedment. Upon inspection, it was noted that the holes were 6" deep. Asked Dylan with WG Clark Construction about this; and he stated that he directed the installer to drill 6" so that the back of the wall would not blow out during drilling, which does occur when the holes are drilled too close to the outside face of the wall. Noted that the hook bars anchored at the bottom of the stairs were 7-1/2" deep. All holes were brushed and blown clean, as required. Hilti HIT-HY 200 (lot 1452 24 L2, expiration 06/2021) was used for the installation. The holes were filled, and the reinforcing steel bars were installed. PRELIMINARY INSPECTION The engineer should review the reduced embedment for acceptance prior to concrete placement. Dylan has made contact with the engineer and is waiting for a response. Additional Inspector onsite: Abdullah Sultani Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Michael Mattox Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter n Schroder 17 (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: �j<. C Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Thomas Cain Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Senior Project Field Manager Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 POST -INSTALLED ANCHORS REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0034 Service Date: 10/07/20 Report Date: 10/11/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Overcast Observed installation of pre -cast bulwark using FiveStar DP Epoxy Grout for the seawall/bulkhead. The FiveStar DP Epoxy Grout was approved by email on 10/06/20 from project engineer, Blaine McRae, prior to anchor installation, and was prepared according to manufacturer's specifications. The resin lot number was 5249651970, the hardener lot number was 5251702020 and the aggregate lot number was 21 FG-FIV-05008. The (18) 3" diameter holes were drilled according to plan details (S3.2) with a depth of 12" +/- 3", meeting minimum embedment depth of 8", according to plan details (S3.2). The holes were also drilled 12" +/- 3" on center apart according to plan details (S3.2). The holes were roughened, cleaned and dried according to manufacturer and project specifications, as well as possible considering environmental conditions, prior to anchor installation. Epoxy -coated #6 bars were installed into bulwark prior to inspection. The 3" diameter holes were then filled with FiveStar DP Epoxy Grout immediately prior to bulwark installation. The bulwark was then lifted and placed by forklift with each of the epoxy -coated #6 bars inserted into each 3" diameter hole, meeting the minimum 8" embedment depth (S3.2). To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Jacob Lembcke Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder �.t (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: - Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Kevin Graham Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Department Manager 11 Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0035 Service Date: 10/22/20 Report Date: 10/27/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (4) 4x8" cylinders 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Sunny Performed a reinforcing steel inspection for the radius weeding lawn concrete retaining wall (per L5.4) and for the bulkhead structural pourback (per detail B/S3.2). Verified that the reinforcing steel was placed per the approved contract document details and specifications. Observed the placement of (12) cubic yards of CalPortland concrete mix 633331 (5000 psi at 28 days required) for the items noted above. The concrete was placed by concrete pump truck and mechanically vibrated for consolidation. A sample was taken, with (1) set of (4) 4x8" cylinders cast for compressive strength testing. The field test results were: • Ambient Temperature: 52°F • Concrete Temperature: 630F • Slump: 5" • Air Content: 6% To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Randal Dohrman Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder �.t (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: - Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Kevin Graham Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Department Manager 11 Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0035A Service Date: 10/22/20 Report Date: 10/30/20 Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Specified Strength: 5,000 psi @ 28 days Mix ID: 63333I Supplier: CalPortland Batch Time: 1400 Plant: 260 Truck No.: 7675 Ticket No.: 2442636 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 1 3.98 1 2 1 3 1 4 Initial Cure: Inside Result Specification 5 6.0 63 52 Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Age at Maximum Area Date Date Test Load (sq in) Received Tested (days) (lbs) 12.44 10/23/20 10/29/20 7 86,790 10/23/20 11/19/20 28 10/23/20 11/19/20 28 10/23/20 11/19/20 28 Final Cure: Moist Room Comments: Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Randal Dohrman Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie Airf«-con CO"A" 10/22/20 Sample Time: 1500 Randal Dohrman Sunny 8 Batch Size (cy): 8 Pump 0 0 Truck chute Radius wedding lawn retaining wall and the bulkhead pour back Compressive Strength Fracture Tested (psi) Type By 6,980 2 KWB Reviewed By: Kevin Graham Department Manager II Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT MAYES TESTING ENGINEERS Report Number: M7191337.0035A Service Date: 10/22/20 Report Date: 11/23/20 Revision 1 - 28-day results Task: Client Project - M7191337 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA 98020 Permit No.: BLD2018-1653 Material Information Sample Information Airf«-con CO"A" Specified Strength: 5,000 psi @ 28 days Sample Date: 10/22/20 Sample Time: 1500 Sampled By: Randal Dohrman Mix ID: 63333I Weather Conditions: Sunny Supplier: CalPortland Accumulative Yards: 8 Batch Size (cy): 8 Batch Time: 1400 Plant: 260 Placement Method: Pump Truck No.: 7675 Ticket No.: 2442636 Water Added Before (gal): 0 Water Added After (gal): 0 Field Test Data Sample Location: Truck chute Test Result Specification Placement Location: Radius wedding lawn retaining wall Slump (in): 5 and the bulkhead pour back Air Content (%): 6.0 Concrete Temp. (F): 63 Ambient Temp. (F): 52 Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type By 1 1 3.98 12.44 10/23/20 10/29/20 7 86,790 6,980 2 KWB 1 2 3.99 12.5 10/23/20 11/19/20 28 110,690 8,850 2 JBD 1 3 3.99 12.5 10/23/20 11/19/20 28 108,520 8,680 2 JBD 1 4 3.98 12.44 10/23/20 11/19/20 28 105,630 8,490 2 JBD Average (28 days) 8,670 Initial Cure: Inside Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Mayes/Terracon Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Randal Dohrman Reported To: Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Milton Thompson (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Reid Middleton, Blaine McRae (1) City of Edmonds WA, Eric Carter (1) Environmental Works, Inc., Nic Morin (1) Mayes Testing Engineers, Inc, Todd Wirtz (1) WG Clark Construction Co, Dylan Currie Reviewed By: Kevin Graham Department Manager II Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR000t, 11-16-12, Rev.6 Page 1 of 1 ASPHALT OBSERVATIONS REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0036 Service Date: 12/05/20 Report Date: 12/07/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: N/A 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Clear Picked up nuclear gauge #24 from Mayes Testing Engineers Lynnwood, WA lab -cure to perform asphalt compaction testing. Upon arrival at site, spoke with WG Clark, Dylan, about re -compacting the base course subgrade disturbed by equipment traffic prior to today, and observed some finishing of a little base course material grading including re - compaction at the Waterfront Redevelopment side of the new asphalt paving lots. Mayes Testing Engineers inspector, Keith Bellows, sampled 1/2" minus HMA material from the Cadman - Woodinville plant for extraction and gradation. Was informed by Keith, this morning, of a 157.4 pcf for the Rice value unit weight. Ran in -place asphalt field density compaction tests today at the paved parking lots at the Edmonds Senior Center and adjoining the City of Edmonds Waterfront Redevelopment projects. Nuclear density tests indicate compaction effort by a 1.5-ton and a 5-ton roller meet the 91 % minimum compaction requirement. Asphalt temperature range as delivered was between 265°F and 338°F. See attached Asphalt Field Density Test Report for additional information. Returned the nuclear gauge to the Lynnwood, WA lab at end of day per WSDOT requirement. To the best of our knowledge, the items inspected today are in conformance with approved plans and specifications. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Todd Wirtz Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder �.t (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: - Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Kevin Graham Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Department Manager 11 Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 MAYES TESTING ENGINEERS R erra¢vI:nw.%,- 2022� Cedar Valley Road. Sude 1-6 Rh 426 742 9= = - L}n^vro^d VA 98036 Fax 425 746 1 =7 ASPHALT FIELD DENSITY TEST REPORT Page 1 of 1 Project No.: M7191337 Date: 12/05/20 Project: City of Edmonds Waterfront Redevelopment Inspector: Todd A. Wirtz Laboratory Field Maximum Rice Wet Corrected Depth or Probe Compaction Test Elevation Depth Density Density Correction Density Compaction Requirement Asphalt Type No. Location (feet) (inches) (lb/cu.ft.) (lb/cu.ft.) Factor (lb/cu.ft.) % Minimum % Pass Fail Description 1 East side of parking lot at Final BS 157.4 146.6 N/A N/A 93.1 % 91 X 1/2" HMA fro Cadman - Senior Center as halt Woodinville olant 2 Drive lane at Senior Center Final BS 157.4 144.9 N/A N/A 92 91 X asphalt 3 West side of parking lot at Final BS 157.4 143.4 N/A N/A 91.1 91 X Senior Center as halt 4 Driveway approach at Senior Final BS 157.4 149.6 N/A N/A 95 91 X Center asphalt 5 South side drive lane at Final BS 157.4 145.3 N/A N/A 92.3 91 X Waterfront Redevelo ment as halt 6 South side parking lane at Final BS 157.4 147.2 N/A N/A 93.5 91 X Waterfront Redevelo ment as halt 7 East side drive lane at Final BS 157.4 145.2 N/A N/A 92.3 91 X Waterfront Redevelo ment as halt 8 West side drive lane at Final BS 157.4 145.4 N/A N/A 92.4 91 X Waterfront Redevelo ment as halt 9 North side parking lane at Final BS 157.4 149.2 N/A N/A 94.7 91 X Wterfront Redevelo ment as halt 10 North side drive lane at Final BS 157.4 144.7 N/A N/A 91.9 91 X Waterfront Redevelopment as halt Reference Standard Used AASHTO T209 X ASTM D2041 Density Test Method Used WSDOT FOP for AASHTO T355 X ASTM D2950 Comments: Parkina lot Davina was performed at Senior Center and Waterfront Redevelopment. MTE Nuclear Gauge No. 24 Density Std. Count: 2017 Moisture Std. Count: 641 MTE 1300-2C, Rev 4, 11.01.17 ASPHALT SAMPLE PICK-UP REPORT MAYES TESTING ENGINEERS nlrerracan cmernxv Report Number: M7191337.0037 Service Date: 12/05/20 Report Date: 12/07/20 Client City of Edmonds WA Attn: Henry Schroder Public Works Dept 121 Fifth Ave N Edmonds. WA 98020 Permit No.: BLD2018-1653 Samples: (2) boxes 1/2" HMA 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Project City of Edmonds Waterfront Redevelopment 220 Railroad Avenue Edmonds, WA Project No. Weather: M7191337 Clear At Cadman -Woodinville plant and waited for the batching of the third truck. Sampled out of the truck (1) box and (1) reserve box, as requested by City of Edmonds, of 1/2" HMA. Transported samples to Mayes Testing Engineers Lynnwood, WA Laboratory for an Ignition/Gradation and Rice Density test. Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Keith Bellows Reported to: WG Clark Construction Company Contractor: W.G. Clark Report Distribution: (1) City of Edmonds WA, Henry (1) City of Edmonds WA, Eric Carter Schroder �.t (1) City of Edmonds WA, Milton (1) Environmental Works, Inc., Nic Reviewed By: - Thompson Morin (1) Mayes Testing Engineers, Inc, (1) Mayes Testing Engineers, Inc, Kevin Graham Donna Pollard Todd Wirtz (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Department Manager 11 Currie The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000t, 10-16-13, Rev.lo Page 1 of 1 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 MAYES TESTING ENGINEERS nlrerracon coMw,Ww ASPHALT IGNITION GRADATION AND RICE DENSITY TEST REPORT Report Number: M7191337.0037A Service Date: 12/05/20 Report Date: 12/08/20 Task: Client Project City of Edmonds WA City of Edmonds Waterfront Redevelopment Attn: Henry Schroder 220 Railroad Avenue Public Works Dept Edmonds, WA 121 Fifth Ave N Edmonds, WA98020 Project No. M7191337 SAMPLE DESCRIPTION: 112" PG58H-22 HMAMD200007 Cadman, Woodinville TEST RESULTS: Rice Density (ASTM D2419 or AASHTO T-209) Lab # Date Sampled Specific Gravity @ 25' C Rice Density 5408 12/5/2020 2.529 157.4 pcf Asphalt Content of Hot -Mix Asphalt by Ignition Method (ASTM D6307 or AASHTO T308) Asphalt Content = 5.38% Sieve Analysis of Extracted Aggregate (ASTM D5444 or AASHTO T30) See attached Grain Size Analysis Curve for test results. Tested By: Keith Bellows Report Distribution p (1) City of Edmonds WA, Henry Schroder (1) City of Edmonds WA, Eric Carter fvpvrr A (1) City of Edmonds WA, Milton Thompson (1) Environmental Works, Inc., Nic Morin Reviewed By: (1) Mayes Testing Engineers, Inc, Donna Pollard (1) Mayes Testing Engineers, Inc, Todd Wirtz Zenaida Revilla (1) Reid Middleton, Blaine McRae (1) WG Clark Construction Co, Dylan Currie Laboratory Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT000z, 10-16-13, Rev.8 Page 1 of 1 MAYES TESTING ENGINEERS, INC. AIF-I.- COMPANY 11 ��������•��w��������������������������� 1 11 • • • • • • • • • 1 1 • 1 *9-03.8(6) Standard Specifications for Road, Bridge and Municipal Construction WSDOT 2018 Edition 1 1 1111 • •n: Cadman Woodinville SampleProject: Number Asphalt• D6307 or AASHTO 1: City • • • •Waterfront Redevelopment 1'Asphalt Content ect #: M7191337 Date Sampled:1 1 Tested By: K. Burke Date Tested: 12/8/20 M7191337.0037A.1 - 12/8/2020