Loading...
ENG2021-0446 SIDE SEWER PERMITSEWER PERMIT PERMIT NUMBER City of Edmonds -0446 www.cityofedmonds.gov Description: SIDE SEWER CONNECT TO ADDN FOR BLD2019-0078 ISSUED: 11/23/2021 Address: 18209 76TH AVE W EDMONDS WA 98026-5408 EXPIRES: 11/21/2022 Permit Type: SEWER Permit Subtype: PARTIAL LINE Parcel Number: 00370800300500 REPLACEMENT CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT JAMES & ALISON POPE 1 (425)350-7773 CONTRACTOR JAMES & ALISON POPE 18209 76TH AVE W, EDMONDS WA 98026 (425)350-7773 OWNER POPE JAMES & ALISON 18209 76TH AVE W, EDMONDS WA 98026 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 SIDE SEWER PERMIT - PARTIAL REPLACEMENT $110.00 $110.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW ENGINEERING DIVISION APPROVED AS NOTED RELEASED BY %'/-*fie 9��9� 11 /23/2021 DATE Printed: Tuesday, November 23, 2021 3:41:56 PM 1 of 2 SEWER PERMIT PERMIT NUMBER City of Edmonds .98020 ENG2021-0446 www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSP PRIOR TO BACKFILL Call for all required inspections. All work shall be inspected prior to backfill. Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Handout E71 for SEWER ASBUILT requirements. PLEASE REFER TO STANDARD DETAILS SS-200, SS-201 AND, SS-202. STANDARD DETAILS CAN BE FOUND ON THE CITY OF EDMONDS WEBSITE. SDR35 WITH GASKETED FITTINGS IS REQUIRED FOR ALL SEWER REPAIRS. FOR ANY REPAIRS WHERE THERE IS MORE THAN ONE STICK OF PIPE, A PRESSURE SEWER REQUIREMENTS TEST IS REQUIRED. WHERE LINING OR PIPE BURSTING WATER AND TV TEST IS REQUIRED. IF THE 4-6 TRANSITION IS ENCOUNTERED, A 6" CLEANOUT IS REQUIRED AT THE PROPERTY LINE. THE 6" CLEANOUT SHALL HAVE A 12" CAST IRON LAMPHOLE COVER WITH 1/2 HEX BOLTS, GRIPPER TWIST PLUG, AND A 24" CONCRETE COLLAR. AN AS BUILT IS REQUIRED PRIOR TO FINAL OF THE PERMIT. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. UNDERGROUND WIRING All new, extended, rebuilt, or relocated electrical utility and/or service shall be placed underground. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. WATER AND SEWER Maintain 10' of separation between the sanitary side sewer and the water service line. SEPARATION INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE E-2 SIDE SEWER X-2 ENGINEERING FINAL" Printed: Tuesday, November 23, 2021 3:41:56 PM 2 of 2 Rothfus, Debbie Debbie.RothfusCaedmondswa.gov Side sewer permit application attached Nov 1, 2021 at 9:30:05 AM alison.pope@comcast.net Alison, Please complete the attached side sewer permit application and either email it to: engineeringpermits@edmondswa.gov or drop it by City Hall. If dropping it by, please call Development Services (425-771-0220) upon your arrival and we will meet you at the front door. Debbie Rothfus Administrative Assistant, Development Services City of Edmonds 121 5th Ave North, 2nd Floor Edmonds, WA 98020 (425) 771-0220 CITY HALL IS CURRENTLY CLOSED TO THE PUBLIC. The Development Services Permit Center is open M-F 8am-4:30pm for Telephone & Digital/ Remote access. In -Person walk-in service is currently unavailable except by appointment. Please call ahead to arrange an in -person or remote (Zoom) appointment to assure the appropriate staff member is available. CONTRACTOR INF'ORNIA I ION. CutttlMtty �i1tM: Cwnpan� �+lddrese: city State Lkexse M Espiratbu Dage: PROPERTY LNF'0W%J 110\: (iwncr's \nosy: I 1 Sb V) SIDE SEWER PERMIT APPLICATION 7Jp: Site c ."lad: -r• me b(,Uvv - F.naakld: II e+oYl 4 pope tomeaS41 rl e Clt� liustncsi lJc�rac # �' & -t" A"e 0 vAd jak4es £-dwvnJs Pap, qZ C5 390 [FULL LINE REPLACENIFNT ❑ SPOT IMPALR O PIPF BURST ❑ RUINE CPFRAI,%LINEONLY) DESCRIPTION OF PROPOSED WORK (&- Slxc.i le)t >4 dP h e ial' —yb Wt a h addr-fiO.14 -.) k - �_e_LA ISSUANCE OF TIIIS PrRhii'f DOES NOT CONSTITUTE. PEM-IISSION TO WORK ON ANY PROPERTY OTIiCR THAN THAT OWNED BY THE SUBJECT PROPERTY OWNER. Cf_RTIFICATIONS NEC FSSARY FOR INSTALLATION MI_TIIODS ARE TmE R LMKWSI RIL ITY OF TILL"" - CONTRACTOR PERFORMINo SAID WORK. I REPRESENT AND WARRANI- TO THE CITY OF EDMONDS. IF REPAIR OF EXISTING, .QA;- I"R EXTENDS TO AN ADJACENT PROPERTY, 1 HAVE OWNERS EXPRESS PERMISSION TO PERFORM WORK ON TI IAT ADJACENT PROPERTY. SIGNATURE. PDATE l 07 ! 7- 0 Z- / Contractor er Aivot NO WORK SHALL RECIN PRIOR TO PERMIT ISSUANCE' SITE PLAN NOTES Alison & James Pope 1. THISISNOTANOFFICIALSURVEYANYCONTOURSSHOWN 18209 76th Ave W., Edmonds, WA 98026 HEREIN ARE BASED ON AVAILABLE DATA. THIS ARCHITECTURAL SITE PLAN St IOULD BE SUFFICIENT FOR THE Ls 1 Arta= 0.32 ActsTO Smh—. C.-y P-1 R-1: 00370800300500 RELATIVE COMPLEXITY OF AND; OBTAIN CNRgWNER SURVEY Subdn�sioa VERIFY D]. INFORMATION AND OBTAIN AN OFFICIAL SURVEY IF NEEDED. Rsidutu1% 'NS-12 w rvrama'In Mni—B Ids Sabaha(1620.030) 2 SURFACE WATER SHALL DRAIN AWAY FROM THE I IOUSEATALL ^4oel9tak.,pg n Fmm (1V) P—(E) Sldc(N) Side(S) MU Hngl POINTS. DIRECT TIIEDRAINAGEWATERTOTHESTREETORTO - AN APPROVED DRAINAGE COURSE. 25ft 25ft IOft IOft 25ft coma„a usar. ;r tl 1 61 'r 1 i _o EXISUNG.FOOTPMIT / � ` 1 :PRO?OBFD ADGY^OV - �•(S@/ r80. ,0------------------PERAfITSHT lO t2+12018 EXISTING ROAD I COLBY DALLEY BUILDING DATA .> STEVE TLEK M LOTSIZE 13.939 SF 0.32 AC SITE PLAN = 2d875G 5.69% SITE PLAN (BUILDING FOOTPRINT) ... scuel•-Io IMPF.RVIOUSAREA 3.1A]SF 2729°A (STRUCTURED- PAVING) A-010