Building Permit'S IDENTIAL BLDG Permit
PERMIT NUM
of Edmonds
EdmondsCity
980201 1 •
www.edmondswa.gov
wwm
Type: RESIDENTIAL BLDG Owner/ Business: CONNOR MCKEEVER Status: ISSUED
Subtype: ALTERATION OR REMODEL
Parcel No: 27032400205000 Site Address: 508 21ND AVE N EDMONDS,WA 98020-3106
Applied: 2/23/2021
Subdivision: 005922 Lot: 0
Issued: 5/11/2021
Fire Sprinklers: Lot Area: Zoning:
Final:
Valuation: $7,000.00 Occupancy Type: Construction Type:
Expiration Date: 5/6/2022
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Issued by: NED
Scope of Work: SINGLETON- REMODEL NO P/M
WA State Contractor L & I #: CHERMC1110NW City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS I
PHONE
EMAIL
APPLICANT
CONNOR MCKEEVER
8801 3RD AVE NW, SEATTLE WA
(206)880-6315
HEADWATERSNW@GMAIL.COM
98117
CONTACT
HEADWATERS NW
8801 3RD AVE NW, SEATTLE WA
(206)880-6315
headwatersnw@gmail.com
CONSTRUCTION LLC
98117
CONTRACTOR
CHERMAK CONSTRUCTION
655 EDMONDS WAY, EDMONDS
(425)776-1367
DESIGN@CHERMAK.COM
WA 98020
OWNER
KEITH SINGLETON
508 2ND AVE N, EDMONDS WA
keith_singleton@msn.com
98020
—
EE
INFORMATION
DESCRIPTION ACCOUNT
AMOUNT
PAID PAID DATE RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
5/11/21
R12259
PER PERMIT
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$245.00
$245.00
5/11/21
R12259
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$208.25
$208.25
2/23/21
R10687
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
5/11/21
R12259
TOTALS: $499.75 $499.75
"IF• •
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, May 11, 2021 2:24:15 PM 1 of 3
' : Permit
PERMIT NUM
City of Edmonds
. •:0i 1 1 •
-. •. • JIL
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
SPECIAL INSPECTION REPORTS
FOR
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
INSPECTIONS
- Schedule Online
at: https://Inspection.MVBuildingPermit.com
COMPLETED
SEQID
INSPECTION TYPE
INSPECTOR
RESULT
NOTES
DATE
A-1 BUILDING PRECON
B-2 DEMO AMT
VERIFICATION
B-2 FOOTINGS
B-3 ROOF SHEATHING
B-3 UNDERFLR FRAMING
B-4 DRYWALL FASTENING
B-4 FRAMING
Printed: Tuesday, May 11, 2021 2:24:15 PM 2 of 3
Printed: Tuesday, May 11, 2021 2:24:15 PM 3 of 3