Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED
Parcel No: 00580700002701 Site Address: 21727 76TH AVE W unit F EDMONDS,WA 98026- Applied: 10/22/2021
7549
Subdivision: 005807
Fire Sprinklers: Yes
Valuation: $375,200.00
Code Edition: 2018
Lot Area:
Occupancy Type: B
No. Stories: 0
Scope of Work: SEATTLE SKIN & LASER- REMODEL NO P/M
Lot: 0
Zoning: MU
Construction Type: VB
# of Dwelling Units: 0
WA State Contractor L & I #: BPCONC*942QP
Issued:11/24/2021
Final:
Expiration Date: 11/19/2022
Issued by: NED
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
GINA DAIS
21911 76TH AVE W 210,
(425)559-4463
GDAIS@TGBARCHITECTS.COM
EDMONDS WA 98026
21701 76TH AVE W 100,
CONTACT
SEATTLE SKIN AND
LASER
(206)525-1168
kthomas@island-derm.com
EDMONDS WA 98026
CONTRACTOR
BP CONTRACTING
31908 NE 114TH PLACE,
(206)384-9871
CARNATION WA 98014
HR ACQUISITION I
PO BOX 92129, SOUTHLAKE TX
OWNER
CORPORATION
76092
FEE •' •
DESCRIPTION
ACCOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00 $40.00
$40.00
10/29/21
R15614
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150 $25.00
$25.00
11/24/21
R16085
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00 $3,287.20
$3,287.20
11/24/21
R16085
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00 $2,794.12
$2,794.12
10/29/21
R15614
TOTALS: $6,146.32
$6,146.32
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, November 24, 2021 10:31:29 AM 1 of 2
•M MERCIAL BLDG Permit
of Edmonds PERMIT NUM
IF
EdmondsCity
121 5th Ave N, 98020 1 4�9
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
INSPECTIONS
- S• •https://Inspection.MyBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-4 CEILING GRID
B-4 FRAMING
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
Printed: Wednesday, November 24, 2021 10:31:29 AM 2 of 2