Loading...
Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED Parcel No: 00580700002701 Site Address: 21727 76TH AVE W unit F EDMONDS,WA 98026- Applied: 10/22/2021 7549 Subdivision: 005807 Fire Sprinklers: Yes Valuation: $375,200.00 Code Edition: 2018 Lot Area: Occupancy Type: B No. Stories: 0 Scope of Work: SEATTLE SKIN & LASER- REMODEL NO P/M Lot: 0 Zoning: MU Construction Type: VB # of Dwelling Units: 0 WA State Contractor L & I #: BPCONC*942QP Issued:11/24/2021 Final: Expiration Date: 11/19/2022 Issued by: NED CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT GINA DAIS 21911 76TH AVE W 210, (425)559-4463 GDAIS@TGBARCHITECTS.COM EDMONDS WA 98026 21701 76TH AVE W 100, CONTACT SEATTLE SKIN AND LASER (206)525-1168 kthomas@island-derm.com EDMONDS WA 98026 CONTRACTOR BP CONTRACTING 31908 NE 114TH PLACE, (206)384-9871 CARNATION WA 98014 HR ACQUISITION I PO BOX 92129, SOUTHLAKE TX OWNER CORPORATION 76092 FEE •' • DESCRIPTION ACCOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 10/29/21 R15614 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 11/24/21 R16085 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $3,287.20 $3,287.20 11/24/21 R16085 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $2,794.12 $2,794.12 10/29/21 R15614 TOTALS: $6,146.32 $6,146.32 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, November 24, 2021 10:31:29 AM 1 of 2 •M MERCIAL BLDG Permit of Edmonds PERMIT NUM IF EdmondsCity 121 5th Ave N, 98020 1 4�9 www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. INSPECTIONS - S• •https://Inspection.MyBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-4 CEILING GRID B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP Printed: Wednesday, November 24, 2021 10:31:29 AM 2 of 2