Kentner Bond Quantity 02.21.2020Site Improvement Bond Quantity Worksheet
LIM King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266
206-296-6600 TTY Relay 711
Project Name:
Kentner Residence
S15 Web date: 04/03/2015
For alternate formats, call 206-296-6600.
Date: 02.21.2020
Location: 806 Cary Road Edmonds WA 98020 Project No.:
Activity No.:
Clearing greater than or equal to 5,000 board feet of timber?
yes
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
Kentner Bond Quantity 02.21.2020
x no
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 2/26/2020
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
330
1
495
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESCA5
SWDM 5.4.2.3
$ 4.00
SY
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
1
1
1800
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
40
1
4400
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
40
1
5600
WRITE -IN -ITEMS **** (see page 91
Each
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
Kentner Bond Quantity 02.21.2020
$ 12,295.00
$ 3,688.50
$ 15,983.50
A
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 2/26/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
375
46.88
Backfill & Compaction- trench
GI - 2
$ 9.00
CY
14
126.00
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI - 4
$10,000.00
Acre
Excavation - bulk
GI - 5
$ 2.00
CY
25
50.00
Excavation - Trench
GI - 6
$ 5.00
CY
5
25.00
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 20
GI - 9
$ 1,400.00
Each
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
50
125.00
Grading, fine, with grader
GI - 18
$ 2.00
SY
200
400.00
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Day
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew ( 2 flaggers)
GI - 24
$ 120.00
HR
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
155
8,525.00
Wall, rockery
GI - 29
$ 15.00
SF
Page 3 of 9
SUBTOTAL
9,297.88
Unit prices updated: 03/02/2015
`KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Kentner Bond Quantity 02.21.2020 Report Date: 2/26/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROAD IMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000sy
RI - 1
$ 30.00
SY
AC Grinding, 4' wide machine 1000-2000E
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000sy
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
14
490.00
Barricade, type III ( Permanent)
RI-6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
25
46.25
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
Shoulder, AC, ( see AC road unit price )
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
30
1,140.00
Sidewalk, 4" thick, demolition and disposa
RI - 18
$ 32.00
SY
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
Sidewalk, 5" thick, demolition and disposa
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
Each
Striping, thermoplastic, ( for crosswalk)
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
1 LF
Page 4 of 9
SUBTOTAL
536.25
1,140.00
Unit prices updated: 03/02/2015
`KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Kentner Bond Quantity 02.21.2020 Report Date: 2/26/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant, Cost
ROAD SURFACING
No.
4" Rock = 2.5 base & 1.5" to
D course 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
HMA Road, 2", 4" rock, Qty. over 2500 SN
RS - 5
$ 21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 SY
RS - 6
$ 42.00
SY
HMA Road, 3", 9 1/2" Rock, Qty Over 250
RS - 7
$ 35.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
HMA 3/4" or 1 ", 4" Depth
RS - 12
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Desigi
RS - 15
Thickened Edge
IRS - 17
$ 8.60
LF
Page 5 of 9
SUBTOTAL
Unit prices updated: 03/02/2015
`KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Kentner Bond Quantity 02.21.2020 Report Date: 2/26/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road, R/D
$ 21.00
SY
Bollards - fixed
LD-
$ 240.74
Each
Bollards removable
$ 45,
Each
(CBs include frame and lid)
CB Type I
D - 4
$ 1,500.00
Each
CB Type IL
D - 5
$ 1,750.00
Each
CB Type II, 48" diameter
D - 6
$ 2,300.00
Each
for additional depth over 4'
D - 7
$ 480.00
FT
CB Type II, 54" diameter
D - 8
$ 2,500.00
Each
1
2,500.00
for additional depth over 4'
D - 9
$ 495.00
FT
CB Type II, 60" diameter
D - 10
$ 2,800.00
Each
for additional depth over 4'
D - 11
$ 600.00
FT
CB Type II, 72" diameter
D - 12
$ 3,600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
Culvert, PVC, 6"
D - 19
$ 13.00
LF
Culvert, PVC, 8"
D - 20
$ 15.00
LF
12
180.00
Culvert, PVC, 12"
D - 21
$ 23.00
LF
35
805.00
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
$ 270.00
LF
Culvert, CMP, 72"
D - 31
$ 350.00
LF
Page 6 of 9
SUBTOTAL
00
Unit prices updated: 03/02/2015
`KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Kentner Bond Quantity 02.21.2020 Report Date: 2/26/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
40
2240
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
I D - 64
$ 550.00
Each
Page 7 of 9
SUBTOTAL
2240
Unit prices updated: 03/02/2015
`KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Kentner Bond Quantity 02.21.2020 Report Date: 2/26/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Unit Price I Unit I Quant.
Existing Future Public Private
Right-of-way Right of Way Improvements
& Drainage Facilities
Price Quant. I Cost Quant. Cost
Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$
21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base cours
PL - 2
$
28.00
SY
NA
NA
4" select borrow
PL - 3
$
5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL-4
$
14.00
SY
NA
NA
IUTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utilitv's Cost Estimate
Utility Pole(s) Relocation
UP-1
Lump Sum
Street Light Poles w/Luminaires
UP-2
$ 7,500.00 Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Stormwater Vault
W I - 1
#########
Each
Block Wall
WI - 2
$ 16.00
SY
Yard Drain
WI - 3
$ 225.00
CY
WI-4
LF
WI-5
FT
WI-6
WI-7
WI-8
WI-9
WI-10
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
Page 8 of 9
'KCC 27A authorizes only one bond reduction.
Kentner Bond Quantity 02.21.2020
536.25
160.88
16,162.88
4,848.86
697.13 21,011.74
B C D
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 2/26/2020
Site Improvement Bond Quantity Worksheet
Original bond computations prepared by:
Name: Date:
PE Registration Number: Tel. #:
Firm Name: CG Engineering
Address: 250 4th Ave South, Suite 200 Edmonds WA 98020 Project No:
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond* shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND*
AMOUNT
(A) $ 15,983.5
(B) $ 697.1
(C) $
(D) $ 21,011.7
(A+B) $ 16,680.6
(T) $ 37,692.4
Minimum is $2000.
MINIMUM BOND* AMOUNT
REQUIRED FOR RECORDING OR
TEMPORARY OCCUPANCY AT
SUBSTANTIAL COMPLETION ***
T x 0.30 $ 11, 307.7
Minimum is $2000.
Web date: 04/03/2015
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND*
(B+C) x
0.25 = $ 174.3
Minimum is $2000.
Date:
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kin_pcountV.poy/permits Version: 03/02/2015
Kentner Bond Quantity 02.21.2020 Report Date: 2/26/2020