Building PermitType: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED
Parcel No: 00566900600102
Subdivision: 005669, SP S-7-80
Fire Sprinklers: No
Valuation: $380,000.00
Code Edition: 2018
Site Address: 21010 70TH AVE W EDMONDS,WA 98026-7202
Lot: 0
Lot Area:
Occupancy Type: B-S2
No. Stories: 1
Zoning:
Construction Type: VB
# of Dwelling Units: 0
Scope of Work: MIKES PLUMBING: NEW T/I (B TO B/S2) P&M NOT INCL.
WA State Contractor L & I #: HSTCOC1920KA
Applied: 9/17/2021
Issued:12/1/2021
Final:
Expiration Date: 11/26/2022
Issued by: NED
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
BLAKE BETHARDS
2130 6TH AVE W., SEATTLE WA
(310)463-1013
BLAKE@BETHARDSARCHITECTURE.CO
98119
M
CONTACT
BETHARDS ARCHITECTURE +
2130 6TH AVE W., SEATTLE WA
(310)463-1013
blake@bethardsarchitecture.com
DESIGN
98119
CONTRACTOR
HST CONSTRUCTION
11512 NE 20TH STREET,
(425)681-4326
nigelstarr@hstconstruction.com
BELLEVUE WA 98004
21010 70TH AVE W, EDMONDS
OWNER
MARINEZ RE GROUP
LLC
WA 98026
•' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/17/21
R14869
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
12/1/21
R16150
INDEPENDANT FEE CALCULATION
001.000.341.82.000.00
$260.00
$260.00
12/1/21
R16150
REVIEW
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$3,316.00
$3,316.00
12/1/21
R16150
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$2,818.60
$2,818.60
9/17/21
R14869
TOTALS: $6,459.60
$6,459.60
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, December 01, 2021 3:06:32 PM 1 of 2
•MERCIAL BLDG PermitCity
-
• • • •
98020 1 • 1
. •. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
SEPARATE PERMIT REQUIRED
FOR I
Separate Permit Required For:
NFORMATION
INSPECTIONS
- Schedule Online
at: https://Inspection.MvBuildingPermit.com
COMPLETED RESULT
SEQID INSPECTION TYPE
INSPECTOR
NOTES
DATE
B-4 FRAMING
B-5 INSULATION ENERGY
X-3 BUILDING FINAL**
Printed: Wednesday, December 01, 2021 3:06:32 PM 2 of 2