Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ENG2021-0432 ROW PERMIT
OF WAY EUC PERMIT PERMIT NUMBIER City of Edmonds EdmondsRIGHT 98020 www.cityofedmonds.gov / 425.HASE 1 Description: PUD-UG PRIMARY SERVICE FOR ODOR SCRUBBER & CHARGING STATION ISSUED: 12/03/2021 Address: 600 3RD AVE S EDMONDS WA 98020 EXPIRES: 06/01/2022 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27032600101300 NAME TYPE NAME ADDRESS PHONE APPLICANT SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 CONTRACTOR SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 OWNER EDMONDS CITY OF 250 5TH AVENUE N, EDMONDS WA 98020 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 ENGINEERING INSPECTION FEE $220.00 $0.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $0.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW ENGINEERING DIVISION APPROVED AS NOTED RELEASED BY DATE �?-2t��P �� 12/03/2021 Printed: Friday, December 03, 2021 8:43:41 AM 1 of 2 -KRWOF WAY EUC PERMIT PERMIT NUMBER City of Edmonds ...• • 1 14 www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. • INSPECTION TYPE DATE RESULT NOTES 1r COMPLETE A 11 JOB START X-2 ENGINEERING FINAL" E-7 TRAFFIC CTRL E-7 RESTOR LIMITS Printed: Friday, December 03, 2021 8:43:41 AM 2 of 2 E NG2021-0432 W - I • RIQsk3IT OF WAY CONSTRUCTION ION PERMIT "PLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way -permit Handout E6,s. RECEIVED NOV 05 2021 If any field is not applicable to your project, write "N/A" instead of leaving blank. CITY OF EDMONDS All fields required. Incomplete Applications wiR be denied. DEVELOPMENT SERVICES DEPARTMENT SECTION A • • ., Name of Company [P.M... • Primary Name Agent -Name Title Tide Mobile Address Email city State Zip SecondaryName Phone Title Email Mobile City of Edmonds Business License No: Email State License No: -3 `"A., ¢ O(,3 ` EX Contractor verifies it is currently bonded EX Contractor verifies it currently bas general liabilityinsurance .NU L15: A(x(;1U.bo.o2o requires that theAppLication be signed by a Licensed and bonded contractor unless otherwise approved by the city engineer. Type of Development — Check ALL that ❑ Multifamily residential Commercial YCity project Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) Traffic Control Only (no associated development) ❑ Utility Franchise Work (no associated development) City of Edmonds ROW construction permitApplication--Page 1 of 3 Updated 3/25/2o21 RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x IF SF Alley 72 hours + IF x IF SF Parldng 72 hours + LF x IF SF SEMON B - If you are not a utility company performing work in the City ROW, -skip to SECTIONC. . The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ''power o gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No 2. Will any equipment be added underglound or above ound (e.. pedestals, vaults, etc.)? If yes, describe: %4g_o U (--3( 0 Qi,) ) W 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? 5. Does the work involve proposed additions to an aboveground utility stem? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the Purpose of serving a single-family residential subdivision? 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e, the actual area in which the 6a. I Does your project I How many are existinz? I I How many are to be added? I I I : ' _ I City of Edmonds ROW constructionpermitApplication--Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: How mny poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How man . What is the height of the additional oles? 6c. Are anypoles to be modified/rebuilt/replaced? If yes: How many? What is the height of the poles after? Describe the modification rebuild: SECUON C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every fiagger must be trained as required by WAC 296-155-3o5 and must have certification verifying completion of the required training in their possession, Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to' any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of anyldnd or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectlyfrom any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they maybe liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorizedby owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: L DATE: k tA APPLICANT PRINTED NAME: f_A a""'_, APPLICANT TITLE: �0'r- c NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Cityof Edmonds ROW constructionpermitAppheation—Page 3 of 3 Updated 3/25/2021 RECEIVED NOV 05 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT December 2000 Applicant shall repair/replace all damagt!('to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. Figure 6H-6 Shoulder Work with Minor Encroachment (TA-6) OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROLAND DRAINAGE A Typical Application 6 ENGINEERING DIVISION APPROVED AS NOTED 12/03/2021 Page 6H-17 3 Sect 6R0! P.M. NMR _P uo LAYOUT LEGEND: PAD MOUNTED TRANSFORMER ® SUBMERSIBLE TRANSFORMER Q ABOVE GROUND J-BOX QJ SUBMERSIBLE J-BOX Q SECONDARY VAULT PULLING VAULT LJ PAD MOUNTED SWITCH CABINET Q SUBMERSIBLE SWITCH CABINET © SMALL SECONDARY PEDESTAL © LARGE SECONDARY PEDESTAL ® STREET LIGHT PEDESTAL PRIMARY UNDERGROUND CABLE --•—•—-- 0350 SECONDARY UNDERGROUND CABLE - - - - - - - - 4/0 SECONDARY UNDERGROUND CABLE ...... I ........ •••• .... -1/0 SECONDARY UNDERGROUND CABLE ------STREET LIGHT CABLE SERVICE CONDUIT Q POLE AND OVERHEAD LINE — - - PROPERTY LINE — —RIGHT-OF-WAY LINE U EXISTING UNDERGROUND CABLE EXISTING DUCT — FUTURE DUCT ------- S------ SANITARY SEWER/MANHOLE ------- D------ STORM DRAIN/CATCH BASIN -------W------WATER MAIN/METER Y FIRE HYDRANT 8) STREET LIGHT Tt UNDERGROUND LOCATOR MARKER SCHEMATIC LEGEND: • 10 TRANSFORMER 3 0 TRANSFORMER O SUBMERSIBLE TRANSFORMER O 200 AMP J-BOX ■ 600 AMP J-BOX FUSE PRIMARY UNDERGROUND CABLE ---------------ABANDONED PRIMARY UNDERGROUND CABLE OVHD EXISTING OVERHEAD I-- DISCONNECT SWITCH.NORMALLY OPEN DISCONNECT SWITCH, NORMALLY CLOSED 1 STANDOFF BRACKET ••• —FEEDER LINE B-- PULL THRU BOX —T— FEED THRU BUSHING ON TRANSFORMER I) FAULT INDICATOR U ADDITIONAL UGND TAPPED AT T/O POLE VAULT INSPECTION FORM: REFER TO SHEET 2 CONSTRUCTION NOTES: PUD TO INSTALL 30 PRI RISER ASSY 12U308 ON PLI 1577. EXISTING DIST XFMR BANK ON PLI1677 TO BE REMOVED ON OPNO 0030. Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. TRANSFORMERS CABLE ALL FOOTAGES APPROXIMATE BY PUD OR PUD'S CONTRACTOR BY PUD OR PUD'S CONTRACTOR A-55016 75 KVA 12.470-480/277V A-55017 75 KVA 12,470-208/120V FROM PLI1677 TO A-55015 114' OF (3) 1/0 AL 15KV CNCTRC NEUT JCKTD PRI IN 4" PVC UTC UTC MAKE PO REEL SER SER MAKE PO REEL MAKE MAKE MAKE PO REEL FT MARK TO VAULTS BY CUSTOMER FROM A-55015 TO A-55016 32' OF (3)110 AL 15KV CNCTRC NEUT JCKTD PRI IN 4" PVC A-55015 MAKE PO REEL MAKE PO REEL 4'8" x 4'8" x 3'6" CONCRETE VAULT AND 4'8" x 4'8" x 6" COVER W/A 3' x 3' DIAMOND MAKE PO REEL PLATE LID FT MARK TO A-55015 & A-55016 FROM A-55015 TO A-55017 4'8" x 4'8" x 3'6" CONCRETE VAULT AND 14D' OF (3) 1/0 AL 15KV CNCTRC NEUT JCKTD PRI IN 4" PVC 6' x 6' x 6" COVER W/A 40" x 18" ACCESS HOLE MAKE PO REEL MAKE PO REEL MAKE PO REEL FT MARK TO VAULT LIST VAULT SHEET DUCT BY CUSTOMER A-55015 THRU A-55017 1 D 54' OF 4" PVC O 2' OF 4" PVC © 110' OF 4" PVC A-55015 A-55017 A-55016 ENGINEERING DIVISION 3-4 WAY APPROVED AS NOTED 75_ 75_ 12/03/2021 111590 „159,J 111592 - 587 11,1588 11158 itt589 APPROVAL FOR PHASE 1 111584 PINE ST 17586__ ,. ONLY (BORING AACROSS FU 25 - PINE ST). AMPS OVHD 1 OVHD b OVHD , ; PUD TO SUBMIT FOR 0 0 PLI 1677 PHASE 2 AT LATER DATE. SCHEMATIC NTS A-55017 A-55015 _ © A-55016 N -------T---- 7 , NORTH B i N OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROLAND DRAINAGE --------- -------T--- PLI 1677 30 OVHD BANK TO P-13621-X BE REMOVED ON L-19913-X ORDO 10008639E OPN• 0030 i RESTORATION LIMITS TO BE LAYOUT DETERMINED BY CITY INSPECTOR. I" n 20' SCHEDULE ALL NOTED INSPECTIONS THROUGH MYBUILDINGPERMIT.COM. LOCATION 600 3RD AVE S EMOONDS 98020 AREA LYNNWOOD POLE 140 PLI 1677 NEV4S 26 T 27 R3 DATE 10/28/21 ORDER 100085398 REASON FOR WORK PROVIDE 30 PRIMARY ENGINEER McA.LLISTER OPERATION 0060 UNDERGROUND SERVICE FOR DRAFTER J.SOLVBERG UGND NO 14461-1 CITY OF EDMONDS APPROVED SCALE NOTED L 50 KW CONN DATE DATE WORK COMPLETED FOREMAN SUBSTATION WESTGATE INSPECTOR CIRCUIT NO 12-405 PHASE 1.2.3 DATE FEES REO'D ■YES ❑NO ROAD CROSSINGS ONLY PRIMARY OVERHEAD APPV DATE DESCRIPTION ❑ RESIDENTIAL ❑ CO)AMERCIAL LEO- REVISIONS et =f— APPV NO. DATE DESCRIPTION PRIMARY UNDERGROUND ❑ RESIDENTIAL ❑ COMMERCIAL BASIC FEE $_ LEU- o S— J.. 5- SECONDARY UNDERGROUND BASIC FEET_ f WORK IN RIGHT OF WAY ❑ PRIMARY O SECONDARY FT 0 t_ . f AS -BUILT APPV NO, DATE DESCRIPTION MISCELLANEOUS FEES VAULT f PERMIT f CSLER s f TOTAL DUE$ DATE PAID RECEIPT - ENGINEER MARY MCALLISTER CUSTOMER PAMALA RANDOLF PHONE (425) 670-3216 PHONE (425> 771-0237 RECEIVED NOV 05 2021 (I PUGET SOUND P WOODWAY CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT EDMONDS VICINITY MAP PERMITS (DATE GRANTED) ❑ TREE TRIM ❑ STATE ❑ COUNTY _ ■ EDMONDS EASEMENTS ❑ REQUIRED E. ❑ NOT REQUIRED REQUEST NO - DATE APPROVED FOREIGN CONTACTS ❑ JPN- ❑ JOINT TRENCH ZIPLY 4 CATV ❑ JOINT BORE ZIPLY 6 CATV ■ N/A POLE STENCILING FROM TO TAKE OFF POLE PRE-CONSTR REQUIREMENTS ❑ TREE TRIM ❑ PUD LOCATOR ❑ BACKHOE ❑ ❑ ONE CALL DATE STREET LIGHTING ❑ YES ❑ NO M&R AS -BUILT GIS GIS OCI IM&R GIS Phl IJOINT USE LOCATION MAP PAGE 454. F7 TAGS z $ 1D VAULT: A-55015 THRU A-55017 CABLE: 111584 THRU 111592 0 -p u 0) 3ti I 4a Griggs, Natalie From: Sent: To: Cc: Subject: Categories: Hi Jeanie, Yes the bore is at A. McAllister, Mary <MMMcAllister@SNOPUD.com> Thursday, November 18, 2021 3:07 PM McConnell, Jeanie Dunn, Kyle; Derrick, Michael; Edmonds Engineering Permits RE: City Park Odor Scrubber; PUD RoW Permit; Road Bore Red category, Green category PUD will only be doing the 60' road bore for phase 1, and then I will send you the updated plan for the remainder of the project, showing the changes in the vault locations for phase II. Thank you, Mary From: McConnell, Jeanie <Jeanie.McConnell@edmondswa.gov> Sent: Thursday, November 18, 2021 1:30 PM To: McAllister, Mary <MMMcAllister@SNOPUD.com> Cc: Dunn, Kyle <kyle.dunn@edmondswa.gov>; Derrick, Michael < Michael. Derrick@edmondswa.gov>; Edmonds Engineering Permits <EngineeringPermits@edmondswa.gov> Subject: RE: City Park Odor Scrubber; PUD RoW Permit; Road Bore Hi Mary, In an effort to get the bore work scheduled, we can issue a phased ROW permit for the proposed work. We'll call the bore work Phase I. Can you please confirm the portion shown below as "A" is the bore work from the previous application that you are requesting ROW permit for now? The remainder of the work will come in as Phase 11, correct? AMPS C I 1 OVHD OVHO OVHO , Pll 1677 o! =i 01 SCHEMATIC NTS A-55017 ------•=w-------- --= =---- - -55015 A-55016 r... wvr- - _....yv r ------------- r N O r r � r U OVNO BMus TO I SE REMMO ON "0 ONO I LAYOUT r • 2V Thank you, Jeanie •....... C. -------------- T-----------•--- From: McAllister, Mary <MMMcAllister@SNOPUD.com> Sent: Thursday, November 18, 2021 12:05 PM To: Derrick, Michael <Michael.Derrick@edmondswa.gov> Cc: Dunn, Kyle <kyle.dunn@edmondswa.gov>; McConnell, Jeanie<Jeanie.McConnelI@edmondswa.gov> Subject: RE: City Park Odor Scrubber; PUD RoW Permit; Road Bore Hi Michael, As soon as I receive the ROW permit for the bore portion I can re -schedule the date. Just need the City approval going forward. Thanks, Mary From: Derrick, Michael < Michael. Derrick@edmondswa.gov> Sent: Thursday, November 18, 2021 10:45 AM To: McAllister, Mary <MMMcAllister@SNOPUD.com> Cc: Dunn, Kyle <kvle.dunn@edmondswa.gov>; McConnell, Jeanie<Jeanie.McConnell@edmondswa.gov> Subject: City Park Odor Scrubber; PUD RoW Permit; Road Bore CAUTION: THIS EMAIL IS FROM AN EXTERNAL SENDER. Do not click on links or open attachments if the sender is unknown or the email is suspect. Good morning Mary: Can the bore now be rescheduled? Thank you, Michael Derrick Edmonds, Wash. Wastewater Treatment Plant Program Administrator Office (425) 771-0237 X1357 Cell (425) 218-3282