Building Permit•M MERCIAL BLDG PermitCity
• • • • PERMITNUM
1[7
98020BLD2020-1218
www.edmondswa.gov
Type: COMMERCIAL BLDG Owner/ Business: JOHNATHON CAVE Status: ISSUED
Subtype: EXISTING TENANT REMODEL
Parcel No: 27032500306200 Site Address: 750 EDMONDS WAY EDMONDS,WA 98020-5126
Applied: 11/6/2020
Subdivision: 006107, BLA LL-2000-134, SP 93-30, 005546 Lot: 0
Issued: 2/25/2021
Fire Sprinklers: Yes Lot Area: Zoning:
Final:
Valuation: $658,000.00 Occupancy Type: Construction Type: VA
Expiration Date: 2/20/2022
Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 0
Issued by: NED
Scope of Work: SUNRISE SR LIVING- REMODEL
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
JOHNATHON CAVE
1401 WEST GARFIELD STREET,
(206)782-8208
JCAVE@CLARKBARNES.COM
SEATTLE WA 98119
CONTACT
CLARKI BARNES
1401 WEST GARFIELD STREET,
(206)782-8208
jcave@clarkbarnes.com
SEATTLE WA 98119
CONTRACTOR
CONTRACTOR UNKNOWN
OWNER
SUNRISE SENIOR LIVING
7902 WESTPARK DRIVE,
(703)854-0106
MCLEAN VA 22102
INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
2/25/21
R10715
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
2/25/21
R10715
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$5,128.00
$5,128.00
2/25/21
R10715
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$4,358.80
$4,358.80
11/12/20
R8570
TOTALS: $9,551.80 $9,551.80
CONDITIONS
CONDITION TYPE STATUS NOTES
Printed: Thursday, February 25, 2021 8:42:10 AM 1 of 2
• '-rmit
PERMIT NUM
City of Edmonds
. •:� i66 1 1
WW.www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
Separate Permit Required For:
FOR
1. Plumbing
SEPARATE PERMIT REQUIRED
INFORMATION
2. Mechanical
3. Fire systems alterations
4. Washington State Department of Health
•I
Pq ITT$ M r we
• •- • C • •'- •
COMPLETED
SEQID INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-4 DRYWALL FASTENING
B-4 FIRESTOPPING
B-4 FRAMING
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL**
Printed: Thursday, February 25, 2021 8:42:10 AM 2 of 2