Loading...
Building Permit•M MERCIAL BLDG PermitCity • • • • PERMITNUM 1[7 98020BLD2020-1218 www.edmondswa.gov Type: COMMERCIAL BLDG Owner/ Business: JOHNATHON CAVE Status: ISSUED Subtype: EXISTING TENANT REMODEL Parcel No: 27032500306200 Site Address: 750 EDMONDS WAY EDMONDS,WA 98020-5126 Applied: 11/6/2020 Subdivision: 006107, BLA LL-2000-134, SP 93-30, 005546 Lot: 0 Issued: 2/25/2021 Fire Sprinklers: Yes Lot Area: Zoning: Final: Valuation: $658,000.00 Occupancy Type: Construction Type: VA Expiration Date: 2/20/2022 Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: SUNRISE SR LIVING- REMODEL WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JOHNATHON CAVE 1401 WEST GARFIELD STREET, (206)782-8208 JCAVE@CLARKBARNES.COM SEATTLE WA 98119 CONTACT CLARKI BARNES 1401 WEST GARFIELD STREET, (206)782-8208 jcave@clarkbarnes.com SEATTLE WA 98119 CONTRACTOR CONTRACTOR UNKNOWN OWNER SUNRISE SENIOR LIVING 7902 WESTPARK DRIVE, (703)854-0106 MCLEAN VA 22102 INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 2/25/21 R10715 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 2/25/21 R10715 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $5,128.00 $5,128.00 2/25/21 R10715 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $4,358.80 $4,358.80 11/12/20 R8570 TOTALS: $9,551.80 $9,551.80 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, February 25, 2021 8:42:10 AM 1 of 2 • '-rmit PERMIT NUM City of Edmonds . •:� i66 1 1 WW.www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. Separate Permit Required For: FOR 1. Plumbing SEPARATE PERMIT REQUIRED INFORMATION 2. Mechanical 3. Fire systems alterations 4. Washington State Department of Health •I Pq ITT$ M r we • •- • C • •'- • COMPLETED SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL** Printed: Thursday, February 25, 2021 8:42:10 AM 2 of 2