Building PermitType: FIRE ALARM Subtype: FIRE ALARM MODIFICATION I Status: ISSUED
Parcel No: 00610600300502 Site Address: 10117 EDMONDS WAY EDMONDS,WA 98020-5129
Subdivision: 006106, IOOF CEMETERY Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: FIRE ALARM-AES RADIO
Applied: 11/29/2021
Issued:12/13/2021
Final:
Expiration Date: 12/13/2022
Issued by: WAC
I WA State Contractor L & I #: WASHIAI282C3 I
CONTACTS
NAME TYPE
NAME
A
PHONE
EMAIL
APPLICANT
TREYVEN CHIN
2030 AIRPORT WAY S, SEATTLE
(206)436-5300
PERMITS@WASHINGTONALARM.COM
WA 98134
CONTACT
WASHINGTON ALARM
INC
2030 AIRPORT WAY S, SEATTLE
(206)436-5300
permits@washingtonalarm.com
WA 98134
2030 AIRPORT WAY S, SEATTLE
MMCILWAIN@WASHINGTONALARM.
CONTRACTOR
WASHINGTON ALARM
INC
(206)328-3288
WA 98134
COM
GOODWILL-SBI EDMONDS
232 7TH AVE N 100, SEATTLE
OWNER
LLC
WA 98109
•' •
DESCRIPTION
7CITY.T,E�CHNOLOGY
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
12/1/21
R16145
PER RMIT
FIRE ALARM - BLDG BASE FEE
001.000.322.10.000.00
$100.00
$100.00
12/1/21
R16145
MODIFICATION FEE - NUMBER OF
001.000.342.40.000.00
$150.00
$150.00
12/1/21
R16145
HEADS OR DEVICES
TOTALS: $290.00
$290.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Monday, December 13, 2021 10:53:58 AM 1 of 2
FIRE
ALARM Permit
City of Edmonds PERMIT N
www.edmondswa.gov1
1
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
INSPECTIONSSchedule
•https://Inspection.MvBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
F-0 FIRE ADDRESS VISIBLE
F-0 FIRE EXTINGUISH EXITS
F-1 FIRE ALARM ACCEPT
X-1 FIRE FINAL"
Printed: Monday, December 13, 2021 10:53:58 AM 2 of 2