ENG2021-0487 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
871
www.cityofedmonds.gov
Description: COMCAST-REAPPLYING FOR EXPIRED PERMIT ENG2021-0087
ISSUED: 12/16/2021
Address: 18407 88TH AVE W EDMONDS WA 98026-5708
EXPIRES: 06/16/2022
Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00434600001004
NAME TYPE NAME ADDRESS PHONE
APPLICANT COMCAST 1525 75TH ST SW, EVERETT WA 98203 (425)921-8201
CONTRACTOR CABLECOM LLC 20021 120TH AVE NE, SUITE 101, BOTHELL WA 98011 (360)668-1300
OWNER MCMILLAN DANIELJ 18407 88TH AVE W, EDMONDS WA 98026-5708
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00
RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
Q_� �' � 12/16/2021
RELEASED BY t1l DATE
Printed: Thursday, December 16, 2021 8:07:35 AM 1 of 2
-KRWOF WAY EUC PERMIT
ER
City of • • •
Edmonds•:• •ENG2021-04-87
www.cityofedmonds.gov• •
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND OR NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROL
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL"
Printed: Thursday, December 16, 2021 8:07:35 AM 2 of 2
ENG2021-0487
ofEDM0tio� RECEIVED
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION NOV 23 2021
Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS
Requirements outlined in Right -of -Way permit Handout E6�. DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name COMCAST - CABLE COM
Site Address or if no site address use Property Address at NW corner of project area: 18407 88TH AVE W
Associated Permits: BLD PLN ENG ENG2021-0087
Owner and Entity Holding
Name of Company COM CAST Franchise Ordinance No:
Point of ContactTERESA STEMLER
Title
Address 1525 75TH ST
City EVERETT
State WA
Zip 98203
Phone 425-770-0020
Email Teresa—stemler@comcast.com
Contractor and Authorized Agent of Owner (see note below)
Name of Company COMCAST
Contractor Contacts During Construction
Primary Name LEUA TOFAEONO
Agent Name
Title PERMIT SUPERVISOR
Title
Mobile 360-622-5388
Address20021 120TH AVE NE
Email LEUA.TOFAEONO@CABLECOMLLC. NET
City BOTHELL
State WA
Zip 98001
Secondary Name PUNA.TALO
Phone
Title PERMIT COORDINATOR
Email SNOHOMISH.PERM ITTING@CABLECOMLLC. NET
Mobile360-622-5149
City of Edmonds Business License No: N R-021 818
Email PUNA.MCILWAIN@CABLECOMLLC.NET
State License No: CABLE*971 DP
x Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
• Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
STARTING AT POLE LOCATED AT CORNER OF 18407 88TH AVE W PLACE NEW MB AND REPLACE CATV AT POLE 10 WITH NEW 2X4 CATV
THEN OVERLASH 1.500' OF .875 CAN FROM POLE 1 TO POLE 10 RETAP. REBLANCE AND REPLACE TO DESIGN AT MARKED LOCATIONS.
NO CHANGE IN SCOPE OF WORK.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk '72hours +
LF
I x
LF
SF
Alley'72 hours +
LF
Ix
I LF
SF
Parking 72 hours +
LF
Ix
I LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications o cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
x
No
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
x
If yes, describe: REPLACE CATV
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
X
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
X
Are the additions for the purpose of serving new commercial development?
x
Are the additions for the purpose of serving a single-family residential subdivision?
x
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
X
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? I I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area? 10
What is the height of the existing poles?
How many poles are to be removed? 0
Are additional poles to be laced? 0
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes: 0
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: /04"12
APPLICANT PRINTED NAME: Punamamao Mcilwain
APPLICANT TITLE: PERMIT COORDINATOR
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
11 /23/2021
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
3
Completed By:
Scott Vermeys
N
W ' _ __ p E
I'
....
�"
S
Completion Date:
3/3/2021
Address
18407 88TH AVE W, EDMONDS, WA 98026
COMICAST
Survey Revision Date:
Survey Revision Task ID:
Footages Entered On Route Overview Sheet
Engineered For:
Project Manager:
-
P2 ID:
JB0000588255
Additional Pages Needed
No
Legend
New Ped
❑
Pole
New Vault
❑v
Lock Box
Existing Ll/G
Footage
150'
Existing Aerial
Text Box
Text
New LI/G
Callout Arrow
New Aerial
New Tap
0
Interior Path
Phase Identifier
❑i
Footage Break
Power Supply
■
Fiber Splice Point
Hard Surface Cut
•
w
DETAIL 3
Provide Clear Detail about the Project
Construction Notes:
STARTING AT POLE LOCATED AT CORNER OF 18407 88TH
AVE W PLACE NEW MB AND REPLACE CATV AT POLE 10
WITH NEW 2X4 CATV THEN OVERLASH 1,500' OF .875 CATV
FROM POLE 1 TO POLE 10. RETAP, REBALANCE, AND
RESPLICE TO DESIGN AT MARKED LOCATIONS
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
'.A000 LVII,
!S
14
'3
so
ES
1 .)
..
r!
2
r0
-kNNGIM :.1*,:
1%
200
2W
M
*0
1 JZ
4A
VJ
OAf
-
EUFFER VEIBCILE ROLL AHEAD DISTANCE = R
TRANIWORTA9l.E ATTE"TOR
30 FK7 11111114,
U14VW MOST V941CLE MOOT 15000 LSL THE WUUIRM
O
YRWALL �t IN ACCORDAV41M lilt
100 R
VAXVAXIGM
VAAUFACTURERI RECON11EFOATIOK
PROTECTIVE VEHICLE
No oweirrn
NAY OE A WORK VENCA OTRATEOCALLY LOCATIbO TO SNELO
.ISIAKIt
THE WOM AREA.
REO..IRED
ROAD
WORK
AHEAD
11'
\ +�
1 ORE LANE
ROAD
AHEAD
RECEIVED
LEGEND
MAR 12 2021
FLAGONG
44
STATION
b
1F01PORARY SON LOCATION
CITY OF EDMONDS
p
CMANNIM11I43 OtYCPS
DEVELOPMENT
SERVICES DEPARTMENT
®
rRottctnr vr"Ictr
1f
PREPAIED
TO stop
W20'i!
W3006 ,*PlIOkA.L 10-
go VPII OR LE331
SIGN SPACING = X (11
MURAL HIGMYAY2 IC /U UPN
Y(ErA
RURAL AnAnS AS Is$ UP"
sms
RURAL ROAD6 L DRRAN AIMAIALS K i40 VPM
Ma
RURAL W)AW LIFT AN ANIERAL!� 21 # 10 VPM
RESDE:MrKL L eUNNESS DIS'RICTS
2002 (1)
URWA STRU79 2S UPM OR 1E98
Swa (2)
411AU 81AACNG VAv DE A044AAE0 70 ACCOVVODATE
NNT11RUCtIONS AND URVLVAYL.
(a 1146 900005 VAY BE kk:VCkD IN VWM AIrtAS 10 FIT
ROADIWY CONDIJ WX
3979 In,
e oRvkN
R
W=
184TH ST SW O C ARSA
Soo
"Mill (OPTIONAL F
q, som" OR less)
11' 11'
OE ROAD
PiSIPARED WORK
To stop AHEAD
11' +1' 11' 11'
w20•Te ONE LAZE: vrmi
ROAD
AHEAD
16' 11'
>: To 1112116TA W20-4
NN I 7! 1 x 1I I X
W2&TA
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
ENGINEERING DIVISION
APPROVED AS NOTED
ldl 1,1/Q.i10.,44p 12/14/2021
VV
ONE -LANE, TWO-WAY TRAFFIC CONTROL
WITH FLAGGERS
NIT T(' S-AI
SPACING FEE
111M
TAPER
iAlALN1
S00S
10 i0 20
00
0Yf
10 tO ?0
RO
lY10
t0 10 20
+0
Molt*
% A., WAS ARC RACK ON ORANG9.
7. "TENDING TMC CIANNESIZIN0 DEVICE TAPER ACM23
S"OIRDER 19 RECO11111"Cl
7, NgIR YNORK REQUIRES A00111"t. ROAOIWY U1lfTh6 Ar
FLAGGING STAT)ONS.Stt THE STANDARD *%CIFKA1104 FOR
A:OITIDIIA. OCTAL£.
4. Sfr SMCMI IT016120-4 POR VOW -OUR 4STRIVICHS
Completed By:
Scott Vermeys
Address:
18407 88TH AVE W, EDMONDS, WA 98026
Completion Date:
3/3/2021
Footages
COMICAST
Survey Revision Date:
New Aerial Coax
0
Overlash Coax
New UG Fiber
0
Survey Revision Task ID:
New Aerial Fiber
0
Overlash Fiber
0
Existing UG Fiber
0
Engineered For:
ISP Footage
0
New UG Coax
0
Total Aerial
Project Manager:
Conduit Only
0
Existing UG Coax
0
Total Underground
0
P2 ID:
JB0000588255
Are Additional Pages Needed
No
Total Private Footage
0
r"/ _-'-+�.•
'•
� r
f
Legend
New Ped ❑
New Vault ❑V
Pole
Lock Box
Existing U/G
Footage 150'
- •
• f� s
�
Existing Aerial
Text Box Text
I�
New U G
Callout Arrow
New Aerial
----'
New Tap
Interior Path
Phase Identifier ❑i
- `
`ti.�C
F
- <
Footage Break
PS
Power Supply
`i
Fiber Splice Point
Hard Surface Cut
."d_ Edmonds
Route Overview
Provide
Construction Notes:
Clear Detail about the Project
d.
�' FA
..
r ----- --
_ I r
STARTING AT POLE LOCATED AT CORNER OF 18407 88TH
AVE W PLACE NEW MB AND REPLACE CATV AT POLE 10
WITH NEW 2X4 CATV THEN OVERLASH 1,500' OF .875 CATV
FROM POLE 1 TO POLE 10. RETAP, REBALANCE, AND
RESPLICE TO DESIGN AT MARKED LOCATIONS
` �
185th 31-SW ..
k
SW
Pi SW
� -
I a
1!;' t1 S.
m
RECEIVEDlaw
—'
MAR 12 2021
—
PAGE LEGEND
G
#1-ROUTE OVERVIEW
#2 RIGHT OF WAY
#3-DETAIL
#4-DETAIL2
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT+.
; f •L
-- !=—•---- no p
_ ., --I
'
-�
`` '- t
d
#5-DETAIL 3
1
?
-7
I I I 1 I as
I
2
Completed By:
Scott Vermeys
N
W ' _ __ p E
S
Completion Date:
3/3/2021
Address
18407 88TH AVE W, EDMONDS, WA 98026
COMICAST
Survey Revision Date:
Survey Revision Task ID:
Footages Entered On Route Overview Sheet
Engineered For:
Project Manager:
-
P2 ID:
JB0000588255
Additional Pages Needed
No
Legend =t,�l.•J� �t=— •'
_ .
New Ped Pole ;•'►Aja•]•�, .� ��. ( � -
New Vault ❑v Lock Box �► :� r� . j ,•�� i J`4
❑ �
• _ ,,. .
Existing U/G Footage ' gam.
150'
Existing Aerial Text Box Text � _ �'� ��1111111p-
IL
New U/G Callout Arrow -lobi
New Aerial
New Tap ,
•s I
Interior Path Phase Identifier ❑i iR!
r I 7 i
Footage Break Power Supply Ps 1 ••
Fiber Splice Point ! -�s �:, • '
Hard Surface Cut O • . _ •
Right of Way � •_ ' ' 46
Provide Clear Detail about the Project
Construction Notes:
STARTING AT POLE LOCATED AT CORNER OF 18407 88TH Pole 1 f�•
AVE W PLACE NEW MB AND REPLACE CATV AT POLE 10 2r-_ems
WITH NEW 2X4 CATV THEN OVERLASH 1,500' OF .875 CATV'
FROM POLE 1 TO POLE 10. RETAP, REBALANCE, AND
RESPLICE TO DESIGN AT MARKED LOCATIONS 155 � 170' 106' 147' 92'
WP
.' "now IL
^ fly
r 1 -
RECEIVED 1W
f -
MAR 12 2021 K - • � � •- � ,
CITY OF EDMONDS 1 Ut i SW
DEVELOPMENT wAll
_
#2-RIGHT OF WAY
SERVICES DEPARTMENT -
4cJ,
� 188' R
,`
4
����� ��� -ate -.• ..-�
10i t Sw Pole 10
240' '7't .266' 136'
•
all
3
Completed By:
Scott Vermeys
N
Completion Date:
3/3/2021
Address
18407 88TH AVE W, EDMONDS, WA 98026
Survey Revision Date:
Survey Revision Task ID:
Footages Entered On Route Overview Sheet
COMICAST
--
W _ _ o E
'
� .S
Engineered For:
Project Manager:
-
P2 ID:
JB0000588255
Additional Pages Needed
No
Legend
New Ped
❑
Pole
New Vault
Lock Box
Existing U/G
Footage
150'
Existing Aerial
Text Box
Text
New U/G
Callout Arrow
New Aerial
New Tap
Interior Path
Phase Identifier
❑i
Footage Break
Power Supply
Ps
Fiber Splice Point
Hard Surface Cut
O
DETAIL
Provide Clear Detail about the Project
Construction Notes:
STARTING AT POLE LOCATED AT CORNER OF 18407 88TH
AVE W PLACE NEW MB AND REPLACE CATV AT POLE 10
WITH NEW 2X4 CATV THEN OVERLASH 1,500' OF .875 CATV
FROM POLE 1 TO POLE 10. RETAP, REBALANCE, AND
RESPLICE TO DESIGN AT MARKED LOCATIONS
RECEIVED
MAR 12 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
#3-DETAIL
184th St W �
v
Q
0
M
N
Q
182nd
00
00
M
EM
M
41,
SW
2
Completed By:
Scott Vermeys
N
Completion Date:
3/3/2021
Address
18407 88TH AVE W, EDMONDS, WA 98026
Survey Revision Date:
Survey Revision Task ID:
Footages Entered On Route Overview Sheet
COMICAST
--
W _ _ o E
'
� .S
Engineered For:
Project Manager:
-
P2 ID:
JB0000588255
Additional Pages Needed
No
Legend
New Ped
❑
Pole
New Vault
Lock Box
Existing U/G
Footage
150'
Existing Aerial
Text Box
Text
New U/G
Callout Arrow
New Aerial
New Tap
A
Interior Path
Phase Identifier
0
Footage Break
Power Supply
Ps
Fiber Splice Point
Hard Surface Cut
O
DETAIL 2
Provide Clear Detail about the Project
Construction Notes:
STARTING AT POLE LOCATED AT CORNER OF 18407 88TH
AVE W PLACE NEW MB AND REPLACE CATV AT POLE 10
WITH NEW 2X4 CATV THEN OVERLASH 1,500' OF .875 CATV
FROM POLE 1 TO POLE 10. RETAP, REBALANCE, AND
RESPLICE TO DESIGN AT MARKED LOCATIONS
RECEIVED
MAR 12 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
#4-DETAIL 2
81
EN
cc
184th St SW
3
Completed By:
Scott Vermeys
N
Completion Date:
3/3/2021
Address
18407 88TH AVE W, EDMONDS, WA 98026
Survey Revision Date:
Survey Revision Task ID:
Footages Entered On Route Overview Sheet
COMICAST
--
W _ _ o E
I,
'
I
Engineered For:
Project Manager:
-
P2 ID:
JB0000588255
Additional Pages Needed
No
Legend
New Ped
❑
Pole
New Vault
❑V
Lock Box
Existing U/G
Footage
150'
Existing Aerial
Text Box
Text
New U/G
Callout Arrow
New Aerial
New Tap
Interior Path
Phase Identifier
❑i
Footage Break
Power Supply
Ps
Fiber Splice Point
Hard Surface Cut
O
DETAIL 3
Provide Clear Detail about the Project
Construction Notes:
STARTING AT POLE LOCATED AT CORNER OF 18407 88TH
AVE W PLACE NEW MB AND REPLACE CATV AT POLE 10
WITH NEW 2X4 CATV THEN OVERLASH 1,500' OF .875 CATV
FROM POLE 1 TO POLE 10. RETAP, REBALANCE, AND
RESPLICE TO DESIGN AT MARKED LOCATIONS
RECEIVED
MAR 12 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
#5 DETAIL3
I
y�
'y
, ..
'W"I