Loading...
ENG2021-0451 ROW PERMITRIGHT OF WAY EUC PERMIT PERMITNUMBER, City of Edmonds ...0i 1 1 www.cityofedmonds.gov Description: ZIPLY-REMOVE EXISTING POLE AND TRANSFER RISERS ISSUED: 12/20/2021 Address: 555 DAYTON ST EDMONDS WA 98020-3601 EXPIRES: 06/20/2022 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00434212002100 NAME TYPE NAME ADDRESS PHONE APPLICANT ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230 CONTRACTOR PACIFIC CABLE CONSTRUCTION, INC. , EVERETT WA 98201-1255 (425)348-7735 OWNER 555 DAYTON LLC 710 WALNUT ST, EDMONDS WA 98020-3422 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 ENGINEERING INSPECTION FEE $220.00 $0.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $0.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 12/20/2021 :»•>/F9:1H ]1 DATE Printed: Monday, December 20, 20219:20:29 AM 1 of 2 -KRWOF WAY EUC PERMIT ER PERMITNUMBER, City of Edmonds ...• •ENG2021-0451 www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" E-7 TRAFFIC CTRL E-7 RESTOR LIMITS Printed: Monday, December 20, 2021 9:20:29 AM 2 of 2 ENG2021-0451 of ECIM°"os RECEIVED RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION NOV 18 2021 Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS /Ivc. i sa° Requirements outlined in Right -of -Way permit Handout E6�. DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General • Project Name 551o676 Site Address or if no site address use Property Address at NW corner of project area: 555 Dayton St. at 6th Ave. S Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) Name of Company Ziply Fiber Franchise Ordinance No: WN U-17 Point of Contact Mike HaKahan Title Engineer Address 1800 41 St St, Ste N 100 city Everett State WA Zip 98203 Phone 425-949-0230 Email mike.hakahan@ziply.com Contractor and Authorized Agent of Owner (see note below) Name of company Pacific Cable Construction Contractor Contacts Primary Name During Construction Danielle Harrera Agent Name Danielle Herrera Title Permit Manager Title Permit Manager Mobile 425-348-7735 Address PO BOX 573 Email danielle@paccab.com City Woodinville State WA Zip 98072 Secondary Name Phone 425-348-7735 Title Email danielle@paccab.com Mobile City of Edmonds Business License No: PACI FCC954PJ Email State License No: 3636CON 1096 Of Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) m Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Telecommunications and broadband provider Ziply Fiber to remove existing pole on W side of 6th Ave. S at 555 Dayton St. Risers from old pole will be transferred to existing pole at that locaiton on the other side of the sidewalk. Hand hole to be alaced at site where old pole was removed. nect exlstina Aber. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + 12 LF x 6 LF SF � Alley 72 hours + LF x LF SF Parking 72 hours + LF Ix I LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: VZtelecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes x No 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? Y If yes, describe: Hand hole to be placed where old pole is removed. 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? X 5. Does the work involve proposed additions to an aboveground utility stem? If es: x Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more X than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? 186 1 How many are to be added? 10 City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: How many poles are existing in the project area? 2 What is the height of the existing poles? 35' How many poles are to be removed? 1 Are additional poles to be laced? x How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: 7AL� C-eM4'41 APPLICANT PRINTED NAME: Micah comer APPLICANT TITLE: Field Coordinator NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 11/18/2021 City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 1] ENGINEERING DIVISION SIDEWALK RESTORATION LIMITS TO BE Applicant toushall ides or all APPROVED AS NOTED damage to utilities or frontage DETERMINED BY CITY INSPECTOR improvements in City right-of-way per city standards that is caused or 12/16/2021' occurs during the permitted project. VV SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM srs from old pole being transferred r to this existing Note: No the hydrants at this location. No city water near this location. Approximate clearance of 12' between sidewalk cut and city sewer Wwr -% � �1 s � O t1-77 Ulo pole tnat IS Deing removed. Risers are being removed and a hand hole is being placed in its location. Location of sidewalk cut and trench. This trench is to bring conduit from the newly -placed hand hole over to the new risers being installed on the existing pole. Approx. length of 6'. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE 06 OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. 11 if EIVED 18 2021 SERVICES DEPARTMENT LEGEND: O SIGNALIZED INTERSECTION O CONE (CANDLESTICK) TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS OWE WARNING SIGN (WHERE REQUIRED) DIRECTION OF TRAFFIC NOT PAVEMENT MARKINGS) FLAGGER (AS NEEDED) ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, v1AKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) WORK DETAILS: REMOVE POLE [IN W SIDE OF 6TH AVE, S. PLACE HAND HOLE IN ITS PLACE. CUT SIDEWALK TRENCH AND Q RUN CONDUIT APPROX. 9' FROM OLD POLE LCATION TO EXISTING POLE ON OTHER SIDE OF SIDEWALK. RISER UP FROM THIS CONDUIT ON EXISTING POLE AND PULL FIBER TO CONNECT CUSTOMER. e SPOTTER NEEDED FOR PEDESTRIAN e TRAFFIC AND DRIVEWAY ACCESS. PHASE 1 SIGN LEGEND: ROAD SHOULDER WORK SIDEWALK SIDEWALK CLOSED SIDEWALK CLOSED AHEAD WORK CLOSED CROs� cRos~ W20-1 W21-5 R9-9 R9-1la(R) R9-11a(L) a R9-11 a(L) b 6th Ave. S (2 5 MPH) 100' 100' WORK R911 a(R) R9-9 AREA R9-9 W21-5 W20-1 DOOD O SIDEWALK DRIVE DRIVE Y �RIVEW e o o ° ENGINEERING DIVISION B 11' MIN. G R APPROVED AS NOTED 0 11' MIN. b CIO dill U14410,,Wz 12/16/2021 VV mm� � RECEIVED w2°-1 NOV 18 2021 L 0 n 100' CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 64 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R HOST VEHICLE WEIGHT (Ibs) 9,900 TO 22,000 HOST VEHICLE WEIGHT (Ibs) > 22,000 < 45 MPH 45 - 55 MPH > 55 MPH < 45 MPH 45 - 55 MPH > 55 MPH 100, 123' 172' 74' 100, 150' NOTE: MON. - FRI. = 7:00am TO 4:00pm CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50/70 40 80 35/45 30 60 25/30 20 40 MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SHOULDER POSTED SPEED (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8 40 40 60 90 120 130 150 160 170 190 10 40 60 90 90 150 170 190 220 220 240 USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55 / 70 MPH 1500' ± RURAL HIGHWAYS 60 / 65 MPH 800' ± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' ± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. O ATCO COMMUNICATIONS SERVICES, LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 WSTCS# 012911 zi I fiber �y Everett, WA 98206 U) N 3 In o° m C E � W � N LLJ o LIJ Z v/'1 � n LJ_ � \LLI 0 U) mW C Z W W a W Z a a rZ DATE: 11.16.2021 DESIGNED BY: Micah Comer ATCO CONTACT: 830.513.2366 micah.comerfatcoteiecom.com SCALE: SHEET: = 40' 02 N0: 2 OF COPPER CABLE WORKERS DBJ 5071 RECEIVED DBJ 5481 NOV 18 2021 DBJ sss x DBJ 5761 DBJ 599 1 CITY OF EDMONDS DEVELOPMENT DBJ 628 1 SERVICES DEPARTMENT DBJ 6331 DBJ 642 1 DBJ 6441 DBJ 645 X DBJ 6461 DBJ 648 X DBJ 8281 DBJ 842 X DBJ 843 X DBJ 845 X DBJ 84x UNITS/ACCT CODES DBJ 8491 DBJ 863 X DBJ 864 X *Please note that pairs 576 & 599 appear to have been shotgun into a different cable due to the distant address per the cable run info. I I ' i REVISIONS `i zipl �m I Y a HLLK-JPN23353 Overdue .. a 555 Dayton Ave @ 117 6th Ave S PROJECT C.O. AREA, 51419 NUMBER: 5510676 EXCH. CODE: WA HALLS LAKE DRAWN DATE: ENGR: MIKE HAKAHAN CNTY: Snohomish 11/9/2021 PHONE:425.949-0230 FILE: 5510676,DWG SCALE, 1:100 TAX DISTRICT:3748F DWG 2 OF 2 r TWNSHR 27N PIN& 3E SEC 24 CONSTRUCTION NOTES • Place new 10' double alley (side) arms on new pole to hold up existing strand with fiber cable splice location at old pole location. • Open cut sidewalk and trench to lay riser cables down from old pole to new pole location with split duct and new PVC. •• Place new Quazite HH at old riser location to protect UG pathway and place (2) new 2" PVC to existing PED as well as new stic 2x3 HIH described below. •• Upsizeaexisting copper PED and lay "C13" and "C15" into upsized PED and cut off for new splice. Run new 12-pair copper drop from upsized PED up new riser at new pole to keep working customers in service at "C7," "C18," "C19," and "C20" per cable run info. •• Place new 2x3 plastic HH next to existing PED to contain new'74" & "F5" fiber cut splices. Place new 150' section of 24F & 12F cables from splice case to cut existing "F4" & "F5" cables at splice case and pull back old slack into new risers - - - and 2x3 HH for section replacement. • Remove old pole. • Be safe and have a great day! F1 1219 01.2007 0 YJD 360 HLLKWAXX FC1031,1-66+ XD,67-360 F2 394 06.2008 RBN 288 HLLKWAXX H5021,1-19+ XD,20-24+ HLLKWAXX H5021,25-29+ KD,30-33+ HLLKWAXX H5021,34-208+ XD,209-288 F3 618 06.2008 RBN 288 rLLKWAXX H5021,1-19+ XD,20-24+ c3 -iLLKWAXX H5021,25-29+ XD,30-33+ HLLKWAXX H5021,34-144+ XD,145-208+ XD,209-288 ca Fa 920 09.2012 24-FIBER 24 HLLKWAXX H5021,157-161+ XD,5-8+ c5 HLLKWAXX H5021,165-172+ (D,18-24 Fs -ILLKWAXX 96830 - 500' TAILO P.26' `�--- - - - - - I I �-- MAIN ST--------------���------ z c Ld I C a I I �3 P.27 I FRb1 2 I III c721 0 1 P. II I U) LLI> O 1 F3 I III C61i Q r--------------- I Fs 1 I cs � II --- F9 ---FB -- .7S %K 1 ry F9 F C9 C8 4 I III F4 F5 1 �^ I IIII F9 F8 1 � F4 ---------------------- F7 - - - I C3 _ C1 DAYTON ST F 1 - - - - - 230' AKF 300 24 C9EDM DBJ,1201-1254+ XD,1255+ C9EDM DBJ,1256-1260+ XD,1261+ C9EDM DBJ,1262-1286+ XD,1287+ C9EDM DBJ,1288-1297+ XD,1298+ C9EDM DBJ,1299-1500 356' MKF 1200 26 C9EDM 3R3,1-600+ C9EDM 3R3,1201-1500+ XD,1501-1800 370' AKF 400 24 C9EDM DBJ,1-100+ XD,101-150+ C9EDM DBJ,151-400 232' AKF 400 26 C9EDM DBJ,501-900 58' AKF 50 24 C9EDM DBJ,851-900 -ILLKWAXX H5021,173-178 C6 178' Fs 174 12.2008 AKF 24 RBN 24 C9EDM0 DBJ,851-900 XD,1-9+ BLDG TRM 50PR HLLKWAXX H5021,202-208+ C9EDM D321 XD,17-24 C9EDM DBJ,851-900 F� HLLKWAXX 96826 - 50' TAIL ca PED TRM 50 PAIR HLLKWAXX H5021,202-208+ HLLKWAXX 2502P7S1 XD,8-12 C9EDM DBJ,801-850 Fa HLLKWAXX 85179 - 500' TAIL C9 85' HLLKWAXX H5021,191-201+ AKF 50 26 XD,12 C9EDM DBJ,801-850 F9 HLLKWAXX 85182 - 1,000' TAIL(2)BLDG TRM 50PR PROT C9EDM D781 HLLKWAXX H5021,179-190 C9EDM DBJ,801-850 120' AE 25 24 C9EDM DBJ,651-675 BLDG TERM 51PR PROT C9EDM A613 XD,1-25+ C9EDM DBJ,651-675 245' AE 25 24 C9EDM DBJ,601-625 BLDG TERM 26PR PROT C9EDM 8291 C9EDM DBJ,601-625 ®i 125' AE 25 24 C9EDM DBJ,626-650 4688-F/50PR TERM C9EDM E414 C9EDM DBJ,626-650+ XD,651-675 ®1 332' AEF 100 24 C9EDM DBJ,501-600 0 25 C9EDM 872 C9EDM DBJ,501-525 0 0 25 C9EDM 5314 C9EDM DBJ,526-550 TRMUKN 25 2421.101 C9EDM E462 C9EDM DBJ,551-575 RECEIVED NOV 18 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT .�. MUNICIPALITY: CITY OF EDMONDS ❑ BLANKET ❑NO PERMIT REQUIRED IN TCP/TRAFFIC 91 DETAILED(NOT BLANKET) - JOINT POLE MAIN ST JFN/NJUNSTICKET# POLE OWNER: I I I I I DAYTON ST MAPLE ST4 � IIiil� MAPLE ST 41-1I - - - - - - - - - - - - - - I� LLKWAXX 5 21 FDH 48/4 2 IN: HLLKWA X FC 031,115-126+ I XD,13-28 OUT: HILL AXX H5 21,1-432 QF 3600 1201 2422.101 G C9EDM BJ IN: C9EDM 3R3,1501-1800+ C9EDM 1R3,1001-1050+ C9EDM 1 R3,1151-1500 I IIII C9EDM 3R3,2001-2100 XD,801-1200 II�I�I�I UT:C9EDM D J,1-180 + �I I 1 ITT 0D -------------- ALDER ST CONSTRUCTION REQUIREMENTS ❑ FLAGGING ❑ BRUSHING QJ CONTRACTOR SCHEDULING: JOHN WOOD - 425-261-1412 ENGINEER: MIKE HAKAHAN - 425-949-0230 FACILITIES: SHAWN CONKLIN - 425-263-4010 CUSTOMER CONTACT: CALL BEFORE YOU DIG! - 811 CONSTRUCTION START: IN SERVICE I CERTIFY THAT THE WORK I COMPLETED ON THIS WORK ORDER AND AS -BUILT IS IN COMPLIANCE WITH FRONTIER QUALITY STANDARDS AS IDENTIFIED ON THE IPQIP CHECKLIST. (SIGNATURE AND DATE) UNITS /ACCT CODES II REVISIONS I ziply fiber HLLK-JPN23353 Overdue 555 Dayton Ave @ 117 6th Ave S PROJECT C.O. EA: 51419 NUMBER. 5510676 EXCH. CODE: WA WAH EXCH. HALLS LAKE DRAWN DATE: ENGR: MIKE HAKAHAN CNTY: Snohomish 1%12021 PHONE:425-949-0230 FILE: 5510676.DWG SCALE: 1:100 TAX DISTRICT:3748F DWG 1 OF 2 TWNSHP:27N RNG: 3E SEC: 24 ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, 0AKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) uTeslas Drones Salt ano Iron K 1' 555 Dayton St, Edmonds, WA 98020 isas 1 Sa i ® Dayton St Dayto yS15 4 %I�Via' Si i A A WORK AREA Alder St 6#61 Ln ' 1 Wain 40" or Ced C„_—, a�XLiC St rn t n� O Cn VICINITY MAP ow RECEIVED NOV 18 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT O ATCO COMMUNICATIONS SERVICES, LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 WSTCS# 012911 zilyfiber p Everett, WA 98206 W LLJ L:� Ld 0 U 3 0 W Cn O C I �o 0 LO n A w DATE: 11.16.2021 DESIGNED BY. Micah Comer ATCO CONTACT. 830.513.2366 micah.comerOatcoteiecom.com SCALE: SHEET- 0 1 NO: 1 OF